1 Exeter Flood Defence Scheme CECA South West Member s Presentation 30th November 2016 Tristan Bassett Commercial Services Manager, EA Don Higgs Framework Manager, BMM JV
2 Update Covering.. Why we re Building What we re Building How we re Building plus construction Challenges
3 Why We re Building Areas at risk of Flooding 1:100 Year Event Exwick Properties at Risk Approx Domestic Properties City Centre Approx Commercial Properties St Thomas Critical Infrastructure Current Standard : Generally 1 in 40 Marsh Barton Blocker to Economic Growth
4 Description of the Works Scheme Starts at Cowley Bridge in the North End at Countess Wear / Bridge Road in the South Spread out over 7 km Zone 1 Location of Network Rail Land Zone 2 Exwick & Flowerpot Fields Zone 3 Central Exeter Zone 4 Exeter Quay Zone 5 Exeter Canal Zone 6 Countess Wear
5 Overall Programme for Exeter FDS Phase 1 : In-channel works south of Trew s Weir Permitted development Completed October 2015 Phase 2 : Raised defences, gates etc Planning Consent received July 2015 Future Milestones: March 2016: Award Construction Contract May 2016: Site works to commence Summer 2018: Completion
6 Phase 1 Modification of Trew s Flood Relief Channel Reduce crest of side weir New fish passes on Trews Weir and side weir Deepen flood relief channel and create wetland habitat Remove existing check weir
7 Phase 2 Cowley Bridge defence solutions to be designed in association with Network Rail Design Aim = to maximise flow capacity Channel capacity improvements Structural alterations 7.4km raised defences Railway defence walls and banks Station Road flood gates St Davids Station defence walls Exwick defence walls and banks Exe Bridges defence embankments Bonhay Road - Localised defences. Eagle Cottages defence walls Haven Banks defence embankments and walls
8 The Quay Demountable defences Trews Side Weir crest modifications Countess Wear Sewage Treatment Works SWW defence embankments Phase 2 Will raise standard of flood protection from 1/40 annual risk to 1/100 annual risk Trews Flood Relief Channel regrading to improve capacity Construction in 2 phases: 1. In Channel works 2. Flood defences Canal Banks raised embankments and walls (also acts to protect trunk sewer) Mill Lane Defence wall and embankments
9 Phase 2 - The Quay Before
10 Phase 2 - The Quay After
11 Phase 2 The Quay During
12 Phase 2 Flood Gates
13 Phase 2 Cowley to St Davids Interface with Network Rail infrastructure Access
14 Costs, Funding and Partner Cooperation The Partners Governance & Project Team Staff & DCC departments Future Operations Cost m Funding Contributors Exeter CC - 3m Devon CC - 3m SWW Up to 1.5m, dialogue ongoing EA - 25m
15 How we re Building plus construction Challenges Key Quantities Earthworks Strategy Key locations and challenges
16 Key Quantities Earthworks Total 130,000m3 Sheet Piling Total 1670m CFA Piling 280no RC Walls 1690m Flood Gates 14no Glass Flood Panels 130m Demountable Flood Panels 95m
17 Key Quantities Earthwork Strategy Ensure fill meets engineering requirements, advanced trial holes / testing. No material moved off site. Control of high value core fill material. Programming to take advantage of summer months where possible given other constraints. Minimise haul distances and vehicular movements.
18 Station Road
19 Bonhay Road
20 Eagle Cottages
21 The Quay
22 Double Locks
23 Countess Wear
24 Communications Importance recognised for public, businesses and partner organisations Dedicated PL staff member Several evening drop in sessions Extensive use of social media
