1 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H) Study Guidance 1

2 09/25/2018 DRAFT FEMA Region I PA H&H Study Table of Contents Contents 1. BACKGROUND HYDROLOGIC AND HYDRAULIC (H&H) STUDY THREE OPTIONS FOR H&H STUDY REQUIREMENTS H&H STUDY PERFORMANCE AND COMPONENTS... 7 Appendices Appendix A Appendix B Examples H&H Comments and Conditions for EHP Project Review Appendix C Regulatory Citations Appendix D Related FEMA Categorical Exclusions from NEPA 2

3 Region I Federal Emergency Management Agency (FEMA) Hydrologic and Hydraulic (H&H) Study Guidance 1. BACKGROUND FEMA's July 9, 2018 Policy Clarification for Public Assistance Hydrologic and Hydraulic Study Requirements for Drainage Structures and Culverts clarified the April 26, 2018 Public Assistance Program and Policy Guide (PAPPG) Appendix J requirement for a watershed Hydrology and Hydraulics (H&H) study for projects involving replacing or upsizing drainage structures or culverts, in compliance with 44 CFR Part 9 (E Floodplains and E Wetlands) and Part 60 (NFIP). The Policy Clarification directed Public Assistance staff to work with Environmental and Historic Preservation (EHP) and Mitigation field staff to determine when projects require an H&H study. This document provides guidance on when H&H studies are required in FEMA Region 1 and addresses common types of Public Assistance (PA) projects, i.e., upsizing culverts and bridges. The guidance may also be applied to new culverts being installed as a mitigation measure. Other types of projects and/or those in complex hydrologic or highly developed settings should be discussed with EHP and NFIP staff to determine H&H requirements. Requirements of 44 CFR Part 9 (E Floodplains and E Wetlands) and Part 60 (NFIP) related to H&H studies are outlined below. Note that projects eligible for FEMA Public Assistance grants without Mitigation are not necessarily exempt from H&H study requirements and other elements of Environmental and Historic Preservation review. Even if upgrades are a result of codes and standards improvements, the following requirements and guidance apply to the project. In addition, culvert and bridge construction projects are subject to any other local, state and federal requirements that may require H&H studies../ 44 CFR Part 9 Floodplain Management and Protection of Wetlands has the following requirements (paraphrased): 9.11(d)(4) No encroachments within a floodway that would result in any increase in flood levels, no increase in water surface elevation of the base flood more than one foot within the community. 9.11(d)(5) In a floodway or coastal high hazard area, additional standards... must be the only practicable alternative, not inconsistent with NFIP or more restrictive state or local standards, elevated in coastal high hazard areas. 9.11(f) Restore and Preserve-if the action will result in harm to or within the floodplain or wetland, the agency shall design or modify the action to preserve as much of the natural and beneficial floodplain and wetland values as is possible../ 44 CFR Part 60 NFIP contains the following (paraphrased): 60.3(b)(7)-Assure that the flood carrying capacity within the altered or relocated portion of any watercourse is maintained. 60.3(c)(10)--Cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the 3

4 base flood more than one foot at any point within the community. 60.3(d)(3)-Prohibit encroachments within the floodway unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the proposed encroachment would not result in any increase in flood levels within the community during occurrence of the base flood discharge. 60.6(a)(7) Variances may be issued for new construction, substantial improvements and for other development necessary for the conduct of a functionally dependent use (without any increase in base flood discharge levels in the floodway, or if it would not result in increased flood heights, additional threats to public safety, extraordinary public expense, nuisance... ) and the structure or development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety. 2. HYDROLOGIC AND HYDRAULIC (H&H) STUDY A Hydrologic and Hydraulic (H&H) Study is the study of movement of water, including the volume and rate of flow as it moves through a watershed, basin, channel, or man-made structure. Typically the analysis includes an evaluation of the upstream watershed area and expected flood flows so that culverts can be appropriately sized. A complete H&H study also evaluates upstream and downstream water surface elevations for the proposed water crossing at flood flows consistent with Base Flood Elevations (BFE), to assure that BFE in the community's Special Flood Hazard Area (SFHA) does not increase more than one foot, as a result of the new water conveyance. The standard for a regulatory floodway (a mapped area of the main channel carrying the majority of river flow) is no rise in BFE. The 1% annual flood discharge is used in the analysis. If the project is a critical action, the more restrictive 0.2% annual flood discharge is used in the analysis. H&H studies are necessary to protect against future flood loss. In addition, culvert and bridge replacement projects may require H&H studies for low flows to assure aquatic organism passage in accordance with other state or federal requirements. H&H Studies may also be required for projects that are in a wetland outside of the SFHA. Situations where this could arise are perennial streams with surrounding wetlands in a mountainous area, or where an undersized culvert has created ponding and a wetland. While this latter category are "manmade" wetlands, they may support wetland communities, and maintaining them may be environmentally beneficial. Region 1 comprises six states with varying requirements (Codes and Standards) for stream road crossing design and permitting. All six states have their own Clean Water Act (CWA) General Permits regulated by the U.S. Army Corps of Engineers (USAGE). Most replacement-in-kind projects are exempted from Clean Water Act requirements. Minor alterations are covered by the CWA General Permits in New England as long as General Conditions are met, with varying reporting requirements. Projects that alter the size or configuration of stream road crossings may require a higher level of permitting under the CWA. State and federal agency contact information is included on the "Green Sheet" developed for each disaster declaration; the information is intended to assist project proponents in determining project permitting requirements. Applicants must comply with current regulatory requirements for their projects. 4

