1 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217

2 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted to: The Olson Company 31 Old Ranch Parkway, Suite 1 Seal Beach, CA 974 Prepared by: LSA 2 Executive Park, Suite 2 Irvine, California (949) Project No.: OLC164 April 217

3 TABLE OF CONTENTS INTRODUCTION... 1 PROJECT DESCRIPTION... 1 METHODOLOGY... 1 Intersection Level of Service Methodology... 4 Roadway Segment Level of Service Methodology... 5 Significance Criteria... 6 EXISTING CONDITION... 6 Existing Circulation System... 6 Existing Intersection Level of Service Analysis... 7 Existing Roadway Segment Level of Service Analysis... 7 FUTURE (219) BASELINE CONDITION... 7 Future (219) Baseline Intersection Level of Service Analysis... 7 Future (219) Baseline Roadway Segment Level of Service Analysis... 1 GENERAL PLAN BUILDOUT BASELINE CONDITION... 1 General Plan Buildout Baseline Intersection Level of Service Analysis... 1 General Plan Buildout Baseline Roadway Segment Level of Service Analysis... 1 PROJECT IMPACTS Trip Generation Trip Distribution and Assignment EXISTING PLUS PROJECT CONDITION Existing Plus Project Intersection Level of Service Analysis Existing Plus Project Roadway Segment Level of Service Analysis FUTURE (219) PLUS PROJECT CONDITION Future (219) Plus Project Intersection Level of Service Summary Analysis Future (219) Plus Project Roadway Segment Level of Service Analysis GENERAL PLAN BUILDOUT PLUS PROJECT CONDITION General Plan Buildout Plus Project Intersection Level of Service Analysis General Plan Buildout Plus Project Roadway Segment Level of Service Analysis ACCESS ANALYSIS CONCLUSION REFERENCES APPENDICES A: EXISTING TRAFFIC VOLUMES B: INTERSECTION CAPACITY UTILIZATION WORKSHEETS C: HIGHWAY CAPACITY MANUAL WORKSHEETS P:\OLC164\TIA 3.docx «4/5/17» i

4 FIGURES AND TABLES FIGURES Figure 1: Project Location... 2 Figure 2: Site Plan... 3 Figure 3: Existing Volumes... 8 Figure 4: Future (219) Baseline Volumes... 9 Figure 5: General Plan Buildout Baseline Traffic Volumes Figure 6: Project Trip Assignment and Distribution Figure 7: Existing Plus Project Volumes Figure 8: Future (219) Plus Project Volumes Figure 9: Trip Distribution and Assignment for Additional Units Figure 1: General Plan Buildout Plus Project Volumes... 2 TABLES Table A: Existing Intersection Level of Service Summary... 7 Table B: Future (219) Baseline Intersection Level of Service Summary... 1 Table C: General Plan Buildout Baseline Intersection Level of Service Summary Table D: Trip Generation Comparison Table E: Existing Plus Project Intersection Level of Service Summary Table F: Future (219) Plus Project Intersection Level of Service Summary Table G: Trip Generation for Additional Units Table H: General Plan Buildout Plus Project Intersection Level of Service Summary P:\OLC164\TIA 3.docx «4/5/17» ii

5 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A INTRODUCTION LSA has prepared the following analysis to identify the potential traffic impacts resulting from the development of 42 townhome dwelling units on acres (ac) near the intersection of South East Street and East South Street (proposed project) in the City of Anaheim (City), California. For the purposes of this analysis, East Street and South Street refer to the portions of South East Street and East South Street, respectively, in the immediate vicinity of the proposed project. In accordance with the scope of work, LSA has prepared this analysis consistent with the requirements of the City and with applicable provisions of the California Environmental Quality Act (CEQA). The purpose of this traffic impact analysis is to provide a focused analysis of the proposed project within the Colony District. Figure 1 shows the location of the project site. The traffic analysis for the proposed project examines six scenarios: 1. Existing conditions 2. Existing plus project conditions 3. Future (219) baseline conditions 4. Future (219) plus project conditions 5. General Plan buildout baseline conditions 6. General Plan buildout plus project conditions PROJECT DESCRIPTION The existing ac site is currently occupied by two businesses located at 711 East Street and 633 East Street. The two sites are accessed by separate unsignalized full-access driveways onto East Street. One business performs screen printing and the other is an automobile storage lot that auctions vehicles to dealerships. Auctions occur Mondays at 6: p.m. and Fridays at 12: p.m. The proposed project will demolish the existing uses and construct 42 townhome dwelling units. The two existing driveways will be consolidated into one unsignalized full-access driveway on East Street. This driveway is further analyzed in the Access Analysis section of this report. A site plan of the proposed project is illustrated on Figure 2. METHODOLOGY The study area analyzed in this report includes the following intersections: 1. East Street/Santa Ana Street 2. East Street/South Street Additionally, this report analyzes the effects to roadway average daily traffic (ADT) on East Street between Santa Ana Street and South Street. Figure 1 illustrates the locations of the intersections included in the study area. P:\OLC164\TIA 3.docx «4/5/17» 1

6 1 SANTA ANA ST EAST ST Project Site 2 SOUTH ST LEGEND - Study Area Intersection # FIGURE 1 N 2 FEET SOURCE: Google Earth 4 I:\OLC164\G\Location.cdr (12/3/216) Project Location

