Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Size: px
Start display at page:

Download "Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING"

Transcription

1 Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD

2

3 Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G1 Creek Improvements for Conveyance of the Regulatory Flow TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD

4

5 Design of a 2-Stage Uniform Channel Low Flow Channel Design Flow m 3 /s Slope m/m Mannings 'n' Side Slopes (H:V) 2.0 :1 Base Width 5.0 m Depth 0.50 m 8.9 Full Flow Area 3.00 m 2 Full Flow Wetted Perimeter 7.24 m Calculated Flow 3.06 m 3 /s Velocity 1.02 m/s Top Width 7.00 m Hydraulic Depth 0.43 m Froude Number 0.50 <= Overbank Depth <=Shelf Width=> Overbank Area Design Flow m 3 /s Base Slope m/m => Width <= Manning's 'n' 0.06 Low Flow Channel Side Slopes 2 :1 Low Flow Channel Width 5.0 m Low Flow Channel Depth 0.50 m Overbank Side Slopes 3 :1 Shelf Width 5.0 m Overbank Depth 1.50 m 2.3 Full Section Area m 2 Full Section Wetted Perimeter m Full Section Flow m 3 /s Average Channel Velocity 1.29 m/s Total Channel Depth 2.00 m Channel Top Width m Hydraulic Depth 1.36 m Froude Number 0.35 <= <= Base Depth <= Manning's Open Channel Flow - 2 Stage Channel.xls Sheet1 11/18/13 1 of 1

6 C D E A 8800 Dufferin Street, Suite 200 Vaughan, ON L4K 0C5... p: f: KROSNO CREEK DIVERSION PROJECT PROPERTY REQUIRED FOR CONVEYANCE OF THE REGULATORY FLOW PROJECT No. SCALE: 1:4000 DATE: SEPTEMBER 2013 DESIGNED BY: ET DRAWN BY: CAD CHECKED BY: SH CHECKED BY: FIGURE No. 4-1

7 City of Pickering Krosno Creek Diversion Project TMIG Project Cost Estimate Reconstructed Channel to convey Regulatory Storm Approx 25 m top width plus buffers Item No. Spec. Code Item Description Unit Quantity Unit Price Total Notes 1 Property Acquisition LS 1.0 $ 14,200, $ 14,200, All property on one side of the existing channel is required. 46 properties required if channel is constructed to the east of the existing channel 2 Channel Reconstruction m $ 2, $ 2,125, Including grading and landscape restoration 3 Bridges each 4.0 $ 1,000, $ 4,000, Bridges to span the channel at Bayly, Morden, Reytan and Alyssum 4 General Contingencies (20 %) LS 1 $ 4,065, $ 4,065, TOTAL COST $ 24,390,000.00

8

9 Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G2 Enhanced Stormwater Management Controls TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD

10

11 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Enhanced Stormwater Management Controls Downtown Pickering Intensification, 5 mm retention, 100 Year Post to Pre, where Pre is max 50% impervious Maximum Flow Rate Location Conduit Drainage Area (ha) Hazel Highway _ Bayly Street Weir Flow KC_CJ44_HC Culvert Flow KC_CJ Total Flow ADD Downstream Bayly Street KC_CJ Morden Lane Weir Flow KC_CJ37_HC Culvert Flow KC_CJ Total ADD Reytan Boulevard Weir Flow KC_CJ29_HC Culvert Flow KC_CJ Total ADD Alyssum Street Weir Flow KC_CJ25_HC Culvert Flow KC_CJ Total ADD Sandy Beach Road North Culvert Weir Flow KC_CJ20_HC Culvert Flow KC_CJ Total ADD Confluence with East Tributa KC_CA Sandy Beach Road South Culvert Weir Flow KC_CJ7_HC Culvert Flow KC_CJ Total ADD Outlet to Frenchman's Bay KC_CJ

12 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Enhanced Stormwater Management Controls Downtown Pickering Intensification, 5 mm retention, 100 Year Post to Pre, where Pre is max 50% impervious Maximum Hydraulic Grade Line (m) Location Node Hazel Sandy Beach Road North Culvert - Downstream KC_J Sandy Beach Road North Culvert - Upstream KC_J Alyssum Street Culvert - Downstream KC_J Alyssum Street Culvert - Upstream KC_J Reytan Boulevard Culvert - Downstream KC_J Reytan Boulevard Culvert - Upstream KC_J Morden Lane Culvert - Downstream KC_J Morden Lane Culvert - Upstream KC_J Bayly Street Culvert - Downstream KC_J Bayly Street Culvert -Upstream KC_J Highway 401 / CNR Culverts - Downstream KC_J Highway 401 / CNR Culverts - Upstream flood damages incurred

