APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

Size: px
Start display at page:

Download "APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,"

Transcription

1 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR US 83 C P14BM $2,112,500 $3,721,952 STATE N/A LIMITS FROM: CANYON ROCK ROAD LIMITS TO: IBERIS ROAD LAYMAN DECSRIPTION: RELOCATE RAMPS AND RECONSTRUCT FRONTAGE ROADS FOR ONE WAY OPERATION REVIEWER: FA1 REMARKS: 3.2 $2,112,500 $3,721,952 HOWARD VA BOR 2004(670) HP $1,565,515 $50,082,560 FED SUBMIT 0610HP $929, HP $6,668,570 13V2DT $32,103,915 P14B $2,260, A $1,399,724 LIMITS FROM: RM 33 LIMITS TO: IH 20 LAYMAN DECSRIPTION: CONSTRUCT NEW RELIEF ROUTE REVIEWER: FA1 REMARKS: BEGINS US87@31.192( );US87 INT AT ( $44,927,638 $50,082,560 FISHER CR BR 2011(764) A $845,000 $669,477 STATE SUBMIT LIMITS FROM: CR 357 LAYMAN DECSRIPTION: REPLACE BRIDGE LIMITS TO: AT SWEETWATER CREEK REVIEWER: FA1 REMARKS: PWP FISHER COUNTY 0.1 $845,000 $669,477 TAYLOR LP 322 C P14BM $1,857,500 $4,080,946 STATE N/A P14B $1,503,782 LIMITS FROM: LYTLE CREEK LIMITS TO: NEAR MAPLE STREET LAYMAN DECSRIPTION: RELOCATE RAMPS AND RECONSTRUCT FRONTAGE ROADS FOR ONE WAY OPERATION REVIEWER: FA1 REMARKS: 2.5 $3,361,282 $4,080,946 ABILENE DISTRICT TOTAL 4 CONTRACTS 13.3 $51,246,420 $58,554,935

2 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, ATLANTA DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TITUS FM 1402 C V2DT $838,240 $1,483,047 STATE N/A LIMITS FROM: 1.2 MI N OF IH 30 LIMITS TO: 1.8 MI N OF IH 30 LAYMAN DECSRIPTION: IMPROVE ALIGNMENT AND ADD TURN LANES AT HART'S BLUFF SCHOOL Y REMARKS: 0.6 $838,240 $1,483,047 ATLANTA DISTRICT TOTAL 1 CONTRACT 0.6 $838,240 $1,483,047

3 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, AUSTIN DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TRAVIS FM 973 BR 2013(930) A $11,100,000 $12,475,973 STATE SUBMIT 1311A $1,375,972 LIMITS FROM: 1.2 MILES N OF THE COLORADO RIVER LIMITS TO: SH 71 LAYMAN DECSRIPTION: REPLACE BRIDGE & APPROACHES N* TRAVIS FM 973 STP 2012(591) ROW $2,659,448. STATE RECD LIMITS FROM: 1.2 MILES N OF THE COLORADO RIVER LIMITS TO: SH 71 LAYMAN DECSRIPTION: RIGHT OF WAY ACQUISITION, UTILITY ADJUSTMENTS AND RELOCATION N* ASSISTANCE REMARKS: WPL13BRO;13;NA;STR ;@ COL RIV;EA CSJ: $15,135,420 $12,475,973 AUSTIN DISTRICT TOTAL 1 CONTRACT 3.0 $15,135,420 $12,475,973

4 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, BRYAN DISTRICT FUNC AUTHORIZED TOTAL EST OVER- GRIMES SH 6 STP 1302(048) $75,000 $4,979,765 STATE SUBMIT P148SB $2,700,000 LIMITS FROM: 0.41 MILE NORTH OF FM 3090 LIMITS TO: 0.5 MILE SOUTH OF SP 515 / SH 105 LAYMAN DECSRIPTION: UPGRADING OF A FREEWAY FACILITY CONSISTING OF GRADING, Y STRUCTURES, PAVEMENT, SIGNS AND PAVEMENT MARKINGS REVIEWER: FA1 REMARKS: 3.5 $2,775,000 $4,979,765 BURLESON FM 60 C V2DT $7,800,000 $11,800,000 STATE N/A LIMITS FROM: 1.2 MILES WEST OF FM 2039 LIMITS TO: 0.62 MILE EAST OF OLD RIVER LAYMAN DECSRIPTION: NEW LOCATION NON-FREEWAY FACILITY CONSISTING OF GRADING, Y STUCTURES, BASE AND SURFACE REVIEWER: FA1 REMARKS: 4.0 $7,800,000 $11,800,000 BRYAN DISTRICT TOTAL 2 CONTRACTS 7.5 $10,575,000 $16,779,765