7 FIGURE 2 N 25 FEET SOURCE: KTGY 5 I:\OLC164\G\Site Plan.cdr (1/17/217) Site Plan

8 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Intersection Level of Service Methodology In accordance with the City s Criteria for Preparation of Traffic Impact Studies, the study area intersections were analyzed using Intersection Capacity Utilization (ICU) methodology for signalized intersections (i.e., study area intersections) and Highway Capacity Manual 21 (HCM 21) methodology for unsignalized intersections (i.e., project driveways). Traffix (Version 8.) and Synchro 9.1 are the software applications utilized to determine the levels of service (LOS) for signalized and unsignalized intersections, respectively. These programs calculate LOS based on traffic volume and intersection geometry inputs. The ICU methodology compares the amount of traffic an intersection is able to process (capacity) to the level of traffic during peak hours (volume). The resulting volume-to-capacity (v/c) ratio is expressed in terms of LOS. The HCM 21 methodology calculates the delay experienced by all movements through an intersection. At a two-way, stop-controlled intersection (i.e., unsignalized intersections where the main street is uncontrolled and the minor street has to stop before finding a gap to enter the main street), delay is reported for the most delayed approach. LOS criteria for intersections are presented below. LOS Descriptions. LOS is a qualitative assessment of the quantitative effects of such factors as traffic volume, roadway geometrics, speed, delay, and maneuverability on roadway and intersection operations. LOS is assigned along the following letter gradient where LOS A represents free-flow activity, and LOS F represents overcapacity operation: LOS A: No approach phase is fully utilized by traffic, and no vehicle waits longer than one red indication. Typically, the approach appears quite open, turns are made easily, and nearly all drivers find freedom of operation. LOS B: This service level represents stable operation, where an occasional approach phase is fully utilized, and a substantial number are nearing full use. Many drivers begin to feel restricted within platoons of vehicles. LOS C: This level still represents stable operating conditions. Occasionally, drivers may have to wait through more than one red signal indication, and backups may develop behind turning vehicles. Most drivers feel somewhat restricted, but not objectionably so. LOS D: This level encompasses a zone of increasing restriction approaching instability at the intersection. Delays to approaching vehicles may be substantial during short peaks within the peak period; however, enough cycles with lower demand occur to permit periodic clearance of developing queues, thus preventing excessive backups. LOS E: Capacity occurs at the upper end of this service level. It represents the most vehicles that any particular intersection approach can accommodate. Full utilization of every signal cycle is attained no matter how great the demand. LOS F: This level describes forced-flow operations at low speeds, where volumes exceed capacity. These conditions usually result from queues of vehicles backing up from a restriction downstream. Speeds are reduced substantially, and stoppages may occur for short or long periods of time due to the congestion. In the extreme case, speed can drop to zero. P:\OLC164\TIA 3.docx «4/5/17» 4

9 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A The relationship between LOS and the delay (in seconds) or v/c ratio at unsignalized and signalized intersections is as follows: Level of Service Delay (seconds) (HCM Methodology) Volume-to-Capacity Ratio (ICU Methodology) A 1. <.6 B >1. and C >15. and D >25. and E >35. and F >5. > 1. HCM = Highway Capacity Manual ICU = intersection capacity utilization The City s guidelines specify the use of a saturation flow rate of 1,7 vehicles per lane per hour and a clearance interval factor of 5 percent. These have been applied in the analysis of all signalized study area intersections. Roadway Segment Level of Service Methodology Using the same v/c methodology discussed above, daily roadway link v/c ratios were determined using roadway volume data and the theoretical daily capacities determined by the Circulation Element of the Orange County General Plan. Existing and future roadway volumes are based on volume data collected via pneumatic tube along East Street on Tuesday, December 2, 216. The theoretical daily capacity of a roadway is dependent on roadway classification, as shown in the table below. Type of Arterial Daily Capacity Eight Lanes Divided 75, Six Lanes Divided 56,3 Four Lanes Divided 37,5 Four Lanes (Undivided) 25, Two Lanes (Undivided) 12,5 Source: Orange County General Plan, Circulation Element, Table IV-2B. For roadway segments, the City General Plan establishes a target of LOS C. If a segment is found to operate at LOS D, E, or F under daily conditions, its operation is also analyzed under peak-hour conditions. If the roadway segment also operates at LOS D, E, or F under peak-hour conditions and project traffic increases the daily v/c ratio by.1 or greater, then the project is determined to have a significant impact. The relationship between LOS and the v/c ratio for roadways is shown in the following table. P:\OLC164\TIA 3.docx «4/5/17» 5

10 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Level of Service V/C Ratio A <.6 B.61.7 C.71.8 D.81.9 E F > 1. V/C = volume-to-capacity Significance Criteria A transportation impact on an intersection is considered significant in accordance with the following table. The Final V/C Ratio includes the future v/c ratio at an intersection, considering traffic from existing conditions, ambient growth, approved/related projects, and the proposed project but without any proposed mitigation. Mitigation is required for any intersection where project traffic is considered to have a significant impact. Level of Service Final V/C Ratio Project-Related Increase in V/C Ratio C > D > E, F >.91.1 Source: City of Anaheim, Criteria for Preparation of Traffic Impact Studies. V/C = volume-to-capacity EXISTING CONDITION Existing Circulation System Key roadways in the vicinity of the proposed project are as follows: East Street: East Street is a north-south roadway located east of and adjacent to the project site and is classified as a Secondary Arterial by the City s General Plan Circulation Element. East Street is a four-lane roadway divided by a two-way left-turn (TWLT) lane that acts as a median. East Street provides direct access to the project site and therefore facilitates all of the trips generated by the project. The posted speed limit on East Street is 35 miles per hour (mph). There are sidewalks provided on both sides of the street. There are no bike lanes, and on-street parking is not permitted. South Street: South Street is an east-west roadway located south of the project site and is classified as a Collector Street by the City s General Plan Circulation Element. It is a two-lane, undivided roadway. The posted speed limit on South Street is 35 mph. There are sidewalks on both sides of the street, and on-street parking is permitted. Bike lanes are not provided. Santa Ana Street: Santa Ana Street is an east-west roadway located north of the project site and is classified as a Collector Street by the City s General Plan Circulation Element. It is a two-lane undivided roadway. The posted speed limit on Santa Ana Street is 35 mph. There are sidewalks on both sides of the street, and on-street parking is permitted. Bike lanes are not provided. P:\OLC164\TIA 3.docx «4/5/17» 6

