1 NORDSYNC ANNUAL REPORT 2016 Grenoble 1

2 Content 1. Introduction Nordsync`s financial contribution to ESRF Organisation of Nordsync Distribution of shares Nordsync`s representation in Council and Administrative and Financial committee (AFC) Nordsync visibility at ESRF Purchases from the Nordic countries Nordsync annual meeting Appendix 1. Beam time statistics Appendix 2. Purchase return coefficients Appendix 3. Minutes of the annual Nordsync meeting Appendix 4. Calculation of the national shares Appendix 5 Nordsync delegation Edited by Aase Hundere (Research Council of Norway) and Helmer Fjellvåg (University of Oslo) Cover: View from the main building towards the storage ring in 2015 following completion of phase I of the upgrade

3 Nordsync Annual report Introduction The four Nordic countries Denmark, Finland, Norway and Sweden are members of the ESRF through the consortium Nordsync, as formulated in the revised agreement concerning Nordsync that entered into force as from January An objective for Nordsync is to coordinate and enhance the use of synchrotron radiation for scientific and industrial research in the Nordic countries, and also to promote purchases to ESRF from Nordic companies. The members of ESRF are presented in Figure 1. Figure 1: ESRF members and associated (2016). During the period the facility undergoes an ambitious modernisation programme in two phases with total investments of 330 MEUR. ESRF was in 2016 able to support a record number of experimental sessions. This increase is a direct consequence of the renewed beamline portfolio being built in the Upgrade Phase 1 which was completed in The Upgrade program allowed not only new scientific investigations but also shorter and more efficient experiments, says Director General Francesco Sette in the ESRF Annual report

4 Figure 2. ESRF Upgrade programme The ESRF Extremely Brilliant Source program (ESRF- EBS) is overall in schedule in Most importantly the project is well off the starting blocks and substantial progress has been made both on the accelerator and experimental sides. This gives a high activity in procurements at ESRF which also has given a positive effect on Nordsync`s purchase return coefficient. The Phase II of the Upgrade Programme with a budget of 150 million EUR, includes construction of a new storage ring with a performance increased by a factor of 100, construction of new state-of-the-art beamlines and an instrumentation programme including optics and detectors. 2. Nordsync's financial contribution to ESRF At its 64 th meeting in November 2016, the ESRF Council approved the budget for 2016 of EUR The Nordsync contribution to the ESRF budget for 2016 amounted to EUR This contribution consists of two components: i) 5 % Nordsync share of the ESRF budget and ii) Nordic overuse of beam time according to ESRF rules for corrective measures. Table 1 gives an overview of Nordsync`s contributions to ESRF in the period

5 Table 1. Nordsync's contributions to ESRF`s income budget in ESRF income budget Share Members contribution (EUR)* Exceptional contribution overuse beam time (EUR)* Total contribution Nordsync (EUR)* Nordsync use beam time (%) ,50 Nordsync ideal share (%) * Source: Calls for contribution Corrective measures and effect on the distribution of shifts for Nordsync In order to balance the scientific use of ESRF there are guidelines in place to regulate this. Each member and associated partner can add 10 % value of used beam time to their ideal share. Use of beam time exceeding 10 % is regarded as "overuse" and the member is requested to pay an exceptional contribution. Beam time granted through a peer review, and though the number of Nordsync proposals submitted roughly corresponds to the 5 % share, the quality of the proposals from the Nordic user communities are of a quality, so they are awarded more than 6 % of the beam time. As a consequence Nordsync has annually paid exceptional contribution for overuse according to the rules for corrective measures. In 2014 the Nordic use of beam time was "all time high" with a share of 6.99 %. This reflects that the Nordic synchrotron user communities are very competitive at ESRF, however this success also comes with a price. From 2015 Nordsync implemented a new routine giving the consortium a possibility to control costs corresponding to exceptional contribution. The implemented routine is as follows: Allocation of beam time above 6.5 % (calculated on an average for a calendar year) needs approval from the four Nordsync members. The scientific consequence of the new routine is that there can be limitations other than through the peer review process, for beam time allocated to the Nordic user communities. In 2016 about 45 shifts of beam time allocated through the peer review system were removed from the final allocation to Nordsync researhers. The Nordsync consortium will continue carefully monitoring the effect of the capping of beam time exceeding 6.5 %. Currently, it is estimated that more than 1000 scientists (including PhD students) from the Nordic countries are engaged in synchrotron based research. Out these approx. 300 use ESRF in their research annually. 5

6 3. Organisation of Nordsync 3.1 Distribution of shares The distribution of national shares between the four Nordsync countries changes every third year based on the distribution of DONE shifts at the ESRF beamlines by the national users, in preceding three years. This procedure is in accordance with the Nordsync agreement (2008). The annual shares for each country of the done shifts for Nordsync are given in Table 1. The calculated distribution of share for the periods ( ) and ( ) are presented in Table 2. See appendix 4 for more detailed description of the calculation of the national shares Table 2 Annual distribution of the DONE shifts at ESRF between the Nordsync countries Annual percentage of the distribution of shifts Data mining for distribution of shares (periods) Year Denmark Finland Norway Sweden % 13.2 % 24.1 % 43.0 % X % 8.2 % 16.3 % 47.0 % X % 9.7 % 22.7 % 42.0 % X % 11.6 % 28.9 % 36.7 % X % 20.0 % 24.0 % 33.7 % X % 15.6 % 23.9 % 37.9 % X % 15.8 % 20.8 % 41.3% X % 12.9% 16.4% 42.4% X 2017 X Table 3 National shares of the Nordsync membership of ESRF ( ) and ( ) National shares Denmark % % Finland % % Norway % % Sweden % % Subtotal 100 % 100 % The scientists apply for beam time at all public beamlines and available CRGs at ESRF. Each beamline is equipped with advanced infrastructures mostly specialized for particular areas of research. The distribution of beam time is categorized into 12 different scientific categories and allocated by the beam line review committees. The allocated beam time to Nordic users distributed per scientific category is presented in Figure 3. There are quite large differences between the four countries; Sweden and Finland have their most successful groups within structural biology MX. Denmark has the majority of done shifts within materials science and the Norwegian use is dominated by utilization of the Swiss Norwegian beam line (SNBL). 6

7 No of shifts Sweden Finland Denmark Norway Figure 3: Distribution of beam time statistics at ESRF pr. scientific area for the Nordsync countries in Nordsync`s representation in Council and Administrative and Financial committee (AFC) The Nordsync steering committee has a representative from each of the member's countries. The members of the steering committee represent Nordsync in the ESRF Council as: 1. Member of Council and Head of Delegation (HoD) 2. Member of Council 3. Member of Council 4. Adviser in the Council and substitute for a member and Vice Head of Delegation According to the decision of the Nordsync Annual Meeting 2013, the council assignments shall rotate every second year among the steering committee members following the order Sweden-Finland-Norway-Denmark, with the Swedish representative acting as Head of Delegation in 2012, Finland in and so forth. Head of delegation 2012: Sweden : Finland : Norway : Denmark : Sweden and so forth. According to the decision made in the Nordsync Annual Meeting 2013, the administrative and finance committee (AFC) assignments shall rotate every second year among the steering 7

8 committee members following the order Sweden-Finland-Norway-Denmark, with the exception during This is due to Norway acting as the chair of the AFC in The (three) two-year rotations of AFC HoD follow: : Finland : Denmark : Norway : Sweden Delegations in 2016 The representation of Nordsync in the ESRF Council by the steering committee was in 2016 as follows: Head of Delegation Helmer Fjellvåg, Norway (June & November Council meetings) Delegate Sine Larsen, Denmark (June & November Council meetings) Delegate Ingmar Persson, Sweden (June and November Council meeting) Adviser Keijo Hämäläinen (June & November Council meetings) The representation of Nordsync in the AFC in 2016 was as follows: Anders Kjær, Denmark, delegate (Head of Delegation, May and October, 2016) Ritva Taurio, Finland, delegate (May and October, 2016) Aase M. Hundere, Norway, adviser (May & October, 2016) Winnie Birberg, Sweden, delegate (May and October, 2016) 8

9 4. Nordsync visibility at ESRF Mikael Eriksson has been a member of Machine Advisory Committee (MAC) in Ragnvald Mathiesen has been a delegate to the Scientific Advisory Committee (SAC) and five other Nordic representatives have been members of the review committees in 2016 names highligted in bold in the below list: Review committees for beam time allocation Following the reorganisation in 2012, there were 10 beam time allocation committees in The committees are nominated by the Research Directors at ESRF. All member countries are welcome to suggest candidates for the committees and the Nordsync consortium generally encourages national user communities to take this opportunity. The members from Nordsync countries are highlighted in the list. Surfaces & Interfaces Science: C01 (Chair: Edwin Lundgren, Sweden) This deals with surfaces and interface science, including diffraction and spectroscopy. The remit is beamlines ID01, ID03, BM25B and BM32. Chemistry: C02 (Chair: Olivier Thomas); Ragnald Mathiesen, Norway, David Wragg, Norway This committee deals with proposals related to chemistry, atomic structures of material, engineering materials sciences and diffraction. The remit is beamlines ID11, ID15A, ID15B and ID22. Spectroscopy: C03 (Chair: Andrea Severing) The committee deals with spectroscopy, magnetism, chemistry and the electronic structures of materials. The remit is beamlines ID12, ID20, ID26, ID32 and BM28. Structure of Materials: C04 (Chair: Federico Boscherini) The committee addresses the electronic and magnetic properties of materials; structural properties aspects are included but only when related directly to magnetic or electronic properties. Techniques/methods include EXAFS, Powder Diffraction, Magnetism. The remit is beamlines ID24, BM01B, BM08, BM20, BM23, BM25A, BM26A and BM30B Diffraction: C05 (Chair: Valentina Giordano) This committee deals with studies of the structures of ordered systems, studies under extreme conditions, dynamics and spectroscopy. The beamline remit is: ID06-LVP, ID09A, ID18, ID27, ID28 and BM01A. Biomedical and Engineering Materials Research: C06 (Chair: Bert Müller); Per Ahlberg, Sweden This committee deals with studies of industrial or engineering relevance, as well as biomedical research involving 2D-3D X-ray imaging. In addition it reviews radiobiology and radiotherapy-related proposals. The remit is beamlines ID17 and ID19. Nanomaterials: C07 (Chair: Owen Addison) The committee reviews proposals involving nanomaterial, environmental science, and spectroscopy. The beamline remit is ID13, ID16B-NA and ID21 SAXS and soft condensed matter: C08 (Chair: Helga Lichtenegger) The committee reviews proposals on SAXS and soft condensed matter. The beamline remit is BM26B. Soft condensed matter: C09 (Chair: Michel Goldmann); Adrian Rennie, Sweden 9

