1 Deepwater Floating Production Systems An Overview Introduction In addition to the mono hull, three floating structure designs Tension leg Platform (TLP), Semisubmersible (Semi), and Truss Spar have been successfully developed for use as floating production systems (FPS) over the past several decades. Each of these floater designs has evolved along with subsea and riser technology to meet new field development challenges related to increased water depth, drilling, and reservoir operating pressures and temperatures. Design improvements continue to be made as new developments in deepwater technology are incorporated into the basic designs. The functional requirements for floating structures can be generalized as: Drilling facilities o Number, type and location of drilling rig Production facilities o Weight, area and center of gravity Drilling / production risers o Number and arrangement Well systems o Number of wells, completion and workover methods, minimum well spacing and well bay location Hull compartmentalization o Damage stability considerations Air gap requirements o New metocean criteria As illustrated in the following figure, the relative hull responses of the three designs vary considerably. In all cases the objective is to minimize the response to the environment. Natural Periods of Heave Responses Vertical Motions are Suppressed by Tendons TLPs Floaters Vertical Motions are Controlled Hull Configuration Design Wave Energy Wave Periods (secs)

2 Efficient design of floating structures is predicated on functionality and performance it should be capable of supporting all the necessary equipment for production and related tasks while meeting all performance criteria. The structure should provide sufficient space and robustness to fulfill its intended purpose; also, the floating structure should be built at a minimum of cost, which is governed mainly by the hull steel weight. Hull weight estimates are based on global sizing which is determined by the naval architectural and structural design. Global sizing is a key engineering design process in both the concept selection stage and design phase of a floating structure. The sizing of a moored floating structure considers relationships among the payload, the size of the hull, and the mooring system. During the concept selection phase, efforts are concentrated on the main dimensions and weights under the consideration of design standards and performance requirements without a high degree of engineering detail. Finalized dimensions and main properties of the floating structures will be determined in the front-end engineering and design (FEED) stage through various analyses. Spar Technology The first Spars were based on the Classic design. This evolved into the Truss Spar by replacing the lower section of the caisson hull with a truss. Truss Spars are often considered along with TLPs for dry tree solutions because they offer favorable vertical motions. However, Truss Spars are different from both Semis and TLPs with regards the mechanism of motion control. One of the distinctions of the Truss Spar is that its center of gravity is always lower than the center of buoyancy which guarantees a positive GM. This makes the Truss Spar unconditionally stable. The Truss Spar derives no stability from its mooring system, so it does not list or capsize even when completely disconnected from its mooring. The deep draft is a favorable attribute for minimal heave motions, its deep draft and large inertia filter wave frequency motions in all but the larger storms. The natural period in heave and pitch are above the range of wave energy periods. The long response periods for Truss Spars mitigate the mooring and riser dynamic responses, which are common to

3 ship shaped FPSOs and Semis. The deep draft, along with protected centerwell, significantly reduce the current and wave loading on the riser system These loads normally control the tension and fatigue requirements of the production risers on TLP or Semis. One of the principal advantages of the Truss Spar over other floating platforms lies in its reduced heave and pitch motions. Low motions in these degrees of freedom permit the use of dry trees. Dry trees offer direct vertical access to the wells from the deck, which allows the Truss Spar to be configured for full drilling, workover operations, production operations, or any combination of these activities. Truss Spar Concept The Truss Spar is divided into three distinct sections. The cylindrical upper section, called the hard tank, provides most of the in-place buoyancy for the Truss Spar. The middle truss section supports the heave plates and provides separation between the keel tank and hard tank. The keel tank, also known as the soft tank, contains the fixed ballast and acts as a natural hang-off location for export pipelines and flowlines since the environmental influences from waves and currents and associated responses are less pronounced there than nearer the water line. The trussed mid-section of the hull is an X-braced space frame constructed of tubular members and flat plates called heave plates. The heave plates increase the added mass in the vertical direction and thereby increase the natural heave period of the Truss Spar and bringing it above the range of periods in the wave energy. In a Truss Spar, they also increase heave damping. The third section of the hull is the keel tank, which is attached to the bottom of the truss at the keel. It provides the buoyancy while the Truss Spar is wet-towed horizontally to site for installation. The keel tank is flooded to initiate upending and, finally, receives the field-installed, fixed ballast, which is key to the Truss Spar s unmatched stability. The porches for the steel catenary export pipeline risers are on the perimeter of the keel tank.

