Daily Drilling Report

Size: px
Start display at page:

Download "Daily Drilling Report"

Transcription

1 Daily Drilling Report Well Name UTL H Report Date 05/05/2014 Field University Lands Supervisor Nate Baxter Report No. 97 Location 990' FNL & 300' FEL Supervisor 2 Kevin Evans DFS 94 County Ward Rig Phone Spud Date 01/31/2014 Rig Name HWD 9 Rig jaggedpeakenergy@outlook.com AFE $3,687, KB 15 Daily Footage Daily Cost $67, Depth (MD) 13,307 TVD at Bit 11,797 Cum. Cost $6,341, Estimated TD 16,140 Casing Data Type Size Weight Grade Connection Top Bottom Shoe Test Surface 9-5/ J-55 8 round -15' 4,899' Intermediate P round -15' 11,145' Mud Properties Last Survey BHA Type Brine Depth Inc Azi Component Length ID OD Weight 13.6 Drill Bit 0.68' FV 42 Motor 24.04' PV 23 Drilling Parameters MWD Tool 2.68' YP 22 Max WOB 15 Monel Collar 29.80' LCM (ppb) Max RPM 35 Monel Collar 29.79' Chlorides Max Torque X-Over 3.40' % Solids 4.8 Max Pull Daily Losses 417 Bkgrnd Gas Total Losses 4280 Max Gas Cnx Gas Trip Gas Total Length: Bit Info Bit # Size Make Type S/N Jets In Out Footage Hrs ROP Grade Hughes DP505X X16 12,260' 13,307' 1,047' CT-Shoulder-1/16--Gauge-To SMith MSi613 JG6874 6x16 13,307' 13,307' 1-5-BT-T-I--G NOV SKHI613M A 's 13,307' From To Hours P / U Summary Wash/Ream F/11655' - T/12113'. GPM: 220 RPM: 75 Torque: 7k-12k WOB: 5k-12k Flare: No Flare Heavy skim of possum belly on shaker. 6:00 12: Planned 12:30 14: UnPlanned Rig repair. (Code 8/NPT). Coupling on #2 parted. Liner washer pump down on pump #1. TOOH F/12133' - T/11150'. 14:00 16: Planned Pull:230k Circulate bottoms up. Spot 80bbl 15.5 Kill shoe. 16:00 17: Planned Flare: 25ft 17:30 18: TOOH F/ T/10900'. 18:00 18: Planned Rig service. 18:30 4: Planned TOOH F/ T/100. 4:00 4: Planned Lay down directional tools. No bit, Bit box attached to motor. 4:30 6: Planned Clean rig floor. Lay down motor. Total Hours: Hour Activity Summary: TOOH T/11150'. Spotted 80bbls 15.5 ppg kill casing shoe. TOOH. Bit, Bit-Box motor shaft not attached to mud motor. 24 Hour Plan TIH with fishing tools to retrieve bit,bit-box,motor shaft. Safety Fuel Last BOP Test 05/01/2014 Last BOP Drill 04/23/2014 Last Function Test 5/1/2014 Diesel Used Diesel Recvd Diesel on Loc 1,682

2 Well Name: UTL H Daily Cost Report Report Date: 05/05/2014 Daily Cost $67,731 Code Description Comments Daily Cum Permits, Licenses, ect $1, Staking & Surveying $1, Road, Locations $125, Mobilization/Demobilization $37, Daywork Contract Day Rate For HWD Rig #9.(1.5hrs code 8/Mud Pump $16,875 $1,602, Mouse/Rathole/Conduct Pipe $16, Directional Drilling & Survey Newsco Directional $17,450 $529, Bits, Tools, Stabalizers $214, Fuel, Power $307, Equipment Rental $2,385 $312, Mud & Chemicals $19,985 $942, Mud Logging Final Invoice (Empirica). $5,988 $49, Core Analysis Openhole Logging $23, Cement Services $327, Casing Crew & Equipment $91, Contract Labor CWS/Welding Services. $300 $52, Fishing Services $288, Drill Water $1,248 $190, Supervision Kevin Evans, Nate Baxter $3,500 $360, Insurance $33, Legal $10, P&A/TA Costs Cement Services (4-1/2" Liner) Total Intangible $67,731 $5,516,695 Code Description Comments Daily Cum Conductor Casing /8" Surface Casing - 9-5/8" $142, Intermediate Casing - 7" $325, Wellhead Equipment $32, Float equipment, Centralizers & DVT $23, Tangible Contingency $301, Production Casing - 4-1/2" Liner Hanger - 4-1/2" WellEz Information Management Ver bg Total Tangible $824,961 Total Costs $67,731 $6,341,657

3 Report Date: 05/06/2014 Field: May 6, 2014 Rig Name: Report #: 10 Location: UTL H Supervisor: SHA STEPHENS Daily Cost: $4,895 County: Ward Phone: Cum Job: $209,556 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,574,292 INSTALL SWD FACILITY 6:00 18: INSTALL SWD FACILITY 12.0 HRS HOT OILER EQUIPMENT RENTAL CONTRACT LABOR COMPLETION RIG COILED TUBING PERFORATING/WIRELINE SERV COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Total Intangible $4, WATER PIPELINE $30, SUBSURFACE EQUIPMENT NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $4,450 $38, CONTINGENCY $445 $3,371 Total Tangible $4,895 $205,256 Total Daily & Cum Costs $4,895 $209,556

4 Report Date: 05/07/2014 Field: May 7, 2014 Rig Name: Report #: 11 Location: UTL H Supervisor: SHA STEPHENS Daily Cost: County: Ward Phone: Cum Job: $209,556 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,597,552 6:00 6: NO ACTIVITY FOR FACILITIES HOT OILER EQUIPMENT RENTAL CONTRACT LABOR COMPLETION RIG COILED TUBING PERFORATING/WIRELINE SERV COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Total Intangible $4, WATER PIPELINE $30, SUBSURFACE EQUIPMENT NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $205,256 Total Daily & Cum Costs $209,556

