July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007

Size: px
Start display at page:

Download "July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007"

Transcription

1 July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 Tex-207-F, Determining Density of Compacted Bituminous Mixtures. is now on-line at the TxDOT website. This test procedure was implemented effective May Please take the time to review these changes, as this version is the form that will be used for performing these tests in the future. Also note that the procedure calls for roadway specimens (specimens containing moisture) to not be dried prior to weighing. These specimens are weighed in the water first, then we get the SSD (Saturated Surface Dry) weight and then we perform the drying process in the oven. Please also note that there are specific instructions for the procedure and temperature constraints for the drying portion of this procedure. The changes to this procedure will help with questions that have arisen in the past about the drying process of this procedure. And in closing, the use of a fan to air dry specimens will not be (and has never been) considered as a valid means of drying specimens to a constant weight. Constant weight is well defined in the test procedure, Constant weight is defined as the weight at which further oven drying does not alter the weight by more than 0.05% in a 2-hr. or longer drying interval. HMA PAVEMENT TECHNOLOGY UPDATE SEMINARS TxAPA will be conducting a HMA Technology Update Seminar in Odessa in August. Typical attendees for these seminars are pavement and design engineers. The following seminars will be available to anyone interested in attending. Lunch is always provided and there is no cost for attendance. PDH s are available upon request. For registration, agendas or further information please contact the TxAPA staff. Odessa HMA Pavement Technology Update Seminar will be held on August 21, 2007 at the MCM Elegante Hotel located at 2355 IH-10 from 8:00 AM to 5:00 PM. SEAL COAT MEETING TxAPA will be conducting a joint Seat Coat meeting on September 5, 2007 at 2:00 PM at the TxAPA office. Please mark your calendars and make plans to attend. This meeting will be a joint meeting with TxDOT and all TxAPA members involved are encouraged to attend.

2 TEXAS TRANSPORATION FORUM, JULY 18 20, 2007 This second annual forum provides a venue for local, regional and state leaders to join national experts in a conversation about the steps being taken to ensure that our transportation system encourages economic vitality and a high quality of life throughout our state and nation. Join us as we discuss ways to "Keep Texas Moving," focusing on strategies to reduce congestion, enhance safety, expand economic opportunity, improve air quality and increase the value of our transportation assets. The Second Annual Texas Transportation Forum (TTF) will take place on July 18-20, 2007 at the Hilton Austin in Austin, Texas. For registration and agenda information please visit TTI s web page at or call TTI Event management at (979) PARTNERS IN QUALITY MEETINGS Our Partners in Quality meetings are informal partnering session designed to bring both representatives from TxDOT and the hot mix industry together to openly discuss hot mix asphalt (HMA) topics that will ensure continued quality HMA in each district. All TxAPA members are encouraged to attend. San Antonio Partners in Quality, July 13, 2007 will meet at the Radisson Hotel located at 9800 Westover Hills Blvd., from 11:30 AM to approximately 2:30 PM. Lunch will be served. Beaumont Partners in Quality August 28, 2007 will meet at the MCM Elegante Hotel located at 2355 IH-10, from 11:30 AM to approximately 2:30 PM. Lunch will be served. Houston Partners in Quality, August 29, 2007 will meet at the Houstonian Golf Club located at Houstonian Drive, Richmond, from 11:30 AM to approximately 2:30 PM. Lunch will be served. To sign up for the Partners in Quality Meetings or for further information please contact Kari Stafford at the association office at Your participation is greatly appreciated.