4 The Truss Spar hull includes two access shafts. These shafts contain the ballast and utility piping and instrumentation. They also allow direct personnel access to the piping and to every void tank without requiring workers to pass through an intermediate compartment. Only one void need be open at a time. Access shafts are painted, lighted, and vented, as required, for entry. The seawater ballast system has a dedicated centrifugal pump at the bottom of each access shaft for discharging ballast water. Ballast water is supplied to the tanks from the utility seawater manifold. Each seawater ballast discharge pump services the same two ballast tanks served by its access shaft. All ballasting is over the top of the hull, so that ballast tanks have to be intentionally filled by the ballast operator. This eliminates the possibility of inadvertent flooding, which can occur if a sea-chest system is used. TLP Technology The main principal of the TLP is to assure that the vertical forces acting on the platform are in balance, i.e. fixed and variable platform loads plus tendon tension are equal to its displacement. The VCG should be close to the platforms geometrical center. Positive displacement is obtained by locking the platforms draft below the fixed and variable payload displacement draft. This will result in an upward force applied to the tendons, thereby keeping them in constant tension. As a consequence the vertical platform motions (heave) is almost eliminated, except for motions resulting from tendon elasticity and vertical motion as result of environmental introduced lateral platform motions. The tendons do allow a lateral motion of the platform as a result of wind, wave and current. This motion is similar to an inverted pendulum except for the fact that the displacement variation by pulling the hull down is giving a restoring force to the lateral movement. The tendon tension is set within predefined values, or window of operation. If the variable load of the platform exceeds these values by adding risers or drilling loads etc., the tendon pretension is adjusted by re-ballasting of the platform. Consequently the hull is compartmented into void, machinery and ballast spaces. The TLP has a control system monitoring ballast and VCG. Seawater is used for ballast adjustment.

5 As an evolution of the Classic TLP design, the ETLP (Extended Tension Leg Platform) has been developed. Some of the drivers behind this design development are: Wider tendon base for greater pitch stiffness (stability) Smaller spacing of deck supports for more efficient structure Lower rotational inertia for hull and deck for lower pitch natural period A large moonpool can accommodate conventional top tension risers. De-coupling of tendon porch separation distance from the topsides deck design produces maximum design flexibility. Columns are moved inboard Pontoons extended to tendon porch Conventional TLP ETLP ETLP = Extended Tension Leg Platform Principle Benefits of ETLP Technology: Significant steel weight savings in deck and hull steel Capable of carrying greater payloads into deeper water Number of tendons is reduced Comprised of safe, conventional and well-proven systems ETLPs have been successfully designed, fabricated, and installed at the Kizomba A, Kizomba B Located offshore Angola and Magnolia locations in the Gulf of Mexico. Typical TLP Heave Motion RAO s Heave Motion RAO (m/m) Heave Motion RAO-225 deg Heading High-Tide, No Riser High Tide, Max Riser No Tide, No Riser No Tide, Max Riser Period (sec)

6 Semisubmersible Technology Semi units offer a number of benefits, including large payload capacity, limited sensitivity to water depth, quayside integration and the ability to relocate after field abandonment. A typical Semi design has four columns connected at the bottom by pontoon with a nominally rectangular cross-section. A truss structure connects the column tops and supports topsides modules. This arrangement provides a high degree of flexibility in fabrication methodology. The Semi is designated as a column stabilized units (USCG, ABS, DnV, etc.). The columns are stability columns and primarily provide floatation stability. Important design variables are column dimensions and spacing, pontoon size and the ratio of pontoon width to pontoon height, draft of the hull, etc. In order to satisfy the stability and motion requirements, ranges for the variables and critical parameters such as GM value, free board value, heave natural period, etc are set as the constraints. Columns are sized to provide adequate water plane area to support all anticipated loading conditions, spaced to support topsides modules, and tuned for a natural period of at least 20 seconds. These columns are supported by two parallel pontoons or a ring pontoon. Pontoons are sized to provide adequate buoyancy to support all weights and vertical loads, and proportioned to maximize heave damping. Typical Semi RAO s Head Sea RAO's 2.5 RAO (ft/ft or deg/ft) Surge Sway Heave Roll Pitch Yaw Wave Period (Sec)

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR ATMA 2006 HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR Partie 1 Pierre-Armand THOMAS TECHNIP Division Offshore - Paris (France) Diapositives

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology

More information

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico From the Wellhead to the Tanker Offshore Production Systems Index Offshore Installations Subsea Systems Field overview Christmas Trees Manifolds Templates Mid-Water Arches Topsides FPSOs The Oil Production

More information

Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 1 Lecture - 3 Compliant type offshore structures -1 Welcome to the

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2 Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2 10121-4404-03 Jelena Vidic-Perunovic Doris, Inc. 1 Best of RPSEA 10 Years of Research - Ultra-Deepwater

More information

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific June 2011 Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific Daniel Brooker, MCS Kenny Presentation Agenda 1. Objectives 2. Top Tensioned Riser (TTR) Selection Drivers

More information

EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE

EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE Sabri ALKAN 1, Ayhan Mentes 2, Ismail H. Helvacioglu 2, Nagihan Turkoglu 2 1 Department of Mechanical Engineering,

More information

REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS

REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS AMIR H. IZADPARAST SENIOR RESEARCH ENGINEER, HYDRODYNAMICS AND MOORING TECHNOLOGY, SOFEC JIAXING CHEN RESEARCH ENGINEER,

More information

International Journal of Scientific & Engineering Research, Volume 7, Issue 10, October ISSN

International Journal of Scientific & Engineering Research, Volume 7, Issue 10, October ISSN International Journal of Scientific & Engineering Research, Volume 7, Issue 10, October-2016 172 DYNAMIC ANALYSIS OF MINI TENSION LEG PLATFORMS UNDER RANDOM WAVES Shibin P Shaji, Dr. Jayalekshmi R. Abstract

More information

Semi-Submersible Offshore Platform Simulation Using ANSA & META

Semi-Submersible Offshore Platform Simulation Using ANSA & META Semi-Submersible Offshore Platform Simulation Using ANSA & META Offshore platforms are large structures designed to withstand extreme weather conditions and have a lifespan of at least 40 years. Million

