1 DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) Presented by: Tomasz Płotka - StoGda

2 0. StoGda Ship Design & Engineering Ltd Beginning of the StoGda Ship Design & Engineering it is march 1997, when Gdansk Shipyard was closed because of financial problems. Only 15 experienced designers were employed, this time. We have abt. 60 workstations now. During these sixteen years we engineered projects for our customers from all around the world from China customers, through European customers to USA/Canadian customers. Also, type of designed vessels and scope of projects were different. The next slides show our the most important projects. Maria S. Merian Icegoing Research Vessel project for German Shipyard (partly basic design and workshop docs)

3 Rescue Vessel project for customer from Nederland (workshop docs)

4 Transhipper basic design and workshop docs; built by Remontowa Shipyard,

5 Lengthening of the passenger vessel Braemar basic and workshop docs; for German customer

6 Lengthening of the passenger vessel Braemar basic and workshop docs; for German customer

7 When we are talking about renewal sources of energy, I should not forgot the project engineered for ODYS Shipyard (from Gdansk). It was electric power station where see waves are sources of energy. We engineered basic design and workshop docs for steel structure and piping. It was working model, in scale 1:2 for testing purposes, built for Danish contractor

8 1. Wind Farm Installation Vessels StoGda s Beginnings Project THOR it was our first project of the Self Elevating Wind Turbine Installation Vessels. Originally, we signed contract with Skaramanga Shipyard from Thyssenkrupp Company. Finally, this vessel was built by CRIST Shipyard. We engineered workshop docs for the hull structure and hull steel outfitting, firstly for Skaramanga, then for CRIST. Contract between CRIST Shipyard and HOCHTIEF Solutions AG.

9 Next one, it was INNOVATION project. We were involved much more deeper into this project. It was necessary to modify the basic design and then to engineer the workshop docs, not only hull but also deck steel outfitting, machinery piping and hull piping plus As Built docs together with naval calculations (intact stability and damage stability). Also contract between CRIST Shipyard and HOCHTIEF Solutions AG.

10 And finally, the latest and the newest project VIDAR project. This is fully our, StoGda s design from conceptual design, through basic design till workshop docs. It is also contract between CRIST Shipyard and HOCHTIEF Solutions AG. On basis of this project, I ll try to familiar You with designing process of the Self Elevating Wind Turbine Installation Vessels. The below presented analysis is from technical point of view, not from economical point of view.

11 2. Designing of the Self Elevating Wind Turbine Installation Vessels - Basics First step: to define the wind mill farms on which the vessel will operate. It allows to define the environmental conditions for operating the vessel. Chosen parameters are important because of future operation of the vessel how many days per year, the vessel will operate on the wind mill farm Please observe parameters defined on the very early stage of the project VIDAR: Transit Design Condition: Significant wave height: Wave peak period: Wind velocity: No crane operations. Jacking Design Condition and DP-2: Significant wave height: Wave peak period: Wind velocity: Current velocity: No crane operations. Water depth: Jacked Operational Design Condition: Significant wave height: Wave peak period: Wind velocity: Current velocity: Air gap at water depth xx Leg penetration With crane operations. Jacked Survival Design Condition: Maximum Water Depth Significant wave height: Maximum wave height: Wave peak period: Wind velocity: Air gap at water depth xx Current velocity: No crane operations

12 Second step: Speed of jacking system important factor for the staying of the self elevating unit on one place. Third step: prognosis for the wind mill farm and wind turbines dimensions of the turbines, value of the future power generation. Fourth step: payload load mass of the cargo on the main deck which vessel should be able to jack up together with selfweight. Fifth step: choosing of the SWL of the main crane and auxiliary cranes. Now we are ready for choosing the main dimensions of the vessel: Length over all Length between perpendiculars Breadth moulded Depth to main deck Design draught Scantling draught Leg length (from ship s basic line to the top of the leg) Design speed

13 3. Designing of the Self Elevating Wind Turbine Installation Vessels Design Challenge 3.1 Design Speed CFD calculations One of contractual value is speed of the vessel. It should be very carefully evaluated the hull form, position of the aft thrusters. The breadth of the Self Elevating Wind Turbine Installation Vessels is normally bigger than classic vessel, so the resistance of the hull is bigger. It should be checked and predicted, on very early stage of the vessel, by computational propulsion prediction, the required power of the aft thruster. Result of such calculations is shown on the diagram

14 3.2 Dynamic Positioning Ability Please observe this slide there is not so lot of free space for mounting the wind mills, on the wind mill farm. So, very important for the vessel, we are analyzing, is to keep position during jacking-up operation especially during first step of jacking operation, when the legs starting touch the bottom. Such ability should be checked at the early stage of the project. It is also important to minimize the power of generating sets mounted on board. Dynamic Positioning Ability is calculated at the beginning of the project and checked during tank tests. Let s observe the following slides.