5 3. THREE OPTIONS FOR H&H STUDY REQUIREMENTS OPTION 1: AN H&H STUDY IS til2i REQUIRED If any one of the following criteria are met, an H&H Study is NOT required in Region Project is completed as PA Category B (Emergency Protective Measures), needed to maintain public safety access; or 2. Project cost is less than $5,000 and exempt from E and E review; or 3. Return back to exact pre-disaster condition (length, diameter, number of culverts) or the only change is in material type; or 4. Project is a stormwater-only drainage or conveyance structure, where water does not flow regularly or seasonally (i.e., a "road crossing," "cross culvert," or "equalization culvert"). This only applies to locations that are NOT mapped as riverine or other wetlands on the US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: and must be verified by regional EHP staff; or 5. Culvert or bridge size increases for projects: a. outside of Special Flood Hazard Areas (SFHA) and b. the new cross sectional open area is within 160% of the structure opening(s) being replaced (an of increase of no more than one circular culvert size in accordance with the following list of diameters in inches): 8"-10"-12"-15"-18"-21"-24"-30"-36"-42"-48" Circular culverts with diameters greater than 48 inches or others with crosssectional open areas above square feet would be subject to H&H study requirements, Options 2 and 3 below. Examples illustrating projects meeting Option 1 are provided in Appendix A.1 and A.2. OPTION 2: LIMITED H&H STUDY If a project does not meet the Option 1 criteria but is of a small enough scale relative to the SFHA, a limited H&H study is adequate. For projects within or upstream of SFHA, where an H&H study is required, the downstream analysis can be limited to an assessment of the proportion of the site's drainage area to the SFHA drainage area. In cases where the drainage area to the project is less than 10% of the drainage area to the nearest point of the next downstream SFHA, it is presumed that the project will not have a significant impact on the downstream BFE. The Limited H&H study only requires calculation of the upstream flows and analysis to properly size the water conveyance opening. EHP staff can assist in determining when the Limited Downstream H&H Analysis is applicable. Steps to verify the applicability of the Limited H&H Study: 1. Using the National Flood Hazard Layer (NFHL) viewer available at: 5

6 9cd or another method, find the project location; 2. Compute the size of the drainage area to the project site using the USGS StreamStats Application: 3. Using the National Flood Hazard Layer (NFHL) viewer or another method, determine the location of the nearest downstream SFHA that drainage from the project would flow into; 4. Compute the size of the drainage area to the nearest downstream SFHA determined in Step 3 using the StreamStats Application; 5. Calculate the proportion of the drainage area of the project site to that of the nearest downstream SFHA: Drainage Area of Step 2 divided by Drainage Area of Step 4. If the result is less than 0.10, the project is eligible for the Limited H&H option and does not require further downstream analysis. If the result is greater than 0.10, a complete H&H study (Option 3), including downstream analysis is needed for the project. An example illustrating Option 2 is provided in Appendix A.3. OPTION 3: A COMPLETE H&H STUDY IS REQUIRED If any of the following conditions apply, a Complete H&H study is required in Region 1. Other cases may also require complete H&H studies based upon professional judgment of EHP, NFIP staff or a Professional Engineer to assure the requirements of 44 CFR Part 9 and Part 60 can be confidently achieved. 1. Permanent PA Category C Projects that are located: a. In a mapped floodplain (SFHA on the FEMA Map Service Center or Printed FIRM) and b. Carries a surface water feature mapped on US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: or 2. 8-Step Analysis Required: An 8-step analysis by EHP staff demonstrating the need for the project, its lack of impacts on base flood levels and wetland resources, and the lack of practicable alternatives is required in addition to the complete H&H study if project: a. Carries a wetland or surface water feature mapped on US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: and b. Project cost is more than $100,000; or 3. Wetland and large increase: a. Carries a mapped riverine wetland or supports a non-riverine wetland feature on US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: and S:\4. Mitigation Division\_EHP Branch\EHP MASTER\011 b) Streams\H&H Studies\FEMA H&H Policy\Draft FEMA R1 HH 6

7 b. Is new construction or alterations (mitigation) of bridges and culverts, that alters the diameter of the culvert, or the number of culverts such that the total open area at the project location is an increase of more than 160% of the prior structure's open area (more than one circular culvert size increase in accordance with the following list of diameters in inches): 8"-10"-12"-15"-18"-21"-24"-30"-36"-42"-48" (Circular culverts with diameters greater than 48 inches or others with cross-sectional open areas above square feet would be subject to complete H&H study requirements, unless the location meets the Limited H&H Study (Option 2) allowance); or 4. Projects that could be reasonably expected to impact base flood elevations in SFHA due to the magnitude of the size increase, proximity to the SFHA, proximity to public infrastructure or other structures, or in areas where multiple projects affecting the waterway are under development: or 5. Presence of aquatic endangered species; or 6. H&H Study is required by another local, state, or federal jurisdiction. An example of a project that requires a complete H&H study is provided in Appendix A H&H STUDY PERFORMANCE AND COMPONENTS Applicant may utilize its own qualified staff or services of a company that has licensed professional civil, environmental, or hydrologic engineers for assistance. FEMA Region 1 will accept complete H&H studies by qualified public agency staff offering technical assistance to applicants, provided they meet minimum requirements of evaluating appropriate flood flows and downstream impacts (as needed). Analysis shall be performed in accordance with standard current engineering practice. Information required in an H&H Study: Limited and Complete H&H Studies: Watershed area computation and flood flow estimates Design of appropriate flood conveyance structure(s) Complete H&H Studies: Water surface elevations and water surface profiles at proposed project relative to BFE Development of appropriate and effective mitigation measures to avoid, minimize, and mitigate potential impacts to floodplain storage and physical habitat provided within a floodplain system Any other requirements imposed by local, state or federal agencies. S:\4. Mitigation Division\_EHP Branch\EHP MASTER\011 b) Streams\H&H Studies\FEMA H&H Policy\Draft FEMA R1 HH 7

