Walvis Bay LNG FSRU. Concept Study Report REV August XARIS Namibia

Size: px
Start display at page:

Download "Walvis Bay LNG FSRU. Concept Study Report REV August XARIS Namibia"

Transcription

1 Walvis Bay LNG FSRU Concept Study Report REV August 2014 XARIS Namibia

2 Walvis Bay LNG FSRU Concept Study Report S RP-PP-001-R1.docx 18 August 2014 REV. TYPE DATE EXECUTED CHECK APPROVED CLIENT DESCRIPTION / COMMENTS 01 D DAS AAM Approved TYPE OF ISSUE: (A) Draft (B) To bid or proposal (C) For Approval (D) Approved (E) Void XARIS Namibia Prestedge Retief Dresner Wijnberg (Pty) Ltd 5 th Floor, Safmarine Quay, Clock Tower Precinct, Victoria & Alfred Waterfront Cape Town, South Africa PO Box 50023, Waterfront 8002 T: Cape Town, South Africa Santiago, Chile Perth, Australia Seattle, USA

3 Copyright Disclaimer This Document, including all design and information therein, is Confidential Intellectual Property of PRDW and/or Xaris. Copyright and all other rights are reserved by PRDW and/or Xaris. This Document may only be used for its intended purpose. XARIS Namibia Prestedge Retief Dresner Wijnberg (Pty) Ltd 5 th Floor, Safmarine Quay, Clock Tower Precinct, Victoria & Alfred Waterfront Cape Town, South Africa PO Box 50023, Waterfront 8002 T: Cape Town, South Africa Santiago, Chile Perth, Australia Seattle, USA

4 CONTENTS Page N 1. INTRODUCTION Background Scope of Work 1 2. FUNCTIONAL REQUIREMENTS Battery Limits Berth Availability and Throughput Considerations Limiting Operational Conditions Survival Conditions for FSRU at Berth Ship Manoeuvring Operations Cargo Operations Navigational Criteria Design Vessel Stopping Distance Turning Areas Channel Geometry Berth Geometry LNG Safety Requirements 5 3. CONCEPT LAYOUT DEVELOPMENT Concept Layouts Marine Infrastructure Berthing Structure Pipeline Support Layout Evaluation and Preferred Layout ENVIRONMENTAL CONDITIONS Introduction Water Levels Wind Description of Available Data Operational Wind Climate Extreme Wind Speeds Waves Description of the Wave Model Operational Wave Climate Model Setup Model Results Effect of Proposed FSRU Berth on Proposed Tanker Berths Extreme Wave Heights 21

5 Model Setup Model Results Geology VESSEL NAVIGATION SIMULATION Introduction Description of the Simulator Simulation Environment (2D Model) Simulator Programme Simulation of Environmental Conditions Simulator Ship Model Tug Simulation Evaluation Criteria Simulation Runs Simulation Run Analysis Berthing Manoeuvres Sailing Manoeuvres Tug Power Evaluation CAPITAL COST ESTIMATE Introduction Allowance for P&G Allowance for Design Risk Allowance for Site and Engineering Capital Cost Estimate CONCLUSIONS WAY FORWARD REFERENCES 35 TABLES Page N Table 2-1: Design vessel characteristics 3 Table 2-2: Semi-protected channel depth requirements 4 Table 2-3: Berth depth requirements 5 Table 4-1: Tidal characteristics of the port of Walvis Bay (SANHO, 2013) 12 Table 4-2: Extreme value analysis of wind speed at Pelican Point Lighthouse. See Figure 4-1 for location of data. 15 Table 4-3: Extreme value analysis of wind speed at modelled wave height at the proposed FSRU berth. See Figure 4-5 for location of data. 23 Table 5-1: Summary of simulated environmental conditions 27 Table 5-2: Characteristics of the simulator ship model 27 Table 5-3: Simulator tug characteristics 28 Table 5-4: Simulation runs completed 29

