1 470 Granville Street, Suite 630, Vancouver, BC V6B 1N3 t Memorandum Date: December 18, 2013 To: Jesse McCormick Donovan & Company Project: Site C Project From: Palmer Environmental Consulting Group cc Brian Kopach MSES Inc. Subject: Review of Site C Environmental Impact Statement (EIS) - Fish and Fish Habitat Dear Mr. McCormick, Palmer Environmental Consulting Group Inc. is pleased to provide our review of the fish and fish habitat mitigation measures proposed by BC Hydro for the Peace River (upstream of the dam) and the Moberly River, as requested in the Technical Support Description provided by Donovan & Company on behalf of the Saulteau First Nations (SFN). The purpose of the review was to identify any deficient mitigation measures, and to provide recommendations for potential mitigation enhancements for the Joint Review Panel (JRP) meeting scheduled for January 13, Methods: The review of fish and fish habitat mitigation measures was conducted using documents listed in the Technical Support Description, and found on the BC Environmental Assessment Office website: Site C Clean Energy Project Environmental Impact Statement- Volume 2: Assessment Methodology and Environmental Effects Assessment Section 12: Fish and Fish Habitat Volume 2, Appendix O, Fish and Fish Habitat Technical Data Report Volume 2, Appendix Q, Fish Passage Management Plan Volume 2, Appendix P, Aquatic Productivity Reports Site C Clean Energy Project Environmental Impact Statement - Volume 3: Economic and Land and Resource Use Effects Assessment - Section 24: Harvest of Fish and Wildlife Resources Information Request No. 1: JRP Request (IR1-20), BCH Response (IR1-12 & 14-20), BC Response (IR13) Information Request No. 2: JRP Request (IR 21-74), BCH Response (IR 21-74) Review Of Site C EIS Fish And Fish Habitat - Technical Memorandum - 1
2 December 18, 2013 Jesse McCormick Memorandum Information Request No. 3 (Part 1): JRP Request (IR and Supplemental Request S26-68), JRP Clarification to IR 85, BCH Response (Part One), BCH Response (Part Two) EBA Engineering Technical Memo on Sufficiency Review The environmental assessment documentation provided by BC Hydro is notably vast and detailed, making an analysis of every potential issue unrealistic for the purposes of this review. Instead, four key areas were identified as requiring discussion following a high level review of the reference materials, and consultation with the SFN legal counsel representative. These key areas were selected based on their relevance to SFN priorities including the primary fish species of concern, and the priority areas of SFN land users as described in the Technical Support Description provided by Donovan & Company. Supporting documents pertaining to these four areas were analyzed in the context of facilitating the discussion of potential mitigation deficiencies and recommendations: 1. Fisheries Productivity Offsetting (i.e., compensation) 2. Fish Population Modelling 3. Fish Stranding 4. Riparian Vegetation Key Issues and Recommendations: Commentaries for these four areas, including the potential environmental issues, key points, and recommendations for the JRP are provided below: 1.0 Fish Productivity Offsetting 1.1 Issue: Habitat alteration from riverine to reservoir due to inundation of the mainstem Peace River and downstream sections of the Moberly and Halfway Rivers will potentially lower fisheries productivity or extirpate local fish populations including the Moberly River Arctic grayling, Halfway River bull trout and Peace River mountain whitefish populations. 1.2 Key Points: There is currently no fisheries offsetting plan provided to indicate how effects to valued component fish species will be compensated Information Request No. 11 was an enquiry of the missing Fish Habitat Compensation Plan. The response from BC Hydro was very limited and did not provide sufficient detail given the current stage of the project. A general compensation plan including goals, target species, locations, and general methods should be a priority for development in order to facilitate meaningful discussion with the SFN Review Of Site C EIS Fish And Fish Habitat - Technical Memorandum - 2
3 December 18, 2013 Jesse McCormick Memorandum 1.3 Suggested Recommendations: BC Hydro should develop an offsetting plan to address the potential effects on Arctic grayling, bull trout, and mountain whitefish productivity. SFN priorities including fish species of concern in local habitats should be considered during offsetting plan development. For example, compensation could focus on enhancing habitat for locally harvested species that will be reduced or extirpated due to project effects such as Arctic grayling. In addition, potential offsetting locations could include the enhancement of SFN fisheries in Moberly Lake, Moberly River, or the Peace River (e.g., habitat enhancement or creation). The offsetting plan should also consider research programs with the aim of identifying any critical informational gaps which will aid in directing and prioritizing future compensation efforts. The SFN should be engaged in guiding research priorities, and trained as technicians for assisting in the field research. 2.0 Fish Population Modelling 2.1 Issue: The Site C dam construction and operations will have wide ecological implications for fish abundances and population composition. Fish population models have been conducted for identified species of concern to determine if population-level conservation objectives will be met following dam construction. 2.2 Key Points: Vol. 2, App. Q3: Species-specific fish passage models were completed for Arctic grayling, bull trout and kokanee. Vol. 2, App. Q3, P , 29-31: The developed models are deterministic age-structured models which do not provide sufficient justification or explanation regarding the following points: Basis for parameter assumptions, including validation methods. The robustness of these parameters depending on the chosen input values (e.g., sensitivity testing). The models as described do not include the potential for dynamic interactions, such as the change in number of recruits depending on spawner density. For example, the Arctic grayling model uses a fixed recruitment of 1000 recruits per spawner (Vol 2. App. Q3, P. 30), and the bull trout model stipulates that the number of age-3 recruits is independent of the number of spawners (Vol 2. App. Q3, P. 20). Vol. 2, App. Q3, P. 20 and 30: Beverton-Holt stock recruitment models were employed in fish population modelling. However, the Ricker stock-recruitment model is more sensitive to changes in stock abundance, and is the most commonly employed model for predicting relationships for salmonid species (e.g., Arctic grayling and bull trout). Review Of Site C EIS Fish And Fish Habitat - Technical Memorandum - 3