More information

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs PAU, FRANCE 5-7 APRIL 2016 Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs Author: Fan Joe Zhang Presenter: Styrk Finne DNV GL - Software Contents Typical

More information

Wind Turbine Shuttle. Ferdinand van Heerd

Wind Turbine Shuttle. Ferdinand van Heerd Wind Turbine Shuttle Ferdinand van Heerd Contents Introduction Concept Resistance Seakeeping Vessel motion compensation system Hoisting motion compensation system Landing the wind turbine Workability Efficiency

More information

Dynamic analysis of offshore floating wind turbines

Dynamic analysis of offshore floating wind turbines Dynamic analysis of offshore floating wind turbines Hasan Bagbanci Centre for Marine Technology and Engineering (CENTEC), Instituto Superior Técnico Technical University of Lisbon, Lisboa, Portugal ABSTRACT:

More information

The SDS Skip. Subsea Deployment Systems Ltd.

The SDS Skip. Subsea Deployment Systems Ltd. The SDS Skip SUBSEA SKIP An alternative to enhance the recovery of structures, spool pieces, mattresses etc. during decommissioning work Can be used to transport complex structures or spool pieces to field

More information

Ameliorating the Negative Damping in the Dynamic Responses of a Tension Leg Spar-Type Support Structure with a Downwind Turbine

Ameliorating the Negative Damping in the Dynamic Responses of a Tension Leg Spar-Type Support Structure with a Downwind Turbine 1 Ameliorating the Negative Damping in the Dynamic Responses of a Tension Leg Spar-Type Support Structure with a Downwind Turbine Madjid Karimirad Torgeir Moan Author CeSOS Centre Centre for Ships for

More information

Tension-Leg-Buoy (TLB) Platforms for Offshore Wind Turbines

Tension-Leg-Buoy (TLB) Platforms for Offshore Wind Turbines Tension-Leg-Buoy (TLB) Platforms for Offshore Wind Turbines EERA DeepWind'2014 Deep Sea Offshore Wind R&D Conference, Trondheim, 22-24 January 2014 Tor Anders Nygaard, Institute for Energy Technology (IFE),

More information

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT Ionuț-Cristian SCURTU Principal instructor, Navy Academy Mircea cel Batran Constanta, Romania Abstract-The fast evolution

More information

PHASE 1 WIND STUDIES REPORT

PHASE 1 WIND STUDIES REPORT PHASE 1 WIND STUDIES REPORT ENVIRONMENTAL STUDIES AND PRELIMINARY DESIGN FOR A SUICIDE DETERRENT SYSTEM Contract 2006-B-17 24 MAY 2007 Golden Gate Bridge Highway and Transportation District Introduction

More information

Fully Submersible Heavy Lift Vessel

Fully Submersible Heavy Lift Vessel Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Oil and Gas Authority (OGA) (15th February 2016) CONTENT Leadon structures demobilisation Competitiveness (case studies) Decommissioning options Installation

More information

Deepwater Challenges Pipeline Installation Case

Deepwater Challenges Pipeline Installation Case Deepwater Challenges Pipeline Installation Case Seminar Nasional Oceano, ITS, 28 March 2011, Surabaya Gunawan Suwarno, 28 March 2011 DeepLay Energy Services email : marketing@deep-lay.com 1 Deepwater Development

More information

Numerical modelling of disconnectable turret mooring systems

Numerical modelling of disconnectable turret mooring systems Numerical modelling of disconnectable turret mooring systems A. Duggal, S. Ryu & O. De Andrade Research & Development Department, SOFEC Inc., USA. Abstract Floating, Production, Storage, and Offloading

More information

Experimental Analysis on the Mooring Lines Force Behaviour of Semisubmersible

Experimental Analysis on the Mooring Lines Force Behaviour of Semisubmersible Jurnal Teknologi Full paper Experimental Analysis on the Mooring Lines Force Behaviour of Semisubmersible in Regular Waves N.M. Khairuddin a, Mohamad Pauzi b, Jaswar Koto a* a Department of Aeronautics,

More information

DESIGN OF A SEMI-SUBMERSIBLE PRODUCTION AND DRILLING FACILITY FOR THE GULF OF MEXICO

DESIGN OF A SEMI-SUBMERSIBLE PRODUCTION AND DRILLING FACILITY FOR THE GULF OF MEXICO DESIGN OF A SEMI-SUBMERSIBLE PRODUCTION AND DRILLING FACILITY FOR THE GULF OF MEXICO OCEN 407- Design of Ocean Engineering Facilities Ocean Engineering Program Texas A&M University Final Report May 9,

More information

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen Aasta Hansteen Operational Experiences FFU Seminar 28 th January 2016 Tom-Erik Henriksen Agenda Introduction to Aasta Hansteen Main Challenges & Risks Operational Experiences - 2015 Campaigns 2 seabed-to-surface

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering

More information

Development of Accidental Collapse Limit State Criteria for Offshore Structures

Development of Accidental Collapse Limit State Criteria for Offshore Structures Risk Acceptance and Risk Communication Stanford, March 26-27, 2007 Development of Accidental Collapse Limit State Criteria for Offshore Structures by Torgeir Moan Norwegian University of Science and Technology