5 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, EL PASO DISTRICT FUNC AUTHORIZED TOTAL EST OVER- HUDSPETH IH 10 IM 0101(266) R $1,299,616 $1,185,161 STATE SUBMIT LIMITS FROM: 0.23 MI E OF FM 34 LIMITS TO: 8.38 MI W OF FM 1111 HUDSPETH IH 10 IM 0101(266) R $385,384 $385,384 STATE SUBMIT LIMITS FROM: 8.38 MI W OF FM 1111 LIMITS TO: 5.18 MI W OF FM 1111 HUDSPETH IH 10 IM 0101(266) R $1,181,855 $1,181,855 STATE SUBMIT LIMITS FROM: 0.18 MI W OF FM 1111 LIMITS TO: 8.82 MI E OF FM 1111 HUDSPETH IH 10 IM 0101(266) R $1,102,742 $1,102,742 STATE SUBMIT LIMITS FROM: 8.82 MI E OF FM 1111 LIMITS TO: 9.43 M W OF HUDSPETH/CULBERSON CL HUDSPETH IH 10 IM 0101(266) R $1,104,798 $1,104,798 STATE SUBMIT LIMITS FROM: 9.43 MI W OF HUDSPETH/CULBERSON CL LIMITS TO: 0.30 MI W OF HUDSPETH/CULBERSON CL CULBERSON IH 10 IM 0101(266) R $360,605 $360,605 STATE SUBMIT LIMITS FROM: 0.30 MI W OF HUDSPETH/CULBERSON CL LIMITS TO: 2.68 MI E OF HUDSPETH/CULBERSON CL EL PASO IH 10 IM 0101(266) R $1,374,977 $1,374,977 STATE SUBMIT LIMITS FROM: 0.87 MI W OF FM 1281 LIMITS TO: 0.90 MI E OF FM 793 EL PASO IH 10 IM 0101(266) R $610,023 $610,023 STATE SUBMIT LIMITS FROM: 0.90 MI E OF FM 793 LIMITS TO: 0.56 MI W OF FM 3380 HUDSPETH IH 10 IM 0101(266) R $726,000 $726,000 STATE SUBMIT LIMITS FROM: 0.55 MI W OF SH 198 LIMITS TO: 0.31 MI W OF SH 20

6 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, EL PASO DISTRICT FUNC AUTHORIZED TOTAL EST OVER- REVIEWER: ELP REMARKS: FY 2013 SAFETY/RURAL MOBILITY PROJECTS 03/25/13 RML 69.4 $8,146,000 $8,031,545 EL PASO DISTRICT TOTAL 1 CONTRACT 69.4 $8,146,000 $8,031,545

7 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, HOUSTON DISTRICT FUNC AUTHORIZED TOTAL EST OVER- HARRIS US 290 NH 2013(983) LOCAL $20,125,060 $87,180,090 FED SUBMIT 13V2TM $27,699,500 13V2DT $12,830, M $21,600,000 LIMITS FROM: EAST OF MUESCHKE ROAD LIMITS TO: EAST OF TELGE ROAD (SEGMENT 9) LAYMAN DECSRIPTION: RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE N* MANAGED LANES, AUXILIARY LANES AND TWO 2-LANE FRONTAGE ROADS REMARKS: 2025 RTP SHORT RANGE, RTL 8/ $82,254,560 $87,180,090 HARRIS IH 610 CM 2013(991) LOCAL $101,187,070 $130,951,476 FED SUBMIT P12B $24,995,785 TMFBM $987, A $2,830,000 LIMITS FROM: W OF W 34TH ST ON US 290 (SEG 3) LIMITS TO: ON IH 610 LAYMAN DECSRIPTION: RECONSTRUCT US 290/IH 610 INTERCHANGE WITH DIRECT CONNECTORS N* AND 3-LANE REVERSIBLE MANAGED LANE DIRECT CONNECTOR REMARKS: 0.2 $130,000,000 $130,951,476 HARRIS IH 45 CM 2013(984) A $25,000,000 $46,532,404 FED SUBMIT 1307A $20,000, A $1 LIMITS FROM: AT IH 610 E LIMITS TO:. LAYMAN DECSRIPTION: CONSTRUCT DIRECT CONNECTOR IH 610 EB TO IH 45 NB REMARKS: PROP 12 ENGINEERING FUNDS 2.2 $45,000,001 $46,532,404 HARRIS IH 10 IM 0107(442) V2BR $34,518,250 $38,674,453 STATE SUBMIT LIMITS FROM: ON ELYSIAN ST.; FROM COMMERCE ST. LIMITS TO: BROOKS ST. LAYMAN DECSRIPTION: REPLACE BRIDGE AND APPROACHES N* HARRIS IH 10 NH 2013(507) ROW $1,000,000. STATE RECD LIMITS FROM: AT ELYSIAN ST. UNDERPASS LIMITS TO:. LAYMAN DECSRIPTION: ROW ACQUISITION, RELOCATION ASSISTANCE & UTILITY ADJUSTMENTS N* REMARKS: POSSIBLE CAT 12 AND CAT 6 CONTRIBUTIONS 2.2 $35,518,250 $38,674,453

