The date, site name, report author, report recipient, and report number are presented above.

Size: px
Start display at page:

Download "The date, site name, report author, report recipient, and report number are presented above."

Transcription

1 Engineering Management Support, Inc. Memorandum To: Jesse Aviles, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: December 20, 2017 Re: POLREP #29 - Vasquez Boulevard/Interstate 70 (VB/I70) Superfund Site, Operable Unit 2, Removal Action ======================================================================= On behalf of the City and County of Denver (Respondent), Engineering Management Support, Inc. (EMSI) is submitting this Pollution Report (POLREP #29) in accordance with Section 4.c of Appendix C to the Administrative Settlement Agreement and Order on Consent for Removal Action, for the subject Superfund Site (the Site). This report follows the outline detailed in Section 4.c of Appendix C, and contains pertinent new information specified in the Superfund Removal Procedures, Removal Response Reporting: POLREP and On-Scene Coordinator (OSC) Reports (EPA, 1994). Section I Heading The date, site name, report author, report recipient, and report number are presented above. Section II Response Information This reporting period extended from November 1 through 30, 2017 during which time, the following activities occurred: Excavation of Regulated Asbestos-Contaminated Soils (RACS) and hauling to and disposing at the Denver Arapahoe Disposal Site (DADS); Excavation of non-racs and hauling to and disposing at DADS; Construction of the concrete box conduit, outlet wing walls, and open channel sidewall footings through the Coliseum Parking Lot (CPL); Pumping and treatment of groundwater from dewatering zones 1, 2, 3a, and 3b; Construction of the drop inlet structure and reinforced box conduits (RBCs) in dewatering zone 2 (beneath Delgany sanitary sewers); Construction of lateral drain boxes in dewatering zone 3a; On-site and off-site monitoring for air quality, dust, and odors; and Updated the groundwater flow model to reflect new hydrogeologic conditions observed during construction. The volumes of RACS and non-racs excavated and managed, and the volumes of water pumped, treated, and returned to the South Platte River, are summarized in Table 1. On-site monitoring for volatile organic compounds (including methane), odor, and visible dust

2 Memorandum POLREP #29 VB/I70, OU2 removal Action December 20, 2017 Page 2 emissions occurred continuously during excavation activities. In addition, monitoring for airborne asbestos fibers proceeded in accordance with Section 5.5 of the Colorado Department of Public Health and Environment (CDPHE) Solid Waste Regulations. Due to their overall size, daily monitoring reports for volatile organic compounds, odor, dust, and asbestos are being submitted under separate cover. Off-Site monitoring by Denver for PM 10, airborne lead and arsenic at four locations within the monitoring boundary continued throughout the reporting period. Sampling from these stations occurred every sixth day throughout the month. Results were all below Occupational Safety and Health Administration 8-hour limits and National Ambient Air Quality Standards. Monthly monitoring report are posted on the Globeville Landing Outfall (GLO) project web site at: As part of the GLO project s Community Outreach program, a community hotline was operated. No complaints were received during the reporting period. The Community Advisory Group (CAG) held its ninth and tenth meetings on November 14 th and December 12 th, respectively. Meeting minutes are posted on the VB/I-70 Superfund Community Advisory Group web site. The next CAG meeting is scheduled for January 9, The following project meetings were held in November: Weekly GLO Project Status Meetings (November 2, 9, and 30, 2017); EPA monthly progress meeting (November 15, 2017); and Technical meetings with EPA to discuss leaving sheet along southern in place (November 14 and 29, 2017). Lastly, a 3-week look-ahead Construction Schedule is attached to this POLREP. Section III Issues, Resolutions, and Planned Activities A Quality Assurance Audit was performed on Asbestos-Containing Soils Daily Reports (ACSRs) prepared by Kleinfelder during the month of October for consistency with Section 5.5 of Colorado s Solid Waste Regulations (CSWRs) and the Final Materials Management Plan (MMP) (EMSI, 2016). No deficiencies were noted. A copy of the Audit Report is attached to this POLREP. Monitoring of treated effluent from the GLO project continued during the reporting period in accordance with Discharge Permit Number CO All monitored parameters met discharge limits during the month. The exceedance of potentially dissolved selenium in treatment plant effluent during October was researched and confirmed to exceed the permit limit. As stated in last month s POLREP, plant operating parameters prior to and during the sampling event were found to be within normal operating ranges and sampling procedures, preservation, chain of custody, and delivery procedures were followed exactly as in the past. As shown in the

3 Memorandum POLREP #29 VB/I70, OU2 removal Action December 20, 2017 Page 3 summary table attached to this POLREP, historical plant influent concentrations, including those from October and November, were less than the effluent permit limit. Consequently, the October exceedance was determined to be an anomaly. Beginning in November, the plant operator initiated collection of weekly effluent samples for metals analyses and simply holding them until the end of the month for analyses should a first-of-the-month sample result exceed a permit limit. Planned activities for the next reporting period consist of: Continue construction of wing walls, open channel sidewall footings, and open channel sidewalls through the CPL and GLP; Continued construction of lateral drain boxes in the GLP; Continued construction of outlet structures and riprap downstream of the RBCs in the GLP; Continued final grading of the drainage channel in preparation for placement of the strengthening layer; Continued dewatering in zones 1, 2, 3a and 3b; and Continued on-site and off-site monitoring of air quality. To maintain effective and transparent communication during GLO implementation, EPA and CDPHE personnel are invited to participate in weekly coordination meetings at Kiewit s RiNo office. The next two EPA Monthly Status meetings will be held on December 20 th and January 17 th at 9:00 in the Webb building. Please call Jennifer Luthi ( ) or me ( ) if you have any questions. Attachments: November 2017 Summary of GLO Construction Activities 3-Week Look-Ahead Schedule QA Audit Report #6 Summary of Effluent and Influent Analytical Results