15 Electric Load Balance prior to DP capability tank tests Electric Load Balance after DP capability tank tests

16 As result of the DP Capability tank test, we are receiving the following plots proving us that thruster system was properly chosen

17 Let s return to the slide showing the wind mill farm. Please observe, how important is Dynamic Positioning Ability. It is calm water, but normal situation is that there is wind, wave, current. It is not possible to rotate the vessel to minimize the forces acting on it (forces from wave, wind and current) because of low space between wind mills and infrastructure laying on the see bottom (cables, connection boxes). So, the vessel should keep position in case the environmental forces acting from any direction.

18 3.3 Green Water Wind Mill Parks are situated on the shallow water, often close to Nature 2000 areas. It means that we should save Nature and, for example, to reduce the Green Water effect. To minimize the value of the water entering the fore parts of the vessel, it should be very carefully designed the bow form and the tank rest should be done. Green Water Effect basic form of the hull

19 Green Water Effect final form of the hull

20 3.4 Air Suction by the Bow Thruster As the wind mill parks are situated on the shallow water and because of it the design draught is rather small, it can happen that bow thruster will suck the air as it is shown on the slide. Such effect can be observe during tank tests and any corrections can be made together with bow thruster supplier.

21 3.5 Cooling system during Jacked-up operations It is not so easy to say which cooling system, during Jacked-up operation, is better: - water cooling using raw water pumps minus is that this system is used on the shallow water and the raw water pumps will pump a lot mud together with water. It is necessary to clean, very often, the cooling water filters not so convenient. - Air cooling system - minus is that this system is not so effective as water system; additionally, the air coolers should be mounted on the deck area where is cargo area lost of cargo area.

22 3.6 Jacking system Type of the Jacking system was requested by Hochtief. System was designed by StoGda, excluding the hydraulic which was designed and delivered by supplier from Nederland Lifting speed for project VIDAR is abt. 1m/min and comparing with similar project, it is rather high.

23 To secure the smooth continuous lifting and lowering operations, two moveable rings were provided, powered by set of hydraulic cylinders. Please observe, that lifting capacity should be defined on very early stage of the project and it is not so easy to do it. Calculating it (or estimating it), not only Deadweight and mass of the empty vessel should be taken into account. Influence of the environmental forces (forces from wave, wind and current) plus gaps between sliding elements, because of friction forces, should be considered.

24 4. Designing of the Self Elevating Wind Turbine Installation Vessels Strength Calculations This type of vessel are treated by classification societies partly as ocean going vessels and partly as offshore structure this requires very complicated and time consuming strength calculations. The most consuming calculations are calculations of the environmental forces (forces from wind, wave and current) for several operating conditions. Please observe that there are quite good mathematical models of the wind, wave and current for the deep water.

25 There no exist the numerical models, enough exact, describing wave, wind and current for shallow waters areas. It is why, there is a lot of discussions between class societies and designers if the model is correct or no, what kind of factors should be taken for consideration. (for example simultaneous acting of the max wind, wave and current forces) or what kind of software is the most appropriate. According to my opinion, numerical calculations should be proved by appropriate tank tests. I have to underline, that complete tank tests, including test in wind tunnel, for the project VIDAR were performed in CTO Towing Tank, here in Gdansk.

26 Fatigue analysis On the right is shown example of the Operating Pattern of the Self Elevating Wind Turbine Installation Vessel. As it was said previously, some parts of the structure are treated as offshore structure and it is reason that fatigue analysis is required at least, as minimum, for offshore structure and for jacking system and structure. It is also time consuming process

27 5. Designing of the Self Elevating Wind Turbine Installation Vessels Vessel on the Wind Mill Farm The slide shows one of the Load Case foreseen as possible during vessel operation. Handing of the vessel to the Owner doesn t mean finish of the design work. Of course, the design work, belongs to this stage can be done by other design office but we also offer supporting Owner on this stage. Prior to leaving the harbor, each load case should be recalculated it should be calculated/checked: - Fastening of the cargo - Stability of the vessel - Longitudinal strength of vessel

28 The mentioned calculations should be done for each condition: - transit to wind mill farm - transit inside the wind mill farm - preloading - jacked-up operation - survival It is also must to check the see bottom and to prepare it to avoid accidence like: - punch through - bottom scour - bottom layer sliding (layered soils) - sliding - leg bottom impact

29 Thank You for Attention

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE HUTTLE TABLE OF CONTENTS 01 DESCRIPTION 03 1.1 Vessel General 03 1. Purpose of the Vessel 0 1.3 High Workability 0 1. Installation Scenarios 05

More information

Wind Turbine Shuttle. Ferdinand van Heerd

Wind Turbine Shuttle. Ferdinand van Heerd Wind Turbine Shuttle Ferdinand van Heerd Contents Introduction Concept Resistance Seakeeping Vessel motion compensation system Hoisting motion compensation system Landing the wind turbine Workability Efficiency