More information

STABILITY OF MULTIHULLS Author: Jean Sans

STABILITY OF MULTIHULLS Author: Jean Sans STABILITY OF MULTIHULLS Author: Jean Sans (Translation of a paper dated 10/05/2006 by Simon Forbes) Introduction: The capsize of Multihulls requires a more exhaustive analysis than monohulls, even those

More information

Air gap on semi-submersible MOUs under DNVGL Class. Current & Future Design Practice

Air gap on semi-submersible MOUs under DNVGL Class. Current & Future Design Practice Air gap on semi-submersible MOUs under DNVGL Class Current & Future Design Practice Topics for the presentation Wood Group Norway Motivation DNVGL OTG-13 DNVGL OTG-14 Case study Impact on semi submersible

More information

BUOYANCY, FLOATATION AND STABILITY

BUOYANCY, FLOATATION AND STABILITY BUOYANCY, FLOATATION AND STABILITY Archimedes Principle When a stationary body is completely submerged in a fluid, or floating so that it is only partially submerged, the resultant fluid force acting on

More information

A COMPARISON BETWEEN THE PRELIMINARY DESIGN STUDIES OF A FIXED AND A FLOATING SUPPORT STRUCTURE FOR A 5 MW OFFSHORE WIND TURBINE IN THE NORTH SEA

A COMPARISON BETWEEN THE PRELIMINARY DESIGN STUDIES OF A FIXED AND A FLOATING SUPPORT STRUCTURE FOR A 5 MW OFFSHORE WIND TURBINE IN THE NORTH SEA A COMPARISON BETWEEN THE PRELIMINARY DESIGN STUDIES OF A FIXED AND A FLOATING SUPPORT STRUCTURE FOR A 5 MW OFFSHORE WIND TURBINE IN THE NORTH SEA M Collu, A J Kolios, A Chahardehi, F Brennan, Cranfield

More information

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA Mazlan Muslim and Md Salim Kamil Marine and Design Technology Section, University Kuala Lumpur MIMET, Lumut, Perak, Malaysia E-Mail

More information

S0300-A6-MAN-010 CHAPTER 2 STABILITY

S0300-A6-MAN-010 CHAPTER 2 STABILITY CHAPTER 2 STABILITY 2-1 INTRODUCTION This chapter discusses the stability of intact ships and how basic stability calculations are made. Definitions of the state of equilibrium and the quality of stability

More information

DIFFERENT SOLUTIONS TO INSPECT PLATFORM RISERS. By R van Agthoven and H Quakkelsteijn, ApplusRTD, Rotterdam, The Netherlands

DIFFERENT SOLUTIONS TO INSPECT PLATFORM RISERS. By R van Agthoven and H Quakkelsteijn, ApplusRTD, Rotterdam, The Netherlands DIFFERENT SOLUTIONS TO INSPECT PLATFORM RISERS By R van Agthoven and H Quakkelsteijn, ApplusRTD, Rotterdam, The Netherlands SUMMARY The need for the inspection of pipelines and risers is growing, as the

More information

for Naval Aircraft Operations

for Naval Aircraft Operations Seakeeping Assessment of Large Seakeeping Assessment of Large Trimaran Trimaran for Naval Aircraft Operations for Naval Aircraft Operations Presented by Mr. Boyden Williams, Mr. Lars Henriksen (Viking

More information

OVERVIEW. Capabilities & Services

OVERVIEW. Capabilities & Services +1.713.467.0505 Sales@boamarine.com www.boamarine.com OVERVIEW Capabilities & Services BOA MARINE SERVICES provides engineering, construction and contracting services related to fi xed and fl oating offshore

More information

Alternative Installation Methods for. Offshore Wind Substations

Alternative Installation Methods for. Offshore Wind Substations Department of Mechanical and Aerospace Engineering Alternative Installation Methods for Offshore Wind Substations Author: Justo Aguiar Quintana Supervisor: Mr Cameron Johnstone A thesis submitted in partial

More information

IMO REVISION OF THE INTACT STABILITY CODE. Proposal of methodology of direct assessment for stability under dead ship condition. Submitted by Japan

IMO REVISION OF THE INTACT STABILITY CODE. Proposal of methodology of direct assessment for stability under dead ship condition. Submitted by Japan INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON STABILITY AND LOAD LINES AND ON FISHING VESSELS SAFETY 49th session Agenda item 5 SLF 49/5/5 19 May 2006 Original: ENGLISH REVISION OF THE INTACT

More information

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION Proceedings of COBEM 2009 Copyright 2009 by ABCM 20th International Congress of Mechanical Engineering November 15-20, 2009, Gramado, RS, Brazil INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION Helena

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

Risk Safety Systems US Inc.