6 FIGURES Page N Figure 3-1: Planned tanker berths of the Walvis Bay SADC port (PRDW, 2014) 6 Figure 3-2: FSRU layout 1-200m channel offset. Incorporated with planned tanker berths. 7 Figure 3-3: FSRU layout 2-300m channel offset. Incorporated with planned tanker berths. 7 Figure 3-4: FSRU layout 3-200m channel offset. Incorporated with existing Walvis Bay port entrance channel. 8 Figure 3-5: Typical LNG berthing structure 9 Figure 3-6: Light trestle example, San Vicente Bay LPG, Chile (Panoramio, 2014). 9 Figure 3-7: Preferred FSRU layout - 200m channel offset. Incorporated with planned tanker berths. 11 Figure 4-1: Locations of wind data used in this study. 12 Figure 4-2: Wind roses of mean wind speed for measurements at Pelican Point Lighthouse and NCEP hindcast node located at 14 E, 23 S. See Figure 4-1 for location of data. 14 Figure 4-3: Wind speed exceedances at Pelican Point Lighthouse. See Figure 4-1 for location of data. 14 Figure 4-4: Extreme value analysis of 1 min average wind speed at Pelican Point Lighthouse. See Figure 4-1 for location of data. 15 Figure 4-5: Model bathymetry, mesh and model output locations. 17 Figure 4-6: Example of spectral wave model output with wave boundary conditions Hm0 = 4.2 m, Tp = 13 s, Mean Wave Direction = Figure 4-7: Wave height roses at the proposed FSRU berth, entrance channel, and start of entrance channel. See Figure 4-5 for location of data. 19 Figure 4-8: Wave period roses at the proposed FSRU berth, entrance channel, and start of entrance channel. See Figure 4-5 for location of data. 19 Figure 4-9: Occurrence of Hm0 and Tp combinations at the proposed FSRU berth. See Figure 4-5 for location of data. 20 Figure 4-10: Comparison of wave height exceedance at the proposed FSRU berth, entrance channel, and start of entrance channel. See Figure 4-5 for location of data. 20 Figure 4-11: Wave roses at the proposed Tanker berth 1, with and without the proposed FSRU berth. See Figure 4-5 for location of data. 21 Figure 4-12: Comparison of wave height exceedance at the proposed Tanker berth 1, with and without the proposed FSRU berth. See Figure 4-5 for location of data. 21 Figure 4-13: Extreme value analysis of modelled wave height at the proposed FSRU berth. See Figure 4-5 for location of data. 22 Figure 4-14: Scatter plot of Hm0 vs Tp at the proposed FSRU berth. 23 Figure 5-1: Six-degrees of freedom of movement 25 Figure 5-2: Simulation environment layout 26 Figure 5-3: Simulation run A01 30 Figure 5-4: Simulation run A04 31 Figure 6-1: Estimated capital cost for three scenarios all using trestle pipe support 33 Figure 6-2: Estimated capital cost for three scenarios all using subsea pipeline for pipe support 33

7 ANNEXURES ANNEXURE A DESIGN BASIS ANNEXURE B FUTURE WALVIS BAY TANKER BERTH LAYOUT ANNEXURE C LNG FSRU PREFERRED LAYOUT ANNEXURE D VESSEL NAVIGATION SIMULATION DETAILS

