1 INTERNATIONAL SMALL CRAFT INDUSTRY CONSULTATION AND VALIDATION STUDY ISO/DIS Hull Construction Scantlings Part 9: Appendages and rig attachment. Validation against existing boats - (Fixed ballast FRP yachts ONLY) Supported by The European Boating Association International Sailing Federation Royal Yachting Association 27 March 2009

2 REPORT TITLE INTERNATIONAL SMALL CRAFT INDUSTRY CONSULTATION AND VALIDATION STUDY. ISO/DIS Hull Construction Scantlings Part 9: Appendages and rig attachment. Validation against existing boats. (Fixed ballast FRP yachts ONLY) SUMMARY This report describes the results of an industry consultation exercise conducted between October 2008 and March The objective was to obtain feedback and actual boat data for fixed keel, composite yachts and compare these against the current requirements of ISO/DIS Twelve companies were targeted and asked to supply input for two boats each, which would have yielded data for 24 boats. In the event 9 boats were received from five organisations. Additional discursive feedback was received from several companies. Further valuable feedback was obtained by the attendance by one company at a working group 18 meeting in November 2008 and by others at a number of meetings outside WG18 organised by the group s convenor. Given the data made available, the validation is considered suitable for spot-checking purposes. The plots of minimum compliance factors should be viewed collectively to give an overall impression of ISO/DIS requirements versus the diverse range of industry practices. Industry practice for keel design is expected to vary from use of pastexperience/rules of thumb, class rules (with or without class involvement) up to full finite element analysis using measured loads. Against this backdrop considerable variations are to be expected. Viewed overall, the scantling requirements of ISO/DIS seem to be reasonable and there is sufficient evidence to conclude that part 9 is ready for progression to FDIS as far as the fixed keel component is concerned. From previous experience with earlier parts of ISO-12215, progression to FDIS is usually followed by increased levels of interest from the industry and this is expected to be the case with part 9. DISTRIBUTION UNRESTRICTED ISSUE DATE 27 March 2009 AUTHOR: R Loscombe, CEng, FRINA. navalarchserv@ntlworld.com DISCLAIMER This report is for information only and is only to be used for ISO/DIS development purposes. The results may not be used to support or otherwise any existing keel configuration. ISO/DIS may not be referred to as an International Standard and this draft does not constitute an advanced draft under the meaning of RSG guidelines. Supporting organisations 1

3 1. BACKGROUND 1.1 ISO ISO is a nine part small craft scantling standard which has been under development since the early 1990 s. The standard is being developed by Working Group 18 (WG18) under the convener-ship of Gregoire Dolto of Fédération des Industries Nautiques (France). Parts 1-6 have been harmonized and may be referred to as International Standards. DIS and FDIS denote Draft and Final Draft international standard respectively, with DIS being a pre-fdis version. The FDIS version is the draft voted on by the national standards bodies concerned. Revisions after harmonization are generally at five yearly intervals unless a safety issue is identified in the interim period. 1.2 ISO/DIS Full title: Hull construction Scantlings Part 9: Sailing craft Appendages and rig attachment. Part 9 is currently at the DIS stage. The intention is to develop the FDIS by May 2009 for approval by WG18 at the 18 th June meeting in London. Part 9 covers keels and their attachment for keel boats and dinghies, dagger boards, chainplates, foundations, mast steps and other associated structure. The only items covered in this report are fixed ballast keels and their attachment. The Royal Yachting Association has supported the attendance of one of its staff at WG18 meetings since In addition, it has been their practice to use advanced drafts of for RCD scantling assessments, as permitted under RSG guidelines, as part of its role as a notified body. ISO/DIS has been used on an informative basis to complement other methods (where these exist). In this way, the requirements of the draft have already been compared with actual boat keel configurations and found to give good agreement for 12-18m production yachts. The current industry-wide validation therefore is only one in a series of ongoing validation exercises. Accident investigation reports have also been reviewed as these become available. 1.3 Industry consultation project This project commenced in the autumn of 2008 following the WG18 meeting in Berlin at which time the working group judged that the development process would benefit most from a targeted industry-level validation exercise. A number of key leaders in the field of fixed keel structures were identified and contacted. Of these, twelve indicated a willingness to assist either directly by contact with the report s author or as relayed indirectly by the convenor. Each was asked to identify only TWO boats as being representative of their range or of special interest to them. This was intended to give a good spread of types/sizes and minimise their time commitment. 2

4 Companies were supplied with a spreadsheet developed by WG18 at the end of November 2008 which was intended to reduce the labour involved. The workload was estimated to be no more than ½-1 day for the two boats, if the data was readily to hand. Due to external time pressures (see 1.4) a deadline notification for end of January 2009 was sent to companies at the end of 2008 and subsequently extended to the last quarter of February. A final effort to gathering in outstanding boats was made in March. In the event, data for nine boats were received by the deadline as follows: Finland (2), France (4), New Zealand (2) and UK (1). The quality/consistency of data often required some intuitive work-arounds by the author. This was done without compromising the integrity of the process, since one can only take so much of company s time. The data is considered to be of sufficient quantity and quality to render the validation study meaningful, given that only an overview is being sought here. Several companies provided general feedback in respect of canting keels, fatigue-based design and composite laminate requirement in way of keel bolts. Two companies were unable to assist since the spreadsheet did not cater for their keel types being tray or recessed types (see 1.5). Of course, it is understood that companies have to balance issues of client confidentiality, diversion of their staff from fee-earning work and the limited incentives for releasing their expertise into the public domain. On the other hand, there is no question at this stage of ISO being dropped so everybody needs to work together to make it as good as it can be. It seems likely given the importance of keel structures, that even those companies who did not supply data or reply in anyway will have taken a thorough look at the requirements and it may be presumed (perhaps optimistically) that they are reasonably content. 1.4 International Sailing Federation (ISAF) agenda Following a number of incidents with lost keels combined with the effective loss of the American Bureau of Shipping s plan review service some years ago, ISAF voted in November 2008 to institute a plan review for 0, 1 and 2 category boats. This is to be based on ISO and is due to commence in June This (together with the use of within the Volvo 70 rule) has swung the centre of gravity of the ISO scantling standard more towards all-out racing yachts away from production craft than would otherwise have been the case. The ISAF decision has also imposed a need for part 9 to be issued as a FDIS as soon as possible. 3

5 1.5 Part 9 limitations In developing part 9, WG18 have moved away from the part 5 approach whereby the design pressures given in this part of ISO are only (to be) used with the given equations. This is because the design loads in part 9 are more independent of the selected is the case with the pressures of part 5. The four key ballast keel load cases are: 90 degree knockdown (fixed keels) 70 degree maximum cant angle plus 40% overload factor (canting keels) Vertical force (up only) Longitudinal grounding (normal and enhanced resistance) The allowable stress factors are set at a level which should generally mean an explicit fatigue life assessment is not necessary, although an informative annex detailing one fatigue life prediction method is included. See discussion. Designers are free to use a range of alternative methods such as deflection-compatibility grillage theory, matrix-displacement or finite element methods. However, it would be an excessive burden if such more advanced methods were IMPOSED on all users of the standard. To counter this part 9 provides a series of strength of materials level beam theory based procedures. It is these which are implemented within the keel calculator spreadsheet. These methods are intended to be conservative and are limited in their scope. The part 9 annexes assume that the floors carry the transverse load. Version two of the spreadsheet (not supplied to companies in November 2008) includes an algorithm for distributing the grounding load between the floors and girders. This was derived from simple grillage analyses but is only applicable to one centreline or pair of closely spaced girder. Keels which fall outside the applicability of part 9 annexes: Recessed keels Multiple girder tray-moulding style keels Lifting keels, particularly keel boxes 4