Risk Safety Systems US Inc. INTEGRATED ESCAPE CHUTE (AND LIFE RAFT) SYSTEM (IECS) Basic Principles and applications Example: Variable Height Integrated Escape Chute System Risk Safety Systems US Inc. Introduction to Risk Safety Systems

More information

FULL SCALE MEASUREMENT OF LH11-1 FPS HULL AND MOORING SYSTEM

FULL SCALE MEASUREMENT OF LH11-1 FPS HULL AND MOORING SYSTEM FULL SCALE MEASUREMENT OF LH11-1 FPS HULL AND MOORING SYSTEM Qu Yan Research Institute of CNOOC Beijing, China Shi Zhongmin Research Institute of CNOOC Beijing, China ABSTRACT Nanhai Tiaozhan FPS of LH11-1

More information

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering ABSTRACT Drilling operations for subsea wells are typically carried out

More information

Active Hydrophore System AHS-01

Active Hydrophore System AHS-01 BRIEF PRODUCT DESCRIPTION: Standard material Seawater exposed parts: Titanium gr. 2 Rapid Response Valves: Titanium gr. 2 Cabinet: SST AISI 316 This is a skid mounted unit, with the hydrophore tank and

More information

U S F O S B u o y a n c y And Hydrodynamic M a s s

U S F O S B u o y a n c y And Hydrodynamic M a s s 1 U S F O S B u o y a n c y And Hydrodynamic M a s s 2 CONTENTS: 1 INTRODUCTION... 3 2 ACCURACY LEVELS... 3 2.1 LEVEL-0... 3 2.2 LEVEL-1... 3 2.3 PANEL MODEL... 3 3 EX 1. SINGLE PIPE. NON FLOODED... 4

More information

Impact of Passive Heave Compensator on Offshore Lifting

Impact of Passive Heave Compensator on Offshore Lifting Journal of Shipping and Ocean Engineering 5 (2015) 166-180 doi: 10.17265/2159-5879/2015.04.003 D DAVID PUBLISHING Impact of Passive Heave Compensator on Offshore Lifting Arvind Keprate Department of Mechanical

More information

EXPERIMENTAL COMPARISON OF THREE FLOATING WIND TURBINE CONCEPTS

EXPERIMENTAL COMPARISON OF THREE FLOATING WIND TURBINE CONCEPTS Proceedings of the 31 st International Conference on Ocean, Offshore and Arctic Engineering OMAE2012 Rio de Janeiro, Brazil June 10-15, 2012 OMAE2012-83645 EXPERIMENTAL COMPARISON OF THREE FLOATING WIND

More information

Effect of Wave Steepness on Yaw Motions of a Weathervaning Floating Platform

Effect of Wave Steepness on Yaw Motions of a Weathervaning Floating Platform 16 th Australasian Fluid Mechanics Conference Crown Plaza, Gold Coast, Australia 2-7 December 27 Effect of Wave Steepness on Yaw Motions of a Weathervaning Floating Platform Jayanth Munipalli, and Krish

More information

VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10

VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10 / ED VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES OPERATING PRINCIPLE The VPPL are variable displacement axial-piston pumps with variable swash plate, suitable for applications

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 11 Other Operations and Systems 6 Guidelines for the Preparation of Damage Stability Calculations and Damage Control Documentation

More information

The salient features of the 27m Ocean Shuttle Catamaran Hull Designs

The salient features of the 27m Ocean Shuttle Catamaran Hull Designs The salient features of the 27m Ocean Shuttle Catamaran Hull Designs The hull form is a semi-planing type catamaran. It employs a combination of symmetrical and asymmetrical sponson shapes, thereby combining

More information

BWS ONLINE FORECASTING BERTH OPERATING SAFETY. Matthew R. O Halloran, Daphne Choong

BWS ONLINE FORECASTING BERTH OPERATING SAFETY. Matthew R. O Halloran, Daphne Choong BWS ONLINE FORECASTING BERTH OPERATING SAFETY Matthew R. O Halloran, Daphne Choong OMC International Pty Ltd, 2/2 Walmer St, Abbotsford, Vic 3067, Australia matthew@omc-international.com.au daphne@omc-international.com.au

More information

MSC Guidelines for Review of Stability for Towing Vessels (M)

MSC Guidelines for Review of Stability for Towing Vessels (M) S. E. HEMANN, CDR, Chief, Hull Division References Contact Information a. 46 CFR Subchapter M, Part 144 b. 46 CFR Subchapter S, Parts 170, 173 c. Navigation and Vessel Circular No. 17-91, CH 1, Guidelines

More information

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES

APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES APPLICATION OF PUSHOVER ANALYSIS ON EARTHQUAKE RESPONSE PREDICATION OF COMPLEX LARGE-SPAN STEEL STRUCTURES J.R. Qian 1 W.J. Zhang 2 and X.D. Ji 3 1 Professor, 3 Postgraduate Student, Key Laboratory for

More information

OMAE S&R Paper 6129

OMAE S&R Paper 6129 Proceedings of ETCE/OMAE2000 Joint Conference Energy for the New Millenium February 14-17, 2000, New Orleans, LA OMAE 2000 - S&R Paper 6129 RISK ASSESSMENT OF DELAYS DURING DEEP WATER PIPE-LAYING Vladimir

More information

DP Ice Model Test of Arctic Drillship

DP Ice Model Test of Arctic Drillship Author s Name Name of the Paper Session DYNAMIC POSITIONING CONFERENCE October 11-12, 211 ICE TESTING SESSION DP Ice Model Test of Arctic Drillship Torbjørn Hals Kongsberg Maritime, Kongsberg, Norway Fredrik