10 This committee reviews proposal on spectroscopy and diffraction experiments on soft condensed matter. The beamline remit is ID09B, ID10 and BM02 Structural Biology: C10 (Chair: Gerlind Sulzenbacher) Marjolein Thunnissen, Sweden The committee reviews proposals to study the structures of biological macromolecules using X-ray crystallography. Experimental methods include single or multi-wavelength anomalous dispersion (SAD/MAD), molecular replacement using fixed wavelength X-rays, and Laue techniques. The beamline remit is IS14-1, ID23-1, ID23-3, ID29, ID30A-1, BM29, BM14U and BM30A. Staff at ESRF with Nordic affiliation A handful people with Nordic affiliation are among the staff at ESRF. Table 4 Staff with Nordic affiliation at the ESRF in Engineers Name First name Nationality Contract SVENSSON OLOF SWEDISH CDI OHLSSON STAFFAN SWEDISH CDI OSKARSSON MARCUS SWEDISH CDI Post-Docs. Name First name Nationality Contract PEDERSEN MARTIN NORS DENMARK CCD SUURONEN JUSSI-PETTERI FINLAND CCD Scientist Name First name Nationality Contract HONKIMAKI VEIJO FINLAND CDI WULFF MICHAEL DENMARK CDI CDD = temporary contract, CDI = permanent contract Senior technician Name First name Nationality WIKER GEIR NORWAY Staff at SNBL The CRG Swiss-Norwegian Beamline (SNBL) at BM01 A + B is one of the most successful and productive beamlines at ESRF which contribute to a positive Nordic visibility at ESRF. The possibility to use combined techniques at SNBL is considered particularly attractive to many users. In 2016 there was a restructuring of beamlines at SNBL. Beamline BM01B was moved to BM31 in May. The new beamline was in user operation from October The new beam line at SNBL increase the flexibility and possibilities to exploit new techniques in the future. 10

11 5. Purchases from the Nordic countries The return coefficient for purchases from the Nordic countries has always been low. The situation was improved late 2015 due to the purchase of magnets from the Danish company Danfysik. This positive purchase from a Nordsync supplier continued into The return coefficient in 2016 was 1,09. The full statistics are given in Appendix Nordsync annual meeting 2016 Nordsync held its annual meeting at the Research Council of Norway (Lysaker, Oslo) on September 28 th. The minutes of the meeting are provided in Appendix 3. The annual meeting 2017 will be held in Copenhagen on October 9 th. 11

12 Appendix 1. Beam time statistics The following pages display statistics for beam time allocated, scheduled, and number of shifts actually done by the Nordsync countries for the proposal rounds 10/2015 and 4/2016. The code in the first column refers to beam time allocation committee. All proposals containing at least one institution from a Nordsync country are shown, and the breakdown is by country. The same proposal may appear in two different tables if there are applicants from two Nordic countries. The country of the main applicant is also shown: it does not have to be the same as the country listed in the table. Table is without project titles. The list of CRG proposals is not included in these tables. Denmark ID All Req. BL (shifts) Alloc. BL (shifts) Done BL (shifts) CH-4631 ID12 (9) FR CH-4661 BM23 (18), BM26A, BM01B, ID26 (18) BM01B (18), BM23 (18) BM23 (18) IT CH-4696 BM01A (9) DK CH-4711 ID28 (18) DK CH-4715 ID21 (12) DK Country Code CH-4789 ID15A (9), ID31, ID11 ID31 (9) ID31 (9) DK CH-4813 ID12 (9) FR CH-4815 ID12 (18) DK CH-4829 CH-4838 BM23 (18), BM31, BM26A, ID26 (18), ID20, BM30B BM23 (6), BM25A BM26A (15) BM26A (15) IT DK CH-4888 BM01 (9) BM01 (9) BM01 (9) DK CH-4890 BM01 (12) DK CH-4919 ID21 (12) DK CH-4922 ID02 (9) SE CH-4960 ES-418 ID26 (18), ID20, BM30B ID19 (15), ID11, ID16B-NA ID26 (18) ID26 (18) IT DK ES-506 ID19 (15) DK EV-197 ID22 (6), BM31 ID22 (3) ID22 (3) IT EV-205 EV-213 BM20 (18), ID26 (9), ID20, BM30B ID16B-NA (14), ID13 HC-2325 ID22 (15) ID22 (18) ID22 (18) DE DK DK HC-2422 BM23 (12), ID24 (18) BM23 (18) BM23 (18) DK 12

13 HC-2471 ID27 (6) DK HC-2482 ID27 (9) ID27 (9) ID27 (9) DK HC-2503 ID28 (18) DK HC-2553 ID10 (18) FR HC-2699 ID32 (18) CH HC-2810 ID28 (18) ID28 (36) ID28 (9) DK HC-2882 ID24 (18) ID24 (18) ID24 (18) ESRF HC-2888 ID24 (18) ESRF HG-76 ID16B-NA (9) DK HG-84 ID13 (9), ID21 (6) ID21 (6) ID21 (6) DK HG-92 ID16B-NA (9) DK LS-2489 ID16A-NI (15) DE LS-2505 ID21 (18) GB LS-2527 ID09 (12) ID09 (15) ID09 (15) SE LS-2567 ID21 (18) GB MA-1317 (LT) ID11 (107), ID06A ID06A (90), ID11 (263) ID06A (203), ID11 (105) DK MA-2901 ID11 (15) ID11 (15) ID11 (15) DK MA-2907 ID11 (12) DK MA-3002 ID16A-NI (9) ID16A-NI (9) ID16A-NI (9) DK MA-3009 ID16B-NA (9) ID16B-NA (15) ID16B-NA (15) DK MA-3011 MA-3162 MA-3213 ID16B-NA (6), ID16A-NI ID31 (15), ID15A BM01 (15), ID15B, BM31 ID16B-NA (9) ID16B-NA (8) DK ID31 (15) ID31 (15) DK BM01 (15) BM01 (15) DK MA-3230 ID19 (15) ID19 (24) ID19 (17) NO MA-3267 ID02 (12) NO MD-830 (LT) ID16A-NI (108) ID16A-NI (108) ID16A-NI (85) FR MD-980 ID15A (9) DK MI-1245 ID09 (24) ID09 (36) ID09 (32) FR MX-1780 (BAG) BM29, ID23-1, ID29, ID30B, ID23-2, ID30A-1 BM29 (6), ID23-1 (9), ID23-2 (6), ID29 (12), ID30A-1 (1), ID30B (6) BM29 (7), ID23-1 (9), ID23-2 (5), ID29 (6), ID30A-1 (3.8), ID30B (3) DK MX-1807 BM29 (1) BM29 (1) BM29 (1) DK MX-1818 BM29 (2) BM29 (2) BM29 (2) DK MX-1856 ID23-1 (1) ID23-1 (2) ID23-1 (2) DK MX-1868 BM29 (3) BM29 (2) BM29 (3) ESRF MX-1871 BM29 (3) DK SC-4248 BM28 (9) DK SC-4285 ID02 (12) ID02 (6) ID02 (6) DK SC-4440 ID10 (18), ID02 (21) DK 13

