1 WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE

2 WIND TURBINE HUTTLE TABLE OF CONTENTS 01 DESCRIPTION Vessel General Purpose of the Vessel High Workability 0 1. Installation Scenarios High Transit Speed and Excellent Seakeeping Running on LNG Fuel DP3 System Vessel Motion Compensation System Motion Compensation in the Hoisting System Ballast System Structural Design Maintenance, Repair & Decommisioning Additional Applications of the Vessel Shallow Draft Catamaran Version 10 0 TECHNICAL SPECIFICATIONS 11.1 Vessel 11. Top Side Equipment 11 Artist s impression of WTS

3 1. DESCRIPTION WIND TURBINE SHUTTLE ADVANTAGES 1.1 Vessel general To improve the efficiency of offshore wind turbine installation, Huisman developed the Wind Turbine Shuttle: a dynamically positioned, fast sailing (1 knots) SWATH - Small Water plane Area Twin Hull - type construction vessel which can carry and install two fully assembled wind turbines. By combining low vessel motions, compensating systems and an accurate dynamic positioning system, the wind turbine is kept virtually stationary in relation to the fixed foundation during installation. At least 80% workability in annual North Sea conditions Excellent vessel motion characteristics Active roll and pitch vessel motion compensation systems Active heave, pitch and surge compensation hoisting systems High transit speed and DP3 Can transport up to two wind turbines in one piece Commissioning and testing onshore, turbine earlier online Also capable of installing jackets, mono piles, piling, and other offshore structures 3

4 WIND TURBINE HUTTLE 1. Purpose of the vessel The vessel is especially dedicated to installing wind turbines offshore. Fully assembled wind turbines delivered to the installation site minimizing the time of construction works offshore. The vessel can also carry two large jackets or two large mono piles or combinations thereof. In case of jacket installation the wind turbines shuttle can carry the piles needed to secure the jacket to the seafloor. The WTS is a SWATH-type vessel which provides excellent vessel motions and therefore a large workability. Since the unit is not jacked out of the water, the workability is not limited by this operation. Also no additional time is consumed by this operation. The unit has two large underwater pontoons, rather small columns and a deck box above the water. As soon as the unit sails out of the harbour, the draft is adjusted so that the pontoons are submerged beneath the water line, providing low vessel motions during the transit and during the installation. The vessel is able to transport simultaneously two complete wind turbines with a maximum mass of 1000mt each. This enables the vessel to install all current models of wind turbines and future models up to an approximate size of 8MW. As the wind turbines can be fully erected, commissioned and tested onshore, the offshore commissioning time is minimized. The wind turbines will be earlier on-line and deliver power faster to the grid. The vessel can also carry and install two complete foundations (jacket type and mono piles) with the maximum weight of 000mt each. The main capabilities of the new vessel are: Installing complete wind turbines Installing complete foundations (jacket type) Installing complete foundations (mono piles) Pile driving All year operation in The North Sea High yearly performance with very limited down time. WTS with two wind turbines WTS with two jackets 1.3 High workability Traditionally, crane vessels and jack-up platforms are utilized for offshore construction works. Normally parts of the wind turbines are loaded into the vessel and then transported to the wind farm site. The wind turbines are assembled from these parts offshore utilizing a large crane. However the workability of crane vessels without jack-up system is very low. Even a moderate sea state makes the lifting operation impossible. Operating the vessels or platforms equipped with the jack-up system is time consuming. The lowering and retrieving of the legs of the jack-up system takes time. These operations are also sensitive to environmental conditions. Normally the transit speed of these vessels is quite low. WTS with two mono piles WTS with piles

5 The vessel is able to install wind turbines with a maximum significant wave height of 3.5m. This gives the unit a workability of at least 80% of the year in North Sea conditions in the open areas and up to 95% closer to the shore. By choosing the heading, the vessel will mainly endure (limited) heave, pitch and surge motions. Additionally the vessel is equipped with an active pitch and roll damping system to further reduce vessel motions. 1. Installation scenarios Minimization of offshore work is achieved by transporting the wind turbines as entirely tested units. All the testing and commissioning is done onshore. This requires a low number of dedicated shore bases (e.g. Denmark, East of England, and Scotland). The vessel has an optimised hull form and significant installed power to reach a high transit speed. In 1 hours the vessel can travel approx. 150 miles. WTS picking up wind turbine from a shore base North Sea with wind parks and 150 miles radius from 3 shore bases (East of England, Esbjerg (DK), Scotland) Distance shore base to wind farm [miles] Load two wind turbines Sail to wind farm Install two wind turbines Sail back to harbour Contingency Total for two wind turbines Load two foundations Sail to wind farm Install two foundations Sail back to harbour Contingency Total for two foundations Total for two wind turbines & foundations Number of wind turbines & foundations per year based on; workability of 80% for installation of wind turbines and a workability of 90% for installation of foundations, excl. piling [-] 5

6 WIND TURBINE HUTTLE 1.5 High transit speed and excellent seakeeping Since the WTS can take only two wind turbines or two foundations the requirement for covering the distance between the shore base and the installation site in a short time is of major importance. At the same time good seakeeping performance is required for installation. A SWATH type vessel is chosen due to combination of excellent seakeeping characteristics and the high transit speed. Extensive research and model testing resulted in a highly optimized hull shape. 1.6 Running on LNG fuel The vessel will be equipped with diesel generator sets capable of running on both MDO and LNG. If LNG bunker facilities are provided all operations of the Wind Turbine Shuttle can be performed using LNG fuel making the whole installation campaign even more environmentally friendly. Resistance model tests in towing tank CFD calculations Seakeeping model tests in waves 6