3 TxAPA ANNUAL MEETING SPONSORSHIP OPPORTUNITIES Sponsorship contributions are being solicited to enable us to continue providing a quality program along with exciting social functions. Sponsors will be recognized in the official program, by ribbons on the name tags of those attending from the sponsoring firms, by listings on posted signs at the golf tournament, registration table, social functions and recognition at all TxAPA sponsored activities. Three levels of sponsorship are available: Bronze - $ includes what is listed above only Silver - $ includes 1 free round of golf at tournament Gold - $1, includes 1 free annual meeting registration fee For your convenience your meeting registration payment and sponsorship contribution can be made with a single check. Please contact TxAPA staff for a sponsorship form or if you have any questions. This is a great way for your company to be recognized as a supporter of our industry and of the Association. Sponsors play an important part in our Annual Meetings and we hope to receive your continuing support. NAPA MIDYEAR COMMITTEE CONFERENCE NAPA will be hosting their Midyear Committee Conference August 20 22, 2007 at the Ritz-Carlton in Amelia Island, Florida. Hotel accommodations need to be made by July 15, 2007 and can be done by calling For complete registration information please visit the NAPA web page at TxAPA GOLF BAG GIVEAWAYS The 2007 TxAPA Annual Meeting Golf Tournament is scheduled for September 19 at the Galveston Country Club. Each year we typically have approximately 130 golfers and we are expecting another great turnout for this annual event and wish to offer you the opportunity to promote your companies by donating items for the Golf Gift Bags that will be given to all of the tournament participants. These items can be sleeves of balls, tees, towels, ink pens, etc., anything that will be a nice surprise for the golfers and be able to fit into the same size bag that we handed out last year. If you have any questions, please contact us. As always we sincerely appreciate your continued support and your membership. Members helping members, a key factor in the success of the finest Asphalt Pavement Association in the country.

4 TxAPA CALENDAR OF EVENTS JULY 4 CLOSED HOLIDAY SB 201 CLASS BUDA :00 TxDOT LETTING AUSTIN 13 11:30 SAN ANTONIO PART. IN QUALITY SAN ANTONIO LEVEL 1 B CLASS BUDA TEXAS TRANSPORTATION FORUM AUSTIN LEVEL 1 A TRAINING BUDA SB 202 CLASS BUDA AUGUST 6 3:00 FINANCE COMMITTEE MEETING BUDA SB 101 CLASS BUDA 7 2:00 TEST PROCEDURE MEETING BUDA 7 8 1:00 TxDOT LETTING AUSTIN 8 2:00 MARKETING MEETING BUDA SB 102 CLASS BUDA SB 103 CLASS BUDA LEVEL 1 B CLASS FT. WORTH LEVEL 2 TRAINING BUDA LEVEL 1 A RECERTIFICATON BUDA SEPTEMBER 3 CLOSED FOR LABOR DAY HOLIDAY 5 2:30 SEAL COAT MEETING BUDA 5 3:00 FINANCE COMMITTEE MTG BUDA 5 4:00 BOARD OF DIRECTORS BUDA 6 7 1:00 TxDOT LETTING AUSTIN ALL DAY TxAPA ANNUAL MEETING GALVESTON

