1 Spiral Transitions Current guidance states that the use of spiral transitions reduce crash probability and are beneficial for operational and aesthetic performance. Since this guidance will result in increased spiral transition usage and spiral transitions are not currently widely used within our department, this document is intended to provide an introduction for drafting in Microstation V8i to assist our designers. Short Discussion on Choosing Spiral Length Spiral transitions typically vary in length from 200-ft. to 400-ft., either set to the length of superelevation runoff or in even 100-ft. increments. Loop style ramps drive well and have exhibited improved safety performance using 300-ft. entry spirals. 200-ft. lengths are sufficient when transitioning between compound curves in the same direction or in other situations with minimal superelevation transition length, as well as in constrained situations. 400-foot lengths are less common but can be beneficial where particular safety concerns or extraordinary superelevation runoff lengths are in play. Demonstrations of three different tools (easiest last) with basic instrucitons on their use included below. Alternate methods provided because different tools may be better suited to different situations. Also note that the upcoming version of our CADD system may eliminate or change some of these tools. Location of Spiral Drafting Tools GEOPAK>ROAD>Geometry>Layout Alignments Horizontal (COGO opens with these tools) Or access Horizontal Alignment Generator from the COGO menu bar 1 P a g e
2 Select Tools>Spiral Combinations Spiral Combination Tools Automatic Save Feature The alignment tools shown in this document exist within Geopak and have the save feature defaulted to on. If multiple iterations of the design are likely it may be preferable to disable this automatic save option. The elements can be saved after an acceptable design is found, or the save feature can be turned on so the tool can be used to save with the preferred settings. 2 P a g e
3 Place Spiral Into And Out Of A Circular Curve Choose Place SCS (Intersecting Elements) Choosing a Design Table consistent with your Design Speed and roadway section will pre-select entry and exit spiral lengths. Adjust to chosen spiral length, commonly the length of Superelevation Runoff. Follow instructions on the status bar the tangent on either side of the curve you want to add spirals to. to select and accept 3 P a g e
4 Hold curser so that the tentative curve is shown on the correct side before final left click to accept. The new SCS is now visualized (dashed blue lines in this example). 4 P a g e
5 The zoomed in shot below shows the offset between the original (cyan) and new (dashed blue) curves. The offset is ~1-ft. in this example, but will vary by radius and deflection angle. Radius adjustments could be used to reduce offset if necessary or desired. The spiral was saved in the gpk (check the automatic save feature if not saving). 5 P a g e
6 Place Loop With Spirals And A Compound Curve Aligning a loop with a spiral on either side can probably be accomplished in many ways. One will be shown here and will be updated later if a simpler solution is suggested to us. Use the Place SC Tangent to Line tool to create a spiral from a line to a curve radius. Entry Spiral Length is where the chosen spiral length is set, 200-ft. used in this example, although 300-ft. is preferred for loops. Tangent length and curve length cause the tool to draw these elements instead of just the spiral alone. Include some curve length because we will use it to help locate the spiral later. Follow the status bar prompt and select the right side of the tangent that the spiral will begin from (choosing the other side of the line will orient the spiral in the opposite direction). *Note the handle line perpendicular to the entry tangent used to place the spiral. 6 P a g e
7 Left click to accept, locating the spiral and curve somewhere near the original (new spiral visualization shown as blue dashed lines). Repeat this process to create a spiral curve combination on the alignment at the other end of the loop. Delete the circular curve that was produced with this second spiral. 7 P a g e
8 Extend the circular curve around as shown below (marked with red arrow) and create a line tangent to the end of the spiral (marked with green arrow). Use Construct Minimum Distance Line tool (red arrow) can be used to draw a line (dashed white) to the nearest point of the circular curve. 8 P a g e
9 Trim the circular curve at the dashed white line. This leaves the end of the circular curve tangent to the spiral (green arrow). Move the spiral and connect it to the circular curve as shown below. Next the SCS loop we have created needs to be shifted so that end spirals meet the exit tangent while keeping the entry spiral on the entry tangent. Accomplish this by copying the entry tangent (green arrow) and connecting it to the end of the exit spiral (red arrow). 9 P a g e
10 Trim this new line where it meets the exit tangent (red arrow) and then make a selection set of the new SCS loop. Move the SCS loop along the line that was just trimmed (from green arrow to red arrow). Trim approach and exit tangents to end of spirals. 10 P a g e
11 These graphical elements no longer match the spirals and curve stored in the gpk. Caution: These items can be removed from the gpk, but may result in deletion of the visualization elements we have been using. Creating spirals in the new location can easily be accomplished by placing lines perpendicular to the entry and exit tapers (shown in red) to match the spiral placement handles pointed out earlier in this section. Place Complex Ramp This example shows a simpler tool to create a loop ramp with a spiral entry and exit. GEOPAK>ROAD>Geometry>Layout Alignments Horizontal, or open from the Geopak Road toolbar: Select Tools>Main, then choose Complex Transitions>Place Complex Ramp 11 P a g e
12 Choose drop down options as shown here: Set chosen values for entry and exit spiral lengths, and for the Intermediate Curve Radius. Also, set Truncate: Both and check Loop (Exterior Construction). Follow status bar prompts to choose and accept the first element. Select, but wait to accept the second element. Move the cursor until the visualized loop ramp appears in the appropriate quadrant, and then click to accept. After acceptance the new loop ramp will be visualized on screen and stored in Geopak if the automatic save setting is still enabled. 12 P a g e
ROUNDABOUTS/TRAFFIC CIRCLES
GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal
More informationFigure 1: Graphical definitions of superelevation in terms for a two lane roadway.
