1 University of Massachusetts Amherst Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish Passage 2017 Jun 21st, 9:45 AM - 10:10 AM Project Award Presentation Follow this and additional works at: "Project Award Presentation" (2017). International Conference on Engineering and Ecohydrology for Fish Passage This Event is brought to you for free and open access by the Fish Passage Community at UMass Amherst at ScholarWorks@UMass Amherst. It has been accepted for inclusion in International Conference on Engineering and Ecohydrology for Fish Passage by an authorized administrator of ScholarWorks@UMass Amherst. For more information, please contact scholarworks@library.umass.edu.
2 Soda Springs Dam Fish Passage Program North Umpqua Hydroelectric Project, Oregon PacifiCorp Richard Grost, Scott Schevenius, Steve Albertelli (and many more) Resource Coordination Committee (BLM, NMFS, ODFW, ODEQ, OWRD, USFS, USFWS) MWH Americas Clint Smith Stillwater Sciences Dirk Pedersen Meridian Environmental George Gilmour
3
4
5 North Umpqua Hydroelectric Project, Oregon, USA
6 North Umpqua Hydroelectric Project Western Cascade Mountains, National Forest
7 North Umpqua Hydroelectric Project Soda Springs - 8 dams, 8 powerhouses, 40 miles of waterway MW Generation Capacity - built , new license in required many new fish protection facilities
8 Soda Springs Fish Passage Program Restores access to most historical habitat (6.6 miles) Spawning habitat improvements Higher flow Toketee Falls Tailrace barriers Log habitat improvements Ladder, screen, spillway modifications
9 Spawning Habitat below Soda Springs dam
10 Gravel Augmentation below Soda Springs dam
11 Spawning Habitat Soda Springs bypass reach
12 Slide Creek bypass reach, spawning habitat
13 Soda Springs Tailrace Barrier Preclude adult salmon and steelhead Powerhouse capacity 1,600 cfs Criteria: <1 gap, <1 ft/s velocity Area = 1,600 ft^2 Natural challenges: narrow canyon, bedload and debris
14 Soda Springs powerhouse pretailrace barrier
15 Soda Springs powerhouse with tailrace barrier
16 Soda Springs Tailrace Barrier prior to submersion (1-inch gap aluminum grating, 20 bays, each 10 ft wide)
17 Hydraulic Evaluation
18 Hydraulic evaluation water velocity (fps) 3.5 SDS TRB water velocity msmts (powerhouse 1,400 cfs; bypass 290 cfs) 14 Approach velocity (fps) a2 a7 b5 c2 c7 approach velocity average Gate opening (inches) Gate opening (inches) Bay #
19 Soda TRB Baffle Testing
20 Operational challenges: debris management
21 TRB Biological Evaluation no injury
22 Soda Springs Dam Fish Passage Steelhead, Chinook and Coho salmon, Cutthroat, trout, Lamprey Dam 60 ft high, screened flow 1,875 cfs Criteria: Half-Ice-Harbor ladder, 1 ft steps V-screen, <1.75 mm gap, <0.4 ft/s velocity Operational challenges: reservoir fluctuation 14 ft for re-regulation of upstream load following Natural challenges: steep canyon with active landslides, fractured rock, debris
23 Soda Springs Fish Passage Project 2006: Recon (geotech, aerial, surveys) : Design, modeling, permitting : Construction employed many local contractors work area flooded out 4 times : Major repairs and Upgrades : Performance Evaluation : O&M, Monitor Results Ladder, screen, spillway modifications
24 Soda Springs Dam, March 1952
25 Soda Springs Dam 2004
26 Soda Springs Dam 2011
27 Soda Springs Dam 2012
28 Soda Springs Fish Passage Design
29 Half-Ice Harbor design, smooth floor and curved turning walls
30 15 Fish Ladder Exit Gates to account for Reservoir Fluctuation
31 Fish Ladder Underwater Video Study of Fish Behavior -no delay or injury -
32 Soda Springs Fish Ladder Video Fish Counting Window
33