5 JULY 2007 HIGHWAY LETTING - SCHEDULED PROJECTS # COUNTY HWY DESCRIPTION TONNAGE ANDERSON CR REPLACE BRIDGE & APPROACHES 442 AUSTIN SH 159 CONSTRUCT LEFT TURN LANE 2,419 BAZORIA SH 288 ASPHALT CONC TY "D" OVERLAY 2,952 BEE SH 72 REHAB ROADWAY AND WIDEN 58,763 BEXAR IH 35 RAISE & WIDEN NARROW BRIDGE 5,336 BEXAR CS RESTORE EXIST.PAVEMENT 4 LANE 17,890 BEXAR CS EXPAND 2 TO 4 LN. RDWY W/LFT TURN LANE 12,797 BEXAR FM 2252 EXPAND 2 TO 4 LANE DIVIDED 28,801 BEXAR LP 1604 OPERATION AND SAFETY IMPROV 16,950 BAZORIA SH 332 WIDEN TO 4-LANE DIVIDED AND NEW BRIDGE 21,734 CAMERON SH 345 GRAD, BASE & SURF 12,329 COMANCHE US 67 CONSTRUCT RR OVERPASS AND APPROACHES 51,478 CORYELL US 84 REHAB RDWY & ADD PASSING LANES 97,897 DALLAS LP 12 REHABILITATION OF EXISTING ROADWAY 12,721 DELTA SH 24 UPGRADING OF EXIST 2-LANE TO A 4-LANE 74,001 DENTON FM 2499 WIDEN 2-LN RURAL TO 6-LANE DIV URBAN HWY 44,034 EL PASO CS PAVE STREET/BUILD 4-LANES UNDIVIDED 4,627 ELLIS CS REPLACE BRIDGE AND APPROACHES 806 ELLIS CS REPLACE BRIDGE AND APPROACHES 225 ERATH SH 108 REPLACE BRIDGE AND APPROACHES 399 FORT BEND FM 762 FLATTEN HORIZONTAL CURVE 1,571 GALVESTON IH 45 CONSTRUCT OVERPASS ON NEW LOCATION 5,980 HAYS CR REPLACE BRIDGE AND APPROACHES 100 HILDAGO FM 907 WIDEN TO 4 LANE DIVIDED 15,190 JACK US 281 REPLACE BRIDGE AND APPROACHES 378 JASPER US 96 MILL AND INLAY EXISTING ROADWAY 8,585 JASPER CS REPLACE EXIST BRIDGE AND APPROACHES 80 JEFF DAVIS SH 118 MILL AND INLAY OF EXISTING ROADWAY 20,540 JOHNSON SH 171 REPLACE CULVERT WITH A BRIDGE 7,585 LAVACA US 77 WIDEN, REHABILIT BRIDGE AND APPROACHES 5,931 LEE US 77 REPLACE BRIDGE AND APPROACHES 9,974 LIBERTY FM 1008 REHAB EXIST RDWY, WIDEN EXIST. BRIDGES 1,179 LIVE OAK US 281 MILL AND OVERLAY 84,170 NACOGDOCHES FM 2609 MILL AND OVERLAY 51,183 SABINE FM 276 ADDITIONAL PAVED SURFACE WIDTH 14,604 SHELBY SH 7 REPLACE BRIDGE AND APPROACHES 7,735 SHELBY, ETC SH 7 PLANE, SEAL AND HMA OVERLAY 9,333 TAYLOR IH 20 MILL, UNDSL, ACP, MBGF 15,533 TAYLOR US 84 CONSTRUCTION OF AN INTERCHANGE 54,547 TRAVIS LP 1 CONSTRUCT CUSTOMER SERVICE CENTER 339 TRINITY FM 356 UPGRADE GUARD RAIL 572 UPSHUR SH 155 RESURFACE EXISTING 2-LANE HIGHW 8,840 WILBARGER US 70 REVISE INTERSECTION 770 TOTAL

6

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009. Value from &! M East HOU M East HOU M East HOU &! M East HOU &! M East HOU IH 45 0271-14-217 0271-14-218 0271-14-213 0271-14-228 0500-03-462 0500-03-550 0500-03-565 Reconstruct US /IH 610 IC. Construct

More information

OPPORTUNITY ZONE TRACT LISTING

OPPORTUNITY ZONE TRACT LISTING TRACT NUMBER COUNTY 48001950401 Anderson County 48001950901 Anderson County 48005000200 Angelina County 48005000500 Angelina County 48005000600 Angelina County 48005000700 Angelina County 48005001001 Angelina

More information

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952

More information

DISTRICT AUSTIN 3226 BASTROP US NH 2011(720) $ 578, NO AWARD

DISTRICT AUSTIN 3226 BASTROP US NH 2011(720) $ 578, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 3226 BASTROP US 290 0114-04-063 NH 2011(720) 1.364 $ 578,444.15 4-16.15 NO AWARD CONTRACTOR: J.D. RAMMING PAVING CO., LTD.