8 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, HOUSTON DISTRICT FUNC AUTHORIZED TOTAL EST OVER- HOUSTON DISTRICT TOTAL 4 CONTRACTS 9.6 $292,772,811 $303,338,423

9 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, LAREDO DISTRICT FUNC AUTHORIZED TOTAL EST OVER- VAL VERDE SL 79 STP 2013(939) $5,000,000 $5,013,471 STATE SUBMIT LIMITS FROM: MILES EAST OF US 90 NORTH LIMITS TO: MILES WEST OF US 90 NORTH LAYMAN DECSRIPTION: FOR THE CONSTRUCTION OF A 2 LANE UNDIVIDED HIGHWAY N* REMARKS: 0.5 $5,000,000 $5,013,471 LAREDO DISTRICT TOTAL 1 CONTRACT 0.5 $5,000,000 $5,013,471

10 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, LUFKIN DISTRICT FUNC AUTHORIZED TOTAL EST OVER- POLK US 59 NH 2013(915) R $2,210,000 $2,210,000 STATE SUBMIT LIMITS FROM: JUST N OF KNIGHT STREET LIMITS TO: 0.5 MI SOUTH LAYMAN DECSRIPTION: REMOVE CROSSOVERS AND CONSTRUCT TURN-AROUNDS WITH ACCELERATION LANES REVIEWER: LFK REMARKS: SAFETY IMPROVEMENTS TO ADDRESS CRASHES AT TRUCK STOPS 0.6 $2,210,000 $2,210,000 SAN JACINTO US 59 NH 2013(916) V2DT $7,050,000 $8,586,339 STATE SUBMIT 1311A $1,536,339 LIMITS FROM: JUST S OF UPRR IN SHEPHERD LIMITS TO: JUST N OF FM 2914 LAYMAN DECSRIPTION: ADD SB FRONTAGE RD & RECONSTRUCT MAIN LANES REMARKS: 1.6 $8,586,339 $8,586,339 LUFKIN DISTRICT TOTAL 2 CONTRACTS 2.2 $10,796,339 $10,796,339

11 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, PARIS DISTRICT FUNC AUTHORIZED TOTAL EST OVER- GRAYSON US 75 NH 2013(908) LOCAL $1,300,000 $5,549,127 FED SUBMIT 13V2MP $2,351, U $2,240, A $1 LIMITS LOY LAKE ROAD (SHERMAN) LIMITS TO:. LAYMAN DECSRIPTION: WIDEN EXISTING BRIDGE OVERPASS N* REMARKS: APPRVED AS CAT 2-URBAN COORIDOR PROJ IN 2012 UTP 0.4 $5,891,001 $5,549,127 DELTA SH 24 TCSP 2010(387) V2DT $30,860,135 $33,860,498 FED SUBMIT 1301A $36,526 LIMITS FROM: FM 904 LIMITS TO: FM 64 LAYMAN DECSRIPTION: UPGRADING OF EXISTING 2-LANE TO A 4-LANE DIVIDED HIGHWAY DELTA SH 24 BR 2013(909) A $1,175,000 $641,983 FED SUBMIT LIMITS FROM: AT BARNETT CREEK LIMITS TO:. LAYMAN DECSRIPTION: REPLACE BRIDGE AND APPROACHES REMARKS: COMB W/ , & $32,071,661 $34,502,481 HUNT FM 1568 STP 2013(910) A $2,600,000 $2,441,510 STATE SUBMIT LIMITS FROM: FM 3218 LIMITS TO: SH 499 LAYMAN DECSRIPTION: REHABILITATION OF EXISTING ROAD N* REVIEWER: PAR REMARKS: 4.4 $2,600,000 $2,441,510 PARIS DISTRICT TOTAL 3 CONTRACTS 15.7 $40,562,662 $42,493,118

