1 Exeter Flood Defence Scheme CECA South West Member s Presentation 30th November 2016 Tristan Bassett Commercial Services Manager, EA Don Higgs Framework Manager, BMM JV

2 Update Covering.. Why we re Building What we re Building How we re Building plus construction Challenges

3 Why We re Building Areas at risk of Flooding 1:100 Year Event Exwick Properties at Risk Approx Domestic Properties City Centre Approx Commercial Properties St Thomas Critical Infrastructure Current Standard : Generally 1 in 40 Marsh Barton Blocker to Economic Growth

4 Description of the Works Scheme Starts at Cowley Bridge in the North End at Countess Wear / Bridge Road in the South Spread out over 7 km Zone 1 Location of Network Rail Land Zone 2 Exwick & Flowerpot Fields Zone 3 Central Exeter Zone 4 Exeter Quay Zone 5 Exeter Canal Zone 6 Countess Wear

5 Overall Programme for Exeter FDS Phase 1 : In-channel works south of Trew s Weir Permitted development Completed October 2015 Phase 2 : Raised defences, gates etc Planning Consent received July 2015 Future Milestones: March 2016: Award Construction Contract May 2016: Site works to commence Summer 2018: Completion

6 Phase 1 Modification of Trew s Flood Relief Channel Reduce crest of side weir New fish passes on Trews Weir and side weir Deepen flood relief channel and create wetland habitat Remove existing check weir

7 Phase 2 Cowley Bridge defence solutions to be designed in association with Network Rail Design Aim = to maximise flow capacity Channel capacity improvements Structural alterations 7.4km raised defences Railway defence walls and banks Station Road flood gates St Davids Station defence walls Exwick defence walls and banks Exe Bridges defence embankments Bonhay Road - Localised defences. Eagle Cottages defence walls Haven Banks defence embankments and walls

8 The Quay Demountable defences Trews Side Weir crest modifications Countess Wear Sewage Treatment Works SWW defence embankments Phase 2 Will raise standard of flood protection from 1/40 annual risk to 1/100 annual risk Trews Flood Relief Channel regrading to improve capacity Construction in 2 phases: 1. In Channel works 2. Flood defences Canal Banks raised embankments and walls (also acts to protect trunk sewer) Mill Lane Defence wall and embankments

9 Phase 2 - The Quay Before

10 Phase 2 - The Quay After

11 Phase 2 The Quay During

12 Phase 2 Flood Gates

13 Phase 2 Cowley to St Davids Interface with Network Rail infrastructure Access

14 Costs, Funding and Partner Cooperation The Partners Governance & Project Team Staff & DCC departments Future Operations Cost m Funding Contributors Exeter CC - 3m Devon CC - 3m SWW Up to 1.5m, dialogue ongoing EA - 25m

15 How we re Building plus construction Challenges Key Quantities Earthworks Strategy Key locations and challenges

16 Key Quantities Earthworks Total 130,000m3 Sheet Piling Total 1670m CFA Piling 280no RC Walls 1690m Flood Gates 14no Glass Flood Panels 130m Demountable Flood Panels 95m

17 Key Quantities Earthwork Strategy Ensure fill meets engineering requirements, advanced trial holes / testing. No material moved off site. Control of high value core fill material. Programming to take advantage of summer months where possible given other constraints. Minimise haul distances and vehicular movements.

18 Station Road

19 Bonhay Road

20 Eagle Cottages

21 The Quay

22 Double Locks

23 Countess Wear

24 Communications Importance recognised for public, businesses and partner organisations Dedicated PL staff member Several evening drop in sessions Extensive use of social media

25 Zone 1 Cowley Bridge

26 Zone 1 Cowley Bridge

27 Zone 2 Exwick / Flowerpot

28 Zone 2 Exwick / Flowerpot

29 Zone 2 Exwick / Flowerpot

30 Zone 3 Trew s Flood Relief Channel

31 Zone 3 Trew s Flood Relief Channel

32 Zone 3 Trew s Flood Relief Channel

33 Zone 6 Countess Weir

34 Zone 6 Countess Weir

35 Zone 6 Countess Weir

36 Thank you!

Stoke Mandeville Parish Council 17 April 2018

Stoke Mandeville Parish Council 17 April 2018 Stoke Mandeville Parish Council 17 April 2018 Stoke Mandeville Parish Council 1 Introductions 2 Construction Approach 3 MWCC in Stoke Mandeville 4 Future Engagement Introduction HS2 Phase One Delivery

More information

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Page 1 of 6 Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Dear Mr Hassan 14th September 2015 Re: Development of Bus & Coach Station Site Following the submission

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

What s the issue for transport in Cardiff?

