1 FORGE Energy UL 21 Freedom 1 API Number: /13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000 psi test casing to 4650 psi for 3 min. RIH with pref gun (2 holes per foot - 4') shoot hole in casing POOH with gun. RIH with GBB spot acid top of perf. POOH RD E&P wire line.pump 7 BBLs in to get brake down 4682 #. Pump water to get rate 5.5 bpm. max 4700 psi pump 60 BBLs total water ISIP 3252 psi. 5 min min min min min /16/2013 Set up to frac 07/17/2013 Set 1 gas buster open top tanks, 4 light towers, 4 anchors, 1 trash trailer, 2 portable restrooms. 07/18/2013 Remove DFIT recorder, shoot holes in casing, RU frac tanks put fresh water in tanks. 07/19/2013 Rising Star frac R/U, test lines, comp went out. 07/20/2013 Frac 3 stages from 7283' to 7198, 7135' to 7055', 7021' to 6953'. Used feet of water from frac pond. 07/21/2013 Rig up sand trap and MIRU coil tubing. 07/22/2013 RU coil tubing, drill out CBPs, TIH to PBTD. POOH with coil tubing RDMO. Start flowing well to flow back tanks. 07/23/2013 Flow well, set pumping unit, hook up knock out. 05:00 Casing 1175 psi, H2O 65 BBLs /

2 hour, total H2O 1834 BBLs, TR of oil, 9.43 % Fluid recovered. 07/24/2013 RU knock out to flow line. Flow well to frac tanks. Choke 18/64,casing 850 psi,h2o 53 BBLs per hour, Oil 5 BBLs per hour, Chloride 55,000, flaring gas, no sand, 07/25/2013 Flowing well to knock out CL are running around 50,000 to 60,000. We where trying to get 70 BBLs per hour through knock out but we started have a lot of water carry over with the oil, so I made the call to slow the rate down to 65 BBLs per hour. 06:00 psi 800, H2O 52 BBLs per hour, gas 7.3, choke 17/64, oil 5 BBLs per hour % Fluid recovered, total 4407 BBLs 07/26/2013 Flowing well to knock out. Started to have a lot of water carry over with the oil. Slowed the rate down to 50 BBLs per hour. AT 0600 HRS: 19/64 choke, 775 psi casing pressure, 60,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 1,062 bbl water, 70 bbl oil, 397 mcf gas. CUMULATIVE: Recovered 5,469 bbl water, 182 bbl oil, 946 mcf gas. LOAD: Recovered 28% of 19,442 bbl total load to recover. 07/27/2013 AT 0600 HRS: 20/64 choke, 675 psi casing pressure, 65,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 824 bbl water, 94 bbl oil, 479 mcf gas. LOAD RECOVERY: Recovered 6,293 bbl of 19,442 bbl total load to recover (32.4%). 07/28/2013 AT 0600 HRS: 20/64 choke, 550 psi casing pressure, 70,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 852 bbl water, 106 bbl oil, 560 mcf gas. LOAD RECOVERY: Recovered 7,527 bbl of 19,442 bbl total load to recover (36.8%). 07/29/2013 AT 0600 HRS: 20/64 choke, 550 psi casing pressure, 78,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 624 bbl water, 79 bbl oil, 456 mcf gas. LOAD RECOVERY: Recovered 7,767 bbl of 19,442 bbl total load to recover (39.45%). 07/30/2013 AT 0600 HRS: 22/64 choke, 495 psi casing pressure, 83,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 564 bbl water, 71 bbl oil, 487 mcf gas. LOAD RECOVERY: Recovered 8,323 bbl of 19,442 bbl total load to recover (42.8%). 07/31/2013 AT 0600 HRS: 25/64 choke, 350 psi casing pressure, 85,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 600 bbl water, 112 bbl oil, 462 mcf gas.

