1 Why Opencast Coal Mining? David Gosling and Sam Thistlethwaite Banks Mining

2 CPRE s VIEW OF OPENCASTING Not only do opencast mines deface some of our finest landscapes and wreck tranquillity, they can have a devastating effect on nearby communities and wildlife, while hindering efforts to reduce CO 2 emissions. The majority of local communities and local councils are overwhelmingly against new opencast mines. Local inquiries find that noise, pollution and disruption harm the health and recreation of residents, damage urban regeneration and discourage investment. Despite this, there is a worrying trend for the Government to overturn the decisions of County Councils and grant consent to damaging applications notably at Cramlington in Northumberland and Smalley in Derbyshire. CPRE website

3 NEED FOR COAL

4 GLOBAL COAL SUPPLY TO UK Russia Poland Columbia Australia

5 ACTUAL & PROJECTED UK OUTPUT

6 ENVIRONMENTAL ACCEPTABILITY In applying the principles of sustainable development to coal extraction, whether opencast or deep-mine, and to colliery spoil disposal, the Government believes there should normally be a presumption against development unless the proposal would meet the following tests: i) Is the proposal environmentally acceptable, or can it be made so by planning conditions or obligations? ii) If not, does it provide local or community benefits which clearly outweigh the likely impacts to justify the grant of planning permission? iii) In National Parks and Areas of Outstanding Beauty (AONBs), proposals must also meet the additional tests set out in paragraphs 28 and 29 below. iv) Proposals within or likely to affect Sites of Special Scientific Interest (SSSIs) and National Nature Reserves (NNRs) must meet the additional tests set out in paragraphs 30 and 31. v) Proposals within the Green Belt must meet the additional test in paragraph 36 below. MPG3, paragraph 8 disturbingly recent decisions suggest that in practice, there is now a presumption in favour of coal. CPRE website

7 BANKS TRACK RECORD AND SUCCESS RATE 140 Cumulative Coal Approvals Refused Sites Approved

8 NOISE SUPPRESSION Impact of noise suppression measures fitted by Banks Before After Reduction CAT RH RH Figures in db(a) Fitting of white noise reversing alarm

9 DUST SUPPRESSION Results of independent review of 22 months of Shotton Air Quality Data by Andy King Original forecast increase in for PM 10 18% Actual increase in PM %

10 ECOLOGY

11 LANDSCAPE

12 LANDSCAPE Visual Impact Monitoring

13 LANDSCAPE Tree Translocations

14 LANDSCAPE Growth of New Planting

15 IMPACT OF LORRIES

16 STAFF SKILLS AND TRAINING Noise Abatement Society John Connell Award 2004 Coal Authority Award for Environmental Excellence 2004

17 CUMULATIVE IMPACT

18 CUMULATIVE IMPACT Year Well Hill Shotton (inc Shotton Additional) Brenkley Lane Delhi Fox Covert Gardeners Houses Milkhope Brenkley North Brenkley Various planning permissions for coal extraction and waste disposal

19 CUMULATIVE IMPACT

20 CUMULATIVE IMPACT

21 CUMULATIVE IMPACT Scoping Response Brenkley Lane scoping report submitted March 2008 Combined response from Newcastle and Northumberland Councils Highlighted Cumulative impact one of three key issues, particularly in relation to: Landscape and Visual impact Ecology Highways Amenity (Dust, Noise, vibration)

22 CUMULATIVE IMPACT Landscape and visual impact Cumulative assessed included: Impacts upon regeneration primarily transport routes between Newcastle Airport and Cramlington Cumulative impacts upon the A1 Cumulative impacts upon Ponteland Road Cumulative effects upon landscape character

23 CUMULATIVE IMPACT Ecology Assessments undertaken of previously restored sites Assessments carried out on sections of currently active sites Cumulatively positive impact through creation of wide network of wildlife corridors

24 CUMULATIVE IMPACT Highways Cumulative assessment related to the then existing operational sites, Delhi and Shotton Concluded that the main transport routes to key customers, such as Alcan in Lynemouth, rail loading facility in Blyth and power stations in the Aire Valley were within capacity. Shotton appeal examined issues no change in numbers to situation then discussed, inspectors findings still applicable. Cumulative limit for traffic leaving Brenkley and Shotton going to Alcan was imposed.