4 Table 1 - November 2017 Construction Summary Current Month QTY QTY to date Comments EXCAVATION/HAULING # of days Excavation occurred Globeville park 9 97 # of days Excavation occurred Municipal Landfill 4 35 Volume of Racs Excavated (CY) 5,908 89,163 From Globeville Park and Coliseum Parking lot Volume of Racs hauled to DADS (CY) 5,908 89,163 From Globeville Park and Coliseum Parking lot Volume of Non-Racs Excavated (CY) ,969 Volume of Non-Racs stockpiled onsite (CY) 12,606 Volume of Non-Racs hauled to DADS (CY) ,363 Material was Non-RACS from Over-Exc area (unsuitable) Volume Hauled to Clean Harbors (CY) 0 GROUT AND STONE COLUMNS number of grout columns installed this month 0 1,091 All Stone and Grout columns are complete Grout column SPT testing results 0 0 All Stone and Grout columns are complete number of stone columns installed per month All Stone and Grout columns are complete stone column test results 0 0 All Stone and Grout columns are complete REMEDIATION DEWATERING AND TREATMENT LF of underdrain/wick wells installed 650 Volume of water transported and treated at MFEI 1,687,496 23,569,371 Volume of treated water, including dilution, discharged to S. Platte 1,721,857 24,035,657 Analytical results 0 Oct DMR submitted CONSTRUCITION DEWATERING status of permit compliance LINER INSTALLATION % complete during the month N/A QC/QA testing results N/A Issues and Resolutions N/A MODCP RESULTS Daily Methane, Odor, and Dust monitoring reports Issues and Resolutions COMMUNITY OUTREACH Summary of Calls to hotline Issues and Resolutions

5 Globeville Phase 1A Schedule Title Current Week Phase 1A 3 week schedule Monday, December 04, 2017 Item Activity Description Work performed by Start Finish Shift Current Forecast Forecast Forecast Comments 12/04 12/04 12/05 12/05 12/06 12/06 12/07 12/07 12/08 12/08 12/09 12/09 12/10 12/10 12/11 12/11 12/12 12/12 12/13 12/13 12/14 12/14 12/15 12/15 12/16 12/16 12/17 12/17 12/18 12/18 12/19 12/19 12/20 12/20 12/21 12/21 12/22 12/22 12/23 12/23 12/24 12/24 12/25 12/25 12/26 12/26 12/27 12/27 12/28 12/28 12/29 12/29 12/30 12/30 12/31 12/31 M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su 1 2 EARTHWORK (Park Channel) 3 Excavate Tie in between Park Walls and Arkins Ames 12/13/17 12/20/17 day 4 5 OUTFALL CHANNEL 6 Excavate for 42" type M Soil Rip Rap Ames 11/28/17 12/05/17 day 7 Place 42" Type M Soil Rip Rap Ames 11/30/17 12/05/17 day 8 Install Soil Wraps Ames 12/06/17 12/12/17 day 9 Install type 2 bedding above soil wraps Ames 12/06/17 12/18/17 day 10 Install Rip Rap above bedding Ames 12/18/17 12/22/ DROP OUTLET 15 F/R/P Wing wall Walls (A1) Ames 12/11/17 12/15/17 day 16 F/R/PCIP box Deck Ames 12/04/17 12/11/17 day 17 F/R/P headwall Ames 12/18/17 12/22/17 day S. LATERAL DRAIN BOX 22 Form Deck sections 1-6 Ames 12/11/17 12/29/17 day N. LATERAL DRAIN BOX 26 F/R/P N. Lateral Footings 1-4 Ames 11/30/17 12/17/17 day 27 F/R/P N. Lateral Walls sections 1-4 Ames 12/18/17 01/10/18 day EAST PARK WALL 33 F/R/P East Park wall section 2 Footing Ames 11/27/17 12/06/17 day WEST PARK WALL 38 F/R/P West Park wall section 1 Footing Ames 11/27/17 12/06/17 day COLISEUM CONDUIT 41 Seal joints Ames 11/27/17 12/08/17 day 42

6 Globeville Phase 1A Schedule Title Current Week Phase 1A 3 week schedule Monday, December 04, 2017 Item Activity Description Work performed by Start Finish Shift Current Forecast Forecast Forecast Comments 12/04 12/04 12/05 12/05 12/06 12/06 12/07 12/07 12/08 12/08 12/09 12/09 12/10 12/10 12/11 12/11 12/12 12/12 12/13 12/13 12/14 12/14 12/15 12/15 12/16 12/16 12/17 12/17 12/18 12/18 12/19 12/19 12/20 12/20 12/21 12/21 12/22 12/22 12/23 12/23 12/24 12/24 12/25 12/25 12/26 12/26 12/27 12/27 12/28 12/28 12/29 12/29 12/30 12/30 12/31 12/31 M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su 43 COLISEUM CONDUIT OUTLET 44 Excavate/Finegrade Outlet Apron Ames 12/06/17 12/08/17 day 45 F/R/P Apron Ames 12/08/17 12/18/17 day N. Coliseum Wall 48 F/R/P N. Colisuem Walls Ames 12/18/17 01/15/18 day S. Coliseum Wall 51 F/R/P S. Colisuem Walls Ames 12/05/17 01/15/18 day S. Bridge Abutment 55 Finegrade Abutment Footings Ames 12/05/17 12/07/17 day 56 F/R/P Abutment/WW footings Ames 12/07/17 12/15/17 day Arkins outlet 59 F/R/P S. A1, J1, K1 Wing wall footings Ames 11/30/17 12/20/17 day