8 XARIS Walvis Bay LNG FSRU Concept Study Report 1. INTRODUCTION 1.1 Background Prestedge Retief Dresner Wijnberg (Pty) Ltd (PRDW) has been appointed by Xaris to develop a concept layout, supported by a vessel navigation study, for a LNG offloading facility at Walvis Bay. Xaris have specified that LNG carriers will offload their product into a Floating Storage and Regasification Unit (FSRU) which will regasify the LNG and pump it onshore, where it will be used to fuel a 250 MW gas fired power plant. This report provides a broad description of the study. It includes the critical assumptions and logic used to define the preferred layout. In addition the results of the wave modelling and vessel navigation simulation, performed on the preferred layout, are included. An approved Design Basis report detailing initial assumptions preceded this report. The Design Basis is included in Annexure A. Section 2 of this report contains key assumptions and specifications with regards to the functional requirements of the facility. The layout selection is included in Section 3. The environmental conditions, including wave transformation modelling details, are presented in Section 4. The vessel navigation simulation, capital cost estimates and conclusions follow in Sections 5, 6 and 7 respectively. 1.2 Scope of Work The scope of work for this project, as defined in the proposal, is broken down below: Prepare a design basis capturing the functional requirements of the FSRU mooring and berthing facilities (civil infrastructure). The required Topsides and Trestle Gas Pipeline Engineering and Procurement will be provided by Excelerate. Develop a general arrangement layout of the FSRU mooring and berthing facilities (civil infrastructure), integrated with the Namport oil terminal and future Walvis Bay Southern African Development Community (SADC) Port. Desktop ship simulation (navigation) study to confirm the new layout accommodating FSRU and LNG carriers. Rough order of magnitude capital cost estimate for the FSRU marine infrastructure (berth, access trestle, dredging). Report compilation. XARIS Concept Study Report Page 1 of 36

9 2. FUNCTIONAL REQUIREMENTS 2.1 Battery Limits This study only considers the marine facilities. This includes the marine structures and consideration of the gas pipeline from the berth to the coastline. 2.2 Berth Availability and Throughput Considerations The required berth availability is dependent on the required throughput, throughput frequency and storage volume of the LNG facility. In the case where the LNG is used as feedstock for a power plant there is very little scope to allow a plant shutdown due to a lack of LNG. It is assumed the facility will service a power plant with finite tank volume; hence the following berth availability requirements have been made: The marine facilities will be designed to a maximum berth unavailability of 5 consecutive days In order to ensure that berth unavailability does not exceed 5 consecutive days, at a concept design level, it is assumed that the annual berth availability should be 98.6%, in lieu of storm duration data. The anticipated throughput at the facility has been defined, by Xaris, as m 3 /yr, with vessel calls every 60 days. 2.3 Limiting Operational Conditions Survival Conditions for FSRU at Berth For survivability of a FSRU at the berth the limiting significant wave height (Hs) is 2.5 m (Ramirez, 2014). A moored vessel, 1 minute averaged, wind speed (Vw,1min) limit of 25 m/s, acting transverse, to the quay may not be exceeded (PIANC, 2014) Ship Manoeuvring Operations The limiting wave height conditions for ship manoeuvring operations will be based on the support vessel (tugs) operational limits. This requires that the significant wave height does not exceed a value of 1.5 m to 2.0 m (PIANC, 2012). Operation of the pilot boat is limited to a significant wave height of 2.5 m. Limiting wind conditions during berthing and unberthing operations are 10.0 m/s (transverse to quay) and 17.0 m/s (longitudinal to quay) respectively (wind speeds are Vw,1min) (PIANC, 2014) Cargo Operations Limiting wind conditions during cargo transfer operations are 16.0 m/s (transverse to quay) and 22.0 m/s (longitudinal to quay) (wind speeds are Vw,1min) (PIANC, 2014). LNG transfer between a LNG carrier and FSRU are deemed unsafe in conditions exceeding a Hs of 2 m and a peak wave period (Tp) of 8 s (Ramirez, 2014). 2.4 Navigational Criteria Design Vessel The LNG berthing and offloading facilities should cater for a m 3 capacity FSRU and a m 3 LNG tanker. The navigation criteria will be based on the larger of the two vessels, the FSRU. The main dimensions of the LNG tanker and FSRU are specified in Table 2-1. XARIS Concept Study Report Page 2 of 36