11 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Existing Intersection Level of Service Analysis Vehicle turning volumes were collected for the study area intersections during the peak morning (7: a.m. 9: a.m.) and evening (4: p.m. 6: p.m.) commute periods. LSA confirmed schools were in session with typical hours prior to scheduling data collection. Peak-hour intersection turn volumes were surveyed on a typical weekday (Tuesday, December 2, 216) at the two study area intersections. These volumes were taken in 15-minute increments and then totaled as hourly volumes, which is the standard procedure for volume data collection. Figure 3 presents the existing a.m. and p.m. peak-hour turn movement volumes for the study area intersections as determined by this method. The traffic volume data sheets are provided in Appendix A. Table A summarizes the results of the existing a.m. and p.m. peak-hour LOS analysis for the two study area intersections. All ICU analysis worksheets are provided in Appendix B. As Table A indicates, all study area intersections operate at an acceptable LOS (i.e., LOS D or better) in the a.m. and p.m. peak hours. Table A: Existing Intersection Level of Service Summary Study AM Peak Hour PM Peak Hour Area No. Intersections V/C Ratio LOS V/C Ratio LOS 1 East Street/Santa Ana Street.43 A.5 A 2 East Street/South Street.6 A.56 A LOS = level of service V/C = volume-to-capacity Existing Roadway Segment Level of Service Analysis According to the volume data collected on Tuesday, December 2, 216, the existing daily traffic volume on East Street between Santa Ana Street and South Street is approximately 13,552 average daily traffic (ADT). With a roadway capacity of 37,5 ADT, this roadway segment operates with a v/c ratio of.36. The study area roadway segment operates at a satisfactory LOS A in the existing condition. FUTURE (219) BASELINE CONDITION The proposed project is anticipated to be completed by 219. LSA did not identify any approved or pending projects in the vicinity of the proposed project that would have the potential to add measurable traffic to the study intersections. In order to account for ambient traffic growth in future year baseline traffic volumes, existing roadway and intersection volumes were escalated 1 percent per year, for a total of 2 percent over the next 2 years. Future (219) Baseline Intersection Level of Service Analysis Intersection geometrics at the study area intersections are not anticipated to change by the project opening year. The future a.m. and p.m. peak-hour traffic volumes are shown on Figure 4. Table B summarizes the results of the future a.m. and p.m. peak-hour LOS analysis for both study area P:\OLC164\TIA 3.docx «4/5/17» 7

12 57 / / / / / / / 7 34 / / / / / / / / / / / / / / / / / 58 1 East Street/Santa Ana Street 2 East Street/South Street FIGURE 3 XXX / YYY AM / PM Volume Existing Volumes P:\OLC164\xls\Fig 3 - Existing Volumes.xls (1/3/217)

13 58 / 96 6 / / / / / / / / / / / / / / / / / / / / / / / 59 1 East Street/Santa Ana Street 2 East Street/South Street FIGURE 4 XXX / YYY AM / PM Volume Future (219) Baseline Volumes P:\OLC164\xls\Figure 4 - Future (219) Baseline Volumes.xls (3/1/217)

14 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Table B: Future (219) Baseline Intersection Level of Service Summary Study Area AM Peak Hour PM Peak Hour No. Intersections V/C Ratio LOS V/C Ratio LOS 1 East Street/Santa Ana Street.44 A.51 A 2 East Street/South Street.61 B.57 A LOS = level of service V/C = volume-to-capacity intersections. As this table indicates, all study area intersections operate at an acceptable LOS in the a.m. and p.m. peak hours in the future (219) baseline condition. Future (219) Baseline Roadway Segment Level of Service Analysis Existing roadway traffic volume was also escalated by 2 percent to account for regional traffic growth. The projected future daily volume along East Street between Santa Ana Street and South Street is 13,823 ADT. With a capacity of 37,5 ADT, this roadway segment operates with a v/c ratio of.37. The study area roadway segment operates at a satisfactory LOS A in the future (219) baseline condition. GENERAL PLAN BUILDOUT BASELINE CONDITION The City analyzed the conversion of this property to residential with the certified Housing Opportunities Rezoning Project (Supplemental Environmental Impact Report [SEIR] 346). At that time, a density of 18 dwelling units per acre (32 dwelling units) was analyzed. The City of Anaheim Housing Opportunities Rezoning Project SEIR 346 Technical Traffic Study (Iteris, July 213) included the intersection of East Street/South Street in the analysis. This data forms the baseline for analysis of the proposed project, which increases the number of dwelling units to 42. General Plan Buildout Baseline Intersection Level of Service Analysis Intersection geometrics at the study area intersections are anticipated to change slightly in the General Plan buildout. The southbound and northbound approaches at East Street/South Street currently have one right-turn, one through, and one left-turn movement for each approach. According to the General Plan, the right-turn only lane will become a shared through-right lane on both approaches. The General Plan buildout a.m. and p.m. peak-hour traffic volumes from the Housing Opportunities Rezoning Project SEIR 346 Technical Traffic Study are shown on Figure 5. Table C summarizes the results of the future a.m. and p.m. peak-hour LOS analysis for all study area intersections. As Table C indicates, all study area intersections operate at an acceptable LOS in the a.m. and p.m. peak hours in the General Plan buildout baseline condition. General Plan Buildout Baseline Roadway Segment Level of Service Analysis The City of Anaheim Housing Opportunities Rezoning Project SEIR 346 Technical Traffic Study (Iteris, July 213) did not analyze daily traffic conditions along East Street or South Street. Roadway P:\OLC164\TIA 3.docx «4/5/17» 1