12 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, SAN ANTONIO DISTRICT FUNC AUTHORIZED TOTAL EST OVER- FRIO IH 35 IM 0352(344)G R $230,000 $230,000 STATE SUBMIT LIMITS FROM: FRONTAGE RDS AT FM 117 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL TRAFFIC SIGNAL N* FRIO IH 35 IM 0352(343) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: FRONTAGE RDS AT SH 85 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* FRIO FM 117 STP 2013(933) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: AT BS 35 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* FRIO SH 85 STP 2013(933) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: AT BS 35 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* FRIO SH 85 STP 2013(933) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: AT FM 1583 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* FRIO SH 85 STP 2013(933) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: AT FM 1582 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* MCMULLEN SH 97 STP 2013(933) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: AT SH 72 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* REVIEWER: SAT REMARKS: ADD'L 2013 SAFETY PROJECT; 0.0 $980,000 $980,000 WILSON US 181 STP 1302(005)G R $135,000 $135,000 STATE SUBMIT LIMITS FROM: AT SH 97 WEST LIMITS TO:. LAYMAN DECSRIPTION: INSTALL TRAFFIC SIGNAL N*

13 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, SAN ANTONIO DISTRICT FUNC AUTHORIZED TOTAL EST OVER- WILSON SH 123 NH 2013(934) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: AT FM 3355 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON WILSON SH 123 NH 2013(934) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: AT FM 1681 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* WILSON SH 123 NH 1302(004)G R $250,000 $250,000 STATE SUBMIT LIMITS FROM: AT BS 87 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL TRAFFIC SIGNAL N* ATASCOSA FM 3350 STP 2013(944) R $125,000 $125,000 STATE SUBMIT LIMITS FROM: AT FM 3510 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* ATASCOSA SH 16 STP 1302(005)G R $230,000 $230,000 STATE SUBMIT LIMITS FROM: AT FM 140 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL TRAFFIC SIGNAL N* BEXAR SH 211 STP 2013(944) R $250,000 $250,000 STATE SUBMIT LIMITS FROM: AT US 90 LIMITS TO:. LAYMAN DECSRIPTION: INSTALL FLASHING BEACON N* REVIEWER: SAT REMARKS: ADD'L 2013 SAFETY PROJECT; 0.0 $1,240,000 $1,240,000 COMAL BS 46-C C V2DT $9,000,000 $10,800,038 STATE N/A LIMITS FROM: KERLICK LANE LIMITS TO: LANDA STREET LAYMAN DECSRIPTION: EXPAND FROM 2 LANES TO 4 LANES N* REMARKS: 1.1 $9,000,000 $10,800,038

14 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, SAN ANTONIO DISTRICT FUNC AUTHORIZED TOTAL EST OVER- COMAL US 281 C V2DT $3,000,000 $3,000,000 STATE N/A LIMITS FROM: AT SH 46 LIMITS TO:. LAYMAN DECSRIPTION: CONSTRUCT TURNAROUNDS N* REMARKS: 0.3 $3,000,000 $3,000,000 SAN ANTONIO DISTRICT TOTAL 4 CONTRACTS 1.4 $14,220,000 $16,020,038