10 Table 2-1: Design vessel characteristics Parameter LNG tanker FSRU Cargo Capacity (m 3 ) Length oa (m) Length pp (m) Beam (m) Loaded Draft (m) Depth to Main Deck (m) Stopping Distance In protected waters, a stopping distance of 5 times the maximum design vessel length will be used (Thoresen, 2010). The stopping distance, in protected water, shall be measured from the end of the protected manoeuvring area. Stopping distances less than this will be based on the assumption that the berth will only be accessed when the significant wave height is less than 1.5 m (i.e. where there is tug assistance available). This requires a manoeuvre with the use of tugs providing directional control and reducing the headway of the arriving vessel Turning Areas The minimum diameter of a turning circle where the vessel turns solely by engine and rudder movements should be approximately 4 times the length of the vessel. Under very favourable manoeuvring conditions this could be reduced to 3 times the length of the vessel and should tugs be employed this can be further reduced to 2 times the length of the vessel. Should the vessel be equipped with a bow and/or stern thruster, the diameter can be further reduced to 1.8 times the vessel length Channel Geometry The channel geometry including dredge depths and channel dimensions required for the design vessel will be based on the guidelines and recommendations from PIANC (2014). The channel width required is 230 m, based on 5 times the beam of the design vessel. The semi-protected channel depth requirements for the proposed layouts are shown in Table 2-2 below. A channel depth of 15.6 m CD is required for the channel, however the future tanker berths require a channel depth of 16.5 m CD. Typically access channels are navigated by a leading light indicating the centre of the channel and buoys demarcating the extents. Widening the tanker berth channel and only deepening the wider section of the channel to the required 15.6 m CD would create a dangerous navigational passage for the tanker vessels. Thus, for layout 1 and 2, the channel depth has been set at 16.5 m CD. XARIS Concept Study Report Page 3 of 36

11 Table 2-2: Semi-protected channel depth requirements Zone Depth Related Factors Semi-Protected Channel Design Draft Tidal Allowance 0.00 Nominal Depth Zone (Vesselrelated Factors) Vertical Vessel Motions: Wave Response Motions (PIANC 2014, p ) 1.07 Dynamic List 0.40 Squat (PIANC 2014, p. 194) 0.40 Out of Trim Allowance 0.00 Net under keel Clearance 0.50 Nominal Depth (Advertised depth) Maintenance Zone (Seabedrelated Factors) Allowance for Sounding Accuracy 0.10 Allowance for Siltation 0.30 Allowance for Dredging Accuracy 0.00 Scour Protection Clearance 0.00 Total Channel Depth Requirement Berth Geometry The minimum length of the berth pocket should be 1.25 times the overall length of the maximum design vessel (Thoresen, 2010). This corresponds to a berth pocket length of approximately 370 m. The width of a berth pocket should be at least 1.25 times the beam of the largest vessel to use the berth, corresponding to a width of 60 m. A berth depth of -15 m CD is required for the offloading berth based on the guidelines and recommendations from PIANC (2014). The same depth is required for the manoeuvring area. The berth depth requirements are shown below in Table 2-3. XARIS Concept Study Report Page 4 of 36

12 Table 2-3: Berth depth requirements Zone Depth Related Factors Berth depth Design Draft Tidal Allowance 0.00 Nominal Depth Zone (Vesselrelated Factors) Vertical Vessel Motions: Wave Response Motions (PIANC 2014, p ) 0.35 Dynamic List 0.38 Squat (PIANC 2014, p. 194) 0.02 Out of Trim Allowance 0.50 Net under keel Clearance 0.50 Nominal Depth (Advertised depth) Maintenance Zone (Seabedrelated Factors) Allowance for Sounding Accuracy 0.10 Allowance for Siltation 0.30 Allowance for Dredging Accuracy 0.00 Scour Protection Clearance (piled structure) 0.00 Total Channel Depth Requirement LNG Safety Requirements The LNG safety requirements were based on Sandia National Laboratories (2004), SIGTTO (1997) and Thoresen (2010). The following, planning level, safety zones were discussed and agreed on with the project stakeholders. 200 m safety radius offset from other vessels in transit. 500 m safety radius between LNG vessels and other marine infrastructure. XARIS Concept Study Report Page 5 of 36