More information

Challenges in Ship Design to Maintain Thrusters inside Ship

Challenges in Ship Design to Maintain Thrusters inside Ship DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Thrusters Challenges in Ship Design to Maintain Thrusters inside Ship Tom Nylund and Timo Rintala Beacon Finland 1 DP Conference - Challenges in Ship Design

More information

THE ROLE OF INSTALLATION AND SUPPORT VESSELS

THE ROLE OF INSTALLATION AND SUPPORT VESSELS THE ROLE OF INSTALLATION AND SUPPORT VESSELS Ulstein - Offshore wind in Taiwan - 9-12 April 2018 Gunnar Haug, Ulstein Asia Pte Ltd OFFSHORE WIND FARM DEVELOPMENT OFFSHORE WIND EVOLUTION INSTALLATION VESSELS

More information

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 MAIN PARTICULARS LENGTH OVER ALL 60.68 m LENGTH WATER LINE 59.35 m BREADTH MAX 20.80 m DRAUGHT MAX 3.10 m DEPTH 6.70 m MAX SPEED 37.0 knots @

More information

A DECADE OF EXPERIENCE

A DECADE OF EXPERIENCE SEA INSTALLER Efficient and cost-effective A DECADE OF EXPERIENCE SEA INSTALLER reflects more DECK than a decade of experience in SEA INSTALLER's deck measures 3,350 m2 The deck is reinforced and can carry

More information

Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC

Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC Offshore Wind Vessels Steven Kopits Douglas-Westwood LLC Offshore Wind: Removing Market Barriers DOE Webinar July 25, 2012 1 www.dw-1.com Our business History and Office Locations Established 1990 Aberdeen,

More information

Hydrostatics and Stability Dr. Hari V Warrior Department of Ocean Engineering and Naval Architecture Indian Institute of Technology, Kharagpur

Hydrostatics and Stability Dr. Hari V Warrior Department of Ocean Engineering and Naval Architecture Indian Institute of Technology, Kharagpur Hydrostatics and Stability Dr. Hari V Warrior Department of Ocean Engineering and Naval Architecture Indian Institute of Technology, Kharagpur Module No.# 01 Lecture No. # 01 Introduction Hello everybody.

More information

AUSTAL WIND EXPRESS SERIES

AUSTAL WIND EXPRESS SERIES WIND EXPRESS SERIES ABOUT AUSTAL AUSTAL WIND EXPRESS SERIES Austal is the world s leading designer and builder of customised, high performance aluminium vessels for both commercial and defence applications

More information

Development of TEU Type Mega Container Carrier

Development of TEU Type Mega Container Carrier Development of 8 700 TEU Type Mega Container Carrier SAKAGUCHI Katsunori : P. E. Jp, Manager, Ship & Offshore Basic Design Department, IHI Marine United Inc. TOYODA Masanobu : P. E, Jp, Ship & Offshore

More information

Pile Gripper Systems

Pile Gripper Systems Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +

More information

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 7 General information and documentation requirements for submarines

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 7 General information and documentation requirements for submarines RULES FOR CLASSIFICATION Naval vessels Edition December 2015 Part 1 Classification and surveys Chapter 7 General information and documentation requirements for submarines The content of this service document

More information

Ship Stability. Ch. 8 Curves of Stability and Stability Criteria. Spring Myung-Il Roh

Ship Stability. Ch. 8 Curves of Stability and Stability Criteria. Spring Myung-Il Roh Lecture Note of Naval Architectural Calculation Ship Stability Ch. 8 Curves of Stability and Stability Criteria Spring 2016 Myung-Il Roh Department of Naval Architecture and Ocean Engineering Seoul National

More information

Shallow-Draft Ro-Pax Ships for Various Cargos and Short Lines

Shallow-Draft Ro-Pax Ships for Various Cargos and Short Lines Journal of Water Resources and Ocean Science 2017; 6(5): 65-70 http://www.sciencepublishinggroup.com/j/wros doi: 10.11648/j.wros.20170605.12 ISSN: 2328-7969 (Print); ISSN: 2328-7993 (Online) Shallow-Draft

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Parametric analysis of hull structure of mono- and catamaran-type inland vessels T. Jastrzebski & Z. Sekulski Faculty ofmaritime Technology, Technical University of Szczecin, AL Piastow 41, 71-065 Szczecin,

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 4 Guidelines for Equipment on Fire Fighting Ships Edition 2008 The following Guidelines come into

More information

Offshore Service Vessels for Wind Farming. BALTEXPO 2011, September 2011

Offshore Service Vessels for Wind Farming. BALTEXPO 2011, September 2011 Offshore Service Vessels for Wind Farming BALTEXPO 2011, September 2011 Agenda 1. Market Outlook and Vessel Prognosis 2. Design Concepts Wind Turbine Installation Ships 3. Rules and Regulations 4. Maintenance

More information

RENEWABLE OCEAN ENERGY

RENEWABLE OCEAN ENERGY Energy from Waves Energy from Wind Tidal Energy RENEWABLE OCEAN ENERGY Salinity Gradient Power Thermal Energy LIST OF VESSELS Vessel Type: Vessel 1: Vessel Type: Vessel 2: Vessel Type: Vessel 2: Offshore