6 There is no simple engineering method for analyzing these, leaving the choice between rules of thumb/experience (which puts these types outside the scope of ) or finite element analysis. It is not possible to develop simple methods for every configuration meaning there is no alternative, if the keel is to be engineered, but to apply suitable computational methods. At least part 9 provides loads and criteria. 2. RESULTS 2.1 Actual boats used in validation exercise All are category A, with lengths between 8 and 20 metres. Indicative hull lengths, full load displacement and ballast ratio and keel type are provided within this report. To further preserve confidentially, boats are labelled A to I and can only be identified by the originators. 2.2 Assessment conditions Of the nine boats supplied two used grillage-derived floor and girder moments/forces. This may well be representative of industry design practices. Where supplied, these grillage calculations (and other studies carried out by the author) indicate that the simplified annex isolated floor approach is only slightly conservative for transverse bending load cases and but excessively so for the longitudinal grounding case. Of course where no girders exist, the isolated floor assumption is likely to be less conservative (although the role of the rigid CL girder, aka the keel fin is another issue). For validation purposes, the spreadsheet provides an approximate equation for distributing the load between floors and girder(s) (for the grounding load case only). This equation was derived by matrix-displacement analysis of various floor/girder combinations varying end conditions and flexural rigidity ratios (approximately 80 configurations). 1 girder x 3 floors 2 girders x 3 floors 1 girder x 4 floors 2 girders x 4 floors K GFSR n G i1 n F j1 k k EF EF EI 3 L G EI 3 L F G F i j 5

7 Of course, this is only an approximation, showing the expected fair amount of scatter and the recommended approach is to model the grillage in 3-D so that loads may be applied directly to the keel rather than the grid (see figure on page 4). In practice, users will be able to submit their own estimate of the load share between floors and girders. Without a grillage analysis, this can only be intuitive and hence the equation-fit to the above data is considered to be a good intermediate approach between guesswork and rigorous 3-D analysis. It will be up to the working group to decide whether the load-share equation should be included within the standard. Two companies (of the five) supplied their own floor/girder offered capabilities (EI, ultimate moments in crown tension or compression and web shear force). In one case, the designer confirmed that these were based on the ABS Offshore Racing Yacht Guide equivalent thickness for sandwich plating which is considerably more generous than the ISO approach. In this validation, these have been replaced by ISO Evaluation level B mechanical properties, except in two cases where the designer supplied only final compliance table for one boat and no laminate schedules for the other. In this second case, the company values have been used. This combination of reasonably achievable mechanical properties and conservative isolated floor method are considered to provide a fair middle of the road comparison, neither too high-tech nor excessively conservative. This is the design/assessment approach which many production builders are expected to adopt as it involves the minimum level of deviation from the standard and no recourse to more advanced stress analysis methods. 2.3 Presentation of results Results are presented as MINIMUM compliance factors (ratio of offered value to ISO/DIS required value or limiting stress divided by actual stress). As capabilities are reduced by the limiting stress factor, a compliance factor of 1.0 indicates NOT that there is no margin of safety, but that the offered scantling JUST complies with the requirements of part 9 (which have a margin of safety factor built in). COMPLIANCE FACTOR = 1.0 (component JUST complies) COMPLIANCE FACTOR < 1.0 (component does not comply) COMPLIANCE FACTOR >> 1.0 (component easily complies) A histogram is provided for each boat for 9 critical items: Minimum CF for floors under knockdown moment (Load case 1 LC1) Minimum CF for floors under longitudinal grounding (normal) (Load case 4 LC4/I) Minimum CF for floors under longitudinal grounding (enhanced) (Load case 4 LC4/II) Minimum CF for girders under longitudinal grounding (normal) (Load case 4 LC4/I) Minimum CF for girders under longitudinal grounding (enhanced) (Load case 4 LC4/II) Minimum CF for keel bolts under knockdown moment (Load case 1 LC1) Minimum CF for keel bolts under longitudinal grounding (normal) (Load case 4 LC4/I) Minimum CF for keel bolts under longitudinal grounding (enhanced) (Load case 4 LC4/II) Minimum CF for the fin at root under knockdown moment (Load case 1 LC1) The vertical load case is rarely critical from this study and so results are not reported here. Keel flange and bulb-fin connections are also not reported as this information was not supplied in general by the companies. However, tentative calculations were made for fin-bulb connection using four horizontal bolts of the same diameter/material as the keel bolts, located 6

8 equidistance along the tip chord and in most cases this gave compliance factors marginally greater than one under bulb deceleration loads in grounding. As these are minimums it should be recognised that other components are likely to have higher CF s. In a real RCD assessment for example, it may only be necessary to introduce localised reinforcement in order to produce a fully compliant boat. The laminate in way of the keel has been reputedly an issue in a number of keel loss incidents. It is also one of the most difficult areas to rigorously analyse, at least within the zero R&D budget available to WG18. It is considered to be too important an area to neglect and yet it is an area in which it seems classification societies prefer to work on a case by case basis rather than provide extensive design equations. WG18 s preferred approach is to provide indicative values within the Annexes. These should be taken as indicative of reasonable practice and the intention is to flag this up as an important issue for designers. However, it is NOT intended that these should be interpreted as cast-in-stone figures. As there are numerous criteria (backing plate diameter and thickness, hull thickness, lapping tray requirements, location of bolt with respect to floor/girder webs and load case, bolt force), a compliance map is provided whereby red means non-compliance, green compliance. This provides an at a glance indication as to the extent to which the structure complies. The map assumes that the same backing plate/laminate/tray configuration is applied for all bolts. This of course need not be the case and many red areas may simply require local reinforcement. There is also some uncertainty about the integrity of the supplied data in this area. THE RESULTS FOR THE NINE BOATS ARE GIVEN IN APPENDIX I. No attempt is made to drill down into particular areas of non-compliance. This is only worth doing is there is 100% confidence in the supplied data and this is not the case. In reality, the only way to do this is to supply plans and material test data reports. 3. DISCUSSION POINTS Please note; the opinions expressed here are those of the author and do not necessarily represent the views of working group 18. This section is included to provide some wider perspective than merely reporting the validation results. Comments from readers are welcomed, especially if this comes in the form of validated equations or solid data. 3.1 What constitutes a good result It will be noted that there are areas of non-compliance amongst the nine boats. This is to be expected and is not wholly unwelcome (in the author s opinion only) for the following reasons: 1. It must be recognised that keel attachment is too important for the standard to be seen as a rock-bottom minimum. A bit of healthy conservatism is seen as the responsible course of action. The risk of users designing down to a minimum standard should not be ignored, a particular concern if design by experience is replaced by handle-turning of the Annex/spreadsheet-level method. As experience is gained with the standard (see conclusions) it may be possible to adjust the requirements on the basis of well documented case studies, but this should not be done on the basis of a nine boat study. 7

