DISTRICT AUSTIN 3226 BASTROP US NH 2011(720) $ 578, NO AWARD
|
|
- Malcolm Booth
- 5 years ago
- Views:
Transcription
1
2 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE BASTROP US NH 2011(720) $ 578, NO AWARD CONTRACTOR: J.D. RAMMING PAVING CO., LTD. $ 485, NO CONTRACT AMOUNT $ 485, LIMITS: TRAVIS C/L TO SH 95 TYPE: FULL DEPTH,UNDERSEAL&OVERLAY WB LNS 3024 BASTROP SH STP 2011(724)HES $ 1,216, NO AWARD CONTRACTOR: COLORADO DOUBLE D CONSTRUCTION LLC $ 985, NO CONTRACT AMOUNT $ 985, LIMITS: SH 21/95 (BASTROP) TO W. END COLORADO RIV BRG(SMITHVILLE) TYPE: INSTALL MEDIAN BARRIER DISTRICT WACO 3212 BELL LP STP 2011(633) $ 395, NO AWARD CONTRACTOR: JAMES CONSTRUCTION GROUP, L.L.C. $ 362, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 362, AVE D IN BELTON TO TYPE: CONSTRUCT LEFT TURN LANE DISTRICT SAN ANTONIO 3008 BEXAR VA STP 2011(589)G $ 912, NO AWARD CONTRACTOR: E-Z BEL CONSTRUCTION, LLC $ 886, NO CONTRACT AMOUNT $ 886, LIMITS: DISTRICTWIDE TRAFFIC CNTRY FY 2011 TO (PROJECT 1) TYPE: DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2011 (PROJECT 1) (ON-SYSTEM SIGNALS, SIGNS, PAVEMENT MARKERS ETC) DISTRICT SAN ANTONIO 3216 BEXAR VA STP 2011(590)G $ 912, NO AWARD CONTRACTOR: E-Z BEL CONSTRUCTION, LLC $ 898, NO CONTRACT AMOUNT $ 898, LIMITS: DISTRICTWIDE TRAFFIC CNTRL FY 2011 TO (PROJECT 2) TYPE: DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2011 (PROJECT 2) (ON-SYSTEM SIGNALS, SIGNS, PAVEMENT MARKERS ETC)
3 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE BRAZORIA SH STP 2011(712) $ 1,094, NO AWARD CONTRACTOR: ANGEL BROTHERS ENTERPRISES, LTD. $ 906, NO CONTRACT AMOUNT $ 906, LIMITS: SH 288 TO FM 523 TYPE: MILLING, ACP OVERLAY AND PAVEMENT MARKINGS 3010 BRAZORIA FM CC $ 6,133, NO AWARD CONTRACTOR: TRIPLE B SERVICES, L.L.P. $ 5,344, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 5,344, LIMITS: 0.19 MILES NORTH OF CR 360 TO SH 35 TYPE: REALIGNMENT OF EXISTING FM 524 DISTRICT CHILDRESS 3234 BRISCOE SH STP 2011(709) $ 1,578, NO AWARD CONTRACTOR: J. LEE MILLIGAN, INC. $ 1,449, NO CONTRACT AMOUNT $ 1,449, LIMITS: SWISHER C/L, EAST TO FM 3030 TYPE: ASPHALTIC CONCRETE PAVEMENT OVERLAY DISTRICT PHARR 3205 BROOKS SH STP 2011(586) $ 3,273, NO AWARD CONTRACTOR: BALLENGER CONSTRUCTION COMPANY $ 3,276, NO CONTRACT AMOUNT $ 3,276, LIMITS: VARIOUS LOCATIONS TO TYPE: OVERLAY DISTRICT BRYAN 3034 BURLESON CR BR 2007(863) $ 438, NO AWARD CONTRACTOR: DIAMOND K EQUIPMENT INC. $ 379, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 379, LIMITS: ON CR 204 (LOCAL ROAD NO. 125) TO AT BRUSHY CREEK TYPE: REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, STRUCTURE AND BASE
4 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 3 DISTRICT ATLANTA 3211 CAMP SH STP 2011(554)HES $ 1,755, NO AWARD CONTRACTOR: STRIPE-A-ZONE, INC. $ 1,679, NO CONTRACT AMOUNT $ 1,679, LIMITS: VARIOUS LOCATIONS TO. TYPE: INSTALL CENTERLINE RUMBLE STRIPS DISTRICT TYLER 3236 CHEROKEE FM STP 2011(733)HES $ 1,026, NO AWARD CONTRACTOR: BIG CREEK CONSTRUCTION, LTD. $ 977, NO CONTRACT AMOUNT $ 977, LIMITS: 2.4 MI S OF FM 241, S 2.7 MI TO 0.5 MI S OF CR 2405, ETC. TYPE: PROVIDE ADDITIONAL PAVED SURFACE WIDTH DISTRICT DALLAS 3012 COLLIN US NH 2011(573) $ 220, NO AWARD CONTRACTOR: DENALI CONSTRUCTION SERVICES, LLC $ 169, NO CONTRACT AMOUNT $ 169, LIMITS: TICKY CREEK TO COUNTY ROAD 458 TYPE: LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING, IRRIGATION SYSTEM DISTRICT WACO 3016 CORYELL SH STP 2011(191) $ 31,999, NO AWARD CONTRACTOR: LEDCOR CMI INC. $ 31,901, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 31,901, LIMITS: US 190 TO FM 116 TYPE: CONSTRUCT INITIAL TWO-LANE OF ULTIMATE FOUR-LANE DIVIDED FOR COPPERAS COVE NE RELIEF RTE & TANK DESTROYER BLVD CONNECTION DISTRICT EL PASO 3213 CULBERSON SH STP 2011(576) $ 1,597, NO AWARD CONTRACTOR: RYAN EQUIPMENT INC $ 1,599, NO CONTRACT AMOUNT $ 1,599, LIMITS: 3 MILES NORTH OF B10 TO B10 TYPE: REHABILITATION TO INCLUDE HOT MIX OVERLAY, SIDEWALKS, AND ADA RAMP CONSTRUCTION