More information

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences. Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)

More information

Part 3 Structures, equipment Chapter 1 Hull design and construction, general

Part 3 Structures, equipment Chapter 1 Hull design and construction, general RULES FOR CLASSIFICATION Inland navigation vessels Edition December 2015 Part 3 Structures, equipment Chapter 1 Hull design and construction, general The content of this service document is the subject

More information

Study on the shape parameters of bulbous bow of. tuna longline fishing vessel

Study on the shape parameters of bulbous bow of. tuna longline fishing vessel International Conference on Energy and Environmental Protection (ICEEP 2016) Study on the shape parameters of bulbous bow of tuna longline fishing vessel Chao LI a, Yongsheng WANG b, Jihua Chen c Fishery

More information

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras Lecture - 7 Air and Wind Resistance Dimensional Analysis I Coming back to the class, we

More information

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators Second International Symposium on Marine Propulsors smp 11, Hamburg, Germany, June 2011 Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the

More information

Aalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007

Aalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007 Aalborg Universitet Design Loads on Platforms on Offshore wind Turbine Foundations with Respect to Vertical Wave Run-up Damsgaard, Mathilde L.; Gravesen, Helge; Andersen, Thomas Lykke Published in: Proceedings

More information

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7 Development of a New Deep-Water Riser System Daniel Karunakaran Subsea 7 Introduction Grouped SLOR TM is an open bundle riser solution developed by Subsea 7 and 2H Offshore Array of close standing SLOR

More information

World Marine Offshore Torskekaj Esbjerg, Denmark

World Marine Offshore Torskekaj Esbjerg, Denmark Vessel Specification Suitable for transfer of crew and cargo to wind indu stry, crew change vessel, survey, ROV, standby rescue and guard duties. The vessel design is a proven concept within support vessels

More information

DAMAGE STABILITY TESTS OF MODELS REPRESENTING RO-RC) FERRIES PERFORMED AT DMI

DAMAGE STABILITY TESTS OF MODELS REPRESENTING RO-RC) FERRIES PERFORMED AT DMI TECHNISCHE UNIVERSITET laboratoriurn vow Scheepshydromechareba slechlef Meketweg 2, 2628 CD. Delft Tel.: 015-788873 - Fax 015-781838 DAMAGE STABILITY TESTS OF MODELS REPRESENTING RO-RC) FERRIES PERFORMED

More information

Experience and Future Potential of the Oblique Icebreaker

Experience and Future Potential of the Oblique Icebreaker SHIP Design & Engineering CONSULTING & Project Development ICE MODEL & Full Scale Testing OFFSHORE Development Experience and Future Potential of the Oblique Icebreaker Mika Hovilainen Project Manager

More information

World Marine Offshore Torskekaj Esbjerg, Denmark

World Marine Offshore Torskekaj Esbjerg, Denmark WS30 WORLD BORA Vessel Specification MULTIPURPOSE OFFSHORE SUPPORT Suitable for transfer of crew and cargo to wind industry, crew change vessel, survey, ROV, standby, rescue and guard duties. The vessel

More information

World Marine Offshore Torskekaj Esbjerg, Denmark

World Marine Offshore Torskekaj Esbjerg, Denmark WS25 WORLD SCIROCCO Vessel Specification MULTIPURPOSE OFFSHORE SUPPORT Suitable for transfer of crew and cargo to wind industry, crewchange vessel, survey, ROV, standby rescue and guard duties. The vessel

More information

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS CHINA CLASSIFICATION SOCIETY Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS Version: December, 2016,RCN No.2 Effective date: 03 January, 2017 Beijing Contents PART ONE PROVISIONS

More information

OFFSHORE SUPPORT VESSELS 2015

OFFSHORE SUPPORT VESSELS 2015 Part 1: Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification) RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2015 PART 1 CONDITIONS OF CLASSIFICATION (Supplement

More information

Assessment and operation of Wind Turbine Installation Vessels.

Assessment and operation of Wind Turbine Installation Vessels. Noble Denton Marine Services Assessment and operation of Wind Turbine Installation Vessels. Risk reduction through implementation of good practice recommendations Mark Hayward 24 January 2017 1 DNV GL

More information

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE VESSEL DESIGNS HUISMAN PRODUCT BROCHURE VESSEL ESIGNS TABLE OF CONTENTS 01 GENERAL 03 1.1 Introduction 03 1.2 Development 03 02 DRILL SHIPS 06 2.1 HuisDrill 12000 06 03 MOBILE OFFSHORE DRILLING UNITS 07

More information

The wind tunnel tests of wind pressure acting on the derrick of deepwater semi-submersible drilling platform

The wind tunnel tests of wind pressure acting on the derrick of deepwater semi-submersible drilling platform Available online at www.sciencedirect.com Energy Procedia 14 (2012) 1267 1272 2011 2nd International Conference on Advances in Energy Engineering (ICAEE2011) The wind tunnel tests of wind pressure acting