25 Zone 1 Cowley Bridge
26 Zone 1 Cowley Bridge
27 Zone 2 Exwick / Flowerpot
28 Zone 2 Exwick / Flowerpot
29 Zone 2 Exwick / Flowerpot
30 Zone 3 Trew s Flood Relief Channel
31 Zone 3 Trew s Flood Relief Channel
32 Zone 3 Trew s Flood Relief Channel
33 Zone 6 Countess Weir
34 Zone 6 Countess Weir
35 Zone 6 Countess Weir
36 Thank you!
Stoke Mandeville Parish Council 17 April 2018
Stoke Mandeville Parish Council 17 April 2018 Stoke Mandeville Parish Council 1 Introductions 2 Construction Approach 3 MWCC in Stoke Mandeville 4 Future Engagement Introduction HS2 Phase One Delivery
More informationTel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN
Page 1 of 6 Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Dear Mr Hassan 14th September 2015 Re: Development of Bus & Coach Station Site Following the submission
More informationRoads and public rights of way
Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:
More informationWhat s the issue for transport in Cardiff?
Demand for travel The number of commuters travelling to work in Cardiff has increased from 190,000 in 2001 to 198,000 in 2010, with some 124,000 Cardiff residents travelling across the city daily to their
More informationSection 2 Strategic Alignment. Contents
Section 2 Strategic Alignment Contents 2 Strategic Alignment... 2 2.1 General... 2 2.2 SmartGrowth Strategy and Implementation Plan... 2 2.3 Walking and Cycling Strategy... 3 2.4 Built Environment Strategy...
More informationWarfield Neighbourhood Plan: 4.4 Infrastructure
Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy
More information7.3 Traffic and Transport Impacts 15/10/2014
Midland Metro 7.3 Traffic and Transport Impacts 7.3.1 Introduction This section addresses the potential impacts arising from generated construction traffic and construction on users of the local road network
More informationCycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans
Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans 1 Investing in cycling and walking contributes to a broad range of cross-cutting policy objectives Cycling and walking
More informationCommunity engagement guide May 2018
Community engagement guide May 2018 Greater Wellington Regional Council (GWRC), Hutt City Council (HCC) and the New Zealand Transport Agency (NZTA) are working together to achieve some big improvements
More informationStyal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169
Styal Golf Course Accommodation Works Non-Technical Summary 1007/6.15.2/169 September 2013 Document Control Sheet Project Title: Styal Golf Course Report Title: Non Technical Summary Document No: 1032775.014.001
More informationCasablanca Boulevard & GO Station Access
Casablanca Boulevard & GO Station Access Class Environmental Assessment STAKEHOLDER WORKSHOP Thursday September 27th, 2018 5:30PM 8:00PM 1 WORKSHOP PURPOSE Provide an overview of the Design Alternatives
More information1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,
1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology
More informationAIRE VALLEY LEEDS AREA ACTION PLAN
AIRE VALLEY LEEDS AREA ACTION PLAN Leeds Local Development Framework Development Plan Document Infrastructure Delivery Plan Background Paper Update December 06 INFRASTRUCTURE DELIVERY PLAN (IDP) AS IT
More informationPolicy. Stormwater Fencing. 1. Overview Objective Scope Summary
Policy Stormwater Fencing 1. Overview 1.1. Objective The purpose of the Fencing Policy is to ensure the right information and consistent guidelines are used in fencing Sydney Water s Stormwater Network
More informationFAQ s Walsh Road / Ferguson Road Pilot Scheme
FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary
More informationGreater Cambridge City Deal Executive Board & Joint Assembly
Greater Cambridge City Deal Executive Board & Joint Assembly Welcome to the Call for Evidence on tackling congestion in Cambridge Launch Event 11 th November 2015 Bob Menzies Service Director: Strategy
More informationGreen Travel Strategy & Action Plan
Green Travel Strategy & Action Plan 2016- Executive summary I am delighted to introduce the Green Travel Plan for the Penryn and Falmouth campuses 2016-. In the last few years we have seen a significant
More informationJuni 2013 DI Bernhard Engleder,
Juni 2013 DI Bernhard Engleder, Head of department Vienna City Administration - Road Construction and Maintenance ESTABLISHMENT OF A MOBILITY AGENCY FOR VIENNA Introduction The current coalition agreement
More informationCycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:
Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion
More informationGreen Travel Strategy & Action Plan
Green Travel Strategy & Action Plan 2016-2021 Executive summary I am delighted to introduce the Green Travel Plan for the Penryn and Falmouth campuses 2016-2021. In the last few years we have seen a significant
More informationUpdate June 2018 OUR 2017 PUBLIC ENGAGEMENT
Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part
More informationAPPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION
APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION 1 PURPOSE 1.1 To provide the following information and supporting evidence for the Member decision (reference
More informationa CYCLING ACTION PROGRESS MEETING
a CYCLING ACTION PROGRESS MEETING 9 TH APRIL 2013 Present: Apologies: Chris Vinestock (CCS Transportation, Head of Service) Cllr Nick Davies (CCS Cycle Forum Designate) Ben George (CCS Transport Strategy)
More informationTransport Plan Adopted March 2012
Burneside Parish Council Transport Plan Adopted March 2012 POLICY AREAS: TP1: Motor Vehicles TP2: Public Transport TP3: Cycling and Pedestrian Routes THE REPORT: 1. Scope of the Plan 2. Background 3. Local
More informationANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025
ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.