14 Finland ID All Req. BL (shifts) Alloc. BL (shifts) Done BL (shifts) CH-4719 ID02 (9) ID02 (6) ID02 (6) FI CH-4739 ID20 (15) DE CH-4747 ID26 (18) FI CH-4945 ID20 (15) DE Country Code CH-4946 ID20 (12) ESRF CH-4959 ID26 (18) ID26 (18) ID26 (18) FI ES-377 BM30B (18) DE ES-417 ID19 (3) FI ES-452 BM30B (18) BM30B (18) BM30B (24) DE ES-502 ID19 (12) ID19 (12) ID19 (12) FI HC-2558 ID20 (18) ID20 (18) ID20 (18) FI HC-2867 ID20 (9) FI HC-2875 ID20 (18) ID20 (18) ID20 (20) FI HG-90 ID19 (6) FI LS-2481 ID19 (12) FI LS-2545 ID19 (9) FI LS-2565 ID21 (12) ID21 (12) ID21 (12) FI MA-2787 ID16B-NA (12) ID16B-NA (24) ID16B-NA (15) FR MA-2865 BM25B (18) FI MA-3010 ID16B-NA (15) FI MD-953 ID17 (18) ID17 (24) ID17 (12) FR MD-963 ID19 (9) FI MD-999 ID17 (15) CH MD-1010 ID17 (15) ID17 (24) ID17 (18) BE MI-1269 ID16B-NA (18) ID16B-NA (15) ID16B-NA (15) DE MX-1734 (BAG) BM29, ID30A-1, ID30A-3, ID23-1, ID29, ID30B, ID23-2 BM29 (6), ID23-1 (6), ID23-2 (6), ID29 (9), ID30A-1 (6), ID30A-3 (12), ID30B (6) BM29 (6), ID23-1 (6), ID23-2 (6), ID29 (9), ID30A-1 (3.9), ID30A-3 (12), ID30B (6) FI MX-1792 (BAG) BM29, ID30A-1, ID23-1, ID29, BM14U, ID30A- 3, BM30A, ID30B BM14U (3), BM29 (12), BM30A (3), ID23-1 (6), ID29 (6), ID30A-1 (24), ID30A-3 (6), ID30B (3) BM14U (3), BM29 (10), BM30A (3), ID23-1 (6), ID29 (6), ID30A-1 (10.1), ID30A-3 (3), ID30B (3) NO MX-1828 (BAG) ID30A-1, ID23-1, BM14U, ID30A-3, ID29, BM30A, BM29 BM14U (3), BM29 (1), BM30A (3), ID23-1 (6), ID29 (3), ID30A-1 (6), ID30A-3 (9) BM14U (3), BM29 (1), BM30A (3), ID23-1 (6), ID29 (3), ID30A-1 (7.8), ID30A-3 (6) GB 14

15 MX-1850 (BAG) BM29, ID30A-1, ID30B, ID30A-3, ID23-1 BM29 (6), ID23-1 (1), ID30A-1 (12), ID30A-3 (6), ID30B (6) BM29 (6), ID23-1 (1), ID30A-1 (10.3), ID30A-3 (4.5), ID30B (3) FI SC-4291 ID13 (6) FI SC-4297 ID13 (15) FI SC-4351 BM25B (21) FI SC-4404 ID13 (9) FI 15

16 Norway ID All Req. BL (shifts) Alloc. BL (shifts) Done BL (shifts) CH-4642 BM01B (12) PL CH-4647 BM01B (18) NO CH-4665 BM23 (18), ID24 BM23 (18) BM23 (17) CH Country Code CH-4669 CH-4697 BM23 (18), BM01B, BM26A, BM31 BM01A (18), BM01B BM23 (18), BM31 (18) BM31 (18) RU NO CH-4788 ID15A (15) NO CH-4829 BM23 (18), BM31, BM26A, ID26 (18), ID20, BM30B BM26A (15) BM26A (15) IT CH-4876 BM31 (15) NO CH-4877 BM31 (18), BM23 RU CH-4881 BM31 (18) NO CH-4882 BM31 (15) DE CH-4883 CH-4887 BM31 (15), BM26A, BM23, BM08 BM01 (6), BM31 (3) BM23 (15) BM23 (17) IT NO ES-295 (LT) ID19 (45) ID19 (45) ID19 (37) FR ES-410 ID19 (9) ID19 (18) ID19 (10) NO ES-416 ID19 (9) NO ES-504 ID19 (9) NO HC-2295 HC-2640 ID03 (9), BM25B ID15A (6), ID11, ID22 NO ID22 (6) ID22 (6) NO HC-2740 BM31 (9) NO HG-93 ID21 (16) NO MA-2847 MA-2933 MA-3048 MA-3155 MA-3208 ID01 (15), BM25B BM01B (18), BM26A ID26 (18), BM01A (18) ID22 (9), ID11, ID15A BM31 (15), BM23 NO BM01B (15) BM01B (15) NO ID26 (18) ID26 (18) CH ID22 (9) ID22 (9) NO BM31 (18) BM31 (18) IL MA-3209 BM31 (18) NO MA-3210 BM31 (12) NO MA-3211 BM01 (15) NO MA-3215 BM01 (15) NO MA-3230 ID19 (15) ID19 (24) ID19 (17) NO 16

17 MA-3267 ID02 (12) NO MI-1274 ID10 (15) NO MX-1792 (BAG) BM29, ID30A-1, ID23-1, ID29, BM14U, ID30A- 3, BM30A, ID30B BM14U (3), BM29 (12), BM30A (3), ID23-1 (6), ID29 (6), ID30A-1 (24), ID30A-3 (6), ID30B (3) BM14U (3), BM29 (10), BM30A (3), ID23-1 (6), ID29 (6), ID30A-1 (10.1), ID30A-3 (3), ID30B (3) NO MX-1811 BM29 (3) BM29 (3) BM29 (3) NO MX-1817 BM29 (1) BM29 (3) BM29 (3) NO SC-4285 ID02 (12) ID02 (6) ID02 (6) DK SC-4324 ID09 (15) NO SC-4338 ID10 (12) NO 17

18 Sweden ID CH-4399 CH-4578 All Req. BL (shifts) ID09B (18), ID09 ID24 (18), BM23 (18) Alloc. BL (shifts) ID09 (9), ID09B (15) Done BL (shifts) ID09 (9), ID09B (21) Country Code ESRF ID24 (36) ID24 (37) SE CH-4600 ID03 (18) ID03 (15) ID03 (15) ES CH-4620 ID22 (9) SE CH-4654 BM08 (18), BM23 BM08 (15) BM08 (15) IT CH-4702 ID06-LVP (18) SE CH-4703 ID06-LVP (18) SE CH-4720 ID02 (12) SE CH-4737 ID20 (18) SE CH-4753 ID26 (18) DE CH-4801 ID22 (18), ID31, ID15A CH-4922 ID02 (9) SE CH-4926 ID02 (9) SE CH-4949 ID24 (18), BM23 (3) CH-4968 ID26 (3) SE ES-342 ID19 (15) ID19 (30) ID19 (15) SE ES-406 ID19 (3) SE ES-415 ID19 (15) ID19 (12) ID19 (13) SE ES-500 ID19 (3) SE ES-505 ID19 (12) ID19 (12) ID19 (12) CZ ES-520 ID21 (12) SE HC-2289 ID03 (15) ID03 (30) ID03 (25) SE HC-2317 ID11 (12), ID22, ID31 HC-2320 ID11 (18) SE HC-2345 ID12 (18) DE HC-2346 ID12 (18) DE HC-2378 BM28 (18), BM02, BM25B SE SE SE BM28 (18) BM28 (18) SE HC-2380 BM28 (18) SE HC-2382 ID32 (18) DE HC-2393 ID32 (18) SE HC-2397 ID32 (21) DE HC-2399 ID32 (18) GB HC-2411 BM01B (6) SE HC-2418 BM23 (12), BM26A, BM30B HC-2521 ID16B-NA (18) ID16B-NA (12) ID16B-NA (12) SE HC-2535 ID09 (18) DE HC-2538 ID09 (15) ID09 (18) ID09 (18) SE SE 18

19 HC-2545 ID10 (15), ID01, BM32 HC-2567 ID20 (18) SE HC-2624 ID03 (18) SE HC-2703 ID32 (18) ID32 (18) ID32 (18) SE HC-2706 ID32 (18) GB HC-2793 ID27 (6), ID15B SE HC-2831 ID21 (18) SE HC-2850 ID10 (15) RU HC-2862 BM28 (18) SE HC-2869 ID20 (18) SE LS-2487 ID16A-NI (9) ID16A-NI (9) ID16A-NI (9) GB LS-2527 ID09 (12) ID09 (15) ID09 (15) SE LS-2542 ID19 (9) SE LS-2543 LS-2550 ID19 (6), ID17 (6) ID16A-NI (12), ID16B-NA RU SE ID16A-NI (12) ID16A-NI (12) BE LS-2584 ID13 (15) SE LS-2589 ID09 (15) ID09 (15) ID09 (15) SE LS-2590 ID09 (15) SE LS-2594 ID09 (18) SE LS-2595 ID10 (9) ID10 (9) ID10 (9) SK LS-2596 ID26 (6) SE MA-2239 (LT) ID03 (72) ID03 (63) ID03 (66) SE MA-2855 ID03 (18) ID03 (18) ID03 (11) SE MA-2890 ID11 (12), ID31 SE MA-2919 ID22 (9) SE MA-2988 ID19 (6) SE MA-3024 BM26B (9) SE MA-3035 ID09 (15) ID09 (15) ID09 (15) SE MA-3043 ID20 (6) ID20 (6) ID20 (9) DE MA-3126 ID15A (5), ID11 SE MA-3143 ID15A (9) ZA MA-3144 ID15A (6) SE MA-3160 ID31 (12) SE MA-3227 ID19 (3) ID19 (3) ID19 (3) FR MD-953 ID17 (18) ID17 (24) ID17 (12) FR MD-956 ID19 (11) ID19 (18) ID19 (6) SE MD-962 ID19 (8) SE ME-1418 ID15A (6) ZA ME-1421 ID15A (9) ZA MI-1226 ID19 (12) ID19 (24) ID19 (9) SE MI-1246 ID09 (15) SE MI-1254 ID01 (6) ID01 (9) ID01 (9) CH MI-1271 ID09 (15) SE 19