4 December 18, 2013 Jesse McCormick Memorandum Risk-based models developed for bull trout can be employed as a secondary comparative model. Using this approach, minimum acceptable population sizes can be predetermined with respect to maintaining a sufficient population for harvesting. The use of a risk-based model would have significantly helped in establishing the worth of the chosen modeling approach. 2.3 Suggested Recommendations: Fish population models should be adapted to incorporate stochastic biological relationships, for example varying the number of recruits systematically depending on spawner density. The models should undergo rigorous sensitivity testing to evaluate parameter assumptions, including the computation of elasticity measures. In addition, the prediction uncertainty bounds need to be presented in a clear manner for assessment. Provide clear, scientific justification and validation of model parameter assumptions in order to assess their effectiveness at predicting population changes. Use a Ricker stock-recruitment model in addition to the Beverton-Holt model employed. Use a secondary risk-based model developed previously for bull trout for comparison with the abundance-based model (e.g., Staples, D. F., Taper, M. L. and Shepard, B. B Risk-based viable population monitoring. Conservation Biology. 19: ). 3.0 Fish Stranding 3.1 Issue: Due to reservoir creation, and regular water level fluctuations during operations, fish stranding is an ongoing concern. 3.2 Key Points: Vol 2. Sect. 12, P : Proposed surveillance and re-location measures for stranded fish are standard. A better description of frequent site surveillance and triggers for surveillance should be made available. Depending on stranding conditions, stranded fish may have minutes to days before stranding conditions result in death. Vol 2. Sect. 12, P : It is not clear that collection and relocation programs to offset the effects of stranding will be fully effective as claimed. Any program will be bias toward larger bodied fish and more effective in quiet water, littoral habitats. The mitigation may offset the effect, but it will not eliminate it because of the sampling biases inherent in standardized fisheries field techniques. 3.3 Suggested Recommendations: Provide further detail of the fish salvaging program to support claims that the effects of stranding will be fully mitigated, including: Review Of Site C EIS Fish And Fish Habitat - Technical Memorandum - 4
5 December 18, 2013 Jesse McCormick Memorandum Frequency of surveillance: when and how often? Triggers for surveillance Design of the re-capture program Fishing gear types used various methods should be employed to reduce gear sizeselectivity Emergency draindown protocol Include estimated fish mortality from stranding in population estimate modelling. 4.0 Riparian Vegetation 4.1 Issue: The conversion of the Peace River into a reservoir will promote the loss of a large area of riverine riparian vegetation. Regular water level fluctuations will reduce the function of new reservoir riparian vegetation. 4.2 Key Points: Vol 2. Sect. 12: There is no attempt to assess riverine riparian habitat loss or the functionality of a fluctuating water line. New lacustrine riparian habitat will be limited in comparison due to the high surface area: shoreline length ratio in the reservoir. A fluctuating shoreline will reduce riparian habitat functionality including shade and protective cover for fish. 4.3 Suggested Recommendations: BC Hydro should provide an estimate of the quality and quantity of riparian habitat lost They should also provide an analytical discussion of how lacustrine riparian habitat with a fluctuating water level will provide functional riparian habitat (e.g., shade, protective cover) relative to baseline riverine riparian habitat BC Hydro should account for this difference of productivity in its fisheries productivity offsetting plan Review Of Site C EIS Fish And Fish Habitat - Technical Memorandum - 5
6 December 18, 2013 Jesse McCormick Memorandum Conclusion: Despite the large array of documentation presented by BC Hydro, there remains a substantial amount of uncertainty in the assessment due to legitimate unknown information, unrealistic model assumptions, and the lack of transparency provided. As indicated by the EIS, future research and adaptive management and monitoring programs will strive to provide new information to best inform management practices of local fisheries. However, increased transparency and development of model assumptions will allow a much more effective assessment of future biological conditions in the reservoir and Moberly River. In particular, future bull trout and Arctic grayling productivity largely hinges on the accuracy of model assumptions and parameter sensitivity. Bull trout projections as presented by BC Hydro currently meet population-level conservation objectives, however, there is a range of unrealistic and unsupported detail included in the model which led to the optimistic conclusion. The sustainability of Moberly River Arctic grayling seems unpredictable and arguably unlikely even if a rigorous trap and haul mitigation program is implemented. Considering this, future research programs and proposed productivity offsetting should focus on the viability of maintaining this fishery, and/or compensating for productivity elsewhere. Review Of Site C EIS Fish And Fish Habitat - Technical Memorandum - 6
7 Site C Project: Fish and Fish Habitat Presenters: Jesse McCormick, Donovan & Company Rick Palmer, Palmer Environmental Consulting Group (PECG) Alyssa Murdoch, PECG On Behalf of: Saulteau First Nations Joint Review Panel Hearing, Fort St. John, BC, January 13,