3 LOAD RECOVERY: Recovered 8,899 bbl of 19,442 bbl total load to recover (45.77%). 08/01/2013 AT 0600 HRS: 25/64 choke, 350 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 474 bbl water, 96 bbl oil, 496 mcf gas. LOAD RECOVERY: Recovered 9457 bbl of 19,442 bbl total load to recover (47.97%). 08/02/2013 AT 0600 HRS: 25/64 choke, 250 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 449 bbl water, 94 bbl oil, 403 mcf gas. LOAD RECOVERY: Recovered 9906 bbl of 19,442 bbl total load to recover (50.95%). 08/03/2013 AT 0600 HRS: 27/64 choke, 200 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 438 bbl water, 99 bbl oil, 459 mcf gas. LOAD RECOVERY: Recovered bbl of 19,442 bbl total load to recover (53.2%). Sold 2 loads of oil. 08/04/2013 AT 0600 HRS: 27/64 choke, 150 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 390 bbl water, 74 bbl oil, 391 mcf gas. LOAD RECOVERY: Recovered bbl of 19,442 bbl total load to recover (55.22%). 08/05/2013 AT 0600 HRS: Open through gut line, 100 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 230 bbl water, 54 bbl oil, 294 mcf gas. LOAD RECOVERY: Recovered bbl of 19,442 bbl total load to recover (56.4%). 08/06/2013 AT 0600 HRS: Open through gut line, 50 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 59 bbl water, 24 bbl oil, 251 mcf gas. LOAD RECOVERY: Recovered bbl of 19,442 bbl total load to recover (56.6%). 08/07/2013 Set WLTRBP did not hold bleed well off flaring gas. AT 0600 HRS: Open through gut line, 35 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 40 bbl water, 12 bbl oil, 91 mcf gas. LOAD RECOVERY: Recovered bbl of 19,442 bbl total load to recover (56.82%). 08/08/2013 AT 0600 HRS: Open through gut line, 20 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 0 bbl water, 5 bbl oil, 48 mcf gas. LOAD RECOVERY: Recovered bbl of 19,442 bbl total load to recover (56.82%). 08/09/2013

4 AT 0600 HRS: Shut in. PREVIOUS 24 HRS: Recovered 0 bbl water, 0 bbl oil, 38 mcf gas. LOAD RECOVERY: Recovered bbl of 19,442 bbl total load to recover (56.82%). 08/10/2013 Pull 2 WLTRBP, run production tubing 08/11/2013 Run rods, build flow line 08/28/2013 MIRU WSU, Kill well, unseat pump & POOH w/ polish rod, 154-3/4, 103-7/8, 8-K bar & pump. NDWH, NUBOP, RIH w/ 19 jts lowering string already in hole , , NDBOP, attempted to set TAC without success. SDFD 08/29/2013 RU swabbing equip, made 13 runs taking samples & recording fluid level each time. A swab cup broke on the last run and their was no extras on rig. Dropped two soap sticks down tbg & SIFD 08/30/2013 RIH w/ rods and then POOH w/ rods laying down 08/31/2013 POOH W/ tbg. RU wireline and set bridgeplug at 6907' then RIH w/ open ended tbg. Pressure test plug, circulated hole w/ 150 bbls fresh water and biocide then spotted acetic acid. POOH laying down tbg. SIFD 09/01/2013 Finish laying down the tbg in the derrick, RDBOP and assist in setting frac head. RDMO WSU. 09/04/2013 RIG UP SCHLUMBERGER WIRELINE AND SHOOT 40 PERFS 6866' BACK TO 6776',RIG DOWN WIRELINE,RIG UP RISING STAR PUMP TRUCK,PRESSURE TEST LINES BREAK DOWN 2300',INCREASE RATE TO 4.9 BBLS AMD PUMP 50 BBLS ACID IN PERFS, ISIP 2560#,5 MINUTES 2283#,10 MINUTES 2174#, 15 MINUTES 2106#,SHUT WELL IN FOR NIGHT, RIG UP FRAC CREW FOR FRAC JOB, HAUL WATER TO FILL FRAC TANKS FOR JOB,RIG UP FLOWBACK CREW,AND WATER PUMPING PUMP FOR FRAC TANKS, 09/05/2013 UNLOAD SAND TO BINS IN ORDER TO START FRAC JOB,PUMP 1ST STAGE,SCREEN OFF ON