9 2. The validation uses the annex methods of part 9. There is some evidence gleaned during development of the standard and in discussions with companies that these methods are conservative in comparison with 2-D and 3-D numerical methods. There should be some incentive for designers to use more theoretically sound procedures and it believed that many structural specialists will welcome the edge this flexibility provides. 3.2 A suggestion as to how part 9 should be used This last point is seen as critical. Keel grids are complex structures. The components do not behave as isolated beams. ISO/DIS recognises this by permitting more rigorous stress analysis methods. Stress distributions around keel bolts/backing plates are complex and cannot be accurately represented by simple equations of the sort contained in part 9 annexes. The part 9 annexes (as implemented within the validation spreadsheet) cannot assess recessed keels, keel boxes, canting keel wet compartment bulkheads or complex grillage configurations. What the annexes aim to do is to supply a simple, inexpensive not excessively conservative assessment tool for assessing the vast majority of conventional fixed ballast supported principally by floors with one or two tie-ing girders close to the centreline. ISO/DIS = Simple holistic (and conservative) procedures for production boatbuilders + Loads + criteria + guidance on advanced engineering methods for structural specialists It must be recognised that the standard, even if eventually harmonised, should not be regarded as the only way. A tick-box compliance mindset must be avoided at all costs and assessment bodies, such as notified bodies assessing for RCD compliance or ISAF approved notified bodies must possess the engineering competence to review designers/builders alternative methods when these are presented. While ISO/DIS should be seen as an assessment load-criteria based method, allowing some flexibility in the stress analysis methods for those that want it, this does not relieve designers of their responsibility to work within ISO in terms of grid properties, e.g. evaluation levels and effective plating. 3.3 Background to the stress factor (agreed by WG18) The stress factor is currently set at about 1/3 rd of ultimate for metals, wood and composite. It has been set at this level to effectively reduce the need for an explicit fatigue life prediction. Guidance for this is currently provided within the standard, but it is a difficult calculation since it requires a lifetime stress range v number of stress cycles history. By setting the stress level at a low level for infrequently occurring load cases, fatigue life becomes less of an issue. This is not necessarily the case for very high strength steels or where the structural configuration contains significant local stress-raisers. Again, just ticking the part 9 boxes may not be enough for all keel configurations. 3.4 Background to the load cases (under consideration by WG18) The load cases have been exhaustively checked against current classification society practice and design methods (where these were divulged). The transverse bending load cases (90 degree knockdown -fixed, maximum cant angle plus 40% dynamic overload factor -canting) are considered to be well grounding in existing methods and real load cases. 8

10 The most contentious load case is the fore and aft grounding (load case 4). This has been part of the ABS ORY guide for 20 years, albeit subject to various interpretations/amendments over that period. The current F 4 formula has been extensively checked against other methods, but this is still highly non-scientific. F 4-ENHANCED = 0,8 g m LDC (L WL /10) 1/2 N (with FRP stress factor of 0,33) Using ABS at L WL = 20m, (assuming 35% ballast ratio) and stress factor = 0,5, would yield a coefficient of 1,95 x 0,33/0,5 /1.414 = 0,91 Using DNV Large yacht rule, (assuming 35% ballast ratio) and stress factor = 0,5, would yield a coefficient 1,495 x 0,33/0,5 /1.414 = 0,7 It is not possible to relate the speed directly to grounding force and in any case this would be meaningless as a low speed impact on rock may be more damaging than a high speed impact on mud. The mechanics of impact of yachts with containers, berg-bits or whales defies simple analysis. Solid mechanics would need to be factored in - quite inappropriate for a simple standard. This is a crude deterministic approach to a probabilistic load case and should be treated with caution. Notwithstanding this, to give a feel only for the effective decelerating force (applied at the centre of gravity) implied by 0,8g (10m boat) or 1.1g (20m boat), assuming a constant impulse approach, a boat travelling at the hull speed would stop in about 0.5 second (translation only). The load applied at the keel would cause a bow down attitude of (very roughly) 0.5m at the bow. This all seems to constitute a pretty severe load case. Please note again very rough figures. It emerged from the validation that some boats, particularly those with no girders had little hope of complying with this load case, without substantial local reinforcement. It is important to recognise differences between the risk/consequences of impact loads on ocean racing boats with those of typical recreational craft. Hence, it was felt sensible to have a dual grounding load case approach; NORMAL and ENHANCED. Designers/builders could opt for either. A category A or B yacht need not necessarily be designed to impact Type II. It is for the designer or builder to decide. Type II may be applicable to ocean-going racing yachts in collision with floating objects, ice flows or marine creatures. For other category A or B craft (while designed to the appropriate requirements in all other respects) such a load case may not be appropriate. Whatever type is selected, the following note shall be included in the owner s manual to the effect: This boat has been designed to a Impact Type [I] [II] (delete as necessary) grounding scenario as defined in ISO , where the craft is expected to be operating at [low] [high] speed prior to the impact (delete as necessary). While compliance does not guarantee that the boat will suffer no damage in such a grounding, the resistance of a boat designed to Type II is normally expected to be substantially greater than that designed to Type I. The NORMAL grounding deceleration is subject to discussion and the validation study has been informative in that respect. The current formulation is: F 4-NORMAL = 0,3 g m LDC N (as of beginning March 2009) 9

11 Note: another version F 4-NORMAL = 0,4 g m LDC (L WL /10) 1/2 has been recently proposed 10-March 2009, meaning the normal load case 4 value is 50% of the enhanced value. Results are presented for the first formulation. For the alternative simply multiply LC4/II compliance factors by two to obtain CF s for this version. Again no speed can be associated with this factor, but using the same grossly simplified logic as above, the speed is of the order of 3-4 knots. This is considered to be typical of operating speeds in shallow waters, where skippers, aware of the danger of grounding, proceed with caution. Grounding at this speed might lead to very minor injuries but should not it might reasonably be argued result in any hull damage. This then seems a reasonable minimum standard which the boating public might expect all boats to be designed to. Of course there will always be cases where groundings result in damage and no doubt ISO will be cited by various parties. This is perhaps why an explicit speed-load relationship would be dangerous as well as scientifically invalid. This is not a reason for avoiding building in of some measure of collision resistance. 3.5 Other issues Centre of rotation under load case 4 (refer to draft standard, annex B for details) This discussion is relevant to load case 4 only. The draft uses a centre of rotation (CoR) based on the relative stiffness of the floors, ignoring the girders and the thorny issue of how to treat the rigid keel root/flange. The method works well when CoR is located reasonably centrally with respect to the floor positions. It even works well when the configuration includes a grounding floor located near the trailing edge of the keel. However it does have a problem if the after floors are fairly similar but the most forward floor incorporates the stiff mast step. This rigid forward member attracts the CoR meaning that few bolts are forward of the rotation point (bolts are assumed to be effective in tension only). It would seem logical that the keel kick-up is taken by bearing on the shell aft of the CoR and the load is apportioned accordingly. Nevertheless this approach can lead to very low compliance factors on the forward (few) bolts. Ideally the standard should not drive design, but the provision of a stiff after (grounding) floor does seem intuitively correct. If this feature is employed then whether the mast step is there or not, the CoR is located near the bolt group longitudinal centroid (or aft which is even more advantageous) and there then do not appear to be any problems with keel bolts in the forward zone failing to comply Effective plating There are three general approaches to the effective breadth of attached sandwich plating: 1. ABS guides t based, using equivalent EI (i.e. strictly an effective width, post buckling phenomenon). 2. LR/ISO t based, using 20 (t o + t i ) (i.e. strictly an effective width, post buckling phenomenon). 3. DNV HSLCNSC rules b eff based on flange elastic and shear moduli, distance between point of zero bending moment AND only the inner skin is considered to be effective (shear lag based phenomenon) Using author s best interpretation of the published rules, for a typical floor configuration (550 x 1500) for which LR/ISO would yield 517mm width, ABS would yield 480mm and DNV 78 or 10

