1 Agenda Item #10 Council Agenda Report SUBJECT: REVIEW, DISCUSS AND APPROVE LETTER TO THE CENTRAL VALLEY FLOOD PROTECTION BOARD REGARDING ISSUES WITH THE CENTRAL VALLEY FLOOD PROTECTION PLAN MEETING DATE: April 5, 2012 RECOMMENDATION The Mayor requests that the City Council of the City of Rio Vista review and discuss the Central Valley Flood Protection Plan (CVFPP) and approve a letter to the Central Valley Flood Protection Board regarding potential impacts of the CVFPP to Rio Vista. BACKGROUND The State Plan of Flood Control (SPFC) and the CVFPP represent policy of the CV Flood Protection Board protecting the Central Valley from disastrous flooding. The Systemwide Planning Area (SPA) considers areas that are not technically covered by the SPFC, although the State does not plan to expand its jurisdiction to areas not in the SPFC (See Attachment 1). SPFC levees are project levees and appear on the DWR Sacramento-San Joaquin Delta Atlas of 1993, and is a project facility under the State Water Resources Law of All other flood control levees (and there are many) are non-project levees and maintained primarily by Reclamation Districts (RDs). Rio Vista, although it sits on the edge of the Sacramento River, is located just downstream from the Yolo Bypass, and is threatened by flooding, is not part of the SPFC. Rio Vista is in the SPA. Apparently, the reason Rio Vista has not been in the SPFC is we have no levee or floodwall that is SFPC maintained (see discussion of levees below). The SPFC ends just above Rio Vista, at our borders, though maps do not detail this adequately. In the SPFC and the CVFPP, Rio Vista is classified as a small community on a par with Isleton, Walnut Grove, Courtland, Hood, Knights Landing and other small cities along the Sacramento River or its tributaries. All identified small communities (see Attachment 5) are in the SPA. However, none of the maps in the plan show which towns are in the SPFC. Levees The State and Federal governments have established (and continue to refine) standards for flood protection levees. The classifications are Hazard Mitigation Plan (HMP) and Public Law (PL8499). The latter is a higher standard.

2 Page 2 North of Rio Vista are two SPFC levees and an additional non-project levee (Attachment 2 though difficult to see, and Attachments 2A, 2B and 2C): Reclamation District 536 Egbert Tract SPFC levee. Map 2A shows it is meeting PL8499 standards. Mellon Levee, North of Rio Vista SPFC levee. Map 2B shows it meeting PL8499 standards except along the river. This part of River Road is a low-height levee road, State Hwy 84, leading to the Cache Slough Ferry. (It washed out in the flood of 97/98) The Mellon Levee is NOT on the maps showing the SPFC levees, and is maintained by the Solano County Water Agency. This lack has been pointed out to the DWR section responsible for the CVFPP, but needs to be mentioned again. RD 2084 Little Egbert Tract. Map 2C. It is below HMP standards except for short portions at either end which meet PL8499. This is most likely not a SPFC levee it is not on the CVFPP maps. It is a restricted height levee, designed to overflow in a flood. This levee did not overflow in 97/8 to my knowledge, and did not contribute to the damage to SH 84 the flood water came from the river. These levees are the sole protection that Rio Vista has from a significant flood from the Yolo Bypass. CVFPP The 2012 CVFPP is a Framework Plan, with no specific project details. This makes it somewhat difficult to comment on, so our comments will be broad. The purpose of the plan is to provide a systemwide investment approach for sustainable, integrated flood management in areas currently protected by facilities of the State Plan of Flood Control (SPFC). The CVFPP will be updated every five years, with each update providing support for subsequent policy, program and project implementation (page 1-1). The plan has been in preparation since 2009, with significant public input. The Mayor participated in the Delta Work Group for the entire 2 years, through all three phases. During this time, she was assured that the concerns of Rio Vista would be considered, though this is not evident in the final document since Rio Vista is not in the SPFC. A Program EIR has been completed and the Executive Summary has been reviewed. The plan outlines three scenarios: Achieve State Plan of Flood Control Design Capacity; Protect High Risk Communities; and, Enhance Flood System Capacity. Each scenario was evaluated for effectiveness and cost. The most effective, and most expensive ($31 to $41 Billion), scenario was Enhance Flood System Capacity. A fourth, preferred, scenario, the State Systemwide Investment Approach (SSIA), would provide increased protection from flood risks, some secondary benefits, and would cost $13 to $16 Billion. Key elements include: Minimum of 200-year level of protection for urban communities protected by facilities of the SFPC; Lower peak flood stage through much of the system, especially for the Feather, lower Sacramento and lower San Joaquin rivers; 100-year protection for small communities where feasible; Proactive floodplain management, including a program to floodproof and/or relocate structures in the floodplains where building ring levees and other flood structures is not feasible; Enhancing rural-agricultural area flood protection by repairing known localized problems that cause the highest risk of exposure and restoring all-weather roads on levee crests; Leveraging flood system improvements to create habitat through levee setbacks, waterside planting berms and the extension and expansion of bypass systems and to connect riparian habitat from he Delta to Butte Basin and Oroville; Connecting fishery habitat from the Delta to Yolo and Sutter Bypass and to Butte Creek; Supporting policies, implementation programs, and financing strategy (CVFPP, page 2-29)