5 TAIL IN OF JOB,FLOW BACK WELL TO FLOWBACK TANKS TO CLEAN WELLBORE,RUN WIRELINE GAUGE RING,SPOT ACID,RIG UP AND SET 6759', SHOOT 40 PERFS FROM 6742' BACK TO 6642',SHUT WELL IN FOR NIGHT 09/06/2013 Stage 2,3 and 4 were pumped successfully today. All sand was pumped as designed with some changes to the gel fluid schedule which improved sand placement. Job complete at 17:45 hours. RDMO equipment and prepare for drill out and flowback. Pumped 22,882 bbls. total. 09/07/2013 Move open top gas buster frac tank from Voyage location and setup on location for drill out. 09/08/2013 MIRUCT drill out 3 plugs, RU flow back flow well. 06: psi, 366 BBLs 09/09/2013 AT 0600 HRS: 19/64 choke, 1050 psi casing pressure. PREVIOUS 24 HRS: Recovered 1815 bbl water, 0 bbl oil,. Chlorides 27,000 ppm. LOAD RECOVERY: Recovered 2181 bbl of 22,882 bbl total load to recover (09.53%). 09/10/2013 AT 0600 HRS: 19/64 choke, 750 psi casing pressure. PREVIOUS 24 HRS: Recovered 1708 bbl water, 0 bbl oil, no gas. Chlorides 27,000 ppm. LOAD RECOVERY: Recovered 3890 bbl of 22,882 bbl total load to recover (17.0%). 09/11/2013 AT 0600 HRS: 26/64 choke, 150 psi casing pressure. PREVIOUS 24 HRS: Recovered 1559 bbl water, 0 bbl oil, no gas. Chlorides 52,000 ppm. LOAD RECOVERY: Recovered 5449 bbl of 22,882 bbl total load to recover (23.81%). 09/12/2013 AT 0600 HRS: Open to gut line, 5 psi casing pressure. PREVIOUS 24 HRS: Recovered 659 bbl water, 5 bbl oil, no readable gas. Chlorides 52,000 ppm. LOAD RECOVERY: Recovered 6108 bbl of 22,882 bbl total load to recover (26.69%). 09/13/2013 Rig down flow back. 09/17/2013 MIRU WSU, unable to kill well due to high csg pressure. RU flow back and open well to frac tanks, well has flowed 250 bbls so far and has a rate of 25 bbls/hr now. SDFD 09/18/2013

6 Arrived on location, well had 3-5 psi & still flowing a small amt. RU pump truck and pump 100bbls brine, well had ~275psi after pumping, Open well back to frac tanks. Let well bleed back down and pump 114 bbls of KCL before shutting down, well stabilized at 400 psi. Open well back to tanks to flow overnight. FB crew is on location. 09/19/2013 Arrived at location, well flowed 200 bbls of water overnight, there was very little pressure on well but still flowing(6 bbl/hr), RU wireline and pressure test lubricator, RIH with gauge ring making a dummy run. POOH and LD gauge ring, PU bridgeplug, RIH and set at 6300'. POOH and RD wireline, opened well to frac tanks(dead well) ND frac head, NU BOP. RU pump truck and pressure test casing to 2000 psi. for 15 min.(tested good), RD pump truck, SDFD

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

FORGE Energy UL 21 Pahaska 1H API Number:

FORGE Energy UL 21 Pahaska 1H API Number: FORGE Energy UL 21 Pahaska 1H API Number: 42-495-33740 10/26/2016 07:00 HPJM 07:15 Install 1502 Adapter Flanges to Well Head. RU Pump Truck test lines to 1000 PSI no leaks. Load hole w/ 15 bbls fresh water.

More information

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS 11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:

More information

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251

More information

Zarvona DAILY WORKOVER / COMPLETION REPORT

Zarvona DAILY WORKOVER / COMPLETION REPORT Lease/Well No: CURRENT WELL TEST: PURPOSE OF WORK: MIRU service companies/start frac PULLING UNIT: KOP 10,429' TD: 15,906' KB ABOVE GL: 30 10,713' PBTD: 15,885' INT CSG: 60 10,998' TVD: 10,950' PROD CSG:

More information

Zarvona Energy LLC DAILY OPERATIONS

Zarvona Energy LLC DAILY OPERATIONS DAYS FROM SPUD: 120 DAYS ON 0 Jun 28 2016 RIG SUPERVISOR: Tyler Dupriest MIRU pulling unit MIRU pulling unit, move in and tally TBG. SDFN RIH with RBP DAYS FROM SPUD: 121 DAYS ON 1 Jun 29 2016 RIG SUPERVISOR:

More information

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions NOTE: Changes to the Form 5A, effective June 1, 2012, to accommodate the disclosure requirements are indicated by a preceding asterisk (*) and bold italics. All other fields are unchanged. FORM 5A HEADING

More information

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017 5/2/27 5:23:5 Report Version: 4..6R9 Generated from data in EDM/Opens/PROFILE Report 29 5/9/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326.