More informationLearning Objectives. Sustainable Development: The Making of the Queen Elizabeth Olympic Park. John Charles Hopkins, ASLA, University of Pennsylvania
Sustainable Development: The Making of the Queen Elizabeth Olympic Park John Charles Hopkins, ASLA, University of Pennsylvania ASLA 2012 Annual Meeting and EXPO Learning Objectives 1. How London's Olympic
More informationRegional Cycle Programme Update
Agenda Item 10 (ii) Regional Cycle Programme Update Glossary Auckland Council Auckland Transport Cycle Action Auckland New Zealand Transport Agency Regional Cycle Network (AC) (AT) (CAA) (NZTA) (RCN) Executive
More informationMaking innovation happen! eit.europa.eu. EITeu EITnews EIT
Making innovation happen! eit.europa.eu EITeu EITnews EIT Our results. More than:* 2242 business ideas 305 innovative start-ups 1232 430 knowledge transfers and adoptions new products and services 1224
More informationTHE HOCKEY STRATEGY. UPDATED March 2012
THE HOCKEY STRATEGY UPDATED March 2012 1 CURRENT SITUATION SWOT Hockey has great potential with some unique strengths and competitive advantages...we must play to our strengths SWOT Strengths Global sport,
More informationPlanning for tennis in your Local Government Area. A resource from Tennis Australia
Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.
More informationGreater wind capture for ultimate business case certainty
Greater wind capture for ultimate business case certainty Vestas Active Output Management (AOM) At Vestas, we are relentlessly committed to wind. That s why we recognise that making the most of your wind
More information// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015
// RoWSaF Making roads safer for road workers rowsaf.org.uk Working in partnership with clients, industry and key stakeholders to improve worker safety Often working close to live traffic, activities conducted
More informationAppendix 10B Photographs (Including Historical Images)
Lower Lee (Cork City) Drainage Scheme in association with Appendix 10B Photographs (Including Historical Images) Environmental Impact Statement APPENDIX 10B: PHOTOGRAPHS (INCLUDING HISTORICAL IMAGES) Plate
More informationDo you have the energy, drive and passion to deliver transformational growth in cricket participation?
Job Title: Responsible to: Contract: Location: Head of Participation CEO Full-time, permanent Edinburgh Do you have the energy, drive and passion to deliver transformational growth in cricket participation?
More informationAppendix N(b): Portishead Station Outline Travel Plan
Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple
More information14 NOISE AND VIBRATION
14 NOISE AND VIBRATION 14.1 EXISTING ENVIRONMENT 14.1.1 The noise environment within Poole Harbour is generally characterised by low to medium noise levels depending on location. For example, certain areas
More informationStrategy for Walking & Cycling Action Plan
Strategy for Walking & Cycling Action Plan To achieve higher levels of walking and cycling activity, the destinations which people access have to be available within suitable distances and designed to
More informationAuckland Council Finance & Performance Committee Presentation
Board Meeting 26 May 2015 Presentation Open Session Auckland Council Finance & Performance Committee Presentation Recommendation That the Board: i. Receives this report. Executive summary As part of the
More informationWalking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland
Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints
More informationLocal Highway Panels Members Guide. 9 Public Rights of Way
Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.
More informationAPPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY
APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose
More informationECONOMY PEOPLE ENVIRONMENT
Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements
More informationFisheries newsletter. Wessex and Devon & Cornwall
Fisheries newsletter Wessex and Devon & Cornwall April to June 2015 This newsletter is a quarterly update on some of the fisheries work undertaken by the Environment Agency and other partners including
More informationPL AN. To be the premier swimming state in Australia by Photo courtesy of Delly Carr/Swimming Australia
S T R AT E GIC PL AN To be the premier swimming state in Australia by 2018. Photo courtesy of Delly Carr/Swimming Australia Introduction Swimming is Australia s highest participation sport and is an activity
More informationSevern Estuary Partnership
Severn Estuary Partnership Working in partnership for the future of the Severn Estuary Severn Estuary Partnership Lucy Taylor Severn Estuary Partnership Officer Coastal Partnership Network www.severnestuarypartnership.org.uk
More informationBELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development
BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality
More informationWinter Maintenance in Lithuania
Winter Maintenance in Lithuania Henrikas Jurkuvėnas, Head of Road Maintenance Division Lithuanian Road Network CLIENTS FOR ROAD MAINTENANCE State roads (21300 km) Lithuanian Road Administration Municipal
More informationProgress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016
Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 1. Introduction The concept of the Sustainable Movement Corridor (hereafter the SMC ) was first developed
More informationPART 1: INFRASTRUCTURE OPPORTUNITIES
PART 1: INFRASTRUCTURE OPPORTUNITIES AUTHORS This article was authored by David Nancarrow (Partner, Perth), Alyson Eather (Senior Associate, Perth) and Celeste Koravos (Associate, Melbourne and Tokyo).
More informationBus and Transit Lane Review Update
Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive
More informationSPORT AND RECREATION. Outcome Strategy. Outcome 10. Outcome I 10
Section 2 Department Outcomes 10 Sport and Recreation Outcome 10 SPORT AND RECREATION Improved opportunities for community participation in sport and recreation, and excellence in high-performance athletes,
More informationWellington Public Transport Spine Study
Wellington Public Transport Spine Study Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook
More informationPITCH IMPROVEMENT PROGRAMME
THE FA PITCH IMPROVEMENT PROGRAMME FREQUENTLY ASKED QUESTIONS The FA Pitch Improvement Programme (PIP) Frequently Asked Questions (FAQ) The need for this service is more relevant now than ever, given the
More informationNottingham, the great cycle city
Nottingham, the great cycle city Our vision for the city s cycling future Foreword Councillor Jon Collins Leader of the Council Nottingham has a world class public transport system which is essential to
More informationCycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design
Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy
More informationSwim Ireland Strategic Plan
Toe in the water. Face in the water. Staying afloat. Touching the bottom. One length without stopping. Fifty lengths without stopping.. 3 3 We exist to encourage participation, develop excellence and regulate
More information[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the
[Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] 4 th Summer Youth Olympic Games
More informationNottingham Cycle City Frequently Asked Questions
Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly
More informationLOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX L - Mobilitiy Component Implementation Matrix
LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX L - Mobilitiy Component Implementation Matrix TRANSPORTATION DEMAND MANAGEMENT (TDM) TRANSIT/TIGER TRAILS/ TRAMLINK Staff/Faculty
More information9. Parking Supporting Statement
9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.
