CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS
|
|
- Ophelia Moody
- 5 years ago
- Views:
Transcription
1 Stormwater Miscellaneous Sewers and Drains Streets Water Structures Earthwork Street Lighting and Traffic Signals Landscape and Irrigation TABLE OF CONTENTS Plan No. Miscellaneous 003 Legend Project Notification Sign Elevations and Datums Pipe Encasement R.R. Track Crossing Monument Box Installation Detail Monument Box Casting Detail Sewers and Drains 101 Manhole Drop Manhole Details Inside Drop Manhole Manhole Adjustment Sequence (After Final Paving) Sanitary Sewer Cleanout Sanitary and Storm Drain Service Manhole Casting Detail Cleanout Frame and Lid Plug for New Sanitary Sewer Plugs for Abandoning Sanitary Sewer Casing Detail Anchor Block Details Sanitary Sewer Deep Connection Riser (Chimney) Sewer Service Reconnections Trailer Dump Station Tamperproof/Waterproof Manhole Frame and Cover TOC 1
2 Stormwater 200 Type 1 Catch Basin (and Cleanout) Type 2 Catch Basin Type 3 Catch Basin Type 4 Catch Basin Catch Basin Frames and Grates Type A, B, and Vaned Round Cleanout Sand and Oil/Water Separator Shallow Precast Manhole (H less than 4'-0") Trash Trap and Leach Line Plan Trash Trap and Leach Line Details Cleanout Cover Conversion Infiltration Stormwater Planter Filtration Planter Rain Garden Vegetated Filter Strip Combination Swale Check Dam Details Facility Overflow Configurations Treatment Wetland Subsurface Gravel Wetland Green Roof Planters Without Parking ROW Planters with Parking ROW Planter Section Views Curb Extension Planter with Curbside Sidewalk Curb Extension Planter in Planting Strip Curb Extension Planter Sections Planter Wall Details ROW Swale Plan View ROW Swale Section Views Concrete Inlet Type A Concrete Inlet Type B Metal Inlet Details Inlet and Outlet for Curb Extensions Modified Metal Inlet Assembly Channel and Grate Details Grate and Frame Details Liner Attachment and Pipe Boot Details Rock Check Dam for Swales Wood Check Dam for Swales TOC 2
3 244 Wood Check Dam for Planters Concrete Check Dam for Planters Beehive Inlet Grate Sleeve Detail for Domestic Water Service A Detention Tank B Detention Tank Details Soakage and Storm Chamber Retention Drywell A Flow Control Structure Weir B Flow Control Structure Baffle Splash Block Driveway Dispersion Trench and Rock Pad Foot Dispersion Trench Foot Dispersion Trench Sheet Flow Dispersion Streets 301A Standard Driveway Approach Curbline Sidewalk B Fully Lowered Driveway Approach Curbline Sidewalk Driveway Approach Property Line Sidewalk Curbs Alley Detail Portland Cement Concrete Standard Alley Details Asphalt Concrete Sidewalk Details A Curb Ramps (Perpendicular) B Curb Ramps (Parallel) C Curb Ramps (Combination) D Blended Transitions E Detectable Warning Surface Mid-Block Walk Entrance Traffic Control Pavement Patching Permanent Barricade Widened Sidewalk at Mailbox Locations Future Street Extension Sign Mid-Block Bike/Pedestrian Walkway Commercial Curb Returns for Driveway and Alley Approach Hammerhead Turnaround Concrete Stairway Typical Street Sections Traffic Island Installation 18" to 24" Wide Traffic Island Installation 24" to 60" Wide Traffic Island Installation Greater than 60" Wide TOC 3
4 322A Pavement Marking Details B Pavement Marking Details C Pavement Marking Details Pipe Sign Support Detail Speed Hump and Striping Water 400.A Water Valve Box Assembly B Water Valve Box C Water Valve Operator Extension Horizontal Thrust Blocking Joint Restraint Vertical Bend Anchor Block Detail " to 16" Tied Back Thrust Block Schematic and Dimensions " to 16" Tied Back Thrust Block Construction Details Blow Off with In Line Valve Blow Off with In Line Valve for 10" Dia. Pipe and Larger Blow Off with Plugged End Blow Off with Reduced Size Valve for 10" Dia. Pipe and Larger " Blow Off Plug " Water Service Installation " Water Service Replacement Main Line Chlorination Assembly Fire Hydrant Installation Combination Air Release Valve Assembly 2" and Smaller Cathodic Protection Detail ½" and 2" Domestic Water Service Installation ½" and 2" Irrigation Water Service Installation Automatic Meter Reader Lid Domestic Water Service Sleeve Structures 501 Retaining Wall Height of Wall 2'-0" or Less Retaining Wall Height of Wall 2'-0" to 4'-0" Utility Vault (Cast in Place) Meter and Vault Size and Specifications Earthwork 601 Pipe Trench Pipe Zone TOC 4
