1 Getting a Bridge Built The progress of the Black River bridge construction was recorded by two I men, the clerk and the bookkeeper of the project. Their photographs of the work have left a wonderful record of how a major engineering project was completed with only steam and manpower. We do not know the complete names of these men, but they presented albums of the photos to railroad executives, including Jack Myers, an inspector for the B & O, whose album has been preserved by his family and was given to the Lodi Historical Society. The batch plant mixed concrete to be poured into the cavity of the large stone piers that were built to support the bridge. Materials were brought by railroad car. There seems to be a steam pressure tank in the right background that might be sending steam in a line from a boiler in the building. The river bottom was found to be soft shale; therefore piles had to be driven to solid rock using this steam-powered pile driver. The men are standing on the superstructure over a cofferdam that kept the river from flooding the area. The excavation for the cofferdam was dug by hand. Each shovel of soil would be placed in the large bucket on the right and a steam-powered boom-jack would lift the load from the excavation. Piles and all timber used in the project were cut locally. FOURTH QUARTER 2013 The Sentinel 9

2 Keeping the inside of the cofferdam clear of water was a constant job done by steam-powered pumps. This photo shows a pier being built adjacent to the bank of the river. This photo, probably taken from the bridge structure, shows all the major components of the job. The pile driver sits on a cofferdam; a boom-jack moves piles into place. In the background great stacks of stone are visible near the batch plant. On the right a narrow-gauge track is visible. These small tracks were placed and moved as needed to move stone and wood. All these tools were driven by stationary steam engines, some small and movable, and some in a central location with lines to the job. One pier has been completed behind the pile driver. Taken from the top and west end of the site, this photo offers another look at the basic components of the job. Hundreds of wood piles await the pile driver, which is centered over the cofferdam. The nearby countryside provided more than 3,00 piles for the bridge and trestle structure. The steam-powered boom-jack, predecessor of the modern crane, provided the great lifting power required. The machine consisted of two large wooden beams seated in a rotating base. The upright bea was connected by cable to the second beam, or boom, from which a lifting cable could be extended. By changing the angl of the boom to the upright beam with cable, the direction of the boom and lift cable could be moved. 10 The Sentinel FOURTH QUARTER

3 Berea sandstone, transported by rail from a quarry near Plymouth, Ohio, was the ultimate building material. It was both economical and convenient. Crude stone was cut and refined by English and Italian stone cutters. Each stone had to be individually cut to specific dimensions to form the arch. The top and bottom of the stone might vary by only one-quarter of an inch. Concrete was used only in the piers of the bridge. Every other stone was held in place by its own mass and gravity. By the summer of 1906 the principal piers were complete. The rounded ends of the piers are upstream and will divert the flow and occasional floodcarried debris around the bridge. The piles driven into the middle of the river will support the cribbing that is to be built to support the arch under construction. 5[_:s The central arch is complete with the river running freely underneath. The cofferdam protecting the piers and cribbing has been removed. FOURTH QUARTER 2013 The Sentinel 11

4 Each arch is a perfect half-circle The wood cribbing had to be stable and rugged enough to support the weight of the stone until the entire arch was finishe When the cribbing was removec each pier supported an estimate 22 tons of weight. The capstone is placed, but the work has only begun. Light showing through the cribbing shows that much more stone must be placed. Each stone in an arch had to be tapered onequarter of an inch even though the stone might be 5 feet long. Work continues on all three arches. At this time the walls between each arch are being constructed, to be filled in with aggregate material. Two platforms about 50 feet above the river support the boom-jacks needed to finish the structure. 12 The Sentinel FOURTH QUARTER

5 I The first row of stone is complete and the walls are gradually being added. The trestle for the final track is visible on the left. When the bridge is completed the trestle will be an embankment completely covered with soil and gravel. A great deal of fill material was required to bring the adjacent track up to the level of the completed bridge. An extensive wooden trestle was constructed and fill material excavated nearby was brought using a donkey engine and sidedumping cars. The fill area is about a mile long on either side of the bridge. i Even though the cars of fill material were usually pushed out onto the trestle and the engine was kept on the embankment, accidents did happen. The area near the east end of the project is muck soil and considered a swamp. Locals have a story that one engine and its cars fell from the track into the nearby swamp and disappeared. I On top of the arches, now almost complete, aggregate is added to fill the trough created by the walls. The fill material is lifted in barrels by boom-jack and then distributed by manpower. The unbonded stone and aggregate act as a cushion for the weight and vibration of trains. Weep holes allow water drainage and no freezing z=-3v3& mm. fee.*-..,*, *,«; FOURTH QUARTER 2013 The Sentinel 13