5 Daily Drilling Report Well Name UTL H Report Date 05/08/2014 Field University Lands Supervisor Nate Baxter Report No. 100 Location 990' FNL & 300' FEL Supervisor 2 Tate Edeler DFS 97 County Ward Rig Phone Spud Date 01/31/2014 Rig Name HWD 9 Rig jaggedpeakenergy@outlook.com AFE $3,687, KB 15 Daily Footage Daily Cost $13, Depth (MD) 13,307 TVD at Bit 11,797 Cum. Cost $6,401, Estimated TD 16,140 Casing Data Type Size Weight Grade Connection Top Bottom Shoe Test Surface 9-5/ J-55 8 round -15' 4,899' Intermediate P round -15' 11,145' Mud Properties Last Survey BHA Type Brine Depth Inc Azi Component Length ID OD Weight 13.6 Sub 0.76' FV 43 Sub 1.55' PV 18 Drilling Parameters Sub 8.81' YP 25 Max WOB 15 X-Over 1.32' LCM (ppb) Max RPM 35 X-Over 1.68' Chlorides Max Torque Sub 7.75' % Solids 3.66 Max Pull X-Over 1.31' Daily Losses Bkgrnd Gas X-Over 3.40' Total Losses 4280 Max Gas Cnx Gas Trip Gas Total Length: Bit Info Bit # Size Make Type S/N Jets In Out Footage Hrs ROP Grade Hughes DP505X X16 12,260' 13,307' 1,047' CT-Shoulder-1/16--Gauge-To SMith MSi613 JG6874 6x16 13,307' 13,307' 1-5-BT-T-I--G NOV SKHI613M A 's 13,307' From To Hours P / U Summary 6:00 11: Planned Wait on wire line and completions to bring out RBP. Rigging down off line cleaning auxiliary pit equip and rigging down misc. in back yard. Start Pre- Move with Red River trucking CO. 11:00 15: Planned Run RBP with Capitan wire line T/10,990' Top of 10,986' 15:00 18: Planned Pressure Test Plug 2000psi 30 min. Good test. R/D Wire line. Dump and drain pits. Start N/D BOPE. Pre Move Rig Misc. 25 loads hauled of pipe and misc. to new location. Rig 18:00 Total Hours: Hour Activity Summary: Run wireline retrievable bridge plug pressure test same. Clean pits. R/D by hand and prepare to move to Trinity H Rig 18:00HRS 24 Hour Plan Secure Well and release rig Safety Fuel Last BOP Test 05/01/2014 Last BOP Drill 04/23/2014 Last Function Test 5/1/2014 Diesel Used Diesel Recvd Diesel on Loc 482

6 Well Name: UTL H Daily Cost Report Report Date: 05/08/2014 Daily Cost $13,806 Code Description Comments Daily Cum Permits, Licenses, ect $1, Staking & Surveying $1, Road, Locations $125, Mobilization/Demobilization $37, Daywork Contract Day Rate For HWD Rig #9 $13,500 $1,644, Mouse/Rathole/Conduct Pipe $16, Directional Drilling & Survey Newsco Directional $531, Bits, Tools, Stabalizers $216, Fuel, Power Credit back fuel $-16,635 $290, Equipment Rental $7,714 $325, Mud & Chemicals $942, Mud Logging $49, Core Analysis Openhole Logging $23, Cement Services $327, Casing Crew & Equipment $91, Contract Labor Capitan Wire Line and Kent for cleaning pits $5,727 $58, Fishing Services $288, Drill Water $191, Supervision Tate Edeler, Nate Baxter $3,500 $370, Insurance $33, Legal $10, P&A/TA Costs Cement Services (4-1/2" Liner) Total Intangible $13,806 $5,576,841 Code Description Comments Daily Cum Conductor Casing /8" Surface Casing - 9-5/8" $142, Intermediate Casing - 7" $325, Wellhead Equipment $32, Float equipment, Centralizers & DVT $23, Tangible Contingency $301, Production Casing - 4-1/2" Liner Hanger - 4-1/2" WellEz Information Management Ver bg Total Tangible $824,961 Total Costs $13,806 $6,401,803

7 Report Date: 05/21/2014 Field: May 21, 2014 Rig Name: Report #: 13 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $11,378 County: Ward Phone: Cum Job: $240,070 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,641,872 MIRU TEC #6 workover rig make up 4 3/4" shoe 8rd connection would not make up wait on x-over sub started in hole Finish in hole to top of plug rig up slick line retrieve profile plug 6:00 7: no acitivity 7:00 10: MIRU TEC RIG # 6 on well 10:00 13: Off loaded 2 7/8" tbg off trucks onto pipe racks tallied pipe picked up 4 3/4" shoe sub back to 2 7/8" box Would not make up in box under cut thread 13:00 16: Waiting on x-over sub from Cornell Solutions 16:30 20: Made up shoe and started in hole tallying pipe run in hole to 3800' shut well in for night 20:00 6: No activity HOT OILER EQUIPMENT RENTAL $40 $ CONTRACT LABOR $1,320 $1, COMPLETION RIG TEC RIG 6 $7,484 $7, COILED TUBING PERFORATING/WIRELINE SERV $6, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $1,500 $2,800 Total Intangible $10,344 $22, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $10,344 $238,225

8 Report Date: 05/22/2014 Field: May 22, 2014 Rig Name: Report #: 14 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $18,547 County: Ward Phone: Cum Job: $258,616 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,660,419 Finished in hole with shoe rig up slickline retrieve profile nipple made several runs unable to pull plug shut down for night Rig up wireline make equalizing prong make run and pick up retrieving tool and pull profile nipple 6:00 11: Finished in hole to 10,997' top of pkr 11:00 14: rigged up Diamond D Slickline made up 15' 1 1/2" bars and spang jars with equalizing prong to 10,958' Beat down with spang jars to burst glass to equalize pooh 14:00 16: Made up retrieving tool went in hole to 10,958' wireline meas with retrieving tool. worked down to plug pooh no recovery 16:30 19: Rigged up pump truck pumped 6 bbls water down tbg working pipe up and washing down to pkr with 10,000# weight rig up slickline went in hole to 10,958' with retrieving tool worked spang jars pooh no recovery 19:00 21: Made up baler went in hole to 10,958' baled pooh recovered 14.0 lb mud rig down shut well in for night 21:00 6: Well shut in for night HOT OILER M&W HOT OIL< INC PUMP TRUCK $1,172 $1, EQUIPMENT RENTAL $130 $ CONTRACT LABOR $1, COMPLETION RIG $7,178 $14, COILED TUBING PERFORATING/WIRELINE SERV $6,880 $13, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $1,500 $4,300 Total Intangible $16,861 $39, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $16,861 $255,086

9 Report Date: 05/23/2014 Field: May 23, 2014 Rig Name: Report #: 15 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $12,689 County: Ward Phone: Cum Job: $271,305 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,683,560 Rig up Slickline run in hole with equalizing prong sheared brass on plug at 10,997' unable to pull due to well going on Vaccum 6:00 8: No acitivity 8:30 12: rig up Slickline run in hole with equalizing prong sheared brass, well on vaccum worked spang jars Not able to pull free 12:00 19: Rig up M&W pump truck circ 14 LB mud out of well with fresh water pumping into water transport trucks Total of 360 BBLS bled well to 0 psi 19:00 21: Working with jars to release spear from plug unable close bops on slickline pressured up on packoff 21:00 6: Shut down for night EQUIPMENT RENTAL $130 $ CONTRACT LABOR $2,822 $4, COMPLETION RIG $7,083 $21, COILED TUBING PERFORATING/WIRELINE SERV $13, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $1,500 $5,800 Total Intangible $11,535 $51, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $11,535 $266,621

