TERMAP S.A. Terminales Marítimas Patagónicas Sociedad Anónima
|
|
- Buck Morgan
- 6 years ago
- Views:
Transcription
1 TERMAP S.A. Terminales Marítimas Patagónicas Sociedad Anónima Annex 5 - Document 5.2 OPERATIONAL LIMITATIONS OF CALETA CORDOVA AND CALETA OLIVIA TERMINALS 1. OPERATIONAL LIMITS LAID OUT BY THE P.N.A. - PREFECTURA NAVAL ARGENTINA "Particular navigation safety rules of applicable to SPM monobuoys, Attachment of SNAV disposition, NA 9 Nro. 34/99" 1.1. Minimum visibility for mooring and unmooring: Minimum visibility to start the mooring: 5 nautical miles Minimum visibility to unmoor: 3 nautical miles Meteorological Conditions for mooring: Maximum admissible wind speed: Maximum wave height: 15 m/s (wind coming from the West) 1,8 m For winds coming from other sectors or quadrants, the permitted speed must be lower, so that the related wave does not reach the maximum height indicated Meteorological Conditions for operations: Maximum admissible wind speed: 25 m/s (wind coming from the West) 1.4. Mooring maneuvers time: Vessels under DWT: Vessel above DWT: They can moor at night when the wind speed does not exceed 5 m/s and/or the wave height does not surpass 0,5 meters. They can only moor during daylight time Maximum allowed draft: 18 meters (59' 02")
2 2. DESIGN AND CONSTRUCTION LIMITS C. Córdova SPM C. Olivia SPM Maximum admitted DWT 150,000 DWT 150,000 DWT Minimum admitted DWT 39,000 DWT 39,000 DWT Environmental conditions envisaged: - Depth m (121.8') m (138.9') - Range of the tide 5.98 m (19.6') 5.98 m (19.6') - Wind speed m/s (50 knots) m/s (50 knots) - Current speed 55 m/s (1.07 knots).55 m/s (1.07 knots) - Maximum wave height 6.30 m (20.6') 5.00 m (16.4') 3. MOORING SYSTEM AND HOSE LAYOUT LIMITS Both SPMs MAXIMUM ALLOWED DRAFT MAXIMUM BOW-MANIFOLD DISTANCE MINIMUM BOW-MANIFOLD DISTANCE 18.0 m (59') m (487.2') 92.0 m (301.8') HOSE LIFTING EQUIPMENT CAPACITY (SWL): Dead weight tonnage, 39,000 to 60,000 DWT Dead weight tonnage, from 61,000 to 150,000 DWT 10 tons 15 tons CONNECTION FLANGE AT TANKER HOSE 16" MANIFOLD ARRANGEMENT 76mm CHAIN STOPPER ACCORDING TO OCIMF OCIMF 1 x SWL: 200 tons. FLOATING HOSE CONNECTION TO VESSEL: - Caleta Olivia SPM Port - Caleta Córdova SPM Starboard It is required that the Lifting Vessels have mooring systems and manifold arrangements according to the requirements of OCIMF (Oil Companies International Maritime Forum) included in "Recommendations for equipment employed in the mooring of ships at single point moorings", third edition, 1993, and "Mooring equipment guidelines", second edition, The following features may be highlighted in the above publications:
3 Deck equipment: Distance between stopper - forward fairlead: 2.7 to 3.7 m. Stopper characteristics: SWL 200 tons, to secure 76mm chain. Throat section: mm x mm. Since only a single chain is used for mooring, it is deemed advisable to use a stopper and a central fairlead. A Smit Bracket may not be used. For the exceptional mooring of vessels with 54mm stoppers, advance notice will be required, as well as agreement to pay for the mooring chain change service according to TERMAP S.A. scale of charges for services provided to vessels. Manifold equipment: Horizontal distance between manifold flange-side of ship: 4.6 m Maximum height of flange center on main deck: 2.1 m Minimum distance between manifold flange centers: 2.0 m Distance between connection flange center to drip trays: 0.9 m (#) (#) Due to the use of a 16" double carcass connection hose (1.4 m outside diameter), vessels failing to comply with this last requirement shall not be connected. 4. OPERATIONAL SAFETY REASONS LIMITS The mooring service provided by the Terminal includes a mooring vessel and a support tugboat. All operations are performed with the assistance of the tugboat in order to keep the mooring hawser tight and a safety distance between the buoy and the tanker's bow. The buoys have a control system of the operational parameters, which is radio-linked with the Tank Farm and the support tugboat. This telemetry system has automatic warning signals in which reference values have been set for the Mooring and Loading Master. Operations will be suspended and vessel unmooring will take place when the mooring hawser tension (because the meteorological and sea conditions) exceeds 80 tons. in repeated readings, the tension tendency is in crescent and the immediate weather forecast is unfavorable. When the system is not operative, or a spare buoy without telemetry system (replacement) is in use, the unmooring will be realized the wind surpass the limit established by the PNA. It is required that all vessels have an inert gas system for treating their tank atmosphere. Mooring Masters shall only authorize mooring of vessels having tank atmospheres with 8% or less O 2 content by volume. Vessels that, due to the number, volume and layout of cargo tanks, cannot load at the loading rate agreed upon between Terminal and Producers in the relevant Rules, may be unmoored so as not to delay the next vessel coming up within the agreed time window, and finish loading when the schedule of vessels allows so. In order to avoid a new nomination of vessels failing to comply with the requirements of the Company, the Vessel Commanding Officer, Producers or Shipowners, Charterers or Freight Agents, shall be duly advised of the reasons why they are disqualified from operating with the Company.