More information

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS SCOPE

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS SCOPE PART II RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS TITLE 12 CONTAINER SHIPS SECTION 1 NAVAL ARCHITECTURE CHAPTERS A SCOPE B DOCUMENTS, REGULATIONS AND STANDARDS

More information

The salient features of the 27m Ocean Shuttle Catamaran Hull Designs

The salient features of the 27m Ocean Shuttle Catamaran Hull Designs The salient features of the 27m Ocean Shuttle Catamaran Hull Designs The hull form is a semi-planing type catamaran. It employs a combination of symmetrical and asymmetrical sponson shapes, thereby combining

More information

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION Proceedings of COBEM 2009 Copyright 2009 by ABCM 20th International Congress of Mechanical Engineering November 15-20, 2009, Gramado, RS, Brazil INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION Helena

More information

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance

More information

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras Lecture - 6 Bulbous Bow on Ship Resistance Welcome back to the class we have been discussing

More information

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE LIST OF TOPICS A B C D E F G H I J Hydrostatics Simpson's Rule Ship Stability Ship Resistance Admiralty Coefficients Fuel Consumption Ship Terminology Ship

More information

NEXT GENERATION CRANE VESSEL

NEXT GENERATION CRANE VESSEL NEXT GENERATION CRANE VESSEL The Oleg Strashnov heavy lifting vessel for Seaway Heavy Lifting Alain Wassink GustoMSC ABSTRACT A monohull heavy lift vessel has always been a compromise between the required

More information

Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations

Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations OIL & GAS Site-Specific Assessment of Jack-Ups Part 5: When Things Go Wrong Lessons and Mitigations Noble Denton marine services Mike White 1 SAFER, SMARTER, GREENER Overview Review of several incidents:

More information

STATIONKEEPING DYNAMIC POSITIONING FOR YACHTS. Hans Cozijn

STATIONKEEPING DYNAMIC POSITIONING FOR YACHTS. Hans Cozijn STATIONKEEPING DYNAMIC POSITIONING FOR YACHTS Hans Cozijn Senior Project Manager Offshore YACHTS VS. OFFSHORE INDUSTRY 2 YACHTS VS. OFFSHORE INDUSTRY Source : www.hdmt21.com Source : www.charterworld.com

More information

IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view?

IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view? IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view? Seamocs meeting in Malta Gaute Storhaug, DNV Maritime 19th of March 2009 Overview

More information

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE GUIDANCE NOTES GD03-2017 CHINA CLASSIFICATION SOCIETY GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE 2017 Effective from 1 March 2017 BEIJING Chapter 1 GENERAL 1.1 Application

More information

Offshore Stabilization Pontoon for a heavy lift vessel Concept design & workability

Offshore Stabilization Pontoon for a heavy lift vessel Concept design & workability Offshore Stabilization Pontoon for a heavy lift vessel A.M. ten Klooster Delft University of Technology OFFSHORE STABILIZATION PONTOON FOR A HEAVY LIFT VESSEL CONCEPT DESIGN & WORKABILITY by A.M. ten Klooster

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

UNDERWATER VEHICLES, SYSTEMS AND HYPERBARIC FACILITIES 2002

UNDERWATER VEHICLES, SYSTEMS AND HYPERBARIC FACILITIES 2002 RULES FOR BUILDING AND CLASSING UNDERWATER VEHICLES, SYSTEMS AND HYPERBARIC FACILITIES 2002 NOTICE NO. 5 January 2008 The following Rule Changes were approved by the ABS Rules Committee on 7 June 2007

More information

Hydrodynamic Trends in Ferry Design

Hydrodynamic Trends in Ferry Design 11 th International Conference on Fast Sea Transportation FAST 2011, Honolulu, Hawaii, USA, September 2011 Hydrodynamic Trends in Ferry Design John S. Richards 1, Oliver Reinholz 1 1 Hamburg Ship Model

More information

ANALYSIS OF THE POSITIVE FORCES EXHIBITING ON THE MOORING LINE OF COMPOSITE-TYPE SEA CAGE

ANALYSIS OF THE POSITIVE FORCES EXHIBITING ON THE MOORING LINE OF COMPOSITE-TYPE SEA CAGE 194 He, W., Li, C.: Analysis of the positive forces exhibiting on ANALYSIS OF THE POSITIVE FORCES EXHIBITING ON THE MOORING LINE OF COMPOSITE-TYPE SEA CAGE Wei He 1* Chunliu Li 2 1 Ocean College, Agricultural

More information

Light draught m

Light draught m Tugboats 900hp tugboat 1200hp tugboat 2400hp ABS ocean going tugboat Built in 2010, brand-new LOA 30.00 m Length 27.76 m Length of waterline 28.75 m Breadth 7.50 m Depth 3.20 m Light draught 1.450 m Full-load