More information

The WindFloat Project. Hamburg, September 2016

The WindFloat Project. Hamburg, September 2016 The WindFloat Project Hamburg, September 2016 WindFloat Atlantic: a step change in turning floating wind commercial Technical Performance Competitive LCOE Bankability 2 WindFloat Atlantic: overall description

More information

MSC Guidelines for Engine Cooling Systems

MSC Guidelines for Engine Cooling Systems S. T. Brady, CDR, Chief, Engineering Division References: Contact Information: a. 46 CFR 56.60, 56.50-95 & 56.50-96 (Subchapter F) b. 46 CFR 77.03-1 (Subchapter H) c. 46 CFR 90.20 & 46 CFR 96.03 (Subchapter

More information

SeaScape A Platform for your imagination

SeaScape A Platform for your imagination SeaScape A Platform for your imagination Introduction SeaScape is a new way to experience the sea. It is not a floating house but a stationary yacht, with the vision to surprise holidaymakers in their

More information

Spar platform at deep water region in Malaysian sea

Spar platform at deep water region in Malaysian sea International Journal of the Physical Sciences Vol. 6(30), pp. 6872-6881, 23 November, 2011 Available online at http://www.academicjournals.org/ijps DOI: 10.5897/IJPS11.571 ISSN 1992-1950 2011 Academic

More information

Vibration and Pulsation Analysis and Solutions

Vibration and Pulsation Analysis and Solutions 1 Vibration and Pulsation Analysis and Solutions Brian Howes, M.Sc., P.Eng. Beta Machinery Analysis Ltd. Problems created by excessive vibration in machinery can have serious economic impact. Frequently

More information

Level MEASUREMENT 1/2016

Level MEASUREMENT 1/2016 Level MEASUREMENT 1/2016 AGENDA 2 A. Introduction B. Float method C. Displacer method D. Hydrostatic pressure method E. Capacitance method G. Ultrasonic method H. Radar method I. Laser method J. Level

More information

THE USE OF ENERGY BUILD UP TO IDENTIFY THE MOST CRITICAL HEELING AXIS DIRECTION FOR STABILITY CALCULATIONS FOR FLOATING OFFSHORE STRUCTURES

THE USE OF ENERGY BUILD UP TO IDENTIFY THE MOST CRITICAL HEELING AXIS DIRECTION FOR STABILITY CALCULATIONS FOR FLOATING OFFSHORE STRUCTURES 10 th International Conference 65 THE USE OF ENERGY BUILD UP TO IDENTIFY THE MOST CRITICAL HEELING AXIS DIRECTION FOR STABILITY CALCULATIONS FOR FLOATING OFFSHORE STRUCTURES Joost van Santen, GustoMSC,

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

INNOVATIVE MOORING SYSTEMS

INNOVATIVE MOORING SYSTEMS INNOVATIVE MOORING SYSTEMS VESSEL AUTOMOORING MODULES QUAY AUTOMOORING INSTALLATIONS DOCKLOCK brings mooring to a next level PAGE 2 FOR OVER A CENTURY THE WORLD S LEADING EXPERT IN MOORING, BERTHING AND

More information

Comparative Stability Analysis of a Frigate According to the Different Navy Rules in Waves

Comparative Stability Analysis of a Frigate According to the Different Navy Rules in Waves Comparative Stability Analysis of a Frigate According to the Different Navy Rules in Waves ABSTRACT Emre Kahramano lu, Technical University, emrek@yildiz.edu.tr Hüseyin Y lmaz,, hyilmaz@yildiz.edu.tr Burak

More information

Research on Goods and the Ship Interaction Based on ADAMS

Research on Goods and the Ship Interaction Based on ADAMS Research on Goods and the Ship Interaction Based on ADAMS Fangzhen Song, Yanshi He and Haining Liu School of Mechanical Engineering, University of Jinan, Jinan, 250022, China Abstract. The equivalent method

More information

03 Vessel Fitness and Safety

03 Vessel Fitness and Safety 03 Vessel Fitness and Safety Competence (Skills) Knowledge, Understanding and Proficiency Level Required Vessel Terminology and Characteristics Vessel hull types and configurations Members must know the

More information

RESOLUTION MSC.141(76) (adopted on 5 December 2002) REVISED MODEL TEST METHOD UNDER RESOLUTION 14 OF THE 1995 SOLAS CONFERENCE

RESOLUTION MSC.141(76) (adopted on 5 December 2002) REVISED MODEL TEST METHOD UNDER RESOLUTION 14 OF THE 1995 SOLAS CONFERENCE MSC 76/23/Add.1 RESOLUTION MSC.141(76) THE MARITIME SAFETY COMMITTEE, RECALLING Article 38(c) of the Convention on the International Maritime Organization concerning the functions of the Committee, RECALLING

More information

The Physics of Lateral Stability 1

The Physics of Lateral Stability 1 The Physics of Lateral Stability 1 This analysis focuses on the basic physics of lateral stability. We ask Will a boat heeled over return to the vertical? If so, how long will it take? And what is the

More information

OTC Copyright 2010, Offshore Technology Conference

OTC Copyright 2010, Offshore Technology Conference OTC 21018 Mooring Design and Installation Considerations for the Mirage and Telemark Field Development Todd Veselis, InterMoor; Ross Frazer, SPE, ATP Oil & Gas Corporation; Mark Huntley, Whitehill Manufacturing