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

FM 471. Open House Public Meeting FM 471

FM 471. Open House Public Meeting FM 471 Open House Public Meeting November 12, 2014 FROM: LP 1604 TO: FM 3487 BEXAR COUNTY OPEN HOUSE PUBLIC MEETING November 12, 2014 H.B. Zachry Middle School 9410 Timber Pass 5:00 7:00 PM San Antonio, TX 78250

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

AGENDA. TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas THURSDAY June 30, 2005 * * *

AGENDA. TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas THURSDAY June 30, 2005 * * * INTERNET ADDRESS: http://www.dot.state.tx.us AGENDA TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas 78701-2483 THURSDAY June 30, 2005 * * * 9:00 A.M. CONVENE MEETING Approved 1. Approval

More information

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E. RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project

More information

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop ENERGY SECTOR ROADWAY REPAIR PROJECT August 15, 2013 Industry Workshop Safety Moment Sign-in Sheet Exit Locations Gathering Point Directions from Emergency Responders Signal to re-enter the Building or

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2007-2010 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2007-2010 Prepared

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2045 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Bexar Alamo

More information

ASPHALT PLANT LEVEL 1

ASPHALT PLANT LEVEL 1 ASPHALT PLANT LEVEL 1 Module 5: Bulk Specific Gravity FM 1 T 166 FDOT Course Release: 10, Module 5 1 Specification Year: January 2015 Release 10 5-1 FM 1 T 166 Bulk specific gravity of compacted mixtures.

More information

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016 Pavement Markings: Past, Present, and Future TxDOT Short Course October 2016 Then 1911 640,000 registered vehicles in the US 200,000 miles of paved roads 2,000 fatalities First Pavement Markings 1911 Wayne

More information

SPONSORSHIP OPPORTUNITIES

SPONSORSHIP OPPORTUNITIES SPONSORSHIP OPPORTUNITIES 5 th ANNUAL SATURDAY, April 7, 2018 BOCA RATON RESORT & CLUB 501 E. Camino Real ~ Boca Raton, FL 33432 CONTINENTAL BREAKFAST ~ 7:00 A.M. at 501 East SHOTGUN START ~ 8:00 A.M.

More information

ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION

ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION 2015 TxDOT Short Course Miguel Arellano, P.E. Austin District Pavement Engineer October 13, 2015 Table of Contents 1 Goals: Overall Reduction in Crashes

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Texas Department of State Health Services Vital Statistics Unit

Texas Department of State Health Services Vital Statistics Unit 142 ANDERSON COUNTY 74 53 71.62% 200 ANDREWS COUNTY 16 9 56.25% 090 ANGELINA COUNTY 107 64 59.81% 017 ATASCOSA COUNTY -- CLERKS OFFICE 222 94 42.34% 074 AUSTIN COUNTY -- COUNTY CLERK 57 38 66.67% 220 BAILEY

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

Action Plan and Summary for Roads to Gravel

Action Plan and Summary for Roads to Gravel Impact of Energy Sector and Heavy Commercial Development Action Plan and Summary for Roads to Gravel Research Report RR-13-01 Prepared for Texas Department of Transportation Maintenance Division Prepared

More information

VENDOR REGISTRATION. Address: City: State: Zip:

VENDOR REGISTRATION. Address: City: State: Zip: VENDOR REGISTRATION GEORGIA ASSOCIATION OF SCHOOL FACILITY ADMINISTRATORS APPLICATION AND CONTRACT FOR EXHIBIT SPACE 26th Annual Conference and Trade Show October 18 - October 21, 2015 The Marriott Riverfront

More information

2010 Sponsorship Opportunities Type Cost # Avail. # Playing Spots

2010 Sponsorship Opportunities Type Cost # Avail. # Playing Spots 2010 Sponsorship Opportunities Type Cost # Avail. # Playing Spots Boys and Girls Club Title Sponsorship Platinum $5,000 One 4 Premium Sponsor Gold $3,500 Open 4 Contest hole-in-one Sponsorship Gold $2,500

More information

Children s Hospital Golf Classic

Children s Hospital Golf Classic Dear Friends, Planning has begun It s time to mark your calendar for the 2019. Building on years of tradition, we are excited to and again partner with celebrated golf professional and three-time PGA Tour

More information

100 Most Congested Roadways in Texas

100 Most Congested Roadways in Texas 100 Most Congested Roadways in Texas 2018 Report EXECUTIVE SUMMARY In response to increased roadway congestion throughout the state, in 2009 the Texas Legislature mandated that the Texas Department of