3 Page 3 The portion of the plan with the potential to impact Rio Vista include: Change or Expand o Fremont Weir north of Woodland in the Yolo bypass increase length and notch the weir to allow fish passage (also part of Bay Delta Conservation Plan BDCP) o Sacramento Weir, just north of Sacramento widening and automation of gates o Setback levees in the Yolo Bypass Expand Yolo Bypass (Attachment 3) o Setback levees north of Rio Vista, no specific location o 42 miles of new levees, no specific location Potential Impact of Bypass Expansion to Rio Vista Attachment 3 indicates the extent of lower Yolo Bypass expansion to just north of Rio Vista. There are no details of the project, added levees, etc. There should be more information in the 2017 Plan Update. Attachment 4 shows the estimated changes in total flood flows for flood levels 2%, 1% (100 year), and 0.5% (200 year). The change in estimated peak flow for No Project vs. SSIA shows a slight increase in flow for a 2% flood, a decrease of 24,000 cfs for a 1% flood, and slight decrease of 4,000 cfs for 0.5% floods. Note this does not consider the impact of storm surge, tide level, or sea level rise. Note: Sea level rise will be considered in the 2017 update. This plan used the 1997/8 flood (El Nino) as a surrogate; the tide was about 2 feet higher than expected (this is the flood that washed out Hwy 84/River Road). Small Community Flood Protection (Attachments 5 & 6) Rio vista is shown as a small community, but is not included in SPFC. This plan suggests assistance in protecting communities through floodwalls, improving adjacent SPFC levees (Mellon and Egbert?) and other strategies. The plan estimates a total of 22 small communities would receive 100-year protection through various structural and non-structural actions. Questions for us include: Is Rio Vista included as a small community? What kind of protection assistance would we receive, if any? Issues to Bring to Attention of CV Flood Protection Board 1. Rio Vista is not in the SPFC, even though: We are at the end of Yolo Bypass, subject to flows from the Bypass as well as the River and sloughs; We are somewhat protected by SPFC levees (Egbert and Mellon), but question if they are sufficient; Our industrial area along River Road, our downtown commercial and residential are subject to 100 year floods; We have no riverfront protection along our entire length. 2. The impact from an expanded Bypass is not clear; is the theoretical decrease in flow projected in the SSIA accurate? What impact would increased habitat in the Bypass and increased seasonal flooding have on Bypass capacity? These issues need much more study, particularly in light of increased habitat in the Bypass planned and proposed in the Bay Conservation and Development Plan. 3. Maps north of Rio Vista are incorrect: Location of Egbert Tract levee Absence of Mellon Levee

4 Page 4 Approve attached letter to the Central Valley Flood Protection Board outlining our concerns. FINANCIAL CONSIDERATIONS None. ALTERNATIVES Edit content of letter Mayor Attachments: Letter Attachments 1 through 6