8 General guidance for Complete H&H Studies (as eligible/required): 1) The H&H study should be a standalone document prepared and signed by an Engineer Licensed in the State and qualified to perform such work. The report should have a narrative portion including but not limited to: a. A description of the pre-disaster site conditions, an overview of the damages and a description of the proposed installation. b. Identification of the exact location of the site using latitude and longitude including the verbal names of the stream/drainage (if there is one) and the name of the facility (or road). c. A description of the methodology used to analyze the basin and the input parameters used in the calculations. The description should also include the conditions at the drainage crossing (e.g. size/slope/length of pipe and height of roadway above pipe invert elevation/top of stream bed/shape, slope and roughness values used for tailwater conditions). d. A statement should be included that indicates why the selected storm frequency was chosen for the analysis (e.g. local/state standards or unique site conditions). e. Discussion of other considerations such as bottom embedment (counter-sinking the pipe) or use of baffles to allow for fish passage, changing culvert type from a RCP to a CMP, or installation of an arch culvert as necessary because of permit requirements. f. A summary statement that provides an overview of the analysis and signed/stamped by a Professional Engineer. 2) FEMA funding for upsizing of culverts/water crossings is conditional on an evaluation of upstream/downstream impacts in accordance with the options provided in this guidance document. If the increased conveyance will not negatively affect upstream or downstream structures/properties, the summary statement should state that there are "no negative upstream or downstream impacts to structures or property". If the applicant/engineer is unable to determine the effects of upsizing a conveyance. the proposed conveyance structure may be considered "not technically feasible". 3) The H&H study should include calculations and reference material used to perform the analysis (specifically tables, charts, maps, & graphs). Resources should be appropriately cited. 8

9 Appendix A Examples 9

10 A.1 Example Site where H&H Study NOT Required: Mclaren Hill Rd Culvert #2 Site location coordinates: , Category C, 30-inch diameter CMP culvert replaced with 36-inch diameter CMP culvert OPTION 1: AN H&H STUDY IS NOT REQUIRED If any one of the following criteria are met, an H&H Study is NOT required in Region Project is completed as PA Category B (Emergency Protective Measures}, needed to maintain public safety access; (NO-was Category C so DOES NOT MEET); or 2. Project cost is less than $5,000 and exempt from E and E review; (NOwas Category C so DOES NOT MEET) or 3. Return back to exact pre-disaster condition (length, diameter, number of culverts) or the only change is in material type; (NO-was increased size so DOES NOT MEET) or 4. Project is a stormwater-only drainage or conveyance structure, where water does not flow regularly or seasonally (i.e., an intermittent stream or "road crossing"). This only applies to locations that are NOT mapped as riverine or other wetlands on the US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: ; (NO-carries a mapped unnamed tributary to Stevens River so DOES NOT MEET) or 5. Culvert or bridge size increases for projects: a. outside of Special Flood Hazard Areas (SFHA) (YES-Project is outside SFHA so MEETS) and b. the new cross sectional open area is within 160% of the structure opening(s) being replaced (an of increase of no more than one circular culvert size in accordance with the following list of diameters in inches): 8"-10"-12"-15"-18"-21"-24"-30"-36"-42"-48" (YES-Culvert is one size increase on list so MEETS) (PROJECT MEETS BOTH CRITERIA #Sa and #Sb so MEETS and NO H&H STUDY REQUIRED) S:\4. Mitigation Division\_EHP Branch\EHP MASTER\011 b) Streams\H&H Studies\FEMA H&H Policy\Draft FEMA R1 HH 10

11 A.2 Example Site where H&H Study NOT Required: McLaren Hill Rd Culvert #3 Site location coordinates: , Category C, No Original Culvert; Adding 36-inch diameter culvert OPTION 1: AN H&H STUDY IS NOT REQUIRED If any one of the following criteria are met, an H&H Study is NOT required in Region Project is completed as PA Category B (Emergency Protective Measures), needed to maintain public safety access; (NO-is Category C so DOES NOT MEET); or 2. Project cost is less than $5,000 and exempt from E and E review; (NO- DOES NOT MEET) or 3. Return back to exact pre-disaster condition (length, diameter, number of culverts) or the only change is in material type; (NO-no culvert present pre-disaster so DOES NOT MEET) or 4. Project is a stormwater-only drainage or conveyance structure, where water does not flow regularly or seasonally (i.e., an intermittent stream or "road crossing"). This only applies to locations that are NOT mapped as riverine or other wetlands on the US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: ; (YES; MEETS SO H&H IS NOT REQUIRED) or 5. Culvert or bridge size increases for projects: a. outside of Special Flood Hazard Areas (SFHA) (YES-project is outside of Sf HA so MEETS) and b. the new cross sectional open area is within 160% of the structure opening(s) being replaced (an of increase of no more than one circular culvert size in accordance with the following list of diameters in inches): 8"-10"-12"-15"-18"-21"-24"-30"-36"-42" (NO-new culvert project so more than 160% increased open area--does NOT MEET) (Both required conditions in Item 5 were not met, so DOES NOT MEET) 11

12 A.3 Example Site where Complete H&H Study Required: Wardsboro Newell Hill Rd Culvert #15 Site Location Coordinates: , Category C, Replacing 36-inch diameter culvert with 12-ft wide x 6-ft high box culvert OPTION 1: AN H&H STUDY IS NOT REQUIRED If any one of the following criteria are met, an H&H Study is NOT required in Region Project is completed as PA Category B (Emergency Protective Measures), needed to maintain public safety access; (NO-is Category C so DOES NOT MEET); or 2. Project cost is less than $5,000 and exempt from E and E review (NO- DOES NOT MEET); or 3. Return back to exact pre-disaster condition (length, diameter, number of culverts) or the only change is in material type; (NO-new culvert configuration/size so DOES NOT MEET) or 4. Project is a stormwater-only drainage or conveyance structure, where water does not flow regularly or seasonally (i.e., an intermittent stream or "road crossing"). This only applies to locations that are NOT mapped as riverine or other wetlands on the US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: (NO-culvert carries a mapped tributary to Wardsboro Brook so DOES NOT MEET) or 5. Culvert or bridge size increases for projects: a. outside of Special Flood Hazard Areas (SFHA) (YES-project is outside of the SFHA so MEETS) and b. the new cross sectional open area is within 160% of the structure opening(s) being replaced (an of increase of no more than one circular culvert size in accordance with the following list of diameters in inches): 8"-10"-12"-15"-18"-21"-24"-30"-36"-42"-48" Original 36-inch diameter culvert open area= 1,018 square inches= 7.1 square feet Replacement 12-ft x 6-ft box culvert open area = 10,368 square inches = 72 square feet Open area size increase= 10,368/1,018 X 100 = 1,018 percent (NO--new open area greater than square feet and increase of more than 160%, so DOES NOT MEET) (Only one of the two conditions required under item 5 were met, so DOES NOT MEET) CONTINUE TO OPTION 2 (NEXT PAGE) 12