8 Palmer Environmental Consulting Group Rick Palmer, M.Sc., R.P.Bio., Senior Fisheries Biologist Alyssa Murdoch, M.Sc., R.P.Bio., Aquatic Biologist 2
9 Introduction Review of Site C Environmental Impact Statement Section 12 Fish and Fish Habitat Deficient mitigation of project effects Mitigation and compensation enhancement SFN primary fish species of concern Rainbow trout, bull trout, Dolly Varden, Arctic grayling, jackfish/pike, whitefish, burbot, other trout Priority areas of SFN land users 3
10 4 Project Area
11 Key Recommendation Sections 1. Fisheries Productivity Offsetting (i.e. compensation) 2. Fish Population Modelling 3. Fish Stranding 4. Riparian (Stream-side) Vegetation 5
12 1. Fisheries Productivity Offsetting/Compensation Issue: Likely reduction of fisheries productivity and/or entire loss of key fisheries, such as the Moberly River Arctic grayling, Halfway River bull trout and Peace River mountain whitefish Key Points: A fisheries productivity offsetting plan is required by law (Fisheries Act) BC Hydro did not effectively respond to the request for a Fish Habitat Compensation Plan in Info. Request #11 The plan needs to be developed to address the potential and likely loss of fisheries productivity 6
13 1. Fisheries Productivity Offsetting/Compensation Suggested Recommendations: Target species: locally harvested species of concern e.g., Arctic grayling Locations: Moberly Lake, Moberly River, Peace River Compensation options: improving or creating fish habitat, e.g., spawning or overwintering habitat for Arctic grayling Research initiatives: SFN involvement in prioritizing research questions, and training as field technicians 7
14 2. Fish Population Modelling Issue: Fish population models were conducted for identified species of concern to determine if population-level conservation objectives will be met following dam construction Key Points: Vol. 2, App. Q3: Models were completed for Arctic grayling, bull trout and kokanee Several unrealistic or unsupported assumptions, e.g. fixed recruitment (1000 eggs/arctic grayling spawner) Modelled results were not adequately tested for potential changes to input parameter values (e.g., recruitment, initial population size) The Beverton-Holt stock-recruitment model used is less conservative and not appropriate for the types of species being modelled A secondary risk-based model would provide additional support to predictions and would be more conservative for maintaining harvestable levels of fish 8
15 2. Fish Population Modelling Suggested Recommendations: Include more realistic biological relationships Perform sensitivity testing Report level of uncertainty Provide clear, scientific justification and validation of model parameter assumptions Use more appropriate Ricker stock-recruitment function Use secondary risk-based model to compare and confirm abundance-based model results 9
16 3. Fish Stranding Issue: Due to reservoir creation, and regular water level fluctuations during operations, fish stranding is an ongoing concern Key Points: BC Hydro claims that fish stranding effects will be fully mitigated, but do not provide details of their mitigation strategy Depending on stranding conditions, fish may have minutes to days before stranding conditions result in death 10
17 3. Fish Stranding Suggested Recommendations: Provide further detail of the fish salvaging program to support claims that the effects of stranding will be fully mitigated, including: Frequency of surveillance: when and how often? Triggers for surveillance Design of the re-capture program Fishing gear types used various methods should be employed to reduce gear size-selectivity Emergency draindown protocol Include estimated fish mortality from stranding in population estimate modelling 11
18 4. Riparian (Stream-side) Vegetation Issue: Riparian vegetation provides nutrient and food inputs, structural habitat inputs (e.g., woody debris), fish protective cover, and regulates temperature changes. The conversion of the Peace River into a reservoir will promote the loss of a large area of riverine riparian vegetation. Regular water level fluctuations will reduce the function of new reservoir riparian vegetation Key Points: There is no attempt to assess riverine riparian habitat loss or the functionality of a fluctuating water line New riparian habitat will be limited in comparison due to the high surface area : shoreline length ratio in the reservoir A fluctuating shoreline will reduce riparian habitat functionality including shade and protective cover for fish 12
19 4. Riparian (Stream-side) Vegetation Suggested Recommendations: BC Hydro should provide an estimate of the quality and quantity of predicted riparian habitat loss They should also provide an analytical discussion of how new riparian habitat with a fluctuating water level will provide functional riparian habitat (e.g., shade, protective cover) relative to baseline riverine riparian habitat BC Hydro should account for this difference of productivity in its fisheries productivity offsetting plan 13
20 Conclusions Need better and more transparent model predictions where possible Need to develop compensation strategies to offset reduction and loss of key fisheries e.g., Moberly River Arctic grayling 14
21 Recommendations Summary 1. Fisheries Productivity Offsetting/Compensation 1. BC Hydro should develop an offsetting plan to address the potential effects on Arctic grayling, bull trout, and mountain whitefish productivity. 2. SFN priorities including fish species of concern in local habitats should be considered during offsetting plan development. For example, compensation could focus on enhancing habitat for locally harvested species that will be reduced or extirpated due to project effects such as Arctic grayling. In addition, potential offsetting locations could include the enhancement of SFN fisheries in Moberly Lake, Moberly River, or the Peace River (e.g., habitat enhancement or creation). 3. The offsetting plan should also consider research programs with the aim of identifying any critical informational gaps which will aid in directing and prioritizing future compensation efforts. The SFN should be engaged in guiding research priorities, and trained as technicians for assisting in the field research 15