More information

The Transportation Improvement Program

The Transportation Improvement Program Waco Metropolitan Planning Organization The Transportation Improvement Program Waco Urbanized Area For Fiscal Years 2015 Through 2018 Proposed Amendment 4 FY 2016 PHASE: E COUNTY: McLennan LIMITS FROM:

More information

TEXAS TRAFFIC SAFETY TASK FORCE. Jeff Moseley Texas Transportation Commission

TEXAS TRAFFIC SAFETY TASK FORCE. Jeff Moseley Texas Transportation Commission TEXAS TRAFFIC SAFETY TASK FORCE Jeff Moseley Texas Transportation Commission June 7, 2016 Fatalities and fatal crashes 2010 2015 4,000 3,500 3,417 3,407 3,536 3,533 3,000 3,061 3,067 2,782 2,803 3,037

More information

Driving Indiana s Economic Growth

Driving Indiana s Economic Growth Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David

More information

BOMA Annual Sustaining Sponsor Program

BOMA Annual Sustaining Sponsor Program 2018 BOMA Annual Sustaining Sponsor Program BOMA s Annual Sustaining Sponsorship Program was created at the requests of BOMA member companies who desired to package their company s marketing and support

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2008-2011 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2008-2011 Prepared

More information

Texas Department of State Health Services Vital Statistics Unit

Texas Department of State Health Services Vital Statistics Unit 142 ANDERSON COUNTY 57 54 94.74% 200 ANDREWS COUNTY 38 25 65.79% 090 ANGELINA COUNTY 147 107 72.79% 017 ATASCOSA COUNTY -- CLERKS OFFICE 311 142 45.66% 074 AUSTIN COUNTY -- COUNTY CLERK 103 71 68.93% 220

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -

More information

Texas Rural Transportaion Plan - Preliminary Project Rankings by District

Texas Rural Transportaion Plan - Preliminary Project Rankings by District Texas Rural Transportaion Plan - Preliminary Rankings by District RTP ID Score Rank District County Highway Description Limit From Limit To 271 564.7 171 Abilene Howard US 87 CONSTRUCT NEW RELIEF ROUTE

More information

Benefit for Children

Benefit for Children Benefit for Children SPONSORSHIP OPPORTUNITIES Sunday and Monday, April 22-23 The Valero Texas Open and our Valero Benefit for Children have collectively raised over 122 million in Valero's 15 years as

More information

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road. CAMPO Plan Priority Project List: Regionally Funded Projects (Projects may be funded by Federal, State or Local funding) AS AMENDED: 1/10/2011, 3/11/2011, 10/10/2011, 4/9/2012, and 10/8/2012 I. Roadway

More information

24,801 Roadway Departure Fatalities Nationally. The Safety Edge : Minimizing The Effects of Shoulder Drop-off. 41,059 Highway Fatalities a Year

24,801 Roadway Departure Fatalities Nationally. The Safety Edge : Minimizing The Effects of Shoulder Drop-off. 41,059 Highway Fatalities a Year 48 th Annual: Idaho Asphalt Conference 24,801 Roadway Departure Fatalities Nationally The Safety Edge : Minimizing The Effects of Shoulder Drop-off 49% jl 51% Roadway Departure October 23, 2008 Moscow,

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Apr 16, 2010 LAB MANUAL 1810

Apr 16, 2010 LAB MANUAL 1810 Apr 16, 2010 LAB MANUAL 1810 1810 BULK SPECIFIC GRAVITY (GMB), DENSITY AND PERCENT ABSORBED WATER OF COMPACTED BITUMINOUS SPECIMENS AASHTO Designation T 166 (MN/DOT Modified) 1810.1 SCOPE This test method

More information

BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)

BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) NOTICE OF PUBLIC MEETING INTERSTATE HIGHWAY 30 (Rockwall) FROM: BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) 2642 CSJs: 0009-11-238; 0009-12-215; 0009-12-908 Dallas County and Rockwall County, Texas

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017 INTRODUCTION + 241 km long, 2

