CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

Size: px
Start display at page:

Download "CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016"

Transcription

1 CLOSURE PLAN CCR (b) Landfill Area Welsh Power Plant Pittsburg, Texas October, 2016 Prepared for : Southwest Electric Power Company Welsh Plant Pittsburg, Texas Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH GERS

2

3 Table of CONTENTS 1.0 OBJECTIVE DESCRIPTION OF THE CCR UNIT DESCRIPTION OF CLOSURE PLAN (b)(1)(i) CLOSURE IN PLACE (b)(1)(iii) CLOSURE PERFORMANCE STANDARDS (d)(1) DRAINING AND STABILIZING OF THE SURFACE IMPOUNDMENT (d)(2) FINAL COVER SYSTEM (d)(3) ESTIMATE OF MAXIMUM CCR VOLUME (b)(1)(iv) ESTIMATE OF LARGEST AREA OF CCR REQUIRING COVER (b)(1)(v) CLOSURE SCHEDULE (b)(1)(vi)... 6 Page 3 of 6

4 1.0 OBJECTIVE This report was prepared by AEP- Geotechnical Engineering Services (GES) section to fulfill requirements of CCR (b) for Closure Plans of Existing CCR Units. 2.0 DESCRIPTION OF THE CCR UNIT The AEP J. Robert Welsh Plant is located in southern Titus County, approximately 8 miles northeast of Pittsburg, Texas, and approximately two miles northwest of Cason, Texas. It is owned and operated by Southwest Electric Power Company (SWEPCO). The facility operates a landfill for the disposal of CCR materials. The Welsh Landfill is a Class 2, Industrial Solid Waste Facility per the Texas Commission on Environmental Quality, Industrial Solid Waste Management Technical Guideline No DESCRIPTION OF CLOSURE PLAN (b)(1)(i) [A narrative description of how the CCR unit will be closed in accordance with this section] The Welsh Landfill Area will be closed by closure in place. The closure will consist of re-grading the existing onsite materials and the installation of an impermeable cap with vegetative cover. The existing surface will be graded to achieve a gently sloping surface to promote surface water runoff. The re-graded surface will be covered with 3-ft of re-compacted clay soil material with a permeability of 1X10-7 or less and 18-inches of vegetative soil cover that is capable of sustaining native plant growth. The surface soil will be seeded and mulched to promote the growth of a vegetative cover. 4.0 CLOSURE IN PLACE (b)(1)(iii) [If closure of the CCR unit will be accomplished by leaving the CCR in place, a description of the final cover system, designed in accordance with paragraph(d) of this section, and the methods and procedures to be used to install the final cover. The closure plan must also discuss how the final cover system will achieve the performance standards specified in paragraph (d) of this section.] The final cover system will consist of 3-ft of re-compacted clay soil material with a permeability of 1X10-7 cm/sec or less and 18-inches of vegetative soil cover that is capable of sustaining native plant growth. The final cover will be seeded and mulched to promote growth of a vegetative cover. The final cover slope will be a minimum of 2% and will convey water to a TPDES permitted outfall. 4.1 CLOSURE PERFORMANCE STANDARDS (d)(1) SECTION (d)(1)(i) [Control, minimize or eliminate, the maximum extent feasible, post-closure infiltration of liquids into the waste and releases of CCR, leachate, or contaminated run-off to the ground or surface waters or to the atmosphere.] The final cover system will cover the CCR material and will have a permeability that is less than or equal to the permeability of the natural subsoils and is no greater than 1 x 10-5 cm/sec. Page 4 of 6

5 4.1.2 SECTION (d)(1)(ii) [Preclude the probability of future impoundment of water, sediment, or slurry.] The final surface areas will be graded to a minimum slope 2% to prevent the ponding of surface runoff. Drainage features will be designed to have positive drainage SECTION (d)(1)(iii) [Include measures that provide for major slope stability to prevent the sloughing or movement of the final cover system during the closure and post-closure care period.] The final cover system will be gently graded with a minimum of 2% slope. The final configuration of the impoundment will meet the stability requirements to prevent the sloughing or movement of the final cover system during the closure and post-closure care period SECTION (d)(1)(iv) [Minimize the need for further maintenance of the CCR unit.] The landfill facility will be vegetated to prevent erosion. Maintenance of the final cover system will include mowing SECTION (d)(1)(v) [Be completed in the shortest amount of time consistent with recognized and generally accepted good engineering practices.] The CCR unit will be closed in a timeframe consistent with recognized and generally accepted good engineering practices. As the fill reaches the approved final grades, periodic closure activities may occur. 4.2 DRAINING AND STABILIZING OF THE SURFACE IMPOUNDMENT (d)(2) This section is not applicable to a landfill. 4.3 FINAL COVER SYSTEM (d)(3) [If a CCR unit is closed by leaving CCR in place, the owner or operator must install a final cover system that is designed to minimize infiltration and erosion, and at a minimum, meets the requirements of paragraph (d)(3)(i) of this section, or the requirements of the alternative final cover system specified in paragraph (d)(3)(ii) of this section. The final cover system must be designed and constructed to meet the criteria in paragraphs (d)(3)(i)(a) through (D) of this section. The design of the final cover system must be included in the written closure plan.] Page 5 of 6