15 72 / / / / / / 4 59 / 7 72 / / / / / / / / / / / / / / 65 3 / / / 54 1 East Street/Santa Ana Street 2 East Street/South Street FIGURE 5 XXX / YYY AM / PM Volume General Plan Buildout Baseline Volumes Source:Housing Opportunities Rezoning Project SEIR 346 Technical Traffic Study (Iteris, July 213) P:\OLC164\xls\Figure 5 - GP Buildout Baseline Volumes.xls (3/1/217)

16 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Table C: General Plan Buildout Baseline Intersection Level of Service Summary Study AM Peak Hour PM Peak Hour Area No. Intersections V/C Ratio LOS V/C Ratio LOS 1 East Street/Santa Ana Street.6 A.59 A 2 East Street/South Street.8 C.72 C LOS = level of service volumes on East Street for the General Plan buildout scenarios have therefore been developed using the p.m. peak-hour intersection turn movement volumes. The General Plan buildout intersection turn movement volumes disclosed in SEIR 346 indicate a p.m. peak-hour volume of 2,3 vehicles along East Street. By applying an industry standard factor (i.e., 1 percent of daily traffic occurs during the p.m. peak hour), the General Plan buildout daily volume along East Street between Santa Ana Street and South Street is estimated at 2,3 ADT. With a capacity of 37,5 ADT, this roadway segment operates with a v/c ratio of.54. The study area roadway segment operates at a satisfactory LOS A in the General Plan buildout baseline condition. PROJECT IMPACTS Trip Generation As stated previously, the project site is currently occupied by two businesses: one performs screen printing, and the other is an automobile storage lot that auctions vehicles to dealerships. Auctions occur Mondays at 6: p.m. and Fridays at 12: p.m. Neither business is easily placed into an Institute of Transportation Engineers (ITE) Trip Generation category. In order to calculate existing trip generation, LSA contracted with an independent data collection company to obtain driveway volumes in the p.m. peak hour on Monday, December 19, 216 (auction day) and in a.m. and p.m. peak hours the following Tuesday, December 2, 216 (typical weekday) for 711 East Street (Driveway 1) and 633 East Street (Driveway 2). Given the potential for parking intrusion into the nearby residential neighborhood, pedestrian traffic into 633 East Street was also noted. For the purposes of determining the trip generation for the existing sites, the typical weekday volumes were used. However, it should be noted that the survey during the auction period on Monday showed a slightly higher volume of vehicles along with pedestrian volumes from vehicles parked in a nearby residential neighborhood. According to the driveway vehicular volumes, the combined volume of the two driveways (i.e., existing trip generation) was 16 a.m. peak-hour trips (11 inbound and 5 outbound), and 33 p.m. peakhour trips (9 inbound and 24 outbound) on a typical weekday. The trip generation potential of the proposed project was calculated using a trip generation rate for townhomes found in the ITE Trip Generation, Ninth Edition (212). The trip generation comparison for the proposed project is summarized in Table D. As Table D indicates, the proposed project is anticipated to generate 244 daily trips, 19 a.m. peak-hour trips (3 inbound and 16 outbound), and 22 P:\OLC164\TIA 3.docx «4/5/17» 12

17 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Table D: Trip Generation Comparison AM Peak Hour PM Peak Hour Land Use Size Unit ADT In Out Total In Out Total Existing Trip Generation 1 Driveway 1 (711 East Street) Driveway 2 (633 East Street) Subtotal Proposed Project Trip Rates 2 Residential Condominium/Townhome (23) DU Proposed Project Trip Generation Townhomes 42 DU Net Trip Generation (Proposed - Existing) (8) (17) (11) 1 Trip generation based on the existing driveway volumes from Tuesday, December 2, Trip rates based on the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th Edition (212). ADT = average daily traffic DU = dwelling units p.m. peak-hour trips (15 inbound and 7 outbound). With the project, there are 3 additional a.m. peakhour trips and 11 fewer p.m. peak-hour trips than the existing condition. Trip Distribution and Assignment The potential routes from the project (north to Lincoln Avenue, east to State College Boulevard, south to Ball Road, and west to Harbor Boulevard) appear to have relatively equal utility. Therefore, LSA distributed project trips equally in all directions with east-west movements assigned to South Street. Figure 6 illustrates the net project trip distribution and the a.m. and p.m. peak-hour trip assignment volumes. EXISTING PLUS PROJECT CONDITION The net project trips were added to the existing traffic volumes at the study area intersections and roadway segments. Figure 7 shows the resulting existing plus project a.m. and p.m. peak-hour traffic volumes. Existing Plus Project Intersection Level of Service Analysis Table E summarizes the results of the existing plus project a.m. and p.m. peak-hour LOS analysis for all study area intersections. As Table E indicates, all study area intersections are anticipated to operate at an acceptable LOS (i.e., LOS D or better) in the a.m. and p.m. peak hours with implementation of the proposed project. Based on the City s criteria for determining significant traffic impacts (as described in the Methodology section of this report), the proposed project is not expected to result in a significant impact at any of the study area intersections. P:\OLC164\TIA 3.docx «4/5/17» 13

18 25% 25% 25% 25% -2 / 1-2 / 1-2 / 2 3 / -4 2 / -5 3 / -4 3 / -4-2 / 2 1 East Street/Santa Ana Street 2 East Street/South Street FIGURE 6 XXX / YYY AM / PM Volume # Trip Distribution Percentage Net Project Trip Assignment and Distribution P:\OLC164\xls\Figure 6 - Net Project Trip Assignment and Distribution.xls (3/1/217)