22 Recommendations Summary 2. Fish Population Modelling 4. Fish population models should be adapted to incorporate stochastic biological relationships, for example varying the number of recruits systematically depending on spawner density. The models should undergo rigorous sensitivity testing to evaluate parameter assumptions, including the computation of elasticity measures. In addition, the prediction uncertainty bounds need to be presented in a clear manner for assessment. 5. Provide clear, scientific justification and validation of model parameter assumptions in order to assess their effectiveness at predicting population changes. 6. Use a Ricker stock-recruitment model in addition to the Beverton-Holt model employed. 7. Use a secondary risk-based model developed previously for bull trout for comparison with the abundance-based model (e.g., Staples, D. F., Taper, M. L. and Shepard, B. B Risk-based viable population monitoring. Conservation Biology. 19: ). 16
23 Recommendations Summary 3. Fish Stranding and 4. Riparian Vegetation 8. Provide further detail of the fish salvaging program to support claims that the effects of stranding will be fully mitigated, including: Frequency of surveillance: when and how often? Triggers for surveillance Design of the re-capture program Fishing gear types used various methods should be employed to reduce gear sizeselectivity Emergency draindown protocol 9. Include estimated fish mortality from stranding in population estimate modelling. 10. BC Hydro should provide an estimate of the quality and quantity of riparian habitat lost 11. They should also provide an analytical discussion of how lacustrine riparian habitat with a fluctuating water level will provide functional riparian habitat (e.g., shade, protective cover) relative to baseline riverine riparian habitat 12. BC Hydro should account for this difference of productivity in its fisheries productivity offsetting plan 17
24 Thank you, any questions? Presenters: Jesse McCormick, Donovan & Company Rick Palmer, Palmer Environmental Consulting Group (PECG) Alyssa Murdoch, PECG On Behalf of: Saulteau First Nations Joint Review Panel Hearing, Fort St. John, BC, January 13,
Peace River Water Use Plan. Monitoring Program Terms of Reference. GMSMON-1 Peace River Creel Survey
Peace River Water Use Plan Monitoring Program Terms of Reference GMSMON-1 Peace River Creel Survey April 10, 2008 Terms of Reference for the Peace River Water Use Plan Monitoring Program: Peace River Creel
More informationTHE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON
THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON To: Branch of Natural Resources P.0. Box C, Warm Springs, Oregon 97761 Phone (541) 553-2002/2003 Fax (541) 553-1994 The Independent Science
More informationAssessment Summary Report Gulf of Mexico Red Snapper SEDAR 7
Assessment Summary Report Gulf of Mexico Red Snapper SEDAR 7 Stock Distribution: Red snapper are found throughout the Gulf of Mexico, the Caribbean Sea, and from the U.S. Atlantic Coast to northern South
More informationBenchmark Statement Respecting the Fish, Fish Habitat and Fisheries of Fish and Little Fish Lake, within the Taseko River Watershed.
Benchmark Statement Respecting the Fish, Fish Habitat and Fisheries of Fish and Little Fish Lake, within the Taseko River Watershed. Information Supporting the Environmental Assessment of the Prosperity
More informationBurns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #
Burns Paiute Tribe Fisheries Department Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project # 199701900 Prior to 1990 Technical and/or scientific background Malheur population,
More informationSALMONID ACTION PLAN FINAL DRAFT
SALMONID ACTION PLAN FINAL DRAFT Table of Contents 1 Introduction... 2 2 Overview context... 4 2.1 Fish and Fish Habitat in the Shuswap River... 5 2.2 Impacts and Threats... 6 2.3 Limiting factors... 7
More informationReport to the Joint Standing Committee on Inland Fisheries and Wildlife
Report to the Joint Standing Committee on Inland Fisheries and Wildlife As Required by 12 Section 10107-A White-tailed Deer Population Management Written By: Wildlife Management Staff, Inland Fisheries
More informationPaper prepared by the Secretariat
COMMISSION FOURTEENTH REGULAR SESSION Manila, Philippines 3 7 December 2017 REFERENCE DOCUMENT FOR REVIEW OF CMM 2005-03 AND FOR THE DEVELOPMENT OF HARVEST STRATEGIES UNDER CMM 2014-06 North Pacific Albacore
More informationApplication of a New Method for Monitoring Lake Trout Abundance in Yukon: Summer Profundal Index Netting (SPIN)
Application of a New Method for Monitoring Lake Trout Abundance in Yukon: Summer Profundal Index Netting (SPIN) Prepared by: Lars Jessup Nathan Millar November 2011 Application of a New Method for Monitoring
More informationNorth Carolina. Striped Mullet FMP. Update
North Carolina Striped Mullet FMP Update Presentation for the Marine Fisheries Commission January 24, 2008 COMMERCIAL HARVEST 4,000,000 2,000,000 3,500,000 3,000,000 Landings (lb) Value ($) 1,800,000
More informationFWCP External Projects Delivered by Stakeholders and First Nations
FWCP External Projects Delivered by Stakeholders and First Nations 2013-2014 For more information contact FWCP-Columbia program manager, Trevor Oussoren Trevor.oussoren@bchydro.com 250-365-4551 2013-2014
More informationAttachment 2 PETITIONERS
Attachment 2 PETITION TO TEMPORARILY MODIFY FRESHWATER FISHERY REGULATIONS ADOPTED UNDER THE CONSERVATION PLAN FOR NATURALLY PRODUCED SPRING CHINOOK SALMON IN THE ROGUE RIVER (submitted September 26, 2017)
More informationTHE WESTERN NATIVE TROUT INITIATIVE PLAN FOR STRATEGIC ACTIONS November GOALS, OBJECTIVES, and KEY STRATEGIC ACTIONS
THE WESTERN NATIVE TROUT INITIATIVE PLAN FOR STRATEGIC ACTIONS November 2016 INTRODUCTION In January 2008, after an intensive scoping and development process, the Western Native Trout Initiative (WNTI)
More informationImplementing the New Fisheries Protection Provisions under the Fisheries Act
Implementing the New Fisheries Protection Provisions under the Fisheries Act Discussion Paper Fisheries and Oceans Canada April 2013 Contents 1. Introduction 2. Managing Threats to Canada s Fisheries 3.
More informationMonitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A.
Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon 1998- February 8, 2 By Greg A. Taylor Oregon Dept. of Fish & Wildlife 315 E. Main Street Springfield, OR 97478
More informationThe Blue Heron Slough Conservation Bank
1 The Blue Heron Slough Conservation Bank CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES The Blue Heron Slough Conservation Bank (Washington) I. OVERVIEW & BACKGROUND: Location: Snohomish River
More informationRestoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho
Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Susan Ireland, Kootenai Tribe of Idaho Future of our Salmon Conference Technical Session August 2016 Healthy Floodplains,
More informationProposal for biomass and fishing mortality limit reference points based on reductions in recruitment. Mark N. Maunder and Richard B.
Proposal for biomass and fishing mortality limit reference points based on reductions in recruitment Mark N. Maunder and Richard B. Deriso IATTC Limit Reference Points: Background Triggering an LRP should
More informationDon Pedro Project Relicensing
Don Pedro Project Relicensing M ODESTO I RRIGATION D ISTRICT TURLOCK I RRIGATION D ISTRICT FERC PROJECT N O. 2299 Resident Fish in Don Pedro Reservoir Don Pedro Reservoir Fish Stocking (1971-Present) CDFG
More informationStudy 9.5 Fish Distribution and Abundance in the Upper Susitna River
Initial Study Report Meeting Study 9.5 Fish Distribution and Abundance in the Upper Susitna River October 15, 2014 Prepared by R2 Resource Consultants, Inc. 10/15/2014 1 Study 9.5 Objectives 1. Describe
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-49 2013 LAKE TAHOE WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL PROGRESS REPORT
More informationFISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP
FISHERIES A warming climate, by itself, substantially affects the hydrology of watersheds in the Blue Mountains. Among the key hydrologic changes projected under all scenarios for the 2040s and beyond
More informationAPPENDIX 2.1 Lake Sturgeon - Mitigation and Enhancement
APPENDIX 2.1 Lake Sturgeon - Mitigation and This page is intentionally left blank. Lake Sturgeon Mitigation and As a provincial crown corporation providing electric energy and natural gas service, Manitoba
More informationPACIFIC BLUEFIN TUNA STOCK ASSESSMENT
PACIFIC BLUEFIN TUNA STOCK ASSESSMENT SUMMARY 19-21 December 2012 Webinar PACIFIC BLUEFIN TUNA STOCK ASSESSMENT SUMMARY 1. Stock Identification and Distribution Pacific bluefin tuna (Thunnus orientalis)
More informationBlack Sturgeon Regional Plan
Black Sturgeon Regional Plan This is one of twenty Regional Plans that support implementation of the Lake Superior Biodiversity Conservation Strategy (Strategy). The Strategy, prepared and overseen by
More informationFishery Improvement Projects
Fishery Improvement Projects What is a Fishery Improvement Project (FIP)? A FIP is an alliance of stakeholders retailers, processors, producers, and/or catchers that comes together to resolve problems
More informationIdentifying and Executing Stream Projects Kristin Thomas, Aquatic Ecologist MITU
Identifying and Executing Stream Projects Kristin Thomas, Aquatic Ecologist MITU Introduction 1. Methods for Identifying Projects 2. Methods in Action 3. The Partnership Paradigm 2 River Stewards Program
More informationSWG-11-JM-10. F Limit Reference Points about Preventing Recruitment Overfishing and its Uncertainty
11th Meeting of the Science Working Group Lima, Peru, 1-19 October 01 F Limit Reference Points about Preventing Recruitment Overfishing and its Uncertainty One of the purposes of reference points (RPs)
More informationCertification Determination. Louisiana Blue Crab Commercial Fishery
15 th November 2016 Certification Determination For The Louisiana Blue Crab Commercial Fishery Following a meeting of a Global Trust Certification Committee on 20 th October 2016, a positive determination
More informationCOA-F17-F-1343 YEAR END REPORT
DAVE MARSHALL SALMON RESERVE RESTORATION, MAINTENANCE, AND UPGRADES YEAR END REPORT Prepared for: Fish and Wildlife Compensation Program Prepared by: Edith Tobe, RPBio, Executive Director Box 1791, Squamish,
More informationExecutive Summary. Map 1. The Santa Clara River watershed with topography.
Santa Clara River Steelhead Trout: Assessment and Recovery Opportunities December 2005 Prepared By: Matt Stoecker and Elise Kelley, Ph.D. University of California, Santa Barbara Prepared For: The Santa
More informationAPPENDIX D: LEWIS RIVER HATCHERY REVIEW
APPENDIX D: LEWIS RIVER HATCHERY REVIEW JANUARY 14, 2004 Prepared for PacifiCorp and Cowlitz PUD Prepared by S.P. Cramer & Associates, Inc. 600 NW Fariss Gresham, Oregon 97030 www.spcramer.com D-1 TABLE
More informationPRE- PROPOSAL FORM - Lewis River Aquatic Fund
PRE- PROPOSAL FORM - Lewis River Aquatic Fund 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest 2. Organization purpose Resource management agency 3. Project manager (name,
More informationAgenda Item Summary BACKGROUND. Public Involvement ISSUE ANALYSIS. Attachment 1
Agenda Item Summary Attachment BACKGROUND Between 996 and 03 white sturgeon fisheries in the Columbia River downstream from Bonneville Dam were managed under a series of management accords between the
More informationOcean and Plume Science Management Uncertainties, Questions and Potential Actions (Work Group draft 11/27/13)
Ocean and Plume Science Management Uncertainties, Questions and Potential Actions (Work Group draft 11/27/13) (The work group thinks the following four questions should form a logic path, but that logic
More informationMeeting in Support of Species at Risk Act Listing Process for Lower Fraser River and Upper Fraser River White Sturgeon
Meeting in Support of Species at Risk Act Listing Process for Lower Fraser River and Upper Fraser River White Sturgeon 1 Chilliwack, Kamloops and Prince George May and June, 2018 Meeting Objectives Outline
More informationFish Lake Informational Meeting. Dan Wilfond, Fisheries Specialist Deserae Hendrickson, Area Fisheries Supervisor MN DNR Fisheries - Duluth
Fish Lake Informational Meeting Dan Wilfond, Fisheries Specialist Deserae Hendrickson, Area Fisheries Supervisor MN DNR Fisheries - Duluth Why are we here tonight? Provide background info on fish community
More informationTrout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9
October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement
More informationChagrin River TMDL Appendices. Appendix F
Appendix F The following are excerpts from the Eastern Brook Trout Joint Venture s Conservation Strategy (Working Draft v.6), Conserving the Eastern Brook Trout: Strategies for Action Found at: http://www.easternbrooktrout.org/constrategy.html
More informationFrequently Asked Questions and Answers Regarding the Draft Northern Continental Divide Ecosystem (NCDE) Conservation Strategy
Frequently Asked Questions and Answers Regarding the Draft Northern Continental Divide Ecosystem (NCDE) Conservation Chris Servheen, USFWS, chris_servheen@fws.gov 5/1/13 Q1. What is the NCDE Conservation?