More information

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover: Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12

More information

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original

More information

Colorado Oil and Gas Conservation Commission

Colorado Oil and Gas Conservation Commission Colorado Oil and Gas Conservation Commission http://cogcc.state.co.us/ FORM 5A Completed Interval Report INDUSTRY TRAINING Denver, Colorado November 27, 2012 Form 5A Completed Interval Report Introduction

More information

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas H. H. HOWELL, INC. Bevans & Wildcat Field Menard County, Texas API #42-327- 31235 RRC Permit # 803460 GAU letter, RRC Letter #GAU-1436 = 245 Ground Elevation GL: 2186 (Rig KB to GL =8 ) Rig KB =2194 Location:

More information

Daily Drilling Report

Daily Drilling Report Daily Drilling Report Well Name UTL 38-17-1H Report Date 05/05/2014 Field University Lands Supervisor Nate Baxter Report No. 97 Location 990' FNL & 300' FEL Supervisor 2 Kevin Evans DFS 94 County Ward

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 16947 Status: Submitted RAILROAD COMMISSION OF TEAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Pasquale Imbò e Marco Pelucchi ENI S.pA; 7th European Gas Well Deliquification Conference Innovative Failsafe Capillary Injection System Resolves Liquid Loading in Gas Well with a Cost- Effective Solution that Maintaining Production and Well-Safety

More information

BP SIT Testing Franks Facility Lafayette

BP SIT Testing Franks Facility Lafayette BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells Gas Well De-Liquification Workshop February 28 - March 2, 2005 Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells Robert Lestz, Eddie Bruner Lynn Rowlan ChevronTexaco OBJECTIVE: 1. Observe

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

VortexFlow DX (Downhole) Tool Installation Instructions

VortexFlow DX (Downhole) Tool Installation Instructions VortexFlow DX (Downhole) Tool Installation Instructions www.vortextools.com Page 1 of 10 The VortexFLOW tools are based upon Technology that is a result of U.S.A. patents 6,151,751; 6,659,118; 6,749,374;

More information

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Parry Hillis: Technical Manager BakerHughes David Ayre: BP Well Perforation Specialist Jim Gilliat: TCP/DST Business Development

More information

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

Greystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 7 4/26/2010

More information

Coal Bed Methane (CBM) Permeability Testing

Coal Bed Methane (CBM) Permeability Testing Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April 28-29, 2011 ExxonMobil Exploration / Well Testing Team CBM Flow Characteristics Flow mechanism Gas desorbs when pressure drops below

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

PHE KE30-A8 WORKOVER PROGRAM

PHE KE30-A8 WORKOVER PROGRAM PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.

More information

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs Overview of Presentation BlackBrush Oil & Gas Natural Gas Liquids (NGLs) as frac fluid. Advantages

More information

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director SPE Forum: Source Control for Wells in Shallow Water Lars Herbst, Gulf of Mexico Regional Director Agenda Introduction and Background Historical Well Control Events Scope of Discussion Scenario Driven

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Abandonment Program for Paramount Fort Liard F 36

Abandonment Program for Paramount Fort Liard F 36 Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841

More information

Dynamic Underbalance Perforating

Dynamic Underbalance Perforating Dynamic Underbalance Perforating Subset of underbalance perforating. Uses volume of gun and sometimes added surge chambers to create downhole flow surge without flow to surface. Last for a few seconds,

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 15871 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Deliquification Short Stories

Deliquification Short Stories Gas Well De-Liquification Workshop February 28 - March 2, 2005 Deliquification Short Stories Gordon Gates Deliquification Specialist Bp Houston Assisted By: Danny Patterson, Jess Babbitt, Tony Lott Does

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016 Report 1 8/3/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 1. Objective Install Completion Original