5 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 4 DISTRICT DALLAS 3005 DALLAS SH NH 2011(574) $ 983, NO AWARD CONTRACTOR: REBCON, INC. $ 831, NO CONTRACT AMOUNT $ 831, LIMITS: AT HIDDEN RIDGE DRIVE IN IRVING TO TYPE: REPAIR SLOPE FAILURE DISTRICT DALLAS 3201 DALLAS IH STP 2011(706)MM $ 16,293, NO AWARD CONTRACTOR: HAYDON BUILDING CORP. $ 14,780, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 14,780, LIMITS: BELT LINE RD. TO N.E. 15TH ST., ETC. TYPE: CONSTRUCT EASTBOUND FRTG RD & PARK AND RIDE FACILITY DISTRICT DALLAS 3219 DENTON FM C $ 6,016, NO AWARD CONTRACTOR: JAGOE-PUBLIC COMPANY $ 4,152, NO CONTRACT AMOUNT $ 4,152, LIMITS: 0.1 MI N OF FM 2450 TO IH 35 TYPE: ADD 10' SHOULDERS AND REHAB AND REPLACE BRIDGE AT MOORE BR DISTRICT ODESSA 3018 ECTOR VA STP 2011(584)G $ 226, NO AWARD CONTRACTOR: WILLIS ELECTRIC CO., LP $ 197, NO CONTRACT AMOUNT $ 197, LIMITS: DISTRICTWIDE TO. TYPE: SMALL AND LARGE SIGN REPLACEMENTS DISTRICT EL PASO 3204 EL PASO US STP 2011(577)SB $ 6,679, NO AWARD CONTRACTOR: J.D. ABRAMS, L.P. $ 6,329, NO CONTRACT AMOUNT $ 6,329, LIMITS: 1.1 M/W/O US 62/180 & FM 659 INT TO M/E/O US 62/180 & FM 659 INT TYPE: CONSTRUCT NEW OVERPASS STRUCTURE AND RAMPS
6 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE FORT BEND FM STP 2011(750) $ 330, NO AWARD CONTRACTOR: CLARK CONSTRUCTION OF TEXAS, INC. $ 299, NO CONTRACT AMOUNT $ 299, LIMITS: FM 1236 TO VINCIK-EHLERT ROA TYPE: SEAL COAT 3225 FORT BEND FM STP 2011(713) $ 337, NO AWARD CONTRACTOR: CLARK CONSTRUCTION OF TEXAS, INC. $ 308, NO CONTRACT AMOUNT $ 308, LIMITS: FM 1236 TO SH 36 TYPE: SEAL COAT 3240 FORT BEND FM STP 2011(749) $ 438, NO AWARD CONTRACTOR: CLARK CONSTRUCTION OF TEXAS, INC. $ 349, NO CONTRACT AMOUNT $ 349, LIMITS: FM 1093 TO FM 1952 TYPE: SEAL COAT 3232 GALVESTON VA STP 2011(416) $ 147, NO AWARD CONTRACTOR: LEGENDS LANDSCAPES LLC $ 140, NO CONTRACT AMOUNT $ 140, LIMITS: VARIOUS LOCATIONS IN GALV COUNTY TO TYPE: CLEAN AND SEAL BRIDGE JOINTS 3023 GILLESPIE US NH 2011(730) $ 1,623, NO AWARD CONTRACTOR: ASPHALT PAVING COMPANY OF AUSTIN, INC. $ 1,312, NO CONTRACT AMOUNT $ 1,312, LIMITS:.139 MI E OF OLD SAN ANTONIO RD TO.119 MI E OF WOODLAND DR TYPE: SPOT REPAIR, SEAL AND OVERLAY
7 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 6 DISTRICT YOAKUM 3220 GONZALES CR BR 2009(182) $ 125, NO AWARD CONTRACTOR: EASTER CONSTRUCTION, INC. $ 119, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 119, LIMITS: AT VANHAM CREEK CR 382 TO (CR 382) #AA TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT PARIS 3036 GRAYSON US STP 2011(700)HES $ 138, NO AWARD CONTRACTOR: SIG-OP SYSTEMS, INC. $ 130, NO CONTRACT AMOUNT $ 130, LIMITS: US 75 FRONTAGE ROAD TO SH 56 TYPE: IMPROVE TRAFFIC SIGNAL 3020 HARRIS US CC $ 552, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 513, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 513, LIMITS: WEST OF TELGE RD TO EAST OF NORTH ELDRIDGE PARKWAY, ETC TYPE: CONSTRUCT DIAMOND LANE FACILITY ON US 290 MEDIAN 3011 HARRIS VA STP 2011(578)G $ 594, NO AWARD CONTRACTOR: THIRD COAST SERVICES, LLC $ 439, NO CONTRACT AMOUNT $ 439, LIMITS: VARIOUS LOCATIONS DISTRICTWIDE TO. TYPE: INSTALL VIVDS AND INSTALL LOOPS 3230 HARRIS VA STP 2011(714)G $ 1,000, NO AWARD CONTRACTOR: TRAF-TEX, INC. $ 911, NO CONTRACT AMOUNT $ 911, LIMITS: VARIOUS LOCATIONS DISTRICTWIDE TO. TYPE: UPGRADE/RECONSTRUCT TRAFFIC SIGNALS
8 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE HARRIS VA STP 2011(715)G $ 2,124, NO AWARD CONTRACTOR: BATTERSON,LLP $ 2,213, NO CONTRACT AMOUNT $ 2,213, LIMITS: VARIOUS LOCATIONS OUTSIDE HARRIS CO TO TYPE: PAVEMENT MARKINGS (NON-SITE SPECIFIC) 3214 HARRIS VA STP 2011(579) $ 2,081, NO AWARD CONTRACTOR: SPRING EQUIPMENT CO., INC. $ 1,865, NO CONTRACT AMOUNT $ 1,865, LIMITS: CENTRAL HOUSTON AREA TO TYPE: GENERAL MAINTENANCE FOR CENTRAL HOUSTON AREA ROADWAY SYSTEM 3031 HARRIS VA STP 2011(716)G $ 1,969, NO AWARD CONTRACTOR: BATTERSON,LLP $ 2,063, NO CONTRACT AMOUNT $ 2,063, LIMITS: VARIOUS LOCATIONS INSIDE HARRIS CO. TO TYPE: PAVEMENT MARKINGS (NON-STIE SPECIFIC) DISTRICT ATLANTA 3235 HARRISON FM BR 2011(653) $ 1,313, NO AWARD CONTRACTOR: LONGVIEW BRIDGE AND ROAD, LTD. $ 1,322, NO CONTRACT AMOUNT $ 1,322, LIMITS: AT QUAPAW CK & QUAPAW CREEK RELIEF TO TYPE: REPLACE BRIDGES AND APPROACHES 3002 HAYS SH STP 2011(685) $ 1,047, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 915, NO CONTRACT AMOUNT $ 915, LIMITS: VARIOUS TO TYPE: SEAL & OVERLAY