7 Engineering Management Support, Inc. QA Audit Report #7 To: From: cc: Matt Ceresa, Kiewit, Tim Shangraw, EMSI Jennifer Luthi, DEH; Steve Gonzales, DEH; Bret Banwart (DPW); Brian McLaren (DPW); and Patrick Riley (DPW) Date: December 6, 2017 Re: Audit of Kleinfelder CABI Notes, October 2017, Globeville Landing Outfall Project Representatives from Engineering Management Support, Inc. (EMSI) reviewed Asbestos- Containing Soils Daily Reports (ACSRs) prepared by Kleinfelder during the month of October 2017 for consistency with Section 5.5 of Colorado s Solid Waste Regulations (CSWRs) and the Final Materials Management Plan (MMP) (EMSI, 2016). Specifically, the audit involved an independent evaluation of CABI notes consisting of checking for: i. Site description including location; ii. Descriptions of site activities; iii. Descriptions of equipment in use; iv. Descriptions of hand removals (including locations); v. Descriptions of types of debris identified; vi. Descriptions of suspect material identified; vii. Friability of ACM identified (as determined by a CABI); viii. Sampling, if conducted (all sampling shall be conducted by a CABI); ix. Decontamination visual inspection and clearances; x. Excavation visual inspection and clearances; xi. Spill response activities; xii. Observations of visible emissions and responses; xiii. Observations of non-earthen material or the appearance of fill; and xiv. Observations of other indicators of impact to soils. Page 1

8 QA Audit Report #7, GLO Project December 6, 2017 Our process for reviewing Kleinfelder s CABI daily logs consisted of examining daily logs for the items noted above, using the attached spreadsheet as a guide for identification and documentation purposes. The review entailed reading/reviewing descriptions and notes for anything that stood out and/or that was not documented properly. If an issue was identified, it was marked on the spreadsheet with a note below it. When review of a group of logs was complete, we forwarded our spreadsheet with notes to a Kleinfelder representative. That person then corrected a noted issue and/or responded with a verbal clarification. Corrected/revised CABI logs were then uploaded to Teambinder and in turn, EMSI representatives downloaded and reviewed the corrected/revised log. When EMSI representatives approved the correction/revision, the spreadsheet was updated. All change communication was documented in s. AUDIT FINDINGS As shown in the attached table, all final audited parameters complied with Section 5.5 of the CSWRs and the MMP during the month of October. ACTION REQUIRED No corrective action is required. Denver and EMSI will continue to monitor Ames/Kleinfelder s implementation of agreed-to reporting procedures and identify any area(s) in need of improvement during monthly progress meetings and if necessary, in subsequent QA Audit Reports. Page 2

9 Oct 4-Oct 31 QA of CABI daily logs per Colorado Regulation L (Documentation) and Final Materials Management Plan Page 1 1C 1A 1B 1D Personnel Date Grid Grid Site Description Description Description of Description Description Friability per CABI diagram description of site of equipment hand removals of types of suspect of ACMs Notes agree w including activities use including of debris materials discussed CABI location locations Lanaia Carveth 10/4/17 yes yes yes yes yes yes yes yes yes Billie Godby 10/4/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/5/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/5/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/6/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/6/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/7/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/10/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/11/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/11/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/12/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/12/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/13/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/14/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/16/17 yes yes yes yes yes yes yes yes yes Tim Ponder 10/16/17 yes yes yes yes yes yes yes yes yes Tim Ponder 10/17/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/18/17 yes yes yes yes yes yes yes yes yes Tim Ponder 10/18/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/19/17 yes yes yes yes yes yes yes yes yes Mitchell Reese 10/19/17 yes yes yes yes yes yes yes yes yes Tim Ponder 10/19/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/20/17 yes yes yes yes yes yes yes yes yes Tim Ponder 10/20/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/21/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/23/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/23/17 yes yes yes yes yes yes yes yes yes Tim Ponder 10/24/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/24/17 yes yes yes yes yes yes yes yes yes

10 Tyler Godby 10/25/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/25/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/26/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/26/17 yes yes yes yes yes yes yes yes yes Mitchell Reese 10/27/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/28/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/30/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/30/17 yes yes yes yes yes yes yes yes yes Tyler Godby 10/31/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 10/31/17 yes yes yes yes yes yes yes yes yes Notes: 1) NVE = no visible emissions observed 2) in the table "yes" designates that documentation was completed

11 Oct 4-Oct 31 QA of CABI daily logs per Colorado Regulation L (Documentation) and Final Materials Management Plan Page 2 2A and 2B 4 5B 1E 1F Personnel Date Bulk sampling Decontamination Spill Observations Observations Observations Photo-log / documentation visual inspection response of visible of non-earthen of other description and clearance activities emissions / material / indicators of Reponses commented soil impact Lanaia Carveth 10/4/17 Not conducted yes No spills NVE yes yes yes Billie Godby 10/4/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/5/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/5/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/6/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/6/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/7/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/10/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/11/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/11/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/12/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/12/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/13/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/14/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/16/17 Not conducted yes No spills NVE yes yes yes Tim Ponder 10/16/17 Not conducted yes No spills NVE yes yes yes Tim Ponder 10/17/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/18/17 Not conducted yes No spills NVE yes yes yes Tim Ponder 10/18/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/19/17 Not conducted yes No spills NVE yes yes yes Mitchell Reese 10/19/17 Not conducted yes No spills NVE yes yes yes Tim Ponder 10/19/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/20/17 Not conducted yes No spills NVE yes yes yes Tim Ponder 10/20/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/21/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/23/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/23/17 Not conducted yes No spills NVE yes yes yes Tim Ponder 10/24/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/24/17 Not conducted yes No spills NVE yes yes yes

