1 PROBLEM No. 1 In accordance with the project requirements, the contractor has obtained a 4 diameter core from below the shaft bottom. The core run was 5.0 and the total rock recovered was 4.2. A total of 3.7 of the recovered core consisted of core fragments greater than 4. Calculate the percent core recovery (%REC) and Rock Quality Designation (RQD). HW-1 HW2-1

2 PROBLEM No. 2 The plans for a bridge specify that the drilled shaft diameter be 48. However, the contractor supplied a temporary casing with an outside diameter equal to the specified shaft diameter (O.D. casing). The authorized shaft length below ground was 68 and the casing supplied had a wall thickness of ½. What additional length of shaft is required? HW-2 HW2-2

3 PROBLEM No. 3 For the situation presented in Problem #2, determine the factor (F) to adjust pay quantities to compensate for smaller shafts. HW-3 HW2-3

4 Proposed Top of Shaft EL = Rock Socket 50 PROBLEM No. 4 Top of casing EL = Ground Surface 48 (OD) Casing Wall Thickness = 0.5 Bottom of Casing Excavated Shaft DETERMINE 1. Length of casing below ground surface 2. Elevation at bottom of casing 3. Elevation at bottom of shaft 4. Theoretical volume of concrete in yd 3 5. Length of rock socket Bottom of Shaft EL HW-4 HW2-4

5 PROBLEM No. 5 The plans for a bridge show that the drilled shaft diameter is to be 48 and that all concrete cover is to be 6. The length of the drilled shaft is 63. Determine the total number of side spacers required. Assume the lowest level is at 1.5 ft from the bottom Spacers per Row one spacer per 30 inches of circumferenceofcagewithaminimumoffourat each level. Number of Rows within 3 feet of the bottom, within 6 feet of the top, and intervals not exceeding 10 feet along the shaft 6 HW-5 HW2-5

6 PROBLEM No. 6 Using the information from Problem 5 and below, how many CSL tubes are required for the drilled shat and what should their minimum length be Number of CSL Tubes Provide the following number and configuration of cross hole sonic logging access tubes in each drilled shaft based on the diameter of the shaft. Length of CSL Tubes from the tip of shaft to a point high enough above top of shaft to allow crosshole-soniclogging testing, but not less than 30 inches above the top of the drilled shaft, ground surface or water surface, whichever is higher. HW-6 HW2-6

7 PROBLEM No. 7 A drilled shaft contractor placed concrete in a 48 (nominal diameter) shaft which had a top elevation of ft. and a bottom elevation of 60 ft. The following information was recorded by the inspector during the concrete placement operation. Assume permanent casing having an inside diameter of 54 was used in the upper 10. The Contractor used 48 nominal drilling equipment below the upper 10. Neglect the volume of reinforcing steel, telltales, etc. DETERMINE A. The theoretical volume of the shaft. HW-7 HW2-7

8 upper 10 : (from El +5.5 to El -4.5) PROBLEM No. 7A THEORETICAL VOLUME NOTE: The theoretical volume will consist of two straight lines V T = Area x Length A = D2 4 HW-8 HW2-8

9 PROBLEM No. 7A THEORETICAL VOLUME NOTE: The theoretical volume will consist of two straight lines Below the upper 10 : (from El -4.5 to El ) V T = Area x Length A = D2 4 HW-9 HW2-9

10 PROBLEM No. 7A THEORETICAL VOLUME DATA FOR PLOTTING THE THEORETICAL At El -65 : At El -4.5 : At El +5.5 : Cumulative volume=0 Cumulative volume= cy Cumulative volume= + = cy HW HW2-

11 +20 PROBLEM No. 7B Plot the theoretical curve 0 ELEVATION IN FEET CONCRETE VOLUME PLACED (CY) HW HW2-

12 PROBLEM No. 7 B B. Plot the theoretical volume and actual volume placed of concrete. Below is the truck information HW HW2-

13 PROBLEM No. 7B C. After plotting, does the shaft appear OK? HW HW2-

14 PROBLEM No. 8 For Problem 7 : DETERMINE A. What was the actual concrete volume placed in the shaft. B. What was the overpour? C. What would be the Theoretical, Actual and overpour ratio (A/T) that you would fill in the first page of the Drilled Shaft Log? HW HW2-

15 END OF EXERCISES HW HW2-

River Bridge - Test Shaft-1 Clarke County, MS, 4/2/2012

River Bridge - Test Shaft-1 Clarke County, MS, 4/2/2012 Page 1 of 9 The enclosed report contains the data and analysis summary for the SoniCaliper shaft caliper, performed at River Bridge (Test Shaft-1), Clarke County, MS on Monday, April 02, 2012 by Dave Jakstis.