9 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE HAYS SH STP 2011(725)HES $ 64, NO AWARD CONTRACTOR: NY-MAC ENTERPRISES, INC. $ 98, NO CONTRACT AMOUNT $ 98, LIMITS: AT BOGIE DR / ARNOLD AVE TO. TYPE: ADD LEFT TURN LANE DISTRICT TYLER 3001 HENDERSON SH STP 2011(719) $ 4,253, NO AWARD CONTRACTOR: BIG CREEK CONSTRUCTION, LTD. $ 3,857, NO CONTRACT AMOUNT $ 3,857, LIMITS: FM 314 IN BROWNSBORO, E TO 0.2 MI E OF FM 3204 W, ETC. TYPE: RESURFACE ROADWAY DISTRICT TYLER 3237 HENDERSON FM STP 2011(734)HES $ 781, NO AWARD CONTRACTOR: A. L. HELMCAMP, INC. $ 686, NO CONTRACT AMOUNT $ 686, LIMITS: VAN ZANDT C/L, S TO 0.7 MI N OF SH 31 (CR 3300) TYPE: PROVIDE ADDITIONAL PAVED SURFACE WIDTH DISTRICT PHARR 3004 HIDALGO CS STP 2008(131)MM $ 1,974, NO AWARD CONTRACTOR: BALLENGER CONSTRUCTION COMPANY $ 1,932, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 1,932, LIMITS: US 83 TO SUGARCANE ROAD (MILE 9 NORTH) TYPE: RECONSTRUCT AND WIDEN TO 4 LANES DISTRICT PARIS 3209 HOPKINS SH STP 2011(585) $ 2,739, NO AWARD CONTRACTOR: D. L. LENNON INCORPORATED - CONTRACTOR $ 2,424, NO CONTRACT AMOUNT $ 2,424, LIMITS: MILES SOUTH OF CR 1196 EAST TO MILES SOUTH OF FM 1567 WEST TYPE: RECONSTRUCT FROM 2-LANE WITHOUT SHOULDERS TO 2-LANE WITH SHOULDERS
10 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 9 DISTRICT ABILENE 3231 HOWARD IH IM 0202(231) $ 2,622, NO AWARD CONTRACTOR: LIPHAM CONSTRUCTION CO., INC. $ 2,555, NO CONTRACT AMOUNT $ 2,555, LIMITS: VARIOUS LOCATIONS IN THE TO ABILENE DISTRICT TYPE: SEAL COAT DISTRICT EL PASO 3207 JEFF DAVIS SH STP 2011(575) $ 3,179, NO AWARD CONTRACTOR: MISSOURI PETROLEUM PRODUCTS COMPANY LLC $ 2,579, NO CONTRACT AMOUNT $ 2,579, LIMITS: MI N OF FORT DAVIS TO 8.6 MI N OF FORT DAVIS TYPE: SEAL COAT DISTRICT BEAUMONT 3009 JEFFERSON SH STP 2011(561) $ 822, NO AWARD CONTRACTOR: BYRD BROTHERS EMERGENCY SERVICES, LLC $ 820, NO CONTRACT AMOUNT $ 820, LIMITS: MLK BRIDGE INTRACOASTAL WATERWAYS TO MLK BRIDGE TNTRACOASTAL WATERWAYS TYPE: REPAIR BRIDGE DOLPHINS DISTRICT CORPUS CHRISTI 3015 JIM WELLS FM STP 2011(503)SB $ 382, NO AWARD CONTRACTOR: RHYNER CONSTRUCTION SERVICES, INC. $ 490, NO CONTRACT AMOUNT $ 490, LIMITS:.284 MI W OF CR 344 TO.284 MI E OF CR 344 TYPE: INSTALL LEFT TURN LANE OR TWCTL DISTRICT CORPUS CHRISTI 3206 JIM WELLS FM STP 2011(570) $ 3,361, NO AWARD CONTRACTOR: BAY LTD $ 2,898, NO CONTRACT AMOUNT $ 2,898, LIMITS: S.H. 359 TO U.S. 281 TYPE: REHABILITATE AND WIDEN ROADWAY
11 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 10 DISTRICT ABILENE 3026 JONES FM STP 2011(729)HES $ 2,391, NO AWARD CONTRACTOR: STEPHENS MARTIN PAVING, L.P. $ 2,006, NO CONTRACT AMOUNT $ 2,006, LIMITS: MI. N. OF CR 463 (N) TO MI. N. OF CR 463 (S), ETC. TYPE: PROVIDE ADDITIONAL PAVED SURFACE WIDTH DISTRICT SAN ANTONIO 3038 KERR SH STP 2011(748)GHES $ 697, NO AWARD CONTRACTOR: VIKING CONSTRUCTION, INC. $ 606, NO CONTRACT AMOUNT $ 606, LIMITS: FM 1273 TO BANDERA / KERR COUNTY LINE TYPE: SURFACE, SAFETY TREAT FIXED OBJECTS, PAVEMENT MARKINGS SIGNING, & INSTALL ADVANCE WARNING SIGNALS DISTRICT PARIS 3233 LAMAR FM STP 2011(701)SB $ 3,628, NO AWARD CONTRACTOR: BILLY CUMMINGS CONSTRUCTION INC $ 3,360, NO CONTRACT AMOUNT $ 3,360, LIMITS: AT LP 286 TO TYPE: GRADE SEPARATION DISTRICT BEAUMONT 3221 LIBERTY FM STP 2011(703) $ 1,331, NO AWARD CONTRACTOR: SMITH & COMPANY $ 1,109, NO CONTRACT AMOUNT $ 1,109, LIMITS: POLK COUNTY LINE SOUTH TO FM 787 TYPE: RESTORE EXISTING ROADWAY DISTRICT LUBBOCK 3208 LUBBOCK VA STP 2011(678)G $ 1,913, NO AWARD CONTRACTOR: L&L COMPANY $ 2,156, NO CONTRACT AMOUNT $ 2,156, LIMITS: VARIOUS LOCATIONS TO IN THE LUBBOCK DISTRICT TYPE: DISTRICT WIDE STRIPING ON-SYSTEM