5 CITY OF RIO VISTA One Main Street, Rio Vista, California Phone: Fax: April 9, 2011 Ms. Nancy Moricz Central Valley Flood Protection Board 3310 El Camino Avenue, Room 151 Sacramento, CA RE: 2012 Draft Central Valley Flood Protection Plan Dear Ms. Moricz: The City Council of the City of Rio Vista has reviewed the 2012 Central Valley Flood Protection Plan and is requesting that our concerns be addressed. The Mayor, Jan Vick, was a part of the Delta Area Working Group and attended most of the meetings in all three phases of work. Throughout the entire process she was assured that Rio Vista would be part of the plan. However, it does not seem this is the case. 1. Rio Vista is not included in the State Plan of Flood Control, only in the Systemwide Planning Area, even though: The City is at the end of the Yolo Bypass, subject to flows from the Bypass as well as the Sacramento River and adjacent sloughs; We are somewhat protected by SPFC levees (Egbert Tract and the Mellon Levee), but question if they are sufficient. Mellon levee is a dry levee. Our industrial area along River Road, our downtown commercial and residential are subject to 100 year floods; We have no flood protection along our entire riverfront. Although the CVFPP states that the State does not intend to increase its jurisdiction, the City of Rio Vista thinks that it should be included in the SPFC and CVFPP since it is a vulnerable small community on a flood-prone section of the Sacramento River. 2. The impact from an expanded Yolo Bypass is not clear; is the theoretical decrease in flow in the SSIA accurate? This needs much more study, particularly in light of planned increased habitat in the Bypass and proposed in the Bay Development and Conservation Plan which could affect the capacity of the Bypass. At a meeting of the Solano County Water Agency Paul Marshall, Asst. Division Chief for Flood Management assured that flows would be studied further for the 2017 update, but we question whether that is timely, given the potential impacts of the BCDC.

6 Page 2 3. The maps indicate that an expanded Bypass would encompass Egbert and Little Egbert Tracts, all the way to the Rio Vista northern City Limits. This is of great concern for future potential flooding and the CVFPP Comments potential of decreased flood protection to the north. Although the plan indicates levee upgrades and possible additional levees, there are no details, which gives the City grave concerns. 4. The CVFPP maps for the area north of Rio Vista are incorrect and incomplete. Although the levee on Egbert Tract (a SPFC levee) is rated by DWR as meeting PL 8499 or HMP standards, an additional SPFC levee, the Mellon Levee, which is at the city limits of Rio Vista, is not listed or noted. This levee is maintained by the Solano county Water Agency. DWR maps indicate that it is at PL 8499 standards from River Road west, but that the levee going north along HWY 84 is below HMP. This road is slightly raised, but cannot be said to offer flood protection. The issue with the maps and the omission of the Mellon Levee has been mentioned to DWR staff on numerous occasions, even before this final draft was published. 5. Small Communities Although Rio Vista is included on the map of small communities (p 3-9/10), it is not clear if we would be considered for improvements. Since we are vulnerable to floods, it would seem that Rio Vista should be included in the SPFC and eligible for assistance. Our entire river front is within a 100-year floodplain. Thank you for the opportunity to provide our comments and concerns. The CVFPP is a good beginning, but needs much more work overall before the next update in Sincerely, Jan Vick, Mayor City of Rio Vista 1 Main Street Rio Vista, CA jvick@ci.rio-vista.ca.us

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, FLOOD OF FEBRUARY 1986 By J.C. Blodgett and J.B. Lucas U.S. GEOLOGICAL SURVEY Open-File Report 88-82 CO CM I m r-h CM Sacramento, California

More information

RESILIENCE THROUGH RESTORATION

RESILIENCE THROUGH RESTORATION RESILIENCE THROUGH RESTORATION RECLAMATION DISTRICT NO. 1601 TWITCHELL ISLAND SAN JOAQUIN RIVER SETBACK LEVEE PROJECT TWITCHELL ISLAND BASICS Nearly 12 miles of levee Storm drainage facilities Protects

More information

Draft Central Valley Salmon and Steelhead Recovery Plan

Draft Central Valley Salmon and Steelhead Recovery Plan Draft Central Valley Salmon and Steelhead Recovery Plan for Sacramento River winter-run Chinook salmon Central Valley spring-run Chinook Salmon Central Valley Steelhead National Marine Fisheries Service