25 CUMULATIVE IMPACT Amenity Established that past operations were in compliance with the limits for noise, dust and vibration. The proposed method of working was least disruptive. Allowing site to be worked now would provide surety to residents. Historically affected premises were significantly removed from most recent proposal

26 CUMULATIVE IMPACT Planning officer s conclusions Acknowledged no significant adverse amenity impacts from previous worked sites Cumulative visual impacts would be restricted to distant views and restored sites have had no significant disruption to the landscape Concurrent views of working sites would be limited and were not considered significant Recognised ecological disruption at working but also noted improved linked areas of nature conservation

27 ECONOMIC BENEFITS

28 LOCAL COMMUNITY BENEFITS

29 COMMUNITY BENEFITS

30 PERCEPTION v REALITY 53 Objectors Spoke

31 PERCEPTION v REALITY What do people dislike about their area? 73.50% Things disliked more than surface mines included: 25% Lack of recreational facilities, roads, public transport, antisocial behaviour, litter, crime, public service and people 1.20% Other Nothing Surface Mine Telephone Survey Cramlington/Dinnington Area December 2010

32 THE WAY FORWARD Ban all opencasting within 500 metres of dwellings (Mr Bridgen s Bill) The Localism Agenda Referenda

33 THE EFFECTS OF MR BRIDGEN S BILL

34 INVOLVING LOCAL PEOPLE

35 PUBLIC OPINION Telephone Survey

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

APPELLANT S STATEMENT OF CASE

APPELLANT S STATEMENT OF CASE TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.

More information

Newcastle Racecourse Masterplan. 1 Introduction. Completing the vision of a redeveloped Newcastle Racecourse Welcome to our exhibition.

Newcastle Racecourse Masterplan. 1 Introduction. Completing the vision of a redeveloped Newcastle Racecourse Welcome to our exhibition. 1 Introduction Completing the vision of a redeveloped Newcastle Racecourse Welcome to our exhibition. Please take a look at our information boards and feel free to ask members of the project team any questions

More information

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m. Welcome Welcome to the Transportation Master Plan Addendum December 4, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background PIC#1 Public Information Centre #1 (PIC#1) was held on June 25, 2012. Feedback

More information

Overview. 1. Design processes 2. Protection of countryside 3. Climate & transport

Overview. 1. Design processes 2. Protection of countryside 3. Climate & transport Overview 1. Design processes 2. Protection of countryside 3. Climate & transport Map data OpenStreetMap contributors also contains public sector information licensed under the Open Government Licence v3.0.

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

connectivity through walking and cycling

connectivity through walking and cycling active design case study the national forest: connectivity through walking and cycling active design principles in action: 1. ACTIVITY FOR ALL 2. WALKABLE COMMUNITIES 3. CONNECTED WALKING & CYCLING ROUTES

More information

Application No: MO/2018/0004 Location: Land at Langley Vale, South of Downs Road and east of Headley Road, Headley, Epsom

Application No: MO/2018/0004 Location: Land at Langley Vale, South of Downs Road and east of Headley Road, Headley, Epsom 26 February 2018 5 Woodlands Way Ashtead KT21 1LH Telephone: 01372 274925 Email: rbennett@dsl.pipex.com The Chief Planning Officer Mole Valley District Council Pippbrook Dorking Surrey RH14 1SJ Dear Sir,

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169 Styal Golf Course Accommodation Works Non-Technical Summary 1007/6.15.2/169 September 2013 Document Control Sheet Project Title: Styal Golf Course Report Title: Non Technical Summary Document No: 1032775.014.001

More information

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey: Old Strathcona s neighbourhood renewal process is now at the draft concept design phase. Over the last several months, the city has been gathering local knowledge and resident input that has been used

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Section 2 Strategic Alignment. Contents

Section 2 Strategic Alignment. Contents Section 2 Strategic Alignment Contents 2 Strategic Alignment... 2 2.1 General... 2 2.2 SmartGrowth Strategy and Implementation Plan... 2 2.3 Walking and Cycling Strategy... 3 2.4 Built Environment Strategy...