34 Soda Springs Fish Ladder Annual Upstream Passage Winter Steelhead ~ Summer Steelhead ~ Spring Chinook salmon ~ Coho Salmon ~ Brown Trout ~ Rainbow Trout ~ and, there are still 100 s of fish spawning downstream of the dam, too
35 Fish Screen for Juvenile Fish Moving Downstream
36
37
38
39
40
41
42 Fish Return Ramp Varies 14-ft to Account for Reservoir Fluctuation via Ramp - Hopper - Pipe
43 Fish Return Ramp Varies 14-ft to Account for Reservoir Fluctuation via Ramp - Hopper - Pipe
44
45
46
47 Evaluated Test Fish vs. Control Mortality Rate 0, Injury Rate <1%
48 Soda Springs Fish Passage Summary Restores Volitional Access to Most Historical Habitat <1% -injury rate for fry and smolts 6.6 -miles of restored habitat and access 194 MW capacity of low impact hydropower 344 feet of tailrace barrier length (2) 800-1,200 -adult salmon and steelhead passing annually 2038 year that program and monitoring is completed
Follow this and additional works at:
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationSession C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationSuccessful downstream passage of juvenile salmonids at a run-of-river hydro project in the Pacific Northwest
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationFollow this and additional works at:
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationCan we attract lake sturgeon to a fishway?
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationConcurrent Sessions C: Prioritization - Oregon Fish Passage Priority List - A Statewide Barrier Prioritization Effort
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationStudy Update Fish Distribution and Species Composition
Study Update Fish Distribution and Species Composition Goals and Study Area Gain a better understanding of fish species composition and abundance in waters associated with the Packwood Lake Hydroelectric
More informationDownstream Fish Passage Reports from the Field
Downstream Fish Passage Reports from the Field Northwest Hydroelectric Association Fall Workshop Two World Trade Center, Portland, OR October 17, 2013 TODAY S PANEL MEMBERS Steve Fischer, PE, Tacoma Power
More information7.0 FISH PASSAGE PLANNING AND EVALUATION
7.0 FISH PASSAGE PLANNING AND EVALUATION One of the study elements contained in this section is the Anadromous Fish Passage Modeling. The Habitat Modeling Group, established to guide this study element,
More informationPackwood Hydroelectric Project Barrier Analysis December 12, 2006
Packwood Hydroelectric Project Barrier Analysis December 12, 2006 Study Area Natural barriers to upstream fish passage on Lake Creek at RM 1.03 and RM 1.95 Snyder Creek culvert under the Project tailrace
More informationSession B7 - Santee-Cooper: A Lock on Fish Passage Success
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationPackwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington
for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted by EES Consulting 1155 North State
More informationFive Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013
Program - Aquatic Organisms and Stream Crossings Ecological Connectivity A watershed is a network of channels that drain a common boundary. Channel characteristics formed by interaction of precipitation,
More informationFSOC Upstream Fish Passage Guidance Document
FSOC Upstream Fish Passage Guidance Document STEP 1: Identify species and life stages in need of fish passage STEP 2: Identify fishway options and species applicability STEP 3 Fish passage criteria review
More informationConcurrent Sessions B: Columbia River Passage - Hydroturbine Passage Related Barotrauma Research in the Columbia River Basin: How Far Have We Come?