SafetyBuletin. Se ingoutriggerstopreventaccidents

SafetyBuletin. Se ingoutriggerstopreventaccidents SafetyBuletin Se ingoutriggerstopreventaccidents Safety Bulletin This document is intended to supplement but not supersede the manufacturer s applicable insrtuctions. Copyright 2010 ACPA All rights reserved

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

Fig. 3.1 (not to scale)

Fig. 3.1 (not to scale) 1 Fig. 3.1 shows an early water-powered device used to raise a heavy load. The heavy load rests on piston B. cylinder A cylinder B water load piston A piston B connecting rod connecting rod pivot beam

More information

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines. Dry Hydrants What is a Dry Hydrant? A dry hydrant is a non-pressurized pipe system permanently installed in existing lakes, ponds and streams that provides a suction supply of water to a fire department

More information

Perched Box Caisson Overview. January 2014

Perched Box Caisson Overview. January 2014 Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur

More information

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 02545 CR NO. 116 OVER THE RUM RIVER METRO DISTRICT - ANOKA COUNTY SEPTEMBER 9, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

SAFETY BULLETIN SETTING OUTRIGGERS TO PREVENT ACCIDENTS II SHORTRIGGING AMERICAN CONCRETE PUMPING ASSOCIATION

SAFETY BULLETIN SETTING OUTRIGGERS TO PREVENT ACCIDENTS II SHORTRIGGING AMERICAN CONCRETE PUMPING ASSOCIATION SAFETY BULLETIN SETTING OUTRIGGERS TO PREVENT ACCIDENTS II SHORTRIGGING AMERICAN CONCRETE PUMPING ASSOCIATION WWW.CONCRETEPUMPERS.COM Copyright 2010 v1.01 ACPA All rights reserved Manufacturer s recommendations

More information

River. Dynamics Canoeing: This section focuses on rivers; how they flow and on some basic maneuvers which you can execute on the river.

River. Dynamics Canoeing: This section focuses on rivers; how they flow and on some basic maneuvers which you can execute on the river. This section focuses on rivers; how they flow and on some basic maneuvers which you can execute on the river. Dynamics Canoeing: By Robert B. Kauffman, Ph.D. 1 Topics - Laminar and shore to center flows

More information

Slide 1 / What is the density of an aluminum block with a mass of 4050 kg and volume of 1.5 m 3?

Slide 1 / What is the density of an aluminum block with a mass of 4050 kg and volume of 1.5 m 3? Slide 1 / 68 1 What is the density of an aluminum block with a mass of 4050 kg and volume of 1.5 m 3? Slide 2 / 68 2 What is the mass of a rectangular shaped ice block with dimensions of 0.04m x 0.05m

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

Kentucky Lock Project Update Inland Waterways Users Board

Kentucky Lock Project Update Inland Waterways Users Board Kentucky Lock Project Update Inland Waterways Users Board Mr. Don Getty Project Manager Nashville District Great Lakes and Ohio River Division 1 March 2018 The views, opinions and findings contained in

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66513 14 th STREET (MSAS NO. 103) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

SPECIAL LAUNCHING METHODS

SPECIAL LAUNCHING METHODS CHAPTER 18 SPECIAL LAUNCHING METHODS Special launching methods are needed when a restricted site prevents normal roller layout and launching by the standard skeleton launchingnose method. Space on either

More information

Product Guide. Crawler Crane

Product Guide. Crawler Crane Crawler Crane 220 US Tons (100 Metric Tons) @ 16 ft 5 in Radius 285 ft Max Tip (Main Boom) Main Boom, Fixed Jib and Luffing Jib Configurations Product Guide KEY FEATURES ULTRA CAB The Ultra Cab, designed

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 5 Dredging II In the fifth lecture we discussed

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 07542 CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58551 CSAH NO. 41 OVER THE KETTLE RIVER DISTRICT 1 PINE COUNTY JULY 28, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY OCTOBER 22, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

GATES, CATTLE GUARDS AND PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people.