More information

Comparative Stability Analysis of a Frigate According to the Different Navy Rules in Waves

Comparative Stability Analysis of a Frigate According to the Different Navy Rules in Waves Comparative Stability Analysis of a Frigate According to the Different Navy Rules in Waves ABSTRACT Emre Kahramano lu, Technical University, emrek@yildiz.edu.tr Hüseyin Y lmaz,, hyilmaz@yildiz.edu.tr Burak

More information

GERMAN RENEWABLE SHIPBROKERS S GERMAN RENEWABLE VESSEL PORTFOLIO ANY VESSEL ANYTIME

GERMAN RENEWABLE SHIPBROKERS S GERMAN RENEWABLE VESSEL PORTFOLIO ANY VESSEL ANYTIME GERMAN VESSEL PORTFOLIO ANY VESSEL ANYTIME YOU THINK OFFSHORE WE FOLLOW YOUR THOUGHTS! A vessel for construction works at sea? An installation vessel for wind turbine generators or a sale and purchase

More information

EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600

EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600 EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600 EXECUTIVE SUMMARY Damen offers a range of trailing suction hopper dredgers, dedicated for aggregate dredging. The innovative standard designs are future

More information

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras

Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras (Refer Slide Time: 00:32) Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 1 Concepts of Fixed Offshore Platform

More information

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Includes Basic ship Terminologies and Investigation Check list Index 1. Ship Terminology 03 2. Motions of a Floating Body...09 3. Ship Stability.10 4. Free

More information

Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments

Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments By Dag Friis Christian Knapp Bob McGrath Ocean Engineering Research Centre MUN Engineering 1 Overview:

More information

Wind Turbine Installation Vessels

Wind Turbine Installation Vessels Oil & Gas Wind Turbine Installation Vessels Presentation for IMCA Copenhagen Meeting Richard Stonor / Mark Hayward 1 IMCA 14 June - Wind 2016 Installation Vessels SAFER, SMARTER, GREENER Opening comments

More information

Courses of Instruction: Controlling and Monitoring of Pipelines

Courses of Instruction: Controlling and Monitoring of Pipelines Courses of Instruction: Controlling and Monitoring of Pipelines Date December 2010 Dr. Peter Eschenbacher Partner Angergraben 4 85250 Altomünster Germany Tel. +49-(0)8254 / 99 69 57 Fax +49-(0)8254 / 99

More information

FAQ MOTS (Momac-Offshore-Transfer-System):

FAQ MOTS (Momac-Offshore-Transfer-System): FAQ MOTS (Momac-Offshore-Transfer-System): Features of the boat/vessel needed to carry MOTS: What is the recommended vessel technology for MOTS? MOTS can be installed on every vessel type. MOTS minimum

More information

Investigation of the Intact Stability Accident of the Multipurpose Vessel MS ROSEBURG

Investigation of the Intact Stability Accident of the Multipurpose Vessel MS ROSEBURG Proceedings of the 12th International Conference on the Stability of Investigation of the Intact Stability Accident of the Multipurpose Vessel MS ROSEBURG Adele Lübcke, Institute of Ship Design and Ship

More information

Dynamic Response of Jacket Structures to Breaking and Nonbreaking Waves: Yesterday, Today, Tomorrow

Dynamic Response of Jacket Structures to Breaking and Nonbreaking Waves: Yesterday, Today, Tomorrow Leichtweiß-Institute for Hydraulic Engineering and Water Resources Department of Hydromechanics and Coastal Engineering Dynamic Response of Jacket Structures to Breaking and Nonbreaking Waves: Yesterday,

More information

The OTSS System for Drift and Response Prediction of Damaged Ships

The OTSS System for Drift and Response Prediction of Damaged Ships The OTSS System for Drift and Response Prediction of Damaged Ships Shoichi Hara 1, Kunihiro Hoshino 1,Kazuhiro Yukawa 1, Jun Hasegawa 1 Katsuji Tanizawa 1, Michio Ueno 1, Kenji Yamakawa 1 1 National Maritime

More information

TARPON A Minimal Facilities Platform

TARPON A Minimal Facilities Platform TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application

More information

Wave loads on a typical

Wave loads on a typical OFFSHORE & marine Technology ocean & offshore engineering Assessment of loads on a jack-up platform ADVANCED OFFSHORE ANALYSIS Growing importance of the offshore oil, gas, and renewables sectors imposes

More information

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance

More information

Our Company. Sail with us into calm waters! -

Our Company. Sail with us into calm waters! - Rudder Systems Our Company The company MM-Offshore GmbH is one of the major designing and producing ship s equipment supplier in the international shipbuilding market. With our experience of more than

More information

Application Research for DP Enhanced Notation

Application Research for DP Enhanced Notation Journal of Shipping and Ocean Engineering 7 (2017) 19-25 doi 10.17265/2159-5879/2017.01.003 D DAVID PUBLISHING HU Xiaolin Marine Design & Research Institute of China, Shanghai 200011, China Abstract: DP