6 The final cover system will consist of 3-ft of re-compacted clay soil material with a permeability of 1X10-7 cm/sec or less and 18-inches of vegetative soil cover that is capable of sustaining native plant growth. The final cover will be seeded and mulched to promote growth of a vegetative cover. The final cover slope will be a minimum of 2% and will convey water to a TPDES permitted outfall. The final cover slope will be a minimum of 2% to accommodate settling and subsidence. 5.0 ESTIMATE OF MAXIMUM CCR VOLUME (b)(1)(iv) [An estimate of the maximum inventory of CCR ever on-site over the active life of the CCR unit.] The estimated maximum CCR volume on-site is 2,740,000 Cubic Yards for the Landfill Area. 6.0 ESTIMATE OF LARGEST AREA OF CCR REQUIRING COVER (b)(1)(v) [An estimate of the largest area of CCR unit ever requiring a final cover The largest area of the CCR unit requiring a final cover is 40 acres for the Landfill Area. 7.0 CLOSURE SCHEDULE (b)(1)(vi) [A schedule for completing all activities necessary to satisfy the closure criteria in the section, including an estimate of the year in which all closure activities for the CCR unit will be completed. The schedule should provide sufficient information to describe the sequential steps that will be taken to close the CCR unit, including identification of major milestones such as coordinating with and obtaining necessary approvals and permits from other agencies, the dewatering and stabilization phases of the CCR surface impoundment closure, or installation of the final cover system, and the estimated timeframes to complete each step or phase of the CCR unit closure. At this time there are currently no plans to close this CCR unit. Once the CCR unit requires closure a schedule to satisfy this section will be prepared. Page 6 of 6

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016 CLOSURE PLAN CCR 257.102(b) East and West Bottom Ash Ponds Pirkey Power Plant Hallsville, Texas October, 2016 Prepared for : Southwest Electric Power Company - Pirkey Plant Hallsville, Texas Prepared by:

More information

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia. CLOSURE PLAN CFR 257.102(b) Bottom Ash Complex Mountaineer Plant New Haven, West Virginia October, 2016 Prepared for : Appalachian Power Company - Mountaineer Plant New Haven, West Virginia Prepared by:

More information

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016 CLOSURE PLAN CFR 257.102(b) Bottom Ash Pond Northeastern 3&4 Power Station Oologah, Oklahoma October, 2016 Prepared for: Public Service Company of Oklahoma Oologah, Oklahoma Prepared by: American Electric

More information

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016 CLOSURE PLAN CFR 257.102(b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio September, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical Engineering

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum

More information

D.B. Wilson Station CCR Landfill

D.B. Wilson Station CCR Landfill D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Rev. 0 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION AND PURPOSE... 1 2. CLOSURE PLAN NARRATIVE DESCRIPTION... 2 3. FINAL COVER SYSTEM DESCRIPTION... 3

More information

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_ CHOLLA POWER PLANT CLOSURE PLAN 257.102(b) SEDIMENTATION POND CH_ClosPlan_004_20161017 Closure Plan Contents 257.102(b)(1) The owner or operator of a CCR unit must prepare a written closure plan that describes

More information

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016 Written Closure Plan Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure Plan

More information

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016 Written Closure Plan Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Revised: March 27, 2019 Table of Contents 1.0 General Information... 3 2.0 Description

More information

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_ FOUR CORNERS POWER PLANT CLOSURE PLAN 257.102(b) UPPER RETENTION SUMP FC_ClosPlan_011_20161017 Closure Plan Contents 257.102(b)(1) The owner or operator of a CCR unit must prepare a written closure plan

More information

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado Written Closure Plan Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description

More information

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_ FOUR CORNERS POWER PLANT CLOSURE PLAN 257.102(b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_20161017 Closure Plan Contents 257.102(b)(1) The owner or operator of a CCR unit must prepare a written

More information

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado. Written Closure Plan Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure

More information

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station CCR Unit Closure and Post-Closure Plan Texas Municipal Power Agency Gibbons Creek Steam Electric Station Grimes County, Texas October 12, 2016 www.erm.com The business of sustainability Texas Municipal

More information

Notice of Intent to Close Inactive CCR Surface Impoundments

Notice of Intent to Close Inactive CCR Surface Impoundments Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia

More information

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 2018 OPPD Nebraska City Station NC1 Ash Disposal Area

More information

Amended Written Closure Plan

Amended Written Closure Plan Amended Written Closure Plan Valmont Station - Active CCR Impoundments 3A and 3B Public Service Company of Colorado October 17, 2016 Amended January 5, 2018 Table of Contents 1.0 General Information...