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 03/16/2016

More information

Dynamic Underbalance (DUB)

Dynamic Underbalance (DUB) Dynamic Underbalance (DUB) Perforating Cam Le Perforating Product Champion Agenda Overview DUB Software Tools Case histories 2011 HALLIBURTON. ALL RIGHTS RESERVED. 2 Dynamic Underbalance Software Dynamic

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS A DIFFERENT KIND OF ENERGY COMPANY Nine Energy Service isn t your typical oilfield services company. Our success stems from a culture driven by performance

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph: Please read this entire document. It concerns all 9⅝ Vented Thru-tubing Bridge Plugs Read this document before proceeding to NeoProducts Recommended Best Practices for 9⅝ vented T- TBPs. Whenever running

More information

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-D Revision 0 13 February 2015 DC 2015 COPYRGHT PROTECTED

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

Completions & Workovers Module 1.9

Completions & Workovers Module 1.9 Completions & Workovers Module 1.9 CAPPA CAPPA Level 1 LAST REVISED March 20, 2013 Completions & Workovers Module Summary Students will learn what is involved in a well completion, how a completion is

More information

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-S Revision 0 13 February 2015 DC 2015 COPYRGHT

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Live well deployment of long perforating gun system using combined CT technologies

Live well deployment of long perforating gun system using combined CT technologies Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker

More information

SPE MS. Copyright 2015, Society of Petroleum Engineers

SPE MS. Copyright 2015, Society of Petroleum Engineers SPE-173678-MS Cost Effective Solutions to Achieve Injection Post Toe Valve Failure Cody Trebing, Thru Tubing Solutions; Jeff Whitworth, Thru Tubing Solutions; Alex Beszterda, ConocoPhillips Copyright 2015,

More information

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems As a result of a recent job incident utilizing a Ball Drop Type firing system deployed on coiled tubing, the following

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Date: Tracking No.: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Submitted

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 06/29/2015

More information

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary PRES WELL NO. Report End Date: 5/19/2016 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : : 0 Planned VS (ft): Current VS (ft): WOC WOC, CONTACTED TRRC, SPOKE TO ABRAHAM, ADVISED

More information

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Advanced Applications of Wireline Cased-Hole Formation Testers Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Agenda Introduction to Cased Hole Formation tester Tool specifications Applications

More information

Captains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl

Captains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl Captains Meeting 2009 Introduction to Well Testing- Expro Edwin Schoorl Agenda Oil and Gas presence Well construction Well testing Welltest System Welltest Equipment Welltest Video Questions Oil and gas

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

Cased-Hole Logging Environment

Cased-Hole Logging Environment Cased-Hole Logging Environment 2 Planning a Production Logging Job Planning is an important part of a production logging job. Frequently these jobs can only be done in safety during daylight. Thus, the

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

A case study : Underground Blowout Control at Well NHK #285

A case study : Underground Blowout Control at Well NHK #285 A case study : Underground Blowout Control at Well NHK #285 Author: Dr. K. Saikia, Chief Engineer Drilling - CMT INTRODUCTION The well NHK # 285 (Loc-HBS), a gas well, in the Deohal area of Naharkatia

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

Performance and Value of the invision System : Offshore in Coiled Tubing Operations Performance and Value of the invision System : Offshore in Coiled Tubing Operations Case Study #0004 Date November 01 21, 2017 Location Gulf of Mexico, Deep Water Introduction Intelligent Wellhead Systems

More information

Reducing Nonproductive Time

Reducing Nonproductive Time Reducing Nonproductive Time Pipe Recovery Services Solving challenges. Pipe Recovery Services Pipe Recovery Services Halliburton offers a wide range of free point indicators, severing tools and experienced

More information

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King Facilities Design Shift Horizontal Equipment in Oklahoma Scott King Facilities Review in Oklahoma Identified areas for improvement Design criteria is outdated for play types Vertical separation, cannot

More information

Air and Gas Drilling

Air and Gas Drilling Air and Gas Drilling Air and Gas Drilling It is a technique in which the more common drilling fluids, (water or mud) are replaced by highly compressible Air or Natural gas. But Compressibility makes pressure