15 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, TYLER DISTRICT FUNC AUTHORIZED TOTAL EST OVER- SMITH SH 31 STP 2013(914) V2DT $2,515,356 $3,090,658 FED SUBMIT 1301A $1,300,000 LIMITS FROM: FM 850, E OF TYLER, E LIMITS TO: FM757 LAYMAN DECSRIPTION: WIDEN 2 LN ROADWAY TO SUPER-2 (3 LANE) CRITERIA N* REMARKS: PROP 12 V2, FM 850-FM 2908 IN MPO BOUNDARY 6.4 $3,815,356 $3,090,658 HENDERSON FM 59 STP 2013(819) R $5,000,000 $5,000,000 STATE SUBMIT LIMITS FROM: FM 753, S LIMITS TO: 0.7 MI S OF RM 3273 (ANDERSON C/L) LAYMAN DECSRIPTION: PROVIDE ADDITIONAL PAVED SURFACE WIDTH N* ANDERSON FM 59 STP 2013(819) R $3,000,000 $3,000,000 STATE SUBMIT LIMITS FROM: 0.7 MI S OF RM3273(HENDERSON C/L),S LIMITS TO: US 287 AT CAYUGA LAYMAN DECSRIPTION: PROVIDE ADDITIONAL PAVED SURFACE WIDTH N* REVIEWER: TYL REMARKS: CONSULT DEV SHELF PROJECT,CHOSEN FOR PRIORITY RURAL HW 12.5 $8,000,000 $8,000,000 SMITH LP 323 C V2MP $4,744,000 $8,749,624 STATE N/A 13V2DT $1,785,367 LIMITS FROM: 0.6 MI S OF SH 31 (SHAW ST), N LIMITS TO: SH 31 (W) IN TYLER LAYMAN DECSRIPTION: WIDEN FROM 4 LNS TO 6 LNS & REPLACE COTTON BELT R/R U/P Y SMITH LP 323 C V2MP $600,000 $1,112,038 STATE N/A LIMITS FROM: SH 31 (W) IN TYLER, N MI LIMITS TO: ELM ST LAYMAN DECSRIPTION: WIDEN FOR TURN LANES N* REMARKS: TYL MPO & DISTRICT PROP 12 V2 0.9 $7,129,367 $9,861,662 TYLER DISTRICT TOTAL 3 CONTRACTS 19.8 $18,944,723 $20,952,319

16 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, WICHITA FALLS DISTRICT FUNC AUTHORIZED TOTAL EST OVER- WICHITA SH 258 STP 2013(903)HES $3,838,005 $4,898,321 FED SUBMIT LIMITS FROM: 0.2 MILES WEST OF FM 2226 LIMITS TO: US 82 LAYMAN DECSRIPTION: WIDEN STRUCTURES AND ADD SHOULDERS Y WICHITA SH 258 STP 2013(904) SW $2,200,000 $2,720,564 FED SUBMIT LIMITS FROM: SH 25 LIMITS TO: 0.2 MILES WEST OF FM 2226 LAYMAN DECSRIPTION: WIDEN STRUCTURES AND ADD SHOULDERS Y REVIEWER: WFS REMARKS: POTENTIAL BACKLOG PROJECT BWR-D **11PA**2011H03009S 10.4 $6,038,005 $7,618,884 WICHITA FALLS DISTRICT TOTAL 1 CONTRACT 10.4 $6,038,005 $7,618,884

17 APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, YOAKUM DISTRICT FUNC AUTHORIZED TOTAL EST OVER- WHARTON US 59 NH 2013(917) R $400,000 $400,000 STATE SUBMIT LIMITS FROM: AT CR 212 LAYMAN DECSRIPTION: ADDING ACCEL/DECEL LANES LIMITS TO: INTERSECTION DEWITT US 87 NH 2013(917) R $500,000 $500,000 STATE SUBMIT LIMITS FROM: AT FM 2542 LAYMAN DECSRIPTION: ADD LEFT TURN LANE LIMITS TO: INTERSECTION GONZALES SH 80 NH 2013(917) R $500,000 $500,000 STATE SUBMIT LIMITS FROM: AT FM 1117 LAYMAN DECSRIPTION: INTERSECTION IMPROVEMENT LIMITS TO: INTERSECTION GONZALES US 90A NH 2013(917) R $500,000 $500,000 STATE SUBMIT LIMITS FROM: AT FM 443 LAYMAN DECSRIPTION: ADD LEFT TURN LANE LIMITS TO: INTERSECTION REVIEWER: YKM REMARKS: 3.8 $1,900,000 $1,900,000 VICTORIA FM 447 STP 1302(043) A $2,399,108 $2,121,991 STATE SUBMIT LIMITS FROM: US 87 LIMITS TO: FM 236 LAYMAN DECSRIPTION: REPAIR & WIDEN ROADWAY REVIEWER: YKM REMARKS: 5.4 $2,399,108 $2,121,991 YOAKUM DISTRICT TOTAL 2 CONTRACTS 9.2 $4,299,108 $4,021,991 STATE TOTAL 29 CONTRACTS $478,574,728 $507,579,850

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080 Selected for $2 Billion Allocation Safety SLRTP Rural priority IH 35 Corridor Border and Port Trade 100 most congested Ports to Plains Corridor IH 69 Corridor Rural System Preservation Other High Corridors

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Texas Rural Transportaion Plan - Preliminary Project Rankings by District