GATES, CATTLE GUARDS AND PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. Fencing Order No. 307.400-1 Revised December 2015 GATES, CATTLE GUARDS AND PASSAGEWAYS This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. GENERAL

More information

Blasting soft, plastic mineral inside a silo at a copper mine

Blasting soft, plastic mineral inside a silo at a copper mine Blasting soft, plastic mineral inside a silo at a copper mine Benjamin Cebrian ABSTRACT Metallurgical testing at Cobre Las Cruces prior to production at the mill was done with overburden gossan. Some of

More information

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective December 10, 2013

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective December 10, 2013 1 HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM Effective December 10, 2013 PSH 265 Roberts Avenue Santa Rosa, Ca. 95407 (707) 575-9014 Construction Engineering Resource 1837 Wright Street Santa Rosa, Ca. 95404

More information

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective August 25, 2015

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective August 25, 2015 1 HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM Effective August 25, 2015 PSH 265 Roberts Avenue Santa Rosa, Ca. 95407 (707) 575-9014 Construction Engineering Resource 1837 Wright Street Santa Rosa, Ca. 95404

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

Canoe/Kayak Launch Sites and Accessibility

Canoe/Kayak Launch Sites and Accessibility Canoe/Kayak Launch Sites and Accessibility Doug Alderson, Paddling Trails Coordinator Division of Recreation and Parks Office of Greenways and Trails Each potential access site on a river, lake or ocean

More information

Swim Spa Pre-delivery Guide

Swim Spa Pre-delivery Guide Swim Spa Pre-delivery Guide Hello! This document is designed to provide all the information you need to ensure the smooth delivery and installation of your spa or swim spa. Please read it carefully and

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Excavation and Trenching

Excavation and Trenching Excavation and Trenching An excavation is defined as any man-made cut, cavity, trench, or depression in the earth s surface formed by earth removal. Trenches are narrow, underground excavations that are

More information

Who Is OSHA? Who Is PERRP?

Who Is OSHA? Who Is PERRP? Who Is OSHA? Who Is? o Occupational Safety and Health Administration o Public Employment Risk Reduction Program o Both agencies are responsible for worker safety and health protection. 2 Purpose o Ensure

More information

WONDERLAB: THE EQUINOR GALLERY. The science and maths behind the exhibits 30 MIN INFORMATION. Topic FORCES. Age

WONDERLAB: THE EQUINOR GALLERY. The science and maths behind the exhibits 30 MIN INFORMATION. Topic FORCES. Age WONDERLAB: THE EQUINOR GALLERY and maths s INFORMATION Age 7 11 11 14 Topic FORCES 30 MIN Location LEVEL 3, SCIENCE MUSEUM, LONDON What s the science? What more will you wonder? and maths s Wonderlab:

More information

Team 50 Design Log Book. MEMS 0024 Design Project 2: Big Machine

Team 50 Design Log Book. MEMS 0024 Design Project 2: Big Machine Team 50 Design Log Book MEMS 0024 Design Project 2: Big Machine Table of Contents 1) Problem Statement............2 2) Idea Generation..........4 3) Input Requirements...........5 4) Output Requirements...........7

More information

GROVE MODEL RT58D - 20 TON CAPACITY

GROVE MODEL RT58D - 20 TON CAPACITY LIFTING CHARTS - Rough Terrain Cranes GROVE MODEL - 20 TON CAPACITY WEIGHT REDUCTIONS FOR LOAD HANDLING DEVICES 23 JIB with 28-70 BOOM * Stowed - 381 lbs. * Erected - 1,950 lbs. 23-38 TELE. JIB with 28-70

More information

Q1. The diagram shows two buses. Bus A is empty. Bus B contains bags of sand upstairs to represent passengers.