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationFish Passage Studies IV: Passage Options for Climbing Lamprey: If You Build It They Will Come
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationDevelopment and Investigation of Downstream Passage Alternatives for Cougar Dam, South Fork McKenzie River, OR
Development and Investigation of Downstream Passage Alternatives for Cougar Dam, South Fork McKenzie River, OR Mike Langeslay Supervisory Fish Biologist Portland District March 18 th, 2014 US Army Corps
More informationStudy Update Tailrace Slough Use by Anadromous Salmonids
Study Update Tailrace Slough Use by Anadromous Salmonids Goals and Objectives Identify what anadromous salmonids use the tailrace slough by: Life Stage (Juvenile, migrating and spawning adults) Timing
More informationFinal Bull Trout Genetics Monitoring Plan for the Wallowa Falls Hydroelectric Project. (FERC No. P-308) June 2017
Final for the Wallowa Falls Hydroelectric Project (FERC No. P-308) June 2017 Prepared by: Jeremiah Doyle PacifiCorp 825 NE Multnomah Street Portland, OR 97232 June, 2017 Page 1 of 8 Table of Contents 1.0
More informationFish Passage Studies II: Size-Related Turbine Passage Survival and Injury of Lake Sturgeon at the Shawano Project, Wolf River, Wisconsin
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationPenobscot II: Penobscot Indian Nation: Land Management and Stream Connectivity
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2012 ANNUAL REPORT
ADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2012 ANNUAL REPORT David A. Benner, Field Operations Coordinator Fish Passage Center A Collaborative Program of United States Fish and Wildlife
More informationWhooshh Fish Passage- Results from 2016
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationLewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda
Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, August, 27 9: a.m. :45 a.m. Place: CONFERENCE CALL ONLY Contacts: Frank
More informationLewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda
Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, September 4, 27 9: a.m. : a.m. Place: CONFERENCE CALL ONLY Contacts: Frank
More informationLake Merwin and Swift Creek Reservoir Tributaries. Bull Trout Limiting Factors Analysis
Lake Merwin and Swift Creek Reservoir Tributaries Bull Trout Limiting Factors Analysis Study Objectives Answer Key? s Do other tributaries to Swift Creek Reservoir and Lake Merwin not known to support
More informationFollow this and additional works at:
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationLewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda
Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, February 14, 219 9: a.m. 1:3 a.m. Place: CONFERENCE CALL ONLY Contacts:
More informationAn Investigation of the Hydraulics in a Prototype Pool-and-Chute, Vortex Weir Fishway for Anadromous Fish Passage
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationFish Passage from the Tidewater to the Sierras Workshop - Fish Passage at High Dams - Part 1
+ Fish Passage from the Tidewater to the Sierras Workshop - Fish Passage at High Dams - Part 1 35 th Annual Salmonid Restoration Conference held in Davis, CA from March 29 April 1, 2017. Fish Passage from
More informationOREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT
OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT TITLE: Upper Rogue Smolt Trapping Project, 1999 STREAM: Big Butte, Little Butte, South Fork Big Butte, Slate and West Fork Evans Creeks
More informationPLEASE BRING YOUR LUNCH
Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, July 13, 217 9: a.m. 3: p.m. Place: Merwin Hydro Control Center 15 Merwin
More informationAnnual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council
Annual Report for Fiscal Year 2012-2013 and Future Plans for the Tillamook Bay Watershed Council A report prepared for the Tillamook County Board of Commissioners August 2013 Table of Contents: Recently
More informationSession B4: Movement Patterns of Several Fish Species Approaching and Passing a Vertical Slot Fishway
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationLoss of smolts in reservoirs and the effects of barrier removal in lowland rivers
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationInterim Guidance Fish Presence Absence
Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced
More informationADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2016 ANNUAL REPORT
ADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2016 ANNUAL REPORT David A. Benner, Field Operations Coordinator FISH PASSAGE CENTER A Collaborative Program of United States Fish and Wildlife
More informationADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2013 ANNUAL REPORT
ADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2013 ANNUAL REPORT David A. Benner, Field Operations Coordinator Fish Passage Center A Collaborative Program of United States Fish and Wildlife