12 Tyler Godby 10/25/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/25/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/26/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/26/17 Not conducted yes No spills NVE yes yes yes Mitchell Reese 10/27/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/28/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/30/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/30/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 10/31/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 10/31/17 Not conducted yes No spills NVE yes yes yes

13 Historical Influent and Effluent Water Quality, GLO Water Treatment Plant Parameter Unit Sample Frequency Effluent Permit Limit May-17 Jun-17 Influent* Effluent** Influent* Effluent** Influent* Effluent** Influent* Effluent** Influent* Effluent** Influent* Effluent** Influent* Effluent** Flow Rate (monthly ave) gpm Continuous 100 N/R 95.5 N/R 96.8 N/R 91.2 N/R 84.5 N/R 54.6 N/R 38.5 N/R 32.9 ph standard units 3 days/wk N/R N/R N/R N/R N/R N/R N/R Total Residual Chlorine mg/l 3 days/wk 0.5 N/R N/R N/R N/R N/R N/R N/R Oil and Grease (visual) visual presence 3 days/wk Report N/R None N/R None N/R None N/R None N/R None N/R None N/R None Oil and Grease (lab) mg/l Contingent upon visual presence 10 N/R N/R N/R N/R N/R N/R N/R N/R N/R N/R N/R N/R N/R N/R Total Suspended Solids mg/l Weekly N/R <5-21 N/R 1.4J N/R <5-2.5J N/R < N/R N/R N/R < E. Coli #/100 ml Weekly N/R 0-2 N/R 0 N/R 0 N/R N/R 0-54 N/R 0-1 N/R 0-1 BOD 5 mg/l Monthly N/R <2 N/R <1 N/R <1 N/R 1.1 N/R 2.6 N/R <1.0 N/R 11.4 Total Inorganic Nitrogen mg/l Monthly 10 N/R 8.4 N/R 8.7 N/R 8.7 N/R 8.3 N/R 5.9 N/R 6.8 N/R 5.9 Ammonia mg/l Monthly Report N/R 0.48 N/R 0.3 N/R 0.26 N/R 0.38 N/R 0.38 N/R 0.04 N/R 0.38 Arsenic, total recoverable ug/l Monthly < < Cadmium, potentially dissolved ug/l Monthly < < < < < < <0.2 Copper, potentially dissolved ug/l Monthly 5,656-6, < Iron, total recoverable ug/l Monthly 253, < < Lead, total recoverable ug/l Monthly 13, < <1.0 <1.0 < < <1.0 Lead, potentially dissolved ug/l Monthly 2, < <1.0 < < <1.0 Mercury, total ug/l Monthly 3.5 N/R <0.2 N/R <0.2 N/R <0.1 N/R <0.1 N/R <0.1 N/R 2.0 N/R 0.6 Selenium, potentially dissolved ug/l Monthly < WET Testing LC 50 Quarterly 100 N/R N/R N/R Failed, then passed N/R N/R N/R N/R N/R N/R N/R Passsed N/R N/R shaded cell indicates compliance with permit limit shaded cell indicates influent exceeds discharge limit; treatment required shaded cell indicates effluent exceeds permit limit * Metals Screen required per Section 1.A.3 of GLO Discharge Permit. VOC and SVOC screens confirmed only trace detections. ** Monitored parameters required per Section 1.A.2 of GLO Discharge Permit N/R Not Required Jul-17 Aug-17 Sep-17 Oct-17 Nov-17

The date, site name, report author, report recipient, and report number are presented above.

The date, site name, report author, report recipient, and report number are presented above. Engineering Management Support, Inc. Memorandum To: Jesse Aviles, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: March 29, 2018 Re: POLREP #32 - Vasquez Boulevard/Interstate 70 (VB/I70)

More information

The date, Site name, report author, report recipient, and report number are presented above.

The date, Site name, report author, report recipient, and report number are presented above. Engineering Management Support, Inc. Memorandum To: Jesse Aviles, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: June 26, 2018 Re: POLREP #35 - Vasquez Boulevard/Interstate 70 (VB/I70)

More information

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4 City of Columbia Engineering Regulations PART 31: SPECIFICATIONS FOR COMMERCIAL SWIMMING POOL BACKWASH AND DRAINAGE Table of Contents Paragraph Description Page No. 31.1 General 31-1 31.2 Definitions 31-1

More information

Explosive gas migration monitoring for a sanitary landfill facility.

Explosive gas migration monitoring for a sanitary landfill facility. 3745-27-12 Explosive gas migration monitoring for a sanitary landfill facility. (A) Applicability and implementation. This rule applies to the following: (1) The owner or operator of a sanitary landfill

More information

Amended Written Closure Plan

Amended Written Closure Plan Amended Written Closure Plan Valmont Station - Active CCR Impoundments 3A and 3B Public Service Company of Colorado October 17, 2016 Amended January 5, 2018 Table of Contents 1.0 General Information...