4 The Vessel Commanding Officer shall accept in written, the Conditions of Use of Terminals and Services, as indicated in the new forms and appendices to the Port Rules to be published shortly. 5. MOORING MASTER All vessel operations shall be decided by the Mooring Master, who will consider whether the mooring and/or stay of the vessel at the Terminal are safe for the staff, the environment and the facilities, and whether it meets the requirements established by TERMAP S.A. in its Port Rules. 6. ADITIONAL LIMITS TERMAP S.A. reserves the right to establish new limitations at its Maritime Terminals whenever conditions are detected during the operations of Vessels that may threaten the safety of the facilities or of the environment. 7. INFORMATION FOR VESSEL NOMINATION All Vessels operating at the Caleta Córdova and Caleta Olivia Terminals shall be nominated in advance by furnishing the following data: Present vessel name and ex name Type of vessel Flag Loading Terminal Laytime envisaged for the operation Vessel intended Agents Vessel Owner Volume of oil to be loaded Deadweight tonnage (DWT) to maximum summer draft Length overall Beam Molded depth Maximum (summer) draft Distance bow-to-center manifold (BCM) Manifold arrangement (OCIMF) Mooring stopper characteristics (76mm) Arrangement of mooring equipment (OCIMF) Lifting capacity of tackles in the manifold area Manifold connection flange diameter Inert Gas System for tanks Automatic system for ullage and overflow warning. Ballast type and quantity Number of cargo tanks available Name of insurance company or P&I Club Name and telephone of an Oil Spill Response Company that will start, at the latest, 24 hours after the incident, with spill control and cleaning of the area (not applicable to cargo of vessels included in the CCI - Convenio de Cooperación Interempresario).
5 Name, telephone and address of the "Vetting Service" of some major oil company in which the nominated vessel is registered as "Acceptable". Expiration date of its certificate. Acceptance of the use of Services provided by the Terminal. If Terminal services are not going to be used, name of the Contractor rendering the service, who shall secure TERMAP.'s prior authorization of the support operations in order to meet the safety conditions concerning the staff, the environment and the facilities required by the Company. 8. COMMUNICATIONS Caleta Córdova and Caleta Olivia Terminals shall be listening in in channel 9 (VHF marine frequency) when no Vessels are operating at the SPMs. Once contact between the Vessel and the Terminal has been established through that channel, each Terminal shall change only to the operational channel authorized by the Company, as follows: Caleta Córdova: VHF Marine Channel 68 Caleta Olivia: VHF Marine Channel 69 E:\JMARZOCC\DATOS\WORD\Reglamento portuario y limites\reglamento portuario 2005\ANEXOS 2005\Anexo 5\ingles
MOORING, CONNECTION AND DISCONNECTION OF HOSE, AND UNMOORING PROCEDURES
Annex 6 Document 6.1 Update March 03, 2009 Operating Procedure: 21 MOORING, CONNECTION AND DISCONNECTION OF HOSE, AND UNMOORING PROCEDURES 1. Object This document details the general outline in order to
More informationGUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE
GUIDANCE NOTES GD03-2017 CHINA CLASSIFICATION SOCIETY GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE 2017 Effective from 1 March 2017 BEIJING Chapter 1 GENERAL 1.1 Application
More informationTERMINAL DE DALIA - DALIA TERMINAL
Page 2 of 38 TERMINAL DE DALIA - DALIA TERMINAL Page 3 of 38 Table of Contents 1. THE COMPLEX...6 1.1 Description... 6 1.2 Location... 6 1.3 Beaconing... 6 1.3.1 Beaconing of the FPSO... 7 1.3.2 Beaconing
More informationJetty Information Booklet
Page 1 of 15 JETTY INFORMATION BOOKLET Revison Name Change Date Signature 1 S.Chatterjee Section 2.3,2.7,2.8,2.9,2.10,2.11 1 Aug 10 Action Name Title Date Signature Preparation S.Chatterjee Operations
More informationPORT INFO GENERAL BERTH INFO