More information

New Vessel Fuel Efficient Design and Construction Considerations Medium and Long-Term Options

New Vessel Fuel Efficient Design and Construction Considerations Medium and Long-Term Options New Vessel Fuel Efficient Design and Construction Considerations Medium and Long-Term Options By Dag Friis Christian Knapp Bob McGrath Ocean Engineering Research Centre MUN Engineering Overview : Introduction

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

A Study on Roll Damping of Bilge Keels for New Non-Ballast Ship with Rounder Cross Section

A Study on Roll Damping of Bilge Keels for New Non-Ballast Ship with Rounder Cross Section International Ship Stability Workshop 2013 1 A Study on Roll Damping of Bilge Keels for New Non-Ballast Ship with Rounder Cross Section Tatsuya Miyake and Yoshiho Ikeda Department of Marine System Engineering,

More information

Study on Marine Propeller Running in Bubbly Flow

Study on Marine Propeller Running in Bubbly Flow Third International Symposium on Marine Propulsors smp 13, Launceston, Tasmania, Australia, May 2013 Study on Marine Propeller Running in Bubbly Flow Chiharu Kawakita Mitsubishi Heavy Industries, Ltd.,

More information

Improving Cost Efficiency of DP Operations by Enhanced Thruster Allocation Strategy

Improving Cost Efficiency of DP Operations by Enhanced Thruster Allocation Strategy Return to Session Menu DYNAMIC POSITIONING CONFERENCE October 14-15, 2014 GREEN INITIATIVES Improving Cost Efficiency of DP Operations by Enhanced Thruster Allocation Strategy Sofien Kerkeni SIREHNA IMPROVED

More information

Dynamic Positioning Control Augmentation for Jack-up Vessels

Dynamic Positioning Control Augmentation for Jack-up Vessels DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Design and Control Session Dynamic Positioning Control Augmentation for Jack-up Vessels By Bradley Deghuee L-3 Communications 1 Introduction Specialized

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 11 Other Operations and Systems 6 Guidelines for the Preparation of Damage Stability Calculations and Damage Control Documentation

More information

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico

Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Risk Reduction in Offshore Decommissioning Chevron s Success in the Gulf of Mexico Lew Dennis Decommissioning Manager Chevron Gulf of Mexico Business Unit 1 Key Messages Focusing on Risk Reduction in Decommissioning

More information

Minimal Structures for Marginal Nova Scotia Developments

Minimal Structures for Marginal Nova Scotia Developments Minimal Structures for Marginal Nova Scotia Developments May 12, 2009 Cameron Dunn Martec is a member of the Lloyd s Register Group 1 2 Minimal Structures Project NSDOE working to make the Nova Scotia

More information

ATLANTIC EXPLORER with Dynamic Positioning System FULL SPECIFICATIONS

ATLANTIC EXPLORER with Dynamic Positioning System FULL SPECIFICATIONS ATLANTIC EXPLORER with Dynamic Positioning System FULL SPECIFICATIONS Multi Role Offshore Ship Atlantic Explorer Research Safety Rescue Cargo Survey Supply Standby Guard Ship Dive Support Accommodation

More information

SBM Installer. Diving Support & Construction Vessel

SBM Installer. Diving Support & Construction Vessel Diving Support & Construction Vessel New, all-in-one, state-of-the-art installer Safety, versatility and redundancy are the three key concepts to have driven the design of SBM Offshore installation vessels.

More information

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements STRIDE PROJECT Steel Risers in Deepwater Environments Achievements 1999-21 Neil Willis Principal Engineer 2H Offshore Engineering 6 th Annual Deepwater Technologies and Developments Conference 21 The presentation

More information

A Feasibility Study on a New Trimaran PCC in Medium Speed

A Feasibility Study on a New Trimaran PCC in Medium Speed The 6 th International Workshop on Ship ydrodynamics, IWS 010 January 9-1, 010, arbin, China Feasibility Study on a ew Trimaran PCC in Medium Speed Tatsuhiro Mizobe 1*, Yasunori ihei 1 and Yoshiho Ikeda

More information

Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour

Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour Amsterdam, The Netherlands Organised by the ABR Company Ltd Day Paper No. 2 9 Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour Dr Dirk Jürgens and Michael Palm, Voith Turbo Schneider

More information

الاسكندريه مصر Tel Fax: (+2) Mob: (+2)

الاسكندريه مصر Tel Fax: (+2) Mob: (+2) Project Upgrading Alexandria Shipyard Client Alexandria Shipyard Company Date 2010 Present Value 1.2 Billion Egyptian Pounds Role Design and Supervision Location Alexandria Harbor Project Timeline Design

More information

ISSN: ISO 9001:2008 Certified International Journal of Engineering Science and Innovative Technology (IJESIT) Volume 2, Issue 4, July 2013