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 16, 2015 OPPD North Omaha Station CCR Landfill Fugitive Dust Control Plan Table of Contents Revision

More information

Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance

Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance Document Authority: EHS Coordinator Document Custodian: EH&S Coordinator Effective Date: 09.01.15 Issuing Dept: College

More information

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station. Coal Combustion Residuals 2016 Annual Fugitive Dust Control Report Prepared for Montana-Dakota Utilities Company R.M. Heskett Station December 2016 Coal Combustion Residuals Fugitive Dust Emission Control

More information

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for: COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE

More information

Waste Management System.

Waste Management System. Waste Management System. Procedure for backwashing at Cofield Swimming Pool and associated record keeping Corporate Procedure: CP-WMS 005 Authorised by: Issue number: Three Date of issue: 12 th May 2010

More information

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado. Written Closure Plan Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure

More information

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for: COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE

More information

2017 Annual Inspection Report

2017 Annual Inspection Report 2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2018 Table of Contents Certification...

More information

Statistical Method Certification, Coal Combustion Residuals Landfill, Reid Gardner Generating Station

Statistical Method Certification, Coal Combustion Residuals Landfill, Reid Gardner Generating Station TECHNICAL MEMORANDUM Statistical Method Certification, Coal Combustion Residuals Landfill, Reid Gardner Generating Station PREPARED FOR: PREPARED BY: REVIEWED BY: NV Energy Nathan Betts, PE/CH2M Charles

More information

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado Written Closure Plan Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description

More information

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public 1995 Metric CSJ 0915-12-242 SPECIAL PROVISION TO ITEM 7 Legal Relations And Responsibilities To The Public For this project, Item 7 "Legal Relations and Responsibilities to the Public", of the Standard

More information

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_ FOUR CORNERS POWER PLANT CLOSURE PLAN 257.102(b) UPPER RETENTION SUMP FC_ClosPlan_011_20161017 Closure Plan Contents 257.102(b)(1) The owner or operator of a CCR unit must prepare a written closure plan

More information

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS

More information

COTTER MILL SITE SUMMARY - RML

COTTER MILL SITE SUMMARY - RML COTTER MILL SITE SUMMARY - RML NRC Code Totals Estimated Cost Reference/ Index Table No. in table N/A GRAND TOTAL RML SURETY RML TOTAL $20,401,841 N/A N/A N/A GRAND TOTAL RAP SURETY RAP TOTAL $2,891,319

More information

CHAPTER 5 WATER QUALITY, TEST KITS, RECORD KEEPING

CHAPTER 5 WATER QUALITY, TEST KITS, RECORD KEEPING CHAPTER 5 WATER QUALITY, TEST KITS, RECORD KEEPING Section 1. Water Quality. (a) The water quality for pools, spas and similar installations shall meet the criteria outlined in the following charts: Sanitizing

More information

Tiered Permitting Checklist Summary of Violations

Tiered Permitting Checklist Summary of Violations County of Sacramento Environmental Management Department Environmental Compliance Division 10590 Armstrong Ave. Suite A Mather, CA 95655 Voice (8am 5pm): 916/875-8400 FAX: 916/875-8513 http://www.emd.saccounty.net

More information

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN PLEASANTS McELROY S RUN DISPOSAL IMPOUNDMENT Willow Island, WV Allegheny Energy Supply Company, LLC A FirstEnergy Company October 19, 2015 CONTENTS Introduction 1 CCR Unit Description

More information

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station 33200 East Johnson Rd Sibley, Missouri KCP&L Greater Missouri Operations Company October 14, 2016 TABLE OF CONTENTS SECTION 1

More information

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008 UNITY 2 TM Air Server Series 2 Operators Manual Version 1.0 February 2008 1. Introduction to the Air Server Accessory for UNITY 2...2 1.1. Summary of Operation...2 2. Developing a UNITY 2-Air Server method

More information

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 2018 OPPD Nebraska City Station NC1 Ash Disposal Area

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum

More information

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER)

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER) SECTION 28 HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER) 28.A. GENERAL. 28.A.01 This Section applies to: a. Hazardous waste site cleanup operations performed under the Comprehensive Environmental

More information

Removal of Lead-Based Paint

Removal of Lead-Based Paint Safety Management System SP24-61 Process Authority: HS Manager Removal of Lead-Based Paint Approval: Chief Operating Officer Version Date:30/03/2015 Revision: B 1 Purpose To define the requirements for

More information

D.B. Wilson Station CCR Landfill

D.B. Wilson Station CCR Landfill D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big

More information

New Licensed Asbestos Operative Training

New Licensed Asbestos Operative Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Operative Training This unit has twenty-two learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

E2: Manufactured Products

E2: Manufactured Products E2: Manufactured Products SAFETY DATA SHEET (Complies with OSHA 29 CFR 1910.1200) SECTION I: PRODUCT IDENTIFICATION The QUIKRETE Companies Emergency Telephone Number One Securities Centre (770) 216-9580

More information

ANSI Z Compliance Checklist

ANSI Z Compliance Checklist ANSI Z358.1 Compliance Checklist 660 North Union Street (312) 733-2626 P Compliance Checklist Introduction The selection of emergency eye wash and shower equipment is often a complicated process. In addition