19 57 / / / / / / / 7 32 / / / / / / / / / / / / / / 4 19 / / / 58 1 East Street/Santa Ana Street 2 East Street/South Street FIGURE 7 XXX / YYY AM / PM Volume Existing Plus Project Volumes P:\OLC164\xls\Figure 7 - Existing Plus Project Volumes.xls (3/1/217)

20 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Table E: Existing Plus Project Intersection Level of Service Summary Study Area No. Baseline Plus Project AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour V/C Ratio LOS V/C Ratio LOS V/C Ratio LOS V/C Ratio LOS Intersections 1 East Street/Santa Ana Street.43 A.5 A.43 A.5 A 2 East Street/South Street.6 A.56 A.6 B.56 A LOS = level of service V/C = volume-to-capacity Existing Plus Project Roadway Segment Level of Service Analysis With the addition of 244 ADT generated by the project to the existing ADT of 13,552, the existing plus project ADT along East Street between Santa Ana Street and South Street is 13,796 trips. With a capacity of 37,5 ADT, this roadway segment operates with a v/c ratio of.37. The study area roadway segment will continue to operate at a satisfactory LOS A in the existing plus project condition. According to this analysis, the study area roadway segments operate at a satisfactory LOS with the addition of the project. FUTURE (219) PLUS PROJECT CONDITION Traffic generated by the project was added to the future (219) traffic volumes at each study area intersection and roadway segment. Figure 8 illustrates the resulting future (218) plus project a.m. and p.m. peak-hour traffic volumes. Future (219) Plus Project Intersection Level of Service Summary Analysis Table F summarizes the results of the future (219) plus project a.m. and p.m. peak-hour LOS analysis for all study area intersections. As Table F indicates, all study area intersections are anticipated to operate at an acceptable LOS (i.e., LOS D or better) in the a.m. and p.m. peak hours with implementation of the proposed project. Table F: Future (219) Plus Project Intersection Level of Service Summary Study Baseline Plus Project Area AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour No. Intersections V/C Ratio LOS V/C Ratio LOS V/C Ratio LOS V/C Ratio LOS 1 East Street/Santa Ana Street.44 A.51 A.44 A.51 A 2 East Street/South Street.61 B.566 A.61 B.57 A LOS = level of service V/C = volume-to-capacity Based on the City s criteria for determining significant traffic impacts (as described in the Methodology section of this report), the proposed project is not expected to result in a significant impact at any of the study area intersections. P:\OLC164\TIA 3.docx «4/5/17» 16

21 58 / / / / / / / / / / / / / / / / / / / / / / / / 59 1 East Street/Santa Ana Street 2 East Street/South Street FIGURE 8 XXX / YYY AM / PM Volume Future (219) Plus Project Volumes P:\OLC164\xls\Figure 8 - Future (219) Plus Project Volumes.xls (3/1/217)

22 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Future (219) Plus Project Roadway Segment Level of Service Analysis With the addition of 244 ADT generated by the project to the future (219) ADT of 13,823, the future (219) plus project ADT along East Street between Santa Ana Street and South Street is 14,67 trips. With a capacity of 37,5 ADT, this roadway segment operates with a v/c ratio of.38. The study area roadway segment will continue to operate at a satisfactory LOS A in the future (219) plus project condition. According to this analysis, the study area roadway segments operate at a satisfactory LOS with the addition of the project. GENERAL PLAN BUILDOUT PLUS PROJECT CONDITION As mentioned above, the General Plan buildout baseline scenario is based on the data from the City s SEIR 346, where the conversion of the property to residential land use has already been analyzed. The 32 dwelling units previously analyzed are less than the currently proposed 42 dwelling units. In order to add the project to the General Plan buildout scenario, the trip generation for the additional 1 units has been calculated using rates from ITE Trip Generation and is included in Table G. Table G: Trip Generation for Additional Units AM Peak Hour PM Peak Hour Land Use Size Unit ADT In Out Total In Out Total Trip Rates 1 Residential Condominium/Townhome (23) DU Proposed Project Trip Generation Townhomes (23) 1 DU Trip rates based on the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th Edition (212). ADT = average daily traffic DU = dwelling units In the same manner that the net project trips were assigned, LSA distributed new project trips equally in all directions with east-west movements assigned to South Street. Figure 9 illustrates the net project trip distribution and the a.m. and p.m. peak-hour trip assignment volumes. The resulting project trip assignments were overlaid onto the General Plan baseline to determine the General Plan plus project traffic volume and LOS at the study intersections. Figure 1 illustrates the resulting General Plan buildout plus project a.m. and p.m. peak-hour traffic volumes. General Plan Buildout Plus Project Intersection Level of Service Analysis Table H summarizes the results of the General Plan buildout plus project a.m. and p.m. peak-hour LOS analysis for all study area intersections. As Table H indicates, all study area intersections are anticipated to continue to operate at an acceptable LOS in the a.m. and p.m. peak hours with implementation of the proposed project. General Plan Buildout Plus Project Roadway Segment Level of Service Analysis With the addition of 58 ADT generated by the project to the General Plan buildout baseline ADT of 2,3, the General Plan buildout plus project ADT along East Street between Santa Ana Street and P:\OLC164\TIA 3.docx «4/5/17» 18

23 25% 25% 25% 25% / 1 1 / 1 / 1 1 / 1 / 1 1 / 1 1 / / 1 1 East Street/Santa Ana Street 2 East Street/South Street FIGURE 9 XXX / YYY AM / PM Volume # Trip Distribution Percentage Trip Distribution and Assignment for Additional Units P:\OLC164\xls\Figure 9 - Trip Distribution and Assignment for Additional Units.xls (3/1/217)