s ervices SHIPWRIGHT WWW.SHIPWRIGHTSERVICES.CO.ZA 9 DE DUINE CLOSE, BLUEWATERBAY, SALDANHA, 7395, WESTERN CAPE, SOUTH AFRICA TEL. +27 71 040 6022 EMAIL. DERICK@SHIPWRIGHTSERVICES.CO.ZA PORT INFO GENERAL
More informationTHE MOORING OF OIL CARRIERS AT SINGLE POINT MOORINGS
Guide for the Mooring of Oil Carriers at Single Point Moorings GUIDE FOR THE MOORING OF OIL CARRIERS AT SINGLE POINT MOORINGS DECEMBER 2010 American Bureau of Shipping Incorporated by Act of Legislature
More informationJu aymah Crude & LPG Terminals Including Contents Page & Annex Ju aymah Crude Terminal & Ju aymah LPG Terminal
& LPG s Including Contents Page & Annex & Ju aymah LPG s 1 (SPM) Table of Contents 1. General... 1 1.1 Location of... 1 1.2 Description of... 1 1.2.1 An Oil Platform... 1 1.2.2 The Control Platform...
More informationBerths Parameters. Berths Parameters
s Parameters s Parameters 1 s Parameters Saudi Aramco Ports and Terminals Universal Parameters GENERAL COMMENTS 1. All depths, drafts and distances are in meters.. imum SWL of cranes handling and 0 cargo
More informationINTERTANKO'S STANDARD TANKER CHARTERING QUESTIONNAIRE 88 (Q88) Version 3
INTERTANKO'S STANDARD TANKER CHARTERING QUESTIONNAIRE 88 (Q88) Version 3 1. VESSEL DESCRIPTION 1.1 Date updated: 20/10/2016 1.2 Vessel's name: ERREGAIA 1.3 IMO number: 91296663 1.4 Vessel's previous name(s)
More informationDynamic analyses of tankers moored at berth
Dynamic analyses of tankers moored at berth Marin byggteknikkdagen 18.4.2018 Martin Thuve Hovden Department of Marine Tecnology, Multiconsult Tromsø Department of Marine Tecnology, Tromsø 27 marine & coastal
More informationC C S Technical Information
C C S Technical Information (2014) Technical Information No.7 Total No.129 Jan.28,2014 (Total 3+5+1 pages) To: CCS Surveyors, Plan Approval Surveyors, Relevant Ship Companies, Shipyards and Design Institutes
More informationGENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)
RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 AMENDED EFFECTIVE JANUARY
More informationPUERTO BRISA S.A. Rules & Port Regulations
PUERTO BRISA S.A. Rules & Port Regulations Page 1 out of 19 Content 1. GENERAL INFORMATION... 3 2. AIDS TO NAVIGATION... 5 3. INTERNATIONAL SHIP AND PORT FACILITY SECURITY CODE (ISPS Code)... 6 4. PILOT
More informationCABINDA GULF OIL COMPANY LIMITED
CABINDA GULF OIL COMPANY LIMITED CABINDA TERMINALS TERMINAL INFORMATION REGULATIONS AND CONDITIONS OF USE CABINDA GULF OIL COMPANY LIMITED C.P.2950 L U A N D A REPUBLIC OF ANGOLA Revised May 2012 2 CONTENTS
More informationTransport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters
Transport Infrastructure Act 1994 Gladstone Ports Corporation Port Notice 04/17 LNG Vessel Operating Parameters 1. These operating parameters have been developed based on navigation simulations with LNG
More informationMarine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe
Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Includes Basic ship Terminologies and Investigation Check list Index 1. Ship Terminology 03 2. Motions of a Floating Body...09 3. Ship Stability.10 4. Free
More informationDynamic Torsion Load Tests for Offshore Hoses
a Dynamic Torsion Load Tests for Offshore Hoses Dynamic Torsion Load Tests for Offshore Hoses An Update to the Guide to Manufacturing and Purchasing Hoses for Offshore Moorings (GMPHOM 2009), section 3.4.10.3
More informationMarine Guide for Ship Masters Contents
Marine Guide for Ship Masters Contents Marine Guide for Ship Masters... 1 Port Operating Company... 2 Harbour Authority... 2 Location... 2 Pilotage... 2 Pilot Boat... 3 Pilot Ladder... 3 Pilots and Tugs
More informationCode Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)
Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines) This Code Covers The Use Of Tugs And Towage In The Port Of St Helier Page number Contents 2 Introduction 3 Communication
More informationPORT TALBOT BULK TERMINAL MOORING OPERATIONS MANUAL
PORT TALBOT BULK TERMINAL MOORING OPERATIONS MANUAL ABP Marine Operations & Tata Burdening Departments 2017 RESPONSIBILLITIES Tata Steel UK (TSUK) is the operator of the Port Talbot Harbour Bulk Terminal.