More information

Now Let s Think Systemic

Now Let s Think Systemic Now Let s Think Systemic Remote Rural County Use of the Highway Safety Improvement Program TRINITY COUNTY DEPARTMENT OF TRANSPORTATION Richard Tippett Director MEET TRINITY COUNTY 3,208 square miles 13,786

More information

Jan 10, 2002 LAB MANUAL

Jan 10, 2002 LAB MANUAL Jan 10, 2002 LAB MANUAL 1810.0 1810 BULK SPECIFIC GRAVITY (GMB), DENSITY AND PERCENT ABSORBED WATER OF COMPACTED BITUMINOUS SPECIMENS AASHTO Designation T 166 (MN/DOT Modified) 1810.1 SCOPE This test method

More information

100 Most Congested Roadways in Texas

100 Most Congested Roadways in Texas 100 Most Congested Roadways in Texas 2017 EXECUTIVE SUMMARY In response to increased roadway congestion throughout the state, in 2009 the Texas Legislature mandated that the Texas Department of Transportation

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

SAFE-D Members *updated 1/18/2019

SAFE-D Members *updated 1/18/2019 SAFE-D Members *updated 1/18/2019 ESD/Organization Renewal month Austin County ESD 1 Sep 2019 Austin County ESD 3 Feb 2019 Bastrop County ESD 1 Aug 2019 Bastrop County ESD 2 Nov 2019 Bastrop/Travis Counties

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

SPONSORSHIP PACKAGE. Melissa Wood. Manager, Marketing and Member Communications

SPONSORSHIP PACKAGE. Melissa Wood. Manager, Marketing and Member Communications SPONSORSHIP PACKAGE 2019 Melissa Wood Manager, Marketing and Member Communications mwood@ific.ca, 416-309-2308 CONTENTS 3 Sponsorship Opportunities 4 IFIC 28 th Annual Golf Classic 6 IFIC Annual Leadership

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Chapter Table of Contents THE 2017 HOUSTON BIKE PLAN 1-1 HOUSTON BIKEWAYS PROGRAM 1-2 HISTORY OF BICYCLE PLANNING IN HOUSTON 1-3 BICYCLE LEVEL OF COMFORT 1-3 EXISTING PLANS, PROGRAMS

More information

WALKABLE + BIKEABLE REGIONS TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP

WALKABLE + BIKEABLE REGIONS TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP WALKABLE + BIKEABLE REGIONS 2016 TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP How Metropolitan Areas Plan for Walking and Biking Alex Carroll APA Texas Chapter Planning Conference

More information

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer Florida Department of TRANSPORTATION Asphalt Update Howie Moseley State Bituminous Materials Engineer Acknowledgements Jim Musselman Rhonda Taylor Curtis Curl My Background Graduate of the University of

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project FM 471 PROJECT OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties January 24, 2018 Project Location 2 Proposed Improvements Improvements include: Expansion of FM 471 from

More information

2015 premier 2015 PREMIER FACE TIME EXPO, AWARDS CEREMONY & GOLF TOURNAMENT. sponsors. platinum. silver. gold. bronze JUNE 10-12, 2015 SAN ANTONIO, TX

2015 premier 2015 PREMIER FACE TIME EXPO, AWARDS CEREMONY & GOLF TOURNAMENT. sponsors. platinum. silver. gold. bronze JUNE 10-12, 2015 SAN ANTONIO, TX 2015 premier sponsors platinum gold bronze silver minority business enterprises 2015 PREMIER FACE TIME EXPO, AWARDS CEREMONY & GOLF TOURNAMENT JUNE 10-12, 2015 SAN ANTONIO, TX SPONSORSHIP & INFORMATION

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

Tex-207-F, Determining Density of Compacted Bituminous Mixtures

Tex-207-F, Determining Density of Compacted Bituminous Mixtures Overview Effective date: August 1999 to October 2004. Use this method to determine the bulk specific gravity of specimens of compacted bituminous mixtures. Use the bulk specific gravity of the compacted

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARlOUS Counties MINUTE ORDER Page 1 of 1 VARlOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving

More information

Trademarks and the Changing Internet Landscape March 7 8, 2013 Philadelphia, PA, USA The Ritz-Carlton SPONSORSHIP APPLICATION AND CONTRACT