Texas Rural Transportaion Plan - Preliminary Project Rankings by District Texas Rural Transportaion Plan - Preliminary Rankings by District RTP ID Score Rank District County Highway Description Limit From Limit To 271 564.7 171 Abilene Howard US 87 CONSTRUCT NEW RELIEF ROUTE

More information

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009. Value from &! M East HOU M East HOU M East HOU &! M East HOU &! M East HOU IH 45 0271-14-217 0271-14-218 0271-14-213 0271-14-228 0500-03-462 0500-03-550 0500-03-565 Reconstruct US /IH 610 IC. Construct

More information

DISTRICT AUSTIN 3226 BASTROP US NH 2011(720) $ 578, NO AWARD

DISTRICT AUSTIN 3226 BASTROP US NH 2011(720) $ 578, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 3226 BASTROP US 290 0114-04-063 NH 2011(720) 1.364 $ 578,444.15 4-16.15 NO AWARD CONTRACTOR: J.D. RAMMING PAVING CO., LTD.

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

AGENDA. TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas THURSDAY June 30, 2005 * * *

AGENDA. TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas THURSDAY June 30, 2005 * * * INTERNET ADDRESS: http://www.dot.state.tx.us AGENDA TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas 78701-2483 THURSDAY June 30, 2005 * * * 9:00 A.M. CONVENE MEETING Approved 1. Approval

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

Texas Rural Transportaion Plan - Preliminary Project Rankings by District

Texas Rural Transportaion Plan - Preliminary Project Rankings by District RTP ID Score Rank District County Highway Description Limit From Limit To 271 565.3 162 Abilene Howard US 87 CONSTRUCT NEW RELIEF ROUTE IH 20, 4 miles West of Big Spring FM 700, 3 miles North 7.5 1000

More information

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2045 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Bexar Alamo

More information

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015 AAMPO MOBILITY PROJECT DISCUSSION July/August 2015 Proposition 1 FY 16 & 17 $1.74 billion transferred to State Highway Fund in FY 2015 $147.3 million let in SAT district in FY 2015 US 90, IH 10, IH 410

More information

OPPORTUNITY ZONE TRACT LISTING

OPPORTUNITY ZONE TRACT LISTING TRACT NUMBER COUNTY 48001950401 Anderson County 48001950901 Anderson County 48005000200 Angelina County 48005000500 Angelina County 48005000600 Angelina County 48005000700 Angelina County 48005001001 Angelina

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2007-2010 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2007-2010 Prepared

More information

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2040 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Alamo Area

More information

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program Project Number Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AAMPO Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AAMPO Alamo Area Commute Solutions

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2008-2011 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2008-2011 Prepared

More information

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 July 2007 NO. 0707 UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 Tex-207-F, Determining Density of Compacted Bituminous Mixtures. is now on-line at the TxDOT website. This test procedure was implemented effective

More information

NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013

NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013 NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Texas Strategic Highway Safety Plan Update. 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX

Texas Strategic Highway Safety Plan Update. 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX Texas Strategic Highway Safety Plan Update 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX Agenda Welcome and introductions (roll call) Review revised strategies Review new data runs

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Texas Department of State Health Services Vital Statistics Unit

Texas Department of State Health Services Vital Statistics Unit 142 ANDERSON COUNTY 74 53 71.62% 200 ANDREWS COUNTY 16 9 56.25% 090 ANGELINA COUNTY 107 64 59.81% 017 ATASCOSA COUNTY -- CLERKS OFFICE 222 94 42.34% 074 AUSTIN COUNTY -- COUNTY CLERK 57 38 66.67% 220 BAILEY

More information

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop ENERGY SECTOR ROADWAY REPAIR PROJECT August 15, 2013 Industry Workshop Safety Moment Sign-in Sheet Exit Locations Gathering Point Directions from Emergency Responders Signal to re-enter the Building or

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE APPROVED BY FHWA: JULY 2010 UPDATED: OCTOBER 2011 Section 1 Need for and Purpose of Proposed Action Per Council on Environmental Quality

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

Texas Department of State Health Services Vital Statistics Unit

Texas Department of State Health Services Vital Statistics Unit 142 ANDERSON COUNTY 57 54 94.74% 200 ANDREWS COUNTY 38 25 65.79% 090 ANGELINA COUNTY 147 107 72.79% 017 ATASCOSA COUNTY -- CLERKS OFFICE 311 142 45.66% 074 AUSTIN COUNTY -- COUNTY CLERK 103 71 68.93% 220