13 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Enhanced Stormwater Management Controls Downtown Pickering Intensification, 5 mm retention, 100 Year Post to Pre, where Pre is max 50% impervious Pickering Town Centre Storage Summary Storm Event Peak Flow to Storage Node Peak Flow from Storage Node Maximum Storage Volume Maximum Water Level Hazel Node / Conduit

14 Downtown SWM and Diversion Study TMIG Project Flood Damage Estimates Enhanced SWM Controls in Downtown Pickering Storm Event Buildings Impacted Flood Damages* 2 2 $70, $193, $825, $1,750, $1,802, $1,866,600 Regional 65 $1,963,500 Average Annual Damages Existing Average Annual Damages Reduction in Annual Flood Damages $239,401 $390,931 $151,530 * Damages Calculated as 30% of the Assessed Value of all Properties where buildings are partially or entirely within the flood plain

15 Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G3 Culvert Improvements TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD

16

17 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Culvert Upgrades Twin 3 m box culverts at Alyssum, Reytan and Morden Maximum Flow Rate Location Conduit Drainage Area (ha) Hazel Highway _ Bayly Street Weir Flow KC_CJ44_HC Culvert Flow KC_CJ Total Flow ADD Downstream Bayly Street KC_CJ Morden Lane Weir Flow KC_CJ37_HC Culvert Flow KC_CJ Total ADD Reytan Boulevard Weir Flow KC_CJ29_HC Culvert Flow KC_CJ Total ADD Alyssum Street Weir Flow KC_CJ25_HC Culvert Flow KC_CJ Total ADD Sandy Beach Road North Culvert Weir Flow KC_CJ20_HC Culvert Flow KC_CJ Total ADD Confluence with East Tributa KC_CA Sandy Beach Road South Culvert Weir Flow KC_CJ7_HC Culvert Flow KC_CJ Total ADD Outlet to Frenchman's Bay KC_CJ

18 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Culvert Upgrades Twin 3 m box culverts at Alyssum, Reytan and Morden Maximum Hydraulic Grade Line (m) Location Node Hazel Sandy Beach Road North Culvert - Downstream KC_J Sandy Beach Road North Culvert - Upstream KC_J Alyssum Street Culvert - Downstream KC_J Alyssum Street Culvert - Upstream KC_J Reytan Boulevard Culvert - Downstream KC_J Reytan Boulevard Culvert - Upstream KC_J Morden Lane Culvert - Downstream KC_J Morden Lane Culvert - Upstream KC_J Bayly Street Culvert - Downstream KC_J Bayly Street Culvert -Upstream KC_J Highway 401 / CNR Culverts - Downstream KC_J Highway 401 / CNR Culverts - Upstream flood damages incurred

19 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Culvert Upgrades Twin 3 m box culverts at Alyssum, Reytan and Morden Pickering Town Centre Storage Summary Storm Event Peak Flow to Storage Node Peak Flow from Storage Node Maximum Storage Volume Maximum Water Level Hazel Node / Conduit

20 Downtown SWM and Diversion Study TMIG Project Flood Damage Estimates Culvert Upgrades (Alyssum, Reytan & Morden) Storm Event Buildings Impacted Flood Damages* 2 1 $35, $70, $100, $131, $222, $251,500 Regional 7 $222,500 Average Annual Damages Existing Average Annual Damages Reduction in Annual Flood Damages $46,271 $390,931 $344,660 * Damages Calculated as 30% of the Assessed Value of all Properties where buildings are partially or entirely within the flood plain

21 City of Pickering Krosno Creek Diversion Project TMIG Project Cost Estimate Culvert Upgrades Twin 3.0 m x 1.8 m Concrete Box Culverts at Alyssum, Reytan and Morde Item No. Spec. Code Item Description Unit Quantity Unit Price Total Notes 1 2 x 3.0m x 1.8m Concrete Box Culvert Depth - Less than 5.0m (Morden Crossing) m 23.0 $ 12, $ 276, x 3.0m x 1.8m Concrete Box Culvert Depth - Less than 5.0m (Raytan Crossing) m 27.0 $ 12, $ 324, x 3.0m x 1.8m Concrete Box Culvert Depth - Less than 5.0m (Alyssum Crossing) m 23.0 $ 12, $ 276, Headwalls on upstream and downstream end of each culvert each 6.0 $ 30, $ 180, Utility Relocation, Traffic Control and General Contingencies (30 %) LS 1.0 $ 316, $ 316, TOTAL COST $ 1,372, Cost Estimates xls

22

23 Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G4 Diversion Alternatives TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD

24

25 Potential Diversion Route Properties Route Route Description Route Length (m) Minimum Slope (m) Minimum Depth 1 (m) Maximum Pipe Size 2 Full Flow Capacity (m 3 /s) 3 1 Pickering Parkway, West to Pine Creek % m diameter concrete pipes 4, Bayly Street, West to Pine Creek % m diameter concrete pipe Bayly Street, East to Sandy Beach Road, south to Krosno Creek % m wide x 0.9 m high concrete box Morden Lane, south on Reytan Boulevard to Krosno Creek % m wide x 1.2 m high concrete box Morden Lane, south on Krosno Boulevard, east on Alyssum to Krosno Creek % m wide x 1.5 m high concrete box measured from existing ground to diversion invert Based on 0.6 m minimum structural cover as per Ontario Provincial Standard Specifications. This is a deviation from City of Pickering standards (1.8 m cover) Based on free flow conditions, ignoring tailwater elevation and potential surcharging Circular pipe is required for tunnelling under Liverpool Road Twin pipes as per FBSWMMP

26 1 - Pickering Parkway, West to Pine Creek A FUTURE OPTIONAL SWM POND LOCATION 2 - Bayly Street, West to Pine Creek 3 - Bayly Street, East to Sandy Beach Road, south to Krosno Creek C 4 - Morden Lane, South on Reytan Boulevard to Krosno Creek 5 - Morden Lane, South on Krosno Boulevard, West on Alyssum to Krosno Creek D E D 8800 Dufferin Street, Suite 200 Vaughan, ON L4K 0C5... p: f: KROSNO CREEK DIVERSION PROJECT POTENTIAL DIVERSION ROUTES PROJECT No. SCALE: 1:5000 DATE: SEPTEMBER 2013 DESIGNED BY: ET DRAWN BY: CAD CHECKED BY: SH CHECKED BY: FIGURE No. 4-2

27 Diversion Alignment 1: Pickering Parkway to Pine Creek Liverpool Road Average Pipe Slope: 0.30% Maximum Diversion Sewer Height: 2.4 m

28 Diversion Alignment 2: Bayly Street to Pine Creek Liverpool Road Average Pipe Slope: 0.15% Maximum Diversion Sewer Height: 1.8 m

29 Diversion Alignment 3: Bayly Street Sandy Beach Road Krosno Creek Intersection of Bayly & Sandy Beach Existing Ground Invert Obvert Min Cover Average Pipe Slope: 0.30% Maximum Diversion Sewer Height: 0.9 m

30 Diversion Alignment 4: Morden Lane Reytan Boulevard Krosno Creek Invert Obvert Min Cover Existing Ground Average Pipe Slope: 0.30% Maximum Diversion Sewer Height: 1.2 m

31 Diversion Alignment 5: Morden Lane Krosno Boulevard Alyssum Street Krosno Creek 85 Intersection of Krosno Blvd & Reytan Intersection of Krosno Blvd & Alyssum Existing Ground Invert Obvert Minimum Cover Average Pipe Slope: 0.25% Maximum Diversion Sewer Height: 1.5 m

32

33 Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G5 Pickering Parkway Diversion to Pine Creek TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD

34

35 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Pickering Parkway Diversion to Pine Creek Twin 2400 mm Diameter Sewers Maximum Flow Rate Location Conduit Drainage Area (ha) Hazel Highway _ Bayly Street Weir Flow KC_CJ44_HC Culvert Flow KC_CJ Total Flow ADD Downstream Bayly Street KC_CJ Morden Lane Weir Flow KC_CJ37_HC Culvert Flow KC_CJ Total ADD Reytan Boulevard Weir Flow KC_CJ29_HC Culvert Flow KC_CJ Total ADD Alyssum Street Weir Flow KC_CJ25_HC Culvert Flow KC_CJ Total ADD Sandy Beach Road North Culvert Weir Flow KC_CJ20_HC Culvert Flow KC_CJ Total ADD Confluence with East Tributa KC_CA Sandy Beach Road South Culvert Weir Flow KC_CJ7_HC Culvert Flow KC_CJ Total ADD Outlet to Frenchman's Bay KC_CJ

36 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Pickering Parkway Diversion to Pine Creek Twin 2400 mm Diameter Sewers Maximum Hydraulic Grade Line (m) Location Node Hazel Sandy Beach Road North Culvert - Downstream KC_J Sandy Beach Road North Culvert - Upstream KC_J Alyssum Street Culvert - Downstream KC_J Alyssum Street Culvert - Upstream KC_J Reytan Boulevard Culvert - Downstream KC_J Reytan Boulevard Culvert - Upstream KC_J Morden Lane Culvert - Downstream KC_J Morden Lane Culvert - Upstream KC_J Bayly Street Culvert - Downstream KC_J Bayly Street Culvert -Upstream KC_J Highway 401 / CNR Culverts - Downstream KC_J Highway 401 / CNR Culverts - Upstream flood damages incurred