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel

More information

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119

More information

Submission Cover Sheet Mordialloc Bypass Project EES IAC

Submission Cover Sheet Mordialloc Bypass Project EES IAC Submission Cover Sheet Mordialloc Bypass Project EES IAC 61 Request to be heard?: yes Full Name: Organisation: Affected property: Attachment 1: Attachment 2: Attachment 3: Comments: Lucinda Bertram Aspendale

More information

Your views are important. Please fill in a form before you leave. Or alternatively

Your views are important. Please fill in a form before you leave. Or alternatively Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people

More information

M6 Junction 10 Public Consultation

M6 Junction 10 Public Consultation M6 Junction 10 Public Consultation December 2015 Introduction Walsall Council and Highways England are developing plans to provide a long term improvement to M6 junction 10. We are holding this non-statutory

More information

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) West Midlands Interchange Transport Assessment DCO Submission WEST MIDLANDS INTERCHANGE SUBJECT: Technical Note 22 Review of Vicarage Road Junction

More information

BLYTHEWOOD PARK, BROMLEY

BLYTHEWOOD PARK, BROMLEY BLYTHEWOOD PARK, BROMLEY Proposed Access Junction to Serve a Single Residential Dwelling On behalf of Robert Pooke CONTENTS Introduction...1 Appeal Site and Planning History...2 Relevant Transport Policy...4

More information

Policy Statement. Page 2 of 5

Policy Statement. Page 2 of 5 Scottish Wildlife Trust Policy Policy November 2008 Killing of wild animals Scope of this policy 1. This policy (2008) covers of the Scottish Wildlife Trust s (SWT) views on killing of wild animals. It

More information

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager 20mph Speed Limit Trial Warrington Borough Council Mark Tune Traffic Management & Road Safety Manager Benefits of reduced speed Reduced number and severity of accidents More cycle friendly environment

More information

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017 Virginia Street Bus RAPID Transit Extension Project Environmental Assessment (EA) Presentation Public Hearing June 22, 2017 Presentation to RTC July 17, 2015 Presentation Overview Project Timeline Environmental

More information

Our journey a 20 year Transport Manifesto for the North East

Our journey a 20 year Transport Manifesto for the North East Our journey a 20 year Transport Manifesto for the North East Sustrans submission to North East Combined Authority (NECA). March 2016 Summary Sustrans is a leading UK charity enabling people to travel by

More information

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK Elaine Brick Principal Transport Planner AECOM Abstract Smarter Travel funding was awarded to the Chartered Institute of Highways and Transportation

More information

TEST OF ENGLISH FOR EDUCATIONAL PURPOSES

TEST OF ENGLISH FOR EDUCATIONAL PURPOSES TEST OF ENGLISH FOR EDUCATIONAL PURPOSES Practice Test 2 SOURCE BOOKLET University of Reading 2007-12 Questions relating to the following text are in the Task Booklet University of Reading 2007-12 page

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

LOUTH LOCAL AUTHORITIES. Policy on non Regulatory Road Signage

LOUTH LOCAL AUTHORITIES. Policy on non Regulatory Road Signage 1. BACKGROUND LOUTH LOCAL AUTHORITIES Policy on non Regulatory Road Signage 1.1 This policy relates solely to sign/ objects/advertisements placed on Public Roads, footpaths or open spaces and which may

More information

Bait collection and the law

Bait collection and the law Angling Trust Eastwood House 6 Rainbow Street Leominster Herefordshire HR6 8DQ admin@anglingtrust.net www.anglingtrust.net 0844 7700616 Bait collection and the law Introduction For many sea anglers the

More information

F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone

F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone F4.1. Zone description This section addresses the provisions relating to moorings in the Coastal Mooring Zone and those outside the

More information

72 Crossrail Amendment of Provisions

72 Crossrail Amendment of Provisions 72 Crossrail Amendment of Provisions Manhattan Shaft Worksite 5.4.36 This new worksite is adjacent to the Tumbling Bay worksite and will occupy an area of land between the Manhattan Building and the Great