More information

Action Plan and Summary for Roads to Gravel

Action Plan and Summary for Roads to Gravel Impact of Energy Sector and Heavy Commercial Development Action Plan and Summary for Roads to Gravel Research Report RR-13-01 Prepared for Texas Department of Transportation Maintenance Division Prepared

More information

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028 Collin 54005 2351 01 017 FM 2478 FM 1461 to US 380 Collin 54005.1 2351 02 014 FM 2478 Collin 55038 2679 03 015 FM 2514 FM 1461 to North of FM 1461 East of Lavon Parkway to North of Drain Drive Widen two

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARlOUS Counties MINUTE ORDER Page 1 of 1 VARlOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

The Transportation Improvement Program

The Transportation Improvement Program Waco Metropolitan Planning Organization The Transportation Improvement Program Waco Urbanized Area For Fiscal Years 2015 Through 2018 Proposed Amendment 4 FY 2016 PHASE: E COUNTY: McLennan LIMITS FROM:

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon I-35 Corridor Segment Committee 4 3500 NW Loop 410 San Antonio, Texas February 11, 2010 9:00 AM to Noon Welcome Nancy Parker Facilitator Committee Work Session Nancy Parker Facilitator Discussion of Proposed

More information

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS I- COMAL COUNTY OPERATIONAL IMPROVEMENTS OPEN HOUSE The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,

More information

ENERGY SECTOR COORDINATION

ENERGY SECTOR COORDINATION ENERGY SECTOR COORDINATION Darin Kosmak, Deputy Director TxDOT Rail Division November 4, 2013 Energy Sector Considerations Existing FM roads not built to handle truck traffic resulting from: Oil & natural

More information

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of Texas for: Elimination of a U.S. (Interstate) Route AASHTO Use Only

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Transportation Code, establishes prima facie reasonable and prudent speed limits for various categories of public roads, streets and highways.

Transportation Code, establishes prima facie reasonable and prudent speed limits for various categories of public roads, streets and highways. TEXAS TRANSPORTATION COMMISSION V ARlO US Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Transportation Code, 545.352 establishes prima facie reasonable and prudent speed limits for various categories

More information

APPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES

APPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES APPENDIX I-A STATE ROUTES Interstate 5 SR 33 SR 41 SR 43 SR 137 SR 198 SR 269 (See under City of Avenal) (See Figure 4-2 and 4-3 for Rural and Urban Functional Classifications) Appendix A Page A-1 INTERSTATE

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road. CAMPO Plan Priority Project List: Regionally Funded Projects (Projects may be funded by Federal, State or Local funding) AS AMENDED: 1/10/2011, 3/11/2011, 10/10/2011, 4/9/2012, and 10/8/2012 I. Roadway

More information

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St 2040 Metropolitan Transportation Plan Project Listing Short Range Funded (2014-2023) Projects with Allocated as of June 2017 and Listed in the Transportation Improvement Program (TIP) CATEGORY 7 PROJECTS

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018 BOERNE/KENDALL COUNTY TRANSPORTATION FORUM March 22, 2018 Frontage Road Operational Improvements 2 Frontage Roads Under Construction Fair Oaks Pkwy to Dominion I-10 - Fair Oaks Pkwy to FM 3351 Scope: Convert

More information

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects NCHRP Project 15-50 July 2017 1 Research Objective Develop guidelines for safe and cost-effective

More information

Commission Approved Stimulus Maintenance Projects

Commission Approved Stimulus Maintenance Projects West Region TxDOT Districts: Abilene, Amarillo, Childress, El Paso, Lubbock, Odessa, San Angelo ABL HOWARD $5,052,463 Repair Roadway IH 20 MARTIN COUNTY LINE TO BIG SPRING Apr-09 ABL TAYLOR $222,634 Replace

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

AGENDA TEXAS TRANSPORTATION COMMISSION. 125 East 11 th Street Austin, Texas THURSDAY April 30, 2009

AGENDA TEXAS TRANSPORTATION COMMISSION. 125 East 11 th Street Austin, Texas THURSDAY April 30, 2009 INTERNET ADDRESS: http://www.txdot.gov AGENDA TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas 78701-2483 THURSDAY April 30, 2009 9:00 A.M. CONVENE MEETING 1. Approval of Minutes of

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS

CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS Based on Applications Submitted to TCRPC and Presented to Town Hall Forums in December, 2008 and Additional Updates and LRP Task Force

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the

More information

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project FM 471 PROJECT OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties January 24, 2018 Project Location 2 Proposed Improvements Improvements include: Expansion of FM 471 from