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Revision: 1 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 525 Vine Street, Suite 1800 Cincinnati, Ohio 45202

More information

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill Omaha Public Power District Nebraska City, Nebraska January 18, 2019 OPPD North Omaha Ash Landfill CCR Landfill 2018 Annual Inspection

More information

Coal Combustion Residuals Closure Plan

Coal Combustion Residuals Closure Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C150035.00 October 2016 Prepared by: GAI Consultants, Inc. Richmond Office

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

2016 Annual Inspection Report

2016 Annual Inspection Report 2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Pawnee Station 14940 Morgan County Road 24 Brush, Colorado 80723 January 18, 2017 Table of Contents

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Closure Plan for CCR Surface Impoundments

Closure Plan for CCR Surface Impoundments Closure Plan for CCR Surface Impoundments B.L. England Generating Station Beesley s Point, New Jersey April 17, 2018 Prepared For RC Cape May Holdings, LLC 900 North Shore Road Beesley s Point, New Jersey

More information

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area CCR Landfill 21 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 216 OPPD Nebraska City Station NC1 Ash Disposal Area

More information

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station 33200 East Johnson Rd Sibley, Missouri KCP&L Greater Missouri Operations Company October 14, 2016 TABLE OF CONTENTS SECTION 1

More information

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for: Annual CCR Landfill Inspection Lansing Landfill Prepared for: Interstate Power and Light Company Lansing Generating Station 2320 Power Plant Drive Lansing, Iowa 52151 Prepared by: SCS ENGINEERS 2830 Dairy

More information

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report Whitewater Valley Station Wayne County, Indiana GAI Project Number: C151119.07 July 2017 Prepared by: GAI Consultants, Inc. Murrysville Office 4200 Triangle Lane Export, Pennsylvania 15632-1358 Prepared

More information

2017 Annual Inspection Report

2017 Annual Inspection Report 2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2018 Table of Contents Certification...

More information

2018 Annual Inspection Report

2018 Annual Inspection Report 2018 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2019 Table of Contents Certification...

More information

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS

More information

2016 Annual Inspection Report

2016 Annual Inspection Report 2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2017 Table of Contents Certification...

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

Amec Foster Wheeler 2016.

Amec Foster Wheeler 2016. Landfill Closure An Innovative Geosynthetic Barrier System ESAA Remtech 2016 Dean Wall & Ian MacLeod Why Do We Close Landfills? It s the law To minimize post closure environmental liability To minimize

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 16, 2015 OPPD North Omaha Station CCR Landfill Fugitive Dust Control Plan Table of Contents Revision

More information

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill 2016 Annual Landfill Inspection Report for the SCE&G Wateree Station Class III Landfill in Eastover, SC County of Richland January 15, 2017 Annual Inspection Report The Annual Inspection Report is performed

More information

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN PLEASANTS LANDFILL Willow Island, WV Allegheny Energy Supply Company, LLC A FirstEnergy Company October 19, 2015 CONTENTS Introduction 1 CCR Unit Description 1 CCR Fugitive Dust

More information

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill Consulting Engineers and Scientists 2015 Annual Landfill Inspection Report for the Williams Station Highway 52 Class III Landfill in Moncks Corner, SC County of Berkeley January 15, 2016 2015 Annual Landfill

More information

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure Page No. i LEGAL NOTICE This report ( Deliverable ) was prepared by Sargent & Lundy, L.L.C. ("S&L"), expressly for the sole use of Alliant Energy ("Alliant") in accordance with the agreement between S&L

More information

Effect of Perched Water Conditions in MSW Landfills: Considerations for Landfill Operators

Effect of Perched Water Conditions in MSW Landfills: Considerations for Landfill Operators Effect of Perched Water Conditions in MSW Landfills: Considerations for Landfill Operators Timothy Townsend and Pradeep Jain Department of Environmental Engineering University of Florida 2005 SWANA Landfill