13 3. CONCEPT LAYOUT DEVELOPMENT 3.1 Concept Layouts Three alternative layouts were produced for the facility. Two layouts, similar in concept but differing with regards to safety zone dimensions, were initially defined. Both layouts use the planned channel for the future tanker berths, of the Walvis Bay SADC port, to offset capital costs. Subsequently a third layout was created, in order to provide an alternative to using the tanker berth channel, in the event that the tanker berth project was delayed or cancelled. The third layout is situated on the east side of the existing Walvis Bay port channel. At the time of writing the tanker berth project was in the process of being awarded as an Engineering, Procurement and Construction (EPC) contract. The tanker berth layout is shown in Figure 3-1 below, the full extents are included in Annexure B. The three conceptual LNG FSRU layouts are shown further below in Figure 3-2 to Figure 3-4. Figure 3-1: Planned tanker berths of the Walvis Bay SADC port (PRDW, 2014) XARIS Concept Study Report Page 6 of 36

14 Figure 3-2: FSRU layout 1-200m channel offset. Incorporated with planned tanker berths. Figure 3-3: FSRU layout 2-300m channel offset. Incorporated with planned tanker berths. XARIS Concept Study Report Page 7 of 36

15 Figure 3-4: FSRU layout 3-200m channel offset. Incorporated with existing Walvis Bay port entrance channel. The layouts may be labelled and summarized as follows: FSRU layout 1-200m channel offset. Incorporated with planned tanker berths. FSRU layout 2-300m channel offset. Incorporated with planned tanker berths. FSRU layout 3-200m channel offset. Incorporated with existing Walvis Bay port entrance channel. 3.2 Marine Infrastructure Berthing Structure It is proposed that piled dolphin structures are used for the berth and mooring facility. This matches the structure type planned for the future tanker berths and is feasible with regards to the geology at the site (described in Sub-section 4.1). A photo of a typical example is shown below in Figure 3-5. XARIS Concept Study Report Page 8 of 36

16 Figure 3-5: Typical LNG berthing structure Pipeline Support Both a light trestle structure and subsea pipeline were considered as solutions for supporting the LNG gas line/s to the coastline. Initial cost estimates showed the subsea pipeline to have a lower capital cost. However the subsea pipeline does not allow for easy inspection of the pipelines and access to the berths will need to be via a work boat. In a layout workshop including representatives from Xaris, Excelerate and Namport it was decided that the trestle option was best, hence the preferred layout makes use of a trestle rather that the subsea pipeline. In addition Elzevir Gelderbloem, the Walvis Bay Port Engineer, stated during the layout workshop that the future tanker berth trestle has capacity to support the LNG gas line. Thus for layout 1 & 2, a potential capital cost benefit exists as a large portion of the pipeline will be supported on the planned trestle. Provision has been made for a light trestle structure which will support the LNG pipeline and allow for light vehicle (personnel transit only) access to the berth. The trestle consists of a steel truss with piled supports at 20m centres. Photos of a typical example used at San Vicente Bay LPG, in Chile are shown below in Figure 3-6. Figure 3-6: Light trestle example, San Vicente Bay LPG, Chile (Panoramio, 2014). XARIS Concept Study Report Page 9 of 36

17 3.3 Layout Evaluation and Preferred Layout Two meetings were held with Xaris to discuss the layout alternatives. The first meeting, the layout workshop, (held as a teleconference) had representatives from Xaris, Excelerate, Namport and PRDW. Layouts 1 and 2 were discussed. It was agreed that the 300 m channel offset shown in layout 2 seemed overly conservative even at a planning level of study. Hence Layout 1 was selected as the preferred option. Additionally the use of a light trestle combined with use of the planned tanker trestle was agreed to, as opposed to a subsea pipeline. A second meeting was held between PRDW and Xaris in Johannesburg. The third layout, making use of the existing dredge channel, was presented as an option in case the future tanker berths study was differed or cancelled. The alternative layout was noted however it was deemed unlikely that the tanker project will not proceed. Hence the preferred layout remains layout 1. Subsequently the layout has been refined with regards to the navigation area and trestle alignment, the refined, preferred layout is shown below. A larger extent of the layout is attached in Annexure C. XARIS Concept Study Report Page 10 of 36