What s the issue for transport in Cardiff? Demand for travel The number of commuters travelling to work in Cardiff has increased from 190,000 in 2001 to 198,000 in 2010, with some 124,000 Cardiff residents travelling across the city daily to their

More information

Section 2 Strategic Alignment. Contents

Section 2 Strategic Alignment. Contents Section 2 Strategic Alignment Contents 2 Strategic Alignment... 2 2.1 General... 2 2.2 SmartGrowth Strategy and Implementation Plan... 2 2.3 Walking and Cycling Strategy... 3 2.4 Built Environment Strategy...

More information

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

7.3 Traffic and Transport Impacts 15/10/2014

7.3 Traffic and Transport Impacts 15/10/2014 Midland Metro 7.3 Traffic and Transport Impacts 7.3.1 Introduction This section addresses the potential impacts arising from generated construction traffic and construction on users of the local road network

More information

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans 1 Investing in cycling and walking contributes to a broad range of cross-cutting policy objectives Cycling and walking

More information

Community engagement guide May 2018

Community engagement guide May 2018 Community engagement guide May 2018 Greater Wellington Regional Council (GWRC), Hutt City Council (HCC) and the New Zealand Transport Agency (NZTA) are working together to achieve some big improvements

More information

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169 Styal Golf Course Accommodation Works Non-Technical Summary 1007/6.15.2/169 September 2013 Document Control Sheet Project Title: Styal Golf Course Report Title: Non Technical Summary Document No: 1032775.014.001

More information

Casablanca Boulevard & GO Station Access

Casablanca Boulevard & GO Station Access Casablanca Boulevard & GO Station Access Class Environmental Assessment STAKEHOLDER WORKSHOP Thursday September 27th, 2018 5:30PM 8:00PM 1 WORKSHOP PURPOSE Provide an overview of the Design Alternatives

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

AIRE VALLEY LEEDS AREA ACTION PLAN

AIRE VALLEY LEEDS AREA ACTION PLAN AIRE VALLEY LEEDS AREA ACTION PLAN Leeds Local Development Framework Development Plan Document Infrastructure Delivery Plan Background Paper Update December 06 INFRASTRUCTURE DELIVERY PLAN (IDP) AS IT

More information

Policy. Stormwater Fencing. 1. Overview Objective Scope Summary

Policy. Stormwater Fencing. 1. Overview Objective Scope Summary Policy Stormwater Fencing 1. Overview 1.1. Objective The purpose of the Fencing Policy is to ensure the right information and consistent guidelines are used in fencing Sydney Water s Stormwater Network

More information

FAQ s Walsh Road / Ferguson Road Pilot Scheme

FAQ s Walsh Road / Ferguson Road Pilot Scheme FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary

More information

Greater Cambridge City Deal Executive Board & Joint Assembly

Greater Cambridge City Deal Executive Board & Joint Assembly Greater Cambridge City Deal Executive Board & Joint Assembly Welcome to the Call for Evidence on tackling congestion in Cambridge Launch Event 11 th November 2015 Bob Menzies Service Director: Strategy

More information

Green Travel Strategy & Action Plan

Green Travel Strategy & Action Plan Green Travel Strategy & Action Plan 2016- Executive summary I am delighted to introduce the Green Travel Plan for the Penryn and Falmouth campuses 2016-. In the last few years we have seen a significant

More information

Juni 2013 DI Bernhard Engleder,

Juni 2013 DI Bernhard Engleder, Juni 2013 DI Bernhard Engleder, Head of department Vienna City Administration - Road Construction and Maintenance ESTABLISHMENT OF A MOBILITY AGENCY FOR VIENNA Introduction The current coalition agreement

More information

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas: Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion

More information

Green Travel Strategy & Action Plan

Green Travel Strategy & Action Plan Green Travel Strategy & Action Plan 2016-2021 Executive summary I am delighted to introduce the Green Travel Plan for the Penryn and Falmouth campuses 2016-2021. In the last few years we have seen a significant