Iowa Department of Transportation Office of Design Superelevation 2A-2 Design Manual Chapter 2 Alignments Originally Issued: 12-31-97 Revised: 12-10-10 Superelevation is the banking of the roadway along
More informationGeneral References Definitions. (1) Design Guidance. (2) Supporting Information
Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to
More informationRoundabout Design Aid PREPARED BY TRAFFIC AND SAFETY
Roundabout Design Aid PREPARED BY TRAFFIC AND SAFETY May 2018 Engineering Manual Preamble This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires
More informationDeveloped by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA
Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationCHAPTER 6H. TYPICAL APPLICATIONS
Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for
More informationRoundabout Design Principles
des Carrefours Giratoires Roundabout Design Principles NCLUG Roundabout Luncheon Tuesday, March 4, 2014 Prepared by: des Carrefours Agenda Giratoires Roundabout design process: Planning and Policy Lane
More information3D Inversion in GM-SYS 3D Modelling
3D Inversion in GM-SYS 3D Modelling GM-SYS 3D provides a wide range of inversion options including inversion for both layer structure and physical properties for gravity and magnetic data. There is an
More informationFREEWAY AND SERVICE ROAD CONNECTIONS
EDGE LINE WHITE STOP BAR SERVICE ROAD EDGE LINE DOTTED LINE (5 MARK, 20 GAP) EDGE LINE 4" WHITE BROKEN LINE 12" WHITE DOTTED LINE (5 MARK, 20 GAP) LINE LINE EDGE LINE 300 SERVICE ROAD 1/2 X (500 MAX) CHANNELIZING
More informationADA Training Standard Plans
ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb
More informationSECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN
SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3
More informationCentre for Marine Science and Technology
Centre for Marine Science and Technology SailTool 1.14 Help Manual Please note: This is a printed version of the online help file provided with SailTool. Sections of text which appear double underlined
More information1.3.4 CHARACTERISTICS OF CLASSIFICATIONS
Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure
More informationSeptember 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.