More informationPassive sorting of invasive sea lamprey in the Great Lakes basin
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationInstallation of Successful Combined Denil Fishway and Eelway at Upper Mystic Lake, MA
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationProspect No. 3 Hydroelectric Project FERC Project No. P Fish Passage Facilities Study Report: Biological Evaluation
Prospect No. 3 Hydroelectric Project FERC Project No. P-2337 Fish Passage Facilities Study Report: Biological Evaluation Study Objectives Determine if Project fish passage facilities are biologically functional
More informationLewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda
Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, December 14, 2017 9:00 a.m. 11:15 a.m. Place: Merwin Hydro Control Center
More informationFollow this and additional works at:
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationSession B8- Monitoring changes in diadromous populations resulting from fish passage improvements on the Acushnet River, Massachusetts
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationStream Crossings I: Engineering and Design Approaches to Provide Fish Passage at Culvert Slipline Projects in Connecticut
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationDownstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary
Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary Introduction In September 2008, the National Marine Fisheries Service issued the Russian River Biological Opinion, which
More informationSteve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:
From: To: Cc: Subject: Date: Attachments: Hemstrom, Steven "Lewis, Stephen" Sokolowski, Rosana 2014 Rocky Reach Bull Trout Report Wednesday, June 18, 2014 3:01:07 PM Final 2014 Rocky Reach Bull Trout Observations
More informationOregon Department of Transportation (ODOT) Culvert Repair Fish Passage Pilot Programmatic Agreement Final ODFW Report
Oregon Department of Transportation (ODOT) Culvert Repair Fish Passage Pilot Programmatic Agreement 2014-17 Final ODFW Report Prepared by Pete Baki June 27, 2018 Table of Contents 1 Background 4 Culvert
More informationInnovations III: Fish Passage Philosophy on European Rivers Fueling Hydropower Installations in the 21st Century
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationAquatic Habitats and Instream Flows at the Carmen-Smith Hydroelectric Project, Upper McKenzie River Basin, Oregon
Aquatic Habitats and Instream Flows at the Carmen-Smith Hydroelectric Project, Upper McKenzie River Basin, Oregon FINAL REPORT Prepared for Eugene Water & Electric Board Eugene, Oregon Prepared by Stillwater
More informationMerrimack River Watershed MERRIMACK RIVER WATERSHED
MERRIMACK RIVER WATERSHED 96 Merrimack River Watershed Merrimack River Newburyport, Amesbury, Merrimack, Haverhill, Groveland, Methuen, Lawrence, N. Andover, Andover, Dracut, Tewksbury, Lowell, Chelmsford,
More informationSub-watershed Summaries
Project Description The Salmon Drift Creek Watershed Council (SDCWC) has focused their efforts in the Salmon River estuary for the past few years. The multifaceted partnership effort is nearing completion
More informationADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2000 ANNUAL REPORT. Larry R. Basham, Field Operations Coordinator
ADULT FISHWAY INSPECTIONS ON THE COLUMBIA AND SNAKE RIVERS 2000 ANNUAL REPORT Larry R. Basham, Field Operations Coordinator FISH PASSAGE CENTER 2501 SW First Ave., Suite 230 Portland, OR 97201-4752 of
More informationFinal Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project
Final for the Wallowa Falls Hydroelectric Project East Fork Wallowa River barrier to upstream fish migration, photo courtesy of Kendrick Moholt (FERC No. P-308) December 18, 2017 Prepared by: Jeremiah
More informationJamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist
Jamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist 1 1. Chester Fish Ladder Project history Monitoring progress 2. Buffalo River
More informationBiological Opinion. Magnuson-Stevens Fishery Conservation and Management Act Consultation
Endangered Species Act Section 7(a)(2) Consultation Biological Opinion and Magnuson-Stevens Fishery Conservation and Management Act Consultation Operation of the Cowlitz River Hydroelectric Project (FERC
More informationSETTLEMENT AGREEMENT
SETTLEMENT AGREEMENT AMONG PACIFICORP USDA FOREST SERVICE NATIONAL MARINE FISHERIES SERVICE USDI FISH & WILDLIFE SERVICE USDI BUREAU OF LAND MANAGEMENT OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY OREGON
More informationUnintended Fishway Passage and Transport of Native and Non-Native Lampreys (Petromyzontidae)
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationDownstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary
Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary Introduction In September 2008, the National Marine Fisheries Service issued the Russian River Biological Opinion, which
More informationP U B L I C U T I L I T Y D I S T R I C T N O.