10 Report Date: 05/24/2014 Field: May 24, 2014 Rig Name: Report #: 16 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $19,098 County: Ward Phone: Cum Job: $290,403 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,702,658 Working to free slick line pressure 3800# unable drop 3 cutters to cut line pulled free reheade retrieved #3 cutter Go in hole retrieve #2 cutter and fish wire out of tbg 6:00 8: Waiting on Diamond wireline crew 8:30 11: Worked line trying to free tool pressured to 3800# worked line to get free dropped deer hoof cutter waited 20 min to fall with 1500# pull on line no indication of cut 11:00 12: Pumped 5 bbls water at 2 1/2 bbls min still no cut 12:00 14: Waiting on timer cutter 14:30 17: Dropped cutter waited 60 min no cut tool hand said it would reset in 30 min and cut waited no cut 17:00 19: Dropped E-Brace cutter waited 10 min drop bar no cut worked wire with unit came free pooh Left 1302' of wire in hole reheaded rope socket run in hole retrieve bar 19:00 21: Went in hole retrieved cutter #3 pooh shut well in for night 21:00 6: Shut down for night EQUIPMENT RENTAL $130 $ CONTRACT LABOR $990 $5, COMPLETION RIG $6,442 $28, COILED TUBING PERFORATING/WIRELINE SERV $8,300 $21, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $1,500 $7,300 Total Intangible $17,362 $68, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $17,362 $283,983

11 Report Date: 05/25/2014 Field: May 25, 2014 Rig Name: Report #: 17 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $39,738 County: Ward Phone: Cum Job: $330,141 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,742,396 Went in hole with retrieving tool to get cutter went t0 9654' in wire pooh shut well in rig down Slickline Rig up coil tbg to fish wire and cutters inside tbg with baker fishing tools 6:00 8: No acitivity 8:00 10: Went in hole with retrieving tool to get cutter went to 9654' in wire pooh rig slickline down 10:00 6: shut down till 5/26/2014 memorial day EQUIPMENT RENTAL $130 $ CONTRACT LABOR $5, COMPLETION RIG $3,473 $31, COILED TUBING PERFORATING/WIRELINE SERV $31,022 $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $1,500 $8,800 Total Intangible $36,125 $104, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $36,125 $320,108

12 Report Date: 05/26/2014 Field: May 26, 2014 Rig Name: Report #: 18 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $159 County: Ward Phone: Cum Job: $330,300 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,742,555 Shut down for weekend Rig up coil tbg to fish wire and cutters inside tbg with baker fishing tools 6:00 6: Shut down memorial day EQUIPMENT RENTAL $130 $ CONTRACT LABOR $5, COMPLETION RIG $31, COILED TUBING PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $8,800 Total Intangible $130 $104, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $130 $320,238

13 Report Date: 05/27/2014 Field: May 27, 2014 Rig Name: Report #: 19 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $5,712 County: Ward Phone: Cum Job: $336,012 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,748,267 Rig down TEC rig #6 off well MIRU Halliburton CTU Shut down at noon for memorial day commence tomorrow Rig up CTU on well head and fish slickline tools in 2 7/8" tbg 6:00 7: Well shut in 7:00 8: Rig TEC rig #6 off well 8:30 12: Rigged up Halliburton Coil Tbg on well shut down let hands have rest of day off Memorial Day Commence on the 27th 12:00 6: Shut down till morning EQUIPMENT RENTAL $130 $ CONTRACT LABOR $5, COMPLETION RIG TEC RIG #6 $3,563 $35, COILED TUBING HALLIBURTON CTU PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $1,500 $10,300 Total Intangible $5,193 $109, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $5,193 $325,431

14 Report Date: 05/28/2014 Field: May 28, 2014 Rig Name: Report #: 20 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $4,639 County: Ward Phone: Cum Job: $340,651 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,752,906 Rig up Halliburton CTU unit made 2 runs with spears no recovery make a run with retrieving tool to see if a cutter is there Change of plan rig down Halliburton 6:00 7: Shut down 7:00 12: Finished rigging up Halliburton CTU unit 12:00 14: made up spear double prong with gaffs inside 14:00 18: Run in hole to 9670' tagged top of wire worked spear down to 9681' picking up to neutral weight Worked spear several times had indication of wire on spear pooh no recovery 18:00 22: Made up single prong spear with gaffs on the outside went in hole to 9678' worked spear getting a 2500# pull picking up worked spear several times to 9689' pooh no recovery shut down for nightt 22:30 6: No acitivity EQUIPMENT RENTAL $2,670 $3, CONTRACT LABOR $5, COMPLETION RIG TEC RIG #6 $35, COILED TUBING PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $1,500 $11,800 Total Intangible $4,170 $114, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $4,170 $329,601

15 Report Date: 05/29/2014 Field: May 29, 2014 Rig Name: Report #: 21 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: $72,596 County: Ward Phone: Cum Job: $413,247 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $6,825,501 Rig down Halliburton off well MIRU TEC Rig # 6 land tbg nipple down bops NU tree release rig 6:00 7: shut down 7:00 12: Rig Halliburton down off well 12:00 6: Well shut in. rig TEC rig 6 on well 5/29/2014 to ND bops land tbg install tree EQUIPMENT RENTAL $8,725 $12, CONTRACT LABOR $16,429 $21, COMPLETION RIG $35, COILED TUBING HALLIBURTON COIL TUBING UNIT $39,300 $39, PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $1,500 $13,300 Total Intangible $65,954 $180, WATER PIPELINE $30, NIPPLE/VALVE/FITTING/FLO METERING EQP/TELE TANK STAIRS & WALKWAYS SEPARATORS & TREATERS STRUCTURES & INSULATION $33, BUILD BATTERY $38,009 Total Tangible $215,481 Total Daily & Cum Costs $65,954 $395,554

16 Report Date: 05/30/2014 Field: May 30, 2014 Rig Name: Report #: 22 Location: UTL H Supervisor: Bobby Hoffpauir Daily Cost: County: Ward Phone: Cum Job: $685,471 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,097,725 6:00 7: Shut down 7:00 14: Rig TEC rig #6 on well landed tbg in well run in hold down buttons ND bops Nu tree Rig down off well Have 115 jts 2 7/8" 8rd tbg on location. 14:00 6: Shut down operations on well all rental equip picked up EQUIPMENT RENTAL $12, CONTRACT LABOR $21, COMPLETION RIG $35, COILED TUBING HALLIBURTON COIL TUBING UNIT $39, PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Bobby Hoffpauir $13, CONTINGENCY $17,692 Total Intangible $197, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE STRUCTURES & INSULATION $33, BUILD BATTERY $93,009 Total Tangible $487,705 Total Daily & Cum Costs $685,471

17 Daily Drilling Report Well Name UTL H Report Date 06/07/2014 Field University Lands Supervisor Nate Baxter Report No. 101 Location 990' FNL & 300' FEL Supervisor 2 Tate Edeler DFS 127 County Ward Rig Phone Spud Date 01/31/2014 Rig Name HWD 9 Rig jaggedpeakenergy@outlook.com AFE $3,687, KB 15 Daily Footage Daily Cost $18, Depth (MD) 13,307 TVD at Bit 11,797 Cum. Cost $6,430, Estimated TD 16,140 Casing Data Type Size Weight Grade Connection Top Bottom Shoe Test Surface 9-5/ J-55 8 round -15' 4,899' Intermediate P round -15' 11,145' Mud Properties Last Survey BHA Type Brine Depth Inc Azi Component Length ID OD Weight 13.6 Sub 0.76' FV 43 Sub 1.55' PV 18 Drilling Parameters Sub 8.81' YP 25 Max WOB 15 X-Over 1.32' LCM (ppb) Max RPM 35 X-Over 1.68' Chlorides Max Torque Sub 7.75' % Solids 3.66 Max Pull X-Over 1.31' Daily Losses Bkgrnd Gas X-Over 3.40' Total Losses 4280 Max Gas Cnx Gas Trip Gas Total Length: Bit Info Bit # Size Make Type S/N Jets In Out Footage Hrs ROP Grade Hughes DP505X X16 12,260' 13,307' 1,047' CT-Shoulder-1/16--Gauge-To SMith MSi613 JG6874 6x16 13,307' 13,307' 1-5-BT-T-I--G NOV SKHI613M A 's 13,307' From To Hours P / U Summary Total Hours: 24 Hour Activity Summary: 24 Hour Plan Safety Fuel Last BOP Test 05/01/2014 Last BOP Drill 04/23/2014 Last Function Test 5/1/2014 Diesel Used Diesel Recvd Diesel on Loc 482