September 2008 REVISIONS (1) CHAPTER 12 VERTICAL ALIGNMENTS SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) CHAPTER 15 INTERSECTIONS TURNING LANE LENGTHS 15.5(10) CHAPTER
More informationRoundabout Design 101: Principles, Process, and Documentation
Design 101: Principles, Process, and Documentation Part 1 March 7, 2012 Well designed roundabouts should minimize accidents, delay and costs for everyone using the intersection. This session covers the
More informationCounterbore and Countersink Tutorial
Counterbore and Countersink Tutorial This tutorial is designed to show how to create a Counterbore hole in two different ways. 1. Creating 2 Extrudes 2. Using the Hole Tool Types of Holes Counterbore Holes
More informationLADOTD Roundabout Assistance Contract
LADOTD Roundabout Assistance Contract Services Provided: Preliminary Design Development Quick 2D Layout & Analysis Ballpark Design and Capacity Software Training 2 Days of Design or 2 Days of SIDRA / CAD
More informationStaff Report Text Amendment Case #: TA
Staff Report Text Amendment Case #: TA 2017 03 00005 Attachments: Staff Report, Current Code Planning Commission Public Hearing: Thursday, April 6, 2017 City Council Introduction: Tuesday April 11, 2017
More informationCENTER PIVOT EVALUATION AND DESIGN
CENTER PIVOT EVALUATION AND DESIGN Dale F. Heermann Agricultural Engineer USDA-ARS 2150 Centre Avenue, Building D, Suite 320 Fort Collins, CO 80526 Voice -970-492-7410 Fax - 970-492-7408 Email - dale.heermann@ars.usda.gov
More informationATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION
ATTACHMENT NO. 11 RRLRT No. 2 TECHNICAL COMMITTEE: TOPIC: Railroad / Light Rail Transit Technical Committee Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More informationRoundabout Prequalification Training. March 11, 2015
Roundabout Prequalification Training March 11, 2015 Presenters American Structurepoint, Inc. Jeromy Grenard, PE, PTOE Craig Parks, PE Why Roundabouts? Everybody else is building them? They look cool? Circles
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationCURBSIDE ACTIVITY DESIGN
5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented
More informationGDOT Elements of Design. Course ID: GDOT PDH Credits
GDOT Elements of Design Course ID: GDOT-06 3 PDH Credits Civil Engineer Educators LLC 1026 Timberwolf Lane Juneau, AK 99801 Email: support@civilpdh.com Chapter 4 Contents 4. ELEMENTS OF DESIGN 1 4.1. Sight
More information4.1 CONTEXT. The existing terrain and sight conditions will affect available sight lines and approach speeds of bicyclists and motorists.
4 INTERSECTION DESIGN This chapter provides key principles that should be used to develop and evaluate design approaches and treatments that will result in intersections that support all ages and abilities
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationEarthworks X200 Quick Reference Guide
Earthworks X200 Quick Reference Guide Part No. 875-0267-000 Rev. A1 Contents Dig a 1.0 m Deep Hole Using a Flat Plane 1 Extend a Level Excavation 3 Dig a 1.0 m Deep Hole Using a Flat Plane with a 5 Laser
More informationModern Roundabouts: a guide for application
Modern Roundabouts: a guide for application Kentucky Community Transportation Innovation Academy 2005 The contents of this booklet reflect the views of the authors who are responsible for the facts and
More informationKDOT Access Management Policy (AMP)
KDOT Access Management Policy (AMP) (January 2013 Edition) Errata KDOT intends to correct these errors during the next revision to the Policy. Corrections are denoted in red text with a solid line through
More informationMICHIGAN DESIGN MANUAL
CHAPTER 3 INDEX ALIGNMENT AND GEOMETRICS 3.01 REFERENCES 3.02 DEFINITION OF TERMS 3.03 ALIGNMENT - GENERAL A. Horizontal Alignment B. Vertical Alignment C. Combined 3.03.01 Horizontal Alignment - Design
More informationDESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP
DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on
More informationRoadway Design Manual
Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationCHAPTER 6H. TYPICAL APPLICATIONS
2006 Edition Page 6H-1 CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. Standard: The
More informationTournament Manager: Running a VEX IQ Event - Beginner
Tournament Manager: Running a VEX IQ Event - Beginner Indiana IQ Event Partner Workshop Agenda 1. Main Window a. Once i. The Main Window has a standard menu bar. ii. A series of tabbed pages filling the
More informationDETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:
GENERAL NOTES: CURB NOTES: 5'-0" MIN 5'-0" 5'-0" MIN 1. 2. THESE SHEETS ARE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), AND THE REQUIREMENTS OF THE 2011 PROPOSED ACCESSIBILITY GUIDELINES
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,
More informationCHAPTER 1 STANDARD PRACTICES
CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles
More informationGuidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions
ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way
More informationFISHFINDER OPERATIONS
SPOT Spot-Lock LOCK FISHFINDER OPERATIONS minnkotamotors.com 55 How WAYPOINT NAVIGATION Works WAYPOINT REMOTE OPERATIONS Waypoints are stored positions that allow you to mark areas of interest or navigation
More informationUNDERGROUND SURVEY WITH MINEMODELLER
UNDERGROUND SURVEY WITH MINEMODELLER A Tutorial Derek C. Diamond derek@primethought.biz CONTENTS Underground Survey with MineModeller... 2 Introduction... 2 Requirements... 2 Getting Started with MineModeller...