20 MX-1730 (BAG) ID30A-1, ID30A- 3, ID29, ID30B, BM30A, ID23-2, ID23-1, BM14U BM14U (3), BM30A (3), ID23-1 (3), ID23-2 (3), ID29 (3), ID30A-1 (6), ID30A-3 (6), ID30B (6) ID23-1 (3), ID23-2 (3), ID29 (3), ID30A-3 (6), ID30B (3) SE MX-1749 (BAG) ID30A-1, ID30A- 3, ID23-1, ID29, ID30B, BM14U, ID23-2, BM30A BM14U (3), BM30A (3), ID23-1 (9), ID23-2 (12), ID29 (9), ID30A-1 (12), ID30A-3 (12), ID30B (6) BM14U (3), ID23-1 (9), ID23-2 (11.3), ID29 (8.5), ID30A-1 (2.6), ID30A-3 (10), ID30B (6) SE MX-1772 BM29 (2) BM29 (2) BM29 (2) SE MX-1791 (BAG) BM29, ID30A-1, ID23-1, ID29, ID30B, BM14U, BM30A, ID23-2, ID30A-3 BM14U (3), BM29 (6), BM30A (6), ID23-1 (9), ID23-2 (9), ID29 (6), ID30A-1 (6), ID30A-3 (6), ID30B (12) BM29 (3), BM30A (3), ID23-1 (6), ID23-2 (6), ID29 (6), ID30A-1 (4.3), ID30A-3 (3) SE MX-1795 (BAG) BM29, ID23-1, ID30B, ID23-2, ID30A-3, ID30A- 1 BM29 (12), ID23-1 (6), ID23-2 (9), ID30A-1 (2), ID30A-3 (6), ID30B (3) BM29 (9), ID23-1 (9), ID23-2 (9), ID30A-3 (3), ID30B (3) SE MX-1800 ID29 (2), ID23-1 ID23-1 (2) ID23-1 (2) SE MX-1809 BM29 (3) BM29 (3) BM29 (3) SE MX-1812 ID29 (3), ID23-1 ID29 (2) ID29 (2) SE MX-1823 ID23-2 (2), ID29 ID23-2 (4) ID23-2 (2) SE MX-1840 (BAG) BM29, ID30A-1, ID23-1, ID29, ID30B, BM30A, ID23-2, ID30A-3 BM29 (4), BM30A (3), ID23-1 (6), ID23-2 (6), ID29 (9), ID30A-1 (2), ID30A-3 (9), ID30B (6) BM29 (5), BM30A (3), ID23-1 (6), ID23-2 (3), ID29 (10), ID30A-3 (11), ID30B (6) SE MX-1846 (BAG) ID23-1, ID29, ID30B, BM30A, ID30A-3 BM30A (3), ID23-1 (3), ID29 (6), ID30A-3 (3), ID30B (3) ID23-1 (3), ID29 (1.5), ID30A-3 (4), ID30B (3) MX-1857 ID29 (3), ID23-1 ID29 (3) ID29 (3) SE MX-1858 BM29 (3) BM29 (3) BM29 (3) SE MX-1872 ID23-2 (2), ID29, ID30A-3 SE ID30A-3 (2) ID30A-3 (2) SE MX-1908 BM29 (3) BM29 (3) BM29 (3) SE SC-4250 BM01A (6) SE SC-4284 ID02 (6) SE SC-4339 ID10 (18) SE SC-4372 ID02 (9) SE SC-4375 ID02 (6), BM26B SC-4376 ID02 (12) SE SC-4380 ID02 (6) GB SC-4385 ID02 (6) SE SC-4391 ID02 (15), BM26B SC-4416 ID13 (6) SE SC-4441 ID10 (12) ID10 (15) ID10 (15) SE SC-4448 ID10 (18) DE IT SE 20

21 Appendix 2. Purchase return coefficients Evolution of purchase return coefficients from January 1996 to December 2016 for Nordsync Period Return coefficient 1/96 12/ /97 12/ /98 12/ /99 12/ /00 12/ /01 12/ /02 12/ /03 12/ /04 12/ /05 12/ /06 12/ /07 12/ /08 12/ /09 12/ /10 12/ /11 12/ /12 12/ /13 12/15 1,21 01/13-06/16 1,09 Historical average

22 Appendix 3. Minutes of the annual Nordsync meeting 2016 Participants: Sweden; Winnie Birberg (WB) and Ingmar Persson (IP) Denmark: Sine Larsen (SL) Finland: Ritva Taurio (RT) and Keijo Hämäläinen (KH) Norway: Aase Marie Hundere (AMH) and Helmer Fjellvåg (HF) Venue: The Research Council of Norway, Drammensveien 288, Lysaker. Date: Time: 28. September 10:30-16:30 hrs Item 1 Adoption of the agenda The agenda was adopted. Item 2 Approval of minutes from the 2015 Nordsync annual meeting in Oslo The Minutes was approved with minor changes. Item 3 Nordsync Annual Report 2015 A slightly adjusted outline of the Nordsync Annual Report has been introduced for this year's report. The Nordsync delegates had received a first draft version which was discussed and adjusted during the meeting. A revised version will be circulated and finally approved by correspondence. Item 4 Update from ESRF Council and HoD 2016 Nordsync` s head of delegation (HF), reported from the recent Head of Delegation meetings. There had been a record number of proposals for beamtime with well representation also from new Members. The status for the negotiations with Associates is progressing, some positive signals regarding outstanding contributions and possible changes in participants in the CentralSync consortium has been presented. There are ongoing negotiations with potential new Associates. ESRF still has possibility to re-open some beam lines to increase capacity if needed. There are ongoing discussions whether new Associates should contribute with a higher entrance fee as the construction costs of the facility have increased significantly as a consequence of ESRF Upgrade. The long shut down during EBS will take place in the period January 2019-August 2020 (18 months). Exact dates will be announced in June Most components are already in place and the project is so far on time and according to budget. Work related to evaluation of use of external labour during the EBS project and its compliance to French Labour Laws, is in progress. The EBS project affects the split beamlines. The affected beam lines are offered alternative solutions at ESRF. The Swiss-Norwegian beamline (SNBL) is already established in new locations (BM1 and BM31). 22

23 The new French electricity tax (TICFE) will affect the ESRF budgets and correspondingly ESRF has presented two options (1,35 % and 2 %) of increased income budget to cover increased expenses. The 2017 budget will be discussed in forthcoming AFC meeting and decided by Council. ESRF has presented justifications for the proposed 2 % increase. There are ongoing negotiations between ESRF and the labour unions regarding with respect to the collective agreements. Item 5 Beamtime limitation Nordsync, revisited From 2015 Nordsync implemented a new routine giving the consortium a possibility to control costs corresponding to exceptional contribution. Allocation of beam time above 6.5 % (calculated on an average for a calendar year) needs approval from the four Nordsync members. It was decided to keep this beam time limitation in 2017 and It was decided to include a paragraph in the Nordsync annual report 2015 where the reasoning and effect of the beam time limitation is explained more thoroughly for parties interested in the subject. Item 6 Renewal of the Nordsync contract how to proceed? It was decided to leave the Nordsync contracts unchanged even though the present version not fully reflects the revised ESRF Convention. However, these recent changes do not affect the agreement between the Nordsync parties. Item 7 Nordsync position on the ESRF proposed budget for 2017 The members of Nordsync are still in process of concluding position with respect to the two proposed options ( + 2 % and % ). Sweden raised a question about data policy and missing budgetary allocations (at least not explicitly stated). AFC delegates will follow up on this in the meeting and request a feedback from ESRF. Item 8 Discussion of items on the agenda of the forthcoming ESRF AFC meeting No specific comments other than those already covered in the agenda. Item 9 Information on national status regarding the projects MAX IV, ESS and XFEL Sweden (IP) presented updated information about the building and commissioning of beam lines at MAX IV. The facility was inaugurated June 21 st The ESS construction is ongoing. John Womersley, CEO of the UK s Science and Technology Facilities Council (STFC), is appointed the next Director General. He joins the ESS project on November Finland (KH) informed that Finnish interest in XFEL is presented in an early draft of a national road map for research infrastructure. It would be interesting to evolve thoughts of using "the Nordsync model " for joint membership at XFEL. 23

24 Item 10 Information on national user meetings Sweden (IP) there has been no user meeting in but MAX lab will host a meeting March Finland (KH) has a very active user community and there is established an annual meeting. The 2016 meeting in Helsinki gathered approximately 70 participants. Denmark (SL) has its DanScatt which organize annual meetings where typically 200 scientists from a broad scientific user community participate. Norway (HF) there has been no synchrotron user meeting in Item 11 HoD Nordsyn Sine Larsen from Denmark will be head of Delegation for Nordsync in ESRF Council in the period Item 12 Nordsync annual meeting 2017 The AFC meeting will take place October. It was proposed to set the date for the Nordsync Annual meeting 2017 either being Friday October 6 th (week 40) or Monday October 9 th (week 41). Item 13 Any other business The ESRF Council meeting June 2017 will take place at MAX IV in Sweden. The Swedish Research Council and MAX IV will jointly host the meeting. There will be meetings and formal events (dinner) by invitations to distinguished guest. More information will follow. Director Asbjørn Mo from the Research Council of Norway presented a new strategy for Norwegian representation at international organizations like ESRF. Due to the increasing number of similar organizations especially as a consequence of ESFRI, The Research Council will have limited capacity to follow directly all committees. The ambition is to establish a national steering committee with representation from the R&D institutions and potentially transfer the responsibility to them for representations in different committees like the AFC. 24