24 72 / / / / / / 4 59 / 7 73 / / / / / / / / / / / / / / 66 3 / / / 54 1 East Street/Santa Ana Street 2 East Street/South Street FIGURE 1 XXX / YYY AM / PM Volume General Plan Buildout Plus Project Volumes P:\OLC164\xls\Figure 9 - GP Buildout Plus Project Volumes.xls (3/1/217)

25 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A Table H: General Plan Buildout Plus Project Intersection Level of Service Summary Study Area No. Baseline Plus Project AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour V/C Ratio LOS V/C Ratio LOS V/C Ratio LOS V/C Ratio LOS Intersections 1 East Street/Santa Ana Street.6 A.59 A.6 A.59 A 2 East Street/South Street.8 C.72 C.8 C.72 C LOS = level of service V/C = volume-to-capacity South Street is 2,358 trips. With a capacity of 37,5 ADT, this roadway segment operates with a v/c ratio of.54. The study area roadway segment will continue to operate at a satisfactory LOS A in the General Plan buildout plus project condition. Based on the City s criteria for determining significant traffic impacts (as described in the Methodology section of this report), the proposed project is not expected to result in a significant impact at any of the study area intersections or roadway segments. ACCESS ANALYSIS As discussed in the project description, the project will consolidate the two existing driveways on East Street into one unsignalized full-access driveway. In order to assess the operation of the driveway, LSA used northbound and southbound roadway volumes collected by pneumatic tube and anticipated project turn volumes to calculate peak-hour LOS at the proposed project driveway. On Tuesday, December 2, 216, the a.m. peak hour occurred at 7:15 a.m., and the p.m. peak hour occurred at 4:15 p.m. Because the proposed project driveway will be unsignalized, LSA calculated delay and LOS using HCM 21 methodology. Analysis of the unsignalized driveway has been conducted for the proposed driveway using northbound and southbound roadway volumes collected by pneumatic tube along East Street and anticipated project turn volumes. All HCM worksheets have been attached in Appendix C. According to this analysis, the project driveway is expected to operate at a satisfactory LOS with 12.1 seconds of delay (LOS B) in the a.m. peak hour and 1.6 seconds of delay (LOS B) in the p.m. peak hour. CONCLUSION Based on the results of this traffic impact analysis, the proposed 42 townhome dwelling units can be implemented without significantly impacting the circulation system. All study area intersections are anticipated to operate at a satisfactory LOS in both a.m. and p.m. peak hours with the addition of project traffic. LSA also examined the project access driveway and determined that the project can be expected to function adequately without interference to the arterial street system. P:\OLC164\TIA 3.docx «4/5/17» 21

26 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A REFERENCES City of Anaheim, Criteria for Preparation of Traffic Impact Studies Iteris. 213, July. Housing Opportunities Rezoning Project SEIR 346 Technical Traffic Study. Institute of Transportation Engineers ITE Trip Generation, Ninth Edition. Orange County General Plan, Circulation Element, Table IV-2B. Transportation Research Board of the National Academies. 21. HCM21 Highway Capacity Manual. P:\OLC164\TIA 3.docx «4/5/17» 22

27 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A APPENDIX A EXISTING TRAFFIC VOLUMES P:\OLC164\TIA 3.docx «4/5/17»

28 S East St and E Santa Ana St, Anaheim S East St and E South St, Anaheim Peak Hour Summary Peak Hour Summary Date: 12/2/216 Southbound Approach Project #: Date: 12/2/216 Southbound Approach Project #: Day: Tuesday Lanes 2 1 City: Anaheim Day: Tuesday Lanes City: Anaheim AM AM AM AM S East St NOON NOON AM Peak Hour 715 AM S East St NOON NOON AM Peak Hour 715 AM NOON Peak Hour NOON Peak Hour PM PM PM Peak Hour 43 PM PM PM PM Peak Hour 415 PM Eastbound Approach E Santa Ana St AM NOON PM AM NOON PM Lanes CONTROL Signalized Lanes AM NOON PM AM NOON PM Westbound Approach Eastbound Approach E South St AM NOON PM AM NOON PM Lanes CONTROL Signalized Lanes AM NOON PM AM NOON PM Westbound Approach Count Periods Start End AM AM Count Periods Start End AM AM AM 7: AM 9: AM NOON NOON AM 7: AM 9: AM NOON NOON NOON NONE NONE PM PM NOON NONE NONE PM PM PM 4: PM 6: PM 1 2 Lanes PM 4: PM 6: PM Lanes Northbound Approach Northbound Approach Total Ins & Outs Total Volume Per Leg Total Ins & Outs Total Volume Per Leg North Leg North Leg North Leg North Leg AM 123 AM NOON NOON PM 13 PM AM NOON PM East Leg AM NOON PM East Leg West Leg AM NOON PM West Leg AM NOON PM AM 948 AM NOON NOON PM 1116 PM AM NOON PM East Leg AM NOON PM East Leg West Leg AM NOON PM West Leg AM NOON PM AM AM 98 AM AM 97 NOON NOON NOON NOON PM PM 1172 PM PM 174 South Leg South Leg South Leg South Leg