18 Well Name: UTL H Daily Cost Report Report Date: 06/07/2014 Daily Cost $18,075 Code Description Comments Daily Cum Permits, Licenses, ect $1, Staking & Surveying $1, Road, Locations $125, Mobilization/Demobilization $37, Daywork Contract Day Rate For HWD Rig #9 $13,500 $1,658, Mouse/Rathole/Conduct Pipe $16, Directional Drilling & Survey Newsco Directional $531, Bits, Tools, Stabalizers $216, Fuel, Power $290, Equipment Rental $1,075 $326, Mud & Chemicals $942, Mud Logging $49, Core Analysis Openhole Logging $23, Cement Services $327, Casing Crew & Equipment $91, Contract Labor $58, Fishing Services $299, Drill Water $191, Supervision Tate Edeler, Nate Baxter $3,500 $374, Insurance $33, Legal $10, P&A/TA Costs Cement Services (4-1/2" Liner) Total Intangible $18,075 $5,605,368 Code Description Comments Daily Cum Conductor Casing /8" Surface Casing - 9-5/8" $142, Intermediate Casing - 7" $325, Wellhead Equipment $32, Float equipment, Centralizers & DVT $23, Tangible Contingency $301, Production Casing - 4-1/2" Liner Hanger - 4-1/2" WellEz Information Management Ver bg Total Tangible $824,961 Total Costs $18,075 $6,430,330

19 Report Date: 06/08/2014 Field: June 8, 2014 Rig Name: Report #: 24 Location: UTL H Supervisor: Trevor Jones Daily Cost: $3,774 County: Ward Phone: Cum Job: $697,542 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,127,872 Set up equipment and Rig up the rig 6:00 8: No activity 8:00 12: Spot in rig mat, pump and tank. Rig up rig. Spot in cat walk and pipe racks. 12:00 6: EQUIPMENT RENTAL $12, CONTRACT LABOR $21, COMPLETION RIG Falcon $2,320 $37, PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Trevor Jones $1,300 $15, CONTINGENCY $154 $18,000 Total Intangible $3,620 $202, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $3,620 $697,542

20 Report Date: 06/09/2014 Field: June 9, 2014 Rig Name: Report #: 25 Location: UTL H Supervisor: Trevor Jones Daily Cost: $1,454 County: Ward Phone: Cum Job: $698,996 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,129,326 No activity Set up equipment. ND well head NU BOPs. Pick up drill pipe. TIH. Fish wire. POOH. 6:00 6: Wait on Greco tools EQUIPMENT RENTAL $12, CONTRACT LABOR $21, COMPLETION RIG $37, PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Trevor Jones $1,300 $17, CONTINGENCY $154 $18,154 Total Intangible $1,300 $204, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $1,300 $698,996

21 Report Date: 06/10/2014 Field: June 10, 2014 Rig Name: Report #: 26 Location: UTL H Supervisor: Trevor Jones Daily Cost: $26,986 County: Ward Phone: Cum Job: $725,982 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,194,357 Rack tbg. Tally. ND well head. NU BOPs. MU tools. Wait on parts. TIH. Wait on parts. MU x-over. TIH. Latch onto fish. POOH. 6:00 7: :00 7: Safety meeting discuss nippling around. 7:30 10: Nipple down well head and nipple up BOPs. Rig up work floor and tools. Rack and tally drill pipe. Build hard line to the well. 10:00 11: Wait on tong dies and mud cross for BOPs. 11:30 13: Nipple up mud cross and rig floor back up. 13:00 14: Make up tools, jars, bumper sub, modified wire spear. Try to run tools into the hole. Tool is getting hung up in the 2 7/8" by 5" x-over. Run grinder on tool to lessen the OD. Check tool with 2.875" pup joint. Try to run tool in hole. Top of tool is hanging up in the cross over. Change out tool and run in with pigs tail style center rope spear. 14:30 16: TIH. 16:30 17: Crew put on cross over from BAASH ROSS threads to MT and changed torque on tongs with tongs in low gear and spread the top of the cross over. Order new cross over. 17:00 17: Wait on parts. Secure the well and clean up location. 17:30 6: SDFN EQUIPMENT RENTAL $17,144 $29, CONTRACT LABOR $1,125 $22, COMPLETION RIG $4,950 $42, PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Trevor Jones $1,300 $18, CONTINGENCY $2,467 $20,621 Total Intangible $24,519 $231, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $24,519 $725,982

22 Report Date: 06/11/2014 Field: June 11, 2014 Rig Name: Report #: 27 Location: UTL H Supervisor: Trevor Jones Daily Cost: $15,783 County: Ward Phone: Cum Job: $741,765 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,210,140 RI hole. Latch onto fish. Jar up hole. POOH. 6:00 7: :00 10: MU x-over and TIH. 10:30 13: Tag up 9726' turn on pipe to grab slick line. Run in hole to 9907' and turn pipe again to wrap up slick line on tool. Pull up. Dragging something up-hole pulling +/ over string weight. Pull 4 joints to +/- 9780'. Fish appears to have hung up in a tbg collar. We were able to move it up-hole 60 more feet to 9720'. Fish hung up in collar again. Jar on fish to work free. 13:30 18: Fish comes free and moves up-hole another 30' to 9690'. Jar on fish to work free. Work up to 9650'. 18:30 19: Secure the well and clean up location. 19:00 6: EQUIPMENT RENTAL $5,271 $34, CONTRACT LABOR $1,125 $23, COMPLETION RIG Falcon $5,620 $48, PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Trevor Jones $1,300 $19, CONTINGENCY $2,467 $23,088 Total Intangible $13,316 $247, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $13,316 $741,765