18 Figure 3-7: Preferred FSRU layout - 200m channel offset. Incorporated with planned tanker berths. XARIS Concept Study Report Page 11 of 36

19 4. ENVIRONMENTAL CONDITIONS 4.1 Introduction This section presents the environmental conditions at the site. The site conditions were considered in all elements of the design and were specifically used for defining the vessel simulation tests described in Section Water Levels The published tidal levels for the Port of Walvis Bay are shown in Table 4-1. The levels are referenced to Chart Datum (CD), which is defined as m below land levelling datum (LLD). Table 4-1: Tidal characteristics of the port of Walvis Bay (SANHO, 2013) Description Level (m CD) Highest Astronomical Tide (HAT) 1.97 Mean High Water Springs (MHWS) 1.69 Mean High Water Neaps (MHWN) 1.29 Mean Level (ML) 0.98 Mean Low Water Neaps (MLWN) 0.67 Mean Low Water Springs (MLWS) 0.27 Lowest Astronomical Tide (LAT) Wind Description of Available Data Wind data from two sources have been used as part of this study, namely land-based wind measurements at Pelican Point Lighthouse and offshore hindcast wind data. The locations of these two datasets are shown in Figure 4-1. Figure 4-1: Locations of wind data used in this study. XARIS Concept Study Report Page 12 of 36

20 The wind measurements at Pelican Point Lighthouse contain mean wind speed and direction at 10 min intervals, spanning the period October 2001 to August The measurements comprise only 8.6 years of valid data, once missing data has been taken into account. The wind data is measured at an elevation of 33 m above the surface, therefore the raw wind speed data was corrected to the standard reference level of 10 m, according to the following relationship (USACE, 2008): U 10 = U 33 ( ) 7 As highlighted in a recent study using the measured wind data at Pelican Point Lighthouse (PRDW, 2013), the dominant measured wind direction shifts by about 130 for all measurements after approximately April This shift is undoubtedly due to erroneous measurements, therefore the measured wind directions over this period were corrected by applying a constant correction factor of 130 to realign the dominant direction with that of the measurements before April This was preferred over discarding these data, as a long record of measured winds is an important input in terms of the quantification of extreme wind speeds and wave heights for this study. The hindcast wind data has been obtained from the National Centers for Environmental Prediction (NCEP) database (NCEP, 2012). The data provides uninterrupted estimates of mean wind speed and direction at the standard reference level of 10 m elevation, at 3 hourly intervals for the 31 year period of 1979 to Operational Wind Climate Figure 4-2 compares the wind rose at Pelican Point Lighthouse with that of the NCEP hindcast node located at 14 E, 23 S. The data indicates that the measured wind speeds at Pelican Point Lighthouse are on average weaker than those in the hindcast data. The dominant wind direction also shows a rotation of about 15 to the west. The Pelican Point Lighthouse data indicates a significantly higher percentage of westerly and northwesterly wind directions than observed in the offshore hindcast data. The higher prevalence of the northwesterly wind component is considered to be important in terms of wave generation, as the site is particularly exposed to waves from the north-west, while being sheltered from waves from the south-west. XARIS Concept Study Report Page 13 of 36