Trademarks and the Changing Internet Landscape March 7 8, 2013 Philadelphia, PA, USA The Ritz-Carlton SPONSORSHIP APPLICATION AND CONTRACT Trademarks and the Changing Internet Landscape March 7 8, 2013 Philadelphia, PA, USA The Ritz-Carlton SPONSORSHIP APPLICATION AND CONTRACT PLATINUM SPONSOR Platinum Sponsorship US $6,000 Recognition as

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

DRAFT INVESTMENT CORRIDORS

DRAFT INVESTMENT CORRIDORS DRAFT INVESTMENT CORRIDORS Mode Studied ID CORRIDOR / ROADWAY FROM TO EXISTING CMTA ROUTES CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR

More information

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department Best Southwest Transportation Committee North Central Texas Council of Governments Transportation Department The The Regional Regional Veloweb Veloweb Review Review NCTCOG Bicycle and Pedestrian Program

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

Thursday, June 22 nd 2017 Northview Golf and Country Club Street, Surrey BC SPONSOR OR REGISTER AT:

Thursday, June 22 nd 2017 Northview Golf and Country Club Street, Surrey BC   SPONSOR OR REGISTER AT: Northview Golf and Country Club 6857 168 Street, Surrey BC Email: golf@iaff1271.org SPONSOR OR REGISTER AT: www.surreyfirefighters.com/golf 2016 Sponsorship Recognition Presented By: Golf Tournament "Community

More information

General References Definitions. (1) Design Guidance. (2) Supporting Information

General References Definitions. (1) Design Guidance. (2) Supporting Information Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to

More information

Demographic Characteristics and Trends of Bexar County and San Antonio, TX

Demographic Characteristics and Trends of Bexar County and San Antonio, TX Demographic Characteristics and Trends of Bexar County and San Antonio, TX Leadership San Antonio Understand Infrastructure. Prepare for Growth. May 2, 2012 San Antonio, TX Select Growing States, 2000-2010

More information

Transportation Advisory Board

Transportation Advisory Board C I T Y O F WEATHERFORD Transportation Advisory Board AGENDA REPORT Meeting Date: October 15,2015 Staff Contact: Manny Palacios Jr. Phone: E-mail: 817-598-4296 mpalacios@weatherfordtx.gov SUBJECT: Discuss

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

Sponsored By: Support From:

Sponsored By: Support From: Sponsored By: Support From: A voluntary association of local governments, H-GAC provides a regional forum for cooperative action. Created by Texas, role defined by State and local governments: Area Agency

More information

2014 Agent Convention Sponsorship Opportunities. Benefits of Sponsoring

2014 Agent Convention Sponsorship Opportunities. Benefits of Sponsoring 2014 Agent Convention ship Opportunities The sponsorship opportunities listed below are designed to give your company increased brand awareness during the 2014 Agent Convention, which will be held October

More information

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of Texas for: Elimination of a U.S. (Interstate) Route AASHTO Use Only

More information

Kentucky Highway District 7

Kentucky Highway District 7 Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age AMERICANS WITH DISABILITIES ACT TRANSITION PLAN FOR CURB RAMPS AND SIDEWALKS 2015 LEON COUNTY DEPARTMENT OF PUBLIC WORKS 1 P age INTRODUCTION The goal of the Americans with Disabilities Act (ADA) Transition

More information

4th Annual. Christmas Classic EVENT DETAILS. December 15, The Calusa Chapter of the GCSAA is proud to bring you this local charity event.

4th Annual. Christmas Classic EVENT DETAILS. December 15, The Calusa Chapter of the GCSAA is proud to bring you this local charity event. The Calusa GCSA chapter is pleased to bring you our 4th Annual Christmas Golf Charity Event benefitting The Children s Network of SW Fl on December 15th,2017. Children Network of SW FL works with our community

More information

Sponsor Opportunities

Sponsor Opportunities Sponsor Opportunities Mercy Foundation works with generous community members, patients, corporations and organizations to support Mercy initiatives vital to those in need. These sponsorship opportunities

More information

ExpressFall/Winter 2017

ExpressFall/Winter 2017 Evansville MPO Fall/Winter 017 Transportation Planning for Henderson, Vanderburgh, and Warrick counties Metropolitan Transportation Plan 0 The Evansville MPO is gearing up to begin updating Metropolitan

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

Introduction...pg. 1. Study Area...pg. 1. Study Purpose and Need...pg. 2. Study Coordination and Development... pg. 3. Public Involvement...pg.