7 1.7 DP3 system The high redundancy of the DP3 system is provided by arranging all four diesel generators in separated engine rooms. The vessel is equipped with two large variable pitch propellers to obtain a transit speed of 1 knots. Together with the large variable pitch propellers, eight tunnel thrusters are used for dynamic positioning during installation operations. The dynamic positioning system keeps the vessel in place during installation of the wind turbines, even in the most severe weather conditions. By using dynamic positioning (instead of mooring or jacking out of the water) the installation is very fast. Separated engine rooms 1.8 Vessel motion compensation system Although the SWATH type vessel provides excellent seakeeping performance even more effort was put into further improvement of motions in waves. Active roll and pitch compensation systems were developed. The system utilizes a moving mass. For roll compensation a mass driven in the transverse direction is applied. For pitch two masses are used, which move in the longitudinal direction. The vessel motions are reduced by 30-0% when the system is in active mode. These systems will be mostly used during the wind turbine installation sequence when the vessel motions have to be minimized as much as possible. Set-up for testing active pitch compensation system 7

8 WIND TURBINE HUTTLE 1.9 Motion compensation in the hoisting system Huisman has used its 5 years of experience in the application of active heave compensation systems on cranes and other lifting devices for the design of the Wind Turbine Shuttle. The wind turbine is held in place by a hoist frame. This frame consists of two tables connected by a steel structure. Each table is equipped with an active controlled, horizontal movable, XY-clamp. The wind turbine hoist frame connected to the hoist tackle at the bottom table. A passive heave compensation system in the combination with active wire connection between the wind turbine and the foundation is applied for soft controlled lowering and landing of the wind turbine on the foundation. Once the wind turbine is lowered a quick connector is engaged firmly connecting the wind turbine with the foundation. From this point the Wind Turbine Shuttle can sail to the next installation site. The bolt connections can be safely made while the wind turbine is still secured by the quick connector. The quick connector will be picked up later. Upper clamp Lower clamp 8

9 1.10 Ballast system A conventional water ballast system is utilized for changing the draft from shallow harbour draft to the submerged transit / installation draft. During installation, the load of the wind turbine is transferred from the WTS to the foundation. A constant draft has to be maintained. Here a dedicated water ballast system is applied allowing fast water ballast exchange minimizing the wind turbine installation time. The longitudinal position of the dedicated water ballast tanks is close to the longitudinal centre of gravity of the wind turbines. This allows pumping the amount of water equal to the weight of the wind turbine without necessity to compensate for trim change since the trim remains constant. The design wave approach is applied for the global structural analysis of the vessel. The strength against the yield stress and buckling is checked. Fatigue is considered from the very beginning of this project. ANSYS is applied for the structural finite element analysis (FEA). The wave conditions of The North Sea set very high requirements for the design with respect to the fatigue. The major structural connections of the WTS are carefully checked for fatigue and the geometry of these connections is optimized Pump room 1.11 Structural design The installation of the wind turbines and jacket foundations requires large recesses in the deck box structure. The requirement for high speed and rudder arrangement make the struts long and very narrow, thereby attracting significant wave forces. The structural design of the vessel is carefully performed covering both the global strength and the fatigue requirements. 9

10 WIND TURBINE HUTTLE 1.1 Maintenance, repair, & decommissioning Due to its capacity to transport two wind turbines at the same time, the vessel is perfectly suited for exchanging wind turbines. The vessel can install one or two new or refurbished wind turbines and pick up two old wind turbines. All repair, maintenance and decommissioning work is performed onshore. Because the wind turbine shuttle can transport complete turbines, it is an excellent tool for power upgrades and overhaul of existing wind turbines Additional Applications of the Vessel The vessel also provides an excellent platform for offshore construction works. The Wind Turbine Shuttle can be deployed for installation and removal of the top sides and foundations of existing oil platforms. The fact that the vessel is equipped with the highest level DP3 system means that the vessel can be also utilized in the oil industry. Structure of WTS 1.1 Shallow Draft Catamaran Version A shallow draft catamaran version of the Wind Turbine Shuttle can be used in the areas with shallow water depths (see figure). The installations will be carried out in mild weather conditions. Decommissioning of top sides Catamaran Type WTS with shallow draft 10

11 . TECHNICAL SPECIFICATIONS.1 Vessel GENERAL Classification GENERAL MAIN DIMENSIONS Length over all Breadth Airgap during installation / sailing Depth to main deck (also freeboard deck) Design draught Harbour draught Scantling draught Displacement at design draught Payload (wind turbine) Payload (wind turbines foundations) MARINE SYSTEMS Main engines Total installed engine power No. of independent engine rooms Main propulsion (CPP) Tunnel thrusters Dynamic positioning class Service speed PAY LOAD* Payload (two wind turbines) Payload (two wind turbine foundations or monopiles)** Payload (0 piles, max length of piles approx. 50m)** * one of these options at the time ** minimum draft with payload of 000 mt is approx. 11.5m CAPACITIES MDO LNG Fresh water Water ballast capacity MISCELLANEOUS Complement in 1 and person cabins DNV 1A1 Wind Turbine Installation unit, DYNPOS-AUTRO 13. [m] 7.0 [m] 7. [m] 8.8 [m] 16.0 [m] 9.5 [m] 18.0 [m] Approx [mt] 000 [mt] 000 [mt] x 5.7 [MW].8 [MW] [-] x 8.0 [MW] 8 x 1.6 [MW] DP3 [-] 1 [knots] 000 [mt] 000 [mt] 000 [mt] 600 [m 3 ] 600 [m 3 ] 00 [m 3 ] [m 3 ] 100 [-]. Top side Equipment INSTALLATION TOWER / CRANAGE Main hoist fwd Main hoist aft x PMOC 1600 [mt] 1600 [mt] x 300 [mt] Note: Specifications might be subject to changes as the design progresses 11