More information

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1) Modeling and Field Verification Study of Air Slam Conditions on kalanit Pipeline System By Yiftach Brunner & Sathish Kumar ir valves are integral part of long water transmission mains and are essential

More information

SAFEHULL-DYNAMIC LOADING APPROACH FOR FLOATING PRODUCTION, STORAGE AND OFFLOADING (FPSO) SYSTEMS

SAFEHULL-DYNAMIC LOADING APPROACH FOR FLOATING PRODUCTION, STORAGE AND OFFLOADING (FPSO) SYSTEMS GUIDANCE NOTES ON SAFEHULL-DYNAMIC LOADING APPROACH FOR FLOATING PRODUCTION, STORAGE AND OFFLOADING (FPSO) SYSTEMS (FOR THE SH-DLA CLASSIFICATION NOTATION) DECEMBER 2001 American Bureau of Shipping Incorporated

More information

Field Development & Construction

Field Development & Construction Field Development & Construction Michael Cowie Technical Director Ecosse Subsea Systems Ltd Ambient Lifting: A Real Alternative to Heavy Lift Vessels 4 th February 2016, AECC, Michael Cowie Presentation

More information

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance

More information

Performance improvements of mooring systems for wave energy converters

Performance improvements of mooring systems for wave energy converters Performance improvements of mooring systems for wave energy converters P. Casaubieilh 1, F. Thiebaut 1, B. Bosma 2, C. Retzler 3, M. Shaw 3, Y. Letertre 3 & W. Sheng 1 1 Hydraulics & Maritime Research

More information

MSC Guidelines for the Review of OSV Stability

MSC Guidelines for the Review of OSV Stability MSC Guidelines for the Review of OSV Stability Procedure Number: C1-06 Revision Date: February 13, 2013 R. J. LECHNER, CDR, Tank Vessel and Offshore Division Purpose To establish a procedure for reviewing

More information

FLNG CONCEPT DESIGN. Proceedings of SNAME Student Paper Competition SNAME February 27,, MIT, Boston, Massachusetts, USA

FLNG CONCEPT DESIGN. Proceedings of SNAME Student Paper Competition SNAME February 27,, MIT, Boston, Massachusetts, USA Proceedings of SNAME Student Paper Competition SNAME February 27,, MIT, Boston, Massachusetts, USA CONCEPT DESIGN Javier Moreno Department of Mechanical Engineering University of Maine Orono, Maine, 04469

More information

Scissor Mechanisms. Figure 1 Torero Cabin Service Truck. Scissor Mechanism was chassis mounted and lifted the cabin to service aircraft

Scissor Mechanisms. Figure 1 Torero Cabin Service Truck. Scissor Mechanism was chassis mounted and lifted the cabin to service aircraft Scissor Mechanisms Scissor mechanisms are very common for lifting and stabilizing platforms. A variety of manlifts, service platforms and cargo lifts utilize this visually simple but structurally complex

More information

MULTI-DIAMETER, BI-DIRECTIONAL PIGGING FOR PIPELINE PRE-COMMISSIONING

MULTI-DIAMETER, BI-DIRECTIONAL PIGGING FOR PIPELINE PRE-COMMISSIONING MULTI-DIAMETER, BI-DIRECTIONAL PIGGING FOR PIPELINE PRE-COMMISSIONING By: Magne Andreas Vik, StatoilHydro; Alf Åge Kristiansen, StatoilHydro Simon Sykes, FTL Seals Technology; Steve Hutcheson, Pipeline

More information

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS POP Safety Valve POP Safety Valve INTRODUCTION The effects of exceeding safe pressure levels in an unprotected pressure vessel or system, can have catastrophic effects on both plant and personnel. Safety

More information

DYNAMIC POSITIONING CONFERENCE. October 13-14, Arctic. DP In Ice Conditions

DYNAMIC POSITIONING CONFERENCE. October 13-14, Arctic. DP In Ice Conditions Return to Session Directory DYNAMIC POSITIONING CONFERENCE October 13-14, 29 Arctic DP In Ice Conditions Nils Albert Jenssen Kongsberg Maritime, Kongsberg Norway Suman Muddesitti Shell International Exploration

More information

NEW IGC CODE AND IGF CODE

NEW IGC CODE AND IGF CODE NEW IGC CODE AND IGF CODE SAFETY ASPECTS Raffaele Piciocchi Gas Center - Greece SAFETY4SEAS - Athens 1 October 2014 Content NEW IGC CODE DRAFT IGF CODE 2 The New IGC Code A new IGC Code has been approved

More information

POWER TAKE-OFF SYSTEMS OF OFFSHORE RIG POWER PLANTS

POWER TAKE-OFF SYSTEMS OF OFFSHORE RIG POWER PLANTS POWER TAKE-OFF SYSTEMS OF OFFSHORE RIG POWER PLANTS Wieslaw Tarelko Gdynia Maritime University ul. Morska 81-87, 81-225 Gdynia, Poland tel.: +48 58 6901331 e-mail: tar@am.gdynia.pl Abstract The growing

More information

MODELLING THE CAISSON PLACEMENT AT THE CHIOGGIA INLET, VENICE. Bas Hofland 1 and Nico Vink 2