More informationINLAND LAKE MANAGEMENT REPORT FY Spring 2008
INLAND LAKE MANAGEMENT REPORT FY 2008 Spring 2008 Prepared by Robert O. Andress District Fisheries Biologist E. Daniel Catchings District Fisheries Supervisor Kevin W. Baswell District Biologist Aide Department
More information2018 Aquatic Effects Monitoring Program Response Plan Arctic Grayling Presence
January 31, 2019 Angela Love, EP Regulatory Specialist Mackenzie Valley Land and Water Board P.O. Box 2130 Yellowknife, NT X1A 2P6 Via Email: angela.love@mvlwb.com Dear Ms. Love: RE: 2018 Aquatic Effects
More informationI'd like to thank the Board for the opportunity to present here today.
Martin Knutson, NWT Wildlife Federation. I'd like to thank the Board for the opportunity to present here today. The NWT Wildlife Federation represents approximately six hundred and fifty (650) resident
More informationAgenda Item 7.1 For Information. Council CNL(10)24. Annual Report on Actions Taken Under Implementation Plans USA
Agenda Item 7.1 For Information Council CNL(10)24 Annual Report on Actions Taken Under Implementation Plans USA Annual Report on actions taken under the US Implementation Plan for the Calendar Year 2009
More informationPRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013
PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013 On behalf of its 40,000 plus members, The BC Wildlife Federation welcomes the opportunity to address the
More informationUpdate on Columbia Basin Partnership Task Force
Update on Columbia Basin Partnership Task Force June 25, 2018 Marla Harrison Port of Portland M A F A C C B P T A S K F O R C E Overview of Today s Presentation: Background on Columbia Basin & why we need
More informationKirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager
Kirt Hughes Region 6 - Fish Program Manager Habitat Hatcheries Harvest Clean Water Act Shorelines Harvest Hydro Habitat Forest Practices Non-regulatory Programs Water Supply & Conservation Growth Management
More informationAttachment 1. Agenda Item Summary BACKGROUND
Attachment 1 Agenda Item Summary BACKGROUND Spring Chinook Salmon: Prior to the late 1970s, non-treaty spring Chinook fisheries in the mainstem Columbia River occurred from February through May and harvested
More informationEastern Brook Trout. Roadmap to
Eastern Brook Trout Roadmap to CONSERVATION Our Brook Trout heritage he wild Brook Trout is an American symbol of persistence, adaptability, and the pristine wilderness that covered North America prior
More informationNASCO Guidelines for the Management of Salmon Fisheries
NASCO Guidelines for the Management of Salmon Fisheries NASCO Guidelines for the Management of Salmon Fisheries Additional copies of these Guidelines can be obtained free of charge from: The Secretary
More informationPlaice (Pleuronectes platessa) in Division 7.e (western English Channel)
Celtic Seas and Greater North Sea ecoregions Published 30 June 2016 Version 2: 15 May 2017 5.3.51 Plaice (Pleuronectes platessa) in Division 7.e (western English Channel) ICES stock advice ICES advises
More informationSTOCK ASSESSMENT OF ALBACORE TUNA IN THE NORTH PACIFIC OCEAN IN 2011
STOCK ASSESSMENT OF ALBACORE TUNA IN THE NORTH PACIFIC OCEAN IN 2011 Report of the ISC-Albacore Working Group Stock Assessment Workshop 3rd Science Advisory Committee Meeting Inter-American Tropical Tuna
More informationMINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH. Horsefly River Angling Management Plan
MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH Horsefly River Angling Management Plan January 30 th, 2006 Area/Fishery Description The Horsefly River watershed provides
More information***Please Note*** April 3, Dear advisory committee members:
April 3, 29 Dear advisory committee members: The fifth meeting of the CHF advisory committee will be held April 13 in Grants Pass from 6:-8:3 PM, and the purpose of this document is to help committee members
More information145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Douglas County, Washington Project No. 2149-163 ORDER APPROVING BULL TROUT STRANDING, ENTRAPMENT,
More informationBig Spring Creek Habitat Enhancement and Fishery Management Plans
Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and
More informationFinal Draft Integrated Fishery Management Plan. Summary
Final Draft Integrated Fishery Management Plan Summary Cambridge Bay Arctic Char Commercial Fishery Effective 2014 Arctic Char (Salvelinus alpinus) The purpose of this Integrated Fisheries Management Plan
More informationHatchery Scientific Review Group Review and Recommendations
Hatchery Scientific Review Group Review and Recommendations Lochsa River Spring Chinook Population and Related Hatchery Programs January 31, 2009 Lochsa River Spring Chinook Population Report Page - 1
More informationMaster Plan for the Snake River Sockeye Program: Springfield Hatchery
Independent Scientific Review Panel for the Northwest Power & Conservation Council 851 SW 6 th Avenue, Suite 1100 Portland, Oregon 97204 www.nwcouncil.org/fw/isrp Review of the Master Plan for the Snake
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-48 2012 LAKE TAHOE WESTERN REGION Contents NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL PROGRESS
More informationImplementing the New Fisheries Protection Provisions under the Fisheries Act