Q1. The diagram shows two buses. Bus A is empty. Bus B contains bags of sand upstairs to represent passengers. Q1. The diagram shows two buses. Bus A is empty. Bus B contains bags of sand upstairs to represent passengers. Each bus has been tilted as far as it can without falling over. (a) Each bus will topple over

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66546 MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY SEPTEMBER 13, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual LoneStar Fiberglass Pools Do-It-Yourself Installation Manual Chris 1/3/2008 Do-It-Yourself The installation of a LoneStar Fiberglass pool is a much simpler task than most people think. What is important

More information

UNIT D: MECHANICAL SYSTEMS

UNIT D: MECHANICAL SYSTEMS UNIT D: MECHANICAL SYSTEMS SCIENCE 8 SCIENCE 8 UNIT D SECTION 1.0 1 MACHINES ARE TOOLS THAT HELP HUMANS DO WORK. SECTION 1.0 SCIENCE 8 UNIT D SECTION 1.0 2 1 SIMPLE MACHINES MEETING HUMAN NEEDS TOPIC 1.1

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras (Refer Slide Time: 00:32) Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 1 Concepts of Fixed Offshore Platform

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

ROHO QUADTRO SELECT CUSHION ADJUSTMENT INSTRUCTIONS

ROHO QUADTRO SELECT CUSHION ADJUSTMENT INSTRUCTIONS INSTRUCTIONS FOR ADJUSTMENT SELECT Cushion STEP 1: Remove Product from Packaging The SELECT Cushion sets the standard for overall performance in wheelchair seating. Our technology provides unparalleled

More information

The Knowledge Bank at The Ohio State University. Ohio State Engineer. Testing the Bearing Power of Soils.

The Knowledge Bank at The Ohio State University. Ohio State Engineer. Testing the Bearing Power of Soils. The Knowledge Bank at The Ohio State University Ohio State Engineer Title: Testing the Bearing Power of Soils Creators: Morris, Clyde Tucker, 1877- Issue Date: Publisher: Jan-1926 Ohio State University,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7149 CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.

More information

Siting and Installation Manual

Siting and Installation Manual Siting and Installation Manual B-Series Advanced Wastewater Treatment Units Revolutionary Waste Treatment Advanced Wastewater Treatment Units (ATUs) that deliver an unsurpassed performance at an unbeatable

More information

MANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS

MANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS MANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS OBJECTIVE Establish conditions for the proper handling, transportation and storage of electric cable reels, in order to keep the

More information

3. Types of foundation

3. Types of foundation Foundation Engineering CE 48. Types of foundation & foundation materials Contents Introduction Shallow Foundations Deep Foundations Introduction Why different types of? General types of Introduction Why

More information

Each enclosed presentation is copyrighted by the author of the presentation, and may not be used, re-used, or otherwise reproduced without the

Each enclosed presentation is copyrighted by the author of the presentation, and may not be used, re-used, or otherwise reproduced without the Each enclosed presentation is copyrighted by the author of the presentation, and may not be used, re-used, or otherwise reproduced without the express written consent of that author. All rights reserved.

More information

. In an elevator accelerating upward (A) both the elevator accelerating upward (B) the first is equations are valid

. In an elevator accelerating upward (A) both the elevator accelerating upward (B) the first is equations are valid IIT JEE Achiever 2014 Ist Year Physics-2: Worksheet-1 Date: 2014-06-26 Hydrostatics 1. A liquid can easily change its shape but a solid cannot because (A) the density of a liquid is smaller than that of

More information

TOCA MAINTENANCE & TROUBLESHOOTING MANUAL

TOCA MAINTENANCE & TROUBLESHOOTING MANUAL TOCA MAINTENANCE & TROUBLESHOOTING MANUAL Performing regular maintenance on your TOCA Touch Trainer will help prolong the life of the machine and ensure each training session runs smoothly. This manual

More information

Road Safety Facilities Implemented in Japan

Road Safety Facilities Implemented in Japan Road Safety Facilities Implemented in Japan 1 Road Safety Facilities 1.Guard Fence 2.Road Lighting 3.Other Road Safety Facilities 2 Road Safety Facilities 1.Guard Fence 2.Road Lighting 3.Other Road Safety

More information

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships By KATE ASCHERMARCH 21, 2014 Advertisement When it opened in 1931, the Bayonne Bridge with its parabolic arch connecting Staten

More information

Design of Offshore Structures Prof. Dr. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

Design of Offshore Structures Prof. Dr. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Design of Offshore Structures Prof. Dr. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 2 Concept of Fixed Offshore Platform Deck and Jacket 2

More information

Break in the Bahamas. Cutters Head to the Caribbean to Wire Saw Sunken Pier. A 25-foot by 25-foot steel pier section had sunk into the water.