5 Street Lighting and Traffic Signals 701 Typical Lamp Post Installation Streetscape Lamp Post Detail Acorn Style Lamp Streetscape Lamp Post Detail Gas Lamp Style Pole Base Detail Junction Box Details Landscape and Irrigation 801 Irrigation System Back Flow Protection Swing Joint Riser Assembly Tree-Shrub Planting Detail Streetscape Tree Planting Detail Tree Protection Fencing Migration Measures for Work in Critical Tree Area Tree Protection Sign Erosion Control 901 Gravel Construction Fence Sediment Fence Wattles Overland Flow Biofilter Bag Overland Flow Sidewalk Subgrade Gravel Barrier Erosion Matting/Blanket Slope Installation Erosion Matting/Blanket Channel Installation Plastic Sheet Covering Sediment Trap Sediment Pond Interceptor Swales and Dikes Filter Fabric Inlet Barrier Silt Sack Biofilter Bag Inlet Protection Rock Check Dam Biofilter Bag Check Dam Concrete Management Facility TOC 5
2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS
CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use
More informationCITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS
CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut
More informationCITY OF ROSEVILLE DESIGN STANDARDS
CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR
More informationLecture 10 : Sewer Appurtenances
1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and
More informationSuitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More information22. Specialty Valves.
22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,
More informationSECTION VII ROADWAY AND SITE IMPROVEMENTS
SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical
More informationCONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW
Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\ Contract 5 Phase I WM\01 CAD\05 CONTRACT WATER DESIGN I.dwg Plot : Dec 08,2014-8:11am. GENERAL NOTES AND LEGEND Drawing file: I:\Eastham.217\Phase
More informationCITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court
46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND
More informationPERKFILTER. Inspection and Maintenance Guide
PERKFILTER Inspection and Maintenance Guide PerkFilter Media Filtration System Description The PerkFilter is a stormwater treatment device used to remove pollutants from urban runoff. Impervious surfaces
More informationConsult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.
Design Manual Chapter 4 - Water Mains 4C - Facility Design 4C-1 Facility Design A. General Water mains and appurtenances, including hydrants and valves, should be provided along all streets including connections
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationEngineering Design Criteria & Standard Drawings
Engineering Design Criteria & Standard Drawings (January 2018) APPENDIX A STANDARD DRAWINGS Engineering Design Criteria & Standard Drawings APPENDIX A STANDARD DRAWINGS FOREWORD The Standard Drawings presented
More informationR-3501-E2 R-3501-H4. R-3501-HL Mountable Curb Frame, Grate
For a complete listing of FREE OPEN AREAS and PERIMETERS of all grates, refer to pages 306-311. R-3501-D2A See pages 145-146-148 &155 for additional Roll Type products R-3501-D2A C 1.0 3.4 R-3501-E2 ROLL
More informationGENERAL LEGEND 12"CMP
PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET
More informationSediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.