13 Example A.3 (Continued) OPTION 2: LIMITED DOWNSTREAM H&H ANALYSIS: Site coordinates: , Drainage Area to site= 0.54 square miles (Stream Stats) Nearest downstream river SFHA: Wardsboro Brook near intersection of Cross Rd/Newell Hill Rd/Smead Rd , Drainage Area to nearest downstream river SFHA: 8.02 sq miles 0.54 square miles/8.02 square miles= x 100 = 6.7% Percent Project Drainage Area to Downstream SFHA = 6.7% Percent Project Drainage Area less than 10% of Downstream SFHA MEETS CRITERIA FOR LIMITED DS H&H STUDY,+ H&H analysis only needed for culvert sizing,+ No further analysis of downstream impacts needed Unless Project meets criteria for Complete H&H Required CONTINUE TO OPTION 3 (NEXT PAGE) TO VERIFY 13

14 Example A.3 (Continued) OPTION 3: COMPLETE H&H REQUIRED CRITERIA: If any one of the following conditions apply, a complete H&H study is required in Region Permanent PA Category C Projects that are located: a. In a mapped floodplain (SFHA on the FEMA Map Service Center or Printed FIRM) (NO- Project is not in a SFHA so DOES NOT MEET) and b. Carries a surface water feature mapped on US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: l; (YES--Project carries a mapped tributary to Wardsboro Brook so MEETS) or (Both conditions in Item 1 are not met, so DOES NOT MEET) 2. 8-Step Analysis Required: An 8-step analysis by EHP staff demonstrating the need for the project, its lack of impacts on base flood levels and wetland resources, and the lack of practicable alternatives is required in addition to the complete H&H study if project: a. Carries a wetland or surface water feature mapped on US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: (YES--Project carries a mapped tributary to Wardsboro Brook so MEETS) and b. Project cost is more than $100,000 (YES-Project Cost> $100,000: MEETS) (Both conditions in Item 2 are met, so Complete H&H Needed); or 3. Wetland and large increase: a. Carries a mapped riverine wetland or supports a non-riverine wetland feature on US Fish and Wildlife Service National Wetland Inventory map, accessible at the Wetlands Mapper: /Data/Mapper.html: (YES--Project carries a mapped tributary to Wardsboro Brook so MEETS) and b. Is new construction or alterations (mitigation) of bridges and culverts, that alters the diameter of the culvert, or the number of culverts such that the total open area at the project location is an increase of more than 160% of the prior structure's cross sectional open area (more than one circular culvert size increase in accordance with the following list of diameters in inches): 8"-10"-12"-15"-18"-21"-24"-30"-36"-42"-48" (Circular culverts with diameters greater than 48 inches or others with cross-sectional S:\4. Mitigation Division\_EHP Branch\EHP MASTER\011 b) Streams\H&H Studies\FEMA H&H Policy\Draft FEMA R1 HH 14

15 open areas above square feet would be subject to complete H&H study requirements, unless the location meets the Limited H&H Study (Option 2) allowance); Original 36-inch diameter culvert open area= 1,018 square inches= 7.1 square feet Replacement 12-ft x 6-ft box culvert open area = 10,368 square inches = 72 square feet Open area size increase = 10,368/1,018 X 100 = 1,018 percent and new opening greater than square feet (YES-- Upsizing greater than 160% increase in open area-meets) (But MEETS Option 2 Limited H&H Study-so overall DOES NOT MEET Item #3) or 4. Presence of aquatic endangered species; (NO-DOES NOT MEET) or 5. Projects that could be reasonably expected to impact base flood elevations in SFHA due to the magnitude of the size increase, proximity to the SFHA, proximity to public infrastructure or other structures, or in areas where multiple projects affecting the waterway are under development (NO-DOES NOT MEET) Or 6. H&H Study is required by another local, state, or federal jurisdiction (NO-DOES NOT MEET). S:\4. Mitigation Division\_EHP Branch\EHP MASTER\011 b) Streams\H&H Studies\FEMA H&H Policy\Draft FEMA R1 HH 15

16 A.4 Example Site where Complete H&H Study Required: Example site with a wetland impoundmenuundersized culvert or upland wetland OPTION 1: AN H&H STUDY IS NOT REQUIRED 16