P U B L I C U T I L I T Y D I S T R I C T N O. 1 o f C H E L A N C O U N T Y P.O. Box 1231, Wenatchee, WA 98807-1231 327 N. Wenatchee Ave., Wenatchee, WA 98801 (509) 663-8121 Toll free 1-888-663-8121 www.chelanpud.org
More informationUsing edna to Understand Changes in Aquatic Biodiversity Above and Below a Barrier
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationSouthern Oregon Coastal Cutthroat Trout
Species Management Unit Description Southern Oregon Coastal Cutthroat Trout The Southern Oregon Coastal Cutthroat Trout SMU includes all populations of cutthroat trout inhabiting ocean tributary streams
More informationMEMORANDUM Oregon Department of Fish and Wildlife
MEMORANDUM Oregon Department of Fish and Wildlife Date: January 18, 2019 To: From: Oregon Fish and Wildlife Commission Greg Apke, ODFW Statewide Fish Passage Program Coordinator Tom Murtagh, North Willamette
More informationProposed Habitat Suitability Criteria (HSC) Curves For Application in Habitat Flow Modeling For the Sultan River Instream Flow Study RSP 3
- - Proposed Habitat Suitability Criteria (HSC) Curves For Application in Habitat Flow Modeling For the Sultan River Instream Flow Study RSP 3 Prepared for: Public Utility District No. 1 of Snohomish County
More informationExecutive Summary. Map 1. The Santa Clara River watershed with topography.
Santa Clara River Steelhead Trout: Assessment and Recovery Opportunities December 2005 Prepared By: Matt Stoecker and Elise Kelley, Ph.D. University of California, Santa Barbara Prepared For: The Santa
More informationWeekly Report #18 18
Visit our Website at www.fpc.org Fish Passage Center Weekly Report #18 18 847 NE 19th Ave., Suite 250 Portland, OR 97232 (503) 833-3900 This Week s Highlights Water Supply Precipitation throughout the
More informationNATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT
Attachment 4 NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT Figures in Draft Plan of February 28, 27 Figure 1. Map of the Rogue River Basin. PASSAGE ESTIMATES
More informationIDAHO COOPERATIVE FISH AND WILDLIFE RESEARCH UNIT
Technical Report 2007-1 IDAHO COOPERATIVE FISH AND WILDLIFE RESEARCH UNIT EVALUATION OF FISHWAY MODIFICATIONS TO IMPROVE PASSAGE OF ADULT CHINOOK SALMON AND STEELHEAD THROUGH THE TRANSITION POOL AT LOWER
More informationSession A2 - Free access for riverine fish along the Dutch Rhine, hydraulics and construction of the Dutch Rhine fishways
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationREVISED DRAFT HABITAT SUITABILITY CURVES and COHO SALMON and STEELHEAD TROUT. Sawmill Creek Alaska
REVISED DRAFT HABITAT SUITABILITY CURVES and COHO SALMON and STEELHEAD TROUT Sawmill Creek Alaska Blue Lake Hydroelectric Project, FERC No. 2230, Relicensing Prepared by: City and Borough of Sitka ( City
More informationUpstream Passage Assessment of American Shad Using 3D Acoustic Telemetry
Upstream Passage Assessment of American Shad Using 3D Acoustic Telemetry Timothy Hogan, Alden Research Laboratory Corey Wright, Blue Leaf Environmental Skip Medford, Enel Green Power North America Abstract
More informationLewis River Fish Passage Program 2014 Annual Report (30-day review Draft)
Lewis River Fish Passage Program 2014 Annual Report (30-day review Draft) FERC Project Nos. 935, 2071, 2111, 2213 Merwin Fish Collection Facility Adult Holding Tank 2014 Photo by Chris Karchesky PacifiCorp
More informationFISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum
FISH PASSAGE IMPROVEMENT in California s Watersheds Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds The mission of the Fish Passage Forum is
More information1998 Willow Creek Downstream Migrant Trap Report. Draft. Prepared By: C. A. Walker. Lower Trinity Ranger District. Six Rivers National Forest
1998 Willow Creek Downstream Migrant Trap Report Draft Prepared By: C. A. Walker Lower Trinity Ranger District Six Rivers National Forest September 1998 Executive Summary The downstream migrant trap was
More informationUNIT 4E. SALMON SUPPLEMENTAL INFORMATION
UNIT 4E. SALMON SUPPLEMENTAL INFORMATION In the STUDENT HANDOUTS/TEACHER PAGES Section of this unit, we have provided you with a host of information from various sources to supplement not only this unit,
More informationGuidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?