7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion
More informationBids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)
General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND
More informationChapter 11. Culverts and Bridges Design Checklist for Culvert Design
Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional
More informationWELCOME. City of Eden Prairie West 70 th Street
WELCOME City of Eden Prairie West 70 th Street Project Schedule Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug >>> May WEST SEGMENT Concept Plan Fall 2014 Plan Development Winter 2014 Summer 2015 Construction
More informationTabulation of Bids. Counties:
Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT
More informationSECTION 14: LANDSCAPING AND BEAUTIFICATION
SECTION 14: LANDSCAPING AND BEAUTIFICATION RULE 14.1 GENERAL PROVISIONS 14.1.1 The rules and guidelines contained in this section have been established to provide proper guidelines for the beautification
More informationINFILTRATION PRACTICE MAINTENANCE INSPECTION FORM
Facility Number: Date: Time: Subdivision Name: Watershed: Weather: Inspector(s): Date of Last Rainfall: Amount: Inches Streets: Mapbook Location: GPS Coordinates: Property Classification: Residential 9
More informationCONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW
Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\217-1401.06 Contract 6 Phase I WM\01 CAD\06 CONTRACT WATER DESIGN I.dwg Plot : Nov 13,2014-8:24am. GENERAL NOTES AND LEGEND Drawing file: I:\Eastham.217\Phase
More information20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison
20 minute presentation on proposed project Comments and Questions following presentation 2016 2017 Replace concrete pavement & base Replace curb and sidewalk as needed Proposed contra-flow bike lane Replace
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]
Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered
More informationReplace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00
30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Quantity Unit Price Extension Section 1: Sanitary Manhole Rebilitation $581,301.80 100 Replace sanitary manhole casting (CITY
More informationENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY
ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE JULI A LANGEIS ANTHONY FITZGERALD OSVALDO ZEQO TYLER ALBERT TITLE PROJECT MANAGER AND ENGINEERING LEAD PROJECT ENGINEER AND SITE PLANNNG PROJECT ENGINEER
More informationOutlet Structures T-12
Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More information1.3 Pedestrian Environments
SECTION 1: COMMERCIAL DEVELOPMENT 1.3 Pedestrian Environments Design Principle The quality of the pedestrian environment often defines the overall success of a commercial project. Attention to the development
More informationTANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects
January 2012 TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects 1. PURPOSE OF REPORTING The purpose of Tangible Capital Asset (TCA) reporting is to comply with PSAB 3150 reporting
More informationROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax
Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed
More informationCITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council
GRANT COUNTY WASHINGTON TIB NO.: 3-E-164(003)-1 CITY OFFICIALS Kathleen Allstot Bruce Reim Mayor William Coe Stephanie Knitter Valli Millard Matthew Moore Tony Mora, Jr. City Council Mark Wanke Leslie
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationDesigning Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions
Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings
More information2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014
2014 Street and Utility Improvement Project Feasibility Report January 28, 2014 Public Informational Meeting 22 residents from 17 properties signed in Questions about construction (FAQs) Eyebrow cul-de-sac
More informationWarsaw, Missouri Van Buren Street Preliminary Engineering Report
Warsaw, Missouri Van Buren Street Preliminary Engineering Report Prepared for: The City of Warsaw 181 Harrison Street Warsaw, MO 65355 (660) 438-5522 Prepared by Charles LePage, P.E. CFS Engineers 119
More informationWaipio Point Access Road Acessible Path Concept Site Plan. Waipahu Aloha Clubhouse
Waipio Point Access Road Acessible Path Concept Site Plan Waipahu Aloha Clubhouse Problem Statement - There is no continuous or accessible pathway for Clubhouse members to walk to and from the bus stop
More informationAs temporary grade control facilities along waterways until final stabilization is established.