More information

Comments The Plan for Port Whitby

Comments The Plan for Port Whitby Comments The Plan for Port Whitby April 24th, 2013 Community Meeting #2 Summary Report Prepared by GLPi April 29th, 2013 1 Introduction The purpose of the Port Whitby Secondary Plan Update, Community Improvement

More information

Walking and urban planning. Maurizio TIRA Environmental Engineer, Full Professor of Town and regional planning Università degli Studi di Brescia

Walking and urban planning. Maurizio TIRA Environmental Engineer, Full Professor of Town and regional planning Università degli Studi di Brescia Walking and urban planning Environmental Engineer, Full Professor of Town and regional planning Università degli Studi di Brescia The presentation analyses the main obstacles to walking and shows how planning

More information

The use of the open areas of the Orion Park site for motorbike training has been a matter of continuing distress and concern to local residents.

The use of the open areas of the Orion Park site for motorbike training has been a matter of continuing distress and concern to local residents. Please reply to: 34 Wellington Road Northfields Ealing W5 4UH James Egan Planning Services Ealing Council Perceval House 14-16 Uxbridge Road Ealing W5 2HL 11 th January 2015 Dear Mr Egan, Planning Application

More information

Much Wenlock Neighbourhood Plan Land and Premises Availability Assessment

Much Wenlock Neighbourhood Plan Land and Premises Availability Assessment How to submit a site Much Wenlock Neighbourhood Plan Land and Premises Availability Assessment Guidance Notes for completing the form Please use the attached form to suggest sites or premises that you

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

ABERDEEN: CITY OF THE FUTURE

ABERDEEN: CITY OF THE FUTURE ABERDEEN: CITY OF THE FUTURE A contribution towards discussions on a future transport strategy for Aberdeen and its Region Prepared by the Centre for Transport Research University of Aberdeen June 2010

More information

The boards contain our dra Vision & Objec ves for Danbury.

The boards contain our dra Vision & Objec ves for Danbury. Welcome Thank you for visi ng today The boards contain our dra Vision & Objec ves for Danbury. We are also displaying a map of Danbury showing the sites that have been put forward to build the 100 new

More information

MEMORANDUM OF UNDERSTANDING ON THE CONSERVATION OF MIGRATORY BIRDS OF PREY IN AFRICA AND EURASIA

MEMORANDUM OF UNDERSTANDING ON THE CONSERVATION OF MIGRATORY BIRDS OF PREY IN AFRICA AND EURASIA MEMORANDUM OF UNDERSTANDING ON THE CONSERVATION OF MIGRATORY BIRDS OF PREY IN AFRICA AND EURASIA The Signatories Recalling that the Convention on the Conservation of Migratory Species of Wild Animals,

More information

Blyth Estuary Green Travel Project

Blyth Estuary Green Travel Project Blyth Estuary Green Travel Project Green Infrastructure Case Study Creating the UK s first Active Travel Town The Connect 2 Blyth Estuary Green Travel Project shows how green infrastructure can enable

More information

ADDITIONAL EVIDENCE: OTTERS. Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway

ADDITIONAL EVIDENCE: OTTERS. Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway ADDITIONAL EVIDENCE: OTTERS Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway Cardiff University Presented to the Inquiry with a supplementary

More information

3.9 Recreational Trails and Natural Areas

3.9 Recreational Trails and Natural Areas 3.9 Recreational Trails and Natural Areas 3.9.1 Introduction Parks and other recreational facilities such as trails, bicycle routes, and open space are important community resources. This section discusses

More information

Smart Growth: Residents Social and Psychological Benefits, Costs and Design Barbara Brown

Smart Growth: Residents Social and Psychological Benefits, Costs and Design Barbara Brown Smart Growth: Residents Social and Psychological Benefits, Costs and Design Barbara Brown By Scott Siedor 11 At the invitation of the Goodwin-Niering Center for the Environment, Barbara Brown came to Connecticut