29 S East St and Dwy 1 (711 S East St), Anaheim S East St and Dwy 2 (633 S East St), Anaheim Peak Hour Summary Peak Hour Summary Date: 12/19/216 Southbound Approach Project #: Date: 12/19/216 Southbound Approach Project #: Day: Monday Lanes 2 City: Anaheim Day: Monday Lanes 2 City: Anaheim AM AM AM AM S East St NOON NOON AM Peak Hour S East St NOON NOON AM Peak Hour NOON Peak Hour NOON Peak Hour PM PM PM Peak Hour 5 PM PM PM PM Peak Hour 43 PM Eastbound Approach Dwy 1 (711 S East St) AM NOON PM AM NOON PM Lanes 11 CONTROL 11 No Control Lanes AM NOON PM AM NOON PM Westbound Approach Eastbound Approach Dwy 2 (633 S East St) AM NOON PM AM NOON PM Lanes 12 CONTROL 12 No Control Lanes AM NOON PM AM NOON PM Westbound Approach Count Periods Start End AM AM Count Periods Start End AM AM AM NONE NONE NOON NOON AM NONE NONE NOON NOON NOON NONE NONE PM PM NOON NONE NONE PM PM PM 4: PM 6: PM 2 Lanes PM 4: PM 6: PM 2 Lanes Northbound Approach Northbound Approach Total Ins & Outs Total Volume Per Leg Total Ins & Outs Total Volume Per Leg North Leg North Leg North Leg North Leg AM AM NOON NOON PM PM AM NOON PM East Leg AM NOON PM East Leg West Leg AM NOON PM West Leg AM NOON PM AM AM NOON NOON PM PM AM NOON PM East Leg AM NOON PM East Leg West Leg AM NOON PM West Leg AM NOON PM AM AM AM AM NOON NOON NOON NOON PM PM PM PM South Leg South Leg South Leg South Leg

30 S East St and Dwy 1 (711 S East St), Anaheim S East St and Dwy 2 (633 S East St), Anaheim Peak Hour Summary Peak Hour Summary Date: 12/2/216 Southbound Approach Project #: Date: 12/2/216 Southbound Approach Project #: Day: Tuesday Lanes 2 City: Anaheim Day: Tuesday Lanes 2 City: Anaheim AM AM AM AM S East St NOON NOON AM Peak Hour 8 AM S East St NOON NOON AM Peak Hour 8 AM NOON Peak Hour NOON Peak Hour PM PM PM Peak Hour 415 PM PM PM PM Peak Hour 415 PM Eastbound Approach Dwy 1 (711 S East St) AM NOON PM AM NOON PM Lanes 6 7 CONTROL 6 7 No Control Lanes AM NOON PM AM NOON PM Westbound Approach Eastbound Approach Dwy 2 (633 S East St) AM NOON PM AM NOON PM Lanes 5 2 CONTROL 5 2 No Control Lanes AM NOON PM AM NOON PM Westbound Approach Count Periods Start End AM AM Count Periods Start End AM AM AM 7: AM 9: AM NOON NOON AM 7: AM 9: AM NOON NOON NOON NONE NONE PM PM NOON NONE NONE PM PM PM 4: PM 6: PM 2 Lanes PM 4: PM 6: PM 2 Lanes Northbound Approach Northbound Approach Total Ins & Outs Total Volume Per Leg Total Ins & Outs Total Volume Per Leg North Leg North Leg North Leg North Leg AM AM NOON NOON PM PM AM NOON PM East Leg AM NOON PM East Leg West Leg AM NOON PM West Leg AM NOON PM AM AM NOON NOON PM PM AM NOON PM East Leg AM NOON PM East Leg West Leg AM NOON PM West Leg AM NOON PM AM AM AM AM NOON NOON NOON NOON PM PM PM PM South Leg South Leg South Leg South Leg

31

32

33 L S A A P R I L T R A F F I C I M P A C T A N A L Y S I S E A S T A N D S O U T H S T R E E T C I T Y O F A N A H E I M, C A L I F O R N I A APPENDIX B INTERSECTION CAPACITY UTILIZATION WORKSHEETS P:\OLC164\TIA 3.docx «4/5/17»

34 1 Existing Baseline AM Tue Jan 3, :57:18 Page 2-1 OLC164 1 Existing Baseline AM Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #1 East Street and Santa Ana Street, Anaheim, CA Cycle (sec): 1 Critical Vol./Cap.(X):.433 Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx Optimal Cycle: 21 Level Of Service: A Street Name: East Street Santa Ana Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: Y+R: Lanes: Volume Module: Base Vol: Growth Adj: Initial Bse: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** 1 Existing Baseline AM Tue Jan 3, :57:19 Page 3-1 OLC164 1 Existing Baseline AM Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #2 East Street and South Street, Anaheim, CA Cycle (sec): 1 Critical Vol./Cap.(X):.61 Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx Optimal Cycle: 29 Level Of Service: B Street Name: East Street South Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: Y+R: Lanes: Volume Module: Base Vol: Growth Adj: Initial Bse: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** Traffix (c) 28 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA Traffix (c) 28 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA

35 1 Existing Baseline PM Tue Jan 3, :57:4 Page 2-1 OLC164 1 Existing Baseline PM Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #1 East Street and Santa Ana Street, Anaheim, CA Cycle (sec): 1 Critical Vol./Cap.(X):.51 Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx Optimal Cycle: 24 Level Of Service: A Street Name: East Street Santa Ana Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: Y+R: Lanes: Volume Module: Base Vol: Growth Adj: Initial Bse: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** 1 Existing Baseline PM Tue Jan 3, :57:4 Page 3-1 OLC164 1 Existing Baseline PM Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #2 East Street and South Street, Anaheim, CA Cycle (sec): 1 Critical Vol./Cap.(X):.556 Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx Optimal Cycle: 26 Level Of Service: A Street Name: East Street South Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: Y+R: Lanes: Volume Module: Base Vol: Growth Adj: Initial Bse: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** Traffix (c) 28 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA Traffix (c) 28 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA

36 2 Future Baseline AM Tue Jan 3, :58:46 Page 2-1 OLC164 2 Future Baseline AM Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #1 East Street and Santa Ana Street, Anaheim, CA Cycle (sec): 1 Critical Vol./Cap.(X):.44 Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx Optimal Cycle: 21 Level Of Service: A Street Name: East Street Santa Ana Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: Y+R: Lanes: Volume Module: Base Vol: Growth Adj: Initial Bse: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** 2 Future Baseline AM Tue Jan 3, :58:46 Page 3-1 OLC164 2 Future Baseline AM Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #2 East Street and South Street, Anaheim, CA Cycle (sec): 1 Critical Vol./Cap.(X):.612 Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx Optimal Cycle: 3 Level Of Service: B Street Name: East Street South Street Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Permitted Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: Y+R: Lanes: Volume Module: Base Vol: Growth Adj: Initial Bse: User Adj: PHF Adj: PHF Volume: Reduct Vol: Reduced Vol: PCE Adj: MLF Adj: FinalVolume: Saturation Flow Module: Sat/Lane: Adjustment: Lanes: Final Sat.: Capacity Analysis Module: Vol/Sat: Crit Moves: **** **** **** **** Traffix (c) 28 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA Traffix (c) 28 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

TRAFFIC IMPACT ANALYSIS. Photo here CAL MET ROYAL MRF EXPANSION. City of Paramount, CA. arch beach C O N S U L T I N G.

TRAFFIC IMPACT ANALYSIS. Photo here CAL MET ROYAL MRF EXPANSION. City of Paramount, CA. arch beach C O N S U L T I N G. TRAFFIC IMPACT ANALYSIS z Photo here CAL MET ROYAL MRF EXPANSION City of Paramount, CA arch beach C O N S U L T I N G June 23, 214 TRAFFIC IMPACT ANALYSIS CAL MET ROYAL MATERIALS RECOVERY FACILITY (MRF)

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Los Coyotes Country Club Development Plan Traffic Impact Analysis

Los Coyotes Country Club Development Plan Traffic Impact Analysis Los Coyotes Country Club Development Plan Traffic Impact Analysis Prepared For: Phil Martin Associates 2073007450 Los Coyotes Country Club Development Plan Traffic Impact Analysis June 19, 2014 Prepared

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax: 714.665.4501 LOS ANGELES 145 S. Spring Street Suite 120

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

6.14 Traffic and Circulation

6.14 Traffic and Circulation 6.14 Traffic and Circulation 6.14.1 Introduction The analysis in this section summarizes the findings and recommendations presented in the "Marywood Development Traffic Impact Study, City of Orange, California"

More information

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To:

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology 4.11 TRANSPORTATION This section describes the road transportation system in the vicinity of the proposed Project and the potential impacts to this system from the proposed Project. The analysis in this

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

TRAFFIC IMPACT STUDY CANYON HILLS PROJECT LOS ANGELES, CALIFORNIA INTRODUCTION This traffic analysis has been conducted to identify and evaluate the potential traffic impacts of the proposed Canyon Hills

More information

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Mission Street Medical Office Development

Mission Street Medical Office Development reet Medical Office Development Traffic Impact Analysis Prepared for: Palo Alto Medical Foundation February 23, 2012 Hexagon Office: 7888 Wren Avenue, Suite B121 Gilroy, CA 95020 Hexagon Job Number: 11RD11

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

5.3 TRAFFIC, CIRCULATION AND PARKING

5.3 TRAFFIC, CIRCULATION AND PARKING 5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

APPENDIXB. Traffic Operations Technical Memorandum

APPENDIXB. Traffic Operations Technical Memorandum APPENDIXB Traffic Operations Technical Memorandum Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 MEMORANDUM Transportation Jim Kollbaum, PE

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

MEMORANDUM. To: 1.0 PURPOSE

MEMORANDUM. To: 1.0 PURPOSE MEMORANDUM To: Scott Holland, Elements Architecture From: Brian Grover, Dudek Date: July 16, 2014 1.0 PURPOSE In response to the November 4, 2013 request (RE: Incomplete Application Southern California

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

FINAL Albertville Business Park AUAR Update Traffic Study

FINAL Albertville Business Park AUAR Update Traffic Study FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis TRAFFIC IMPACT ANALYSIS FOR A PROPOSED NEIGHBORHOOD SHOPPING CENTER Civic Center Way and Cross Creek Road City of Malibu Prepared for: Goldman Firth Rossi Architects Prepared by:

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento

More information

Lincoln Avenue Road Diet Trial

Lincoln Avenue Road Diet Trial Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume

More information

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION ENVIRONMENTAL SETTING The following section is based on the Draft Traffic Circulation Study for the Malibu La Paz Project (Traffic Study),

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY

Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY PREPARED BY: Aric Evatt, PTP aevatt@urbanxroads.com (949) 660-1994 x204 Charlene So, PE cso@urbanxroads.com (949) 660-1994 x222 OCTOBER 18, 2018

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director

3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 7 County Center Drive T: 53.552.37 Oroville, California 95965 F: 53.538.7785 buttecounty.net/dds BUTTE COUNTY

More information

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017 Traffic Impact Analysis (TIA) Process and Procedures Manual Post Office Box 664 101 Huntersville-Concord Road Huntersville, NC 28070 Phone 704-766-2220 Fax 704-992-5528 www.huntersville.org (c) 2017, Town

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Appendix G. Traffic Study

Appendix G. Traffic Study Appendix G Traffic Study City of Lake Forest SPORTS PARK AND RECREATION CENTER Traffic Study March 2010 Draft City of Lake Forest SPORTS PARK AND RECREATION CENTER Traffic Study Prepared by: Austin-Foust

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information