More informationImportant Information for Yachts & Agents
Important Information for Yachts & Agents 1. The Yacht Services of Alaska agent is your contact for all requests for pilotage and pilot boat services. Refer all communication regarding pilotage to them.
More informationAUTHORISED SIGNATORY. Date : F- 148(17) To, The Master MT. MUNDRA PORT. Dear Captain, We welcome you and your crew to Mundra Port.
Date : F- 148(17) To, The Master MT. MUNDRA PORT Dear Captain, We welcome you and your crew to Mundra Port. A. For your information we enclose the following documents. a. SPM Terminal information Booklet.
More informationOGUENDJO TERMINAL PORT INFORMATION AND RULES
PERENCO Oil & Gas Gabon - OGUENDJO TERMINAL Siège Social : Immeuble Soleil (Quartier Sablière) : B.P. 23770 Libreville, GABON Tél. : (+241) 44.15.54 Fax. : (241) 44.15.55 RCCM Libreville : 2011 B11466
More informationPilotage Directions 2017
Pilotage Directions 2017 1. Commencement These Pilotage Directions shall come into force on 31 st August 2017 on which date the existing Pilotage Directions are revoked. 2. Short Title These Pilotage Directions
More informationPort Sections Guide Section 01
s Guide 01 Cow Bay Marina Date 10/1/2016 Position (lat / lon) Minimum controlled water depth Chart datum Range of water densities Tidal range alongside Bottom type Dredging regime Distance pilot station
More informationLNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN
LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;
More informationGENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS
GENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS Revised: March 5, 2018 TABLE OF CONTENTS GENERAL DEFINITIONS... 2 VESSEL SPACING... 3 HORIZONTAL CLEARANCE... 3 UNDER-KEEL CLEARANCE
More informationPort of Port Elizabeth Information
LOCATION Latitude 34º 01 S Longitude 25º 42 E PILOTAGE Pilotage is compulsory. Rendezvous point is 2.2 nautical miles NE of the port entrance on the leading lights. Pilot transfer is by pilot boat, unless
More informationSLOP RECEPTION AND PROCESSING FACILITIES
RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 8 SLOP RECEPTION AND PROCESSING FACILITIES JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements...
More informationCLIENT NAME: LOCATION: CALM BUOY INSPECTION:
INSPECTOR REVIEWED INSPECTION OF CALM BUOY OVERALL PHOTO REVISION DESCRIPTION: Preliminary / Final Page: 1 TABLE OF CONTENT 1. MANAGEMENT SUMMARY... 3 1.1. SCOPE OF WORK:... 3 1.2. CORRECTIVE ACTIONS...