More information

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints

More information

Connections to the Wild Salmon Resource in prince William Sound/southeast

Connections to the Wild Salmon Resource in prince William Sound/southeast Connections to the Wild Salmon Resource in prince William Sound/southeast Highlights of Opinion Research Sponsored by The Salmon Project As part of a feasibility study in early 2013, the Salmon Project

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

RESOURCE CONSENT APPLICATION FOR B & R MCKENZIE MOETAPU BAY. Our Ref: Date: November2015. Our Ref:

RESOURCE CONSENT APPLICATION FOR B & R MCKENZIE MOETAPU BAY. Our Ref: Date: November2015. Our Ref: RESOURCE CONSENT APPLICATION FOR B & R MCKENZIE MOETAPU BAY Our Ref: 25876 Date: November2015 Our Ref: 25876 1 Our Ref: 25876 16 November 2015 1. BACKGROUND INFORMATION IN SUPPORT OF A RESOURCE CONSENT

More information

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide) Phase 1 Consultation: Understanding the Need Feedback Form Thank you for participating in this phase of planning for the George Massey Tunnel Replacement. Your feedback is important to us. Input received

More information

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT WELCOME TO PUBLIC INFORMATION CENTRE #1 AIRPORT ROAD ENVIRONMENTAL ASSESSMENT From Braydon Boulevard/Stonecrest Drive to Countryside Drive November 23, 2017 6:30 PM 8:30 PM Please sign in and fill out

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Environmental Protection on the Gold Coast of Queensland, Australia. 1. What is the appeal of the Gold Coast to tourists?

Environmental Protection on the Gold Coast of Queensland, Australia. 1. What is the appeal of the Gold Coast to tourists? Environmental Protection on the Gold Coast of Queensland, Australia Sections 1. What is the appeal of the Gold Coast to tourists? 2. How are Gold Coast visitor trends changing? 3. How can the impacts of

More information

Idea-66: Westbound I-66 Inside the Beltway

Idea-66: Westbound I-66 Inside the Beltway Southeastern Institute of Research Idea-66: Westbound I-66 Inside the Beltway Stakeholder Telephone Survey Pulsar Advertising December 22, 2004 G 1 Agenda I. Objectives II. Methodology III. Key Findings

More information

What if YOU could help plan Northern Virginia s transportation future?

What if YOU could help plan Northern Virginia s transportation future? What if YOU could help plan Northern Virginia s transportation future? Photo credits: Washington Metropolitan Area Transit Authority And improve the quality of life in your community -- for yourself, your

More information

Risk Management Case Studies. The National Trust Experience. Caroline Steel Solicitor National Trust Legal Team

Risk Management Case Studies. The National Trust Experience. Caroline Steel Solicitor National Trust Legal Team Risk Management Case Studies The National Trust Experience Caroline Steel Solicitor National Trust Legal Team The National Trust as a landowner / manager We have quite a lot to consider: Coastline over

More information

Berkeley Strategic Transportation Plan A-76

Berkeley Strategic Transportation Plan A-76 Berkeley Strategic Transportation Plan A-76 Appendices 1. A Team Effort 2. Where We ve Been A-11 Berkeley Strategic Transportation Plan Alameda County Transportation Plan Alameda County will be served

More information

Public Consultation Centre For. Transportation Master Plan Update. Information Package

Public Consultation Centre For. Transportation Master Plan Update. Information Package Public Consultation Centre For Transportation Master Plan Update Information Package Date Location Hours Tuesday, September 12, 2017 Wednesday, September 13, 2017 Tuesday, September 19, 2017 Cambridge

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

STONY PLAIN ROAD STREETSCAPE

STONY PLAIN ROAD STREETSCAPE Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where

More information

Overview of the Tokyo 2020 Games Sustainability Plan

Overview of the Tokyo 2020 Games Sustainability Plan Overview of the Tokyo 2020 Games Sustainability Plan June 2018 The Tokyo Organising Committee of the Olympic and Paralympic Games 1 The Sustainability Concept of the Tokyo 2020 Games Be better, together

More information

Transit boulevard: A new road type for Sydney s Growth Centres

Transit boulevard: A new road type for Sydney s Growth Centres Transit boulevard: A new road type for Sydney s Growth Centres Cleaver, M. A., de Roos, M. P., NSW Centre for Road Safety, Roads and Traffic Authority, NSW Collins, G., Network Services, Roads and Traffic