More information

A PPLICATION. Water Filled Tubes. Drilled Shafts S TANDARDS. Depth Wheel & Cables. CT Method. Signal goes around defect or is blocked.

A PPLICATION. Water Filled Tubes. Drilled Shafts S TANDARDS. Depth Wheel & Cables. CT Method. Signal goes around defect or is blocked. CT Method N D E C R O S S H O L E T O M O G R A P H Y A PPLICATION Crosshole Tomography testing is used to accurately characterize the size, location and severity of defects commonly found within newly

More information

Stadium Project - DP-70 Atlanta, GA, 9/30/2014

Stadium Project - DP-70 Atlanta, GA, 9/30/2014 Page 1 of 13 The enclosed report contains the data and analysis summary for the SoniCaliper shaft caliper, performed at Stadium Project (DP-70), Atlanta, GA on Tuesday, September 30, 2014 by Chris Kohlhof.

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

CAISSONS SECTION Section CAISSONS. Part 1-GENERAL

CAISSONS SECTION Section CAISSONS. Part 1-GENERAL Section 02380-CAISSONS Part 1-GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

Lesson 8 Piles Bearing & Acceptance Transcript. Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance.

Lesson 8 Piles Bearing & Acceptance Transcript. Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance. Lesson 8 Piles Bearing & Acceptance Transcript Welcome to the Pile Driving Inspector Course. This is Lesson 8 Piles Bearing & Acceptance. To begin, select the start button or press Shift+N on your keyboard.

More information

OUTER RACE SHIM SPACERS METRIC OUTER RACE SHIM SPACERS. All Dimensions in Millimeters. Material:300 Series Stainless Steel

OUTER RACE SHIM SPACERS METRIC OUTER RACE SHIM SPACERS. All Dimensions in Millimeters. Material:300 Series Stainless Steel OUTER RACE SHIM SPACERS Material:300 Series Stainless Steel METRIC OUTER RACE SHIM SPACERS All Dimensions in Millimeters Material:300 Series Stainless Steel 6-16 INNER RACE SHAFT SPACERS 3 /32" To 1 /2"

More information

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

BARRIER OFFSET 0 A 6 6 A 12 12 A 26 A 26 3A OR 4A L OR S * ** L OR S L OR S ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE

More information

General Information Gravity roller conveyors are available in many sizes and configurations as shown on the following pages. There are many factors to consider when selecting a gravity conveyor. The following

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following graphs.

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE

1) INTRODUCTION 2) THE UNFAIR ADVANTAGE 1 1) INTRODUCTION 2) THE UNFAIR ADVANTAGE and Stingray earth anchors are driven tipping plate soil anchors for reaction of tensile loads. anchors have ultimate capacities up to 20 tons, and Stingray anchors

More information

TorqBolt Wedge Anchors Torque Controlled Expansion Anchor

TorqBolt Wedge Anchors Torque Controlled Expansion Anchor TorqBolt Wedge Anchors Torque Controlled Expansion Anchor Product Description The Torqbolt wedge anchor is a torque-controlled, wedge expansion anchor for heavy duty fastening applications where high pull

More information

Dean Pump Self-Priming Chemical Process Pumps

Dean Pump Self-Priming Chemical Process Pumps Bulletin C 1.2.34.7 Dean Pump Self-Priming Chemical Process Pumps php Series HEAD CAPACITY RANGE CHARTS php Self Primer - 2 Pole 3500 RPM 500 CAPACITY M 3 /HR 2900 RPM 50 HERTZ 25 50 75 125 150 400 TOTAL

More information

In Place Density Determination of Asphalt Concrete by the Coring Method

In Place Density Determination of Asphalt Concrete by the Coring Method In Place Density Determination of Asphalt Concrete by the Coring Method 1. Scope: This procedure is for determining the density of in place asphalt concrete pavement. 2. Apparatus: 2.1 Scale or balance