23 Report Date: 06/12/2014 Field: June 12, 2014 Rig Name: Report #: 28 Location: UTL H Supervisor: Trevor Jones Daily Cost: $15,763 County: Ward Phone: Cum Job: $757,528 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,225,903 Change drill line. Back out 1 1/4 drill pipe. Lay down drill pipe. Change rams. Un-land well. Wait on weight indicator. Try to un-set packer. Stand tag in the derrick. Strip out of the hole. Continue to strip out of the hole. 6:00 7: :00 8: Change out drill line. Pull on drill pipe to see if there is any change. Still stuck. Try to back drill pipe off down hole. Pipe keeps spinning free to the left. Try tightening it back up and set jars a couple of times. Pulled one more joint out of the hole. Try to back off again. Broke drill pipe 41 joints down. Lay down 41 joints. 8:00 11: :30 13: :00 14: :30 18: :30 19: :00 6: Pull BOPs off and pull stabbing guide out of the hanger. Nipple BOPs back up. Change out pipe rams. Un-land the well. Well un-lands at 45,000 lbs. We pulled to 120,000 tubing is still not moving. Wait on line scale indicator and discuss next plan of action. Confirmation to pull to 130,000. Turn tubing to the right to try to unset the packer and pull 128,000 lbs and tbg starts to drag up-hole. Stand back 21 stands of tbg. Continue to strip out of the hole. Total 1 1/4" drill pipe laid down 114 joints and 54 joints of out of the hole 9300'. Secure the well and clean up location. SDFN EQUIPMENT RENTAL $5,271 $39, CONTRACT LABOR $1,125 $24, COMPLETION RIG Falcon $5,600 $53, PERFORATING/WIRELINE SERV $53, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION Trevor Jones $1,300 $21, CONTINGENCY $2,467 $25,555 Total Intangible $13,296 $262, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $13,296 $757,528

24 Report Date: 06/13/2014 Field: June 13, 2014 Rig Name: Report #: 29 Location: UTL H Supervisor: Trevor Jones Daily Cost: $18,927 County: Ward Phone: Cum Job: $776,455 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,244,830 Continue stripping out of the hole. Lay down tools. RU slick line. Spool slick line. POOH. SDFN. TIH w/spear. Latch onto fish. POOH. 6:00 7: :00 7: Safety meeting discuss stripping out and possible pressure control situations. Casing is on a vacuum and nothing on the tubing. 7:30 16: Continue to strip out of the hole. 16:00 16: LD the last of the 1 1/4" drill pipe. Cross over and the top of the jar came out with the drill pipe. Bottom of the jar, bumper sub and center rope spear are still inside of the tubing. POOH to slick line. 90' of the slick line is above the fishing tools. Tools are jammed in side of the tubing with slick line along the side of it. Slick line is broken off below tools. Pull one more joint. Slick line is standing inside of the tubing. 16:30 17: RU slick line. Clamp line. Spool slick line onto truck. Measured out +/- 1260' of slick line. RD slick line. 17:30 18: POOH with rest of Guide on bottom of tubing. 18:00 18: Secure well clean up location. SDFN 18:30 20: :30 5: :00 6: EQUIPMENT RENTAL $7,177 $47, CONTRACT LABOR $1,125 $26, COMPLETION RIG Falcon $5,600 $59, PERFORATING/WIRELINE SERV $3,725 $56, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy $1,300 $22, CONTINGENCY $25,555 Total Intangible $18,927 $281, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $18,927 $776,455

25 Report Date: 06/14/2014 Field: June 14, 2014 Rig Name: Report #: 30 Location: UTL H Supervisor: Trevor Jones Daily Cost: $11,039 County: Ward Phone: Cum Job: $785,624 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,253,998 MU fishing tools. TIH. Turn on wire. POOH. TIH. Turn on wire. POOH RU wireline. Run impression block. RI with grapple and try to catch fish. 6:00 7: :00 7: Safety meeting. Discuss tripping in the hole with tools and latching onto the fish. 7:30 8: Un-load and gauge the fishing tools. MU jars, bumper sub and spear with outside prongs. 8:30 10: TIH with tools and L-80 8rnd 6.5# eue. 10:30 11: Top of packer 10,971' tools are 28' in length + 40' of slick line.top of 10,943'. Top of wire +/- 10,903'. Trip in hole to 10,905'. We picked up 1 joint with 10' sub on top and went in turning the tubing every 5' to 10,940. We saw the weight indicator take lbs of weight while turning. PU on tubing and pulled over 2000 lbs. Lower tubing to 10,940' try again. Pulled over 2000 lbs again twice as we came up like we had ahold of something. 11:30 14: POOH. 14:30 15: We did not recover any fish. 15:00 16: TIH with the same configuration of tools. 16:30 17: Rotate 2 joints and a 10' pup joint into the hole down to 10,956'. We saw a slight tag and tubing torqued up pull up about 4' and turned tubing to wrap wire around spear. We didn't se any over pull coming up so we tried it again with the same results. 17:00 19: POOH. 19:30 20: We didn't recover any fish. Secure the well and clean up location.sdfn 20:00 22: :00 6: EQUIPMENT RENTAL $2,618 $47, CONTRACT LABOR $1,125 $27, COMPLETION RIG Falcon $5,946 $65, PERFORATING/WIRELINE SERV $56, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy Group $1,350 $23, CONTINGENCY $25,555 Total Intangible $11,039 $291, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $11,039 $785,624

26 Report Date: 06/15/2014 Field: June 15, 2014 Rig Name: Report #: 31 Location: UTL H Supervisor: Trevor Jones Daily Cost: $1,350 County: Ward Phone: Cum Job: $786,974 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,255,348 Wireline can't rig up. Be ready for tomorrow. RU WL. RI impression block. RI fishing tools. 6:00 7: :00 8: Wireline says they can't rig up without an operator for the rig. Un-able to locate an operator and keys for the rig. Wireline has the wrong size of lubricator. SDFN. Be ready first thing in the morning. 8:00 6: Make sure everything is ready and make up a good plan to move forward EQUIPMENT RENTAL $47, CONTRACT LABOR $27, COMPLETION RIG $65, PERFORATING/WIRELINE SERV $56, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy Group $1,350 $25, CONTINGENCY $25,555 Total Intangible $1,350 $292, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $1,350 $786,974

27 Report Date: 06/16/2014 Field: June 16, 2014 Rig Name: Report #: 32 Location: UTL H Supervisor: Trevor Jones Daily Cost: $12,925 County: Ward Phone: Cum Job: $799,899 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,268,273 RU wireline. Run impression block. Release wireline. Run in with over socket. Latch onto fish. POOH. 6:00 7: :00 8: Safety meeting. Discuss running in the hole with the impression block. Start up and spot in equipment. 8:00 9: MIRU wireline. 9:00 10: RIH with 5.50" impression block. Tagged 500'. Tagged Impression block shows tools are laying against the casing. No visible sign of wire on the impression block. 10:00 10: The overshot wireline needed to use is a 5 1/2". The only lubricator big enough for this size is 10K. The full weight of the lubricator was going to be over 6000 lbs. The rig wench line is only rated for 2500 lbs. We cannot safely run wireline tools in the hole with the rig over the well. Release wireline and pressure control company. RDMO 10:30 6: Plan fishing job for Monday morning with the rig EQUIPMENT RENTAL $47, CONTRACT LABOR $27, COMPLETION RIG $65, PERFORATING/WIRELINE SERV $11,575 $68, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy Group $1,350 $26, CONTINGENCY $25,555 Total Intangible $12,925 $305, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $12,925 $799,899