12 183mm (fixed or simply supported). For the same configuration but with 2400 gsm outer, 1680 inner and 30mm core, LR/ISO would yield 250mm, the DNV figure would be unchanged BUT would only consider the inner skin and ABS would yield 597mm (although capped by the floor spacing for this example). Reality is probably covered (one hopes) by this massive spread. Nevertheless it does seem rather odd that designers should be spending design time deciding on suitable stiffener pads (typically 3 or 4 plies of CU mm wide) to lower the neutral axis, when the effective plating is still so crudely defined. There are two issues here; firstly to flag up for the benefit of companies using the ABS approach sandwich panel effective breadth, that a notified body proceeding under ISO might have a major problem accepting such grid properties. Secondly, given that the above rule formulations are still current, isn t it about time that this issue was resolved given that a few finite element analyses should allow a common formulation to be devised, if indeed this has not been already been done? 4. CONCLUSIONS The validation study shows reasonable support for the current level of design loads and criteria employed in ISO/DIS , although it may be more correct to say that the validation has not throw up any issues which require a fundamental rethink. Some components appear to easily comply with the requirements of the draft standard whereas others struggle. This is not a surprise as in some cases, floors depths for example will be stiffness driven (not within scope of draft) or determined by cabin sole position. Grillage analysis may resolve many of these. The majority of components examined comply with the requirements of the draft standard even using the Annex methods which are considered to be conservative Non-compliances are not considered to be excessive unless the enhanced grounding case is selected, especially if no longitudinal girder is fitted (boat E). Changing boundary conditions may produce significant different results at floor ends and if some local reinforcement IS required, this is not considered to be a disaster for the builder. Given the problems encountered in obtaining reliable data, further validation studies should involve direct access to engineering drawings. Given the commercial sensitivity of such information, this is considered unlikely to happen and so further validation should be carried out by notified bodies as part of their normal structural assessment work. This information must remain confidential to the notified body but with numerous NB staff working on WG18, general trends will be informative. The problem of engaging industry encountered during the validation of part 5 continues, often for perfectly reasonable and well understood reasons. It is encouraging that despite the initial cries of despair, part 5 seems to be increasingly used with few problems, apart from a couple of known issues. It may well be that part 9 will follow the same path. In one respect their paths will be identical; ISO will not feature on industry s radar UNTIL it is at least at the FDIS stage (maybe not until harmonisation). In one respect, this validation has been invaluable in raising awareness, such that WG18 is likely to receive some further feedback between June 2009 (hopefully FDIS launch) and say November 2009 when all the typo s/tweaks have to be done. In this respect the adoption of part 9 as an approved (but not exclusive) method by ISAF would do much to facilitate this. 11

13 This page intentionally left blank 12

14 APPENDIX I

15 14

16 15

17 16

18 17

19 18

20 19

21 20

22 21

MSC Guidelines for Review of Rigging Systems for Sailing Vessels

MSC Guidelines for Review of Rigging Systems for Sailing Vessels S. E. HEMANN, CDR, Chief, Hull Division Table of Contents References... 1 Contact Information... 2 Applicability... 2 General Guidance... 2 Methodology... 3 Stability and Rigging System... 3 Hull Structure

More information

RULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS

RULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS RULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS 1995 Publications P (Additional Rule Requirements), issued by Polski Rejestr Statków, complete

More information

ISO INTERNATIONAL STANDARD. Small craft Hull construction and scantlings Part 9: Sailing craft appendages

ISO INTERNATIONAL STANDARD. Small craft Hull construction and scantlings Part 9: Sailing craft appendages INTERNATIONAL STANDARD ISO 12215-9 First edition 2012-06-15 Small craft Hull construction and scantlings Part 9: Sailing craft appendages Petits navires Construction de la coque et échantillonnage Partie

More information

ISO INTERNATIONAL STANDARD. Small craft Hull construction and scantlings Part 8: Rudders

ISO INTERNATIONAL STANDARD. Small craft Hull construction and scantlings Part 8: Rudders INTERNATIONAL STANDARD ISO 12215-8 First edition 2009-05-15 Small craft Hull construction and scantlings Part 8: Rudders Petits navires Construction de coques et échantillonnage Partie 8: Gouvernails Reference

More information

IMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea

IMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 48th session Agenda item 6 DE 48/6/1 17 November 2004 Original: ENGLISH ANCHORING, MOORING AND TOWING EQUIPMENT Shipboard

More information

STABILITY OF MULTIHULLS Author: Jean Sans

STABILITY OF MULTIHULLS Author: Jean Sans STABILITY OF MULTIHULLS Author: Jean Sans (Translation of a paper dated 10/05/2006 by Simon Forbes) Introduction: The capsize of Multihulls requires a more exhaustive analysis than monohulls, even those

More information

Guide for Assessing Hull-Girder Residual Strength for Tankers. July 1995

Guide for Assessing Hull-Girder Residual Strength for Tankers. July 1995 AMERICAN BUREAU OF SHIPPING 8, AFFILIATED COMPANIES Guide for Assessing Hull-Girder Residual Strength for Tankers July 1995 American Bureau of Shipping Incorporated by the Legislature of the State of New

More information

photos by JURIJ KORENC production STUDIO 37

photos by JURIJ KORENC production STUDIO 37 photos by JURIJ KORENC production STUDIO 37 www.studio37.si Elan Marine d.o.o. Begunje 1, SI-4275, Begunje na Gorenjskem, Slovenia Phone: +386 4 535 13 70, Fax: +386 4 535 13 60 E-mail: elan.marine@elan.si

More information

Special Considerations for Structural design and Fabrication for. tankers or similar vessels with Large Size (150m or more in length) in.

Special Considerations for Structural design and Fabrication for. tankers or similar vessels with Large Size (150m or more in length) in. Special Considerations for Structural design and Fabrication for tankers or similar vessels with Large Size (150m or more in length) in polar waters He. Guangwei Guangwei_ho@chinagsi.com Mai. Rongzhi MRZ@chinagsi.com

More information

WATER-FREE IOM MEASUREMENT IOMICA, 2005 March 4

WATER-FREE IOM MEASUREMENT IOMICA, 2005 March 4 WATER-FREE IOM MEASUREMENT IOMICA, 2005 March 4 The IOM has grown to become the most broadly accepted radio sailing class worldwide. To a large degree that success can be attributed to a strong set of

More information

This lesson will be confined to the special case of ships at rest in still water. Questions of motions resulting from waves are not considered at

This lesson will be confined to the special case of ships at rest in still water. Questions of motions resulting from waves are not considered at STATIC STABILITY When we say a boat is stable we mean it will (a) float upright when at rest in still water and (b) return to its initial upright position if given a slight, temporary deflection to either