37 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Pickering Parkway Diversion to Pine Creek Twin 2400 mm Diameter Sewers Diversion Flow Summary Storm Event Peak Flow to Storage / Junction Node Peak Flow from Storage / Junction Node Maximum Storage Volume Maximum Water Level Flow in Diversion Sewers Flow in Highway 401 Cuvlert Hazel Node / Conduit D2 34_1

38 Downtown SWM and Diversion Study TMIG Project Flood Damage Estimates Pickering Parkway Diversion to Pine Creek Storm Event Buildings Impacted Flood Damages* 2 5 $162, $686, $1,688, $1,838, $1,866, $1,932,700 Regional 62 $1,866,600 Average Annual Damages Existing Average Annual Damages Reduction in Annual Flood Damages $448,283 $390,931 -$57,352 * Damages Calculated as 10% of the Assessed Value of all Properties where buildings are partially or entirely within the flood plain

39 City of Pickering Krosno Creek Diversion Project TMIG Project Cost Estimate Pickering Parkway Diversion to Pine Creek 650 m Twin 2400 mm diam concrete pipe Item No. Spec. Code Item Description Unit Quantity Unit Price Total Notes 1 Storm Sewer Dia. 2.4m, Installed by Open Cut construction m $ 6, $ 3,780, Quantity reflects twin diversion sewers 2 Storm Sewer Dia. 2.4m, Installed by Tunnelling m $ 10, $ 7,000, Chambers / Headwalls at inlet / outlet each 2 $ 30, $ 60, SWM Pond LS 1 $ 4,000, $ 4,000, A design has not been prepared for the SWM pond. The cost of $4 Million was the high limit of the cost of a pond from the FBSWMMP 5 Utility Relocation, Traffic Control and General Contingencies (20 % of Diversion Costs) LS 1 $ 2,168, $ 2,168, TOTAL COST $ 17,008, Cost Estimates xls

40

41 Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G6 Pickering Parkway Complete Diversion to Pine Creek + Culvert Improvements in Krosno and Pine Creeks TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD

42

43 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Complete Diversion to Pine Creek (Twin 2.4 m Diameter Sewers) Combined with Culvert Improvements (Twin 3.0 m x 1.8 m Box Culverts at Morden, Reytan and Alyssum) Maximum Flow Rate Location Conduit Drainage Area (ha) Hazel Highway _ Bayly Street Weir Flow KC_CJ44_HC Culvert Flow KC_CJ Total Flow ADD Downstream Bayly Street KC_CJ Morden Lane Weir Flow KC_CJ37_HC Culvert Flow KC_CJ Total ADD Reytan Boulevard Weir Flow KC_CJ29_HC Culvert Flow KC_CJ Total ADD Alyssum Street Weir Flow KC_CJ25_HC Culvert Flow KC_CJ Total ADD Sandy Beach Road North Culvert Weir Flow KC_CJ20_HC Culvert Flow KC_CJ Total ADD Confluence with East Tributa KC_CA Sandy Beach Road South Culvert Weir Flow KC_CJ7_HC Culvert Flow KC_CJ Total ADD Outlet to Frenchman's Bay KC_CJ

44 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Complete Diversion to Pine Creek (Twin 2.4 m Diameter Sewers) Combined with Culvert Improvements (Twin 3.0 m x 1.8 m Box Culverts at Morden, Reytan and Alyssum) Maximum Hydraulic Grade Line (m) Location Node Hazel Sandy Beach Road North Culvert - Downstream KC_J Sandy Beach Road North Culvert - Upstream KC_J Alyssum Street Culvert - Downstream KC_J Alyssum Street Culvert - Upstream KC_J Reytan Boulevard Culvert - Downstream KC_J Reytan Boulevard Culvert - Upstream KC_J Morden Lane Culvert - Downstream KC_J Morden Lane Culvert - Upstream KC_J Bayly Street Culvert - Downstream KC_J Bayly Street Culvert -Upstream KC_J Highway 401 / CNR Culverts - Downstream KC_J Highway 401 / CNR Culverts - Upstream

45 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Complete Diversion to Pine Creek (Twin 2.4 m Diameter Sewers) Combined with Culvert Improvements (Twin 3.0 m x 1.8 m Box Culverts at Morden, Reytan and Alyssum) Pickering Town Centre Storage Summary Storm Event Peak Flow to Storage Node Peak Flow from Storage Node Maximum Storage Volume Maximum Water Level Hazel Node / Conduit