More information

Managing floodplain productivity: Slow it down, Spread it out, Grow em Up

Managing floodplain productivity: Slow it down, Spread it out, Grow em Up Managing floodplain productivity: Slow it down, Spread it out, Grow em Up Jacob Katz California Trout C. Jeffres Inland Sea J street Flood of 1862 A Shifting Mosaic of Wetland Habitat Types Dynamic Permanence

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Restoration & Management Program Oncorhynchus mykiss irideus California Steelhead Distinct Population Segments

More information

Water in the Deschutes Who needs it?

Water in the Deschutes Who needs it? Water in the Deschutes Who needs it? Rivers and streams over appropriation and flow alteration. Junior water right holders production agriculture. The Cities long-term supply for growing populations. Climate

More information

North Shore of Long Island, Feasibility Study

North Shore of Long Island, Feasibility Study North Shore of Long Island, Asharoken New York Asharoken, Feasibility Study Asharoken, NY Public Meeting June 30, 2015 US Army Corps of Engineers US Army Corps of Engineers New York BUILDING STRONG BUILDING

More information

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS On May 31, 2013 representatives from CDFW, USFWS, and NMFS went on a field tour to look at locations in

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Kootenai River Habitat Restoration Program Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Decline of native species Kootenai River White Sturgeon ENDANGERED

More information

Juvenile Salmonid Emigration Monitoring in the Middle Sacramento River. Diane Coulon California Department of Fish and Wildlife

Juvenile Salmonid Emigration Monitoring in the Middle Sacramento River. Diane Coulon California Department of Fish and Wildlife Juvenile Salmonid Emigration Monitoring in the Middle Sacramento River Diane Coulon California Department of Fish and Wildlife Monitoring is conducted primarily to develop information on emigration timing

More information

Agenda Item E.2.g Supplemental Public Comment 2 April 2012

Agenda Item E.2.g Supplemental Public Comment 2 April 2012 Agenda Item E.2.g Supplemental Public Comment 2 April 2012 O Laughlin & Paris LLP Attorneys at Law SENT VIA ELECTRONIC MAIL March 26, 2012 Pacific Fishery Management Council 7700 NE Ambassador

More information

Chagrin River TMDL Appendices. Appendix F

Chagrin River TMDL Appendices. Appendix F Appendix F The following are excerpts from the Eastern Brook Trout Joint Venture s Conservation Strategy (Working Draft v.6), Conserving the Eastern Brook Trout: Strategies for Action Found at: http://www.easternbrooktrout.org/constrategy.html

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

Implementing the New Fisheries Protection Provisions under the Fisheries Act

Implementing the New Fisheries Protection Provisions under the Fisheries Act Implementing the New Fisheries Protection Provisions under the Fisheries Act Discussion Paper Fisheries and Oceans Canada April 2013 Contents 1. Introduction 2. Managing Threats to Canada s Fisheries 3.

More information

HIGHWAY 401 WIDENING SECOND LINE WEST STRUCTURE

HIGHWAY 401 WIDENING SECOND LINE WEST STRUCTURE HIGHWAY 401 WIDENING SECOND LINE WEST STRUCTURE Public Meeting November 16, 2011 OVERVIEW BACKGROUND DISCUSSION ITEMS TRAFFIC ANALYSIS CYCLIST / PEDESTRIAN CONNECTION BACKGROUND February 1982 Ministry

More information

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing REPORT To the Honorable Mayor and City Council From the City Manager October 1, 2018 SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing RECOMMENDATION

More information

APPENDIX C. Fluvial and Tidal Hydraulics Report

APPENDIX C. Fluvial and Tidal Hydraulics Report APPENDIX C Fluvial and Tidal Hydraulics Report BUENA VISTA LAGOON ENHANCEMENT PROJECT FLUVIAL AND TIDAL HYDRAULICS ANALYSES Prepared for: SANDAG 401 B Street, Suite 800 San Diego, California 92101 Contact:

More information

TRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments

TRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments 1 INTRODUCTION Maintaining a high quality of life is the essence of this plan for transit and non-motorized transportation in Butte County. Curbing greenhouse gas emissions (GHG) by reducing congestion,

More information

A.21 SACRAMENTO SPLITTAIL (POGONICHTHYS

A.21 SACRAMENTO SPLITTAIL (POGONICHTHYS A. SACRAMENTO SPLITTAIL (POGONICHTHYS MACROLEPIDOTUS) A.. Legal and Other Status The Sacramento splittail was federally listed as threatened on February, (USFWS ), and delisted on September, 00 (USFWS

More information

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-01428 November 13, 2018 Consent Item 09 Title: Memorandum of Understanding: Reimbursement of Costs

More information

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ]

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ] This document is scheduled to be published in the Federal Register on 07/07/2015 and available online at http://federalregister.gov/a/2015-16600, and on FDsys.gov DEPARTMENT OF THE INTERIOR UTAH RECLAMATION

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

APPENDIX D-2. Sea Level Rise Technical Memo

APPENDIX D-2. Sea Level Rise Technical Memo APPENDIX D-2 Sea Level Rise Technical Memo 2185 N. California Blvd., Suite 500 Walnut Creek, CA 94596 (925) 944-5411 Fax: (925) 944-4732 www.moffattnichol.com DRAFT MEMORANDUM To: From: Neil Nichols,

More information

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects

More information

Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming

Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming October 25, 2010 Waterbody: Muskrat Creek - Mainstem of Muskrat Creek from its headwaters downstream to its

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: May 9, 2017 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

5B. Management of invasive species in the Cosumnes and Mokelumne River Basins

5B. Management of invasive species in the Cosumnes and Mokelumne River Basins 5B. Management of invasive species in the Cosumnes and Mokelumne River Basins Cosumnes River The Cosumnes River basin has a number of distinct habitat types that require different management strategies

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

Wind Analysis. Technical Memorandum. Wind Direction and Fetch Length. Water Depth

Wind Analysis. Technical Memorandum. Wind Direction and Fetch Length. Water Depth standardized to a 10m observation level and corrected for increased overwater wind speed. The CEM procedures for adjusting observed winds were used to correct for the elevation of the CIMIS weather station

More information

CONSERVATION AND MANAGEMENT OF COASTAL WETLANDS IN CALIFORNIA

CONSERVATION AND MANAGEMENT OF COASTAL WETLANDS IN CALIFORNIA Studies in Avian Biology No. 2: 151-155, 1979. CONSERVATION AND MANAGEMENT OF COASTAL WETLANDS IN CALIFORNIA JOHN SPETH' The title, Conservation and Management of Coastal Wetlands in California, implies

More information

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT 1.0 INTRODUCTION This chapter provides an overview of the purpose, authorization and focus of this Recirculated Draft Environmental Impact Report (EIR), an identification of the Lead Agency, an outline

More information

South King County High-Capacity Transit Corridor Study

South King County High-Capacity Transit Corridor Study HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report

More information

2.0 Existing Conditions

2.0 Existing Conditions 20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

Appendix 7. Wind and Comfort Impact Analysis

Appendix 7. Wind and Comfort Impact Analysis Appendix 7 Wind and Comfort Impact Analysis Donald Ballanti Consulting Meteorologist 1424 Scott Street El Cerrito, CA 94530 (510) 234-6087 Abe Leider Rincon Consultants 449 15th Street, Suite 303 Oakland,

More information

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River, Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River, 2005-2006 Interim Report for NOAA Fisheries Prepared by: California Department of Water Resources Division of Environmental Services

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Management, Research and Restoration Program Oncorhynchus mykiss irideus California Steelhead - Hot Topics Implementation

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

3.0 Future Conditions

3.0 Future Conditions 3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD

PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD Whychus Creek at Camp Polk Meadow Preserve. Photo: Russ McMillan Top photo: Deschutes River Conservancy 1 Photo: Byron Dudley A Unique Collaboration

More information

SURGE SUPPRESSION ACHIEVED BY DIFFERENT COASTAL SPINE (IKE DIKE) ALIGNMENTS. Bruce A. Ebersole, Thomas W. Richardson and Robert W.