Check Dams (CD) EC-12 Description Check dams are temporary grade control structures placed in drainage channels to limit the erosivity of stormwater by reducing flow velocity. Check dams are typically
More informationSAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS
SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes
More informationOperation and Maintenance Manual. First Defense and First Defense High Capacity. Vortex Separator for Stormwater Treatment
Operation and Maintenance Manual First Defense and First Defense High Capacity Vortex Separator for Stormwater Treatment Page 2 Page 3 Table of Contents I. First Defense by Hydro International 3 First
More informationKansas Department of Transportation. Tabulation of Bids
Page 1 of 17 SECTION: 1 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025600 FIELD OFFICE AND LABORATORY (TYPE A) 5 071554 CONCRETE FOR SEAL
More informationNEIGHBORHOOD ROAD DESIGN GUIDEBOOK A MASSACHUSETTS GUIDE TO SUSTAINABLE DESIGN FOR NEIGHBORHOOD ROADS
NEIGHBORHOOD ROAD DESIGN GUIDEBOOK A MASSACHUSETTS GUIDE TO SUSTAINABLE DESIGN FOR NEIGHBORHOOD ROADS A joint project of the Massachusetts Chapter of the American Planning Association Home Builders Association
More informationPRELIMINARY STORM DRAINAGE REPORT
PRELIMINARY STORM DRAINAGE REPORT DRURY LANE DEVELOPMENT 704 1ST STREET SULTAN, WA 98294-94240 PARCEL #28083200305500 AUDITOR S FILE NO. 1090255 CITY OF SULTAN SNOHOMISH COUNTY, WASHINGTON PREPARED FOR:
More informationTypical Cross Section: DOWNTOWN (Observer Highway - 8th Street)
Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks
More informationCITY OF SOUTH DAYTONA
CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage
More informationCERTIFYING DRAINLAYER
No. 9198 REGISTRATION EXAMINATION, NOVEMBER 2017 CERTIFYING DRAINLAYER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2017. All rights reserved. No part of this publication may be reproduced
More informationEXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016
EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE I. CONTRACTOR MOBILIZATION Golf Course Master Plan Implementation Date: December 1, 2016 Includes the contractor mobilizing on-site with equipment, materials
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY
More informationDesign Guide. Table of Contents
DESIGN GUIDE Table of Contents Table of Contents... 1 1.0 Introduction... 2 2.0 Product Information... 3 3.0 Structural Design... 8 4.0 Subsurface Foundation Requirements... 9 5.0 Installed Storage Volumes
More informationST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS
ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS STANDARD NUMBER TITLE R/1-R/5..... RURAL PUBLIC ROAD I....RURAL PUBLIC ROAD
More informationTYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK
CURB EXPANSION JOINTS (TYP) BOULEVARD 5 t /4 TOOLED EDGES EXPANSION JOINTS (TYP) CONTRACTION JOINTS (TYP) 2 m (TYP) BOULEVARD CURB EXPANSION JOINTS (TYP) EVERY 6 m PLAN TYPICAL CONTRACTION JOINT CURB 12
More informationBids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)
General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS
More informationList of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4
City of Columbia Engineering Regulations PART 31: SPECIFICATIONS FOR COMMERCIAL SWIMMING POOL BACKWASH AND DRAINAGE Table of Contents Paragraph Description Page No. 31.1 General 31-1 31.2 Definitions 31-1
More informationDUAL-VORTEX SEPARATOR. Inspection and Maintenance Guide
DUAL-VORTEX SEPARATOR Inspection and Maintenance Guide Description The Dual-Vortex Separator (DVS) is a hydrodynamic stormwater treatment device used to remove pollutants from urban runoff. Impervious
More informationFIRE & LIFE SAFETY STANDARD
Title: Effective Date: 08/01/2006 Revised Date:01/01/2014 Code References: California Fire Code Note: This standard is a summary of Fire Department clarifications of City and State Codes. Information contained
More informationRZC Appendix 8A Marymoor Subarea Street Requirements
RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS
More informationCDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.