More information28 November Joanna Vincent Inquiry Manager. By only to: Dear Joanna
25 Main Street Lyddington Oakham Rutland LE15 9LR 28 November 2018 Tel: 07885 643341 Email: mike.holland@hollandlp.co.uk Joanna Vincent Inquiry Manager By email only to: joannavincent@personaassociates.co.uk
More informationLiikkumisen ohjauksen mahdollisuudet rakennustyömailla. Dutch experiences
Liikkumisen ohjauksen mahdollisuudet rakennustyömailla Dutch experiences Content Background Dutch congestion problems Regional mobility brokers Seven principles to minimise nuisance due to road works Examples
More informationNORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS
OPTIONS SHORTLIST RECOMMENDATIONS Coastal Unit C: Bayview Options recommended for MCDA scoring. Status quo. Planting 3. Renourishment (gravel) 6. Beach-scraping 7. Restore shingle crest. Inundation accommodation
More informationUniversity of Leeds Travel Plan
University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3
More informationEarthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection
TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change
More informationHerring River Restoration Project Chronology of Key Events
August 2005 Cape Cod National Seashore (CCNS) and Town of Wellfleet Board of Selectmen entered into an MOU (MOU I) to review and summarize the scientific and technical information on the Herring River
More informationCase study 64. Shoreham Harbour Shingle Bypassing and Recycling
Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Authors: Tony Parker, Uwe Dornbusch Main driver: Improved defences Project stage: Ongoing construction/operation since 1992 Photo 1: Shoreham
More informationImplementation Report # False Creek Bridges
Implementation Report #1 2013-04-24 False Creek Bridges ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit
More informationTRANSPORTATION NEEDS ASSESSMENT
TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the
More informationEA Fisheries Thames Area quarterly round-up for the Angling Trust Thames Regional Forum. Stuart Keable Fisheries Technical Officer
EA Fisheries Thames Area quarterly round-up for the Angling Trust Thames Regional Forum Stuart Keable Fisheries Technical Officer Crayfish: a word on illegal traps Signal crayfish are widespread throughout
More informationEnvironmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017
Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017 Agenda 1. Welcome and Introductions 2. Opening Remarks 3. Project Overview
More informationAdditional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne
Ashbourne Strategic Policies SP 1 To operate an Order of Priority for the release of residential lands in compliance with the requirements of CS OBJ 6 of the County Development Plan as follows: i) The
More informationSalmon Five Point Approach restoring salmon in England
Salmon Five Point Approach restoring salmon in England Our Mission To restore the abundance, diversity and resilience of salmon stocks throughout England We will do this by:- a) Maximising the production
More informationConcept. Phased Approach. Process. Participant Centred Approach 07/11/2010. Based on the Business Principle - Customer Focused
Participant Centred Approach Concept Katy Ritchie National Development Manager (New Games, New Markets) England Netball Based on the Business Principle - Customer Focused Understanding the customer and
More informationI-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017
I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing September 25, 2017 Purpose of Tonight s Meeting Provide information and gain public input: Draft Environmental Assessment (EA) Design
More informationHealthy and Environmental Friendly Transport in the City Region
Healthy and Environmental Friendly Transport in the City Region Reindert Augustijn Team manager traffic and transport Arnhem Nijmegen City Region www.polisnetwork.eu/2014conference #polis14 Fact and figures
More informationMorpeth Amateur Swimming Club. Squad Aims and Objectives
Morpeth Amateur Swimming Club Squad Aims and Objectives Introduction As a Club it is essential that we have in place a training structure that is suitable for all of our swimmers and cost effective. As
More informationJoint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010
Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations Joint Response to the Better Rail Stations Consultation This response has been prepared
More informationPuget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL
Restore America s Estuaries Conference 2012 Tampa, FL presented by: Theresa Mitchell, WA Dept. of Fish & Wildlife Nearshore General Investigation Change Analysis: Comparison of historical and current
More informationGOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL
GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL Saskatchewan Highways & Transportation May 29, 2007 I Introduction Government of Saskatchewan Submission To the Railway Safety
More informationThe Orkney Creel Fishery
The Orkney Creel Fishery Fishery Improvement Project Work Plan Michael Bell, Kate Walker 2/21/2013 Introduction This work plan has been developed as part of the Fishery Improvement Project (FIP) of the
More informationTRANSIT SIGNAL PRIORITY The Toronto Experience
TRANSIT SIGNAL PRIORITY The Toronto Experience July 27, 2004 July 27, 2004 1 Warning This presentation contains graphic images depicting serious violations to the coordination of traffic signals and may
More informationGreater wind capture for ultimate business case certainty
Greater wind capture for ultimate business case certainty Vestas Active Output Management (AOM) At Vestas, we are relentlessly committed to wind. That s why we recognise that making the most of your wind
More informationPoole Harbour Aquatic Management Plan 2006
Poole Harbour Aquatic Management Plan 2006 Non-Technical Summary Harbour Office, 20 New Quay Road, Poole, Dorset BH15 4AF. Tel: 01202 440200. Fax: 01202 440235. www.pooleharbouraqmp.co.uk Welcome Introduction
More informationEXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.
TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within
More informationBritish Universities & Colleges Sport International Strategy
British Universities & Colleges Sport International Strategy 2012-15 Executive Summary BUCS seeks to adopt an approach to international influencing which is developed across four key areas : International
More informationWelcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport
Start of works exhibition November 2014 Welcome Scheme plan A56 Bowdon A56 M56 Booth Bank Junction 8 M56 Millington Lane Cherry Tree Lane Junction 7 Millington Hall Lane Rostherne Mere Rostherne Lane N140519
More information2. Context. Existing framework. The context. The challenge. Transport Strategy
Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington
More informationWelcome to the Open House
Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports
More informationBlyth Estuary Green Travel Project
Blyth Estuary Green Travel Project Green Infrastructure Case Study Creating the UK s first Active Travel Town The Connect 2 Blyth Estuary Green Travel Project shows how green infrastructure can enable
More informationarchitectural practice empowering first nations
architectural engineering practice empowering first nations mission statement Ayshkum Engineering Inc. is dedicated to working primarily with Aboriginal Communities, to improve quality of life and standard
More informationTidal Energy from the Severn Estuary: Opportunities and Challenges
Co-financed with the support of the European Union 1 ERDF Atlantic Area Programme Investing in our common future Tidal Energy from the Severn Estuary: Opportunities and Challenges Prof Roger Falconer,
More informationAIRPORT ROAD ENVIRONMENTAL ASSESSMENT
WELCOME TO PUBLIC INFORMATION CENTRE #1 AIRPORT ROAD ENVIRONMENTAL ASSESSMENT From Braydon Boulevard/Stonecrest Drive to Countryside Drive November 23, 2017 6:30 PM 8:30 PM Please sign in and fill out
More informationGuildford Borough (Draft)
ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November
More informationRushey Weir: Background to the Thames weirs
Rushey Weir Richard Harding BEng (Hons) CEng Project Executive Thames Weirs projects 1 Rushey Weir: Background to the Thames weirs The Environment Agency owns, operates and maintains 195 weir sets across
More informationB&K Tourism Development Plan
B&K Tourism Development Plan 2015-2020 B&K Road Assumptions The construction of the new road infrastructure in the B&K region will result in the distance of the future ski resorts to be as follows : From
More informationWELCOME TO OPEN HOUSE # 1 June 14, 2017
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York
More informationStrategic Plan for Sevens Rugby. September 2006
Strategic Plan for Sevens Rugby September 2006 Introduction The promotion of Sevens has been instrumental in taking Rugby to new territories and regions. The continued growth of Sevens would help achieve
More informationCUERDEN TRANSPORT PROPOSALS
1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This
More informationIntroduction. You may find detailed information about the network from the EuroVelo website: Page 1/5
Including EuroVelo in the TEN-T Briefing Paper European Cyclists Federation Adam Bodor, Director of EuroVelo, Cycling Tourism and Regional Policy, a.bodor@ecf.com Ed Lancaster, Cycling Tourism and Regional
More information