More informationSTS Transfer Operations Plan
STS Transfer Operations Plan For compliance with MARPOL Annex I, Chapter 8 Revision 3 IMO NUMBER: *** Foreword The sections in this template shaded yellow are for Guidance or description for the purpose
More informationWORK-REST REQUIREMENTS FOR PILOTS
AN ORDER OF THE BOARD OF PILOT COMMISSIONERS FOR THE PORT OF CORPUS CHRISTI AUTHORITY REGARDING WORK-REST REQUIREMENTS FOR PILOTS AND COMBINED BEAM RESTRICTION Whereas, the current Rules and Regulations
More informationReport on Vessel Casualty of Accident (Form Casualty) Instructions:
Report on Vessel Casualty of Accident (Form Casualty) Tuvalu Ship Registry 10 Anson Road #25-16 International Plaza Singapore 079903 Tel: (65) 6224 2345 Fax: (65) 6227 2345 Email: info@tvship.com Website:
More informationANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,
Page 1 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International
More informationUnderstanding of Meteorology. for. Handling LNG at Ports
Understanding of Meteorology for Handling LNG at Ports All environmental forces on the berth and the berthed ship are considered. When evaluating environmental forces, first estimates are obtained for
More informationGUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE
(12/2009) GUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE REVISION 1 DECEMBER 2009 Responsible Authority The Regional Director Marine Safety Atlantic Region is responsible for this document, including
More informationReferences: Manual Chapt. 9 ISO 9001 par.7 ISO par. 4 ISM Code par. 7; 8
SQEMS OPERATING PROCEDURE OP-SAF-03 1 of 5 References: Manual Chapt. 9 ISO 9001 par.7 ISO 14001 par. 4 ISM Code par. 7; 8 1. SCOPE This Procedure establishes criteria for the control and management of
More informationINTERNATIONAL MARITIME ORGANIZATION
Page 1 of 16 INTERNATIONAL MARITIME ORGANIZATION IMO Resolution A.586(14) REVISED GUIDELINES AND SPECIFICATIONS FOR OIL DISCHARGE MONITORING AND CONTROL SYSTEMS FOR OIL TANKERS. ANNEX This document quote
More informationIPSWICH. Port Safety Notice
IPSWICH Port Safety Notice 19th October 2018 1 Associated British Ports Ipswich Port Safety Notice to Masters Introduction: This Port Safety Notice has been developed and communicated to provide general
More informationTug regulations Port of Gothenburg 29/03/2018
THE PORT OF SCANDINAVIA Tug regulations Port of Gothenburg 57 42 N 11 56 E Special tug regulations are in place at the Port of Gothenburg according to the Bye-Laws of Port of Gothenburg 20. The tug regulations
More informationHELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014
HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 Agenda Item 3 Accidents and ship traffic in the Baltic Sea Document
More informationPOS 02 VTS Guidelines
4.00 BERTHING FACILITIES OF AQABA PORT Name Length (m) Max loaded draft (m) Max Vessel Length (m) Max Displacement (tonne) # 1 160 11.0 250,000 # 2 180 10.0 250 45,000 # 3 180 13.0 250 53,000 # 4 180 12.5
More informationRules Practice Exam 12
1 INLAND ONLY You are on vessel "A", and vessel "B" desires to overtake you on your starboard side as shown. After the vessels have exchanged one blast signals, you should. Diagram 31 A. alter course to
More informationTug regulations Port of Gothenburg 01/07/2018
THE PORT OF SCANDINAVIA Tug regulations Port of Gothenburg 57 42 N 11 56 E Special tug regulations are in place at the Port of Gothenburg according to the Bye-Laws of Port of Gothenburg 20. The tug regulations
More informationGENERAL LIMITATIONS AND RESTRICTIONS. Draft Restrictions
RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 I GENERAL The Rules and
More information(Refer Slide Time: 0:25)
Port and Harbour Structures Prof. R. Sundaravadivelu Department of Ocean Engineering Indian Institute of Technology Madras Module 01 Lecture 04 Ships and Size of Ships So in this class we will continue
More informationForth Ports Limited. Port of Dundee. Rig Move Guidelines
Forth Ports Limited Port of Dundee Contents 1 Introduction... 4 2 Pre-Arrival... 4 2.1 Planning Meetings... 4 2.2 Priority of Movements... 4 2.3 Confirmation/Cancellations... 5 2.4 Weather Parameters...
More informationSEMI FINAL EXAMINATION
SEMI FINAL EXAMINATION 1. Which vessel may exhibit, if practicable, the lights for sailing vessels, but if she does not, she shall have ready at hand a electric torch or lighted lantern showing a white
More informationOIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.]
OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7 [Comrnencernent.] [22nd April, 1968] 1. Short title and interpretation (1) These Regulations may be cited as the Oil in Navigable
More informationPLEM CONTROL SYSTEMS
PLEM CONTROL SYSTEMS Offspring International offers a range of PipeLine End Manifold (PLEM) control systems as part of its integrated CALM buoy and conventional buoy mooring and offloading systems. Available
More information1 of 3 11/21/2013 3:25 PM Pilotage for Crossing the Outer Bar of Mobile Bay or Navigating a Vessel into or out of the Bay or Harbor of Mobile Effective January 1, 2009 Gross tonnage charge: Effective 05/01/13
More informationREVITHOUSSA LNG TERMINAL JETTY AND TERMINAL INFORMATION
REVITHOUSSA LNG TERMINAL JETTY AND TERMINAL INFORMATION General Information Name of Jetty: Revithoussa Name of Terminal: DESFA LNG TERMINAL Revithoussa Product handling: LNG Type of terminal: Receiving
More informationMoor, Tend Mooring And Unmoor Ship - Supervisor Level -
Marine Terminal Operations Competency Standard Moor, Tend Mooring And Unmoor Ship - Supervisor Level - Industry : Oil, Chemical and Gas Industry Competency Category : 2.0 Moor, tend mooring and unmoor
More informationMAC Transit Advisories as of April 30, 2018
MAC Transit Advisories as of April 30, 2018 The Mariners Advisory Committee for the Bay and River Delaware was established in October 1964. Its members and associate members are mainly comprised of master
More informationCARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE
Page: 1 of 5 5.1. PURPOSE To ensure that: The vessel, as applicable, meets MARPOL requirements; There is adequate trim and the propeller is immersed; Stress conditions are within allowable limits during
More informationAUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS
3654-A (OPXI v. 3-2-2011 AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS ADVISORY TO SHIPPING No. A-20-2013 August 2, 2013 TO : All Shipping Agents, Owners, and Operators SUBJECT:
More informationNational Maritime Center
National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 8 Choose the best answer to the following Multiple Choice Questions. 1. Which term indicates the rise in height
More informationVESSEL PARTICULARS (FORM C)
VESSEL PARTICULARS (FORM C) Specifications of the vessel and the gas installation which are representations by the Owners. (A) VESSEL S CHARACTERISTICS PREAMBLE Name : LPG/C SIR IVOR Owner : Forli Shipping
More informationGeneral Requirements for Vessels
General Requirements for Vessels Unless otherwise specified the following is provided in order to facilitate smooth and efficient operations while your Vessel is moored at our Terminal. All Vessels shall
More informationX-03 EMERGENCY TOWING ARRANGEMENTS
Guideline No.: X-03(201510) X-03 EMERGENCY TOWING ARRANGEMENTS Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements,
More informationNAVIGATION AND SEAMANSHIP Secure vessel at mooring, anchor, and berth
1 of 5 level: 3 credit: 4 planned review date: December 2005 sub-field: purpose: entry information: accreditation option: moderation option: Maritime People credited with this unit standard are able to:
More informationRules Practice Exam 7
1 INTERNATIONAL ONLY The light which may be used with a vessel's whistle is to be. A. used when the whistle is broken B. used prior to sounding the whistle C. used only at night D. a white light 2 INTERNATIONAL
More informationDesign and Calculation of Double Buoys Mooring System in Estuary of Yalu River
Applied Mechanics and Materials Online: 2012-12-13 ISSN: 1662-7482, Vols. 253-255, pp 2071-2075 doi:10.4028/www.scientific.net/amm.253-255.2071 2013 Trans Tech Publications, Switzerland Design and Calculation
More informationCargo pumps shall not be operated in excess of their designed maximum working parameters.
Page: 1 of 9 4.1. SCOPE This section provides operating instructions and procedures to be complied with in order to ensure that discharging operations are conducted safely and in accordance with the best
More informationINTERIM REPORT OF THE INVESTIGATION INTO AN INCIDENT INVOLVING MV EPSILON ON 8th FEBRUARY 2016
INTERIM REPORT OF THE INVESTIGATION INTO AN INCIDENT INVOLVING MV EPSILON ON 8th FEBRUARY 2016 REPORT NO. MCIB/258/INTERIM (No.1 OF 2017) The Marine Casualty Investigation Board (MCIB) examines and investigates
More informationRepsol Marine Terminal-to-Tanker Information. Pantalán de Repsol Petróleo, Tarragona
Repsol Marine Terminal-to-Tanker Information Pantalán de Repsol Petróleo, Tarragona 1 Dear Sir, Responsibility for the safe conduct of operations while your ship is at the Repsol Terminal rests jointly
More informationPLEM CONTROL SYSTEMS
Optimised PLEM Control Offspring International offers a range of PipeLine End Manifold (PLEM) control systems as part of its integrated CALM buoy and conventional buoy mooring and offloading systems. Available
More informationHOUSTON SEA CHEST CLOGGING SURVEY
HOUSTON SEA CHEST CLOGGING SURVEY *** YOUR HELP IS VOLUNTARY AND ANONYMOUS*** ***PLEASE DO NOT INCLUDE VESSEL NAME OR NUMBER *** IT IS 2015 MENHADEN SEASON IN THE HOUSTON SHIP CHANNEL To Vessel Master/Chief
More informationBY-LAWS in Novorossiysk Sea Port
Approved by order of Ministry of Transport of the Russian Federation dated 30.11.2017 No. 503 BY-LAWS in Novorossiysk Sea Port I. General provisions 1. The By-Laws in the Novorossiysk seaport (further
More informationDUBLIN PORT COMPANY PILOTAGE BYE-LAWS. 1st July Dublin Port Company Pilotage Bye-Laws, 1 st July 2018 Page 1
DUBLIN PORT COMPANY PILOTAGE BYE-LAWS 1st July 2018 Dublin Port Company Pilotage Bye-Laws, 1 st July 2018 Page 1 Contents PILOTAGE BYE-LAWS... 3 1) Interpretation... 3 2) Compulsory Pilotage and Exempted
More informationMarine Safety Information Bulletin COAST GUARD GUIDANCE FOR DEAD SHIP MOVEMENT IN SECTOR HONOLULU CAPTAIN OF THE PORT ZONE.