Break in the Bahamas. Cutters Head to the Caribbean to Wire Saw Sunken Pier. A 25-foot by 25-foot steel pier section had sunk into the water. Break in the Bahamas Cutters Head to the Caribbean to Wire Saw Sunken Pier A 25-foot by 25-foot steel pier section had sunk into the water. CONCRETE CASES Divers were used to inspect the damaged structure

More information

KCRC Ma On Shan Line. Railway Development in Hong Kong. Tai Wai Station and Maintenance Centre

KCRC Ma On Shan Line. Railway Development in Hong Kong. Tai Wai Station and Maintenance Centre Railway Development in Hong Kong KCRC Ma On Shan Line Tai Wai Station and Maintenance Centre Overview of the Maintenance Centre of the Ma On Shan Line at Tai Wai, as seen in early 2002. The Centre is a

More information

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Fiberstars Light Streams Mini Laminar Installation Manual (LSML) 3072091 ETL listed for installations within 5 ft. (1.5M) of outer edge of water 79-15056-00 Rev. A Page 1 of 6 SAVE THESE INSTRUCTIONS!

More information

Stevens Creek Corridor

Stevens Creek Corridor O F F I C E O F T H E D I R E C T O R O F P U B L I C W O R K S Stevens Creek Corridor Creek Restoration Project Volume Three Project Update: Creek Photos, Before & After BY GAIL SEEDS - PROJECT MANAGER,

More information

General Safety and Health Provisions for Construction Self Inspection Checklist

General Safety and Health Provisions for Construction Self Inspection Checklist Optional Information Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: General Safety and Health Provisions for Construction Self Inspection Checklist Instructions:

More information

Aluminum Sheeting Guide (ASG)

Aluminum Sheeting Guide (ASG) Tabulated Data Aluminum Sheeting Guide (ASG) February 2016 Copyright, U.S.A.,Griswold Machine & Eng., 2016 594 Mendon Road, Union City, MI 49094 (800) 248 2054 Fax: (517) 741 7483 CAUTION EXCAVATION PROCEDURES

More information

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L Great Plains Manufacturing, Inc. 1 NTA607HD Lift Assist Adjustments Null4: When you see this symbol, the subsequent instructions and warnings are serious - follow without exception. Your life and the lives

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

Students questions regarding the future of the Zoar Levee and the town of Zoar in Black

Students questions regarding the future of the Zoar Levee and the town of Zoar in Black Mason Elementary, Akron Public Schools, Grade 4 Students Zoar Village Visit, Thursday, May 17, 2012 Students questions regarding the future of the Zoar Levee and the town of Zoar in Black U.S. Army Corps

More information

CKE4000 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS PRELIMINARY. Max. Lifting Capacity

CKE4000 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS PRELIMINARY. Max. Lifting Capacity HYDRAULIC CRAWLER CRANE CKE4000 Max. Lifting Capacity: 350 t Max. Boom Length : 78.0 m Max. Luffing Jib Combination : 72.0 + 54.0 m PRELIMINARY S P E C I F I C A T I O N S Main Boom Max. Lifting Capacity

More information

Talybont Deep Adit. A photographic Tour

Talybont Deep Adit. A photographic Tour . A photographic Tour In May 2004, some friends from WMS and I commenced a dig in the bottom of the air shaft on the Altycrib Hill. Our objective was to reach the driven from the Wern in 1839 to cut the

More information

Operator s Training Guide

Operator s Training Guide Operator s Training Guide Overview Upon successful completion of this program, the Operator will be awarded an Operator s certificate which demonstrates that he/she can assemble, tow, service and safely

More information

h o l l o w poles for foundat i o n s

h o l l o w poles for foundat i o n s TTT Products Limited Feb 2016. 1 of 6 The MultiPole advantage Introducing the TTT MultiPole an incredibly versatile pole due to its unique hollow core. The MultiPole is a multifunctional pole suitable

More information

h o l l o w poles for foundat i o n s

h o l l o w poles for foundat i o n s TTT Products Limited July 2017. 1 of 6 The MultiPole advantage The TTT MultiPole is an incredibly versatile pole due to its unique hollow core. The MultiPole is a multifunctional pole suitable for structural

More information

CKE2500 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS. Max. Lifting Capacity