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION 1 PURPOSE 1.1 To provide the following information and supporting evidence for the Member decision (reference

More information

a CYCLING ACTION PROGRESS MEETING

a CYCLING ACTION PROGRESS MEETING a CYCLING ACTION PROGRESS MEETING 9 TH APRIL 2013 Present: Apologies: Chris Vinestock (CCS Transportation, Head of Service) Cllr Nick Davies (CCS Cycle Forum Designate) Ben George (CCS Transport Strategy)

More information

Transport Plan Adopted March 2012

Transport Plan Adopted March 2012 Burneside Parish Council Transport Plan Adopted March 2012 POLICY AREAS: TP1: Motor Vehicles TP2: Public Transport TP3: Cycling and Pedestrian Routes THE REPORT: 1. Scope of the Plan 2. Background 3. Local

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

Learning Objectives. Sustainable Development: The Making of the Queen Elizabeth Olympic Park. John Charles Hopkins, ASLA, University of Pennsylvania

Learning Objectives. Sustainable Development: The Making of the Queen Elizabeth Olympic Park. John Charles Hopkins, ASLA, University of Pennsylvania Sustainable Development: The Making of the Queen Elizabeth Olympic Park John Charles Hopkins, ASLA, University of Pennsylvania ASLA 2012 Annual Meeting and EXPO Learning Objectives 1. How London's Olympic

More information

Regional Cycle Programme Update

Regional Cycle Programme Update Agenda Item 10 (ii) Regional Cycle Programme Update Glossary Auckland Council Auckland Transport Cycle Action Auckland New Zealand Transport Agency Regional Cycle Network (AC) (AT) (CAA) (NZTA) (RCN) Executive

More information

Making innovation happen! eit.europa.eu. EITeu EITnews EIT

Making innovation happen! eit.europa.eu. EITeu EITnews EIT Making innovation happen! eit.europa.eu EITeu EITnews EIT Our results. More than:* 2242 business ideas 305 innovative start-ups 1232 430 knowledge transfers and adoptions new products and services 1224

More information

THE HOCKEY STRATEGY. UPDATED March 2012

THE HOCKEY STRATEGY. UPDATED March 2012 THE HOCKEY STRATEGY UPDATED March 2012 1 CURRENT SITUATION SWOT Hockey has great potential with some unique strengths and competitive advantages...we must play to our strengths SWOT Strengths Global sport,

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

Greater wind capture for ultimate business case certainty

Greater wind capture for ultimate business case certainty Greater wind capture for ultimate business case certainty Vestas Active Output Management (AOM) At Vestas, we are relentlessly committed to wind. That s why we recognise that making the most of your wind

More information

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015 // RoWSaF Making roads safer for road workers rowsaf.org.uk Working in partnership with clients, industry and key stakeholders to improve worker safety Often working close to live traffic, activities conducted

More information

Appendix 10B Photographs (Including Historical Images)

Appendix 10B Photographs (Including Historical Images) Lower Lee (Cork City) Drainage Scheme in association with Appendix 10B Photographs (Including Historical Images) Environmental Impact Statement APPENDIX 10B: PHOTOGRAPHS (INCLUDING HISTORICAL IMAGES) Plate

More information

Do you have the energy, drive and passion to deliver transformational growth in cricket participation?

Do you have the energy, drive and passion to deliver transformational growth in cricket participation? Job Title: Responsible to: Contract: Location: Head of Participation CEO Full-time, permanent Edinburgh Do you have the energy, drive and passion to deliver transformational growth in cricket participation?

More information

Appendix N(b): Portishead Station Outline Travel Plan

Appendix N(b): Portishead Station Outline Travel Plan Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple

More information

14 NOISE AND VIBRATION

14 NOISE AND VIBRATION 14 NOISE AND VIBRATION 14.1 EXISTING ENVIRONMENT 14.1.1 The noise environment within Poole Harbour is generally characterised by low to medium noise levels depending on location. For example, certain areas

More information

Strategy for Walking & Cycling Action Plan

Strategy for Walking & Cycling Action Plan Strategy for Walking & Cycling Action Plan To achieve higher levels of walking and cycling activity, the destinations which people access have to be available within suitable distances and designed to