46 City of Pickering Krosno Creek Diversion Project TMIG Project Cost Estimate Complete Flooding Solution, Independent of Highway 401 Culvert Restrictions Pickering Parkway Diversion to Pine Creek Culvert Improvements Flood Proofing remaining vulnerable homes Item No. Spec. Code Item Description Unit Quantity Unit Price Total Notes 1 Diversion Sewers on Pickering Parkway + SWM Pond west of Liverpool Road LS 1 $ 13,008, $ 13,008, Total Cost, including contingencies, from Pickering Parkway Diversion Alternative, less $4Million for SWM Pond at end of diversion 2 Culvert Improvements at Morden, Retyan and Alyssum LS 1 $ 1,372, $ 1,372, Total Cost, including contingencies, from Culvert Upgrades Alternative 3 Pine Creek Improvements to lower tailwater and accommodate increased flows LS 1 $ 15,980, $ 15,980, Radom Street & Hwy 401 culvert replacements plus channel modifications upstream of Highwy 401. Cost, including contingencies, taken from Sept 2007 MMM Report 4 Flood Proofing for Remaining Structures each $ 10, $ - 5 TOTAL COST $ 30,360,800.00

47 Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G7 Krosno Boulevard Relief Sewer TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD

48

49 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Krosno Boulevard Relief Sewer 3.0 m wide x 1.5 m high concrete box sewer Maximum Flow Rate Location Conduit Drainage Area (ha) Hazel Highway _ Bayly Street Weir Flow KC_CJ44_HC Culvert Flow KC_CJ Total Flow ADD Downstream Bayly Street KC_CJ Morden Lane Weir Flow KC_CJ37_HC Culvert Flow KC_CJ Total ADD Reytan Boulevard Weir Flow KC_CJ29_HC Culvert Flow KC_CJ Total ADD Alyssum Street Weir Flow KC_CJ25_HC Culvert Flow KC_CJ Total ADD Sandy Beach Road North Culvert Weir Flow KC_CJ20_HC Culvert Flow KC_CJ Total ADD Confluence with East Tributa KC_CA Sandy Beach Road South Culvert Weir Flow KC_CJ7_HC Culvert Flow KC_CJ Total ADD Outlet to Frenchman's Bay KC_CJ

50 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Krosno Boulevard Relief Sewer 3.0 m wide x 1.5 m high concrete box sewer Maximum Hydraulic Grade Line (m) Location Node Hazel Sandy Beach Road North Culvert - Downstream KC_J Sandy Beach Road North Culvert - Upstream KC_J Alyssum Street Culvert - Downstream KC_J Alyssum Street Culvert - Upstream KC_J Reytan Boulevard Culvert - Downstream KC_J Reytan Boulevard Culvert - Upstream KC_J Morden Lane Culvert - Downstream KC_J Morden Lane Culvert - Upstream KC_J Bayly Street Culvert - Downstream KC_J Bayly Street Culvert -Upstream KC_J Highway 401 / CNR Culverts - Downstream KC_J Highway 401 / CNR Culverts - Upstream flood damages incurred

51 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Krosno Boulevard Relief Sewer 3.0 m wide x 1.5 m high concrete box sewer Diversion Flow Summary Storm Event Peak Flow to Intake Peak Flow in Diversion Sewer Peak Flow in Krosno Creek (Culvert) Peak Flow in Krosno Creek (Weir) Total Flow Continuing in Krosno Creek Hazel Node / Conduit KC_J37 D1 KC_CJ37 KC_CJ37_HC

52 City of Pickering Krosno Creek Diversion Project TMIG Project PCSWMM Model Output Krosno Boulevard Relief Sewer 3.0 m wide x 1.5 m high concrete box sewer Pickering Town Centre Storage Summary Storm Event Peak Flow to Storage Node Peak Flow from Storage Node Maximum Storage Volume Maximum Water Level Hazel Node / Conduit

53 Downtown SWM and Diversion Study TMIG Project Flood Damage Estimates Krosno Boulevard Relief Sewer Storm Event Buildings Impacted Flood Damages* 2 0 $0 5 2 $70, $100, $131, $222, $222,500 Regional 34 $1,074,500 Average Annual Damages Existing Average Annual Damages Reduction in Annual Flood Damages $31,874 $390,931 $359,057 * Damages Calculated as 10% of the Assessed Value of all Properties where buildings are partially or entirely within the flood plain