More information

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr. October 16, 2018 Mr. Mike Bednar Superintendent of Environmental Compliance GRDA-Ecosystems and Education Center PO Box 70 420 Hwy 28 Langley, OK 74350-0070 RE: GRDA CCR Landfill Compliance Report Grand

More information

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report REPORT Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number 2 2018 Annual RCRA CCR Unit Inspection Report Submitted to: Northern Indiana Public Service

More information

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station. Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR

More information

2018 INSPECTION REPORT

2018 INSPECTION REPORT 2018 INSPECTION REPORT NORTHERN INDIANA PUBLIC SERVICE COMPANY R.M. SCHAHFER GENERATING STATION Third Annual RCRA CCR Unit Inspection Report January 2018 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR 257.60) FOR COAL COMBUSTION

More information

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01 NORTHERN INDIANA PUBLIC SERVICE COMPANY R.M. SCHAHFER GENERATING STATION First Annual RCRA CCR Unit Inspection Report January 2016 REPORT RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

PRELIMINARY STORM DRAINAGE REPORT

PRELIMINARY STORM DRAINAGE REPORT PRELIMINARY STORM DRAINAGE REPORT DRURY LANE DEVELOPMENT 704 1ST STREET SULTAN, WA 98294-94240 PARCEL #28083200305500 AUDITOR S FILE NO. 1090255 CITY OF SULTAN SNOHOMISH COUNTY, WASHINGTON PREPARED FOR:

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two) Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two) Fugitive Dust Control Plan for Coal Combustion Residuals Prepared For: Big Rivers Electric Corporation

More information

Trout Buffer Variance

Trout Buffer Variance Trout Buffer Variance Ashley L. Rodgers, PE Spring 2015 Why a Trout Buffer Capturing pollutants in runoff to keep the water clean. Capturing sediment to keep mud out of the water. Providing shade to keep

More information

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:.. CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP Submitted by:.. Tennessee Gas Company L.L.C. 1001 Louisiana St, Suite 1000 Houston, TX 77002 July 2014 Revised March 2015

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals Big Rivers Electric Corporation - D.B. Wilson Generating Station Fugitive Dust Control Plan for Coal Combustion Residuals Prepared For: Big Rivers Electric Corporation 201 3rd Street Henderson, KY 42419

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for: COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE

More information

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN PLEASANTS McELROY S RUN DISPOSAL IMPOUNDMENT Willow Island, WV Allegheny Energy Supply Company, LLC A FirstEnergy Company October 19, 2015 CONTENTS Introduction 1 CCR Unit Description

More information

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc. Northern Indiana Public Service Company R.M. Schahfer Generating Station Fourth Annual RCRA CCR Unit Inspection Report Restricted Waste Type I Landfill - Operating Permit Number 37-01 Submitted to: Northern

More information

Green CCR Surface Impoundment

Green CCR Surface Impoundment Green CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138A

More information

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN Plant Gaston October 2015 Professional Engineer Certification: Based upon my knowledge, information, and belief that the content in the attached

More information

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B Technical Memo To: Brian Trower, From: Peter Daniels, PE (Iowa PE# 21569) Dave Parenteau, PE (MN), Wenck Associates, Inc. Date: Subject: Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck

More information

Definitions as used in this Subchapter:

Definitions as used in this Subchapter: 21-2 Streets and Sidewalks 21-2 STORM WATER. 21-2.01 Definitions as used in this Subchapter: The terms as used in this Subchapter are further defined in the City of Bowling Green Stormwater Best Management

More information

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas Mark Coyle Corpus Christi Navigation Channel PCCA La Quinta Expansion Project History Corpus Christi Ship Channel Improvement Projects

More information

Environmental Management Strategy

Environmental Management Strategy Appin Surface Gas Management Project Appin Mine Surface Gas Management Project Environmental Management Strategy Page 1 Appin Surface Gas Management Project Review History Revision Description of Changes

More information

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for: COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE

More information

CCR Closure Plan Ash Impoundment

CCR Closure Plan Ash Impoundment CCR Closure Plan Ash Impoundment Iatan Generating Station Kansas City Power & Light Company Project No. 87292 Revision 0 4/13/2018 CCR Closure Plan Ash Impoundment prepared for Kansas City Power & Light

More information

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN Plant Barry October 2015 Professional Engineer Certification: Based upon my knowledge, information, and belief that the content in the attached

More information

Site Diary Campus Drive Relocation Project. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Site Diary Campus Drive Relocation Project. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control Site Diary Campus Drive Relocation Project by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University of Alabama Tuscaloosa,

More information

Does DFO Need to Review My Project?