12 HUISMAN EQUIPMENT BV Admiraal Trompstraat 3115 HH Schiedam P.O. Box AD Schiedam The Netherlands Harbour no. 561 Phone: +31 (0) Fax: +31 (0) info@huisman-nl.com

Wind Turbine Shuttle. Ferdinand van Heerd

Wind Turbine Shuttle. Ferdinand van Heerd Wind Turbine Shuttle Ferdinand van Heerd Contents Introduction Concept Resistance Seakeeping Vessel motion compensation system Hoisting motion compensation system Landing the wind turbine Workability Efficiency

More information

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE

VESSEL DESIGNS HUISMAN PRODUCT BROCHURE VESSEL DESIGNS HUISMAN PRODUCT BROCHURE VESSEL ESIGNS TABLE OF CONTENTS 01 GENERAL 03 1.1 Introduction 03 1.2 Development 03 02 DRILL SHIPS 06 2.1 HuisDrill 12000 06 03 MOBILE OFFSHORE DRILLING UNITS 07

More information

World Marine Offshore Torskekaj Esbjerg, Denmark

World Marine Offshore Torskekaj Esbjerg, Denmark WS30 WORLD BORA Vessel Specification MULTIPURPOSE OFFSHORE SUPPORT Suitable for transfer of crew and cargo to wind industry, crew change vessel, survey, ROV, standby, rescue and guard duties. The vessel

More information

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences. Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)

More information

World Marine Offshore Torskekaj Esbjerg, Denmark

World Marine Offshore Torskekaj Esbjerg, Denmark WS25 WORLD SCIROCCO Vessel Specification MULTIPURPOSE OFFSHORE SUPPORT Suitable for transfer of crew and cargo to wind industry, crewchange vessel, survey, ROV, standby rescue and guard duties. The vessel

More information

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project)

DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) DESIGNING OF THE OFFSHORE WIND FARM INSTALLATION VESSELS (on basis of the VIDAR project) Presented by: Tomasz Płotka - StoGda 0. StoGda Ship Design & Engineering Ltd Beginning of the StoGda Ship Design

More information

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 MAIN PARTICULARS LENGTH OVER ALL 60.68 m LENGTH WATER LINE 59.35 m BREADTH MAX 20.80 m DRAUGHT MAX 3.10 m DEPTH 6.70 m MAX SPEED 37.0 knots @

More information

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance

More information

SBM Installer. Diving Support & Construction Vessel

SBM Installer. Diving Support & Construction Vessel Diving Support & Construction Vessel New, all-in-one, state-of-the-art installer Safety, versatility and redundancy are the three key concepts to have driven the design of SBM Offshore installation vessels.

More information

World Marine Offshore Torskekaj Esbjerg, Denmark

World Marine Offshore Torskekaj Esbjerg, Denmark Vessel Specification Suitable for transfer of crew and cargo to wind indu stry, crew change vessel, survey, ROV, standby rescue and guard duties. The vessel design is a proven concept within support vessels

More information

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

Deepwater Floating Production Systems An Overview

Deepwater Floating Production Systems An Overview Deepwater Floating Production Systems An Overview Introduction In addition to the mono hull, three floating structure designs Tension leg Platform (TLP), Semisubmersible (Semi), and Truss Spar have been

More information

Challenges in Ship Design to Maintain Thrusters inside Ship

Challenges in Ship Design to Maintain Thrusters inside Ship DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Thrusters Challenges in Ship Design to Maintain Thrusters inside Ship Tom Nylund and Timo Rintala Beacon Finland 1 DP Conference - Challenges in Ship Design

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

The salient features of the 27m Ocean Shuttle Catamaran Hull Designs

The salient features of the 27m Ocean Shuttle Catamaran Hull Designs The salient features of the 27m Ocean Shuttle Catamaran Hull Designs The hull form is a semi-planing type catamaran. It employs a combination of symmetrical and asymmetrical sponson shapes, thereby combining

More information

Hysucat. powerful, functional...

Hysucat. powerful, functional... STEALTH 520 patrol Hysucat The HYdrofoil SUpported CATamaran (HYSUCAT) is an integrated design comprising a catamaran hull equipped with a hydrofoil system between the demi-hulls which carries a part of

More information

NEXT GENERATION CRANE VESSEL

NEXT GENERATION CRANE VESSEL NEXT GENERATION CRANE VESSEL The Oleg Strashnov heavy lifting vessel for Seaway Heavy Lifting Alain Wassink GustoMSC ABSTRACT A monohull heavy lift vessel has always been a compromise between the required

More information

Offshore Stabilization Pontoon for a heavy lift vessel Concept design & workability

Offshore Stabilization Pontoon for a heavy lift vessel Concept design & workability Offshore Stabilization Pontoon for a heavy lift vessel A.M. ten Klooster Delft University of Technology OFFSHORE STABILIZATION PONTOON FOR A HEAVY LIFT VESSEL CONCEPT DESIGN & WORKABILITY by A.M. ten Klooster

More information

Trim and Stabilisation systems NEXT GENERATION IN BOAT CONTROL.