More information

Auckland Council Finance & Performance Committee Presentation

Auckland Council Finance & Performance Committee Presentation Board Meeting 26 May 2015 Presentation Open Session Auckland Council Finance & Performance Committee Presentation Recommendation That the Board: i. Receives this report. Executive summary As part of the

More information

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints

More information

Local Highway Panels Members Guide. 9 Public Rights of Way

Local Highway Panels Members Guide. 9 Public Rights of Way Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

Fisheries newsletter. Wessex and Devon & Cornwall

Fisheries newsletter. Wessex and Devon & Cornwall Fisheries newsletter Wessex and Devon & Cornwall April to June 2015 This newsletter is a quarterly update on some of the fisheries work undertaken by the Environment Agency and other partners including

More information

PL AN. To be the premier swimming state in Australia by Photo courtesy of Delly Carr/Swimming Australia

PL AN. To be the premier swimming state in Australia by Photo courtesy of Delly Carr/Swimming Australia S T R AT E GIC PL AN To be the premier swimming state in Australia by 2018. Photo courtesy of Delly Carr/Swimming Australia Introduction Swimming is Australia s highest participation sport and is an activity

More information

Severn Estuary Partnership

Severn Estuary Partnership Severn Estuary Partnership Working in partnership for the future of the Severn Estuary Severn Estuary Partnership Lucy Taylor Severn Estuary Partnership Officer Coastal Partnership Network www.severnestuarypartnership.org.uk

More information

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality

More information

Winter Maintenance in Lithuania

Winter Maintenance in Lithuania Winter Maintenance in Lithuania Henrikas Jurkuvėnas, Head of Road Maintenance Division Lithuanian Road Network CLIENTS FOR ROAD MAINTENANCE State roads (21300 km) Lithuanian Road Administration Municipal

More information

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 1. Introduction The concept of the Sustainable Movement Corridor (hereafter the SMC ) was first developed

More information

PART 1: INFRASTRUCTURE OPPORTUNITIES

PART 1: INFRASTRUCTURE OPPORTUNITIES PART 1: INFRASTRUCTURE OPPORTUNITIES AUTHORS This article was authored by David Nancarrow (Partner, Perth), Alyson Eather (Senior Associate, Perth) and Celeste Koravos (Associate, Melbourne and Tokyo).

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

SPORT AND RECREATION. Outcome Strategy. Outcome 10. Outcome I 10

SPORT AND RECREATION. Outcome Strategy. Outcome 10. Outcome I 10 Section 2 Department Outcomes 10 Sport and Recreation Outcome 10 SPORT AND RECREATION Improved opportunities for community participation in sport and recreation, and excellence in high-performance athletes,

More information

Wellington Public Transport Spine Study

Wellington Public Transport Spine Study Wellington Public Transport Spine Study Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook

More information

PITCH IMPROVEMENT PROGRAMME

PITCH IMPROVEMENT PROGRAMME THE FA PITCH IMPROVEMENT PROGRAMME FREQUENTLY ASKED QUESTIONS The FA Pitch Improvement Programme (PIP) Frequently Asked Questions (FAQ) The need for this service is more relevant now than ever, given the

More information

Nottingham, the great cycle city

Nottingham, the great cycle city Nottingham, the great cycle city Our vision for the city s cycling future Foreword Councillor Jon Collins Leader of the Council Nottingham has a world class public transport system which is essential to

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

Swim Ireland Strategic Plan

Swim Ireland Strategic Plan Toe in the water. Face in the water. Staying afloat. Touching the bottom. One length without stopping. Fifty lengths without stopping.. 3 3 We exist to encourage participation, develop excellence and regulate

More information

[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the

[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] 4 th Summer Youth Olympic Games

More information

Nottingham Cycle City Frequently Asked Questions

Nottingham Cycle City Frequently Asked Questions Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly

More information

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX L - Mobilitiy Component Implementation Matrix

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX L - Mobilitiy Component Implementation Matrix LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX L - Mobilitiy Component Implementation Matrix TRANSPORTATION DEMAND MANAGEMENT (TDM) TRANSIT/TIGER TRAILS/ TRAMLINK Staff/Faculty