Implementing the New Fisheries Protection Provisions under the Fisheries Act Part 1 Legislation and Policy * The information in this presentation represents concepts as they have been developed to this
More informationFlorida s Freshwater Fisheries. Mike S. Allen Mark W. Rogers Galen Kaufman. Chris M. Horton
Evaluating Effects of Climate Change on Florida s Freshwater Fisheries Mike S. Allen Mark W. Rogers Galen Kaufman Chris M. Horton Methods Two parts: 1. Literature review to evaluate nationwide implications
More information"Recommended Improvements for the Next Pacific Salmon Treaty"
"Recommended Improvements for the Next Pacific Salmon Treaty" Randall M. Peterman School of Resource and Environmental Management Simon Fraser University Burnaby, British Columbia, Canada Web site: http://www.rem.sfu.ca/fishgrp/
More informationSITE C FISHERIES STUDY UPPER HALFWAY RIVER WATERSHED BULL TROUT SPAWNING SURVEY 2008
SITE C FISHERIES STUDY UPPER HALFWAY RIVER WATERSHED BULL TROUT SPAWNING SURVEY 2008 Note: This report has been redacted for protection of the bull trout (Salvelinus confluentus). Prepared for: B.C. Hydro
More informationProtection Measures Against Exotic Species
MONTANA AUDUBON P.O. Box 595 Helena, MT 59624 406-443-3949 mtaudubon@mtaudubon.org April 9, 2010 MO River Reservoir Management Plan Montana Fish, Wildlife & Parks P.O. Box 200701 Helena, MT 59620-0701
More informationUpdate on EFIMAS Project: Evaluation tool for Alternative scenarios for Northern Hake fisheries management (Management Strategies Evaluation (MSE))
Update on EFIMAS Project: Evaluation tool for Alternative scenarios for Northern Hake fisheries management (Management Strategies Evaluation (MSE)) NWW RAC Focus Group on Northern Hake Long Term Management
More informationWild Virginia and Heartwood first raised this issue at the May 19, 2014 public meeting.
June 13, 2014 Karen Stevens Pat Sheridan, District Ranger Warm Springs Ranger District 422 Forestry Road Hot Springs, VA 24445 karenlstevens@fs.fed.us psheridan@fs.fed.us re: Lower Cowpasture Restoration
More informationLEWIS RIVER FISH PLANNING DOCUMENT
LEWIS RIVER FISH PLANNING DOCUMENT Prepared for PacifiCorp and Cowlitz PUD April 2004 S. P. Cramer & Associates, Inc. 600 NW Fariss Gresham, OR 97030 (503) 491-9577 www.spcramer.com EXECUTIVE SUMMARY The
More informationRemoval of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0
Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL 26/02/2015 Version 2.0 1 Table of Contents List of Tables... 2 Introduction... 3 Methods... 4 Preliminary
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 LAKE TAHOE WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL PROGRESS REPORT
More informationMountain Caribou Recovery Implementation Plan. Predator/Prey Component. Terms of Reference
Mountain Caribou Recovery Implementation Plan Predator/Prey Component Terms of Reference These Terms of Reference (ToR) support the October 2007 BC Mountain Caribou Recovery Implementation Plan. They are
More informationFunding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16
2016 SRFB Grant Round Version: 2/19/16 Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region The Project Funding Process Presented by the Snake River Salmon Recovery Lead Entity
More informationAbundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California
scanned for KRIS Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California Prepared for: Marin Municipal Water District 220 Nellen Drive Corte Madera, California
More informationN ORTHWEST T ERRITORY M ÉTIS N ATION Box 720 Fort Smith, NT Canada X0E 0P0. 1. An Overview of the NWTMN Historical Context
1. An Overview of the NWTMN Historical Context The Northwest Territory Métis Nation (NWTMN) is comprised of the Indigenous Métis from the South Slave region in the Northwest Territories. The NWTMN is comprised
More informationSTUDY PERFORMANCE REPORT
STUDY PERFORMANCE REPORT State: Michigan Project No.: F-80-R-7 Study No.: 230654 Title: Evaluation of brown trout and steelhead competitive interactions in Hunt Creek, Michigan. Period Covered: October
More informationFor next Thurs: Jackson et al Historical overfishing and the recent collapse of coastal ecosystems. Science 293:
For next Thurs: Jackson et al. 2001. Historical overfishing and the recent collapse of coastal ecosystems. Science 293: 629-637. Resource: means of supplying a want or deficiency, from French resourdre
More informationB-36
B-35 B-36 B-37 B-38 B-39 B-40 B-41 B-42 B-43 B-44 B-45 B-46 From: Oliver, Ross C. Sent: Friday, November 08, 2002 8:41 PM To: Kenneth Sims Cc: Badger, Phil C.; Schaefer, Hillary; Richey, Alan C Subject:
More informationFisheries Management Standard. Version 2.0
Enacted in Japanese: 2017.10.03 Effective in Japanese: 2018.02.01 Fisheries Management Standard Version 2.0 Marine Eco-Label Japan Council (2018) Introduction Marine Eco-Label Japan (MEL) Council have
More informationSusitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page
Alaska Resources Library & Information Services Document ARLIS Uniform Cover Page Title: Wildlife harvest analysis study, Study plan Section 10.20 : Final study plan SuWa 200 Author(s) Personal: Author(s)
More informationWorldwide Office 4245 North Fairfax Drive, Suite 100 Arlington, VA 22203