Trim and Stabilisation systems NEXT GENERATION IN BOAT CONTROL. Trim and Stabilisation systems NEXT GENERATION IN BOAT CONTROL www.humphree.com WHEN EFFICIENCY AND PERFORMANCE REALLY MATTERS! Humphree proudly presents the new HCS-5 The HCS-5 combines exceptional mechanical

More information

INNOVATIVE MOORING SYSTEMS

INNOVATIVE MOORING SYSTEMS INNOVATIVE MOORING SYSTEMS VESSEL AUTOMOORING MODULES QUAY AUTOMOORING INSTALLATIONS DOCKLOCK brings mooring to a next level PAGE 2 FOR OVER A CENTURY THE WORLD S LEADING EXPERT IN MOORING, BERTHING AND

More information

OFFSHORE WIND: A CRASH COURSE

OFFSHORE WIND: A CRASH COURSE OFFSHORE WIND: A CRASH COURSE OFFSHORE WIND: DEFINED OFFSHORE WIND: Construction of wind farms in bodies of water to generate electricity from wind. Unlike the typical usage of the term offshore in the

More information

The SDS Skip. Subsea Deployment Systems Ltd.

The SDS Skip. Subsea Deployment Systems Ltd. The SDS Skip SUBSEA SKIP An alternative to enhance the recovery of structures, spool pieces, mattresses etc. during decommissioning work Can be used to transport complex structures or spool pieces to field

More information

Development of TEU Type Mega Container Carrier

Development of TEU Type Mega Container Carrier Development of 8 700 TEU Type Mega Container Carrier SAKAGUCHI Katsunori : P. E. Jp, Manager, Ship & Offshore Basic Design Department, IHI Marine United Inc. TOYODA Masanobu : P. E, Jp, Ship & Offshore

More information

EVALUATING CRITERIA FOR DP VESSELS

EVALUATING CRITERIA FOR DP VESSELS Journal of KONES Powertrain and Transport, Vol. 20, No. 2013 EVALUATING CRITERIA FOR DP VESSELS Jerzy Herdzik Gdynia Maritime University, Marine Power Plant Department Morska Street 81-87, 81-225 Gdynia,

More information

FAQ MOTS (Momac-Offshore-Transfer-System):

FAQ MOTS (Momac-Offshore-Transfer-System): FAQ MOTS (Momac-Offshore-Transfer-System): Features of the boat/vessel needed to carry MOTS: What is the recommended vessel technology for MOTS? MOTS can be installed on every vessel type. MOTS minimum

More information

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering

More information

Dynamic Positioning Control Augmentation for Jack-up Vessels

Dynamic Positioning Control Augmentation for Jack-up Vessels DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Design and Control Session Dynamic Positioning Control Augmentation for Jack-up Vessels By Bradley Deghuee L-3 Communications 1 Introduction Specialized

More information

Three New Concepts of Multi-Hulls

Three New Concepts of Multi-Hulls Three New Concepts of Multi-Hulls Victor A. Dubrovsky Independent designer, Russian Federation 114-71 Budapeshtskaja Str, St.Petersburg, 192283, Russian Federation Multi-hulls@yandex.ru Abstract Many multi-hull

More information

TRACK RECORD SEP. 2018

TRACK RECORD SEP. 2018 TRACK RECORD SEP. 2018 TABLE OF CONTENTS 1 INTRODUCTION... 3 2 MOTION COMPENSATED GANGWAY... 5 2.1 In operation at Walney Extension... 6 2.2 In operation at Borkum Riffgrund II... 7 3 MOTION COMPENSATED

More information

ULMATEC LAUNCH AND RECOVERY SYSTEMS

ULMATEC LAUNCH AND RECOVERY SYSTEMS M L U NC LAU MS ERY V ECO DR N HA C E AT TE SYS S R LA ULMATEC LAUNCH AND RECOVERY SYSTEMS Ulmatec develops efficient, safe and robust solutions for handling remotely operated vehicles (ROVs) from ships

More information

Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC

Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC Offshore Wind Vessels Steven Kopits Douglas-Westwood LLC Offshore Wind: Removing Market Barriers DOE Webinar July 25, 2012 1 www.dw-1.com Our business History and Office Locations Established 1990 Aberdeen,

More information

EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE

EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE 1 MR. G.VIJAYA KUMAR, 2 DR. R. PANNEER SELVAM 1 M.S. Research Scholar, Department of Ocean Engineering, IIT Madras, Chennai,

More information

AUSTAL WIND EXPRESS SERIES

AUSTAL WIND EXPRESS SERIES WIND EXPRESS SERIES ABOUT AUSTAL AUSTAL WIND EXPRESS SERIES Austal is the world s leading designer and builder of customised, high performance aluminium vessels for both commercial and defence applications

More information

Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour

Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour Amsterdam, The Netherlands Organised by the ABR Company Ltd Day Paper No. 2 9 Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour Dr Dirk Jürgens and Michael Palm, Voith Turbo Schneider

More information

THE ROLE OF INSTALLATION AND SUPPORT VESSELS

THE ROLE OF INSTALLATION AND SUPPORT VESSELS THE ROLE OF INSTALLATION AND SUPPORT VESSELS Ulstein - Offshore wind in Taiwan - 9-12 April 2018 Gunnar Haug, Ulstein Asia Pte Ltd OFFSHORE WIND FARM DEVELOPMENT OFFSHORE WIND EVOLUTION INSTALLATION VESSELS