54 City of Pickering Krosno Creek Diversion Project TMIG Project Cost Estimate Krosno Boulevard Relief Sewer 660 m 3.0 x 1.5 Concrete Box Item No. Spec. Code Item Description Unit Quantity Unit Price Total Notes 1 3.0m x 1.5m Concrete Box Sewer Depth - Less than 5.0m m $ 5, $ 3,828, Storm Sewer MH (every 90m) m 8.0 $ 30, $ 240, Headwalls inlet /outlet each 2.0 $ 30, $ 60, Utility Relocation, Traffic Control and General Contingencies (40 %) LS 1 $ 1,651, $ 1,651, Higher contingency related to potenital conflicts with sanitary services to houses along the route TOTAL COST $ 5,779, Cost Estimates xls

MEMO. Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment.

MEMO. Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment. MEMO Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment February 15, 2017 As per the preferred Lakeview Boulevard alignment provided by

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa -

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - Stormwater Management Pond Design Brief Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - December 2008 Ref: 647-07 J.F. Sabourin and Associates Inc. Water Resources and

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

Stormwater Management Report for the Macri Dixon Condo Block

Stormwater Management Report for the Macri Dixon Condo Block for the Macri Dixon Condo Block Town of Milton February 2017 JFSA Ref. No.: 1287-15 Prepared for : Prepared by : David Schaeffer Engineering Ltd. 52 Springbrook Drive, Ottawa, ON K2S 1B9 tel.: 613.836.3884,

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

CITY OF ROSEVILLE DESIGN STANDARDS

CITY OF ROSEVILLE DESIGN STANDARDS CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR

More information

19.1 Problem: Maximum Discharge

19.1 Problem: Maximum Discharge 19.1 Problem: Maximum Discharge In partially full channel having an equilateral triangular cross section, the rate of discharge is Q = KAR/3 in which K is a constant, A flow area, R is the hydraulic mean

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek City of Fairway, Kansas Fairway Stormwater Level of Service Study - Phase 2 Project No. 108200 Revision 1 12/6/2018 Stormwater

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

June 13, 2016 Tom Garigen Re: Myrtle Beach Golf and Yacht Club Drainage assessment

June 13, 2016 Tom Garigen Re: Myrtle Beach Golf and Yacht Club Drainage assessment INFRASTRUCTURE & REGULATION DIVISION- STORMWATER DEPARTMENT 4401 Privetts Road Conway, South Carolina 29526 Post Office Box 1236 Conway, South Carolina 29528-1236 Phone: (843) 915-5160 Fax: (843) 365-2208

More information

City of Guelph. Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4

City of Guelph. Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4 City of Guelph Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4 City of Guelph Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4 Prepared by: AECOM

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

Evaluating Surge Potential in CSO Tunnels

Evaluating Surge Potential in CSO Tunnels 14 Evaluating Surge Potential in CSO Tunnels Karen E. Ridgway Tunnels are being proposed to control combined sewer overflow (CSO) in numerous cities in the United States and Canada. The tunnels are intended

More information

Dam Modification Report Stingy Run Fly Ash Reservoir Appendix E Spillway System Design Calculations E1: Spillway/Energy Dissipater Design for 100-year Event CHE8273 8 September 4, 2014 Written by: CJW

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

The Basics of Culvert and Inlet Design

The Basics of Culvert and Inlet Design PDHonline Course C619 (8 PDH) The Basics of Culvert and Inlet Design Jerry D. Morrow, PE 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030 6658 Phone & Fax: 703 988 0088 www.pdhonline.org

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

Storm Damage Floating Culverts & Other Inlet Issues

Storm Damage Floating Culverts & Other Inlet Issues Storm Damage Floating Culverts & Other Inlet Issues Mark Bailey, PE - Hydraulic Manager, INDOT Dale Sedler, PE - Sr. Hydraulic Engineer, INDOT Road School 2016 What causes a culvert to float? 1. Accumulation

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

South Burlington Multi-Site Stormwater Infrastructure Assessment Site No. 2 Bartlett Bay Road Culvert

South Burlington Multi-Site Stormwater Infrastructure Assessment Site No. 2 Bartlett Bay Road Culvert South Burlington Multi-Site Stormwater Infrastructure Assessment Site No. 2 Bartlett Bay Road Culvert Assessment of Culvert Capacity and Recommendations for Improvements Prepared for: Tom DiPietro Deputy

More information

TM /AFM 88-5, Chap Underground hydraulic design Inlets UFC - Drainage In Areas Other Than Airfields

TM /AFM 88-5, Chap Underground hydraulic design Inlets UFC - Drainage In Areas Other Than Airfields sults of laboratory research concerning soil infiltration through pipe joints and the effectiveness of gasketing tapes for waterproofing joints and seams are available. 3 6. Underground hydraulic design.