12 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 11 DISTRICT LAREDO 3013 MAVERICK US NH 2011(580) $ 677, NO AWARD CONTRACTOR: RYAN EQUIPMENT INC $ 455, NO CONTRACT AMOUNT $ 455, LIMITS: BU 277N INTERSECTION TO MI S OF FM 1665 SOUTH TYPE: RESURFACE OF AN EXISTING HIGHWAY DISTRICT WACO 3238 MCLENNAN CS BR 2007(722) $ 231, NO AWARD CONTRACTOR: ELLIS-MCGINNIS CONSTRUCTION CO. $ 229, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 229, CASTLEMAN CRK BRANCH TO (MAP #1008 RBS) (OLD ROBINSON RD) TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT WACO 3037 MCLENNAN CS BR 2009(351) $ 145, NO AWARD CONTRACTOR: STRILAND CONSTRUCTION, INC. $ 136, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 136, LIMITS: ON CS 1611 (DUTTON AVE) WACO CREEK (MAP #18 WAC) TYPE: REHABILITATE BRIDGE AND APPROACHES DISTRICT SAN ANTONIO 3021 MCMULLEN PW C $ 177, NO AWARD CONTRACTOR: HARBORTH CONSTRUCTION, LLC $ 141, NO CONTRACT AMOUNT $ 141, LIMITS: JAMES DAUGHTREY WMA TO TYPE: REPLACE 2 CULVERT CROSSINGS WITHIN JAMES DAUGHTREY WMA DISTRICT WICHITA FALLS 3035 MONTAGUE FM STP 2011(672) $ 1,342, NO AWARD CONTRACTOR: JAGOE-PUBLIC COMPANY $ 998, NO CONTRACT AMOUNT $ 998, LIMITS: FORESTBURG TO COOKE COUNTY LINE TYPE: SPOT FULL DEPTH REPAIR AND OVERLAY
13 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE MONTGOMERY IH NH 2011(754) $ 8,963, NO AWARD CONTRACTOR: WEBBER, LLC $ 8,966, NO CONTRACT AMOUNT $ 8,966, LIMITS: WALKER COUNTY LINE TO 1.1 MI SOUTH OF WALKER COUNTY LINE TYPE: WIDEN TO 6 MAINLANES DISTRICT BEAUMONT 3228 NEWTON SH STP 2011(711)HRR $ 608, NO AWARD CONTRACTOR: APAC-TEXAS, INC. $ 555, NO CONTRACT AMOUNT $ 555, LIMITS: 1.9 MILES SOUTH OF FM 253, SOUTH TO SH 12 TYPE: SAFETY TREAT FIXED OBJECTS & INCREASE SUPERELEVATION DISTRICT CORPUS CHRISTI 3022 NUECES SH NH 2011(728) $ 4,643, NO AWARD CONTRACTOR: BAY LTD $ 4,636, NO CONTRACT AMOUNT $ 4,636, LIMITS: AIRLINE TO PR 22 TYPE: MILL AND OVERLAY DISTRICT FT WORTH 3025 PARKER IH IM 0204(275) $ 2,748, NO AWARD CONTRACTOR: NORTHEASTERN PAVERS, INC. $ 2,192, NO CONTRACT AMOUNT $ 2,192, LIMITS: SH 171 TO TOWN CREEK TYPE: 2" HMAC MILL AND OVERLAY MAINLANES AND SHOULDERS DISTRICT CORPUS CHRISTI 3019 REFUGIO US STP 2011(566)SB $ 207, NO AWARD CONTRACTOR: HAAS-ANDERSON CONSTRUCTION, LTD. $ 279, NO CONTRACT AMOUNT $ 279, LIMITS:.4 MI N OF KRET LANE TO.4 MI S OF KRET LANE TYPE: INSTALL LEFT TURN LANE OR TWO WAY CONTINUOUS TURN LANE
14 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 13 DISTRICT CORPUS CHRISTI 3218 REFUGIO SH STP 2011(567)SB $ 1,341, NO AWARD CONTRACTOR: BAY LTD $ 1,709, NO CONTRACT AMOUNT $ 1,709, LIMITS:.4 MI N OF FM 774 TO.4 MI S OF FM 774 TYPE: INSTALL LEFT TURN LANE OR TWCTL DISTRICT LUFKIN 3028 SAN JACINTO SH STP 2011(717)HES $ 2,078, NO AWARD CONTRACTOR: BIG CREEK CONSTRUCTION, LTD. $ 1,706, NO CONTRACT AMOUNT $ 1,706, LIMITS: WALKER COUNTY LINE TO 0.23 MI WEST OF FM 945 TYPE: PROVIDE ADDITIONAL PAVED SURFACE WIDTH DISTRICT LUFKIN 3003 SHELBY US BR 2010(878) $ 2,103, NO AWARD CONTRACTOR: LONGVIEW BRIDGE AND ROAD, LTD. $ 2,104, NO CONTRACT AMOUNT $ 2,104, LIMITS: AT SMITH CREEK TO TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT FT WORTH 3027 TARRANT IH IM 8204(276) $ 1,561, NO AWARD CONTRACTOR: AUSTIN BRIDGE & ROAD, LP $ 1,243, NO CONTRACT AMOUNT $ 1,243, LIMITS: MARTIN STREET BRIDGE TO SUN VALLEY TYPE: REPAIR FAILURES AND OVERLAY WITH 2 INCHES NORTHBOUND AND SOUTHBOUND DISTRICT FT WORTH 3202 TARRANT CS BR 2006(767) $ 25,623, NO AWARD CONTRACTOR: TRADECO INFRAESTRUCTURA, INC. $ 22,720, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 22,720, LIMITS: W 7TH ST OVER THE TRINITY TO. TYPE: REPLACE BRIDGE AND APPROACHES