28 Report Date: 06/17/2014 Field: June 17, 2014 Rig Name: Report #: 33 Location: UTL H Supervisor: Trevor Jones Daily Cost: $14,718 County: Ward Phone: Cum Job: $819,333 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,287,707 TIH with over socket. Latch onto fish. POOH. 6:00 7: :00 7: Safety meeting. Discuss running in with over socket. 7:30 10: MU fishing tools. TIH with jars, bumper sub and over socket. 10:30 14: Tag up 10,954'. Try to turn over fish with tongs. Cannot fall over fish. Rig up power swivel and try to turn over fish. Still not falling over fish. Rig up stripping head and pump on well down the casing and up the 5.5 bbls/min to try to stand fish up. Still taking weight but got EOT down to 10,963'. 14:30 17: RD power swivel and stripping head. POOH. 17:00 17: LD fishing tools. Pulled out deer hoof cutter. Stacked out on weight bar and milled a flat spot on guide. Wait on new tools. 17:30 18: Secure the well and clean up location. SDFN. 18:00 20: :00 5: :00 6: EQUIPMENT RENTAL $7,618 $56, CONTRACT LABOR $1,125 $28, COMPLETION RIG Falcon $4,625 $73, PERFORATING/WIRELINE SERV $68, COMPLETE FLUID-FRESH WTR $4, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy Group $1,350 $27, CONTINGENCY $25,555 Total Intangible $14,718 $324, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $14,718 $819,333

29 Report Date: 06/18/2014 Field: June 18, 2014 Rig Name: Report #: 34 Location: UTL H Supervisor: Trevor Jones Daily Cost: $16,354 County: Ward Phone: Cum Job: $838,257 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,306,632 MU fishing tools. TIH. Latch onto fish. POOH. No fish. MU new fishing tools. TIH. Latch onto fish. Jar. POOH. POOH. MU RI with tools for next fish. 6:00 7: :00 7: Safety meeting. Discuss possible pressure on back side while pulling out of the hole. 7:30 8: MU fishing tools. Same configuration as yesterday. Jars, bumper sub, 1 joint and over socket. 8:00 9: TIH. 9:30 10: Tag 10,963'. Pick up and rotate tubing down to fish and 10,965'. Latch onto fish. Pick up on tubing. Tubing pulls over 5000 lbs then back down to string weight. Stack out again and pulls over 2000 lbs then back to string weight. 10:30 13: POOH. 13:30 14: We didn't have anything in the grapple. There are definite marks inside the guide that we had something in there. MU new guide. Mu fishing tools. 14:00 16: TIH. 16:30 18: Establish pump rate psi. Work tubing over fish. PU. Tubing pulls over 20,000#s then pulls off. Pump rate is the same. Repeat action several times. Check pump rate with fish inside of the tool pump rate doesn't change. (The bumper sub has ports in the side of it. We may just be pumping through them.) Pull over 20,000#s and get jars to fire. Pull over 5000 more and loose weight back to string weight. Either we are pulling off of it and we need a different tool or it is on there. 18:00 19: POOH. 19:00 19: Secure the well and clean up location. SDFN 19:30 5: :00 6: EQUIPMENT RENTAL $7,618 $64, CONTRACT LABOR $1,440 $29, COMPLETION RIG Falcon $5,946 $79, PERFORATING/WIRELINE SERV $68, COMPLETE FLUID-FRESH WTR $6, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy Group $1,350 $29, CONTINGENCY $25,555 Total Intangible $16,354 $343, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE BUILD BATTERY $93,009 Total Tangible $494,549 Total Daily & Cum Costs $16,354 $838,257

30 Report Date: 06/19/2014 Field: June 19, 2014 Rig Name: Report #: 35 Location: UTL H Supervisor: Trevor Jones Daily Cost: $17,389 County: Ward Phone: Cum Job: $858,346 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,326,720 POOH. LD fish. TIH. Latch onto fish. POOH. No fish. MU overshot. TIH. TIH. Latch onto fish. POOH. 6:00 7: :00 7: Safety meeting. Discuss laying down fishing tools. 7:30 10: POOH. 10:00 11: Came out with 3 weight bars and the 6" top of the jars. Rest of the jars, eq prong and the kinley cutter are still in the hole. 11:00 13: MU 1 1/4" - 1 3/4" over socket, jars and bumper sub. Same configuration as before. TIH. 13:30 14: RI to 10,977' initial tag on fish. Work tubing down to 10,981'. PU no over pull. Work tubing down again to see if there is any different result. No over pull. Try rotating tubing down over the fish. Tag same place. No over pull. 14:00 17: POOH. 17:00 17: No fish inside of the over socket. MU 1 3/8" grapple in 5 3/4" over shot with jars and bumper sub. 17:30 18: TIH 18:30 19: Secure the well and clean up location. 19:00 21: :00 5: :00 6: EQUIPMENT RENTAL $7,618 $71, CONTRACT LABOR $1,125 $30, COMPLETION RIG Falcon $5,946 $85, PERFORATING/WIRELINE SERV $68, COMPLETE FLUID-FRESH WTR $6, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy Group X 2 $2,700 $31, CONTINGENCY $25,555 Total Intangible $17,389 $361, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE $2, BUILD BATTERY $93,009 Total Tangible $497,249 Total Daily & Cum Costs $17,389 $858,346

31 Report Date: 06/20/2014 Field: June 20, 2014 Rig Name: Report #: 36 Location: UTL H Supervisor: Dana Phillips Daily Cost: $10,693 County: Ward Phone: Cum Job: $869,039 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,337,413 RIH w/os, engage fish. POOH w/os, recover Kinley Cutter. RIH w/os, engage fish. Begin POH w/os. Finish POH w/os. RIH w/retrieving tool and attempt to retrieve Pkr. 6:00 7: :00 7: PJSM - Discussed trip Tbg & general house keeping on Loc. 7:30 9: Open well. No pressure on Tbg or Annulus. Finish RIH w/5 3/4" OS dressed w/1 3/8" grapple. Tag 10,977' MDKB. 9:00 9: Work OS down over fish f/10,977' to 10,981'. P/U on string w/no over pull. set down & 10,977' work back down to 10,981' and set 10K wt on fish. P/U on string w/no over pull. Set down and tag 10,981' and stack 10K on fish. P/U on string w/no over pull. 9:30 13: POH w/os f/10,981' MDKB. Recovered Kinley Cutter. L/D Kinley Cutter in OS (did not remover fish f/os due to possible live charge in Cutter). 13:00 14: Greco sourced another OS for next fish run. 14:30 16: M/U & RIH w/5 3/4" OS dressed w/1 1/2" grapple. Tag 10,981' MDKB. Topped up hole w/1 bbl. TIW valve installed in top jnt. 16:00 16: Worked OS over fish f/10,981' to 10,982'. No over pull when P/U on string. 16:30 17: L/D 4 jnts & POH to 9,345' MDKB. 17:00 17: Secure well & clean Loc. SDFN 17:30 19: :30 5: :00 6: EQUIPMENT RENTAL $2,618 $74, CONTRACT LABOR $1,125 $32, COMPLETION RIG Falcon $5,600 $90, PERFORATING/WIRELINE SERV $68, COMPLETE FLUID-FRESH WTR $6, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy Group $1,350 $33, CONTINGENCY $25,555 Total Intangible $10,693 $371, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE $2, BUILD BATTERY $93,009 Total Tangible $497,249 Total Daily & Cum Costs $10,693 $869,039