21 Figure 4-2: Wind roses of mean wind speed for measurements at Pelican Point Lighthouse and NCEP hindcast node located at 14 E, 23 S. See Figure 4-1 for location of data. Limiting operational wind speeds for this study have been defined in terms of the 1 min average wind speed (PIANC, 2014), rather than the mean wind speed (conventionally defined as the 30 min or 1 hour wind speed). Mean wind speeds have been converted to theoretical 1 min average wind speeds through the relationship (USACE, 2008): U 1min = U 30min /0.814 Figure 4-3 presents wind speed exceedances based on wind speed measurements at Pelican Point Lighthouse, in terms of both the measured mean wind speed as well as the theoretical 1 min average wind speed. Figure 4-3: Wind speed exceedances at Pelican Point Lighthouse. See Figure 4-1 for location of data Extreme Wind Speeds Extreme value analyses (EVA s) on wind speed have been carried out using the MIKE by DHI EVA (Extreme Value Analysis) toolbox (DHI, 2012a). Figure 4-4 presents the results of the extreme value analysis of the theoretical 1-min average wind speed at the Pelican Point Lighthouse. Table 4-2 presents a summary of the results of EVA s carried out on both the measured mean wind speed and theoretical 1 min average wind speed at Pelican Point Lighthouse. XARIS Concept Study Report Page 14 of 36

22 Figure 4-4: Extreme value analysis of 1 min average wind speed at Pelican Point Lighthouse. See Figure 4-1 for location of data. Table 4-2: Extreme value analysis of wind speed at Pelican Point Lighthouse. See Figure 4-1 for location of data. Return period Measured mean U 10 (m/s) Theoretical 1 min average U 10 (m/s) (years) Lower 95% confidence limit Best estimate Upper 95% confidence limit Lower 95% confidence limit Best estimate Upper 95% confidence limit It must be borne in mind that the presented EVA s have been based on 8.6 years of valid wind speed measurements. There is therefore inherent uncertainty in estimates of wind speed in the order of the 100 year return period. Due to this unavoidable uncertainty, it is suggested that the upper 95% confidence limit be used to define extreme wind speeds for this study. A 1-min average wind speed of 25 m/s, defined as the survivability limit of a moored vessel at the FSRU berth (Sub-section 2.3.1), is therefore estimated to have a return period of approximately 10 years. 4.4 Waves Description of the Wave Model The operational and extreme wave climate at the site has been estimated through the application of a spectral wave model. The MIKE 21 Spectral Waves (SW) Flexible Mesh model was used for this purpose. The XARIS Concept Study Report Page 15 of 36

23 application of the model is described in the User Manual (DHI, 2012b), while full details of the physical processes being simulated and the numerical solution techniques are described in the Scientific Documentation (DHI, 2012c). The model simulates the growth, decay and transformation of wind-generated waves and swells in offshore and coastal areas using unstructured meshes. For this application MIKE 21 SW included the following physical phenomena: Wave growth by action of wind Non-linear wave-wave interaction Dissipation due to white-capping Dissipation due to bottom friction Dissipation due to depth-induced wave breaking Refraction and shoaling due to depth variations Operational Wave Climate Model Setup One of the required wave model outputs for the present study is the effect of the proposed FSRU berth on the operational wave climate at the proposed tanker berths (Section ). The operational wave climate at the proposed tanker berths has already been defined in a previous study (PRDW, 2013). The present model setup was therefore kept identical to the previous model setup (PRDW, 2013), changing only the modelled layout, to include the additional dredging requirements necessitated by the proposed FSRU berth. Bathymetry data was sourced from MIKE C-MAP electronic hydrographic charts (DHI, 2014d). The computational mesh is comprised of a combination of rectangular and triangular elements, with the resolution ranging from approximately 5 km offshore to approximately 30 m in the areas of interest. Figure 4-5 shows the extent of the model domain, the model bathymetry, mesh and the model output locations for which data have been presented in this report. XARIS Concept Study Report Page 16 of 36