15 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 14 DISTRICT SAN ANGELO 3017 TOM GREEN VA STP 2011(588)G $ 370, NO AWARD CONTRACTOR: FLAT LINE, INC. $ 378, NO CONTRACT AMOUNT $ 378, LIMITS: VARIOUS LOCATIONS IN SJT DISTRICT TO TYPE: RETRACE PAVEMENT MARKINGS 3227 TRAVIS LP NH 2011(721) $ 776, NO AWARD CONTRACTOR: J.D. RAMMING PAVING CO., LTD. $ 756, NO CONTRACT AMOUNT $ 756, LIMITS: FM 969 TO SHADY LANE TYPE: PVMT REPAIR,MILL,SEAL&THIN OVERLAY 3224 TRAVIS US NH 2011(722) $ 1,521, NO AWARD CONTRACTOR: ANGEL BROTHERS ENTERPRISES, LTD. $ 1,359, NO CONTRACT AMOUNT $ 1,359, LIMITS:.46 MI W OF SPRINGDALE TO.68 MI S OF BOLM RD, ETC TYPE: PVMNT SURFACE REHAB-2 IN PLACE RCYC 3030 TRAVIS US STP 2011(723)HES $ 307, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 343, NO CONTRACT AMOUNT $ 343, LIMITS: AT LOYOLA LANE TO. TYPE: LENGTHEN LTL & ADD SAFETY LIGHTING 3029 TRAVIS FM STP 2011(726) $ 652, NO AWARD CONTRACTOR: ASPHALT PAVING COMPANY OF AUSTIN, INC. $ 524, NO CONTRACT AMOUNT $ 524, LIMITS: FM 2304 TO IH 35 TYPE: 20% LEVEL-UP, SEAL & OVERLAY
16 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 15 DISTRICT SAN ANTONIO 3033 UVALDE US NH 2011(742) $ 8,998, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 8,582, NO CONTRACT AMOUNT $ 8,582, LIMITS: 0.9 MI EAST OF FM 2369 TO VAL VERDE/KINNEY COUNTY LINE TYPE: WIDEN ROADWAY TO PROVIDE PASSING LANES DISTRICT BRYAN 3014 WASHINGTON US STP 2011(562)SB $ 649, NO AWARD CONTRACTOR: TEXAS HIGHWAY MAINTENANCE, LLC $ 846, NO CONTRACT AMOUNT $ 846, LIMITS: FM 1948 TO FM 2679 TYPE: SAFETY IMPROVEMENT WORK CONSISTING OF THE INSTALLATION OF A MEDIAN BARRIER 3223 WILLIAMSON FM STP 2011(727) $ 258, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 281, NO CONTRACT AMOUNT $ 281, LIMITS: SS 158 TO FM 1105 TYPE: SEAL COAT DISTRICT PHARR 3007 ZAPATA VA DMO 2008(627) $ 908, NO AWARD CONTRACTOR: ENCINO LANDSCAPE, INC. $ 1,025, SEE ATTACHMENT 1 CONTRACT AMOUNT $ 1,025, LIMITS: ZAPATA COUNTY BOAT RAMP TO AT ZAPATA LAKE TYPE: PARK AND BOAT RAMP IMPROVEMENTS DISTRICT LAREDO 3006 ZAVALA FM STP 2011(581) $ 960, NO AWARD CONTRACTOR: H. L. ZUMWALT CONSTRUCTION, INC. $ 835, NO CONTRACT AMOUNT $ 835, LIMITS: MI NO OF FM 65 TO US 83 TYPE: MILL AND INLAY OF EXISTING ROADWAY
17 ATTACHMENT 1 TO CONDITIONAL AWARD INFORMATION For December 2010 COUNTY NAME CONTRACT NUMBER CONTROLLING C S J PROJECT NUMBER ENTITY BELL STP 2011(633) City of Belton BRAZORIA CC Brazoria County BURLESON BR 2007(863) Burleson County CORYELL STP 2011(191) City of Copperas Cove DALLAS STP 2011(706)MM North Texas Council of Government (MPO APPROVAL) GONZALES BR 2009(182) Gonzales County HARRIS CC Houston Metropolitan Transit Organization HIDALGO STP 2008(131)MM City of Weslaco, Hidalgo County(MPO APPROVAL) MCLENNAN BR 2007(722) City of Robinson MCLENNAN BR 2009(351) City of Waco TARRANT BR 2006(767) North Central Texas Council of Governments ZAPATA DMO 2008(627) Zapata County
OPPORTUNITY ZONE TRACT LISTING
TRACT NUMBER COUNTY 48001950401 Anderson County 48001950901 Anderson County 48005000200 Angelina County 48005000500 Angelina County 48005000600 Angelina County 48005000700 Angelina County 48005001001 Angelina
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter
More informationAPPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,
APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952
More informationTexas Department of State Health Services Vital Statistics Unit
142 ANDERSON COUNTY 74 53 71.62% 200 ANDREWS COUNTY 16 9 56.25% 090 ANGELINA COUNTY 107 64 59.81% 017 ATASCOSA COUNTY -- CLERKS OFFICE 222 94 42.34% 074 AUSTIN COUNTY -- COUNTY CLERK 57 38 66.67% 220 BAILEY
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARlOUS Counties MINUTE ORDER Page 1 of 1 VARlOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter
More informationTexas Department of State Health Services Vital Statistics Unit
142 ANDERSON COUNTY 57 54 94.74% 200 ANDREWS COUNTY 38 25 65.79% 090 ANGELINA COUNTY 147 107 72.79% 017 ATASCOSA COUNTY -- CLERKS OFFICE 311 142 45.66% 074 AUSTIN COUNTY -- COUNTY CLERK 103 71 68.93% 220
More informationEXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.
Value from &! M East HOU M East HOU M East HOU &! M East HOU &! M East HOU IH 45 0271-14-217 0271-14-218 0271-14-213 0271-14-228 0500-03-462 0500-03-550 0500-03-565 Reconstruct US /IH 610 IC. Construct
More informationTEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements
TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2007-2010 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2007-2010 Prepared
More informationJuly 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007
July 2007 NO. 0707 UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 Tex-207-F, Determining Density of Compacted Bituminous Mixtures. is now on-line at the TxDOT website. This test procedure was implemented effective
More informationAGENDA. TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas THURSDAY June 30, 2005 * * *
INTERNET ADDRESS: http://www.dot.state.tx.us AGENDA TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas 78701-2483 THURSDAY June 30, 2005 * * * 9:00 A.M. CONVENE MEETING Approved 1. Approval
More informationTEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements
TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2008-2011 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2008-2011 Prepared
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More informationTexas Rural Transportaion Plan - Preliminary Project Rankings by District
Texas Rural Transportaion Plan - Preliminary Rankings by District RTP ID Score Rank District County Highway Description Limit From Limit To 271 564.7 171 Abilene Howard US 87 CONSTRUCT NEW RELIEF ROUTE
More informationTransportation Code, establishes prima facie reasonable and prudent speed limits for various categories of public roads, streets and highways.
TEXAS TRANSPORTATION COMMISSION V ARlO US Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Transportation Code, 545.352 establishes prima facie reasonable and prudent speed limits for various categories
More informationSAFE-D Members *updated 1/18/2019
SAFE-D Members *updated 1/18/2019 ESD/Organization Renewal month Austin County ESD 1 Sep 2019 Austin County ESD 3 Feb 2019 Bastrop County ESD 1 Aug 2019 Bastrop County ESD 2 Nov 2019 Bastrop/Travis Counties
More informationSafety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080
Selected for $2 Billion Allocation Safety SLRTP Rural priority IH 35 Corridor Border and Port Trade 100 most congested Ports to Plains Corridor IH 69 Corridor Rural System Preservation Other High Corridors
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationSAFE-D Members *updated 11/1/2017
SAFE-D Members *updated 11/1/2017 ESD/Organiza,on Aus$n County ESD 3 Feb 2018 Bastrop County ESD 1 Aug 2018 Bastrop County ESD 2 Nov 2017 Bastrop/Travis Coun$es ESD 1 May 2018 Bexar County ESD 12 Dec 2017
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationFY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo
More informationENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop
ENERGY SECTOR ROADWAY REPAIR PROJECT August 15, 2013 Industry Workshop Safety Moment Sign-in Sheet Exit Locations Gathering Point Directions from Emergency Responders Signal to re-enter the Building or
More informationTexas Rural Transportaion Plan - Preliminary Project Rankings by District
RTP ID Score Rank District County Highway Description Limit From Limit To 271 565.3 162 Abilene Howard US 87 CONSTRUCT NEW RELIEF ROUTE IH 20, 4 miles West of Big Spring FM 700, 3 miles North 7.5 1000
More informationPerforated Appendix Admission Risk-Adjusted-Rate, 2013
Perforated Appendix Admission -, 2013 The inside of the appendix forms a cul-de-sac that usually opens into the large intestine. When the inside of the appendix is blocked by a piece of stool, a foreign
More information13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? What is your primary means of transportation?