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

28 November Joanna Vincent Inquiry Manager. By only to: Dear Joanna

28 November Joanna Vincent Inquiry Manager. By  only to: Dear Joanna 25 Main Street Lyddington Oakham Rutland LE15 9LR 28 November 2018 Tel: 07885 643341 Email: mike.holland@hollandlp.co.uk Joanna Vincent Inquiry Manager By email only to: joannavincent@personaassociates.co.uk

More information

Liikkumisen ohjauksen mahdollisuudet rakennustyömailla. Dutch experiences

Liikkumisen ohjauksen mahdollisuudet rakennustyömailla. Dutch experiences Liikkumisen ohjauksen mahdollisuudet rakennustyömailla Dutch experiences Content Background Dutch congestion problems Regional mobility brokers Seven principles to minimise nuisance due to road works Examples

More information

NORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS

NORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS OPTIONS SHORTLIST RECOMMENDATIONS Coastal Unit C: Bayview Options recommended for MCDA scoring. Status quo. Planting 3. Renourishment (gravel) 6. Beach-scraping 7. Restore shingle crest. Inundation accommodation

More information

University of Leeds Travel Plan

University of Leeds Travel Plan University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

Herring River Restoration Project Chronology of Key Events

Herring River Restoration Project Chronology of Key Events August 2005 Cape Cod National Seashore (CCNS) and Town of Wellfleet Board of Selectmen entered into an MOU (MOU I) to review and summarize the scientific and technical information on the Herring River

More information

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Authors: Tony Parker, Uwe Dornbusch Main driver: Improved defences Project stage: Ongoing construction/operation since 1992 Photo 1: Shoreham

More information

Implementation Report # False Creek Bridges

Implementation Report # False Creek Bridges Implementation Report #1 2013-04-24 False Creek Bridges ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

EA Fisheries Thames Area quarterly round-up for the Angling Trust Thames Regional Forum. Stuart Keable Fisheries Technical Officer

EA Fisheries Thames Area quarterly round-up for the Angling Trust Thames Regional Forum. Stuart Keable Fisheries Technical Officer EA Fisheries Thames Area quarterly round-up for the Angling Trust Thames Regional Forum Stuart Keable Fisheries Technical Officer Crayfish: a word on illegal traps Signal crayfish are widespread throughout

More information

Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017

Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017 Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017 Agenda 1. Welcome and Introductions 2. Opening Remarks 3. Project Overview

More information

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne Ashbourne Strategic Policies SP 1 To operate an Order of Priority for the release of residential lands in compliance with the requirements of CS OBJ 6 of the County Development Plan as follows: i) The

More information

Salmon Five Point Approach restoring salmon in England

Salmon Five Point Approach restoring salmon in England Salmon Five Point Approach restoring salmon in England Our Mission To restore the abundance, diversity and resilience of salmon stocks throughout England We will do this by:- a) Maximising the production

More information

Concept. Phased Approach. Process. Participant Centred Approach 07/11/2010. Based on the Business Principle - Customer Focused

Concept. Phased Approach. Process. Participant Centred Approach 07/11/2010. Based on the Business Principle - Customer Focused Participant Centred Approach Concept Katy Ritchie National Development Manager (New Games, New Markets) England Netball Based on the Business Principle - Customer Focused Understanding the customer and

More information

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017 I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing September 25, 2017 Purpose of Tonight s Meeting Provide information and gain public input: Draft Environmental Assessment (EA) Design

More information

Healthy and Environmental Friendly Transport in the City Region

Healthy and Environmental Friendly Transport in the City Region Healthy and Environmental Friendly Transport in the City Region Reindert Augustijn Team manager traffic and transport Arnhem Nijmegen City Region www.polisnetwork.eu/2014conference #polis14 Fact and figures

More information

Morpeth Amateur Swimming Club. Squad Aims and Objectives

Morpeth Amateur Swimming Club. Squad Aims and Objectives Morpeth Amateur Swimming Club Squad Aims and Objectives Introduction As a Club it is essential that we have in place a training structure that is suitable for all of our swimmers and cost effective. As

More information

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010 Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations Joint Response to the Better Rail Stations Consultation This response has been prepared

More information

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL Restore America s Estuaries Conference 2012 Tampa, FL presented by: Theresa Mitchell, WA Dept. of Fish & Wildlife Nearshore General Investigation Change Analysis: Comparison of historical and current

More information

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL Saskatchewan Highways & Transportation May 29, 2007 I Introduction Government of Saskatchewan Submission To the Railway Safety