More information

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following

More information

Perched Box Caisson Overview. January 2014

Perched Box Caisson Overview. January 2014 Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur

More information

l DESCRIPTION l FEATURES l LIMITATIONS l TYPICAL APPLICATIONS l MATERIAL SPECIFICATIONS TECHNICAL MANUAL SECTION 2.3 PAGE 1 / 6

l DESCRIPTION l FEATURES l LIMITATIONS l TYPICAL APPLICATIONS l MATERIAL SPECIFICATIONS TECHNICAL MANUAL SECTION 2.3 PAGE 1 / 6 www.ucanfast.com TECHNICAL MANUAL SECTION 2.3 PAGE 1 / 6 l DESCRIPTION The UCAN WAG anchor is a fully threaded torque controlled expansion anchor assembled with a three segment expansion clip. All parts

More information

- Written price quotations are valid for 30 days from the date of the quote unless otherwise noted.

- Written price quotations are valid for 30 days from the date of the quote unless otherwise noted. SPECIFICATIONS - All material is solid brass with a #8 mirror finish unless otherwise noted. - All material sold by length is priced in one foot increments. ORDERING PROCEDURE - Use a Purchase Order number.

More information

Special Provision No. 903S01 November OPSS 903, December 1983, Construction Specification for Piling is deleted and replaced with the following:

Special Provision No. 903S01 November OPSS 903, December 1983, Construction Specification for Piling is deleted and replaced with the following: SUPPLY EQUIPMENT FOR DRIVING PILES - Item No. SUPPLY EQUIPMENT FOR INSTALLING CAISSON PILES - Item No. SUPPLY EQUIPMENT FOR INSTALLING DISPLACEMENT CAISSON PILES - Item No. SHEET PILES - Item No. H-PILES

More information

2 Available: 1390/08/02 Date of returning: 1390/08/17 1. A suction cup is used to support a plate of weight as shown in below Figure. For the conditio

2 Available: 1390/08/02 Date of returning: 1390/08/17 1. A suction cup is used to support a plate of weight as shown in below Figure. For the conditio 1. A suction cup is used to support a plate of weight as shown in below Figure. For the conditions shown, determine. 2. A tanker truck carries water, and the cross section of the truck s tank is shown

More information

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS Page 1 CONTENTS 8.0 WIRE ROPE...2 8.1 SCOPE...2 8.2 GENERAL REQUIREMENTS...2 8.2.1 Design Factors For s... 2 8.2.2 Rotation-Resistant Rope...3 8.2.3 Requirement for Independent Core...3 8.3 INSPECTION

More information

Anchor Component Material Standard Mechanical Properties

Anchor Component Material Standard Mechanical Properties SECTION 4.1 PAGE 1 / 5 l description The UCAN sleeve anchor is a light-medium duty anchor ideal for applications in concrete, hollow block and brick. It is a mechanical expansion anchor assembled with

More information

DEVELOPMENT OF A ROBUST PUSH-IN PRESSUREMETER

DEVELOPMENT OF A ROBUST PUSH-IN PRESSUREMETER DEVELOPMENT OF A ROBUST PUSH-IN PRESSUREMETER Roger Failmezger, P.E. In-Situ Soil Testing, L.C., Lancaster, Virginia, USA ABSTRACT A push-in pressuremeter was developed using slotted steel casing with

More information

TORO TITAN TINES CATALOG 2013

TORO TITAN TINES CATALOG 2013 TORO TITAN TINES CATALOG 2013 PLAN YOUR AERATION SCHEDULE TODAY ORDER YOUR TINES FROM YOUR LOCAL TORO DISTRIBUTOR TODAY TO MAKE SURE YOU'RE READY FOR YOUR AERATION SCHEDULE JAN FEB MAR APR S M T W T F

More information

Restoration Requirements

Restoration Requirements Restoration Requirements Street Excavation Rules & Regulations Public Works Code Article 2.4 DPW Order 178,940 Regulations Article 2.4 of the Public Works Code requires any person excavating in the Public