CKE2500 HYDRAULIC CRAWLER CRANE GENERAL DIMENSIONS. Max. Lifting Capacity HYDRAULIC CRAWLER CRANE CKE Max. Lifting Capacity: 2 t Max. Boom Length: 91.4 m Max. Jib Combination: 76.2 +. m Max. Luffing Jib Combination: 1.8 + S P E C I F I C A T I O N S Main Boom Max. Lifting Capacity

More information

River Dynamics - Rafting FOCUS. Read 10 point text from rear of the room. Bottom

River Dynamics - Rafting FOCUS. Read 10 point text from rear of the room. Bottom Dynamics - Rafting FOCUS Read 10 point text from rear of the room. Bottom 1 This section focuses on rivers; how they flow and on some basic maneuvers which you can execute on the river. Dynamics Rafting:

More information

TEKS Lesson 6.8E: Machines

TEKS Lesson 6.8E: Machines 6.8E Investigate how inclined planes and pulleys can be used to change the amount of force to move an object. : Machines What is a machine? A machine is a device that allows you to do work in a way that

More information

NCDOT S EXPERIENCE USING HYDRAULIC SETTLEMENT GAUGES. David L. Teague,P.E. NCDOT GEOTECHNICAL ENGINEERING UNIT

NCDOT S EXPERIENCE USING HYDRAULIC SETTLEMENT GAUGES. David L. Teague,P.E. NCDOT GEOTECHNICAL ENGINEERING UNIT NCDOT S EXPERIENCE USING HYDRAULIC SETTLEMENT GAUGES David L. Teague,P.E. NCDOT GEOTECHNICAL ENGINEERING UNIT OUTLINE Introduction Benefits of Hydraulic Settlement Gauges (HSG) over traditional settlement

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB) UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 62555B WABASHA STREET SOUTH BOUND (MASA 235 SB) OVER THE MISSISSIPPI RIVER CITY OF ST. PAUL OCTOBER 31, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Related Rates. Instant (true at an instant)

Related Rates. Instant (true at an instant) Related Rates Name Related Rates Day 1: 1. Assume that oil spilled from a ruptured tanker spreads in a circular pattern whose area increases at a constant rate of 5 m 2 /s. How fast is the radius of the

More information

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER SERIAL NUMBER 1 2 TABLE OF CONTENTS GENERAL NOTES... 4 WT. REDUCTIONS / LINE PULLS & REEVING INFO / HOIST PERFORMANCE. 5 LIFTING AREA

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS Why does the City have a Safe Walks Program? The Safe Walks program was initiated in 2006 at the request of City Council in order to address the increasing

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

CAISSON SHAFT SYSTEM

CAISSON SHAFT SYSTEM CAISSON SHAFT SYSTEM Installation Guide INSTALLATION GUIDE FOR DN2000 TO DN3660 UNITS PLATE JOINTING SYSTEM This guide is to be used for the Installation of CPM Group Ltd caisson shaft units which use

More information

Job Demands Analysis SPORTS FIELD INSPECTION (PARK BOARD)

Job Demands Analysis SPORTS FIELD INSPECTION (PARK BOARD) Job Demands Analysis SPORTS FIELD INSPECTION (PARK BOARD) Purpose The purpose of the job of a Sports Field Inspector working for the City of Vancouver s Parks & Recreation Department is to inspect sports

More information

Crane Rental Heavy Machinery Moving Project Management

Crane Rental Heavy Machinery Moving Project Management 2 3 4 5 6 7 8 9 10 Link-Belt TG-2300B lifting crane capabilities - heavy duty boom Boom - tubular: 90" x 90" (2.29 x 2.29 m) with open throat top section, 2" (51 mm) diameter boom pendants. Mast - 43'

More information

The Railway from Pill Junction to Portishead in March 2015

The Railway from Pill Junction to Portishead in March 2015 The Railway from Pill Junction to Portishead in March 2015 A series of pictures taken to record the status of the old line following the major clearance operation Never assume you are safe on or near old

More information

In This Document. OBJECTIVES Upon completion of this module, you should be able to:

In This Document. OBJECTIVES Upon completion of this module, you should be able to: Struck By Fact Sheet MODULE DESCRIPTION This module provides information that will enable you to recognize common struck-by hazards at construction worksites. OBJECTIVES Upon completion of this module,