More informationOctober 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)
October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT
More informationv2.3 USER MANUAL
v2.3 USER MANUAL www.foresightsports.com Table of Contents 03 04 05 09 12 17 20 21 Activation Getting Started Play Compete Improve Settings Update Manager Glossary 04 11 05 12 03 Activation FSX Activation
More informationMultilane Roundabouts
Multilane Roundabouts Supplement to Synchro 7 Studio Users Guide Discussion SimTraffic 7 has been updated to better model multilane roundabouts. With the new logic it is possible to model a two-lane arterial
More informationTutorial 2 Time-Dependent Consolidation. Staging Groundwater Time-dependent consolidation Point query Line query Graph Query
Tutorial 2 Time-Dependent Consolidation Staging Groundwater Time-dependent consolidation Point query Line query Graph Query Model Set-up For this tutorial we will start with the model from Tutorial 1 Quick
More informationChapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES
Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES 5.1 PURPOSE (1) The purpose of the Traffic Safety Studies chapter is to provide guidance on the data collection requirements for conducting a
More informationIntroduction to Roadway Design
Chapter Introduction to Roadway Design 1 This chapter lays the foundation for the Roadway Design course. You examine the roadway design workflow and the completed drawing files and review the project scope,
More informationALLEY 24 TRAFFIC STUDY
ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland
More informationRoadway Horizontal Alignment Design
Roadway Horizontal Alignment Design by Gregory J. Taylor, P.E. INTRODUCTION This course summarizes and highlights the design of horizontal alignments for modern roads and highways. The contents of this
More informationTABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 100 STREETS GENERAL 100.1
TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 100 STREETS SECTION TITLE PAGE 100.1 GENERAL 100.1 100.2 REPORTS 100.1 100.2.1 Submittal Format 100.1 100.2.2 Traffic Impact Analysis Report
More informationDesigning Complete Streets: What you need to know
Designing Complete Streets: What you need to know Getting from this to this. Continuous sidewalk Buffer w/trees Bicycle lane Raised median Buildings close to the street Flexibility in design Design and
More informationFOR LOOP RAMPS-TAPERED DECELERATION LANE
6" WHITE DOTTED LINE: 5 MARK, 20 SKIP 6" WHITE CRYSTAL MONO-DIRECTIONAL MAIN LINE END (EVERY 50 FEET) 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 5 AMBER MONO-DIRECTIONAL 50 FEET BEFORE LAST CRYSTAL PAVEMENT
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationFREEWAY WORK ZONE SPEED MODEL DOCUMENTATION
APPENDIX B FREEWAY WORK ZONE SPEED MODEL DOCUMENTATION B-1 APPENDIX B FREEWAY WORK ZONE SPEED MODEL DOCUMENTATION B.1 INTRODUCTION This software can be used for predicting the speed of vehicles traveling
More information700 Multi-Modal Considerations
700 Multi-Modal Considerations Table of Contents 701 Railroads... 7-1 701.1 Background... 7-1 701.2 Crossing At-Grade... 7-1 701.2.1 General... 7-1 701.2.2 Railroad Parallel to Highway... 7-1 701.3 Lateral
More informationOregon Supplement to the Manual on Uniform Traffic Control Devices. Adopted July 2005 by OAR
Oregon Supplement to the Manual on Uniform Traffic Control Devices Adopted July 2005 by OAR 734-020-0005 2003 Edition Oregon Supplement to the MUTCD Page 2 INTRODUCTION Traffic control devices installed
More informationRoadway Design Manual
Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationMarkings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006
ATTACHMENT NO. 30 Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006 Roundabouts are becoming an increasingly utilized form of intersection design
More informationDesigning for Individuals who are visually impaired or blind
Designing for Individuals who are visually impaired or blind Janet M. Barlow Accessible Design for the Blind NACTO Designing Cities Conference October 25, 2012 What do we mean by visually impaired or blind?
More informationNOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG
NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS SIDEWALK RAMPS DATE: MARCH 2013 FILE NAME: SIDEWALK RAMPS.DWG NOT
More informationRoundabouts 101: As Easy as 1-2-3
Roundabouts 101: As Easy as 1-2-3 APWA Monterey Bay Training Conference June 28, 2016 Watsonville, CA Brian L. Ray Kittelson & Associates, Inc. Presentation Outline Overview Roundabout Size Roundabout
More informationIncluding Revision 1 dated May 2012 and Revision 2 dated May 2012
Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Page 634 2009 Edition Notes for Figure 6H-1 Typical pplication 1 Work eyond the Shoulder 1. If the work space is in the median of a divided
More informationCourse Instructions. 3 Easy Steps to Complete the Course: 1.) Read the Course PDF Below.