More information

BROWNFIELD ASSESSMENT, REDEVELOPMENT & REMEDIATION

BROWNFIELD ASSESSMENT, REDEVELOPMENT & REMEDIATION BROWNFIELD ASSESSMENT, REDEVELOPMENT & REMEDIATION 1 HOW ENVIRONMENTAL SITE ASSESSMENTS (PHASE I) AFFECT THE PURCHASE OR TRANSFER OF ANY PROPERTY 1 Standard 1 Sunshine State Standards: SS.A.1.4.4, SS.C.1.4

More information

Monitoring excavation in the highway

Monitoring excavation in the highway This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Procedure No.: PA-033-0006 Page: 1 of 19 Port Arthur, TX. Reviewed: 02/18 Effective: 02/06/18 (Rev.03) Supersedes: 02/15/16 Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Document

More information

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents

More information

Drinking-Water Systems Regulation O. Reg. 170/03

Drinking-Water Systems Regulation O. Reg. 170/03 2017 ANNUAL REPORT FOR WATER WORKS (R. 170/03, Sec. 11) Drinking-Water System Number: 220008523 Drinking-Water System Name: Island Lake Drinking Water System Drinking-Water System Owner: The Corporation

More information

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 525 Vine Street, Suite 1800 Cincinnati, Ohio 45202

More information

Refresher Licensed Asbestos Supervisor Training

Refresher Licensed Asbestos Supervisor Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS Refresher Licensed Asbestos Supervisor Training This unit has nineteen learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

Tunnelling. Design Element Health Hazard Considerations Possible Solutions Linked to Ref No.

Tunnelling. Design Element Health Hazard Considerations Possible Solutions Linked to Ref No. Document title Designing for health - Guidance for designers Tunnelling Ref DfH012_17 No. Potential health impacts to be considered by the designer: Concept Stage Scheme Design Stage Detailed design Stage

More information

MBMG Butte Mine Flooding Monthly Report BMFOU Consent Decree BU-SEH Remedial Action Monitoring Program Contract No TO-35 September 2013

MBMG Butte Mine Flooding Monthly Report BMFOU Consent Decree BU-SEH Remedial Action Monitoring Program Contract No TO-35 September 2013 MBMG Monthly Report BMFOU Consent Decree 02-35-BU-SEH Remedial Action Monitoring Program Contract No. 400022-TO-35 September 20 The Montana Bureau of Mines and Geology (MBMG) continued to perform monitoring

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

Swimming Pool Requirements Packet

Swimming Pool Requirements Packet Plot Plans shall indicate the following: Drawn to an appropriate scale with pool depths shown and dimensions to other structures Have an engineer address any surcharge loads on the pool or from the pool

More information

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual) GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual) 1. An IU Slug Control Plan must include sufficient general information to enable the POTW to: (1) categorize and restrict

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS

More information

MATERIAL SAFETY DATA SHEET (MSDS)/SAFETY DATA SHEET (SDS) Critical Care Plus

MATERIAL SAFETY DATA SHEET (MSDS)/SAFETY DATA SHEET (SDS) Critical Care Plus I. Product and Company Identification Product Name: Part Numbers: VetScan Reagent Disc A point of care blood diagnostic product 500-1042 (single), 500-0042-12 (12 pack) Company Information: Abaxis, Inc.

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

2016 Annual Inspection Report

2016 Annual Inspection Report 2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2017 Table of Contents Certification...

More information

MATERIAL SAFETY DATA SHEET (MSDS)/SAFETY DATA SHEET (SDS) Kidney Check

MATERIAL SAFETY DATA SHEET (MSDS)/SAFETY DATA SHEET (SDS) Kidney Check I. Product and Company Identification Product Name: Part Numbers: Piccolo Reagent Disc A point of care blood diagnostic product 400-1033 (single); 400-0033 (10 pack); 400-0033 (4 pack) Company Information:

More information

TABLE OF CONTENTS PART 2 - CONFINED SPACES

TABLE OF CONTENTS PART 2 - CONFINED SPACES May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3

More information

POOL CARE GUIDE. The E-Z Clor System To Perfect Pool Water.

POOL CARE GUIDE. The E-Z Clor System To Perfect Pool Water. POOL CARE GUIDE The E-Z Clor System To Perfect Pool Water www.ezclorchemicals.com CONTENTS E-Z Clor 3-Step System...................... 1 Circulation/Your Pump........................ 2 The Filtration

More information

2018 Annual Inspection Report

2018 Annual Inspection Report 2018 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2019 Table of Contents Certification...

More information

Section 33 TABLE OF CONTENTS Hazardous Waste Operations and Emergency Response (HAZWOPER) 33.A General

Section 33 TABLE OF CONTENTS Hazardous Waste Operations and Emergency Response (HAZWOPER) 33.A General Section 33 TABLE OF CONTENTS Hazardous Waste Operations and Emergency Response (HAZWOPER) Section: Page 33.A General... 33-1 33.B Site Safety and Health Plan (SSHP)... 33-1 33.C Responsibilities... 33-4

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan MidAmerican Energy Company George Neal Station South Project No. 86763 Revision A September 25, 2015 CCR Fugitive Dust Control Plan prepared for MidAmerican Energy Company

More information

Sandy Palmatter Office: Cell: Steven Sipes Office: Cell:

Sandy Palmatter Office: Cell: Steven Sipes Office: Cell: Calvin College Swimming Pool Contingency and Emergency Action Plan Prepared by: Date: Approved by: Aquatics Director & EHS 2/18/19 Revision 9 Date: CEHS 4/27/2007 1.0 PURPOSE Michigan s Public Health Code,