SURGE SUPPRESSION ACHIEVED BY DIFFERENT COASTAL SPINE (IKE DIKE) ALIGNMENTS. Bruce A. Ebersole, Thomas W. Richardson and Robert W. SURGE SUPPRESSION ACHIEVED BY DIFFERENT COASTAL SPINE (IKE DIKE) ALIGNMENTS Abstract Bruce A. Ebersole, Thomas W. Richardson and Robert W. Whalin, Jackson State University, Jackson, Mississippi The primary

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

COA-F17-F-1343 YEAR END REPORT

COA-F17-F-1343 YEAR END REPORT DAVE MARSHALL SALMON RESERVE RESTORATION, MAINTENANCE, AND UPGRADES YEAR END REPORT Prepared for: Fish and Wildlife Compensation Program Prepared by: Edith Tobe, RPBio, Executive Director Box 1791, Squamish,

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

STUDY ADVISORY COMMITTEE. October 8, 2015

STUDY ADVISORY COMMITTEE. October 8, 2015 STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming

More information

City of Hanover TRANSPORTATION STUDY

City of Hanover TRANSPORTATION STUDY City of Hanover TRANSPORTATION STUDY AUGUST 2006 Prepared by: WSB & Associates, Inc. 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 (763) 541-4800 (763) 541-1700 (Fax) City of Hanover Transportation

More information

The Blue Heron Slough Conservation Bank

The Blue Heron Slough Conservation Bank 1 The Blue Heron Slough Conservation Bank CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES The Blue Heron Slough Conservation Bank (Washington) I. OVERVIEW & BACKGROUND: Location: Snohomish River

More information

Diamond Springs Parkway Project

Diamond Springs Parkway Project Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of

More information

Leaning Into Adaptation

Leaning Into Adaptation www.marinslr.org Leaning Into Adaptation GFNMS Ocean Summit, May 17, 2016 Jack Liebster, Planning Manager, Marin County Marin County C-SMART Sea Level Rise Adaptation Process Evaluate Science Info. Implement

More information

The Corporation of Delta COUNCIL REPORT Regular Meeting. Boundary Bay Temporary Flood Protection Works

The Corporation of Delta COUNCIL REPORT Regular Meeting. Boundary Bay Temporary Flood Protection Works The Corporation of Delta COUNCIL REPORT Regular Meeting To: Mayor and Council File No.: 5140-20/BBSB From: Engineering Department Date: October 28, 2016 Boundary Bay Temporary Flood Protection Works The

More information

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Scott King, Senior Aviation Planner Jason Gately, Senior Aviation Planner Preston Beck, Associate Planner

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

June 3, 2014 MEMORANDUM. Council Members. Stacy Horton, Policy Analyst, Washington. SUBJECT: Final 2012 Hatchery Fin Clip Report

June 3, 2014 MEMORANDUM. Council Members. Stacy Horton, Policy Analyst, Washington. SUBJECT: Final 2012 Hatchery Fin Clip Report Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington June 3, 2014

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

Enhancing Return on Investment for MnPASS Express Lanes

Enhancing Return on Investment for MnPASS Express Lanes Enhancing Return on Investment for MnPASS Express Lanes Minnesota s Transportation Conference February 28, 2018 mnpass.org Agenda MnPASS Express Lane Background MnPASS System Update Enhancing Return on

More information

Volume I: Ecological Attributes of the San Francisco Bay-Delta Watershed

Volume I: Ecological Attributes of the San Francisco Bay-Delta Watershed XIII. APPENDIX: Summation of Calfed Bay-Delta Program Ecosystem Restoration Program Plan Volumes I and II Visions and Actions Related to Battle Creek Biological Resources as Affected by Facilities and

More information

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22,

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22, Program Update Board of Directors Item 16 February 22, 2019 Relationship: RP, RTIP, Budget, POF 2019 2020 2025 2030 2035 2040 2045 2050 Contains ten-year capital program budget 2 Board of Directors Item

More information

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685 CD10.2 STAFF REPORT ACTION REQUIRED City of Toronto Outdoor Tennis Operations Date: February 19, 2016 To: From: Wards: Reference Number: Community Development and Recreation Committee General Manager,