25 Appendix 4. Calculation of the national shares 1) The calculations are based on data delivered by the ESRF containing information for each proposal on the number of DONE shifts, participating institutions, their nationality, and whether the proposal is a CRG proposal, normal proposal, or industrial proposal. 2) The National Fraction for each proposal is calculated as the number of participating institutions from the particular country divided by the total number of participating institutions. Institutions are considered as identical if they have the same postal address unless they belong to different research institutions or organisations. Only institutions from ESRF members or ESRF associates are considered. The ESRF itself is considered as a member institution. 3) A weight of 0.25 is assigned to the CRG proposals and a weight of 1.0 to the normal proposals. Industrial proposals are assigned a weight of ) For each proposal the weighted number of shifts is calculated as (Number of DONE shifts) (National fraction) (Weight) 5) The national share is calculated as (sum of weighted number of shifts for each country)/(sum of all weighted number of shifts for all Nordsync countries). 2. Payment for overuse at the ESRF In case of a request from the ESRF for an additional contribution due to overuse in the preceding three years, the contribution from each Nordsync country shall be calculated using the national share valid for the year where the additional contribution is to be confirmed at the ESRF council. According to the ANNEX 1 to document on Scientific juste retour, Guidelines for a Readjustment of Contribution Rates, ESRF 10 June

26 Appendix 5 Nordsync delegation 2016 Council delegates Finland: Keijo Hämäläinen, keijo.hamalainen@helsinki.fi Sweden: Ingmar Persson, ingmar.persson@slu.se Norway: Helmer Fjellvåg, helmer.fjellvag@kjemi.uio.no (head of delegation in ) Denmark: Sine Larsen, sine@chem.ku.dk, AFC delegates Finland: Ritva Taurio, ritva.taurio@aka.fi, Sweden: Winnie Birberg, winnie.birberg@vr.se, Norway: Aase Marie Hundere (head of AFC delegation ), amh@forskningsradet.no, Denmark: Anders Kjær, akj@fi.dk Purchasing advisors Sweden: Norway: Johan Holmberg, johan.holmberg@vr.se Ole Petter Nordahl, Ole.Petter.Nordahl@cern.ch 26

Proposals for the European Rowing Extraordinary General Assembly at European Rowing Championships Constitution Statutes and Rules of Racing

Proposals for the European Rowing Extraordinary General Assembly at European Rowing Championships Constitution Statutes and Rules of Racing Proposals for the European Rowing Extraordinary General Assembly at 071117 European Rowing Championships Constitution Statutes and Rules of Racing ConstitutionEuropean Rowing Statutes As amended after

More information

The European Research Council

The European Research Council The European Research Council The ERC: a Success Story for the EU Isabelle Vernos ICREA research Professor CRG BIST founding Conference March 31 st, 2017 Celebrating ERC-10 in Europe and beyond ü ERC Week:

More information

Nordic Swimming Federation

Nordic Swimming Federation Nordic Swimming Federation Statutes A - General rules and regulations B - Swimming C - Diving D - Synchronised swimming E - Water polo F - Masters G - Open water H - Nordic Education Group I - Nordic Records

More information

2017 IIHF BID REGULATIONS

2017 IIHF BID REGULATIONS 2017 IIHF BID REGULATIONS May 2014 Preface The foregoing IIHF Bid Regulations has been developed by the IIHF strictly for the purpose of improving the selection process for the venues of IIHF top-level

More information

Numerical simulation of the ALBA s synchrotron cooling system response to pump start-up and shut-down Page 1

Numerical simulation of the ALBA s synchrotron cooling system response to pump start-up and shut-down Page 1 Numerical simulation of the ALBA s synchrotron cooling system response to pump start-up and shut-down Page 1 Abstract This project consists of the development and validation of a numerical model to simulate

More information

2019 & 2020 National Solo Dance Final. Bid Information & Guidelines. Proposed Competition Dates:

2019 & 2020 National Solo Dance Final. Bid Information & Guidelines. Proposed Competition Dates: Bid Information & Guidelines Proposed Competition Dates: Early to mid-september, 2019 &2020 CONTACT: Elise Preston, Program Development Committee Chair Elise.Preston@gmail.com Karissa Woienski, U.S. Figure

More information

Update of trade weights data underlying the EERs and HCIs

Update of trade weights data underlying the EERs and HCIs August 2017 Update of trade weights data underlying the EERs and HCIs The trade weights underlying the calculation of the effective exchange rates (EERs) of the euro and the harmonised competitiveness

More information

European Rowing Championships Constitution and Rules. Constitution

European Rowing Championships Constitution and Rules. Constitution European Rowing Championships Constitution and Rules Constitution As amended after the Extraordinary General Assembly held in Copenhagen, Denmark on 14 February 2013 Article 1 Foundation At a meeting of

More information

Constitution Adopted 1 March 2014 Amended 28 February 2015 Last amended 18 February 2017

Constitution Adopted 1 March 2014 Amended 28 February 2015 Last amended 18 February 2017 Constitution Adopted 1 March 2014 Amended 28 February 2015 Last amended 18 February 2017 1. Title The organisation shall be called the Cricket Switzerland shall be based in the Swiss Capital. The postal

More information

BSAC Executive Committee, Thursday 11 th May Report. The BSAC Chair welcomed the ExCom members and observers to the meeting.

BSAC Executive Committee, Thursday 11 th May Report. The BSAC Chair welcomed the ExCom members and observers to the meeting. BSAC Executive Committee, Thursday 11 th May 2017 Brunkhuvudet, Malmtorgsgatan 3, Stockholm Report 1. Welcome by the BSAC chair The BSAC Chair welcomed the ExCom members and observers to the meeting. a)

More information

Council CNL(16)31. Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year EU - Finland

Council CNL(16)31. Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year EU - Finland Agenda item 6.1 For information Council CNL(16)31 Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year 2015 EU - Finland CNL(16)31 Annual Progress Report on Actions

More information

ALBA, the Spanish Synchrotron

ALBA, the Spanish Synchrotron ALBA, the Spanish Synchrotron C. Biscari ALBA Café amb la recerca - 1 December 216 Short history of ALBA Synchrotron ALBA is a synchrotron light source Governed by a public consortium, CELLS Owned 5% by

More information

Chapter 2.7 Bylaw sport governance and management

Chapter 2.7 Bylaw sport governance and management Chapter 2.7 Bylaw sport governance and management 2010 International Paralympic Committee Adenauerallee 212-214 Tel. +49 228 2097-200 www.paralympic.org 53113 Bonn, Germany Fax +49 228 2097-209 info@paralympic.org

More information

MFF and the CAP Legislative financial statement

MFF and the CAP Legislative financial statement MFF 2021-2027 and the CAP Legislative financial statement COMAGRI meeting 10 July 2018 CAP POST-2020 LEGAL PROPOSALS COM(2018) 392 Proposal for a Regulation establishing rules on support for strategic

More information

1 January December Kontraktforhandlingsmøte Forskningsrådet 27 april 2017

1 January December Kontraktforhandlingsmøte Forskningsrådet 27 april 2017 1 January 2018 31 December 2027 Kontraktforhandlingsmøte Forskningsrådet 27 april 2017 Motivation New experimental facilities revolutionize how we study matter unprecedented resolution in time and space

More information

Progress with the Road Investment Strategy

Progress with the Road Investment Strategy Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION 2016-17 22 MARCH 2017 4 Key facts Progress with the

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

1. Annex 1: Indicators

1. Annex 1: Indicators 1. Annex 1: Indicators 1.1 Input indicators 1. Financial envelope of AGN operating agreements over 7 years, in * Euro 613 740 613 740 572 773 553 605 553 605 638 904 638 904 *Reported budget outcome 2.

More information

Juni 2013 DI Bernhard Engleder,

Juni 2013 DI Bernhard Engleder, Juni 2013 DI Bernhard Engleder, Head of department Vienna City Administration - Road Construction and Maintenance ESTABLISHMENT OF A MOBILITY AGENCY FOR VIENNA Introduction The current coalition agreement

More information

BYE-LAWS TO ARTICLE 56 DUTIES OF THE COMMISSIONS AND WORKING GROUPS

BYE-LAWS TO ARTICLE 56 DUTIES OF THE COMMISSIONS AND WORKING GROUPS Appendix 6 BYE-LAWS TO ARTICLE 56 DUTIES OF THE COMMISSIONS AND WORKING GROUPS 1. General Duties of the Commissions Each Commission shall: 1. Meet as required when so requested by their Chairs. In principle,

More information

Posting of workers in the European Union and EFTA countries : Report on A1 portable documents issued in 2010 and 2011

Posting of workers in the European Union and EFTA countries : Report on A1 portable documents issued in 2010 and 2011 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Analysis, Evaluation, External Relations Employment Analysis Posting of workers in the European Union and EFTA countries : Report on A1 portable

More information

NSR By-Laws. Appendix 1

NSR By-Laws. Appendix 1 NSR By-Laws Appendix 1 1 17.1.2015 1 NSR Calendar of one Lions year Time (latest to fulfil) Activity Responsibility of the activity To whom is it sent August 2 years before NSR Election of arranging clubs

More information

Last Reviewed 14 th October 2016 HOME COUNTRY CONSTITUTION

Last Reviewed 14 th October 2016 HOME COUNTRY CONSTITUTION Last Reviewed 14 th October 2016 HOME COUNTRY CONSTITUTION 1. Special Olympics Cymru-Wales Special Olympics Wales is recognised as a Home Country (Wales) of Special Olympics GB. a. Membership The membership