More information

Chapter 9 System Design Procedures

Chapter 9 System Design Procedures Chapter 9 CHAPTER 9 SYSTEM DESIGN PROCEDURES TABLE OF CONTENTS PART 9.1 GENERAL 9-1 PART 9.2 EXAMPLE 1, LOW PRESSURE GRAVITY SYSTEM 9-1 PART 9.3 EXAMPLE 2, PUMPED AUTOMATIC PRESSURE PIPELINE 9-4 9.3.1

More information

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1 WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES, 20 MILS ITEM 685.11 (FT) CL STATION ALIGN FROM TO SIDE DESCRIPTION FACTOR LENGTH (FT) E 18+62 62 18+79.19 RT STOP BAR 6 16.6 99.4 E 18+55 00 20+08.00 LT B KE

More information

MAKE BOLLARD IMPACT RESISTANT PROTECT FOUNDATIONS RE-USE BOLLARD

MAKE BOLLARD IMPACT RESISTANT PROTECT FOUNDATIONS RE-USE BOLLARD \\ PROTECT FOUNDATIONS In-ground or surface mount Impact Recovery System protects foundations from damage when bollards are impacted, need replacing or upgrading. Surface mount version uses Impact resistant

More information

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) December 5, 1994 TM Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on

More information

Packaging Information Bulk Packs Non-Gas

Packaging Information Bulk Packs Non-Gas SIZE TYPE PIPE OD 10 IPS 10.750 12 IPS 12.750 14 IPS 14.000 16 IPS 16.000 (Note 1) FORMANCE PIPE IPS PRODUCTS BULK PACKS NON-GAS DISTRIBUTION (All series except 6500,8100,8300) LAYER 40 /50 /53 JOINTS

More information

Buoyancy Control Calculated Cost Allowance for 1 Year Study Cost Estimate

Buoyancy Control Calculated Cost Allowance for 1 Year Study Cost Estimate Prepared for Millennium Project Revision A 21 March 2005 by Greg Lamberson Record of Revisions Prepared Rev Date Description By A 21 Mar 05 Buoyancy Control Study Report FGL Checked By Client Accept Approved

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

Analysis A1 and B2 Methods of Hydrostatic Testing Applied at Gas Pipeline; Cause Study A1-Method

Analysis A1 and B2 Methods of Hydrostatic Testing Applied at Gas Pipeline; Cause Study A1-Method Analysis A1 and B2 Methods of Hydrostatic Testing Applied at Gas Pipeline; Cause Study A1-Method Alfred HASANAJ Abstract in this paper we will analyze methods of hydrostatic testing applied in Trans Adriatic

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58551 CSAH NO. 41 OVER THE KETTLE RIVER DISTRICT 1 PINE COUNTY JULY 28, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method 1. Scope: This test is for determining the in place density of asphalt concrete

More information

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Illini Union Champaign, IL February 24, 2015 Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Temporary Concrete Barrier Pinning and Drop-off Policy

More information

FIGURES APPENDIX A SYMBOL SAMPLING DESCRIPTION Location of sample obtained in general accordance with ASTM D 1586 Standard Penetration Test with recovery Location of sample obtained using thin-wall

More information

Trogear Bowsprit Through Hull Installation Manual

Trogear Bowsprit Through Hull Installation Manual Trogear Marine Products, LLC www.trogear.com info@trogear.com 866-616-2978 Trogear Bowsprit Through Hull Installation Manual Congratulations on your purchase of the Trogear Bowsprit which can be installed

More information

Trial Anchors through Existing Gabions

Trial Anchors through Existing Gabions Lessons learned from one of New Zealand s most challenging civil engineering projects: rebuilding the earthquake damaged pipes, roads, bridges and retaining walls in the city of Christchurch 2011-2016.