Guidance Note Hydropower Guidance Note: This guidance note is not intended as a statement of law. It should be read in combination with, and in the context of, the relevant enactments and EU obligations.
More informationFish Passage Studies I: Evaluation of Lake Sturgeon Passed through the Whooshh Fish Transport System
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationStrategies for mitigating ecological effects of hatchery programs
Strategies for mitigating ecological effects of hatchery programs Some case studies from the Pacific Northwest Kathryn Kostow Oregon Department of Fish and Wildlife Ecological risks occur when the presence
More informationSUMMARY OF OPERATIONS AT THE SAFE HARBOR FISH PASSAGE FACILITY SPRING 2017
SUMMARY OF OPERATIONS AT THE SAFE HARBOR FISH PASSAGE FACILITY SPRING 2017 November 2017 SUMMARY OF OPERATIONS AT THE SAFE HARBOR FISH PASSAGE FACILITY SPRING 2017 Prepared for SAFE HARBOR WATER POWER
More informationAmherst. University of Massachusetts - Amherst. Richard A.A. Noble University of Hull International Fisheries Institute
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationCushman Hydro Project Public Meeting. Cushman Fire Hall Dec. 6, 2018
Cushman Hydro Project Public Meeting Cushman Fire Hall Dec. 6, 2018 Reservoir Operations Florian Leischner Fish and Habitat Biologist Cushman Reservoirs Cushman dams were built in 1924-30 New Cushman license
More informationOREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE WATERSHED DISTRICT REPORT INTRODUCTION
OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE WATERSHED DISTRICT REPORT TITLE: Upper Rogue Smolt Trapping Project, 2003 STREAM: Bear, Little Butte, Elk, Slate and West Fork Evans Creeks and the Little Applegate
More informationUpper Yuba River Watershed Chinook Salmon and Steelhead Habitat Assessment
Technical Report Upper Yuba River Watershed Chinook Salmon and Steelhead Habitat Assessment Prepared for California Department of Water Resources November 2007 Prepared by Upper Yuba River Studies Program
More informationJuvenile salmon survivals in 2017 and river conditions
FISH PASSAGE CENTER 847 NE 19 th Ave., Suite 250, Portland, OR 97213 Phone: (503) 833-3900 Fax: (503) 232-1259 http://www.fpc.org/ e-mail us at fpcstaff@fpc.org MEMORANDUM TO: FROM: Ed Bowles (ODFW) FPC
More informationArctic Grayling and Denil Fishways: A Study to Determine How Water Depth Affects Passage Success
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationAttraction and Passage Efficiency of a Vertical-Slot Fish Pass for Sea Lamprey
University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More information2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA
+ 2 nd Steelhead Summit October 27 & 28, 2016 in San Luis Obispo, CA 1 + Session Overview Sponsors: California Trout City of San Luis Obispo Sustainable Conservation California Conservation Corps Cachuma
More informationAPPENDIX D: LEWIS RIVER HATCHERY REVIEW
APPENDIX D: LEWIS RIVER HATCHERY REVIEW JANUARY 14, 2004 Prepared for PacifiCorp and Cowlitz PUD Prepared by S.P. Cramer & Associates, Inc. 600 NW Fariss Gresham, Oregon 97030 www.spcramer.com D-1 TABLE