More information

DP Ice Model Test of Arctic Drillship

DP Ice Model Test of Arctic Drillship Author s Name Name of the Paper Session DYNAMIC POSITIONING CONFERENCE October 11-12, 211 ICE TESTING SESSION DP Ice Model Test of Arctic Drillship Torbjørn Hals Kongsberg Maritime, Kongsberg, Norway Fredrik

More information

DESIGN COMMENTS #35-95 Submarine support ocean passagemaker

DESIGN COMMENTS #35-95 Submarine support ocean passagemaker w: www.bury.com.au e: info@bury.com.au PO Box 17 Metung VIC 3904 Australia t: +61 (0) 3 9005 6301 : +61 (0) 3 8648 6891 Project: Design 35 95 submarine support Task: Preliminary design comments By: pb

More information

Fully Submersible Heavy Lift Vessel

Fully Submersible Heavy Lift Vessel Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Aberdeen Maritime Branch (28th January 2015) PRESENTATION Introduction to the Subsea Deployment Vessel Installation method Tank test video Potential

More information

The WindFloat Project. Hamburg, September 2016

The WindFloat Project. Hamburg, September 2016 The WindFloat Project Hamburg, September 2016 WindFloat Atlantic: a step change in turning floating wind commercial Technical Performance Competitive LCOE Bankability 2 WindFloat Atlantic: overall description

More information

Fully Submersible Heavy Lift Vessel

Fully Submersible Heavy Lift Vessel Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Oil and Gas Authority (OGA) (15th February 2016) CONTENT Leadon structures demobilisation Competitiveness (case studies) Decommissioning options Installation

More information

Initial Design of Offshore Floating Marina System

Initial Design of Offshore Floating Marina System Initial Design of Offshore Floating Marina System H. Chung* T. W. Oh* S. Namgoong* S. B. Kim* C. H. Jo** *Ocean Space Inc., Seoul, Korea **Naval Architecture and Ocean Engineering Dept., Inha University,

More information

EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600

EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600 EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600 EXECUTIVE SUMMARY Damen offers a range of trailing suction hopper dredgers, dedicated for aggregate dredging. The innovative standard designs are future

More information

Comparison of Motion Sickness Incidence (MSI) of three Crew Transfer Vessels with different hull forms. Héloïse Vignal

Comparison of Motion Sickness Incidence (MSI) of three Crew Transfer Vessels with different hull forms. Héloïse Vignal Comparison of Motion Sickness Incidence (MSI) of three Crew Transfer Vessels with different hull forms Héloïse Vignal University Supervisors : Prof. Zbigniew Sekulski, ZUT Prof. Florin Pacuraru, UGAL Industrial

More information

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL L Boddy and T Clarke, Austal Ships, Australia SUMMARY CFD analysis has been conducted on a 100m catamaran hull

More information

Pile Gripper Systems

Pile Gripper Systems Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +

More information

Introducing The Gemma One

Introducing The Gemma One Introducing The Gemma One The Gemma One is a new generation clean vessel: a practical, safe, conservatively styled, amenity-rich, and highly automated boat that can be 100% powered by renewable energy,

More information

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras Lecture - 17 Resistance of Advanced Marine vehicles - III (Refer Slide Time: 00:10) Now,

More information

EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE

EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE Sabri ALKAN 1, Ayhan Mentes 2, Ismail H. Helvacioglu 2, Nagihan Turkoglu 2 1 Department of Mechanical Engineering,

More information

DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017

DECOMMISSIONING. Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017 DECOMMISSIONING Mark Couwenberg Naval Architect Damen Offshore & Transport 12 May 2017 FEELINGS AGENDA BACKGROUND THE VESSEL THE FUNCTIONS PARTNERS BACKGROUND BACKGROUND BACKGROUND OLSO PARIS CONVENTION

More information

Offshore Service Vessels for Wind Farming. BALTEXPO 2011, September 2011

Offshore Service Vessels for Wind Farming. BALTEXPO 2011, September 2011 Offshore Service Vessels for Wind Farming BALTEXPO 2011, September 2011 Agenda 1. Market Outlook and Vessel Prognosis 2. Design Concepts Wind Turbine Installation Ships 3. Rules and Regulations 4. Maintenance

More information

TLP Minimum tendon tension design and tendon down-stroke investigation

TLP Minimum tendon tension design and tendon down-stroke investigation Published by International Association of Ocean Engineers Journal of Offshore Engineering and Technology Available online at www.iaoejoet.org TLP Minimum tendon tension design and tendon down-stroke investigation

More information

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Includes Basic ship Terminologies and Investigation Check list Index 1. Ship Terminology 03 2. Motions of a Floating Body...09 3. Ship Stability.10 4. Free

More information

Safer, Better, Faster, More Cost-Effective. CTruk Vessel Specifications 2012

Safer, Better, Faster, More Cost-Effective. CTruk Vessel Specifications 2012 Safer, Better, Faster, More Cost-Effective CTruk Vessel Specifications 2012 CTruk 20T MPC CTruk 20T MPC Technical Specifications MAIN PARTICULARS Length over all 18.5m Beam over all 6.1m Draft 0.86m -1.26m

More information

Ocean Transits in a 50m, 45 knot Catamaran The Minimisation of Motions and Speed Loss