More information

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56) 5.9.56 RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method ) 1. SCOPE This test covers preparation of specimens and measurement of the change of tensile strength resulting

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

1 Exam Prep. Questions and Answers

1 Exam Prep. Questions and Answers Part 1 1 Exam Prep Standard for Polyvinyl Chloride Pressure Pipe ANSI/AWWA C900-07 Questions and Answers 1. Which of the following statement is not a correct statement? A. A DR is the average O.D. divided

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

PROPOSAL. PROPOSAL OF, a corporation a

PROPOSAL. PROPOSAL OF, a corporation a PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL 1800 Washingn Blvd. Baltimore Maryland 21230 OIL/GAS WELL COMPLETION REPORT Permit No. Name of Operar Address Well Name and Number Surveyed elevation (feet): KB GL Well Location Field (If wildcat, so state)

More information

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 080311-2 SP3363-1 Side-of-Pole Mount for 1 Module (SPM1)

More information

STANDARD FOR CONTROL VALVE SEAT LEAKAGE

STANDARD FOR CONTROL VALVE SEAT LEAKAGE 11-3 STANDARD FOR CONTROL VALVE SEAT LEAKAGE 1. PURPOSE 1.1 This standard establishes a series of seat leakage classes for control valves and defines the test procedures. 2. SCOPE & LIMITATIONS 2.1 Selection

More information

Use equation for the cylindrical section and equation or for the ends.

Use equation for the cylindrical section and equation or for the ends. Solution 13.1 See section 13.3.4, equations 13.7 to 13.18 Solution 13.2 Use equation 13.34. (a) rigid constant C = 0.43 (b) free to rotate, C = 0.56 Solution 13.3 See section 13.5.1 Use equation 13.39

More information

GROUND ANCHOR LOAD TESTING REPORT FOR WHITE POINT SLOPE STABILIZATION, PASEO DEL MAR, SAN PEDRO DISTRICT, LOS ANGELES, CALIFORNIA

GROUND ANCHOR LOAD TESTING REPORT FOR WHITE POINT SLOPE STABILIZATION, PASEO DEL MAR, SAN PEDRO DISTRICT, LOS ANGELES, CALIFORNIA ALASKA CALIFORNIA COLORADO FLORIDA MISSOURI OREGON WASHINGTON WISCONSIN June 27, 2014 Mr. Gene Edwards Geotechnical Engineering Group Department of Public Works, City of Los Angeles 1149 S. Broadway, Suite

More information

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES Page 1 of 6 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES 1. SCOPE A. This test method covers the laboratory determination of the water conductivity of a compacted asphalt

More information

WEDGE-ALL Wedge Anchors

WEDGE-ALL Wedge Anchors WEDGE-ALL Wedge Anchors The Wedge-All wedge anchors are a non-bottom bearing, wedge-style expansion anchor for use in solid concrete or grout-fi lled masonry. A one-piece clip ensures uniform holding capacity

More information

Hilti, Inc South 122 nd East Avenue Tulsa, OK

Hilti, Inc South 122 nd East Avenue Tulsa, OK Attached are page(s) from the 2014 Hilti North American Product Tech Guide. For complete details on this product, including data development, product specifications, general suitability, installation,

More information

Kennedy Bridge - Summary of Pier 6 Movement Records

Kennedy Bridge - Summary of Pier 6 Movement Records KENNEDY BRIDGE - SUMMARY OF PIER 6 MOVEMENT RECORDS TECHNICAL MEMORANDUM Kennedy Bridge - Summary of Pier 6 Movement Records PREPARED FOR: COPY TO: MnDOT Dale Thomas / CH2M HILL File PREPARED BY: DATE:

More information

GENERAL INSTRUCTIONS FOR A FENCE PERMIT

GENERAL INSTRUCTIONS FOR A FENCE PERMIT Need To Submit: GENERAL INSTRUCTIONS FOR A FENCE PERMIT 1. Building permit application for accessory structures filled out completely. 2. Plot plan or survey showing the location of the proposed fence

More information

FALL PROTECTION LADDERS ACCESSWAYS

FALL PROTECTION LADDERS ACCESSWAYS FALL PROTECTION LADDERS ACCESSWAYS PORTABLE LADDERS Max. Height 20 Step Ladder For small hand tool use only Must have non-slip feet Top step is not to be stood on Wood ladders not to be painted See COE

More information

CHAPTER 5 - PILES AND CAISSONS

CHAPTER 5 - PILES AND CAISSONS CHAPTER 5 - PILES AND CAISSONS BP Durow 5.1 SCOPE Monitoring of the construction of piles or caissons as the means to support road bridges is concerned with the achievement of adequate load bearing capacity