More information

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017 County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017 Introduction 2 Goleta Beach Park welcomes 1.5 million visitors annually Amenities include: Picnic Areas and Group Areas w/bbqs

More information

San Rafael School District. Task Force Meeting Notes. November 5, 2012

San Rafael School District. Task Force Meeting Notes. November 5, 2012 San Rafael School District Task Force Meeting Notes November 5, 2012 Attendees (8) Wendi Kallins Program Director for Safe Routes to Schools; Laura Kelly Volunteer Liaison for Safe Routes to Schools; Leslie

More information

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA Ventura County Watershed Protection District San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA Presentation to Ventura River Watershed Council Project Funding Proposition 50 Integrated

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

PHILOMATH TSP Citizen Advisory Committee (CAC) Meeting Notes Thursday, February 25, :00 PM

PHILOMATH TSP Citizen Advisory Committee (CAC) Meeting Notes Thursday, February 25, :00 PM PHILOMATH TSP Citizen Advisory Committee (CAC) Meeting Notes Thursday, February 25, 2016 6:00 PM Present: Citizen Members: Sonlla Heern, Ron Hartz, Van Hunsaker, Lauri Lehman, Severn Thomas, Rick Wells.

More information

Collaboration: Sea-level Marin Adaptation Response Team (C-SMART)

Collaboration: Sea-level Marin Adaptation Response Team (C-SMART) Collaboration: Sea-level Marin Adaptation Response Team (C-SMART) Photo Credit : Lighthawk Aerial Community Development Agency 3501 Civic Center Drive, Rm. 308 San Rafael, CA 94903 415 4736269 T www.marinslr.org

More information

FINAL Caples Lake Fisheries Management Plan. Version 4.0

FINAL Caples Lake Fisheries Management Plan. Version 4.0 FINAL Caples Lake Fisheries Management Plan Version 4.0 August 15, 2008 Purpose The Caples Lake Fisheries Management Plan (Plan) outlines the stocking plan to reestablish a sport fishery in Caples Lake

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Executive Summary. September 3, 2014

Executive Summary. September 3, 2014 D Executive Summary September 3, 2014 Study Background and Purpose Citizens for Picture Rocks is a community advocacy group representing the Picture Rocks Fire Department, Pima County Sheriff s Department,

More information

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat National Marine Fisheries Service March 2003 The Department

More information

A.23 RIVER LAMPREY (LAMPETRA

A.23 RIVER LAMPREY (LAMPETRA A. RIVER LAMPREY (LAMPETRA AYRESII) A.. Legal and Other Status The river lamprey is a Class (Watch List) California Species of Special Concern (Moyle et al., DFG 0). It has no federal status. A.. Species

More information

Business Plan Presentation

Business Plan Presentation 2019 Department of Water Resources Business Plan Presentation Wednesday, August 29, 2018 Mission To Provide Superior Water Services at an Excellent Value Vision To be widely recognized as a leader in the

More information

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50

More information

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING. Citizen Advisory Group Meeting #8 May 5, 2010 Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.ORG Meeting Agenda Handouts: o Meeting Agenda o Summary of East Seventh

More information

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH ITEM 8.3 REPORTING MANAGER TRIM FILE REF 2014/110936 ATTACHMENTS PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH GROUP MANAGER NATURAL ENVIRONMENT 1

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031 TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031 A summary of what s there, what more is needed, how to find information about your

More information

Segregation Weir Placement, Monitoring and Objective

Segregation Weir Placement, Monitoring and Objective Study 36 Segregation Weir Placement, Monitoring and Objective Final 2014 Monitoring and Analysis Plan November 2013 San Joaquin River Restoration Program Fall - Run Monitoring Activities Segregation Weir

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Informational Report 1 USFWS Mass Marking Update April 2005 Update on USFWS 2005 Mass Marking Initiative Background Under Section 138 of FY 2003 Omnibus Appropriations Act (PL 108-7), Congress directed

More information

Time of Change We Are Growing We Are An Attractive Place To Live We Are Age Diverse + Living Longer 50000 40000 30000 20000 10000 0 2010 Census Job Density Housing Sheds Transit Sheds The Project FUNDING