32 Report Date: 06/21/2014 Field: June 21, 2014 Rig Name: Report #: 37 Location: UTL H Supervisor: Dana Phillips Daily Cost: $9,943 County: Ward Phone: Cum Job: $883,982 State: TX Job AFE: $4,916,220 Total Well AFE: $8,603,220 Cum Well Cost: $7,352,356 POH w/5 3/4" OS w/1 1/2" grapple. No fish recovered. RIH w/short Catch OS w/1 1/16" grapple to catch broken spang jar forks. 6:00 7: Crew Travel 7:00 7: PJSM, discussed POH w/tbg & fishing tools. Check well for pressure, Tbg & Csg = 0 psi. 7:30 10: Finish POH f/9,345' MDKB w/5 3/4" OS dressed w/1 1/2" grapple. No fish recovered. 10:00 10: Secure well. Clean Loc. SDFN. (1 1/16" grapple & short catch OS being sourced from Greco) 10:30 12: Crew Travel 12:30 5: No activity while fishing tools being sourced. 5:00 6: Crew Travel EQUIPMENT RENTAL $5,118 $84, CONTRACT LABOR $575 $32, COMPLETION RIG Falcon $2,900 $93, PERFORATING/WIRELINE SERV $68, COMPLETE FLUID-FRESH WTR $6, COMPLETE FLUID-BRINE WELLSITE SUPERVISION DTC Energy Group $1,350 $34, CONTINGENCY $25,555 Total Intangible $9,943 $386, NIPPLE/VALVE/FITTING/FLO $55, METERING EQP/TELE $2, BUILD BATTERY $93,009 Total Tangible $497,249 Total Daily & Cum Costs $9,943 $883,982

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS 11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling

More information

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover: Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:

More information

FORGE Energy UL 21 Freedom 1 API Number:

FORGE Energy UL 21 Freedom 1 API Number: FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

PHE KE30-A8 WORKOVER PROGRAM

PHE KE30-A8 WORKOVER PROGRAM PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.

More information

FORGE Energy UL 21 Pahaska 1H API Number:

FORGE Energy UL 21 Pahaska 1H API Number: FORGE Energy UL 21 Pahaska 1H API Number: 42-495-33740 10/26/2016 07:00 HPJM 07:15 Install 1502 Adapter Flanges to Well Head. RU Pump Truck test lines to 1000 PSI no leaks. Load hole w/ 15 bbls fresh water.

More information

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig

More information

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original

More information

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Pasquale Imbò e Marco Pelucchi ENI S.pA; 7th European Gas Well Deliquification Conference Innovative Failsafe Capillary Injection System Resolves Liquid Loading in Gas Well with a Cost- Effective Solution that Maintaining Production and Well-Safety

More information

Abandonment Program for Paramount Fort Liard F 36

Abandonment Program for Paramount Fort Liard F 36 Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841

More information

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary PRES WELL NO. Report End Date: 5/19/2016 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : : 0 Planned VS (ft): Current VS (ft): WOC WOC, CONTACTED TRRC, SPOKE TO ABRAHAM, ADVISED

More information

Zarvona Energy LLC DAILY OPERATIONS

Zarvona Energy LLC DAILY OPERATIONS DAYS FROM SPUD: 120 DAYS ON 0 Jun 28 2016 RIG SUPERVISOR: Tyler Dupriest MIRU pulling unit MIRU pulling unit, move in and tally TBG. SDFN RIH with RBP DAYS FROM SPUD: 121 DAYS ON 1 Jun 29 2016 RIG SUPERVISOR:

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

Zarvona DAILY WORKOVER / COMPLETION REPORT

Zarvona DAILY WORKOVER / COMPLETION REPORT Lease/Well No: CURRENT WELL TEST: PURPOSE OF WORK: MIRU service companies/start frac PULLING UNIT: KOP 10,429' TD: 15,906' KB ABOVE GL: 30 10,713' PBTD: 15,885' INT CSG: 60 10,998' TVD: 10,950' PROD CSG:

More information

BP SIT Testing Franks Facility Lafayette

BP SIT Testing Franks Facility Lafayette BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight

More information

Greystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 7 4/26/2010

More information

RIH intermediate section casing in Bazian-1 exploration oil well

RIH intermediate section casing in Bazian-1 exploration oil well Energy and Sustainability V 559 RIH intermediate section casing in Bazian-1 exploration oil well A. K. Darwesh Petroleum Engineering Department, Engineering Faculty, Koya University, Kurdistan Abstract

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Parry Hillis: Technical Manager BakerHughes David Ayre: BP Well Perforation Specialist Jim Gilliat: TCP/DST Business Development

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems As a result of a recent job incident utilizing a Ball Drop Type firing system deployed on coiled tubing, the following

More information

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS A DIFFERENT KIND OF ENERGY COMPANY Nine Energy Service isn t your typical oilfield services company. Our success stems from a culture driven by performance

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph: Please read this entire document. It concerns all 9⅝ Vented Thru-tubing Bridge Plugs Read this document before proceeding to NeoProducts Recommended Best Practices for 9⅝ vented T- TBPs. Whenever running

More information

Live well deployment of long perforating gun system using combined CT technologies

Live well deployment of long perforating gun system using combined CT technologies Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-S Revision 0 13 February 2015 DC 2015 COPYRGHT

More information

DB Bridge Plug. Features. Benefits. Applications

DB Bridge Plug. Features. Benefits. Applications DB Bridge Plug The WELLFIRST Premium Cast Iron Bridge Plug designed to run on electric line. Rated between 2000-10000-psi differential, and 300 F from above and below. Features Field Proven Design Constructed

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-D Revision 0 13 February 2015 DC 2015 COPYRGHT PROTECTED

More information

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas H. H. HOWELL, INC. Bevans & Wildcat Field Menard County, Texas API #42-327- 31235 RRC Permit # 803460 GAU letter, RRC Letter #GAU-1436 = 245 Ground Elevation GL: 2186 (Rig KB to GL =8 ) Rig KB =2194 Location:

More information

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures BAROID DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton January 2014 1 Copyright

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

Reducing Nonproductive Time

Reducing Nonproductive Time Reducing Nonproductive Time Pipe Recovery Services Solving challenges. Pipe Recovery Services Pipe Recovery Services Halliburton offers a wide range of free point indicators, severing tools and experienced

More information

W I L D W E L L C O N T R O L COMPLICATIONS

W I L D W E L L C O N T R O L COMPLICATIONS COMPLICATIONS Complications Learning Objectives You will learn to detect changes that deviate from established trends. You will learn how to respond to problems such as: Pump problems String problems Hole

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

Standard Operating Procedures

Standard Operating Procedures Standard Operating Procedures GlassBore and GlassLine EUE 8RD Tubular Goods Composite Lining Systems Focus on Safety and Quality COMPOSITE LINING SYSTEMS Table of Contents Section 1 page 3 Arrival on Production

More information

TAM Single SeT inflatable

TAM Single SeT inflatable TAM Single SeT inflatable ReTRievAble PAckeRS Sets with pressure only Releases with straight pull or rotate Ideal for horizontal applications Sets in casing or open hole Runs on tubing, coiled tubing,