More information

SAFETY BULLETIN SETTING OUTRIGGERS TO PREVENT ACCIDENTS II SHORTRIGGING AMERICAN CONCRETE PUMPING ASSOCIATION

SAFETY BULLETIN SETTING OUTRIGGERS TO PREVENT ACCIDENTS II SHORTRIGGING AMERICAN CONCRETE PUMPING ASSOCIATION SAFETY BULLETIN SETTING OUTRIGGERS TO PREVENT ACCIDENTS II SHORTRIGGING AMERICAN CONCRETE PUMPING ASSOCIATION WWW.CONCRETEPUMPERS.COM Copyright 2010 v1.01 ACPA All rights reserved Manufacturer s recommendations

More information

McDaniel. General Service Gauges. (Brass Internals) Stainless Steel Case 1 1 /2 and 2 1 /2 Gauges. All Brass 2 and 2 1 /2 Gauges M C

McDaniel. General Service Gauges. (Brass Internals) Stainless Steel Case 1 1 /2 and 2 1 /2 Gauges. All Brass 2 and 2 1 /2 Gauges M C cdaniel General Service Gauges (Brass Internals) Polyamid B ase (Fiberglass reinforced) 4 and 6 Gauges Stainless Steel ase 1 1 /2 and 2 1 /2 Gauges All Brass 2 and 2 1 /2 Gauges cdaniel General Service

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

NATURAL GAS MAINTENANCE. Part 192 Subpart M NATURAL GAS MAINTENANCE Part 192 Subpart "M" CONTACT INFORMATION Pamela West Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Main: (405) 686-2310

More information

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 02545 CR NO. 116 OVER THE RUM RIVER METRO DISTRICT - ANOKA COUNTY SEPTEMBER 9, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

THROUGH-HOLE PACKAGING REELS, TUBES, AMMO PACKS & TAPING SPECIFICATIONS

THROUGH-HOLE PACKAGING REELS, TUBES, AMMO PACKS & TAPING SPECIFICATIONS THROUGH-HOLE PACKAGING REELS, TUBES, AMMO PACKS & TAPING SPECIFICATIONS MINIMUM PACKAGING QUANTITY Device Type MINIMUM PACKAGING QUANTITY Available Packaging Bulk 13 Ø Tape & Reel Ammo Pack Quantity per

More information

Revisions to the Regulations for Agility Trials

Revisions to the Regulations for Agility Trials Revisions to the Regulations for Agility Trials Effective January 2, 2018 Equipment changes may be done prior to January 2, 2018, but must be completed by January 2, 2018 This insert is issued as a supplement

More information

FIBERGLASS MULTI-GARD MULTI-CELL RACEWAY

FIBERGLASS MULTI-GARD MULTI-CELL RACEWAY FIBERGLASS MULTI-GARD MULTI-CELL RACEWAY Heavy Wall Bullet Resistant Bends Terminators Couplings Adapters Expansion Joints Epoxy Kits Spacers 23240 Chagrin Blvd Suite 405 Cleveland, OH 44122 216-464-3400

More information

WEEKLY CONSTRUCTION REPORT

WEEKLY CONSTRUCTION REPORT WEEKLY CONSTRUCTION REPORT SEVEE & MAHER ENGINEERS, INC. PROJECT: PERIOD ENDING: FRI, 28 April 2017 JOB NO.: 16047.00 CLIENT: TOWN OF CUMBERLAND CONTRACTOR: STOREY BROTHERS, INC. PROJECT MANAGER: DAN DIFFIN

More information

GAS DELIVERY PRESSURE AND MEASUREMENT

GAS DELIVERY PRESSURE AND MEASUREMENT GAS DELIVERY PRESSURE AND MEASUREMENT I. PURPOSE: To establish a uniform basis on which to provide gas measurement and pressure regulation facilities on customers premises. II. DELIVERY PRESSURES AND PROVISIONS:

More information

Student Manual. Lesson 4- Nuclear Density Testing. Version 1.0-3/09 4-1

Student Manual. Lesson 4- Nuclear Density Testing. Version 1.0-3/09 4-1 Version 1.0-3/09 4-1 Version 1.0-3/09 4-2 Version 1.0-3/09 4-3 What is the Density we are measuring? Can the Density be more than 100% of Maximum Dry Density reported in the Proctor test? Version 1.0-3/09