More information

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and APPENDIX D EMERGENCY PROCEDURES IN PUBLIC SECONDARY SCHOOLS IN THE EVENT OF A CHEMICAL SPILL There are five major sources of regulations that are potentially applicable to emergencies involving a chemical

More information

Country report. Austrian bathing water quality in Austria. May Photo: Peter Kristensen

Country report. Austrian bathing water quality in Austria. May Photo: Peter Kristensen Country report Austrian bathing water quality in 2016 Austria May 2017 Photo: Peter Kristensen BWD Report For the Bathing Season 2016 Austria The report gives a general overview of information acquired

More information

Ninilchik Harbor Page 2 of 11

Ninilchik Harbor Page 2 of 11 Ninilchik Harbor Ninilchik Harbor Page 2 of 11 Condition of Improvements 31 December 2017 Ninilchik Harbor, Alaska (CWIS No. 012640, 087345) Authorization Rivers and Harbors Act, 3 July 1958 (P.L. 85-500

More information

Closure Plan for CCR Surface Impoundments

Closure Plan for CCR Surface Impoundments Closure Plan for CCR Surface Impoundments B.L. England Generating Station Beesley s Point, New Jersey April 17, 2018 Prepared For RC Cape May Holdings, LLC 900 North Shore Road Beesley s Point, New Jersey

More information

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for: Annual CCR Landfill Inspection Lansing Landfill Prepared for: Interstate Power and Light Company Lansing Generating Station 2320 Power Plant Drive Lansing, Iowa 52151 Prepared by: SCS ENGINEERS 2830 Dairy

More information

DUAL-VORTEX SEPARATOR. Inspection and Maintenance Guide

DUAL-VORTEX SEPARATOR. Inspection and Maintenance Guide DUAL-VORTEX SEPARATOR Inspection and Maintenance Guide Description The Dual-Vortex Separator (DVS) is a hydrodynamic stormwater treatment device used to remove pollutants from urban runoff. Impervious

More information

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN PLEASANTS LANDFILL Willow Island, WV Allegheny Energy Supply Company, LLC A FirstEnergy Company October 19, 2015 CONTENTS Introduction 1 CCR Unit Description 1 CCR Fugitive Dust

More information

WHS record keeping requirements

WHS record keeping requirements WHS record keeping requirements The table below provides details of the record keeping requirements in the Model Work Health and Safety Regulation, covering the following areas: Air-borne contaminant levels

More information

GUARDIAN EQUIPMENT Emergency Eye Wash and Shower Equipment. ANSI Z358.1 Compliance Checklist

GUARDIAN EQUIPMENT Emergency Eye Wash and Shower Equipment. ANSI Z358.1 Compliance Checklist GUARDIAN EQUIPMENT Emergency Eye Wash and Shower Equipment ANSI Z358.1 Compliance Checklist Compliance Checklist Introduction The selection of emergency eye wash and shower equipment is often a complicated

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Page 1 of 9 ISSUED: 5/00 REVISED: 08/06 Introduction Purpose: In accordance with applicable regulations and Temple University, this policy was developed to minimize exposure to Ethylene Oxide. Applicability

More information

Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide

Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide Water Play/Spray Grounds are aquatic facilities where patrons (primarily children) become

More information

The routine maintenance and inspection of local exhaust ventilation (LEV)

The routine maintenance and inspection of local exhaust ventilation (LEV) The routine maintenance and inspection of local exhaust ventilation (LEV) This document details the standards for inspection and maintenance that should be achieved for all local exhaust ventilation owned

More information

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the 1151 METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS 1.0 Scope and Application. 1.1 Analytes. Analyte Volatile Organic Compounds (VOC) CAS No. No CAS number assigned 1.2 Scope. This method

More information

ASBESTOS INSPECTION PLANT BIOLOGY BUILDING 178 MICHIGAN STATE UNIVERSITY

ASBESTOS INSPECTION PLANT BIOLOGY BUILDING 178 MICHIGAN STATE UNIVERSITY Asbestos Inspection Plant Biology Building 178 Michigan State University Prepared For: Michigan State University January 2008 Project No. G07876PB ASBESTOS INSPECTION PLANT BIOLOGY BUILDING 178 MICHIGAN

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Health and Safety Inspection Procedure

Health and Safety Inspection Procedure Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE

More information

Respiratory Protection

Respiratory Protection Respiratory Protection Purpose The purpose is to establish a set of guidelines for the selection of respiratory protection equipment, situations for its use, and training in the use of the respirator required.

More information

2018 CAMS NSW APPENDIX L FORMULA RACE CAR CHAMPIONSHIP

2018 CAMS NSW APPENDIX L FORMULA RACE CAR CHAMPIONSHIP 2018 CAMS NSW APPENDIX L FORMULA RACE CAR CHAMPIONSHIP 1. OBJECTIVE The objective of the championship is to promote and foster racing for wings & slicks open-wheel race cars. 2. CATEGORY ORGANISERS The

More information

Management system template for operators who have a permit to discharge used or waste sheep dip to land

Management system template for operators who have a permit to discharge used or waste sheep dip to land Management system template for operators who have a permit to discharge used or waste sheep dip to land Document owner: National Services/Knowledge, Strategy & Planning (KSP) Version history: Version Date

More information

Mine Dust Management Plan

Mine Dust Management Plan Mine Dust Management Plan 1 PURPOSE The primary purpose of the mine dust management plan is to protect the health of people at work by ensuring that exposures to fugitive dust containing respirable silica