Course Instructions NOTE: The following pages contain a preview of the final exam. This final exam is identical to the final exam that you will take online after you purchase the course. After you purchase
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationCombination Analysis Tutorial
Combination Analysis Tutorial 3-1 Combination Analysis Tutorial It is inherent in the Swedge analysis (when the Block Shape = Wedge), that tetrahedral wedges can only be formed by the intersection of 2
More informationUNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008
UNITY 2 TM Air Server Series 2 Operators Manual Version 1.0 February 2008 1. Introduction to the Air Server Accessory for UNITY 2...2 1.1. Summary of Operation...2 2. Developing a UNITY 2-Air Server method
More informationUpdated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise
The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need
More information2003 Edition Page 2C-1
2003 Edition Page 2C-1 CHAPTER 2C. WARNING SIGNS Section 2C.01 Function of Warning Signs Support: Warning signs call attention to unexpected conditions on or adjacent to a highway or street and to situations
More informationTESLAGON. ShotHelper Manual. How to install and use the Program. Version /30/2014
TESLAGON ShotHelper Manual How to install and use the Program 11/30/2014 Version 1.11 Table of Contents Introduction... 3 Installation Process... 3 ShotHelper Quick Setup... 4 The Main Window... 6 The
More informationUpdated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park
The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need
More information10.0 CURB EXTENSIONS GUIDELINE
10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services
More informationKIOSK: SCORE CENTRE USER MANUAL RCGA Network Kiosk: Score Centre User Manual
RCGA Network Kiosk: Score Centre User Manual - 1 - Member Login Page Steps for Login: 1. Enter your Network ID on the keypad in order to access your player homepage 2. Click Member Name Lookup to search
More informationPART 10. TRAFFIC CONTROLS FOR HIGHWAY-LIGHT RAIL TRANSIT GRADE CROSSINGS TABLE OF CONTENTS
Part 10. Traffic Controls for Highway-Light Rail Transit Grade Crossings Page 10TC-1 PART 10. TRAFFIC CONTROLS FOR HIGHWAY-LIGHT RAIL TRANSIT GRADE CROSSINGS TABLE OF CONTENTS CHAPTER 10A. GENERAL..........................................
More informationQuick Start Guide. A. Hardware installation B. Software installation C. Start the software for the first time D. Do your first measurement
Quick Start Guide This Quick Start Guide describes the hardware and software installation process and the Measurement feature in a simple way. Please follow the sequence of the steps to avoid problems
More informationSECTION 12 ROAD MARKINGS AND DELINEATION
SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details
More informationADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT
ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but
More informationADA Operations Contact Info
Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us
More informationStep 1. CoderDojo Milltown Exercise 1 Pong Page 1 of 13
CoderDojo Milltown Exercise 1 Pong Page 1 of 13 Step 1 Open up Scratch on your computer or online at http://scratch.mit.edu/projects/editor/? tip_bar=getstarted Scratch 1.4 looks like this Scratch 2.0
More informationField Guide for Unpaved Rural Roads
Field Guide for Unpaved Rural Roads Funded by the Federal Highway Administration Local Technical Assistance Program (LTAP) Developed by the Wyoming Technology Transfer (T2) Center, March 1997 Updated by
More informationIntersection Geometric Design
Course No: C04-033 Credit: 4 PDH Gregory J. Taylor, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 info@cedengineering.com
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationViva TPS. TS11/15 Total Stations Check and Adjust Procedure. October Summary
Viva TPS October 2010 TS11/15 Total Stations Summary Leica builds total stations to the highest quality and calibrates each instrument before it leaves the Factory. After the instrument is shipped or used
More informationSingle Engine Complex Training Supplement PA28R-201 Piper Arrow III (Spring 2016 Revision)
Single Engine Complex Training Supplement PA28R-201 Piper Arrow III (Spring 2016 Revision) V-speed Quick Reference V-Speed KIAS Description Airspeed Indicator Marking VSO 55 Stall speed in landing configuration
More informationDesigning for Pedestrian Safety