More information

State Highway 44/State Street High Capacity Corridor

State Highway 44/State Street High Capacity Corridor Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities

More information

Fresno, Kern, Kings, Madera, Mariposa, and Tulare Counties

Fresno, Kern, Kings, Madera, Mariposa, and Tulare Counties Emergency Contact Information for facilities located in RB5: Fresno, Kern, Kings, Madera, Mariposa, and Tulare Counties Central Valley Regional Water Quality Control Board Fresno : Phone: David Sholes

More information

LOCAL COASTAL PROGRAM UPDATE

LOCAL COASTAL PROGRAM UPDATE LOCAL COASTAL PROGRAM UPDATE Agenda Meeting #1 General Information (1 1:45 pm) Introductions and Background Grants involved What is a Local Coastal Program? What is required? LCP Update tasks and schedule

More information

Spring-run Chinook Salmon Reintroduction Experimental Population Designation Elif Fehm-Sullivan National Marine Fisheries Service

Spring-run Chinook Salmon Reintroduction Experimental Population Designation Elif Fehm-Sullivan National Marine Fisheries Service Spring-run Chinook Salmon Reintroduction Experimental Population Designation Elif Fehm-Sullivan National Marine Fisheries Service Overview The San Joaquin River Restoration Program is a comprehensive long-term

More information

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040. COUNCIL AGENDA: 12/01/15 ITEM: 4 CITY OF SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: BAY AREA BIKE SHARE EXPANSION Memorandum FROM: Jim Ortbal DATE: Approved Date irftt/ls'

More information

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX ADOT Statewide Bicycle and Pedestrian Program Summary of Activities APPENDIX B PEDESTRIAN DEMAND INDEX May 24, 2009 Pedestrian Demand Index for State Highway Facilities Revised: May 29, 2007 Introduction

More information

LANE ELIMINATION PROJECTS

LANE ELIMINATION PROJECTS PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:

More information

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California scanned for KRIS Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California Prepared for: Marin Municipal Water District 220 Nellen Drive Corte Madera, California

More information

Pre-Application Document Kaweah Project (FERC Project No. 298)

Pre-Application Document Kaweah Project (FERC Project No. 298) TABLE OF CONTENTS Page 3.12 Aesthetic Resources... 3.12-1 3.12.1 Information Sources... 3.12-1 3.12.2 Setting... 3.12-1 3.12.3 Project Facilities... 3.12-2 3.12.4 Previous Visual Resources Assessment...

More information

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS The Monterey Peninsula Water Management District (MPWMD), in cooperation with

More information

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives STAFF REPORT City Council of the City of Sausalito AGENDA TITLE: Ferry Patron Bicycle Parking Plan - Summer 2014 RECOMMENDED MOTION: Note and file informational item, no action necessary SUMMARY In April

More information

Rochester Area Bike Sharing Program Study

Rochester Area Bike Sharing Program Study roc bike share Rochester Area Bike Sharing Program Study Executive Summary ~ January 2015 JANUARY 2015 8484 Georgia Avenue, Suite 800 Silver Spring, MD 20910 3495 Winton Pl., Bldg E, Suite 110 Rochester,

More information

Appendix H RESPONSES TO PUBLIC COMMENTS

Appendix H RESPONSES TO PUBLIC COMMENTS Appendix H TO PUBLIC COMMENTS A-1 This comment letter confirms receipt and distribution of the draft IS/ MND and documents project compliance with State Clearinghouse review requirements for the draft

More information

Feather River Fish Hatchery spring run Chinook salmon Program: moving toward conservation. Ryon Kurth, Jason Kindopp, Anna Kastner, and A.J.

Feather River Fish Hatchery spring run Chinook salmon Program: moving toward conservation. Ryon Kurth, Jason Kindopp, Anna Kastner, and A.J. Feather River Fish Hatchery spring run Chinook salmon Program: moving toward conservation Ryon Kurth, Jason Kindopp, Anna Kastner, and A.J. Dill Central Valley Spring Run Chinook Central Valley Spring

More information