More information

LEGACY II TM STARTING PLATFORMS

LEGACY II TM STARTING PLATFORMS LEGACY II TM STARTING PLATFORMS INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 (503) 266-2231 Fax (503) 266-4334

More information

Utility Anchor System

Utility Anchor System Utility Anchor System The Dayton Superior Utility Anchor System is designed to economically simplify the lifting and handling of precast concrete elements. Its economics, ease of use and versatility will

More information

Submittal / Substitution Request

Submittal / Substitution Request Submittal / Substitution Request SUBMITTED TO: To: Firm: Project: Submitted Product: SIMPSON STRONG-TIE WEDGE-ALL WEDGE ANCHOR Specified Product: Section: Page: Detail/Sheet No.: Description of Application:

More information

1 Exam Prep. Tabs and Highlights

1 Exam Prep. Tabs and Highlights 1 Exam Prep NFPA 14: Standard for the Installation of Standpipe and Hose Systems Tabs and s These 1 Exam Prep tabs are based on the NFPA 14: Standard for the Installation of Standpipe and Hose Systems,

More information

CAISSON SHAFT SYSTEM

CAISSON SHAFT SYSTEM CAISSON SHAFT SYSTEM Installation Guide INSTALLATION GUIDE FOR DN2000 TO DN3660 UNITS PLATE JOINTING SYSTEM This guide is to be used for the Installation of CPM Group Ltd caisson shaft units which use

More information

Division of Environmental Quality Wellhead Protection Section

Division of Environmental Quality Wellhead Protection Section Division of Environmental Quality Wellhead Protection Section 1 10 CSR 23-3.110 Plugging of Wells Any well which is to be abandoned must be plugged in accordance with these rules. If a well has been determined

More information

Drop-In Internally Threaded Anchor (DIAB) Mechanical Anchors. Key features. Material: Carbon steel. Coating: Zinc plated

Drop-In Internally Threaded Anchor (DIAB) Mechanical Anchors. Key features. Material: Carbon steel. Coating: Zinc plated Drop-In Internally Threaded Anchor (DIAB) Expansion shell anchors for use in solid base materials Simpson Strong-Tie introduces a new, redesigned Drop-In Anchor (DIAB) that provides easier installation

More information

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD Standard Method of Test for Field Determination of Target Density for Plant Produced Asphalt Mix by Use of the Control Strip Technique SCDOT Designation: SC-T-65 (08/18) 1. SCOPE 1.1 This test method is

More information

Caltrans compendium of underwater sound data from pile driving 2014 update

Caltrans compendium of underwater sound data from pile driving 2014 update Caltrans compendium of underwater sound data from pile driving 2014 update Richard RODKIN 1 ; Keith POMMERENCK 2 1 Illingworth & Rodkin, Inc., United States 2 Illingworth & Rodkin, Inc., United States

More information

BIT User Manual. 1. About this manual. 2. Know your BIT 1.1. WARNING System Components

BIT User Manual. 1. About this manual. 2. Know your BIT 1.1. WARNING System Components BIT User Manual About this manual WARNING Know your BIT System Components Operation Methods Maintenance, charging 3.3.1. Cleaning General handling Software Setup Calibrating the BIT Inclinometer calibration

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

Field Manual. Simple by Design

Field Manual. Simple by Design Simple by Design US Patents No. 6,481,300; No. 6,837,120; others pending Field Manual The HydraSleeve is a simple tool. In keeping with the Simple by Design motto, these are the basic instructions. Please

More information

CLIMBING STEEL POLES INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION

CLIMBING STEEL POLES INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION This lesson describes different steel pole steps and discusses strategies for climbing, descending, and positioning steel poles to reach work

More information

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:.. CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP Submitted by:.. Tennessee Gas Company L.L.C. 1001 Louisiana St, Suite 1000 Houston, TX 77002 July 2014 Revised March 2015

More information

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E IT IS NOT ANTICIPATED THAT ONE COMPANY CAN PROVIDE ALL GROUPS, PLEASE PROVIDE PRICING ONLY ON THE GROUPS YOU CAN PROVIDE SERVICES FOR. This document is to be used by the Bidder to specify proposed Rates.