17 Appendix B Regulatory Citations 17

18 Appendix B Regulatory Citations 44 CFR Part 9 Floodplain Management and Protection of Wetlands (8-Step Analysis requirements ) 9.11(d)(4) No encroachments within a floodway that would result in any increase in flood levels, no increase in water surface elevation of the base flood more than one foot within the community. 9.11(d)(S) In a floodway or coastal high hazard area, additional standards... only practicable alternative, not inconsistent with NFIP or more restrictive state or local standards, elevated in coastal high hazard areas, 9.11(f) Restore and Preserve-if the action will result in harm to or within the floodplain or wetland, the agency shall design or modify the action to preserve as much of the natural and beneficial floodplain and wetland values as is possible. 44 CFR Part 60 NFIP 60.3(b)(6)-Notify adjacent communities and the State Coordinating Office prior to any alteration or relocation of a watercourse, and submit copies of such notifications to the Federal Insurance Administrator. 60.3(b)(7)-Assure that the flood carrying capacity within the altered or relocated portion of any watercourse is maintained (The Policy should be consistent with this minimum standard that applies to communities) 60.3(c)(10)-Cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. 60.3(d)(3)-Prohibit encroachments within the floodway unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the proposed encroachment would not result in any increase in flood levels within the community during occurrence of the base flood discharge. 60.6(a)(7) Variances may be issued for new construction and substantial improvements and for other development necessary for the conduct of a functionally dependent use (without any increase in base flood discharge levels in the floodway, or if it would not result in increased flood heights, additional threats to public safety, extraordinary public expense, nuisance... ) and the structure or development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety. 18

19 Appendix C Related FEMA Categorical Exclusions from NEPA 19

20 AppendixC Related FEMA Categorical Exclusions from NEPA CATEX N4-Stream work, modifications, floodways Do not result in adverse flood risk effects to downstream communities, Do not result in any increase of flood levels within the community during the occurrence of the base flood discharge if the action takes place within the regulatory floodway, and Where the effect of the proposed project when combined with other existing or reasonably foreseeable development will not increase water surface elevation of the base flood more than one foot at any point within the community if the action takes place in a floodplain with no regulatory floodway. N6--Relocation/Realignment of Structures and Facilities Does not apply to: realignment actions affecting a regulatory floodway if they result in any increase in flood levels during the base flood discharge; actions occurring seaward of the limit of moderate wave action (or within V zones when the limit of moderate wave action has not been identified). N9--Flood Hazard Reduction Actions Do not result in adverse flood risk effects to downstream communities, Do not result in any increase of flood levels within the community during the occurrence of the base flood discharge if the action takes place within the regulatory floodway, and Where the effect of the proposed project when combined with other existing or reasonably foreseeable development will not increase water surface elevation of the base flood more than one foot at any point within the community if the action takes place in a floodplain with no regulatory floodway. This CATEX captures some standards for minimization of floodplain impacts such as avoidance of flood risk effects, encroachment prohibitions, and minimization of impacts to floodplain values. OHS intends to encourage practices that avoid, minimize, or mitigate impacts to environmental and historic resources and wetlands or floodplain functions such as their conveyance capacity, moderation of flow velocity, groundwater recharge, improvement of water quality, habitat characteristics, and flood moderation. Compensatory mitigation actions are acceptable mitigation measures if they are agreed to by the applicable governmental entity that has regulatory oversight over the affected resource. 20

21 .. Appendix D H&H Comments and Conditions for EHP Project Review S:\4. Mitigation Division\_EHP Branch\EHP MASTER\011 b) Streams\H&H Studies\FEMA H&H Policy\Draft FEMA R1 HH 21

22 Appendix D H&H Comments and Conditions for EHP Project Review Draft Standard REC text for H&H studies SOW should list for each project culvert or bridge, the name of the stream it carries, e.g., "Cold River" (if applicable), or "unnamed tributary to Cold River" or "stormwater only" in addition to coordinates, diameter or opening size, material, and length. H&H Study NOT Required: If multiple culverts, use as many comments needed and select appropriate comment for each and list which ones the statement applies to. Work completed as Category B Emergency Protective Measures: Comment: SOW: In accordance with Region 1 H&H Study guidance, an H&H study is not required for this project because [culvert(s)/bridge replacement] was completed as Category B (Emergency Protective Measures) work. SOW is restoring to pre-disaster condition: Comment: SOW: In accordance with Region 1 H&H Study guidance, an H&H study is not required for this project because [culvert(s)/bridge replacement] project is to restore pre-disaster condition. No change in size; material type change only: Comment: SOW: In accordance with Region 1 H&H Study guidance, an H&H study is not required for this project because the only change in [culvert(s)/bridge replacement] project is material type. Culvert conveys stormwater only: Comment: SOW: In accordance with Region 1 H&H Study guidance, an H&H study is not required for this project because the culvert(s) [is/are] stormwater-only conveyance. Culvert/bridge outside of SFHA and increase in opening is <160% Comment: SOW: In accordance with Region 1 H&H Study guidance, an H&H study is not required for this project because the work is outside of Special Flood Hazard Areas (SFHA) and the new culvert/bridge opening area is within 160% of the original structure opening(s) being replaced. 22

23 Culvert or bridge upsize, Limited H&H Study Required Condition: SOW: In accordance with Region 1 H&H Study guidance, a limited H&H study to properly size [culvert/bridge] opening(s) is required for this project. Culvert or bridge upsize, Complete H&H Study Required Condition: SOW: In accordance with Region 1 H&H Study guidance, a complete H&H study to properly size [culvert/bridge] opening(s) and evaluate downstream impacts to the BFE in SFHA is required for this project. E Floodplain E011988: If located in a Floodplain H&H Study Not Required: Comment: E011988: In accordance with Region 1 H&H Study guidance, an H&H study is not required for this project. See SOW. Limited H&H Study: Condition: E : In accordance with Region 1 H&H Study guidance, a Limited H&H study to assure proper engineering design of the facility is required for this project. The project drainage area is less than ten percent of the drainage area to the nearest downstream SFHA and therefore it is presumed that the project will not have a significant impact on the downstream BFE. Complete H&H Study: Condition: E011988: In accordance with Region 1 H&H Study guidance, a Complete H&H study is required for this project to assure proper engineering design of the facility and to assure the project will not have detrimental effects to SFHA, to comply with 44 CFR Parts 9 and 60. Condition: E011988: A complete H&H study is required for this project in accordance with Region 1 H&H Study Guidance dated [mm/dd/yyyy], to comply with 44 CFR Parts 9 and 60. S:\4. Mitigation Division\_EHP Branch\EHP MASTER\011 b) Streams\H&H Studies\FEMA H&H Policy\Draft FEMA R1 HH 23