Marine Safety Information Bulletin 16-002 U.S. DEPARTMENT OF HOMELAND SECURITY U. S. Coast Guard Sector Honolulu Sand Island Parkway Honolulu, Hawaii 96819 (808) 842-2600 COAST GUARD GUIDANCE FOR DEAD
More informationMA MARINE ACCIDENT INVESTIGATION REPORT
MA2013-4 MARINE ACCIDENT INVESTIGATION REPORT April 26, 2013 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan Transport
More informationADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION
ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION LOCATION Mundra Port is all weather, independent, commercial port with geographical and hydrological advantages on the West Coast of India,
More informationRule 8 - Action to avoid collision
a) Any action to avoid collision shall be taken in accordance with the Rules of this Part and shall, if the circumstances of the case admit, be positive, made in ample time and with due regard to the observance
More informationRESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS
INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING
More informationPort information and safety regulations for oil terminals in the Port of Aalborg. Revised
Port information and safety regulations for oil terminals in the Port of Aalborg evised 01.04.2017 Table of contents 1. Pre-arrival 1.1 General 1.2 Pre arrival information 2. Arrival 2.1 Berth approach
More informationLOCAL NOTICES TO MARINERS 1/13. Valid from: 01/1/13 Expires on: Until withdrawn. HHAL Local Notice To Mariners In Force
LOCAL NOTICES TO MARINERS 1/13 Valid from: 01/1/13 Expires on: Until withdrawn HHAL Local Notice To Mariners In Force 1. 01/07 Lower Leading Light / Day Mark 2. 03/11 North Quay Works 3. 08/11 Bathymetric
More informationAPPROACH DEPTH(m) From East 15.0 From West From East 15.0 From West From East 15.0 From West ) ) From East 15.0 ) From West 16.
UNIVERSAL TERMINAL (OMU) JETTY DEPTH A/S (m) APPROACH DEPTH(m) MAX LOA (m) MAX DISPL. (tonnes) REMARKS OMU1 23.0 From East 15.0 From West 22.5 346 384,604 VLCC berth OMU2 23.0 From East 15.0 From West
More informationGAS FORM C. Main particulars. HHI (Hyundai Heavy Industries, Ulsan, Korea) Delivery
GAS FORM C Main particulars LPG/C BW PRINCESS 2.1 PREAMBLE Ship's name BW PRINCESS Owners Bergesen Gas Shipping AS Flag - Registry NORWEGIAN (NIS) Builder HHI (Hyundai Heavy Industries, Ulsan, Korea) Delivery
More informationRESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6)
Annex 9, page 1 ANNEX 9 RESOLUTION MEPC.288(71) (adopted on 7 July 2017) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International Maritime Organization
More informationPublic Docks Bocaina & São Paulo. Port Information
Public Docks Bocaina & São Paulo Port Information Sumário I- GENERAL INFORMATION... 4 CHAPTER 1 LOCATION... 4 1.1 PILOT BOARDING POINT... 5 1.2 ANCHORAGE AREAS... 6 1.3 EXTERNAL ANCHORAGE AREAS... 6 Internal
More informationRules Practice Exam 14
1 BOTH INTERNATIONAL & INLAND Additional light signals are provided in the Annexes to the Rules for vessels. A. engaged in fishing B. not under command C. engaged in towing D. under sail 2 BOTH INTERNATIONAL
More informationRESOLUTION MEPC.64(36) adopted on 4 November 1994 GUIDELINES FOR APPROVAL OF ALTERNATIVE STRUCTURAL OR OPERATIONAL ARRANGEMENTS AS CALLED FOR IN
MEPC 36/22 THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention of the International Maritime Organization concerning the function of the Committee, NOTING resolution
More informationTHE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY
THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY 8619 Westwood Center Drive Suite 300 Vienna, Virginia 22182, USA Tel: +1 703 790 3434 Fax: +1 703 790 5655 Email: safety@liscr.com Web: www.liscr.com
More informationThe Merchant Shipping (Marine Pollution) Regulations 2004