Ocean Transits in a 50m, 45 knot Catamaran The Minimisation of Motions and Speed Loss Ocean Transits in a 50m, 45 knot Catamaran The Minimisation of Motions and Speed Loss Edward Dudson, Ship Design Director, Nigel Gee and Associates Ltd, UK James Roy, Senior Naval Architect, Nigel Gee

More information

ZIPWAKE DYNAMIC TRIM CONTROL SYSTEM OUTLINE OF OPERATING PRINCIPLES BEHIND THE AUTOMATIC MOTION CONTROL FEATURES

ZIPWAKE DYNAMIC TRIM CONTROL SYSTEM OUTLINE OF OPERATING PRINCIPLES BEHIND THE AUTOMATIC MOTION CONTROL FEATURES ZIPWAKE DYNAMIC TRIM CONTROL SYSTEM OUTLINE OF OPERATING PRINCIPLES BEHIND THE AUTOMATIC MOTION CONTROL FEATURES TABLE OF CONTENTS 1 INTRODUCTION 3 2 SYSTEM COMPONENTS 3 3 PITCH AND ROLL ANGLES 4 4 AUTOMATIC

More information

Examining the merits of jack up platforms as foundations for the offshore wind industry

Examining the merits of jack up platforms as foundations for the offshore wind industry Examining the merits of jack up platforms as foundations for the offshore wind industry By 20 May 2011 1 ABSTRACT A new type of offshore wind foundation has emerged from the offshore oil fields and is

More information

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Charlottetown Marine Terminal Pipeline Decommissioning Project Description Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning

More information

FROM OPERATIONAL PROFILE TO HYBRID PROPULSION Ir. P.T. van Loon, Ir. P van Zon, Feadship, The Netherlands

FROM OPERATIONAL PROFILE TO HYBRID PROPULSION Ir. P.T. van Loon, Ir. P van Zon, Feadship, The Netherlands SUMMARY FROM OPERATIONAL PROFILE TO HYBRID PROPULSION Ir. P.T. van Loon, Ir. P van Zon, Feadship, The Netherlands Every Feadship is designed, engineered and built to a specific and unique design brief,

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Parametric analysis of hull structure of mono- and catamaran-type inland vessels T. Jastrzebski & Z. Sekulski Faculty ofmaritime Technology, Technical University of Szczecin, AL Piastow 41, 71-065 Szczecin,

More information

Seakeeping Tests (with ships) Experimental Methods in Marine Hydrodynamics Lecture in week 43

Seakeeping Tests (with ships) Experimental Methods in Marine Hydrodynamics Lecture in week 43 Seakeeping Tests (with ships) Experimental Methods in Marine Hydrodynamics Lecture in week 43 1 Topics Why do seakeeping tests? What to do? Activities Details of model test set-up and instrumentation Waves

More information

STATIONKEEPING DYNAMIC POSITIONING FOR YACHTS. Hans Cozijn

STATIONKEEPING DYNAMIC POSITIONING FOR YACHTS. Hans Cozijn STATIONKEEPING DYNAMIC POSITIONING FOR YACHTS Hans Cozijn Senior Project Manager Offshore YACHTS VS. OFFSHORE INDUSTRY 2 YACHTS VS. OFFSHORE INDUSTRY Source : www.hdmt21.com Source : www.charterworld.com

More information

A COST-BENEFIT ANALYSIS OF HULL VANE APPLICATION ON MOTOR YACHTS K

A COST-BENEFIT ANALYSIS OF HULL VANE APPLICATION ON MOTOR YACHTS K SUMMARY A COST-BENEFIT ANALYSIS OF HULL VANE APPLICATION ON MOTOR YACHTS K Uithof, MSc., Hull Vane b.v., Netherlands B Bouckaert, MSc., Hull Vane b.v., Netherlands P G van Oossanen, B.Eng., Van Oossanen

More information

STABILITY OF MULTIHULLS Author: Jean Sans

STABILITY OF MULTIHULLS Author: Jean Sans STABILITY OF MULTIHULLS Author: Jean Sans (Translation of a paper dated 10/05/2006 by Simon Forbes) Introduction: The capsize of Multihulls requires a more exhaustive analysis than monohulls, even those

More information

Wave Energy. ME922/927 Wave energy

Wave Energy. ME922/927 Wave energy Wave Energy ME922/927 Wave energy 1 Global ocean wave energy resource 102 48 38 15 15 24 50 97 32 49 19 18 25 33 92 70 38 19 17 21 50 12 38 34 14 40 43 78 20 41 18 10 37 72 84 48 Annual average in kw/m

More information

Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool

Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool Xiaobing Shi, American Global Maritime Torbjørn Hals, Kongsberg Maritime AS Suman Muddusetti, Shell Oct. 11, 2011

More information

Hydrodynamic Analysis of a Heavy Lift Vessel during Offshore Installation Operations

Hydrodynamic Analysis of a Heavy Lift Vessel during Offshore Installation Operations Presentation for Defense of Master Thesis Hydrodynamic Analysis of a Heavy Lift Vessel during Offshore Installation Operations Speaker: Bin Wang Supervisor: Prof. Robert Bronsart 23 rd Feb, 2015 Nantes

More information

Experience and Future Potential of the Oblique Icebreaker

Experience and Future Potential of the Oblique Icebreaker SHIP Design & Engineering CONSULTING & Project Development ICE MODEL & Full Scale Testing OFFSHORE Development Experience and Future Potential of the Oblique Icebreaker Mika Hovilainen Project Manager

More information

The vessel is fully compliant with the latest Special Purpose Ship Code, meets DNV class requirements and holds DP2 notation.