ISSN: ISO 9001:2008 Certified International Journal of Engineering Science and Innovative Technology (IJESIT) Volume 2, Issue 4, July 2013 A Comparison of Hull Resistances of a Mono-Hull and A SWATH Craft Josip Medaković, Ban Dario, Branko Blagojević University of Split, FESB, Department of Mechanical Engineering and Naval Architecture, 21000

More information

SOFTWARE. Sesam user course. 12 May 2016 HydroD Hydrostatics & Stability. Ungraded SAFER, SMARTER, GREENER DNV GL 2016

SOFTWARE. Sesam user course. 12 May 2016 HydroD Hydrostatics & Stability. Ungraded SAFER, SMARTER, GREENER DNV GL 2016 SOFTWARE Sesam user course DNV GL 1 SAFER, SMARTER, GREENER Scope of presentation Describe features & commands for performing a hydrostatic analysis, and their concepts Analysis setup Code-checking Reporting

More information

Règlement pour la navigation pour la zone arctique. Alexey DUDAL Marine Division Bureau VERITAS

Règlement pour la navigation pour la zone arctique. Alexey DUDAL Marine Division Bureau VERITAS Règlement pour la navigation pour la zone arctique Alexey DUDAL Marine Division Bureau VERITAS 1 Contents 1. Introduction 2. BV Rules and Guidelines for Ice-Going Vessels 3. Direct Calculation Tool 4.

More information

Part E. Rules for the Classification of Ships. Service Notations. Effective from 1 January 2016

Part E. Rules for the Classification of Ships. Service Notations. Effective from 1 January 2016 Rules for the Classification of Ships Effective from 1 January 2016 Part E Service Notations Tasneef Mussafah industrial area, street 14, Sector MW 4, Plot 27A, ADSB premises Abu Dhabi United Arab Emirates

More information

Contributions from a multidisciplinary university Finn Gunnar Nielsen Professor Geophysical Institute

Contributions from a multidisciplinary university Finn Gunnar Nielsen Professor Geophysical Institute Workshop Floating Offshore Wind Norwegian Offshore Wind Cluster Dublin 4 th and 5 th December 2018 Contributions from a multidisciplinary university Finn Gunnar Nielsen Professor Geophysical Institute

More information

Underwater noise generated by merchants ships in coastal waters of the Gulf of Gdansk

Underwater noise generated by merchants ships in coastal waters of the Gulf of Gdansk Underwater noise generated by merchants ships in coastal waters of the Gulf of Gdansk Karol LISTEWNIK 1 1 Polish Naval Academy, Poland ABSTRACT Currently, there has been a growing interest in monitoring

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

Hysucat. powerful, functional...

Hysucat. powerful, functional... STEALTH 520 patrol Hysucat The HYdrofoil SUpported CATamaran (HYSUCAT) is an integrated design comprising a catamaran hull equipped with a hydrofoil system between the demi-hulls which carries a part of

More information

The SDS Skip. Subsea Deployment Systems Ltd.

The SDS Skip. Subsea Deployment Systems Ltd. The SDS Skip SUBSEA SKIP An alternative to enhance the recovery of structures, spool pieces, mattresses etc. during decommissioning work Can be used to transport complex structures or spool pieces to field

More information

Our Company. Sail with us into calm waters! -

Our Company. Sail with us into calm waters! - Rudder Systems Our Company The company MM-Offshore GmbH is one of the major designing and producing ship s equipment supplier in the international shipbuilding market. With our experience of more than

More information

Ocean Transits in a 50m, 45 knot Catamaran The Minimisation of Motions and Speed Loss

Ocean Transits in a 50m, 45 knot Catamaran The Minimisation of Motions and Speed Loss Ocean Transits in a 50m, 45 knot Catamaran The Minimisation of Motions and Speed Loss Edward Dudson, Ship Design Director, Nigel Gee and Associates Ltd, UK James Roy, Senior Naval Architect, Nigel Gee

More information

RESCUE BOAT DESIGN UTILIZING REUSED PLASTIC BOTTLES FOR ACCIDENT PREVENTATION

RESCUE BOAT DESIGN UTILIZING REUSED PLASTIC BOTTLES FOR ACCIDENT PREVENTATION RESCUE BOAT DESIGN UTILIZING REUSED PLASTIC BOTTLES FOR ACCIDENT PREVENTATION Abstract- Fiberglass layer of rescue boat has tendency to crack when hit by a heavy wave or involves in accident. As an alternative

More information

Part 3 Pressure hull and structures Chapter 7 Stability and buoyancy

Part 3 Pressure hull and structures Chapter 7 Stability and buoyancy RULES FOR CLASSIFICATION Underwater technology Edition December 2015 Part 3 Pressure hull and structures Chapter 7 The content of this service document is the subject of intellectual property rights reserved

More information

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, Page 1 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International

More information

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX Preventing Damage to Harbour Facilities and Ship Handling in Harbours PART 2 INDEX 1 Vessel handling is based on the basic knowledge that a vessel floats in the water and returns to its original position

More information