Overall Statewide Results 3 1 Houston 2 Dallas 3 Fort Worth 4 San Antonio 2 11 12 Austin 6 Laredo / Pharr 7 Corpus Christi / Yoakum 8 Bryan / Waco 9 Atlanta / Beaumont / Lufkin / Paris / Tyler Amarillo
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationDemographic Characteristics and Trends of Bexar County and San Antonio, TX
Demographic Characteristics and Trends of Bexar County and San Antonio, TX Leadership San Antonio Understand Infrastructure. Prepare for Growth. May 2, 2012 San Antonio, TX Select Growing States, 2000-2010
More informationTexas Strategic Highway Safety Plan Update. 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX
Texas Strategic Highway Safety Plan Update 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX Agenda Welcome and introductions (roll call) Review revised strategies Review new data runs
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationCommission Approved Stimulus Maintenance Projects
West Region TxDOT Districts: Abilene, Amarillo, Childress, El Paso, Lubbock, Odessa, San Angelo ABL HOWARD $5,052,463 Repair Roadway IH 20 MARTIN COUNTY LINE TO BIG SPRING Apr-09 ABL TAYLOR $222,634 Replace
More information09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:
MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationShort and Long Term Needs
Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationplyr Modelling large data Hadley Wickham
plyr Modelling large data Hadley Wickham 1. Strategy for analysing large data. 2. Introduction to the Texas housing data. 3. What s happening in Houston? 4. Using a models as a tool 5. Using models in
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More information"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Bexar Alamo
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationTEXAS TRAFFIC SAFETY TASK FORCE. Jeff Moseley Texas Transportation Commission
TEXAS TRAFFIC SAFETY TASK FORCE Jeff Moseley Texas Transportation Commission June 7, 2016 Fatalities and fatal crashes 2010 2015 4,000 3,500 3,417 3,407 3,536 3,533 3,000 3,061 3,067 2,782 2,803 3,037
More informationI-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design
I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationDIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)
More information10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028
Collin 54005 2351 01 017 FM 2478 FM 1461 to US 380 Collin 54005.1 2351 02 014 FM 2478 Collin 55038 2679 03 015 FM 2514 FM 1461 to North of FM 1461 East of Lavon Parkway to North of Drain Drive Widen two
More informationKalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission
FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort
More information2002 PLAGUE SURVEILLANCE REPORT (REVISED )
Zoonosis Control Division 1100 W 49 th Street Austin, Texas 78756 2002 PLAGUE SURVEILLANCE REPORT (REVISED 10-10-14) Each year Texas Department of Health (TDH) Zoonosis Control personnel, in cooperation
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More information03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
5 YEAR TIP LET LIST DIVISION 14 Let (B) TIP Sub No. Div County Let Type Description 10/14 I-5512 14 Division Design Raleigh Let (DDRL) I-40 REHABILITATE TUNNELS 15, 17, AND 104 12/14 W-5214M 14 Division
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationPedestrian Improvements Kemp Blvd Wichita Falls (Midwestern Pkwy to Southwest Pkwy)
EXHIBIT A TRANSPORTATION ALTERNATIVES PROGRAM (TAP) PROJECTS SELECTED FOR FUNDING SMALL URBAN AREAS (POPULATION 5,001 200,000) Nominating Entity TAP Project Name Federal Funds Bryan South College Phase
More informationODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationENERGY SECTOR COORDINATION
ENERGY SECTOR COORDINATION Darin Kosmak, Deputy Director TxDOT Rail Division November 4, 2013 Energy Sector Considerations Existing FM roads not built to handle truck traffic resulting from: Oil & natural
More informationGeneral References Definitions. (1) Design Guidance. (2) Supporting Information
Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to
More informationAppendix C Status of Major Projects from the TIP
Appendix C of Major Projects from the 2017-2020 TIP This page left blank intentionally of Major Projects Appendix C C 3 Appendix C of Major Projects from the 2017 2020 TIP Appendix C of the 2019-2022 Transportation
More informationMarch 27, All Nursing Facility Administrators
COMMISSIONER Jon Weizenbaum To: All Nursing Facility Administrators Subject: Information Letter (IL) No. 13-17 (Replaces IL 11-37) Provider Letter (PL) 13-12 (Replaces PL 11-08) Re: Minimum Data Set 3.0
More information2018 Challenger, CMZ, SCMZ, and Challenger 1-Day Events
2018 Challenger, CMZ, SCMZ, and Challenger 1-Day Events JANUARY 1st Weekend (6-7) Frisco Tennis School (City of Frisco) Challenger Willow Fork County Club Challenger Brazos Valley Tennis Association CMZ
More informationAGENDA TEXAS TRANSPORTATION COMMISSION. 125 East 11 th Street Austin, Texas THURSDAY April 30, 2009
INTERNET ADDRESS: http://www.txdot.gov AGENDA TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas 78701-2483 THURSDAY April 30, 2009 9:00 A.M. CONVENE MEETING 1. Approval of Minutes of
More informationGENERAL DESCRIPTION. Page 1 of 5
38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190
More informationThe Transportation Improvement Program