More informationLEWIS RIVER FISH PLANNING DOCUMENT
LEWIS RIVER FISH PLANNING DOCUMENT Prepared for PacifiCorp and Cowlitz PUD April 2004 S. P. Cramer & Associates, Inc. 600 NW Fariss Gresham, OR 97030 (503) 491-9577 www.spcramer.com EXECUTIVE SUMMARY The
More informationMEMORANDUM. DATE: June 15, RE: Fishway Inspections May 2001
FISH PASSAGE CENTER 2501 SW First Avenue, Suite 230, Portland, OR 97201-4752 Phone: (503) 230-4099 Fax: (503) 230-7559 http://www.fpc.org/ e-mail us at fpcstaff@fpc.org MEMORANDUM TO: FROM: Salmon Managers
More informationEels II: American Eel Passage Improvements at Coastal Rivers in Massachusetts
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationBULL TROUT OPERATIONAL PLAN
BULL TROUT OPERATIONAL PLAN ROCKY REACH HYDROELECTRIC PROJECT FERC Project No. 2145 April 10, 2001 Public Utility District No. 1 of Chelan County Wenatchee, Washington BULL TROUT OPERATIONAL PLAN This
More informationPROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR
PROJECT OVERVIEW PROJECT AREA FISH AND AQUATIC HABITAT COLLABORATIVE EFFORT (FAHCE) Fish Habitat Restoration Plan Project Area PROJECT OVERVIEW DOCUMENTS A Settlement Agreement Regarding Water Rights of
More informationStream Crossings I: Does Light in Culverts Affect Movement of Topeka Shiner and Other Fishes?
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationEVALUATION OF FISHWAY MODIFICATIONS TO IMPROVE PASSAGE OF ADULT CHINOOK SALMON AND STEELHEAD THROUGH THE TRANSITION POOL AT LOWER GRANITE DAM, 2008
Technical Report 2009-3 EVALUATION OF FISHWAY MODIFICATIONS TO IMPROVE PASSAGE OF ADULT CHINOOK SALMON AND STEELHEAD THROUGH THE TRANSITION POOL AT LOWER GRANITE DAM, 2008 by T.S. Clabough, G.P. Naughton,
More informationBy K.L. Pratt. Prepared for PacifiCorp, in cooperation with Cowlitz PUD, USFWS, WDFW July 2003
Evaluation of Three Proposed Management Scenarios to Enhance Three Potential Bull Trout Nursery Habitats, Accessible to Lake Merwin and Yale Lake, Lewis River By K.L. Pratt Prepared for PacifiCorp, in
More informationPackwood Lake Hydroelectric Project (FERC No. P-2244) Anadromous Salmonid Habitat and Spawner Survey Report
Packwood Lake Hydroelectric Project (FERC No. P-2244) Anadromous Salmonid Habitat and Spawner Survey Report Prepared For Prepared By EES Consulting 1155 N. State Street, Suite 700 Bellingham, WA 98225
More informationThe effects of visual and acoustic deterrents to prevent the upstream movement of Asian carps
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationBATTLE CREEK FISHERIES STUDIES TASK 4: SURVEYS OF BARRIERS TO THE UPSTREAM MIGRATION OF ANADROMOUS SALMONIDS
BATTLE CREEK FISHERIES STUDIES TASK 4: SURVEYS OF BARRIERS TO THE UPSTREAM MIGRATION OF ANADROMOUS SALMONIDS Prepared for: California Department of Fish and Game Redding, California 96001 Prepared by:
More informationLewis River Upstream Transport Plan Interim Final. Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy.
Lewis River Interim Final Upstream Transport Plan Lewis River Upstream Transport Plan Interim Final Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy December 18, 2009 Page 1 of 31 Table