More information

CALCIFICATION ACCRETION UNIT (CAU) ASSEMBLY, DEPLOYMENT AND RECOVERY

CALCIFICATION ACCRETION UNIT (CAU) ASSEMBLY, DEPLOYMENT AND RECOVERY CALCIFICATION ACCRETION UNIT (CAU) ASSEMBLY, DEPLOYMENT AND RECOVERY Purpose: CAUs are deployed on the seafloor for up to three years in order to detect changes in net reef accretion. I. CAU Assembly -CAU

More information

Test Review: Geometry I Period 2,4,6. TEST DATE: All classes Wednesday April 9. Things it would be a good idea to know:

Test Review: Geometry I Period 2,4,6. TEST DATE: All classes Wednesday April 9. Things it would be a good idea to know: Test Review: Geometry I Period 2,4,6 TEST DATE: All classes Wednesday April 9 Things it would be a good idea to know: 1) Special Right Triangles 2) Geometric Mean 3) SOHCAHTOA Test Outline Part I - Non-Calculator

More information

TRAINING PLAN. Half Marathon Training Plan - Improver

TRAINING PLAN. Half Marathon Training Plan - Improver TRAINING PLAN Half Marathon Training Plan - Improver THIS TRAINING PLAN, PUT TOGETHER BY OUR COACHING PARTNERS RUNNINGWITHUS, IS DESIGNED TO GET YOU TO THE START LINE OF THE HALF MARATHON FEELING PREPARED

More information

Quality Plastic Pipe Fittings. Technical Data. Fabricated PVC Fittings IPS Class 100, 125, 160, 200 SCH 40 & SCH 80 Solvent Weld & Gasketed

Quality Plastic Pipe Fittings. Technical Data. Fabricated PVC Fittings IPS Class 100, 125, 160, 200 SCH 40 & SCH 80 Solvent Weld & Gasketed Quality Plastic Pipe Fittings Technical Data Fabricated PVC Fittings IPS Class 100, 125, 160, 200 SCH 40 & SCH 80 Solvent Weld & Gasketed Effective April 1, 2002 PIPE DIMENSIONS IPS-IRON PIPE SIZE Minimum

More information

-SWEPT AWAY- Description & Overview. VEX Classroom Competition Swept Away

-SWEPT AWAY- Description & Overview. VEX Classroom Competition Swept Away -SWEPT AWAY- Description & Overview Swept Away is a head-to-head robotics competition designed and scaled to be run in a classroom environment by a single teacher. This game provides a challenge for designers

More information

Advantage Lockers & Bike

Advantage Lockers & Bike Advantage Lockers & Bike Advantage Bike Racks & Lockers Inc. is the #1 supplier of Storage Lockers and Bike Racks to the Lower Mainland s residential construction industry. With 25+ years of experience

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the

METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE. NOTE: This method does not include all of the 287 METHOD 2E - DETERMINATION OF LANDFILL GAS PRODUCTION FLOW RATE NOTE: This method does not include all of the specifications (e.g., equipment and supplies) and procedures (e.g., sampling and analytical)

More information

Tabulation of Bids. BERGEN, ESSEX, HUDSON, MORRIS, PASSAIC, SUSSEX, UNION Letting Date: Counties:

Tabulation of Bids. BERGEN, ESSEX, HUDSON, MORRIS, PASSAIC, SUSSEX, UNION Letting Date: Counties: Page: 1 BERGEN, ESSEX, HDSON, MORRIS, PASSAIC, SSSEX, NION Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0002 152004P OWNER'S AND CONTRACTOR'S PROTECTIVE

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

CITY OF WINTER SPRINGS East State Road 434 Winter Springs, FL Phone: Fax:

CITY OF WINTER SPRINGS East State Road 434 Winter Springs, FL Phone: Fax: ARTICLE IX. SWIMMING POOLS* CITY OF WINTER SPRINGS 1126 East State Road 434 Winter Springs, FL 32708 Phone: 407 327 1800 Fax: 407 327 4784 www.winterspringsfl.org Swimming Pool Code *Cross references:

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

Installation and Operation Instruction Manual

Installation and Operation Instruction Manual Installation and Operation Instruction Manual Toggle Lok Anchor - Model #7442 Portable Concrete Anchorage Connector ANSI Z359.1 5,000 lbs / 22.24 kn FallTech, Inc 1306 Alameda Street Compton, CA 90221

More information