24 E011990: If located in a Wetland H&H Study Not Required: Comment: E011990: In accordance with Region 1 H&H Study guidance, an H&H study is not required for this project. See SOW. Limited H&H Study: Condition: E011990: In accordance with Region 1 H&H Study guidance, a Limited H&H study to assure proper engineering design of the facility is required for this project. The project drainage area is less than ten percent of the drainage area to the nearest downstream SFHA and therefore it is presumed that the project will not have a significant impact on the downstream BFE. Complete H&H Study: Comment: E011990: In accordance with Region 1 H&H Study guidance, a Complete H&H study is needed to assure proper engineering design of the facility and to assure the project will not have detrimental effects to SFHA or a wetland, to comply with 44 CFR Parts 9 and 60. Condition: E011990: A complete H&H study is required for this project in accordance with Region 1 H&H Study Guidance, to comply with 44 CFR Parts 9 and 60. S:\4. Mitigation Division\_EHP Branch\EHP MASTER\011 b) Streams\H&H Studies\FEMA H&H Policy\Draft FEMA R1 HH 24

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL APRIL 2011 APRIL 2011 Page 1 Preface TIDEROUT 2, Build 1.22 dated June 29, 2006 is the current

More information

Sussex County, DE Preliminary Study Overview

Sussex County, DE Preliminary Study Overview Sussex County, DE Preliminary Study Overview Coastal study scope: 102 miles of entire County shoreline Revised 102 panels for coastal study Riverine study scope: 14 streams, 67.1 miles, within the Nanticoke

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

Environmental Review and Permitting for Wild Trout

Environmental Review and Permitting for Wild Trout Environmental Review and Permitting for Wild Trout Tom Shervinskie Wild Trout Summit Watershed Analysis Section August 26, 2017 Division of Environmental Services The mission of the Pennsylvania Fish and

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek. Minnesota F-29-R(P)-24 Area 315 Study 3 March 2016 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Luxemburg Creek 2015 Mark Pelham Sauk

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2018-00168-MVM Applicant: City of Lino Lakes Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

Photo by: Darryl Hatheway, 2011

Photo by: Darryl Hatheway, 2011 Photo by: Darryl Hatheway, 2011 September 11, 2015 Presentation Discussion Examine PFD V-Zone Mapping in Wave Runup Dominated West Coast Application of PFD V-Zone Mapping Criteria in Pacific G&S PFD V-Zone

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018 St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting May 2, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018 Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting June 05, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study

More information

Climate Change Adaptation and Stream Restoration. Jack Williams;

Climate Change Adaptation and Stream Restoration. Jack Williams; Climate Change Adaptation and Stream Restoration Jack Williams; jwilliams@tu.org 1 Goals for this presentation Develop strategies for adapting streams to climate impacts by Thinking like a watershed Understanding

More information

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES (Approved XXXXX, 2010) Working Draft Version January 14, 2010 VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

More information

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018 Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting May 14, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping Floodplain

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

APPENDIX Region 6 Inland Area Contingency Plan Compliance with Section 7 of the Endangered Species Act

APPENDIX Region 6 Inland Area Contingency Plan Compliance with Section 7 of the Endangered Species Act APPENDIX 56 -- Region 6 Inland Area Contingency Plan Compliance with Section 7 of the Endangered Species Act Pursuant to the Inter-agency Memorandum of Agreement Regarding Oil Spill Planning and Response

More information

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018 Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting July 12, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

Fisheries and Oceans Canada Fisheries Protection Program

Fisheries and Oceans Canada Fisheries Protection Program Fisheries and Oceans Canada Fisheries Protection Program CN Milton Logistics Hub CEAA Panel Information Sessions Presentation March 2017 1 Presentation Outline Responsibilities under the Fisheries Act

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

Presented by Fred Halterman, URS Jennie Agerton, URS

Presented by Fred Halterman, URS Jennie Agerton, URS Presented by Fred Halterman, URS Jennie Agerton, URS What is Eco Friendly Culvert Design? Culvert design that: Maintains connectivity for aquatic organism migration Maintains connectivity for gene flow

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC NO. 516 DOWNSTREAM TEMPERATURE STUDY DRAFT REPORT MAY 28 Prepared by: SOUTH CAROLINA ELECTRIC & GAS COMPANY

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

The Blue Heron Slough Conservation Bank

The Blue Heron Slough Conservation Bank 1 The Blue Heron Slough Conservation Bank CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES The Blue Heron Slough Conservation Bank (Washington) I. OVERVIEW & BACKGROUND: Location: Snohomish River

More information

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017 Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting August 21, 2017 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc.

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc. Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed December 2004 The Cadmus Group, Inc. Grand Valley State University Annis Water Resources Institute Submitted

More information

Section 10 - Hydraulic Analysis

Section 10 - Hydraulic Analysis Section 10 - Hydraulic Analysis Methodology Documentation Functionality Summary Sizing Methodology Fixed/Resize Combined Flow Storm: Sizing as per d/d Structures.dat Storm vs. Sanitary Methodology HGL/EGL

More information

Black Sturgeon Regional Plan

Black Sturgeon Regional Plan Black Sturgeon Regional Plan This is one of twenty Regional Plans that support implementation of the Lake Superior Biodiversity Conservation Strategy (Strategy). The Strategy, prepared and overseen by

More information

The Basics of Culvert and Inlet Design

The Basics of Culvert and Inlet Design PDHonline Course C619 (8 PDH) The Basics of Culvert and Inlet Design Jerry D. Morrow, PE 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030 6658 Phone & Fax: 703 988 0088 www.pdhonline.org