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM,

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, PROJECT NAME: Glade Road/Clark Creek Bridge PROJECT #: CB101 PROJECT DESCRIPTION: Safety improvements of Estimated Cost: 8,316,364 section of Glade Road from Misty Valley Drive to County: Brandy Lane including

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

444 North Capitol Street NW, Suite 249, Washington, DC (202) Fax: (202) ERRATA

444 North Capitol Street NW, Suite 249, Washington, DC (202) Fax: (202) ERRATA Larry L. Butch Brown, Sr., President Executive Director, Mississippi Department of Transportation John Horsley, Executive Director 444 North Capitol Street NW, Suite 249, Washington, DC 20001 (202) 624-5800

More information

Section Access Control Plan - SH 14 (Mulberry Street)

Section Access Control Plan - SH 14 (Mulberry Street) US 287/SH 14 Access Management Report Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 92 US 287/SH 14 Access Management Report Section 5.0 - Access Control Plan - SH 14 (Mulberry Street)

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

FM 471. Open House Public Meeting FM 471

FM 471. Open House Public Meeting FM 471 Open House Public Meeting November 12, 2014 FROM: LP 1604 TO: FM 3487 BEXAR COUNTY OPEN HOUSE PUBLIC MEETING November 12, 2014 H.B. Zachry Middle School 9410 Timber Pass 5:00 7:00 PM San Antonio, TX 78250

More information

Transportation Committee Project Priority List

Transportation Committee Project Priority List Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Phone: Fax: Project Reference No. (to be filled out by MassHighway): Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is

More information

13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? What is your primary means of transportation?

13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? What is your primary means of transportation? Overall Statewide Results 3 1 Houston 2 Dallas 3 Fort Worth 4 San Antonio 2 11 12 Austin 6 Laredo / Pharr 7 Corpus Christi / Yoakum 8 Bryan / Waco 9 Atlanta / Beaumont / Lufkin / Paris / Tyler Amarillo

More information

Introduction...pg. 1. Study Area...pg. 1. Study Purpose and Need...pg. 2. Study Coordination and Development... pg. 3. Public Involvement...pg.

Introduction...pg. 1. Study Area...pg. 1. Study Purpose and Need...pg. 2. Study Coordination and Development... pg. 3. Public Involvement...pg. Table of Contents Introduction...pg. 1 Study Area...pg. 1 Study Purpose and Need...pg. 2 Study Coordination and Development... pg. 3 Public Involvement...pg. 4 Evaluation of Alternatives...pg. 4 Preferred

More information

Appendix C Status of Major Projects from the TIP

Appendix C Status of Major Projects from the TIP Appendix C of Major Projects from the 2017-2020 TIP This page left blank intentionally of Major Projects Appendix C C 3 Appendix C of Major Projects from the 2017 2020 TIP Appendix C of the 2019-2022 Transportation

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

MPO PROPOSITION 1/CATEGORY 2 PROJECTS (METROPOLITAN CORRIDORS)

MPO PROPOSITION 1/CATEGORY 2 PROJECTS (METROPOLITAN CORRIDORS) 2040 Metropolitan Transportation Plan Project Listing Short Range Funded (2014-2023) Projects with Allocated as of December 2018 and Listed in the Transportation Improvement Program (TIP) MPO PROPOSITION

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Proposed Action, Purpose and Need Technical Memorandum

Proposed Action, Purpose and Need Technical Memorandum Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number Michigan Department of Transportation 2004 Traffic and Safety Notes Cross Reference between the Old Note Number and the New Note Number OLD NEW Number Number Title (Prior to 2004) 1.1.1 101-Series General

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS MOD TIP CODE 2008-274 12175.08, 12416.08, 12417.08, 12418.08, 12419.08, 12420.08, 12421.08, 12422.08 DENTON COUNTY TRANSPORTATION AUTHORITY (DCTA) - FY08 PROGRAM OF S - TRANSIT SECTION 5307 - URBANIZED

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

TRAFFIC AND SAFETY NOTE 608A. Spacing for Commercial Drives and Streets. To Promote a Uniform Practice in Determining Access Spacing

TRAFFIC AND SAFETY NOTE 608A. Spacing for Commercial Drives and Streets. To Promote a Uniform Practice in Determining Access Spacing TRAFFIC AND SAFETY NOTE 608A SUBJECT: PURPOSE: Spacing for Commercial Drives and Streets To Promote a Uniform Practice in Determining Access Spacing COORDINATING UNIT: Geometric Design Unit INFORMATION:

More information