More information

Sea-going vessel versus wind turbine

Sea-going vessel versus wind turbine Collision risk at high sea Sea-going vessel versus wind turbine Offshore wind power: Wind turbines off the German coast generally represent obstacles in the traffic routes of ships. What if a large sea-going

More information

MSC Guidelines for Review of Gas Carrier/Barge Structures

MSC Guidelines for Review of Gas Carrier/Barge Structures R. J. LECHNER, CDR, Tank Vessel and Offshore Division Purpose To establish a process for requesting structural plan review approval for a gas carriers/independent pressure tank barges regulated under 46

More information

PRESS PACK n. 1 January 2010

PRESS PACK n. 1 January 2010 PRESS PACK n. 1 January 2010 The KIWI 40FC the birth of an iconic yacht In 2004 the first of a new breed of 40 foot yachts was launched in France. Fast and capable offshore, it could be raced hard or cruised

More information

Structural design and loads on large yachts

Structural design and loads on large yachts Structural design and loads on large yachts Frans Verbaas and Tjepko van der Werff Senior Surveyors to Lloyd s Register Paper presented for the 17 th International Hiswa Symposium on Yacht Design and Yacht

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Buoyancy and strength of existing bulk carriers in flooded conditions J. Jankowski, M. Bogdaniuk, T. Dobrosielski Polski Rejestr Statkow, Gdansk, Poland Email: tk@prs.gda.pl Abstract Bulk carriers have

More information

MEASUREMENT OF ACCELERATIONS AND KEEL LOADS ON CANTING KEEL RACE YACHTS

MEASUREMENT OF ACCELERATIONS AND KEEL LOADS ON CANTING KEEL RACE YACHTS MEASUREMENT OF ACCELERATIONS AND KEEL LOADS ON CANTING KEEL RACE YACHTS M. Hobbs, SP*, UK P. Manganelli, SP*, UK * SP is the marine business of Gurit SUMMARY Canting keel boats can offer a significant

More information

Hatch cover securing and tightness

Hatch cover securing and tightness (1986) (Rev 1 1996) (Corr.1 June 2000) (Rev.2 July 2005) (Corr.1 Oct 2005) Hatch cover securing and tightness 1. Application 1.1 The following recommendations apply to steel hatch covers that are fitted

More information

The Use of BS 5400: Part 10: Code of Practice for Fatigue

The Use of BS 5400: Part 10: Code of Practice for Fatigue THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT Amendment No. 1, dated November 1983 THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND The Use of

More information

Marine Construction & Welding Prof. Dr. N. R. Mandal Department of Ocean Engineering & Naval Architecture Indian Institute of Technology, Kharagpur

Marine Construction & Welding Prof. Dr. N. R. Mandal Department of Ocean Engineering & Naval Architecture Indian Institute of Technology, Kharagpur Marine Construction & Welding Prof. Dr. N. R. Mandal Department of Ocean Engineering & Naval Architecture Indian Institute of Technology, Kharagpur Lecture No # 10 Fore & Aft End Construction (Refer Slide

More information

Analysis of Shear Lag in Steel Angle Connectors

Analysis of Shear Lag in Steel Angle Connectors University of New Hampshire University of New Hampshire Scholars' Repository Honors Theses and Capstones Student Scholarship Spring 2013 Analysis of Shear Lag in Steel Angle Connectors Benjamin Sawyer

More information

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys (Feb 2010) PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys Contents 1 Introduction 2 Preparations for Survey 2.1 General 2.2 Conditions for survey 2.3 Access to structures 2.4 Survey

More information

INDEX PART I REQUIREMENTS AND LIMITATIONS. Section A Conditions for Racing. A.1 General A.2 Crew / Helmsman A.3 Personal Equipment...

INDEX PART I REQUIREMENTS AND LIMITATIONS. Section A Conditions for Racing. A.1 General A.2 Crew / Helmsman A.3 Personal Equipment... INDEX PART I REQUIREMENTS AND LIMITATIONS Section A Conditions for Racing A.1 General... 3 A.2 Crew / Helmsman... 4 A.3 Personal Equipment... 7 A.4 Portable Equipment... 7 A.5 Rig... 7 A.6 Sails... 7 A.7

More information

Development of TEU Type Mega Container Carrier

Development of TEU Type Mega Container Carrier Development of 8 700 TEU Type Mega Container Carrier SAKAGUCHI Katsunori : P. E. Jp, Manager, Ship & Offshore Basic Design Department, IHI Marine United Inc. TOYODA Masanobu : P. E, Jp, Ship & Offshore

More information

Volvo Open 70 Measurement Group. Guide to. Ashore Measurement

Volvo Open 70 Measurement Group. Guide to. Ashore Measurement Volvo Open 70 Measurement Group Guide to Ashore Measurement Revision: Document Number: Status: C Comment Date: 28/07/11 Copyright 2011. This document, including the conceptual content thereof and any specifications

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2010

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2010 Effect of geometric dimensions on the transmission coefficient of floating breakwaters Mohammad Hosein Tadayon, Khosro Bargi 2, Hesam Sharifian, S. Reza Hoseini - Ph.D student, Department of Civil Engineering,

More information

Scissor Mechanisms. Figure 1 Torero Cabin Service Truck. Scissor Mechanism was chassis mounted and lifted the cabin to service aircraft

Scissor Mechanisms. Figure 1 Torero Cabin Service Truck. Scissor Mechanism was chassis mounted and lifted the cabin to service aircraft Scissor Mechanisms Scissor mechanisms are very common for lifting and stabilizing platforms. A variety of manlifts, service platforms and cargo lifts utilize this visually simple but structurally complex

More information

O K D I A MEASUREMENT FORM INTERNATIONAL OK DINGHY CLASS

O K D I A MEASUREMENT FORM INTERNATIONAL OK DINGHY CLASS O K D I A 2010 MEASUREMENT FORM INTERNATIONAL OK DINGHY CLASS NOTES GENERAL 1. The builder shall pay the current building fee to the National OK Dinghy Association which shall issue a building fee receipt

More information

Volvo Open 70 Measurement Group. Guide to. Rig in Boat Measurement

Volvo Open 70 Measurement Group. Guide to. Rig in Boat Measurement Volvo Open 70 Measurement Group Guide to Rig in Boat Measurement Revision: Document Number: Status: C Comment : 11/11/10 Copyright 2010. This document, including the conceptual content thereof and any

More information

Study to Establish Relations for the Relative Strength of API 650 Cone Roof Roof-to-Shell and Shell-to- Bottom Joints

Study to Establish Relations for the Relative Strength of API 650 Cone Roof Roof-to-Shell and Shell-to- Bottom Joints Thunderhead Engineering Consultants I N C O R P O R A T E D 1006 Poyntz Ave. Manhattan, KS 66502-5459 785-770-8511 www. thunderheadeng.com Study to Establish Relations for the Relative Strength of API

More information

Seadog One Design Rules DRAFT

Seadog One Design Rules DRAFT Seadog One Design Rules DRAFT Wickford Frostbite Fleet #166 Sachems Head Frostbite Fleet 1. Seadog One Design Rules 1.1 Mission and Purpose Racing shall be strictly one design in intent and the following

More information

IMO REVISION OF THE INTACT STABILITY CODE. Proposal of methodology of direct assessment for stability under dead ship condition. Submitted by Japan

IMO REVISION OF THE INTACT STABILITY CODE. Proposal of methodology of direct assessment for stability under dead ship condition. Submitted by Japan INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON STABILITY AND LOAD LINES AND ON FISHING VESSELS SAFETY 49th session Agenda item 5 SLF 49/5/5 19 May 2006 Original: ENGLISH REVISION OF THE INTACT

More information

photos by JURIJ KORENC production STUDIO 37

photos by JURIJ KORENC production STUDIO 37 photos by JURIJ KORENC production STUDIO 37 www.studio37.si Elan Marine d.o.o. Begunje 1, SI-4275, Begunje na Gorenjskem, Slovenia Phone: +386 4 535 13 70, Fax: +386 4 535 13 60 E-mail: elan.marine@elan.si

More information

ISAF In-House Certification

ISAF In-House Certification ISAF In-House Certification IOM Sail Training Syllabus The ISAF has developed 3 IOM training syllabus and courses as follows:- Sail Rig Hull and Appendage This paper details the syllabus for Sail training

More information

IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view?

IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view? IACS URS11 defines the dimensioning wave load for ship design, but what does it mean from a statistical point of view? Seamocs meeting in Malta Gaute Storhaug, DNV Maritime 19th of March 2009 Overview

More information

AUSTRALIAN ARROW AND ARAFURA CADET ASSOCIATION ARROW CATAMARAN RESTRICTIONS AND MEASUREMENT CERTIFICATE

AUSTRALIAN ARROW AND ARAFURA CADET ASSOCIATION ARROW CATAMARAN RESTRICTIONS AND MEASUREMENT CERTIFICATE AUSTRALIAN ARROW AND ARAFURA CADET ASSOCIATION ARROW CATAMARAN RESTRICTIONS AND MEASUREMENT CERTIFICATE 1 NOTE: The object of these restrictions is to provide uniform specifications and restrictions for

More information

When Is Wind Speed Excessive for the Safe Display of Fireworks?

When Is Wind Speed Excessive for the Safe Display of Fireworks? An earlier version appeared in Fireworks Business, No. 248, 2004. When Is Wind Speed Excessive for the Safe Display of Fireworks? K. L. and B. J. Kosanke While working on the 2006 edition of NFPA- 1123

More information

PREDICTING THE ABILITY OF SURVIVAL AFTER DAMAGE IN TANKERS. José Poblet Martínez - SENER, (Spain) José Javier Díaz Yraola - SENER, (Spain)

PREDICTING THE ABILITY OF SURVIVAL AFTER DAMAGE IN TANKERS. José Poblet Martínez - SENER, (Spain) José Javier Díaz Yraola - SENER, (Spain) 8 th International Conference on 477 PREDICTING THE ABILITY OF SURVIVAL AFTER DAMAGE IN TANKERS Abstract José Poblet Martínez - SENER, (Spain) José Javier Díaz Yraola - SENER, (Spain) To meet the demand

More information

Residual Strength of Damaged Ship Hull

Residual Strength of Damaged Ship Hull Residual Strength of Damaged Ship Hull Ge Wang, Yongjun Chen, Hanqing Zhang and Yung Shin Research Department, American Bureau of Shipping 1 ABSTRACT Hull-girder residual strength after grounding was investigated

More information

Dry Measuring of International One Metres

Dry Measuring of International One Metres Dry Measuring of International One Metres When a new IOM is to be measured for its certificate the owner faces, what in effect is a two-step process. Having passed the fundamental measurement and clutching

More information

PUBLISHED PROJECT REPORT PPR850. Optimisation of water flow depth for SCRIM. S Brittain, P Sanders and H Viner

PUBLISHED PROJECT REPORT PPR850. Optimisation of water flow depth for SCRIM. S Brittain, P Sanders and H Viner PUBLISHED PROJECT REPORT PPR850 Optimisation of water flow depth for SCRIM S Brittain, P Sanders and H Viner Report details Report prepared for: Project/customer reference: Copyright: Highways England,

More information

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 5 Hull girder strength. Edition October 2015 DNV GL AS

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 5 Hull girder strength. Edition October 2015 DNV GL AS RULES FOR CLASSIFICATION Ships Edition October 2015 Part 3 Hull Chapter 5 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that

More information

Kiefner & Associates, Inc.

Kiefner & Associates, Inc. Kiefner & Associates, Inc. KAPA FAQs What does KAPA stand for? KAPA is an acronym for Kiefner & Associates Pipe Assessment. What does KAPA do? KAPA calculates an estimated failure pressure of a pipe affected

More information

AMENDMENTS NO. 2/2012 to

AMENDMENTS NO. 2/2012 to RULES AMENDMENTS NO. 2/2012 to PUBLICATION NO. 84/P REQUIREMENTS CONCERNING THE CONSTRUCTION AND STRENGTH OF THE HULL AND HULL EQUIPMENT OF SEA-GOING BULK CARRIERS OF 90 M IN LENGTH AND ABOVE 2009 GDAŃSK

More information

Arcona 430 European Yacht of the Year 2009

Arcona 430 European Yacht of the Year 2009 Arcona 430 European Yacht of the Year 2009 Statement of the jury: She s a beauty, the Arcona 430 from Sweden. But not only that. This stylish and elegant performance cruiser, drawn by Stefan Qviberg, can

More information

Introducing the new Farr 25 OD Built by OD Yachting

Introducing the new Farr 25 OD Built by OD Yachting Introducing the new Built by OD Yachting... e n g i n e e r e d f o r p e r f o r m a n c e w i t h s u p e r i o r h a n d l i n g Specs LOA LWL Beam Draft Displ Ballast 7.62 m 6.96 m 2.47 m 1.80 m 930

More information

The salient features of the 27m Ocean Shuttle Catamaran Hull Designs

The salient features of the 27m Ocean Shuttle Catamaran Hull Designs The salient features of the 27m Ocean Shuttle Catamaran Hull Designs The hull form is a semi-planing type catamaran. It employs a combination of symmetrical and asymmetrical sponson shapes, thereby combining

More information

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Includes Basic ship Terminologies and Investigation Check list Index 1. Ship Terminology 03 2. Motions of a Floating Body...09 3. Ship Stability.10 4. Free

More information

REQUIREMENTS FOR VALIDATION OF MATHEMATICAL MODELS IN SAFETY CASES

REQUIREMENTS FOR VALIDATION OF MATHEMATICAL MODELS IN SAFETY CASES REQUIREMENTS FOR VALIDATION OF MATHEMATICAL MODELS IN SAFETY CASES R F Evans Principal Specialist Inspector, Health & Safety Executive Offshore Safety Division, Bootle Merseyside. The Offshore Installations

More information

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators

Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators Second International Symposium on Marine Propulsors smp 11, Hamburg, Germany, June 2011 Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the

More information

The USA Canterbury J. Class Rules

The USA Canterbury J. Class Rules Canterbury J Class Owners Association The USA Canterbury J Class Rules 2010 As Accepted 2008 and Revised February 2010 Published March 2010 The Canterbury J Class Rules ~ 2008 Page 1 of 10 THE CANTERBURY

More information

Offside. Judging Involvement in Play Ohio South Module A On-Line Intermediate Referee Recertification Training

Offside. Judging Involvement in Play Ohio South Module A On-Line Intermediate Referee Recertification Training Offside Judging Involvement in Play 2014 Ohio South Module A On-Line Intermediate Referee Recertification Training CJK 1999 World Cup Offside Scenario 2014 Mod A.ppt OFFSIDE VIDEO The following video is