More information

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT NAPA COUNTY, CALIFORNIA PREPARED BY NAPA COUNTY RESOURCE CONSERVATION DISTRICT 1303 JEFFERSON ST. SUITE 500B NAPA, CALIFORNIA 94559 WWW.NAPARCD.ORG

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022 US Army Corps of Engineers Detroit District Public Notice Corps File No. LRE-2016-00006-100 Date: March 19, 2017 Expires: March 18, 2022 PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATIONS

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Krosno Creek Flood Reduction Project PROJECT

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE Auburn, Washington Phone: (253) Fax: (253)

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE Auburn, Washington Phone: (253) Fax: (253) MUCKLESHOOT INDIAN TRIBE Fisheries Division 39015-172nd Avenue SE Auburn, Washington 98092-9763 Phone: (253) 939-3311 Fax: (253) 931-0752 U.S. Army Corps of Engineers Regulatory Branch Attn: Karen Urelius

More information

Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition

Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition Brian Caufield, P.E., CFM Principal Engineer CDM Smith Kerry Bogdan, CFM Senior Engineer FEMA Region I

More information

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # 4602004 Prepared for Weyerhaeuser Company Ltd. Jason Ladyman R.P.F. 1550 Mission Flats Road PO Box 40 Kamloops BC V2C 5K3 Prepared

More information

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010 Endangered Species Act and FERC Hydroelectric Projects Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010 Shortnose Sturgeon Federally listed as endangered in 1967 Listed under the sole

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

DECISION MEMO. Pursuant to 36 C.F.R (e), the following persons are exempted from this order:

DECISION MEMO. Pursuant to 36 C.F.R (e), the following persons are exempted from this order: DECISION MEMO Forest Supervisor s Orders for the Upper Tellico Off-Highway Vehicle System USDA Forest Service Southern Region Nantahala National Forest Tusquitee Ranger District Cherokee County, North

More information

Wanganui Rd Flood Modelling Investigation

Wanganui Rd Flood Modelling Investigation Wanganui Rd Flood Modelling Investigation Greater Shepparton City Council July 2017 Document Status Version Doc type Reviewed by Approved by Date issued 01 Draft Ben Tate Ben Tate 27/07/2017 Project Details

More information

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 RACETRACK ROAD CULVERT OVER THE SPRING RUN & GREEN SPRINGS ROAD CULVERT OVER AN UNNAMED TRIBUTARY TO SPRING RUN BERWICK TOWNSHIP

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH Engineer Regulation 1110-2-1451 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design ACQUISITION OF LANDS DOWNSTREAM FROM SPILLWAYS FOR HYDROLOGIC

More information

Administrative Action. Programmatic Categorical Exclusion (Pursuant to the National Environmental Policy Act (42 USC 4332(2)(c)))

Administrative Action. Programmatic Categorical Exclusion (Pursuant to the National Environmental Policy Act (42 USC 4332(2)(c))) Administrative Action Programmatic Categorical Exclusion (Pursuant to the National Environmental Policy Act (42 USC 4332(2)(c))) and Documentation of Compliance with other Federal Environmental Laws For

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia. FRST 557 Lecture 7c Bridges and Culverts: Water Velocity and Discharge Lesson Background and Overview: The previous two lessons presented methods for estimating water volume flow at a particular site and

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

Management of headwater streams in the White Mountain National Forest

Management of headwater streams in the White Mountain National Forest Management of headwater streams in the White Mountain National Forest White Mountain National Forest Weeks Act of 1911 authorized the federal government to purchase lands east of the Mississippi River

More information

VOLUME 2 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER

VOLUME 2 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER VOLUME 2 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER DAYTONA BEACH, CITY OF 125099 NEW SMYRNA BEACH, CITY OF 125132 DAYTONA BEACH SHORES, CITY OF 125100

More information

Red River Basin and FM Diversion Hydrology. North Dakota Water Education Foundation Executive Briefing July 13, 2012

Red River Basin and FM Diversion Hydrology. North Dakota Water Education Foundation Executive Briefing July 13, 2012 Red River Basin and FM Diversion Hydrology North Dakota Water Education Foundation Executive Briefing July 13, 2012 Red River Basin Total Drainage Area: 45,000 square miles North Dakota Fargo, ND Moorhead,

More information

Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming

Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming October 25, 2010 Waterbody: Muskrat Creek - Mainstem of Muskrat Creek from its headwaters downstream to its

More information

Creek Trash Assessment (CTA) Methodology (Demonstration: Mill Run Creek, Cheltenham, Pa.)

Creek Trash Assessment (CTA) Methodology (Demonstration: Mill Run Creek, Cheltenham, Pa.) Creek Trash Assessment (CTA) Methodology (Demonstration: Mill Run Creek, Cheltenham, Pa.) Mill Run Creek emerges from a storm sewer in Philadelphia to an open creek in Cheltenham. The Creek downstream

More information

U.S. Army Corps of Engineers Sacramento District

U.S. Army Corps of Engineers Sacramento District U.S. Army Corps of Engineers Sacramento District Regional General Permit (RGP) 3 Pre-Construction Notification (PCN) Form This form may be used to request verification for a small, private, recreational

More information

Tips for Using & Printing Spreadsheets

Tips for Using & Printing Spreadsheets Key to Spreadsheets Spreadsheet # Type Description/Purpose a Development & Construction in Waterways b Debits Development & Construction in Other Aquatic Areas c Indirect Impacts to Waterways from Development

More information

WATER OBSTRUCTION AND ENCROACHMENT PERMIT

WATER OBSTRUCTION AND ENCROACHMENT PERMIT ," /.@ Permit No. E36-813 Commonwealth of Pennsylvania Department of Environmental Protection Southcentral Regional Office Watershed Management Program Permitting and Technical Services Section WATER OBSTRUCTION

More information

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS SITUATE IN: NORTH HUNTINGDON TOWNSHIP WESTMORELAND COUNTY, PENNSYLVANIA PREPARED FOR: North Huntingdon Township 11279 Center Highway North Huntingdon,