More information

The Orkney Creel Fishery

The Orkney Creel Fishery The Orkney Creel Fishery Fishery Improvement Project Work Plan Michael Bell, Kate Walker 2/21/2013 Introduction This work plan has been developed as part of the Fishery Improvement Project (FIP) of the

More information

TRANSIT SIGNAL PRIORITY The Toronto Experience

TRANSIT SIGNAL PRIORITY The Toronto Experience TRANSIT SIGNAL PRIORITY The Toronto Experience July 27, 2004 July 27, 2004 1 Warning This presentation contains graphic images depicting serious violations to the coordination of traffic signals and may

More information

Greater wind capture for ultimate business case certainty

Greater wind capture for ultimate business case certainty Greater wind capture for ultimate business case certainty Vestas Active Output Management (AOM) At Vestas, we are relentlessly committed to wind. That s why we recognise that making the most of your wind

More information

Poole Harbour Aquatic Management Plan 2006

Poole Harbour Aquatic Management Plan 2006 Poole Harbour Aquatic Management Plan 2006 Non-Technical Summary Harbour Office, 20 New Quay Road, Poole, Dorset BH15 4AF. Tel: 01202 440200. Fax: 01202 440235. www.pooleharbouraqmp.co.uk Welcome Introduction

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

British Universities & Colleges Sport International Strategy

British Universities & Colleges Sport International Strategy British Universities & Colleges Sport International Strategy 2012-15 Executive Summary BUCS seeks to adopt an approach to international influencing which is developed across four key areas : International

More information

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport Start of works exhibition November 2014 Welcome Scheme plan A56 Bowdon A56 M56 Booth Bank Junction 8 M56 Millington Lane Cherry Tree Lane Junction 7 Millington Hall Lane Rostherne Mere Rostherne Lane N140519

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

Blyth Estuary Green Travel Project

Blyth Estuary Green Travel Project Blyth Estuary Green Travel Project Green Infrastructure Case Study Creating the UK s first Active Travel Town The Connect 2 Blyth Estuary Green Travel Project shows how green infrastructure can enable

More information

architectural practice empowering first nations

architectural practice empowering first nations architectural engineering practice empowering first nations mission statement Ayshkum Engineering Inc. is dedicated to working primarily with Aboriginal Communities, to improve quality of life and standard

More information

Tidal Energy from the Severn Estuary: Opportunities and Challenges

Tidal Energy from the Severn Estuary: Opportunities and Challenges Co-financed with the support of the European Union 1 ERDF Atlantic Area Programme Investing in our common future Tidal Energy from the Severn Estuary: Opportunities and Challenges Prof Roger Falconer,

More information

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT WELCOME TO PUBLIC INFORMATION CENTRE #1 AIRPORT ROAD ENVIRONMENTAL ASSESSMENT From Braydon Boulevard/Stonecrest Drive to Countryside Drive November 23, 2017 6:30 PM 8:30 PM Please sign in and fill out

More information

Guildford Borough (Draft)

Guildford Borough (Draft) ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November

More information

Rushey Weir: Background to the Thames weirs

Rushey Weir: Background to the Thames weirs Rushey Weir Richard Harding BEng (Hons) CEng Project Executive Thames Weirs projects 1 Rushey Weir: Background to the Thames weirs The Environment Agency owns, operates and maintains 195 weir sets across

More information

B&K Tourism Development Plan

B&K Tourism Development Plan B&K Tourism Development Plan 2015-2020 B&K Road Assumptions The construction of the new road infrastructure in the B&K region will result in the distance of the future ski resorts to be as follows : From

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

Strategic Plan for Sevens Rugby. September 2006

Strategic Plan for Sevens Rugby. September 2006 Strategic Plan for Sevens Rugby September 2006 Introduction The promotion of Sevens has been instrumental in taking Rugby to new territories and regions. The continued growth of Sevens would help achieve

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

Introduction. You may find detailed information about the network from the EuroVelo website: Page 1/5

Introduction. You may find detailed information about the network from the EuroVelo website:  Page 1/5 Including EuroVelo in the TEN-T Briefing Paper European Cyclists Federation Adam Bodor, Director of EuroVelo, Cycling Tourism and Regional Policy, a.bodor@ecf.com Ed Lancaster, Cycling Tourism and Regional

More information