More information

The Junior Young Physicists Tournament JYPT. Regulations

The Junior Young Physicists Tournament JYPT. Regulations The Junior Young Physicists Tournament JYPT Regulations Revised after the fourth JYPT November 2013 1 The Regulations of the Junior Young Physicists Tournament I) Educational Goals The Junior Young Physicists

More information

Finnish Transport Agency / Hydrographic Office

Finnish Transport Agency / Hydrographic Office Finnish Transport Agency / Hydrographic Office Participants in BSHC MWG meeting on Wed 10 Feb 2016 (08:30-11:30) in Swedish Maritime Administration building, meeting room Bris (4 th floor): : Denmark Lars

More information

Future of Collective Bargaining in Germany and the Importance of the recently introduced Minimum Wage Regulations

Future of Collective Bargaining in Germany and the Importance of the recently introduced Minimum Wage Regulations Future of Collective Bargaining in Germany and the Importance of the recently introduced Minimum Wage Regulations Thorsten Schulten Council of Nordic Trade Unions (NFS) & Friedrich Ebert Foundation (FES)

More information

Rochester Area Bike Sharing Program Study

Rochester Area Bike Sharing Program Study roc bike share Rochester Area Bike Sharing Program Study Executive Summary ~ January 2015 JANUARY 2015 8484 Georgia Avenue, Suite 800 Silver Spring, MD 20910 3495 Winton Pl., Bldg E, Suite 110 Rochester,

More information

FMJD Internal Regulations Page 1

FMJD Internal Regulations Page 1 FMJD Internal Regulations Page 1 FMJD Internal Regulations Completely renewed internal regulations, approved at the FMJD Extraordinary General Assembly 11 October 2015 in Didim, Turkey, adapted by the

More information

Golf Ireland. Golf Ireland. Club Meetings

Golf Ireland. Golf Ireland. Club Meetings Golf Ireland Club Meetings Why? Falling membership. - 25% fall in golf club members. estimated 50K nomadic golfers For the good of the game - more modern, inclusive and contemporary Only country in the

More information

BAFA. Associate process guide for contact teams

BAFA. Associate process guide for contact teams 1. Adult contact teams p2 2. University contact teams p8 3. Junior contact teams p8 4. Youth contact teams p8 5. Women s contact teams p8 1 Introduction To enter a contact team into BAFA National Leagues

More information

CADF Business Report 2012

CADF Business Report 2012 2012 Authors: Francesca Rossi, CADF Director Olivier Banuls, CADF Manager Mario Zorzoli, UCI Medical and Scientific Advisor ( 9 Medical and Science) Aigle, 5 th June 2013 Page 1 of 35 Contents 1. Introduction...

More information

REGULATIONS. Orienteering

REGULATIONS. Orienteering REGULATIONS Governing Nordic Military Championship in Orienteering 2014 edition REGULATIONS FOR NORDIC MILITARY CHAMPIONSHIP IN ORIENTEERING TABLE OF CONTENTS 1. General Regulations 2. Administrative Regulations

More information

CHARTER of the B7 Islands Network

CHARTER of the B7 Islands Network CHARTER of the B7 Islands Network ARTICLE 1: NAME of ORGANISATION Full name: Short-forms: B7 ARTICLE 2: VISION, AIMS, STRATEGY VISION: The long-term vision for the islands is: the islands find themselves

More information

The European Research Council

The European Research Council The European Research Council ERC Funding Opportunities: Supporting excellent researchers all over Europe The ERC s quest to support excellent researchers all over Europe Prof Eva Kondorosi Chair ERC Working

More information

The European Research Council (ERC) is the first pan-european funding body supporting the best frontier research in Europe 1.

The European Research Council (ERC) is the first pan-european funding body supporting the best frontier research in Europe 1. The European Research Council (ERC) is the first pan-european funding body supporting the best frontier research in Europe 1. The ERC was created by the European Commission in February 2007. It is the

More information

Introduction QUADRENNIAL PLAN

Introduction QUADRENNIAL PLAN 2017-2020 QUADRENNIAL PLAN Introduction We are pleased to present to you in this leaflet Olympic Solidarity (OS) s objectives, budgets and programmes established for the 2017-2020 quadrennial plan. The

More information

Broadcasting International P7S1 Nordics Henrik Ravn, October 10, 2012

Broadcasting International P7S1 Nordics Henrik Ravn, October 10, 2012 Broadcasting International P7S1 Nordics Henrik Ravn, October 10, 2012 October 10, 2012 Page 1 Overview of P7S1 Nordics The #1 Nordic entertainment house Trailer October 10, 2012 Page 2 Highlights of P7S1

More information

Sony Centre for Performing Arts

Sony Centre for Performing Arts CAPITAL PROGRAM SUMMARY Highlights Overview I: 10-Year Capital 6 II: Issues for Discussion 15 Sony Centre for Performing Arts 2016 2025 CAPITAL BUDGET AND PLAN OVERVIEW The Sony Centre for the Performing

More information

Welsh Triathlon. National Championship and National Series Events. Tender Process for 2018 season

Welsh Triathlon. National Championship and National Series Events. Tender Process for 2018 season Welsh Triathlon National Championship and National Series Events Tender Process for 2018 season 1 Introduction This document is intended for event organisers interested in hosting an event that form part

More information

IRB COMPOSITION AND IRB MEMBER ROLES AND RESPONSIBILITIES

IRB COMPOSITION AND IRB MEMBER ROLES AND RESPONSIBILITIES IRB COMPOSITION AND IRB MEMBER ROLES AND RESPONSIBILITIES 1. Overview Each IRB must be appropriately constituted for the volume and types of human research to be reviewed, in accordance with federal regulations.

More information

THE SCHOOL OF ORIENTAL AND AFRICAN STUDIES. Redundancy Policy

THE SCHOOL OF ORIENTAL AND AFRICAN STUDIES. Redundancy Policy THE SCHOOL OF ORIENTAL AND AFRICAN STUDIES 1 Aim Redundancy Policy 1.1 The School is committed to ensuring the continuing employment of all permanent employees wherever possible.to support this commitment,

More information

INTERNATIONAL DECADE OF OCEAN SCIENCE FOR SUSTAINABLE DEVELOPMENT ( ) OUTLINE

INTERNATIONAL DECADE OF OCEAN SCIENCE FOR SUSTAINABLE DEVELOPMENT ( ) OUTLINE 39th Session, Paris, 2017 39 C 39 C/52 19 October 2017 Original: English Item 4.13 of the provisional agenda INTERNATIONAL DECADE OF OCEAN SCIENCE FOR SUSTAINABLE DEVELOPMENT (2021-2030) OUTLINE Source:

More information

[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the

[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] 4 th Summer Youth Olympic Games

More information

WADA Health, Medical & Research Committee Meeting May 2001 Stockholm SWEDEN. Minutes

WADA Health, Medical & Research Committee Meeting May 2001 Stockholm SWEDEN. Minutes WADA Health, Medical & Research Committee Meeting 27-28 May 2001 Stockholm SWEDEN Minutes 1. Meeting Commencement, Review of Agenda Members present: Arne Ljungqvist Chair Barbara Drinkwater Bengt Saltin

More information

APLC/MSP.16/2017/WP.1

APLC/MSP.16/2017/WP.1 Meeting of the States Parties to the Convention on the Prohibition of the Use, Stockpiling, Production and Transfer of Anti-Personnel Mines and on Their Destruction APLC/MSP.16/2017/WP.1 28 November 2017

More information

December Emirates Cricket Board. Job Vacancy Emirates Cricket General Manager. Job Description and Application Process

December Emirates Cricket Board. Job Vacancy Emirates Cricket General Manager. Job Description and Application Process December 2018 Emirates Cricket Board Job Vacancy Emirates Cricket General Manager Job Description and Application Process Background: Emirates Cricket Board (ECB) is the governing body for cricket in the

More information

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685 CD10.2 STAFF REPORT ACTION REQUIRED City of Toronto Outdoor Tennis Operations Date: February 19, 2016 To: From: Wards: Reference Number: Community Development and Recreation Committee General Manager,

More information

ANNUAL REPORT

ANNUAL REPORT 2015-2016 ANNUAL REPORT Message from the Chair and President/CEO Richard Crépin and Peter Nicol On behalf of Gymnastics Canada, it is our pleasure to provide you with our 2015-2016 annual report. 2015/16

More information

CAIRNGORMS NATIONAL PARK AUTHORITY FINANCE & DELIVERY COMMITTEE FOR DECISION

CAIRNGORMS NATIONAL PARK AUTHORITY FINANCE & DELIVERY COMMITTEE FOR DECISION CAIRNGORMS NATIONAL PARK AUTHORITY FINANCE & DELIVERY COMMITTEE FOR DECISION Title: Prepared by: CAIRNGORMS NATIONAL PARK AUTHORITY GAELIC LANGUAGE PLAN 2018-22 CONSULTATION REPORT Francoise van Buuren,

More information

Membership Guidelines

Membership Guidelines 1 Membership Guidelines Full Members Test playing nation Representation at ICC Executive Board Transitions Success against Full Member countries in ODI matches over a period of time Mature organisation

More information

IMD Governance Review at a glance

IMD Governance Review at a glance IMD Governance Review at a glance Good Governance at the International Olympic Committee Summary of recommendations 07 July 2017 1 Introduction IMD was officially contracted by the International Olympic

More information

Bylaws Page 1

Bylaws Page 1 Article I: Name and Purpose The name of the council shall be the Superintendent s Student Advisory Council, henceforth known as SSAC. Section1: Mission To encourage good will, unity and leadership among