Introduction...pg. 1. Study Area...pg. 1. Study Purpose and Need...pg. 2. Study Coordination and Development... pg. 3. Public Involvement...pg. Table of Contents Introduction...pg. 1 Study Area...pg. 1 Study Purpose and Need...pg. 2 Study Coordination and Development... pg. 3 Public Involvement...pg. 4 Evaluation of Alternatives...pg. 4 Preferred

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

SPONSORSHIP OPPORTUNITIES

SPONSORSHIP OPPORTUNITIES SPONSORSHIP OPPORTUNITIES 3 rd ANNUAL SATURDAY, APRIL 16, 2016 BOCA RATON RESORT & CLUB 501 E. Camino Real ~ Boca Raton, FL 33432 CONTINENTAL BREAKFAST ~ 7:00 A.M. at Mulligan s SHOTGUN START ~ 8:00 A.M.

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

ADA Retrofits Triggered by Paving: What, When, and Why

ADA Retrofits Triggered by Paving: What, When, and Why ADA Retrofits Triggered by Paving: What, When, and Why Ron Franzen NWR Project Development Trainer & Statewide ADA Trainer Regional ADA Coordination Team NWR Engineering Services Paula Hammond Secretary

More information

SAFE-D Members *updated 11/1/2017

SAFE-D Members *updated 11/1/2017 SAFE-D Members *updated 11/1/2017 ESD/Organiza,on Aus$n County ESD 3 Feb 2018 Bastrop County ESD 1 Aug 2018 Bastrop County ESD 2 Nov 2017 Bastrop/Travis Coun$es ESD 1 May 2018 Bexar County ESD 12 Dec 2017

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

Access Management Benefits & Techniques. Access Management Workshop June 2, 2006

Access Management Benefits & Techniques. Access Management Workshop June 2, 2006 Access Management Benefits & Techniques Access Management Workshop June 2, 2006 1 Benefits of Access Management Safety As access density increases, crash rates increase Increasing the density of access

More information

SHSP Action Plan Development. Intersection EA Team

SHSP Action Plan Development. Intersection EA Team SHSP Action Plan Development Intersection EA Team March 7, 2018 Agenda Welcome and Introductions Review Completed Action Plans Developed by Working Groups Next Steps STRATEGIES: INTERSECTION SAFETY EMPHASIS

More information

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080 Selected for $2 Billion Allocation Safety SLRTP Rural priority IH 35 Corridor Border and Port Trade 100 most congested Ports to Plains Corridor IH 69 Corridor Rural System Preservation Other High Corridors

More information

MASTER THOROUGHFARE PLAN

MASTER THOROUGHFARE PLAN MASTER THOROUGHFARE PLAN Master Thoroughfare Plan Update November 2015 Prepared for Town of Northlake AVO 30659 11/11/2015 1201 North Bowser Road Richardson, Texas 75081 Firm Registration No. 312 MASTER

More information

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects NCHRP Project 15-50 July 2017 1 Research Objective Develop guidelines for safe and cost-effective

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

REGISTRATION FORM TEXAS ASPHALT PAVEMENT ASSOCIATION 43 rd ANNUAL MEETING

REGISTRATION FORM TEXAS ASPHALT PAVEMENT ASSOCIATION 43 rd ANNUAL MEETING REGISTRATION FORM TEXAS ASPHALT PAVEMENT ASSOCIATION 43 rd ANNUAL MEETING La Torretta Lake Resort & Spa 600 La Torretta Boulevard Montgomery, Texas - (936) 448-4400 September 19-22, 2017 Registration Page

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information