Designing for Pedestrian Safety Intersection Geometry Presented by: John LaPlante T.Y. Lin International, Inc Keith Sinclair FHWA Resource Center September 9, 2010 Learning Outcomes At the end of this
More informationCW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)
CK: DW: CK: x for mph or less mph devices may be omitted if the work area is a minimum of from the nearest traveled way. (See notes 4 & 5) x for mph or less Work Space mph x for mph or less mph (See notes
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationField Design, Construction and inspection of ADA compliant Curb ramps. Mike Anderson City of Lee s Summit Construction Manager (816)
Field Design, Construction and inspection of ADA compliant Curb ramps Mike Anderson City of Lee s Summit Construction Manager (816)969-1800 Today s Agenda Definitions & Acronyms Access Board vs. PROWAAC
More informationHow Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017
How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 Overview Design Vehicle Design Driver Potential Geometric Impacts of Autonomous Vehicles Connected Vehicles
More informationSaphir Guided Session #8
Ecrin v4.30 - Doc v4.30.05 - KAPPA 1988-2013 Saphir Guided Session #8 SapGS08-1/11 Saphir Guided Session #8 A01 Introduction This Guided Session illustrates the minifrac option available for analysis of
More informationLesson 7 4-Hour Version Slide: 4H-117
Lesson 7 4-Hour Version Slide: 4H-117 Lesson Objectives 4-Hour Version Slide: 4H-118 Lesson Objective: -- 4-Hour Version Slide: 4H-119 Video: L7_V1 - OH Struck-By.wmv Ask/Discuss: Debrief the video As
More informationDesign of Roundabouts A SunCam online continuing education course
Design of Roundabouts by Debra A. Kennaugh, P.E. www.suncam.com Copyright 2010 Debra A. Kennaugh Page 1 of 48 I. Introduction A. Types of Circular Intersections B. Roundabout Features C. Roundabout Dimensions
More informationTension Cracks. Topics Covered. Tension crack boundaries Tension crack depth Query slice data Thrust line Sensitivity analysis.
Tension Cracks 16-1 Tension Cracks In slope stability analyses with cohesive soils, tension forces may be observed in the upper part of the slope. In general, soils cannot support tension so the results
More informationBraiding a knot. The Process. The knot - A 5 X 4 simple turkshead. The mandrel. --> Home Lesson One Lesson Two
--> Home Lesson One Lesson Two Braiding a knot In this lesson we will braid some small knots step by step to show how the principles from the earlier lessons are applied to the braiding process. The Process
More informationSECTION A-1-GEOMETRIC DESIGN STANDARDS
APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS Introduction... A-1 Flexibility In Design... A-1 Secondary Project Improvements... A-2 Roadway Width... A-3 Design Speed (V)... A-3 Operating Speed...
More informationPerformance-Based Approaches for Geometric Design of Roads. Douglas W. Harwood MRIGlobal 3 November 2014
Performance-Based Approaches for Geometric Design of Roads Douglas W. Harwood MRIGlobal 3 November 2014 Traditional Approaches to Highway Geometric Design Based on established geometric design criteria
More informationZIPWAKE DYNAMIC TRIM CONTROL SYSTEM OUTLINE OF OPERATING PRINCIPLES BEHIND THE AUTOMATIC MOTION CONTROL FEATURES
ZIPWAKE DYNAMIC TRIM CONTROL SYSTEM OUTLINE OF OPERATING PRINCIPLES BEHIND THE AUTOMATIC MOTION CONTROL FEATURES TABLE OF CONTENTS 1 INTRODUCTION 3 2 SYSTEM COMPONENTS 3 3 PITCH AND ROLL ANGLES 4 4 AUTOMATIC
More informationDEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space
DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -
More informationErrata Date February 2016 Errata Edition Field. Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA
Errata Date February 2016 Errata Edition Field Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA Errata Reference Number Item Number 100 Page No. 39 Errata 7FE/001/16 The first bullet point under
More informationCurb Ramp Guidelines. October Version 1.0
Curb Ramp Guidelines October 2010 Version 1.0 Table of Contents INTRODUCTION... 3 DEFINITIONS... 3 BASIC CURB RAMP COMPONENTS... 4 PEDESTRIAN RAMP TYPES... 6 Selecting ramp types... 7 PERPENDICULAR CURB
More informationNovember 2012: The following Traffic and Safety Notes were revised:
CHANGE LIST for MDOT Traffic and Safety, TRAFFIC AND SAFETY NOTES Located at http://mdotcf.state.mi.us/public/tands/plans.cfm JANUARY 2014: The following Traffic and Safety Note was added: Note 705A Angled
More information