More information

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES Monte Besler Consultant FracN8R Consulting LLC UNITED STATES Engineered Safety and Environmental Aspects of Well Construction and Fracturing Design Monte Besler FRACN8R Consulting, LLC Surface Considerations

More information

The Time Has Come For Coiled Rod. Reprinted from Well Servicing magazine

The Time Has Come For Coiled Rod. Reprinted from Well Servicing magazine The Time Has Come For Coiled Rod Reprinted from Well Servicing magazine The development of flush-by well service units and stand-alone coiled rod injector head technology has helped grow the coiled rod

More information

WELL NO: BJN-8. Lower master valve

WELL NO: BJN-8. Lower master valve WELL NO: BGN-8.; LOC: BGH Well BGN-8 came into production on 9 th Feb. 2009. Initially the FTHP = 4000 psi, CP=2400 psi and 5 1 / 2 9 5 / 8 annulus pressure = 600 psi. The well was produced at Baghjan

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS (WIRELINE, COILED TUBING & SNUBBING) CORE CURRICULUM AND RELATED FORM WCT-2WSI INTRODUCTORY LEVEL For information on how an course

More information

On-Off Connector Skirt

On-Off Connector Skirt On-Off Connector Skirt Retrievable Packers & Accessories The On-Off Connector Skirt is compact, reliable, fully sealing, J-type tubing disconnect device that automatically engages and releases with a small

More information

Engineered solutions for complex pressure situations

Engineered solutions for complex pressure situations SPECIAL SERVICES Engineered solutions for complex pressure situations Cudd Energy Services (CES) delivers custom engineered solutions to resolve complex pressure situations resulting from equipment failure

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick Railroad Commission of Texas Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick 1 RRC Regulations Primary directives: - Prevent Waste - Promote Conservation - Protect

More information

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 Report: Wiping performance Pressure drop-rupture disc function-gas kick circulation Ketil Botnmark, Kjell Mikalsen 20.05.2011 This report resumes the

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

August 21, Deepwater MPD / PMCD

August 21, Deepwater MPD / PMCD August 21, 2011 Deepwater MPD / PMCD Managed Pressure Drilling (MPD) Pressure held on top of riser while drilling. Drill in overbalance condition Pressurized Mud Cap Drilling (PMCD) Pressure of mud column

More information

CHE Well Testing Package/Service:

CHE Well Testing Package/Service: CHE Well Testing Package/Service: CHE delivers well testing package And services, trailer mounted well testing package and offshore/onshore well testing services with over 10 years experience. Our testing

More information

Railroad Commission of Texas

Railroad Commission of Texas Workshop Railroad Commission of Texas Casing, Cementing, Drilling Well Control, and Completion Requirements Chairman Houston, Barry Texas T. Smitherman Commissioner David J. Porter Commissioner December

More information

Field Loading Procedures Casing Cutters

Field Loading Procedures Casing Cutters JRC Explosive Jet Cutters with Aluminum and/or Steel Housings 3.625 Inch (92.1 mm) to 8.188 (208.0 mm) O.D. for Casing and Tubing 4 1/2 (4.500) Inch (114.3 mm) to 9 5/8 (9.625) Inch (244.5 mm) O.D. Field

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS What are some applications in which you ve successfully used this product? New Completions - Stage by Stage Diversion Between Frac plugs for Intra-Stage Diversion Replace Frac Plugs with Perf PODs - Full

More information

DE149. Wireline Servicing, Fishing Job for Completion and Workover

DE149. Wireline Servicing, Fishing Job for Completion and Workover DE149 Wireline Servicing, Fishing Job for Completion and Workover H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This five-day course is

More information

TROUBLESHOOT ROD PUMPED WELLS USING TUBING FLUID LEVEL SHOTS

TROUBLESHOOT ROD PUMPED WELLS USING TUBING FLUID LEVEL SHOTS 10 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 16-19, 2014 TROUBLESHOOT ROD PUMPED WELLS USING TUBING FLUID LEVEL SHOTS John Sparks, COG OPERATING LLCU Lynn

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking.: Approved 03/11/2015

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WIRELINE OPERATIONS CORE CURRICULUM AND RELATED FORM WCT-2WLF FUNDAMENTAL LEVEL The purpose of the core curriculum is to identify a body of knowledge and

More information