The vessel is fully compliant with the latest Special Purpose Ship Code, meets DNV class requirements and holds DP2 notation. Marine Engineering Diving Services Altus lnvictus Altus Invictus is a multipurpose vessel with inbuilt air diving capability. Built in Batam in 2011, Invictus has a maximum draft of just 5 meters, 65.5

More information

Application and Development of Multi-Hulls

Application and Development of Multi-Hulls April 20, 204 Application and Development of Multi-Hulls a) Balt Techno Prom, St.Petersburg, Russia Victor A. Dubrovsky, a,* *Corresponding author: multi-hulls@yandex.ru Paper History Received: 8-January-204

More information

...introducing Hull Vane

...introducing Hull Vane ...introducing Hull Vane Fuel saving devices for ships, sometimes called energy saving devices, are considered as something new, but some of them have been around for quite a while. Perhaps the most widespread

More information

Règlement pour la navigation pour la zone arctique. Alexey DUDAL Marine Division Bureau VERITAS

Règlement pour la navigation pour la zone arctique. Alexey DUDAL Marine Division Bureau VERITAS Règlement pour la navigation pour la zone arctique Alexey DUDAL Marine Division Bureau VERITAS 1 Contents 1. Introduction 2. BV Rules and Guidelines for Ice-Going Vessels 3. Direct Calculation Tool 4.

More information

A Novel Platform for Drilling in Harsh High-Latitude Environments.

A Novel Platform for Drilling in Harsh High-Latitude Environments. AADE-7-NTCE-73 A Novel Platform for Drilling in Harsh High-Latitude Environments. Brian Roberts, Technip; Chunqun Ji, Technip; Jim O Sullivan, Technip and Terje Eilertsen, Technip. Copyright 27, AADE This

More information

Proceedings of the International Conference on Emerging Trends in Engineering and Management (ICETEM14) 30-31,December, 2014, Ernakulam, India

Proceedings of the International Conference on Emerging Trends in Engineering and Management (ICETEM14) 30-31,December, 2014, Ernakulam, India INTERNATIONAL JOURNAL OF DESIGN AND MANUFACTURING TECHNOLOGY (IJDMT) Proceedings of the International Conference on Emerging Trends in Engineering and Management (ICETEM14) ISSN 0976 6995 (Print) ISSN

More information

Hydrostatics and Stability Dr. Hari V Warrior Department of Ocean Engineering and Naval Architecture Indian Institute of Technology, Kharagpur

Hydrostatics and Stability Dr. Hari V Warrior Department of Ocean Engineering and Naval Architecture Indian Institute of Technology, Kharagpur Hydrostatics and Stability Dr. Hari V Warrior Department of Ocean Engineering and Naval Architecture Indian Institute of Technology, Kharagpur Module No.# 01 Lecture No. # 01 Introduction Hello everybody.

More information

Performance of SSTH-70 after Delivery and Future of SSTH Masahiro Itabashi, Ryoji Michida Ishikawajima-Harima Heavy Industries Co.,Ltd.

Performance of SSTH-70 after Delivery and Future of SSTH Masahiro Itabashi, Ryoji Michida Ishikawajima-Harima Heavy Industries Co.,Ltd. Performance of SSTH-70 after Delivery and Future of SSTH Masahiro Itabashi, Ryoji Michida Ishikawajima-Harima Heavy Industries Co.,Ltd. ABSTRUCT The SSTH-70 Ocean Arrow designed under the concept of the

More information

THE PROJECT The Spark:

THE PROJECT The Spark: THE PROJECT The Spark: The SBS Sailing Booster System was developed by Manoel Chaves and his team in 2015 and after a long list of jobs it was presented to the public during the Annapolis USA Sailboat

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

Advanced Applications in Naval Architecture Beyond the Prescriptions in Class Society Rules

Advanced Applications in Naval Architecture Beyond the Prescriptions in Class Society Rules Advanced Applications in Naval Architecture Beyond the Prescriptions in Class Society Rules CAE Naval 2013, 13/06/2013 Sergio Mello Norman Neumann Advanced Applications in Naval Architecture Introduction

More information

OVERVIEW. Capabilities & Services

OVERVIEW. Capabilities & Services +1.713.467.0505 Sales@boamarine.com www.boamarine.com OVERVIEW Capabilities & Services BOA MARINE SERVICES provides engineering, construction and contracting services related to fi xed and fl oating offshore

More information

The Impact of Composites on Future Deepwater Riser Configurations

The Impact of Composites on Future Deepwater Riser Configurations The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater

More information

Part 1: General principles

Part 1: General principles Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 19030-1 First edition 2016-11-15 Ships and marine technology Measurement of changes in hull and propeller performance Part 1: General principles

More information

OMAE Large Marine Lifts in Shallow Water by Alan P. Crowle CB&I

OMAE Large Marine Lifts in Shallow Water by Alan P. Crowle CB&I Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands OMAE2011-49168 Large Marine Lifts in Shallow Water

More information

PSI France DESCRIPTION Mise à Jour : 02/09/02 SMAL202 Version : 0 Page 1 sur 9

PSI France DESCRIPTION Mise à Jour : 02/09/02 SMAL202 Version : 0 Page 1 sur 9 SMAL202 Version : 0 Page 1 sur 9 1. SUMMARY SPECIFICATIONS...2 2. PERSONNEL COMPARTMENT...3 3. BATTERY...4 4. 120V DISTRIBUTION...4 5. 24V DISTRIBUTION...5 6. THRUSTERS...5 7. PROJECTORS...5 8. AIR DISTRIBUTION...5