MODELLING THE CAISSON PLACEMENT AT THE CHIOGGIA INLET, VENICE. Bas Hofland 1 and Nico Vink 2 MODELLING THE CAISSON PLACEMENT AT THE CHIOGGIA INLET, VENICE Bas Hofland 1 and Nico Vink 2 In the summer of 2014 Strukton Immersion Projects has placed the foundation caissons of the Venice flood barrier

More information

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys (Feb 2010) PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys Contents 1 Introduction 2 Preparations for Survey 2.1 General 2.2 Conditions for survey 2.3 Access to structures 2.4 Survey

More information

ShipRight Design and construction. Procedure for Ship Units July 2014

ShipRight Design and construction. Procedure for Ship Units July 2014 ShipRight Design and construction Procedure for Ship Units July 2014 Document history Document date July 2014 Notes: New document Group Limited, its affiliates and subsidiaries and their respective officers,

More information

INSPECTION & NON-DESTRUCTIVE TESTING

INSPECTION & NON-DESTRUCTIVE TESTING INSPECTION & NON-DESTRUCTIVE TESTING Stork delivers experienced and efficient Inspection and NDT solutions; as a tailored package or a standalone service. WWW.STORK.COM 1 GLOBAL SERVICE WITH A LOCAL PRESENCE

More information

Polar Research Vessel Operational Requirements and Summary of Technical Studies

Polar Research Vessel Operational Requirements and Summary of Technical Studies Polar Research Vessel Operational Requirements and Summary of Technical Studies Presentation to UNOLS by Jim St John Science and Technology Corporation - Polar Technology Office Why a New Antarctic Research

More information

COUPLED DYNAMIC ANALYSIS OF FLOATING OFFSHORE WIND FARMS. A Thesis SANGYUN SHIM

COUPLED DYNAMIC ANALYSIS OF FLOATING OFFSHORE WIND FARMS. A Thesis SANGYUN SHIM COUPLED DYNAMIC ANALYSIS OF FLOATING OFFSHORE WIND FARMS A Thesis by SANGYUN SHIM Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the

More information

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES

2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES Industry Guidelines Part 2 FUSION FITTINGS FOR USE WITH POLYETHYLENE PRESSURE PIPES DESIGN FOR DYNAMIC STRESSES ISSUE 5.1 Ref: POP10B 15 MAR 2010 Disclaimer In formulating this guideline PIPA has relied

More information

DUKC DYNAMIC UNDER KEEL CLEARANCE

DUKC DYNAMIC UNDER KEEL CLEARANCE DUKC DYNAMIC UNDER KEEL CLEARANCE Information Booklet Prepared in association with Marine Services Department 10/10/2005 Dynamic Under Keel Clearance (DUKC) integrates real time measurement of tides and

More information

GEA FOR ADVANCED STRUCTURAL DYNAMIC ANALYSIS

GEA FOR ADVANCED STRUCTURAL DYNAMIC ANALYSIS SMART SOLUTIONS FOR VIBRATION MONITORING GEA FOR ADVANCED STRUCTURAL DYNAMIC ANALYSIS ANALYSIS OF CIVIL STRUCTURES - EXPO MERLATA PEDESTRIAN BRIDGE ABSTRACT Civil structures and in particular bridges and

More information

Lecture 19 PRESSURE-CONTROL VALVES [CONTINUED]

Lecture 19 PRESSURE-CONTROL VALVES [CONTINUED] Lecture 19 PRESSURE-CONTROL VLVES [CONTINUED] 1.5 Counterbalance Valve Schematic diagram of counterbalance valve is shown in Fig. 1.14. These normally closed valves are primarily used to maintain a back

More information

STABILITY EVALUATIONS OF SEMI-SUBMERSIBLE HEAVY TRANSPORT VESSELS BY A PROGRESSIVE FLOODING SIMULATION TOOL

STABILITY EVALUATIONS OF SEMI-SUBMERSIBLE HEAVY TRANSPORT VESSELS BY A PROGRESSIVE FLOODING SIMULATION TOOL Proceedings of the ASME st International Conference on Ocean, Offshore and Arctic Engineering OMAE July -,, Rio de Janeiro, Brazil OMAE-8 STABILITY EVALUATIONS OF SEMI-SUBMERSIBLE HEAVY TRANSPORT VESSELS

More information

OPRC Level I. Oil containment booms

OPRC Level I. Oil containment booms OPRC Level I Oil containment booms Aim Be able to distinguish between the various types of Containment Booms Outline General Purpose of Booms Curtain Booms Fence Booms Beach Booms What is boom? Barriers

More information

THE BEHAVIOUR OF TUGS IN WAVES ASSISTING LNG CARRIERS DURING BERTHING ALONG OFFSHORE LNG TERMINALS

THE BEHAVIOUR OF TUGS IN WAVES ASSISTING LNG CARRIERS DURING BERTHING ALONG OFFSHORE LNG TERMINALS Proceedings of OMAE 5 4 th International Conference on Offshore Mechanics and Arctic Engineering -7 June 5 Halkidiki, Greece THE BEHAVIOUR OF TUGS IN WAVES ASSISTING LNG CARRIERS DURING BERTHING ALONG

More information

Sloshing analysis of LNG membrane tanks

Sloshing analysis of LNG membrane tanks CLASS GUIDELINE DNVGL-CG-0158 Edition February 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class

More information