More information

Strategic Plan Update

Strategic Plan Update Archery GB 2017 Membership Conference The Future of our Sport Strategic Plan Update 2016-2020 Neil Armitage Chief Executive Vision Achieve. Grow. Believe. Mission Lead, grow and promote archery to create

More information

METROPOLIS WORLD ASSOCIATION OF THE MAJOR METROPOLISES

METROPOLIS WORLD ASSOCIATION OF THE MAJOR METROPOLISES TERMS OF REFERENCE OF THE LOGISTICAL ORGANIZATION OF THE METROPOLIS ANNUAL MEETINGS METROPOLIS WORLD ASSOCIATION OF THE MAJOR METROPOLISES With 138 members and more than 30 years of history, Metropolis,

More information

PITCH IMPROVEMENT PROGRAMME

PITCH IMPROVEMENT PROGRAMME THE FA PITCH IMPROVEMENT PROGRAMME FREQUENTLY ASKED QUESTIONS The FA Pitch Improvement Programme (PIP) Frequently Asked Questions (FAQ) The need for this service is more relevant now than ever, given the

More information

THE EUROPEAN RESEARCH VESSEL OPERATORS GROUP ERVO WAY AHEAD. Giuseppe Magnifico ERVO Chair

THE EUROPEAN RESEARCH VESSEL OPERATORS GROUP ERVO WAY AHEAD. Giuseppe Magnifico ERVO Chair THE EUROPEAN RESEARCH VESSEL OPERATORS GROUP ERVO WAY AHEAD National Research Council of Italy giuseppe.magnifico@cnr.it 16 th ERVO Annual meeting June 11-12, 2014 CSIC (UTM-CMIMA), Barcelona (Spain) BACKGROUND

More information

Council CNL(14)45 The management approach to salmon fisheries in Norway (Tabled by Norway)

Council CNL(14)45 The management approach to salmon fisheries in Norway (Tabled by Norway) Agenda Item 6.2 Agenda Item 6.2 For Information Council CNL(14)45 The management approach to salmon fisheries in Norway (Tabled by Norway) 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007

More information

EUROPEAN CHAMPION CLUBS CUP CROSS COUNTRY PROMOTION AND RIGHTS

EUROPEAN CHAMPION CLUBS CUP CROSS COUNTRY PROMOTION AND RIGHTS EUROPEAN CHAMPION CLUBS CUP CROSS COUNTRY 1301. PROMOTION AND RIGHTS 1301.1. The European Athletic Association (hereinafter European Athletics) shall promote a European Champion Clubs Cup in Cross Country

More information

IOF JUNIOR WORLD SKI ORIENTEERING CHAMPIONSHIPS 2020 (JWSOC) AND EUROPEAN YOUTH SKI ORIENTEERING CHAMPIONSHIPS 2020 (EYSOC)

IOF JUNIOR WORLD SKI ORIENTEERING CHAMPIONSHIPS 2020 (JWSOC) AND EUROPEAN YOUTH SKI ORIENTEERING CHAMPIONSHIPS 2020 (EYSOC) INTERNATIONAL ORIENTEERING FEDERATION IOF JUNIOR WORLD SKI ORIENTEERING CHAMPIONSHIPS 2020 (JWSOC) AND EUROPEAN YOUTH SKI ORIENTEERING CHAMPIONSHIPS 2020 (EYSOC) Guidance notes for applicants 2020 These

More information

Executive Board Meeting held on Saturday 21 May 2011 National Volleyball Centre, Kettering MEETING MINUTES

Executive Board Meeting held on Saturday 21 May 2011 National Volleyball Centre, Kettering MEETING MINUTES Executive Board Meeting held on Saturday 21 May 2011 National Volleyball Centre, Kettering MEETING MINUTES Minutes prepared by : Martin Lindsey Circulation : Executive Board, Senior Management Team, Commission

More information

251 engaging and releasing club. 625 only releasing club. 236 all sides. 9,757 only player. 12,604 transfers

251 engaging and releasing club. 625 only releasing club. 236 all sides. 9,757 only player. 12,604 transfers 1 This report offers a summary of the involvement of intermediaries in international 1 transfers completed in FIFA s International Transfer Matching System (ITMS) since 1 January 2013. Typically, three

More information

Trygve Helgaker and Kenneth Ruud. New Tools New Opportunities New Discoveries

Trygve Helgaker and Kenneth Ruud. New Tools New Opportunities New Discoveries Trygve Helgaker and Kenneth Ruud New Tools New Opportunities New Discoveries Motivation New experimental facilities revolutionize how we study matter unprecedented resolution in time and space Revolution

More information

Time series of Staff PPPs

Time series of Staff PPPs Luxembourg, 28 August 2013 Unit C3 A64/13/12 Meeting of the Working Group on Article 64 of the Staff Regulations Luxembourg, 27 th September 2013 Bech Building Room "Ampère" 9.30 a.m. Time series of Staff

More information

Key findings from a survey

Key findings from a survey Key findings from a survey Golf course irrigation management practices in four Nordic countries By Carlos Gómez-Armayones and Jerry Knox, Cranfield Water Science Institute, Cranfield University, UK, February

More information

PRINCIPLES FOR THE SELECTION AND MANAGEMENT OF EUROPEAN ATHLETICS ONE-DAY OUTDOOR MEETINGS

PRINCIPLES FOR THE SELECTION AND MANAGEMENT OF EUROPEAN ATHLETICS ONE-DAY OUTDOOR MEETINGS PRINCIPLES FOR THE SELECTION AND MANAGEMENT OF EUROPEAN ATHLETICS ONE-DAY OUTDOOR MEETINGS 1. Objectives 1.1. To maintain an official system of co-operation and liaison between the European Athletic Association

More information

Baltic Road Association

Baltic Road Association Baltic Road Association Cycle 2013-2017 Martins Dambergs Baltic Road Association 1989: Foundation of Estonian, Latvian and Lithuanian joint organization Baltic Road Council (BRC); 2000: Foundation of Baltic

More information

A Joint Nordic Animal Model for Milk Production Traits in Holsteins and Ayrshires

A Joint Nordic Animal Model for Milk Production Traits in Holsteins and Ayrshires A Joint Nordic Animal Model for Milk Production Traits in Holsteins and Ayrshires Jørn Pedersen 1 and Claus Langdahl 1, Jukka Pösö 2, Kjell Johansson 3, 1 The Danish Agricultural Advisory Centre, Udkaersvej

More information

The UPOV Convention: an International Standard

The UPOV Convention: an International Standard EU Plant Variety Rights in the 21 st Century Conference on the outcome of the evaluation of the Community Plant Variety Rights Regime The UPOV Convention: an International Standard Peter Button (Vice Secretary-General,

More information

N O C HANDBOOK. Policies and Procedures. of the. National Officials' Committee. NOC Orientation April page 1

N O C HANDBOOK. Policies and Procedures. of the. National Officials' Committee. NOC Orientation April page 1 N O C HANDBOOK Policies and Procedures of the National Officials' Committee NOC Orientation April 2012 - page 1 TABLE of CONTENTS 1.0 NATIONAL OFFICIALS' COMMITTEE page 5 1.1 Responsibilities, Mandate,

More information

COUNTY SPORTS PARTNERSHIP (CSP) CORE SPECIFICATION INTERPRETATION GUIDE

COUNTY SPORTS PARTNERSHIP (CSP) CORE SPECIFICATION INTERPRETATION GUIDE COUNTY SPORTS PARTNERSHIP (CSP) CORE SPECIFICATION INTERPRETATION GUIDE Sport England has worked closely with a working group from the County Sports Partnership Network (CSPN) to develop a process and

More information

INTERNATIONAL SKATING UNION

INTERNATIONAL SKATING UNION INTERNATIONAL SKATING UNION Communication No. 2128 SHORT TRACK SPEED SKATING PADDING MEASURES TO INCREASE SAFETY FOR SKATERS (This Communication will replace ISU Communication No. 1726, as of June 1, 2018)

More information

UEFA EURO Technical Services & Overlay / Tender Process. Supplier for Temporary TV Broadcasting Power Phase 1 - Invitation to Express Interest

UEFA EURO Technical Services & Overlay / Tender Process. Supplier for Temporary TV Broadcasting Power Phase 1 - Invitation to Express Interest UEFA EURO 2016 Technical Services & Overlay / Tender Process Phase 1 - Invitation to Express Interest 1. Introduction... 3 2. The Selection Process... 3 3. Submissions of Expression of Interest... 4 4.

More information

for the Structure and Responsibilities of the Subsidiary Bodies of the Commission, and for the Establishment of Decentralized Offices

for the Structure and Responsibilities of the Subsidiary Bodies of the Commission, and for the Establishment of Decentralized Offices Paris, 8 June 2005 English only INTERGOVERNMENTAL OCEANOGRAPHIC COMMISSION (of UNESCO) Guidelines for the Structure and Responsibilities of the Subsidiary Bodies of the Commission, and for the Establishment

More information

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview NationalCyclingStrategFrameworkv3.indd 1 Potential for this modal shift can be found in municipalities of all sizes, in every population

More information

Yacht Engaged in Trade (YET): Blending the Benefits of Private and Charter Use Presented by Patrick Bachofner Lausanne, 2nd May 2017

Yacht Engaged in Trade (YET): Blending the Benefits of Private and Charter Use Presented by Patrick Bachofner Lausanne, 2nd May 2017 THE MARSHALL ISLANDS REGISTRY Yacht Engaged in Trade (YET): Blending the Benefits of Private and Charter Use Presented by Patrick Bachofner Lausanne, 2nd May 2017 AGENDA Introduction to the Marshall Islands

More information

Public data underlying the figures of Annual Report on the Results of Monitoring the Internal Electricity and Natural Gas Markets in 2016

Public data underlying the figures of Annual Report on the Results of Monitoring the Internal Electricity and Natural Gas Markets in 2016 Public data underlying the figures of Annual Report on the Results of Monitoring the Internal Electricity and Natural Gas Markets in 2016 December 2017 Legal notice This document is a joint publication

More information

PART 1: INFRASTRUCTURE OPPORTUNITIES

PART 1: INFRASTRUCTURE OPPORTUNITIES PART 1: INFRASTRUCTURE OPPORTUNITIES AUTHORS This article was authored by David Nancarrow (Partner, Perth), Alyson Eather (Senior Associate, Perth) and Celeste Koravos (Associate, Melbourne and Tokyo).