More information

Grader Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Grader Note: It is recommended that you read the Supporting Information page before you read this factsheet. Grader Note: It is recommended that you read the Supporting Information page before you read this factsheet. Preparation for work (Preparation) Graders are part of a group of specialist machines that are

More information

Appendix J: Q1-Highway 35 Route Construction Plan

Appendix J: Q1-Highway 35 Route Construction Plan PSC REF#:150055 Wisconsin CPCN Appendix J Appendix J: Q1-Highway 35 Route Construction Plan Public Service Commission of Wisconsin RECEIVED: 06/29/11, 8:51:24 AM Hampton Rochester La Crosse 345 kv Transmission

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

Dredging Keeping Our Underwater Highways Open

Dredging Keeping Our Underwater Highways Open Dredging Keeping Our Underwater Highways Open Sedimentation Material that falls to the bottom of a liquid is called sediment. If enough sediment deposits to build a shallow spot on the river or ocean bottom,

More information

STUDY PROCESS & SCHEDULE

STUDY PROCESS & SCHEDULE STUDY PROCESS & SCHEDULE Route Centennial Bridge Study KDOT Project No. -52 KA-3229-01 STUDY OVERVIEW STUDY SCHEDULE The Kansas Department of Transportation (KDOT) has identified a future need to replace

More information

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with? 1. What is the top priority when working on Canadian Pacific (CP) property? A. Production B. Safety C. Quality D. Project deadline 2. When working on CP property what must all Contractors comply with?

More information

MOVEMENT FLOW SEQUENCING A REFORMER CADILLAC AND WUNDA CHAIR REFORMER

MOVEMENT FLOW SEQUENCING A REFORMER CADILLAC AND WUNDA CHAIR REFORMER MOVEMENT FLOW SEQUENCING A REFORMER CADILLAC AND WUNDA CHAIR REFORMER CROSSED LEG HIP OPENING Lie on carriage. Place feet on footbar. Cross one leg over the other. Extend and straighten leg keeping other

More information

Division of Environmental Quality Wellhead Protection Section

Division of Environmental Quality Wellhead Protection Section Division of Environmental Quality Wellhead Protection Section 1 10 CSR 23-3.110 Plugging of Wells Any well which is to be abandoned must be plugged in accordance with these rules. If a well has been determined

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

Old-Exam.Questions-Ch-14 T072 T071

Old-Exam.Questions-Ch-14 T072 T071 Old-Exam.Questions-Ch-14 T072 Q23. Water is pumped out of a swimming pool at a speed of 5.0 m/s through a uniform hose of radius 1.0 cm. Find the mass of water pumped out of the pool in one minute. (Density

More information

The Glockemann Pump Site & Installation Guide

The Glockemann Pump Site & Installation Guide GLOCKEMANN PECK ENGINEERING PTY LTD P.O. Box 357 West Ryde NSW 1685 Telephone/Fax: (02) 9708 0900 Email: glocpump@zip.com.au Internet: www.gpe-waterpumps.com The Glockemann Pump Site & Installation Guide

More information

CUSTOMS TARIFF - SCHEDULE 89 - i

CUSTOMS TARIFF - SCHEDULE 89 - i CUSTOMS TARIFF - SCHEDULE 89 - i Chapter 89 SHIPS, BOATS AND FLOATING STRUCTURES Note. 1. A hull, an unfinished or incomplete vessel, assembled, unassembled or disassembled, or a complete vessel unassembled

More information

Existing conditions of each bridge and repair plan are presented in Table

Existing conditions of each bridge and repair plan are presented in Table 2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road

More information

Protectingpipelinesfor

Protectingpipelinesfor 24 Protectingpipelinesfor Michael Paulin, Damien Humby and Joseph Cocker, INTECSEA Canada, and Glenn Lanan, INTECSEA Inc., describe the process of trenching for the protection of pipelines in ice environments.

More information

Parts of the Ship. Terms you should already know

Parts of the Ship. Terms you should already know Parts of the Ship Toronto Brigantine Terms you should already know After-peak Fore-peak Bow Stern Fairlead Scupper Freeing port Hull Deck Lifeline Hatch Skylight Cleat Pin-rail Fife-rail Spider-band Block

More information