CDBG HANDICAP RAMPS PROJECT NO. 1 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES 3-4 DETAS 5-23
More informationRIIWMG203D Drain and Dewater Civil Construction Site Learner Guide
RIIWMG203D Drain and Dewater Civil Construction Site Table of Contents 1.1 Introduction... 3 1.1.1 Drainage and Dewatering... 3 1.2 Site Policies and Procedures... 5 1.3 Work Instructions... 6 1.3.1 Reading
More informationCulvert Safety Inspection Report
Culvert Safety Inspection Report Facility Federal Structure ID Inspector Name Agency/Consultant Inspection Date LEGEND Haggerty Rd (South) N/A RL/JF GLEG 1/26/2016 9 New Feature Latitude Longitude Struc
More informationADA PRESENTATION (CURB RAMPS)
ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly
More informationCity of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS
City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures Sep/16 R-2 No Drawing Jan/17 R-2A Typical Cross Sections for Granular
More informationSECTION DOMESTIC WATER PIPING
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections
More informationDry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.
Dry Hydrants What is a Dry Hydrant? A dry hydrant is a non-pressurized pipe system permanently installed in existing lakes, ponds and streams that provides a suction supply of water to a fire department
More informationADA Technical Frequently Asked Questions
ADA Technical Frequently Asked Questions 1. What is the correct way to select and label curb ramp types using the Standard Construction Details?... 2 2. When do you label a curb ramp as modified (e.g.
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationJAP Additional Information Sheet
JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide
More informationR A M P U P! - City of Tacoma's Curb Ramp Installation Matrix
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &
More information12A Accessible Sidewalk Requirements. 12A Protruding Objects
TOC Design Manual Chapter 12 - Sidewalks and Bicycle Facilities Table of Contents Table of Contents Chapter 12 - Sidewalks and Bicycle Facilities 12A Sidewalks 12A-1---------------------------------General
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationBID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT
CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,
More informationPROPOSAL. PROPOSAL OF, a corporation a
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned
More information4 GENERIC COST ESTIMATING TOOL
4 GENERIC COST ESTIMATING TOOL Table 4-1 presents a generic cost estimating tools that can serve as a conceptual planning tool for local jurisdictions to estimate the costs of pedestrian improvements.
More informationCITY OF MEMPHIS, TENNESSEE
CITY OF MEMPHIS, TENNESSEE SEWER ASSESSMENT & REHABILITATION PROGRAM (SAR OLD LOOSAHATCHIE SANITARY SEWER INTERCEPTOR DIVERS 61 51 ELVIS PRESLEY BLVD. 240 JACKSON AVE. LAMAR AVE. 385 51 14 SUMMER AVE.
More informationGENERAL NOTES FOR SWIMMING POOLS AND SPAS
GENERAL NOTES FOR SWIMMING POOLS AND SPAS 1. Buried Poly Ethylene (PE) pipe gas lines shall be 18 below finish grade or in an approved recessed channel with 14 gauge insulated tracer wire; Galvanized malleable
More informationDepartment of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE
ADA Ramp Construction Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE Agenda Opening Statements/Welcome PROWAG, ADAAG, INDOT and DPW Standards Inspector
More informationSwimming Pool Requirements Packet
Plot Plans shall indicate the following: Drawn to an appropriate scale with pool depths shown and dimensions to other structures Have an engineer address any surcharge loads on the pool or from the pool
More informationSewer. Contents. Stormwater: Box Culverts. Manhole Bases...2 Access Chambers...3 Make Up Rings...4 Covers...6 Septic...10 Sewer Sundries...