More information

Appendix D: Planning Level Cost Calculator

Appendix D: Planning Level Cost Calculator Appendix D: Planning Level Cost Calculator Network Costs by Facility Type Facility Type Total Miles of Facility Total Number of Intersections Cost per feature or per mile Total Cost Bicycle Boulevard 52.14

More information

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California HEC-RAS Version 3.1.3 May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California X X XXXXXX XXXX XXXX XX XXXX X X X X X X X X X X X X X X X X X X X XXXXXXX XXXX

More information

APPENDIX C SANITARY SEWER PEAK DESIGN FACTOR

APPENDIX C SANITARY SEWER PEAK DESIGN FACTOR PPENDIX C SNITRY SEWER PEK DESIGN FCTOR ll gravity sewers will be designed to accommodate the peak flow from the contributing drainage area. The peak flow will be computed using the appropriate peaking

More information

Modelling of Pressurised Pipes within InfoWorks ICM and CS

Modelling of Pressurised Pipes within InfoWorks ICM and CS Modelling of Pressurised Pipes within InfoWorks ICM and CS 1. Introduction Correctly modelling pressurised pipes, variously described as forcemains or rising mains, can be one of the more difficult aspects

More information

1. In most economical rectangular section of a channel, depth is kept equal to

1. In most economical rectangular section of a channel, depth is kept equal to Objective questions:- 1. In most economical rectangular section of a channel, depth is kept equal to a. One-fourth of the width b. Three times the hydraulic radius c. Hydraulic mean depth d. Half the width

More information

Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017

Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017 Rue des Trappistes Culvert Replacement and Road Reconstruction PUBLIC ENGAGEMENT SUMMARY October 2017 Background The culvert at Rue des Trappistes and Westendorf Coulee needs to be replaced as it is at

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011 OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011 APRIL 2011 Chapter 13 Culverts Table of Contents Foreword.3 13.1 Introduction.. 4 13.2 Policy 6 13.3 Passage

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes

More information

Section 10 - Hydraulic Analysis

Section 10 - Hydraulic Analysis Section 10 - Hydraulic Analysis Methodology Documentation Functionality Summary Sizing Methodology Fixed/Resize Combined Flow Storm: Sizing as per d/d Structures.dat Storm vs. Sanitary Methodology HGL/EGL

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Title: Marsh Creek and Albion River Instream Fish Barrier Removal, Flynn

More information

APPENDIX C. Fluvial and Tidal Hydraulics Report

APPENDIX C. Fluvial and Tidal Hydraulics Report APPENDIX C Fluvial and Tidal Hydraulics Report BUENA VISTA LAGOON ENHANCEMENT PROJECT FLUVIAL AND TIDAL HYDRAULICS ANALYSES Prepared for: SANDAG 401 B Street, Suite 800 San Diego, California 92101 Contact:

More information

Picture Spring Branch Hydrologic and Hydraulic Analysis Report. Prepared for: Anne Arundel County. Final

Picture Spring Branch Hydrologic and Hydraulic Analysis Report. Prepared for: Anne Arundel County. Final Picture Spring Branch Hydrologic and Hydraulic Analysis Report Prepared for: Anne Arundel County Final Date: November 30, 2017 Picture Spring Branch Hydrologic and Hydraulic Analysis Report November 30,

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Fish Passage Planning and Design

Fish Passage Planning and Design Fish Passage Planning and Design Culvert Fishway Planning and Design Guidelines Part I Design Drawings for Fishway Projects Ross Kapitzke James Cook University School of Engineering and Physical Sciences

More information

Presented by Fred Halterman, URS Jennie Agerton, URS

Presented by Fred Halterman, URS Jennie Agerton, URS Presented by Fred Halterman, URS Jennie Agerton, URS What is Eco Friendly Culvert Design? Culvert design that: Maintains connectivity for aquatic organism migration Maintains connectivity for gene flow

More information

Bridge Failures in Alberta

Bridge Failures in Alberta Introduction Bridge Failures in Alberta Bridges are inspected for three primary reasons safety of bridge system maintenance of bridges management of bridge system Inventory or management of the system

More information

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use

More information

Stream Crossings I: Engineering and Design Approaches to Provide Fish Passage at Culvert Slipline Projects in Connecticut

Stream Crossings I: Engineering and Design Approaches to Provide Fish Passage at Culvert Slipline Projects in Connecticut University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Pensacola Beach. BOARD OF COUNTY COMMISSIONERS Special Meeting