More information

ITTC Recommended Procedures and Guidelines

ITTC Recommended Procedures and Guidelines Page 1 of 6 Table of Contents 1. PURPOSE...2 2. PARAMETERS...2 2.1 General Considerations...2 3 DESCRIPTION OF PROCEDURE...2 3.1 Model Design and Construction...2 3.2 Measurements...3 3.5 Execution of

More information

ABS TECHNICAL PAPERS 2005

ABS TECHNICAL PAPERS 2005 OTC 17535 Structural Reliability Applications in Risk-Based Inspection Plans and Their Sensitivities to Different Environmental Conditions A. P. Ku and R. E. Spong, Energo Engineering; C. Serratella, ABS

More information

RESOLUTION MSC.141(76) (adopted on 5 December 2002) REVISED MODEL TEST METHOD UNDER RESOLUTION 14 OF THE 1995 SOLAS CONFERENCE

RESOLUTION MSC.141(76) (adopted on 5 December 2002) REVISED MODEL TEST METHOD UNDER RESOLUTION 14 OF THE 1995 SOLAS CONFERENCE MSC 76/23/Add.1 RESOLUTION MSC.141(76) THE MARITIME SAFETY COMMITTEE, RECALLING Article 38(c) of the Convention on the International Maritime Organization concerning the functions of the Committee, RECALLING

More information

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT ASSET INTEGRITY INTELLIGENCE CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT JAMES R. WIDRIG, Manager Advanced Engineering at Quest Integrity Group VOLUME 23, ISSUE 6 NOVEMBER DECEMBER

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Page 1 of 8 Compiled by Chief Examiner Approved by Qualifications Committee: 27 September 2013 OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Page 2 of 8 KNOWLEDGE, UNDERSTANDING

More information

Aberdeen Significant Error Review ITE Independent Report. Eur Ing Keith Vugler CEng FInstMC

Aberdeen Significant Error Review ITE Independent Report. Eur Ing Keith Vugler CEng FInstMC 1 Aberdeen Significant Error Review ITE Independent Report 331 Eur Ing Keith Vugler CEng FInstMC 2 Previous Presentation Summary My previous presentation (16 th July 2012) provided; an introduction to

More information

RESOLUTION MSC.137(76) (adopted on 4 December 2002) STANDARDS FOR SHIP MANOEUVRABILITY

RESOLUTION MSC.137(76) (adopted on 4 December 2002) STANDARDS FOR SHIP MANOEUVRABILITY MSC 76/23/Add.1 RESOLUTION MSC.137(76) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, RECALLING

More information

for Naval Aircraft Operations

for Naval Aircraft Operations Seakeeping Assessment of Large Seakeeping Assessment of Large Trimaran Trimaran for Naval Aircraft Operations for Naval Aircraft Operations Presented by Mr. Boyden Williams, Mr. Lars Henriksen (Viking

More information

RELIABILITY ASSESSMENT, STATIC AND DYNAMIC RESPONSE OF TRANSMISSION LINE TOWER: A COMPARATIVE STUDY

RELIABILITY ASSESSMENT, STATIC AND DYNAMIC RESPONSE OF TRANSMISSION LINE TOWER: A COMPARATIVE STUDY RELIABILITY ASSESSMENT, STATIC AND DYNAMIC RESPONSE OF TRANSMISSION LINE TOWER: A COMPARATIVE STUDY Yusuf Mansur Hashim M. Tech (Structural Engineering) Student, Sharda University, Greater Noida, (India)

More information

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006 MSC 82/24/Add.2 RESOLUTION MSC.235(82) CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006 THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization

More information

Stress evaluation of a bicycle crank arm connection using BEM

Stress evaluation of a bicycle crank arm connection using BEM Stress evaluation of a bicycle crank arm connection using BEM C. J. Hoff, R. E. Dippery & 3. Knapp Department of Mechanical Engineering Kettering University, USA Abstract An interesting problem encountered

More information

TLP Minimum tendon tension design and tendon down-stroke investigation

TLP Minimum tendon tension design and tendon down-stroke investigation Published by International Association of Ocean Engineers Journal of Offshore Engineering and Technology Available online at www.iaoejoet.org TLP Minimum tendon tension design and tendon down-stroke investigation

More information

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer

More information

OPENINGS AND REINFORCEMENTS 26

OPENINGS AND REINFORCEMENTS 26 ASME BPVC.VIII.1-2015 UG-35.2 UG-36 (4) It is recognized that it is impractical to write requirements to cover the multiplicity of devices used for quick access, or to prevent negligent operation or the

More information

Melges 24 Measurement Handbook. Provided by the United States Melges 24 Class Association

Melges 24 Measurement Handbook. Provided by the United States Melges 24 Class Association Melges 24 Measurement Handbook Provided by the United States Melges 24 Class Association Table of Contents Page Introduction 3 Illustration 1 Deck Layout 4 Illustration 2 Measurement Data Points 5 Illustration

More information

INTRODUCTION TABLE OF CONTENTS

INTRODUCTION TABLE OF CONTENTS 2 INTRODUCTION Thank you for choosing Servometer to design and manufacture your unique, new electrodeposited bellows for your particular application. The definitions, formulas and design parameters inside

More information

S-44 edition 5 The IHO s New Standard For Hydrographic Surveys Chris Howlett Head of Seabed Data Centre United Kingdom Hydrographic Office

S-44 edition 5 The IHO s New Standard For Hydrographic Surveys Chris Howlett Head of Seabed Data Centre United Kingdom Hydrographic Office S-44 edition 5 The IHO s New Standard For Hydrographic Surveys Chris Howlett Head of Seabed Data Centre United Kingdom Hydrographic Office Chairman of IHO Working Group that created S-44 edition 5 S-44

More information

THE WAY THE VENTURI AND ORIFICES WORK

THE WAY THE VENTURI AND ORIFICES WORK Manual M000 rev0 03/00 THE WAY THE VENTURI AND ORIFICES WORK CHAPTER All industrial combustion systems are made up of 3 main parts: ) The mixer which mixes fuel gas with combustion air in the correct ratio

More information

Pedestrian Crosswalk Audit

Pedestrian Crosswalk Audit 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Pedestrian Crosswalk Audit June 19, 2017 The conducted this project in accordance with the International Standards

More information

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE APPENDIX IV Development Canoe Rules APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE 1 GENERAL Class and measurement rules measurement forms may be obtained

More information

Soling Building Tips II

Soling Building Tips II Soling Building Tips II Prepared: Arthur Deane Jan 20, 2002 adeane@ic.net Introduction The following are some lessons learned and experience gained in building a Soling kit. The plan developed is based

More information

BALTIC 175 PINK GIN VI A 6 th good reason to celebrate our 40 th Anniversary

BALTIC 175 PINK GIN VI A 6 th good reason to celebrate our 40 th Anniversary BALTIC 175 PINK GIN VI A 6 th good reason to celebrate our 40 th Anniversary It s a great pleasure for us to be starting construction of the Baltic 175 Pink Gin VI the same year as our company celebrates

More information

Presented to the International Technical Rescue Symposium, November Abstract

Presented to the International Technical Rescue Symposium, November Abstract Presented to the International Technical Rescue Symposium, November 21 Presented by: Chuck Weber, PMI Quality Manager Abstract This paper presents the results of 162 individual drop tests performed at