Waco Metropolitan Planning Organization The Transportation Improvement Program Waco Urbanized Area For Fiscal Years 2015 Through 2018 Proposed Amendment 4 FY 2016 PHASE: E COUNTY: McLennan LIMITS FROM:
More informationTexas County & District Retirement System Pension Trust Fund Schedule of Changes in Financial Net Position by Employer
Pension Trust Fund Schedule of Changes in Financial Net Position by Employer Year ended Dec. 31, 2015 2 3 4 638 Acton MUD $2,247,386 $60,155 $86,382 $(40,983) $105,554 $(37,998) $(1,647) $2,156 $(37,490)
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationAWARDED: CALL ORDER: 043 PROJECT NO.:NHPPY-203N(012)3P J.P. NUMBER:2972604C BAMS NO: 130128 CALENDAR DAYS ALLOTTED: 60 NHPPY-261N(012)3P 2967604C NHPPY-264N(008)3P 2972704C COUNTY: ATOKA HIGHWAY NO.: SH-7/SH-3
More informationSponsored By: Support From:
Sponsored By: Support From: A voluntary association of local governments, H-GAC provides a regional forum for cooperative action. Created by Texas, role defined by State and local governments: Area Agency
More informationAction Plan and Summary for Roads to Gravel
Impact of Energy Sector and Heavy Commercial Development Action Plan and Summary for Roads to Gravel Research Report RR-13-01 Prepared for Texas Department of Transportation Maintenance Division Prepared
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationProposed Action, Purpose and Need Technical Memorandum
Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas
More informationWelcome to Laredo Metropolitan Transportation Plan First Public Meeting. February 27 th, :30 PM to 7:30 PM. We value your opinion!
Welcome to Laredo 2015-2040 Metropolitan Transportation Plan First Public Meeting February 27 th, 2014-5:30 PM to 7:30 PM We value your opinion! Todays Objectives Initiate the planning exercise for the
More informationKentucky Highway District 7
Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More informationShort Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.
CAMPO Plan Priority Project List: Regionally Funded Projects (Projects may be funded by Federal, State or Local funding) AS AMENDED: 1/10/2011, 3/11/2011, 10/10/2011, 4/9/2012, and 10/8/2012 I. Roadway
More informationBASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)
NOTICE OF PUBLIC MEETING INTERSTATE HIGHWAY 30 (Rockwall) FROM: BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) 2642 CSJs: 0009-11-238; 0009-12-215; 0009-12-908 Dallas County and Rockwall County, Texas
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationCY2017 Summary of STP applications
CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run
More informationAnnual Listing of Obligated MPO Projects
Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,
More informationWildlife In The Landscape
Wildlife In The Landscape TPWD Katy Prairie Conservancy Urbanization The spread of human expansion and commerce into once wild areas, affecting and dispersing the wildlife through loss or alteration of
More informationEast Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May5 th through May 11 th, 2016 Road Maintenance This Week Striping Maintenance:
More informationTxAlerts (Flyer Program)
TxAlerts (Flyer Program) Presented by Ben Patterson Alert Program Administrator Missing Person Alerts TDEM oversees issuing AMBER, Silver, Blue and Endangered Missing alerts requested by local law enforcement
More informationImportant Lane Closures for Jan , 2012
Jan. 19, 2011 CONTACT: Marcia McAllister T: 703-572-0506 C: 571-730-9117 marcia.mcallister@dullesmetro.com Important Lane Closures for Jan. 22-28, 2012 Bridge Construction along Median of Route 7 Continues,
More informationUse of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA
Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic:
More informationDerby Street. Project Updates. Salem, Massachusetts
Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationOFFICIAL MINUTES. MINUTES OF THE DIRECTORS BOARD OF THE TEXAS MASTER GARDENERS ASSOCIATION FEBRUARY 3/2018 Texas A&M University College Station, Texas
OFFICIAL MINUTES MINUTES OF THE DIRECTORS BOARD OF THE TEXAS MASTER GARDENERS ASSOCIATION FEBRUARY 3/2018 Texas A&M University College Station, Texas Officers Present: President Nicky Maddams; 1 st Vice
More informationtexas department of transportation Commission Approved Stimulus Maintenance Projects
West Region TxDOT Districts: Abilene, Amarillo, Childress, El Paso, Lubbock, Odessa, San Angelo ABL HOWARD $5,052,463 Repair Roadway IH 20 MARTIN COUNTY LINE TO BIG SPRING Let ABL TAYLOR $222,634 Replace
More informationROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS
RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON
More informationUpdate January 4, 2016
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationFY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
-2022 Transportation Improvement Program Project Number Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AAMPO Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AAMPO Alamo Area Commute Solutions
More informationDISTRICT BICYCLE PROGRAM
DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist
More informationREGIONAL SAFETY ADVISORY COMMITTEE North Central Texas Council of Governments Transportation Council Room Friday, April 27, :00 am 12:00 pm
REGIONAL SAFETY ADVISORY COMMITTEE North Central Texas Council of Governments Transportation Council Room Friday, April 27, 2018 10:00 am 12:00 pm AGENDA 1. Approval of January 26, 2018 Meeting Summary
More information