More information

New Licensed Asbestos Manager Training

New Licensed Asbestos Manager Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Manager Training This unit has twenty-three learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

Ohio EPA. Division of Air Pollution Control. Engineering Guide #78. (also known as DSIWM Guidance Document #1001 and #1002)

Ohio EPA. Division of Air Pollution Control. Engineering Guide #78. (also known as DSIWM Guidance Document #1001 and #1002) Ohio EPA Division of Air Pollution Control Engineering Guide #78 (also known as DSIWM Guidance Document #1001 and #1002) Question: The Standards of Performance for New Stationary Sources (NSPS) for municipal

More information

MATERIAL SAFETY DATA SHEET SODA ASH

MATERIAL SAFETY DATA SHEET SODA ASH Issue date: 01/01/08 MATERIAL SAFETY DATA SHEET SODA ASH SECTION I IDENTIFICATION OF MATERIAL Product Name: Other Names: Recommended Use: Soda Ash (All Grades) Di-Sodium Carbonate, Carbonic Acid/Di-Sodium

More information

Hazardous Materials Management Guidelines

Hazardous Materials Management Guidelines Environmental, Health and Safety Guidelines Hazardous Materials Management Guidelines Applicability These guidelines apply to facilities and activities involving the transportation, production, handling,

More information

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM Title: Material Handling - Rigging Effective Date: 12/4/2014 Control Number: THG_0049 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015 MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

VACUUM TESTING PRECAST CONCRETE MANHOLES

VACUUM TESTING PRECAST CONCRETE MANHOLES 1 OF 5 testing is a quick, safe and practical way to validate manhole system integrity. Manhole sections can be tested at the precast concrete plant prior to delivery or on site prior to backfilling. Here

More information

SAFETY DATA SHEET INDUSTRIAL EP COMPOUND HEAVY DUTY GEAR LUBRICANTS Revision Date:

SAFETY DATA SHEET INDUSTRIAL EP COMPOUND HEAVY DUTY GEAR LUBRICANTS Revision Date: SAFETY DATA SHEET INDUSTRIAL EP COMPOUND HEAVY DUTY GEAR LUBRICANTS Revision Date: 06-01-2018 Section 1. Identification Product Identifier Product Name Industrial EP Compound Heavy Duty Gear Lubricants

More information

Hazardous Material Emergency Spill Response Protocol WAC

Hazardous Material Emergency Spill Response Protocol WAC Hazardous Material Emergency Spill Response Protocol WAC 296-824 1.0 Policy PLU s highest priority is to protect employee and student health and safety. On that basis, PLU employees or students will not

More information

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX SCOTTISH WATER Waste Water Treatment Works Typical WWTW Ellipse Equipment No: 500000XXXX Ellipse Plant No: STW00XXXX Works Manual Volume 1/3 Operating Manual (OMA) Non-Routine Operations Manual Ref No:

More information

Standards of Practice Personal Protective Equipment

Standards of Practice Personal Protective Equipment Document Authority: I. PURPOSE Standards of Practice Personal Protective Equipment Whenever feasible, hazards must be eliminated through engineering, and/or administrative controls, prior to resorting

More information

SECTION LEAD-PAINT REMOVAL

SECTION LEAD-PAINT REMOVAL SECTION 02090 LEAD-PAINT REMOVAL PART 1 - GENERAL 1.1 DESCRIPTION This section specifies abatement and disposal of lead-based paint (LBP) and controls needed to limit occupational and environmental exposure

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Purpose In accordance with applicable regulations and Temple University, this policy was developed to minimize exposure to glutaraldehyde. Applicability This policy is applicable to all Temple University

More information

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb Subparts AA and BB - The Other RCRA Air Rules Beginners aabb 1 Background Subpart AA - Process vents Subpart BB - Equipment leaks Subpart CC - Tanks, surface impoundments, containers. Also includes Subpart

More information

Orion In Situ Oil Sands 2014 Progress Update. Presented May 21, 2015

Orion In Situ Oil Sands 2014 Progress Update. Presented May 21, 2015 Orion In Situ Oil Sands 2014 Progress Update Presented May 21, 2015 Agenda Osum Production Corp.. The Orion Project - History Osum Production Corp.. Geoscience Jack Pels Well Data Osum Production Corp.

More information

Private Swimming Pool Permit Application

Private Swimming Pool Permit Application Private Swimming Pool Permit Application Pool Address: Legal: Lot: Block: Plan: Subdivision: Applicant Information: Are you also the primary contact? Yes No Name: Address: Postal Code: Phone: Email Address:

More information

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL SAFE -14 Page 1 of 8 U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL FUNCTION Safety TOPIC Hotwork Permit Program OBJECTIVE(S): GENERAL POLICY: To provide a work atmosphere that is conducive to

More information

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station. Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR

More information

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report REPORT Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number 2 2018 Annual RCRA CCR Unit Inspection Report Submitted to: Northern Indiana Public Service

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Copies: Dave Favero Deputy Cleanup Manager Michigan RACER Trust. Rhonda Klann, MDEQ Amanda Armbruster, MDEQ John McCabe, MDEQ

Copies: Dave Favero Deputy Cleanup Manager Michigan RACER Trust. Rhonda Klann, MDEQ Amanda Armbruster, MDEQ John McCabe, MDEQ MEMO To: Sue Kaelber-Matlock MDEQ-Remediation and Redevelopment Division From: Scott Clearwater Certified Project Manager Arcadis Copies: Dave Favero Deputy Cleanup Manager Michigan RACER Trust Rhonda

More information