More information

Simulating Streams Through Culverts in Mat-Su, Alaska

Simulating Streams Through Culverts in Mat-Su, Alaska Simulating Streams Through Culverts in Mat-Su, Alaska Project Managers Bill Rice, P.E., USFWS Hydrologist Mary Price, USFWS Fishery Biologist The Team Approach US Fish and Wildlife Service Bill Rice, P.E.,

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME fr.iiif.i ~ US Anny Corps of Engineers New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Jack Karalius nae-pn-nav@usace.army.mil Programs/Project Management

More information

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM VWP CONSTRUCTION INSPECTION REPORT Inspection Date: August 22, 2016 VWP Permit No. 15-1268 SPGP RO Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM Impacts: PFO PEM PSS POW

More information

SANTA ROSA COUNTY, FLORIDA AND INCORPORATED AREAS

SANTA ROSA COUNTY, FLORIDA AND INCORPORATED AREAS VOLUME 1 OF 1 SANTA ROSA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME GULF BREEZE, CITY OF 120275 JAY, TOWN OF 120339 MILTON, CITY OF 120276 SANTA ROSA COUNTY, UNINCORPORATED AREAS COMMUNITY NUMBER

More information

2016 NC Coastal Local Governments Annual Meeting

2016 NC Coastal Local Governments Annual Meeting 2016 NC Coastal Local Governments Annual Meeting Coastal Flood Study Modeling and Mapping 101 April 21, 2016 Tom Langan, PE, CFM Engineering Supervisor NCEM Floodplain Mapping Program FEMA Coastal Flood

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. GZA GeoEnvironmental, Inc. Engineers and Scientists October 17, 2014 File No. 18.0171857.00 Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. 01929 DRAFT Re: Essex River

More information

Illinois State Water Survey

Illinois State Water Survey Illinois State Water Survey HYDROLOGY DIVISION SWS Contract Report 508 COMPARISON OF 1987 AND 1989 BED PROFILE SURVEYS OF THE LOWER CACHE RIVER by Richard Allgire Office of Sediment and Wetland Studies

More information

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed.

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed. Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed December 2004 The Cadmus Group, Inc. Grand Valley State University Annis Water

More information

La Crescent Township Zoning Ordinance

La Crescent Township Zoning Ordinance La Crescent Township Zoning Ordinance Table of Contents SECTION 1 ~ PREAMBLE, TITLE, SHORT TITLE AND PURPOSE... 1 0101 Preamble... 1 0102 Title... 1 0103 Short Title... 1 0104 Purpose... 1 SECTION 2 ~

More information

Feasibility Study for Restoration of Titlow Lagoon Fish Passage. South Puget Sound Salmon Enhancement Group

Feasibility Study for Restoration of Titlow Lagoon Fish Passage. South Puget Sound Salmon Enhancement Group Feasibility Study for Restoration of Titlow Lagoon Fish Passage South Puget Sound Salmon Enhancement Group January 2010 Feasibility Study for Restoration of Titlow Lagoon Fish Passage Prepared for South

More information

3.0 Basin and Watershed Characteristics

3.0 Basin and Watershed Characteristics 3.0 Basin and Watershed Characteristics 3.1 Basin Characteristics 3.1.1 Crystal Lake Crystal Lake, located in the cities of Burnsville and Lakeville (Dakota County), covers an area of approximately 292

More information

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview Project Mobility - Route 3 South Express Toll Lanes Industry Day Overview October 15, 2014 Today s Agenda Project Mobility Overview Design Alternatives and Construction Estimates Existing Traffic Congestion/Project

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; Nora Mead Brownell, and Joseph T. Kelliher. Public Utility District No. 1 of

More information

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek City of Fairway, Kansas Fairway Stormwater Level of Service Study - Phase 2 Project No. 108200 Revision 1 12/6/2018 Stormwater

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

Interim Guidance Fish Presence Absence

Interim Guidance Fish Presence Absence Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced

More information

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA AUTHORS: Joe Richards, Environmental Science Associates Jane Atha, Washington Department of Fish & Wildlife Colin Thorne,

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

TROUT CREEK WATERSHED (Second Year of Snowline Data)

TROUT CREEK WATERSHED (Second Year of Snowline Data) Extent of Snow Cover During the 2002 Spring Freshet For the TROUT CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed basin

More information

Pre-Application Document Kaweah Project (FERC Project No. 298)

Pre-Application Document Kaweah Project (FERC Project No. 298) TABLE OF CONTENTS Page 3.12 Aesthetic Resources... 3.12-1 3.12.1 Information Sources... 3.12-1 3.12.2 Setting... 3.12-1 3.12.3 Project Facilities... 3.12-2 3.12.4 Previous Visual Resources Assessment...

More information

Korell Outfitter and Guide Special-Use Permit Amendment

Korell Outfitter and Guide Special-Use Permit Amendment State said westward I N: R.3E.) z - a Decision Memo Korell Outfitter and Guide Special-Use Permit Amendment U.S. Forest Service Emmett Ranger District Boise National Forest Gem and Valley Counties, Idaho

More information

Discussion on the Selection of the Recommended Fish Passage Design Discharge

Discussion on the Selection of the Recommended Fish Passage Design Discharge Discussion on the Selection of the Recommended Fish Passage Design Discharge Introduction The provision of fish passage is a requirement for most proposed culvert and bridge installations in Alberta, depending

More information

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds The mission of the Fish Passage Forum is

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning

SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning Director Southern Maine Regional Planning Commission jlockman@smrpc.org

More information

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA These regional conditions are in addition to but do not supersede the requirements in the Federal Register (Volume 82 No. 4 of January 6, 2017).

More information

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT Department of the Army New England District, Corps of Engineers 696 Virginia Road

More information