More information

Visual impact assessment viewpoint analysis

Visual impact assessment viewpoint analysis Visual impact assessment viewpoint analysis 1 Introduction In this section we analyse the most important viewpoints affected by this development. In each viewpoint where it is relevant we have cross referred

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

PUBLIC INQUIRY QUESTION

PUBLIC INQUIRY QUESTION M4 Corridor around Newport PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ/156 RAISED BY: The Inspector DATE: 31/01/18 RESPONDED BY: Matthew Jones DATE: 02/03/18 SUBJECT: The Welsh Government s response to

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

Wild Virginia and Heartwood first raised this issue at the May 19, 2014 public meeting.

Wild Virginia and Heartwood first raised this issue at the May 19, 2014 public meeting. June 13, 2014 Karen Stevens Pat Sheridan, District Ranger Warm Springs Ranger District 422 Forestry Road Hot Springs, VA 24445 karenlstevens@fs.fed.us psheridan@fs.fed.us re: Lower Cowpasture Restoration

More information

Watford Health Campus LLP. Watford Fields Residents Association. Re: Wiggenhall Road Junction

Watford Health Campus LLP. Watford Fields Residents Association. Re: Wiggenhall Road Junction Watford Health Campus Partnership LLP Watford Health Campus LLP Watford Fields Residents Association C/o Jags Shah Tempsford Hall Sandy Beds SG19 2BD 27 th January 2016 Re: Wiggenhall Road Junction Dear

More information

Adrian J Tidbury - Estates and Valuation Surveyor Portfolio Development

Adrian J Tidbury - Estates and Valuation Surveyor Portfolio Development 18th September 2017 Community, Health & Housing Committee Courage Playing Fields Report of: Wards Affected: This report is: Adrian J Tidbury - Estates and Valuation Surveyor Portfolio Development Shenfield

More information

University of Leeds Travel Plan

University of Leeds Travel Plan University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3

More information

Parish Council s Comments Planning Reference Land at Ledbury Road, Wellington Heath November 2018

Parish Council s Comments Planning Reference Land at Ledbury Road, Wellington Heath November 2018 2018 Planning Reference 184105 - Land at Ledbury Road, Wellington Heath 183936 - Treetops, Horse Road, Wellington Heath 183920 - The Beck, The Common, Wellington Heath 183143/F - Variation to Permission

More information

ECONOMIC DEVELOPMENT ELEMENT

ECONOMIC DEVELOPMENT ELEMENT ECONOMIC DEVELOPMENT ELEMENT Background The Economic Development Element considers labor force and labor force characteristics, employment by place of work and residence, and analysis of the community

More information

COUNT ME IN PEDESTRIAN COUNTERS CASE STUDY ABOUT THIS CASE STUDY:

COUNT ME IN PEDESTRIAN COUNTERS CASE STUDY ABOUT THIS CASE STUDY: COUNT ME IN PEDESTRIAN COUNTERS CASE STUDY ABOUT THIS CASE STUDY: Getting hold of good data on the number of pedestrians is invaluable to plan and prioritise walking-friendly streets. This case study explains

More information

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016 Road to the future What road users want from Highways England s 2020-25 Route Strategies Summary report November 2016 Road to the future Summary report Foreword Guy Dangerfield Transport Focus aims to

More information

Connections to the Wild Salmon Resource in cook inlet

Connections to the Wild Salmon Resource in cook inlet Connections to the Wild Salmon Resource in cook inlet Highlights of Opinion Research Sponsored by The Salmon Project As part of a feasibility study in early 2013, the Salmon Project sponsored extensive

More information

SANDRINGHAM GOLF LINKS PROJECT

SANDRINGHAM GOLF LINKS PROJECT SANDRINGHAM GOLF LINKS PROJECT STAKEHOLDER ENGAGEMENT BACKGROUND INFORMATION PAPER SEPTEMBER 2017 This paper provides information regarding the context for the concept proposal for the Sandringham Golf