More information

WHEN TO RUSH A BEHIND IN AUSTRALIAN RULES FOOTBALL: A DYNAMIC PROGRAMMING APPROACH

WHEN TO RUSH A BEHIND IN AUSTRALIAN RULES FOOTBALL: A DYNAMIC PROGRAMMING APPROACH WHEN TO RUSH A BEHIND IN AUSTRALIAN RULES FOOTBALL: A DYNAMIC PROGRAMMING APPROACH 8.0. Abstract In Australian rules football, points are scored when the ball passes over the goal line. Six points are

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS

ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS Author s Name Name of the Paper Session DYNAMIC POSITIONING CONFERENCE October 11-12, 2011 OPERATIONS SESSION ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS By Ian Giddings The International

More information

International One Metre International Class Association (IOM ICA) Special General Meeting Amended Agenda. October 31, 2009

International One Metre International Class Association (IOM ICA) Special General Meeting Amended Agenda. October 31, 2009 International One Metre International Class Association (IOM ICA) Special General Meeting Amended Agenda October 31, 2009 Purpose: To vote on a resolution that will determine if IOM ICA will pursue becoming

More information

Appendix HK1 HKSF Prescriptions

Appendix HK1 HKSF Prescriptions Appendix HK1 HKSF Prescriptions Introduction Effective date Rule The HKSF prescribes that these rules become effective in Hong Kong on 1 January 2017. Prescription 67 Damages 1 No claim for damages arising

More information

TOWMASTER. User Manual. Version : 1.0.0

TOWMASTER. User Manual. Version : 1.0.0 TOWMASTER User Manual Version : 1.0.0 Date : 23-November-2014 License Information TOWMASTER TOWMASTER software and source code are property of Technomak Offshore & Marine Consultancy. The software along

More information

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL Class and measurement rules measurement forms may be obtained from the I.C.F.

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

The Physics of Water Ballast

The Physics of Water Ballast The Physics of Water Ballast Nick Newland recently wrote an informative article on water ballast for Water Craft magazine (Newland 2015). Following a discussion on the Swallow Boats Association Forum,

More information

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 *

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 * E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 MSC.1/Circ.1589 24 May 2018 GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER

More information

Study on Resistance of Stepped Hull Fitted With Interceptor Plate

Study on Resistance of Stepped Hull Fitted With Interceptor Plate 39 Study on Resistance of Stepped Hull Fitted With Interceptor Plate Muhamad Asyraf bin Abdul Malek, a, and J.Koto, a,b,* a) Department of Aeronautic, Automotive and Ocean Engineering, Faculty of Mechanical

More information

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T) K.B. FERRIE, CDR, Chief, Hull Division References: a. 46 CFR Subchapter T, Parts 178, 179 b. 46 CFR Subchapter S, Parts 170, 171 c. Marine Safety Manual (MSM), Vol. IV d. Navigation and Vessel Circular

More information

Aeronautical studies and Safety Assessment

Aeronautical studies and Safety Assessment Aerodrome Safeguarding Workshop Cairo, 4 6 Dec. 2017 Aeronautical studies and Safety Assessment Nawal A. Abdel Hady ICAO MID Regional Office, Aerodrome and Ground Aids (AGA) Expert References ICAO SARPS

More information

CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill

CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill The Gunboat design is the latest Radio A class from Graham Bantock, optimised to provide the best boat speed below 4 knots and to be as good as possible

More information

TG GUIDELINES CONCERNING CALIBRATION INTERVALS AND RECALIBRATION

TG GUIDELINES CONCERNING CALIBRATION INTERVALS AND RECALIBRATION GUIDELINES CONCERNING CALIBRATION INTERVALS AND RECALIBRATION Approved By: Senior Manager: Mpho Phaloane Revised By: Field Manager: Neville Tayler Date of Approval: 2015-08-26 Date of Implementation: 2015-08-26

More information

International Paralympic Committee Athlete Classification Code. November 2015

International Paralympic Committee Athlete Classification Code. November 2015 International Paralympic Committee Athlete Classification Code November 2015 IPC Athlete Classification Code Rules, Policies, and Procedures for Athlete Classification November 2015 International Paralympic

More information

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE LIST OF TOPICS A B C D E F G H I J Hydrostatics Simpson's Rule Ship Stability Ship Resistance Admiralty Coefficients Fuel Consumption Ship Terminology Ship

More information

Rudder Investigation. By Harish M

Rudder Investigation. By Harish M Rudder Investigation By Harish M Where and on What? Series of RO RO Vessels designed and constructed by Flensberger Schiffbau Gesselshaft GmbH. Rudders independently manufactured by Macor Neptun GmbH.

More information

IACS Common Structural Rules for Double Hull Oil Tankers, January Background Document

IACS Common Structural Rules for Double Hull Oil Tankers, January Background Document IACS Common Structural Rules for Double Hull Oil Tankers, January 2006 Background Document SECTION 8/1 SCANTLING REQUIREMENTS LONGITUDINAL STRENGTH NOTE: - This TB is published to improve the transparency

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS SECTION SUBJECT 1.1 Standards 1.2 Compliance procedures and certification 1.3 Building premises 1.4 Testing of structures 1.5 Materials 1.6 Definitions of expressions GENERAL

More information

Ship Stability. Ch. 8 Curves of Stability and Stability Criteria. Spring Myung-Il Roh

Ship Stability. Ch. 8 Curves of Stability and Stability Criteria. Spring Myung-Il Roh Lecture Note of Naval Architectural Calculation Ship Stability Ch. 8 Curves of Stability and Stability Criteria Spring 2016 Myung-Il Roh Department of Naval Architecture and Ocean Engineering Seoul National

More information

CHAPTER IV FINITE ELEMENT ANALYSIS OF THE KNEE JOINT WITHOUT A MEDICAL IMPLANT

CHAPTER IV FINITE ELEMENT ANALYSIS OF THE KNEE JOINT WITHOUT A MEDICAL IMPLANT 39 CHAPTER IV FINITE ELEMENT ANALYSIS OF THE KNEE JOINT WITHOUT A MEDICAL IMPLANT 4.1 Modeling in Biomechanics The human body, apart of all its other functions is a mechanical mechanism and a structure,

More information

PHIGIT CLASS RULES 2006 V1.2

PHIGIT CLASS RULES 2006 V1.2 PHIGIT CLASS RULES 2006 V1.2 The Phigit class was developed by Charles Détriché, Graham Bantock, and Lester Gilbert in 2006 with the support of Marine Modelling International under the editorship of Chris

More information

Boat Strength Errata & Updates 5/7/18 Sheet 1 of 5

Boat Strength Errata & Updates 5/7/18 Sheet 1 of 5 Boat Strength Errata & Updates 5/7/18 Sheet 1 of 5 Formulas 1-2 and 1-3, page 7: Instead of averaging LOA and LWL and when LOA is more than 108% and instead of averaging BOA and BWL when BOA is over 112%,

More information

Incompressible Potential Flow. Panel Methods (3)

Incompressible Potential Flow. Panel Methods (3) Incompressible Potential Flow Panel Methods (3) Outline Some Potential Theory Derivation of the Integral Equation for the Potential Classic Panel Method Program PANEL Subsonic Airfoil Aerodynamics Issues

More information