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016 Report 19 5/26/216 Company Type WBS No/API No PERMIAN Exploration 324861 / 423132849. Event Summary Event Type Drilling only Event Start Date 4/24/216 Days on Location 18.67 Objective Drill - Wolfcamp

More information

VortexFlow DX (Downhole) Tool Installation Instructions

VortexFlow DX (Downhole) Tool Installation Instructions VortexFlow DX (Downhole) Tool Installation Instructions www.vortextools.com Page 1 of 10 The VortexFLOW tools are based upon Technology that is a result of U.S.A. patents 6,151,751; 6,659,118; 6,749,374;

More information

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES SHUT-IN PROCEDURES Shut-in Procedures Learning Objectives You will learn general shut-in procedures: For surface BOPs. For subsea BOPs. You will learn to interpret shut-in pressures and be able to perform

More information

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001 OCS Report MMS 2002-040 Investigation of Loss of Well Control Eugene Island Block 277 OCS-G 10744 Well A-2 Off the Louisiana Coast July 6, 2001 U.S. Department of the Interior Minerals Management Service

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS (WIRELINE, COILED TUBING & SNUBBING) CORE CURRICULUM AND RELATED FORM WCT-2WSI INTRODUCTORY LEVEL For information on how an course

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

W I L D W E L L C O N T R O L SNUBBING OPERATIONS SNUBBING OPERATIONS Snubbing Operations Learning Objectives You will learn - Various activities suitable for snubbing operations. Best practices and techniques for conducting snubbing operations. The types

More information

Model A Sleeve Valve Cement Retainer

Model A Sleeve Valve Cement Retainer Ret. O.D. Model A Sleeve Valve Cement Retainer DIMENSIONAL DATA A B C D E F G H J K L M N P Q R 3.593 3.593 3.500 2.500 3.531 3.531 1.345 3.375.750.437 2.437 2.187 7.062 2.437 5.312 11.685 20.093 3.937

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Final Well Report Revision: Version 0 Operating Company: Vulcan Minerals Inc. (Investcan Energy Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Field: Flat Bay Location: Western Newfoundland,

More information

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

A case study : Underground Blowout Control at Well NHK #285

A case study : Underground Blowout Control at Well NHK #285 A case study : Underground Blowout Control at Well NHK #285 Author: Dr. K. Saikia, Chief Engineer Drilling - CMT INTRODUCTION The well NHK # 285 (Loc-HBS), a gas well, in the Deohal area of Naharkatia

More information

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017 5/2/27 5:23:5 Report Version: 4..6R9 Generated from data in EDM/Opens/PROFILE Report 29 5/9/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326.

More information

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Slot Recovery Procedures: Slot Recovery Running Procedures 1. Cut And Retrieve Operation: Borais s cut and retrieve equipment: 1.

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WIRELINE OPERATIONS CORE CURRICULUM AND RELATED FORM WCT-2WLF FUNDAMENTAL LEVEL The purpose of the core curriculum is to identify a body of knowledge and

More information

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

Horizontal Marmaton Wells in Beaver County, OK

Horizontal Marmaton Wells in Beaver County, OK Horizontal Marmaton Wells in Beaver County, OK Drilling Improvements & Lessons Learned Presented by: Michael Dunn Drilling Engineer Unit Petroleum Forward Looking Statement DISCLAIMER It is understood

More information

5k Slickline Lightweight Pressure Control Equipment 4 ID

5k Slickline Lightweight Pressure Control Equipment 4 ID 5k Slickline Lightweight Pressure Control Equipment 4 ID Table of Contents 5k Slickline Lightweight Pressure Control Equipment 4 ID... 1 Hydraulic Slickline Stuffing Box... 3 Wireline Lubricators... 4

More information

WELL NO: BJN-8. Lower master valve

WELL NO: BJN-8. Lower master valve WELL NO: BGN-8.; LOC: BGH Well BGN-8 came into production on 9 th Feb. 2009. Initially the FTHP = 4000 psi, CP=2400 psi and 5 1 / 2 9 5 / 8 annulus pressure = 600 psi. The well was produced at Baghjan

More information

On-Off Connector Skirt

On-Off Connector Skirt On-Off Connector Skirt Retrievable Packers & Accessories The On-Off Connector Skirt is compact, reliable, fully sealing, J-type tubing disconnect device that automatically engages and releases with a small

More information

Engineered solutions for complex pressure situations

Engineered solutions for complex pressure situations SPECIAL SERVICES Engineered solutions for complex pressure situations Cudd Energy Services (CES) delivers custom engineered solutions to resolve complex pressure situations resulting from equipment failure

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

W I L D W E L L C O N T R O L AIR DRILLING

W I L D W E L L C O N T R O L AIR DRILLING AIR DRILLING Air Drilling Learning Objectives You will learn the basics of: Air drilling equipment Types of air drilling Differences between mud and air drilling You will learn how to apply well control

More information

JULY AUG 2010 INNOVATING WHILE DRILLING REGIONAL FOCUS: EUROPE & THE NORTH SEA

JULY AUG 2010 INNOVATING WHILE DRILLING REGIONAL FOCUS: EUROPE & THE NORTH SEA DRILLING C O N T R A C T O R OFFICIAL MAGAZINE OF THE INTERNATIONAL ASSOCIATION OF DRILLING S C O N T R A C T O R Multi-zone, expandable completions JULY AUG 2010 New technologies provide more options

More information

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION

More information

PIONEER OIL TOOLS LIMITED

PIONEER OIL TOOLS LIMITED Sir William Smith Road, Kirkton Industrial Estate, Arbroath, Angus, Scotland, UK. DD113RD Tel: +44 (0)1241 877776 Fax: +44 (0)1241 871037 Email: sales@pioneeroiltools.com Website: www.pioneeroiltools.com

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information

Air and Gas Drilling

Air and Gas Drilling Air and Gas Drilling Air and Gas Drilling It is a technique in which the more common drilling fluids, (water or mud) are replaced by highly compressible Air or Natural gas. But Compressibility makes pressure

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following

More information

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

Performance and Value of the invision System : Offshore in Coiled Tubing Operations Performance and Value of the invision System : Offshore in Coiled Tubing Operations Case Study #0004 Date November 01 21, 2017 Location Gulf of Mexico, Deep Water Introduction Intelligent Wellhead Systems

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017 Report 2/2/27 Company Type WBS No/API No PERMIAN Development 3259585 / 423337 Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location.94 Objective Drill - Wolfcamp Shale Original

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

E NGINEERED C EMENTING S OLUTIONS

E NGINEERED C EMENTING S OLUTIONS DART CATCHER TOOL Blackhawk s Dart Catcher Tool provides indication of the exact location of downhole fluids during inner string cement jobs, cementing squeezes, or balanced cement plugs for temporary/permanent

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017 4/22/217 8:23:32 Report Version: 4.1.16R9 Generated from data in EDM/Opens/PROFILE 1 RESTRICTED Report 29 4/21/217 Company Type bore WBS No/API No PERMIAN Development 3256997 / 42313354. Event Summary

More information