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/W 005 E05 CROSSING, FULLERS END THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION

More information

BICYCLE PARKING IN RESIDENTIAL AREAS

BICYCLE PARKING IN RESIDENTIAL AREAS Infrastructure Give Cycling a Push INFRASTRUCTURE/ PARKING BICYCLE PARKING IN RESIDENTIAL AREAS Overview In residential areas, all residents should have safe overnight storage for a bicycle. This is crucial

More information

PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013

PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013 PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013 On behalf of its 40,000 plus members, The BC Wildlife Federation welcomes the opportunity to address the

More information

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN Indian Nations Council of Governments August 2005 CONTACTING INCOG In developing the Destination 2030 Long Range Transportation Plan, INCOG s Transportation

More information

Local Highway Panels Members Guide. 4 Signs & Road Markings

Local Highway Panels Members Guide. 4 Signs & Road Markings Local Highway Panels Members Guide 4 Signs & Road Markings 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Road Signs and Road Markings on the public highway are governed by legislation.

More information

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council Sustainable Urban Mobility Plan for Aberdeen, Scotland Louise Napier Senior Planner Aberdeen City Council A bit about me.. Louise Napier Senior Planner (Transport Strategy & Programmes) Aberdeen City Council

More information

Speed Limits in the Hoddle Grid

Speed Limits in the Hoddle Grid Speed Limits in the Hoddle Grid Recent History of speed limits March 2013 Docs # 7738485 1 Introduction Muncipalities have power to Erect speed limit signs BUT Municipalities DO NOT have the power to approve

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience Page 1 of 5 Work With Us Free Newsletter Stay Connected Home About Services Training Projects Placemaking Blog Resources Reference Store Great Public Spaces Image Collection Raymond Avenue: Rightsizing

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

Neighbourhood Development Plan for Ickford Parish Council October 2015

Neighbourhood Development Plan for Ickford Parish Council October 2015 Neighbourhood Development Plan for Ickford Parish Council October 2015 Key Points Neighbourhood Development Plans (NDPs) are a new tier of planning documents introduced by the Localism Act in 2011. They

More information

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG)

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG) The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG) Summary. The Berwick-upon-Tweed Conservation Area Advisory Group (CAAG) is a Forum that comprises a number of organisations and representatives

More information

Local Highway Panels Members Guide. 2 Speed and Traffic Management

Local Highway Panels Members Guide. 2 Speed and Traffic Management Local Highway Panels Members Guide 2 Speed and Traffic Management 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Following the publication of the DfT guidance on setting local speed

More information

2019 Development Charge Study: Historical Service Standards. Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018

2019 Development Charge Study: Historical Service Standards. Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018 2019 Development Charge Study: Historical Service Standards Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018 Agenda Service Standards Service Standards Service Standard

More information

Civil Parking Enforcement of Bus Lane Contraventions. Yes. Yes

Civil Parking Enforcement of Bus Lane Contraventions. Yes. Yes Name of meeting: CABINET Date: 6 June 2014 Title of report: Civil Parking Enforcement of Bus Lane Contraventions Is it likely to result in spending or saving 250k or more, or to have a significant effect

More information

CLOSED. Highlights of the Final Concept Design:

CLOSED. Highlights of the Final Concept Design: The final Concept Design is the result of many months of listening, learning, creating, balancing, and understanding different needs and viewpoints, as well as incorporating technical requirements and

More information

20mph. We want to make Edinburgh a better and safer place to live, work and play.

20mph. We want to make Edinburgh a better and safer place to live, work and play. 20mph CREATING A BETTER SAFER EDINBURGH We want to make Edinburgh a better and safer place to live, work and play. That s why on 13 January 2015 Councillors approved a new speed limit network for Edinburgh

More information

Lane Rental - A Utility Perspective. Paul Gerrard Street Works Manager, National Grid

Lane Rental - A Utility Perspective. Paul Gerrard Street Works Manager, National Grid Lane Rental - A Utility Perspective Paul Gerrard Street Works Manager, National Grid Introduction Energy Networks Association (ENA) represents the wires and pipes transmission and distribution network

More information