October 24, 2017 Megan Ware Atlantic States Marine Fisheries Commission 1050 North Highland Street, Suite 200A-N Arlington, Virginia 22201 [sent via email] Dear Ms. Ware and Menhaden Management Board members,
More informationManagement Strategies for Columbia River Recreational and Commercial Fisheries: 2013 and Beyond
Management Strategies for Columbia River Recreational and Commercial Fisheries: 2013 and Beyond Recommendation of the Columbia River Fishery Management Workgroup to the Fish and Wildlife Commissions of
More informationWild & Hatchery Salmon Interactions Model. Pete Rand & Bob Lessard
Wild & Hatchery Salmon Interactions Model Pete Rand & Bob Lessard Hatchery Straying in Prince William Sound Brenner et al. 2012 Objectives Develop a tool to explore some of the hypotheses about wild/hatchery
More informationFinal Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 20, 2018
Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace (FERC No. P-308) December 20, 2018 Prepared by: Jeremiah Doyle PacifiCorp 825 NE Multnomah Street
More informationlas vegas wash coordination committee
las vegas wash coordination committee lvwash.org Proposal to Conduct a Small Mammal Study in the Las Vegas Wash, Nevada March 2009 Proposal to Conduct a Small Mammal Study in the Las Vegas Wash, Nevada
More informationSouthern Oregon Coastal Cutthroat Trout
Species Management Unit Description Southern Oregon Coastal Cutthroat Trout The Southern Oregon Coastal Cutthroat Trout SMU includes all populations of cutthroat trout inhabiting ocean tributary streams
More informationFish and Wildlife Compensation Program Trevor Oussoren, program manager, Columbia region. CRT Workshop, Fauquier, June 15, 2013
Angus Glass Fish and Wildlife Compensation Program Trevor Oussoren, program manager, Columbia region. CRT Workshop, Fauquier, June 15, 2013 The Fish and Wildlife Compensation Program is a partnership of:
More informationKootenay Lake Kokanee and other Fish 2017 Status
Kootenay Lake Kokanee and other Fish 2017 Status Friends of Kootenay Lake 5th Annual Kootenay Lake Summit November 2017 Matt Neufeld and Jeff Burrows BC Fish and Wildlife Nelson Outline Kootenay Lake Fish
More informationWelsh Waters Scallop Strategy 28 th May Summary of research
Welsh Waters Scallop Strategy 28 th May 2013 Summary of research Introduction This document describes the scallop research being conducted by Bangor University s Fisheries & Conservation Science Group
More informationState of San Francisco Bay 2011 Appendix O Steelhead Trout Production as an Indicator of Watershed Health
State of San Francisco Bay 2011 Appendix O Steelhead Trout Production as an Indicator of Watershed Health Gordon Becker and Katherine Smetak, Center for Ecosystem Management and Restoration 290 Introduction
More informationChinook Salmon. The Yukon River Panel
Chinook Salmon and The Yukon River Panel Jan Conitz, ADF&G UAF FISH 493 Discussion January 26, 2016 Discussion Outline I. Yukon River context Salmon and Yukon River basics Fishing and history on the Yukon
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 BOULDER RESERVOIR WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL PROGRESS
More informationColumbia River Salmon Harvest Sport and Commercial Sharing Facts and Relationships
Columbia River Salmon Harvest Sport and Commercial Sharing Facts and Relationships Prepared by Robert Sudar Commercial Advisor Columbia River Fisheries Management Work Group Economic Value of Fish & Wildlife
More informationOfficial Journal of the European Union L 248/17
22.9.2007 Official Journal of the European Union L 248/17 COUNCIL REGULATION (EC) No 1100/2007 of 18 September 2007 establishing measures for the recovery of the stock of European eel THE COUNCIL OF THE
More informationSTATE OF MINNESOTA IN COURT OF APPEALS. Court File No. A Petitioners, Respondents.
STATE OF MINNESOTA IN COURT OF APPEALS Court File No. A12-1680 Center for Biological Diversity, Howling for Wolves, Petitioners, vs. AFFIDAVIT OF JOHN D. ERB Minnesota Department of Natural Resources,
More informationNASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic Salmon Habitat
NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic Salmon Habitat 1 NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic Salmon Habitat Additional copies
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 REDBAND TROUT EASTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL JOB PROGRESS
More informationMaryland Chapter Trout Unlimited Brook Trout Conservation Effort
Maryland Chapter Trout Unlimited Brook Trout Conservation Effort Photo by Matt Kline Portfolio of Recent Work MDTU Brook Trout Conservation Coordinator: Scott C. Scarfone, ASLA sscarfone@oasisdesigngroup.com
More informationAmendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District
Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December 2007 Grand Valley Ranger District Grand Mesa, Uncompahgre, Gunnison National Forests Prepared
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 Lake Tahoe Rainbow Trout Study WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION
More informationPenns Creek, Section 05 Fishery Update and Regulation Review
Penns Creek, Section 05 Fishery Update and Regulation Review Mission: To protect, conserve, and enhance the Commonwealth s aquatic resources and provide fishing and boating opportunities 66-mile long tributary
More information