Stormwater: Box Culverts Sewer Contents Manhole Bases...2 Access Chambers...3 Make Up Rings...4 Covers...6 Septic...10 Sewer Sundries...12 3 1 Sewer: Manhole Bases Sewer: Manhole Bases Manhole Bases Access
More informationMicroscale Audit of Pedestrian Streetscapes (MAPS), Mini Version
Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version Training Manual & Picture Guide Developed by: Carrie Geremia Kelli Cain Revised February 11, 2014 Tool and protocol developed by: James
More informationDELHI DEVELOPMENT AUTHORITY UTTIPEC
DELHI DEVELOPMENT AUTHORITY UTTIPEC Comprehensive CHECK LIST of Quality Audit for UTTIPEC Approved-PROJECTS. (Approved in 39 th Governing Body Meeting of UTTIPEC held on 21.9.2012) I. Based upon Planning
More informationSection 7 Complete Green Street Guidelines DRAFT
Section 7 Complete Green Street Guidelines DRAFT 1 Section: 7.0 COMPLETE GREEN STREET GUIDELINES These guidelines serve as options to mitigate the environmental impact of a project as well as guide the
More informationSidewalk Accessibility Checklist
Starting Address: Ending Address: Date: Sidewalk Accessibility Checklist Please indicate your experience with any barriers you encountered when using the sidewalks in your neighborhood. 1. Did you have
More informationChapter 9 Maintenance
Chapter 9: 9-1.0 Introduction Maintenance The maintenance of bikeways is closely linked to bicyclists safety and the preservation of the bikeway function and investment. Poor maintenance, resulting in
More informationA. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances
GENERAL 1. Description This standard identifies minimum requirements that shall be met for all accessible ramps in the design and construction of elements for Arlington County Horizontal Design Standards.
More informationHow Do I Install My Garden Master Bucket Garden?
How Do I Install My Garden Master Bucket Garden? 1. On the arrival of your Bucket Garden open the bucket and remove the 4 screws from the outside of the bucket rim and pull the 2 buckets apart. Check the
More informationThe University of Alabama Pedestrian System Plan
The University of Alabama Pedestrian System Plan 1 Introduction The University of Alabama Campus Master Plan was developed with a comprehensive open space, accessibility, and circulation system in mind,
More informationOn-Site Leaching Chamber Specifications & Features. Design & Installation Manual Rhode Island
On-Site Leaching Chamber Specifications & Features Design & Installation Manual Rhode Island 1 This manual provides general design and installation information for use of ARC model plastic leaching chambers
More informationPermit and Inspection Requirements for Swimming Pools
Permit and Inspection Requirements for Swimming Pools Building Inspection Office (817) 503.1030 City of Colleyville 100 Main Street Colleyville, TX 76034 Inspection Request Line (817) 503.1172 Building
More informationB. Utility-furnished products include water meters that are furnished to the site, ready for installation.
SECTION 211100 - FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationSafe Routes to School Action Plan Aberdeen, Idaho
Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community
More informationProvides an extension of a road to the subdivision boundary or parcel to facilitate the continuity of possible adjacent development.
SECTION 2 - ROADWAYS 2-1 Continuity of the Public Road System The continuity of a publicly maintained system is a prerequisite to the addition of any street into the County road system. A road or street
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationContactor & Recharger
Contactor & Recharger Stormwater Chambers Product Booklet Retention Detention Water Conveyance Water Quality The Founder of Plastic Chamber Technology CULTEC Stormwater Product Booklet Published by CULTEC,
More informationCity of Columbia Engineering Regulations Manual
City of Columbia Engineering Regulations Manual City of Columbia Engineering Regulations Table of Contents Paragraph Description Page No. Part 1: Submission of Plans 1.1 General 1-1 1.2 Engineer s Report
More informationMEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec
MEMORANDUM To: From: Mayor and City Council Michael Smith, Public Works Director Date: October 13, 2014 Subject 4400 Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec.
More informationBOI / DRH S. 13 th Street Mixed use office/retail development with residential dormitory
Jim D. Hansen, President Sara M. Baker, Vice President Rebecca W. Arnold, Commissioner Kent Goldthorpe, Commissioner Paul Woods, Commissioner October 21, 2015 To: Rick Nesser ISS River Partners, LLC 8312
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 33 1000 - WATER DISTRIBUTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationGWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST
GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST Pool Name: Address: Contractor: Phone: Number of Pools Applied for: GENERAL INFORMATION Plan review paid Pool Piping plan stamped by Design Professional.
More informationVictoria Park Master Plan
Victoria Park Master Plan Phase I Presented By: ARCHITECTURAL ALLIANCE & HUGHES HUGHES INC. History of Victoria Park Phase I Purpose Inventory of Existing Conditions Identification of Options by Type (for
More informationTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER
More information