Does DFO Need to Review My Project? Working Together for Responsible Erosion & Sediment Control Workshop Does DFO Need to Review My Project? June 6, 2014 Fisheries Protection Program Department of Fisheries and Oceans Amendments to the Fisheries

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

CSU Channel Islands Lead Operations and Maintenance Program

CSU Channel Islands Lead Operations and Maintenance Program CSU Channel Islands Lead Operations and Maintenance Program 1.0 Policy It is the policy of California State University Channel Islands to provide employees and visitors with a safe and healthful environment.

More information

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station. Coal Combustion Residuals 2016 Annual Fugitive Dust Control Report Prepared for Montana-Dakota Utilities Company R.M. Heskett Station December 2016 Coal Combustion Residuals Fugitive Dust Emission Control

More information

BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION

BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION BIOREACTOR LANDFILLS: GEOTECHNICAL ASPECTS OF STABILITY EVALUATION Presented by James Law SCS Engineers Master Class ISWA Congress 2009 Lisbon 10 October 2009 PRESENTATION OVERVIEW Landfill Slope Stability

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS Why does the City have a Safe Walks Program? The Safe Walks program was initiated in 2006 at the request of City Council in order to address the increasing

More information

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC United States Environmental Protection Agency RCRA Programs Branch Region IV Atlanta, GA CAA/RCRA Air Rules 27 November 2000 General Inspection Guidance for Waste Management Units Requiring Air Emission

More information

Holding Pond Annual Inspection Report

Holding Pond Annual Inspection Report Holding Pond Annual Inspection Report Shiras Steam Plant Project Number: 445171 January 12, 218 Holding Pond Annual Inspection Report Prepared for: Shiras Steam Plant Marquette, Michigan Prepared by: Brian

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

The Spartan Cap Athletic Field System

The Spartan Cap Athletic Field System The Spartan Cap Athletic Field System A.R. Kowalewski 1, J.R. Crum 2 and J.N. Rogers, III 2 1 Abraham Baldwin Agricultural College, Environmental Horticulture, Tifton, GA 2 Michigan State University, Crop

More information

Holding Pond Annual Inspection Report

Holding Pond Annual Inspection Report Holding Pond Annual Inspection Report Shiras Steam Plant Project Number: 6445171 January 12, 217 Holding Pond Annual Inspection Report Prepared for: Shiras Steam Plant Marquette, Michigan Prepared by:

More information

As temporary grade control facilities along waterways until final stabilization is established.

As temporary grade control facilities along waterways until final stabilization is established. Check Dams (CD) EC-12 Description Check dams are temporary grade control structures placed in drainage channels to limit the erosivity of stormwater by reducing flow velocity. Check dams are typically

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM Facility Number: Date: Time: Subdivision Name: Watershed: Weather: Inspector(s): Date of Last Rainfall: Amount: Inches Streets: Mapbook Location: GPS Coordinates: Property Classification: Residential 9

More information

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS Richard A. Sanger, CLIA, CIC, CID ABSTRACT Lawn Bowling Greens and Croquet Courts are unique when it comes to designing an efficient irrigations system.

More information

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015 EPA R6 Dive Team Operations Report San Jacinto Waste Pits Channelview, TX December 9-10, 2015 BACKGROUND The San Jacinto River Waste Pit Site history has been documented in several documents prepared for,

More information

Appendix J: Q1-Highway 35 Route Construction Plan

Appendix J: Q1-Highway 35 Route Construction Plan PSC REF#:150055 Wisconsin CPCN Appendix J Appendix J: Q1-Highway 35 Route Construction Plan Public Service Commission of Wisconsin RECEIVED: 06/29/11, 8:51:24 AM Hampton Rochester La Crosse 345 kv Transmission

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

Hunters Point Naval Shipyard Environmental Remediation Program Overview

Hunters Point Naval Shipyard Environmental Remediation Program Overview NAVFAC Southwest Hunters Point Naval Shipyard Environmental Remediation Program Overview Bayview Hunters Point Mr. Derek Robinson, BRAC Environmental Coordinator Introductions and Overview Derek Robinson

More information

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL

CHAPTER 4: BEST MANAGEMENT PRACTICES FOR EROSION AND SEDIMENTATION CONTROL Figure 4.4m. Type III Floating Turbidity Barrier Source: American Boom and Barrier Corporation and Virginia Department of Transportation (DOT) Standard Sheets 71 4.4.6 Floating Turbidity Barrier Definition

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS SELF INSPECTION CHECKLIST

FLAMMABLE AND COMBUSTIBLE LIQUIDS SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: FLAMMABLE AND COMBUSTIBLE LIQUIDS Guidelines: This checklist covers regulations issued by

More information