CAYMAN ISLANDS Supplement No.12 published with Gazette No. 2 dated 27 January, 2004 THE MERCHANT SHIPPING (MARINE POLLUTION) LAW 2001 THE MERCHANT SHIPPING (MARINE POLLUTION) REGULATIONS, 2004 1 of 36
More informationU.S. Coast Guard Sector Mobile
U.S. Coast Guard Sector Mobile Maritime Severe Weather Contingency Port Plan A Guide to Port Planning and Preparation X-2-1 TABLE OF CONTENTS INTRODUCTION Background 1 Authority 1 Applicability and Purpose
More informationRESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006
MSC 82/24/Add.2 RESOLUTION MSC.235(82) CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006 THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization
More informationMooring and unmooring
Mooring and unmooring This ARBO chapter is part of the Health and Safety Index for the shipping industry. It is intended to help employers to comply with the requirements of health and safety legislation.
More informationASSESSMENT. Heavy Weather Passage Challenger (Kaitaki) 24 October 2006
ASSESSMENT Heavy Weather Passage Challenger (Kaitaki) 24 October 2006 1 INTRODUCTION On 24 October 2006, the Cook Strait ferry Challenger sailed from Picton to Wellington encountering storm force conditions.
More informationGOVERNMENT GAZETTE REPUBLIC OF NAMIBIA
GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA N$4.00 WINDHOEK - 19 November 2015 No. 5877 CONTENTS Page GOVERNMENT NOTICES No. 269 No. 270 Regulations to reduce incidental by-catch of seabirds in the hake
More informationIMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea
INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 48th session Agenda item 6 DE 48/6/1 17 November 2004 Original: ENGLISH ANCHORING, MOORING AND TOWING EQUIPMENT Shipboard
More informationAppendix 6: Rongdoi Exclusion Zone & Anchorage Map...54
TABLE OF CONTENTS Introduction...3 Receipt Of Rong Doi - Terminal Regulations...4 1.0 Definitions And Interpretation...5 2.0 Conditions Of Use Of Rong Doi Terminal Regulations...8 3.0 Rong Doi Condensate
More informationInternational regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g.
International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g. wind farms) Introduction This is a summary of the most important international
More informationNAVIGATE VESSEL SAFELY AT THE CHITTAGONG PORT ( BANGLADESH) ANCHORAGE
NAVIGATE VESSEL SAFELY AT THE CHITTAGONG PORT ( BANGLADESH) ANCHORAGE Zalal Uddin Ahmed, PhD,MBA, LLB, Dip in Admiralty Law(Lloyds), MNI ( London) The write up prepared to give detail idea as regards Chittagong
More informationAPPLICATION FOR PILOT EXEMPTION CERTIFICATE (PEC)
APPLICATION FOR PILOT EXEMPTION CERTIFICATE (PEC) according to the Swedish Transport Agency s Regulations and General Advice (TSFS 2017:88) on Pilotage New application Renewal of PEC No: Supplement to
More informationAPI MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks
API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of
More informationMARINE ACCIDENT INVESTIGATION REPORT
MA2013-10 MARINE ACCIDENT INVESTIGATION REPORT October 25, 2013 Japan Transport Safety Board The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act
More informationAstrolabe Reef Access Plan Stakeholder Presentation
Astrolabe Reef Access Plan Stakeholder Presentation *Rena s bow thruster approx 18m Agenda Overview Access Plan Introduction State of the Reef & Wreck Site What to Expect Timetable & Activity Questions
More informationAn Ocean of Possibility
An Ocean of Possibility SPM Offloading Buoy CALM Buoy Orwell Offshore s Catenary Anchor Leg Mooring (CALM) Buoy offers a reliable state-of-the-art solution for loading and offloading crude oil, refined
More informationNational Maritime Center
National Maritime Center Providing Credentials to Mariners Master TV to Master Less than 500 Gross Registered Tons Oceans or Near Coastal (Sample Examination) Page 1 of 6 Master TV to Master Less than
More information