More information

Shropshire Cricket Board Cricket Policy

Shropshire Cricket Board Cricket Policy Cricket Policy 1. Background SCB exists as a limited company with charitable status with objectives to: Promote, encourage and support cricket within the county of Shropshire with due reference to the

More information

Olympic Scholarships for Athletes Beijing 2008

Olympic Scholarships for Athletes Beijing 2008 C.I.O. SOLIDARITE OLYMPIQUE I O C OLYMPIC SOLIDARITY Olympic Scholarships for Athletes Beijing 2008 Objectives Description Assist elite athletes nominated by their respective National Olympic Committees

More information

STATUTES OF THE WORLD SNOWBOARD FEDERATION

STATUTES OF THE WORLD SNOWBOARD FEDERATION Annex to the Decision of the Ministry of the Interior Ref.: VS-9513/SDR/1-2004 of 29/3/2005 L. S. STATUTES OF THE WORLD SNOWBOARD FEDERATION (WSF) Version establishing WSF 29th March 2005 Page 1 of 12

More information

Reform of the IAAF. A New Era. An outline of the Proposal for Governance Structure Reform of the IAAF

Reform of the IAAF. A New Era. An outline of the Proposal for Governance Structure Reform of the IAAF Reform of the IAAF A New Era An outline of the Proposal for Governance Structure Reform of the IAAF 1 Preface from the President The life of the athlete is one of permanent evolution. An unflinching ambition

More information

List of attachments Attachment 1: NRS President s report 2018 Attachment 2: NRS Treasurer s report for 2017 and budget for 2018 Attachment 3: ICR Repr

List of attachments Attachment 1: NRS President s report 2018 Attachment 2: NRS Treasurer s report for 2017 and budget for 2018 Attachment 3: ICR Repr List of attachments Attachment 1: NRS President s report 2018 Attachment 2: NRS Treasurer s report for 2017 and budget for 2018 Attachment 3: ICR Representative s report 2018 June 14 th, 2018 Dear NRS

More information

British Universities & Colleges Sport International Strategy

British Universities & Colleges Sport International Strategy British Universities & Colleges Sport International Strategy 2012-15 Executive Summary BUCS seeks to adopt an approach to international influencing which is developed across four key areas : International

More information

County Donegal Public Participation Network Work Plan

County Donegal Public Participation Network Work Plan County Donegal Public Participation Network Work Plan Introduction The purpose of this document is to present a (DRAFT) Work Plan for County Donegal Public Participation Network which will enable member

More information

ECONOMIC ACTIVITY REPORT SEPTEMBER September 2018 Kristoffer Eide Hoen Anders Wettre

ECONOMIC ACTIVITY REPORT SEPTEMBER September 2018 Kristoffer Eide Hoen Anders Wettre ECONOMIC ACTIVITY REPORT SEPTEMBER 2018 27 September 2018 Kristoffer Eide Hoen Anders Wettre END OF AN ERA OF STRONG GROWTH Selected contracting markets CAGR* 2014 2017 Greater Gothenburg 23% Greater Malmö

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. REQUESTED BY: DEPARTMENT: PREPARED BY: Name: Parks and Recreation Kevin V.

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. REQUESTED BY: DEPARTMENT: PREPARED BY: Name: Parks and Recreation Kevin V. 8D1 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: DEPARTMENTAL PRESET: 10:30 AM TITLE: GOLF COURSE DESIGN UPDATE AGENDA ITEM DATES: MEETING DATE: 3/27/2018 COMPLETED DATE: 3/15/2018 COUNTY

More information

Nordel GRID DISTURBANCE AND FAULT STATISTICS

Nordel GRID DISTURBANCE AND FAULT STATISTICS Nordel GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 Introduction... 3 1.1 Contact persons... 4 1.2 Guidelines the statistics... 4 1.3 Voltage levels in the Nordel network...

More information

32nd Meeting of Joint IHO-IOC GEBCO Guiding Committee Kuala Lumpur, Malaysia, 8-9 October 2015

32nd Meeting of Joint IHO-IOC GEBCO Guiding Committee Kuala Lumpur, Malaysia, 8-9 October 2015 32nd Meeting of Joint IHO-IOC GEBCO Guiding Committee Kuala Lumpur, Malaysia, 8-9 October 2015 IOC Report Osamu Miyaki Programme specialist, Intergovernmental Oceanographic Commission/UNESCO 1 Update of

More information

2019 AIBA WOMEN S WORLD BOXING CHAMPIONSHIPS. Bidding Guidelines

2019 AIBA WOMEN S WORLD BOXING CHAMPIONSHIPS. Bidding Guidelines 2019 AIBA WOMEN S WORLD BOXING CHAMPIONSHIPS Bidding Guidelines TABLE OF CONTENTS TABLE OF CONTENTS... 2 ABOUT THE EVENT... 3 BENEFITS OF HOSTING AIBA WOMEN S WORLD BOXING CHAMPIONSHIPS 2019... 5 REQUIREMENTS

More information

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 Severn Trent Water Forum DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 The Water Forum is a multi-stakeholder panel created in 2012 to challenge Severn Trent as it developed its business

More information

Welcome to JM s Capital Markets Day. Kvarnholmen 27 November, 2007

Welcome to JM s Capital Markets Day. Kvarnholmen 27 November, 2007 Welcome to JM s Capital Markets Day Kvarnholmen 27 November, 2007 Agenda Strategic direction Johan Skoglund, President and CEO Structured planning Lennart Henriz, Head of Operations Development (Quality,

More information

Minutes of the Executive Committee meeting of Friday 16 June 2017 in Riga, Latvia

Minutes of the Executive Committee meeting of Friday 16 June 2017 in Riga, Latvia Minutes of the Executive Committee meeting of Friday 16 June 2017 in Riga, Latvia For a list of those present and those sending apologies, see Annex 1. Minutes: Richard Dowling (Secretary) (1) Opening

More information

Chapter Rights and obligations of IPC members

Chapter Rights and obligations of IPC members Chapter 2.1 - Rights and obligations of IPC members December 2011 International Paralympic Committee Adenauerallee 212-214 Tel. +49 228 2097-200 www.paralympic.org 53113 Bonn, Germany Fax +49 228 2097-209

More information

ERRATA A few figures and tables in the print publication contain errors or lack information. The corrected versions are presented below.

ERRATA A few figures and tables in the print publication contain errors or lack information. The corrected versions are presented below. Newspapers in the Nordic Media Landscape 217 1. The Nordic Context ERRATA A few figures and tables in the print publication contain errors or lack information. The corrected versions are presented below.

More information

Operating Committee Strategic Plan

Operating Committee Strategic Plan Operating Committee Strategic Plan September 2017 NERC Report Title Report Date I Table of Contents Preface... ii Introduction... iii Operating Committee Strategic Plan...1 Purpose of Strategic Plan...1

More information

WTP Meeting Sunday 25 th January 2015 Scottish Gymnastics Office, 1 Redheughs Rigg, Edinburgh

WTP Meeting Sunday 25 th January 2015 Scottish Gymnastics Office, 1 Redheughs Rigg, Edinburgh WTP Meeting Sunday 25 th January 2015 Scottish Gymnastics Office, 1 Redheughs Rigg, Edinburgh Present: Rod Smith (RS), Bea Petersen (BP), Cathy Osbourne (CO), Dawn Telford (DT), Katrina Harper (KH) In

More information

III. Player Eligibility Code

III. Player Eligibility Code International Handball Federation III. Player Eligibility Code Edition: 9 November 2017 Edition: 9 November 2017 Page 1 Table of contents I. Basic Principles II. Player Status III. Professional Players

More information

Fishery Improvement Projects

Fishery Improvement Projects Fishery Improvement Projects What is a Fishery Improvement Project? A FIP is an alliance of stakeholders retailers, processors, producers and catchers that comes together to resolve problems within a specific

More information

International RS Tera Class Association

International RS Tera Class Association International RS Tera Class Association Annual General Meeting to be held at Aabenraa Sejl Club on 2 August 2011 at time to be advised (please note change of date) 1 Welcome Agenda 2 Apologies for Absence;

More information

EUROPEAN COMBINED EVENTS TEAM CHAMPIONSHIPS 701. PROMOTION AND RIGHTS

EUROPEAN COMBINED EVENTS TEAM CHAMPIONSHIPS 701. PROMOTION AND RIGHTS EUROPEAN COMBINED EVENTS TEAM CHAMPIONSHIPS 701. PROMOTION AND RIGHTS 701.1. The European Athletic Association (hereinafter European Athletics) shall promote a European Team Championships in Decathlon

More information