More information

OFFSHORE CRANES & ACCESS SYSTEMS

OFFSHORE CRANES & ACCESS SYSTEMS OFFSHORE CRANES & ACCESS SYSTEMS DEMANDING CONDITIONS EXCEPTIONAL SOLUTIONS EFFECTIVE TAILOR-MADE EQUIPMENT FOR ALL INSTALLATION TYPES 2 With over 300 offshore cranes and hoisting systems installed on

More information

PROJECT and MASTER THESES 2016/2017

PROJECT and MASTER THESES 2016/2017 PROJECT and MASTER THESES 2016/2017 Below you ll find proposed topics for project and master theses. Most of the proposed topics are just sketches. The detailed topics will be made in discussion between

More information

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER EXAMINATIONS ADMINISTERED BY THE SCOTTISH QUALIFICATIONS AUTHORITY ON BEHALF OF THE MARITIME AND COASTGUARD AGENCY STCW 95 CHIEF

More information

Dynamic analysis of offshore floating wind turbines

Dynamic analysis of offshore floating wind turbines Dynamic analysis of offshore floating wind turbines Hasan Bagbanci Centre for Marine Technology and Engineering (CENTEC), Instituto Superior Técnico Technical University of Lisbon, Lisboa, Portugal ABSTRACT:

More information

APPLICATION NOTE: MARINE APPLICATIONS Trim, Roll and Leeway.

APPLICATION NOTE: MARINE APPLICATIONS Trim, Roll and Leeway. APPLICATION NOTE: MARINE APPLICATIONS Trim, Roll and Leeway. An Alternative VBOX Application Examples of Trim Angle effects Traditionally, the VBOX has been used by automotive markets but the wealth of

More information

Introducing the new Farr 25 OD Built by OD Yachting

Introducing the new Farr 25 OD Built by OD Yachting Introducing the new Built by OD Yachting... e n g i n e e r e d f o r p e r f o r m a n c e w i t h s u p e r i o r h a n d l i n g Specs LOA LWL Beam Draft Displ Ballast 7.62 m 6.96 m 2.47 m 1.80 m 930

More information

Norway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations

Norway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations Norway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations Strategy and Support Leveraging Statoil s offshore oil and

More information

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7 Development of a New Deep-Water Riser System Daniel Karunakaran Subsea 7 Introduction Grouped SLOR TM is an open bundle riser solution developed by Subsea 7 and 2H Offshore Array of close standing SLOR

More information

THE PERFORMANCE OF PLANING HULLS IN TRANSITION SPEEDS

THE PERFORMANCE OF PLANING HULLS IN TRANSITION SPEEDS THE PERFORMANCE OF PLANING HULLS IN TRANSITION SPEEDS BY DOYOON KIM UNIVERSITY OF SOUTHAMPTON LIST OF CONTENTS AIM & OBJECTIVE HYDRODYNAMIC PHENOMENA OF PLANING HULLS TOWING TANK TEST RESULTS COMPUTATIONAL

More information

Offshore // Marine // Subsea Cable solutions that thrive under pressure

Offshore // Marine // Subsea Cable solutions that thrive under pressure Offshore // Marine // Subsea Cable solutions that thrive under pressure Underwater and pressure resistant cables and harnesses for your needs For over 40 years Habia Cable has developed and manufactured

More information

FUEL EFFICIENCY IN MODERN RESEARCH ICEBREAKER DESIGN. Martin Melzer

FUEL EFFICIENCY IN MODERN RESEARCH ICEBREAKER DESIGN. Martin Melzer FUEL EFFICIENCY IN MODERN RESEARCH ICEBREAKER DESIGN Martin Melzer Agenda Motivation and Introduction Fuel Efficiency in modern Cargo Ship Design About Research Icebreakers Striving for Fuel Efficiency

More information

1. Outline of the newly developed control technologies

1. Outline of the newly developed control technologies This paper describes a vertical lifting control and level luffing control design for newly developed, fully hydraulicdriven floating cranes. Unlike lattice boom crawler cranes for land use, the floating

More information

FMEA Proving Trials and Offloading Simulations

FMEA Proving Trials and Offloading Simulations FMEA Proving Trials and Offloading Simulations Lessons Learned Arjen Tjallema Bluewater Energy Services BV Douwe Stapersma Delft University of Technology Agenda p. 2 Introduction FPSO Munin Soliton Currents

More information

Application Research for DP Enhanced Notation

Application Research for DP Enhanced Notation Journal of Shipping and Ocean Engineering 7 (2017) 19-25 doi 10.17265/2159-5879/2017.01.003 D DAVID PUBLISHING HU Xiaolin Marine Design & Research Institute of China, Shanghai 200011, China Abstract: DP

More information

Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments

Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments By Dag Friis Christian Knapp Bob McGrath Ocean Engineering Research Centre MUN Engineering 1 Overview:

More information

A DECADE OF EXPERIENCE

A DECADE OF EXPERIENCE SEA INSTALLER Efficient and cost-effective A DECADE OF EXPERIENCE SEA INSTALLER reflects more DECK than a decade of experience in SEA INSTALLER's deck measures 3,350 m2 The deck is reinforced and can carry

More information