Pensacola Beach. BOARD OF COUNTY COMMISSIONERS Special Meeting Pensacola Beach Congestion Management Plan BOARD OF COUNTY COMMISSIONERS Special Meeting Board Chambers Suite 100 Ernie Lee Magaha Government Building - First Floor 221 Palafox Place http://www.myescambia.com/pensacola-beach/congestion-management-plan

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

Section 5: Pond Outlets

Section 5: Pond Outlets Section : Pond Outlets Defining and calculating pond outlet devices 8 Minutes Press Space, PageDown, or Click to advance. Press PageUp to reverse. Esc to exit. Right-Click for other options. Outlets Introduction

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Existing conditions of each bridge and repair plan are presented in Table

Existing conditions of each bridge and repair plan are presented in Table 2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road

More information

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

Project Completion Abstract Fish Passage Activity ( Engineering Activities) Project Completion Abstract Fish Passage Activity ( Engineering Activities) SUBMIT COMPLETED FORM TO DISTRICT MANAGER AND FIA ADMINISTRATOR AFTER PROJECT COMPLETION SECTION A GENERAL INFORMATION Recipient:

More information

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3 Public Information Centre Summary Report Muskoka Road 15 (Santa s Village Road) Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village The District Municipality of

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

Culvert Design Basics

Culvert Design Basics PDHonline Course C287 (4 PDH) Culvert Design Basics Instructor: George E. Thomas, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

Access requests to County streets and roadways are processed through one of the following methods:

Access requests to County streets and roadways are processed through one of the following methods: 13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.

More information

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H)

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia. FRST 557 Lecture 7c Bridges and Culverts: Water Velocity and Discharge Lesson Background and Overview: The previous two lessons presented methods for estimating water volume flow at a particular site and

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES. Lake Okeechobee & EAA Vol 3 A-i December 2005 Version 1 Draft 4

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES. Lake Okeechobee & EAA Vol 3 A-i December 2005 Version 1 Draft 4 1 1 1 1 1 1 1 1 0 1 0 1 0 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Lake Okeechobee & EAA Vol A-i December 00 1 1 1 1 1 1 1 1 0 1 from the drainage area served, under a design head of. feet pool

More information

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park I. Background During the Johnson County Board of County Commissioner s (JCBOCC) meeting

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Improving Road Safety for North Eastern State Roads of India A Case Study

Improving Road Safety for North Eastern State Roads of India A Case Study Improving Road Safety for North Eastern State Roads of India A Case Study North Eastern States Portugal Debasis Chakrabarty, Transportation Engineer Key figures of North Eastern States Road Project Total

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia Small Area Study U.S. Route 220 and VA Route 615 Intersection Bath County, Virginia Prepared by the Central Shenandoah Planning District Commission Final Report February 2018 Table of Contents 1. INTRODUCTION...

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS SITUATE IN: NORTH HUNTINGDON TOWNSHIP WESTMORELAND COUNTY, PENNSYLVANIA PREPARED FOR: North Huntingdon Township 11279 Center Highway North Huntingdon,

More information

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # 4602004 Prepared for Weyerhaeuser Company Ltd. Jason Ladyman R.P.F. 1550 Mission Flats Road PO Box 40 Kamloops BC V2C 5K3 Prepared

More information

Operation and Maintenance Manual. First Defense and First Defense High Capacity. Vortex Separator for Stormwater Treatment

Operation and Maintenance Manual. First Defense and First Defense High Capacity. Vortex Separator for Stormwater Treatment Operation and Maintenance Manual First Defense and First Defense High Capacity Vortex Separator for Stormwater Treatment Page 2 Page 3 Table of Contents I. First Defense by Hydro International 3 First

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

CALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION

CALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION APPENDIX IX-A STATE OF CALIFORNIA RESOURCES AGENCY DEPARTMENT OF FISH AND GAME CULVERT CRITERIA FOR FISH PASSAGE For habitat protection, ecological connectivity should be a goal of stream-road crossing

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

I-10 AT SCENIC LOOP RD. Open House

I-10 AT SCENIC LOOP RD. Open House I-10 AT SCENIC LOOP RD Open House General Information I-10 At Scenic Loop Rd KENDALL COUNTY OPEN HOUSE June 30, 2015 Currey Creek Baptist Church 35 Cascade Cavern 5:00 7:00 Boerne, TX 78015 2 Public Meeting

More information

Fish Passage Assessment Report Mare Brook Culverts

Fish Passage Assessment Report Mare Brook Culverts Fish Passage Assessment Report Mare Brook Culverts Fish Passage Assessment Component of Mare Brook Watershed Assessment and Community Engagement Project Prepared for: FB Environmental Associates 97A Exchange

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information