24 Figure 4-5: Model bathymetry, mesh and model output locations. The model has been run in fully spectral instationary mode, thus allowing for wave transformation from deep water into Walvis Bay, as well as additional wave generation within the model domain due to wind. Fully spectral boundary conditions for the operational wave model were obtained from a hindcast wave model developed for the previous tanker berth study (PRDW, 2013). The measured time-series of wind speed and direction at Pelican Point Lighthouse were applied over the model domain, accounting for wind-wave generation in the model. The operational wave climate at the site has been determined by modelling the environmental conditions over the year 2006, generating model output at 1 hourly intervals. The year 2006 was chosen as it is the only calendar year for which there is a complete record of wind measurements at the Pelican Point Lighthouse, as well as the fact that the year 2006 has been shown to be representative in terms of offshore wave and wind conditions (PRDW, 2013) Model Results Figure 4-6 presents an example of the output of the spectral wave model for wave boundary conditions Hm0 = 4.2 m, Tp = 13 s, Mean Wave Direction = 200. As was highlighted in the aforementioned wave refraction study (PRDW, 2013), the effect of the proposed dredge channel on wave refraction is significant, with refraction on the side of the channel creating a wave guide. This leads to significantly higher wave heights on the western side of the proposed channel than on the eastern side, and causes a variation in wave direction from one side of the entrance channel to the other. XARIS Concept Study Report Page 17 of 36

25 Figure 4-6: Example of spectral wave model output with wave boundary conditions H m0 = 4.2 m, T p = 13 s, Mean Wave Direction = 200. Figure 4-7 and Figure 4-8 present wave height and wave period roses at the various model output locations defined in Figure 4-5. Figure 4-9 presents and occurrence table of the modelled combinations of wave height and wave period at the proposed FSRU berth, while height exceedances at the various model output locations are provided in Figure These results have informed the vessel navigation study discussed in Section 5. XARIS Concept Study Report Page 18 of 36

26 Figure 4-7: Wave height roses at the proposed FSRU berth, entrance channel, and start of entrance channel. See Figure 4-5 for location of data. Figure 4-8: Wave period roses at the proposed FSRU berth, entrance channel, and start of entrance channel. See Figure 4-5 for location of data. XARIS Concept Study Report Page 19 of 36

27 Figure 4-9: Occurrence of H m0 and T p combinations at the proposed FSRU berth. See Figure 4-5 for location of data. Figure 4-10: Comparison of wave height exceedance at the proposed FSRU berth, entrance channel, and start of entrance channel. See Figure 4-5 for location of data Effect of Proposed FSRU Berth on Proposed Tanker Berths A required output of the wave model for this study was to quantify the effect of the proposed FSRU berth on the wave climate at the proposed tanker berths. This was carried out by simulating environmental conditions for the year 2006 as described above, both with and without the additional dredging requirements of the FSRU berth. The wave rose and wave height exceedance curves shown in Figure 4-11 and Figure 4-12 indicate that the inclusion of the proposed FSRU berth has a negligible effect on the wave climate at the proposed tanker berths. XARIS Concept Study Report Page 20 of 36

28 Figure 4-11: Wave roses at the proposed Tanker berth 1, with and without the proposed FSRU berth. See Figure 4-5 for location of data. Figure 4-12: Comparison of wave height exceedance at the proposed Tanker berth 1, with and without the proposed FSRU berth. See Figure 4-5 for location of data Extreme Wave Heights Model Setup While Pelican Point provides shelter to the site from the dominant swells from the south-west, the site is particularly exposed to smaller waves propagating from the north-west. The increased prevalence of northwesterly wind directions in the Pelican Point wind measurements when compared with the offshore NCEP hindcast data (Figure 4-2) implies that the inclusion of realistic wind speeds and directions in the modelling of waves at the site is important. Only 8.6 years of wind measurements are however available (accounting for missing data), and the raw time-series could not be used as a direct input into the model, due to the presence of missing data. For this reason, the missing data in the Pelican Point measurements were filled XARIS Concept Study Report Page 21 of 36

29 with offshore hindcast data, extending the record to 11.8 years. This was seen as the best use of the available wind data, being preferable to using the raw offshore hindcast wind data as direct input to the model. Subsequent to the development of the operational wave model described above, PRDW developed offshore fully spectral wave data for the boundary of the wave model (14 E, 23 S), derived from spectral partition data obtained from NCEP (NCEP, 2012). It is thought that this fully spectral data is an improvement on the fully spectral data developed for the operational wave model (PRDW, 2013), and has thus been used as the model boundary condition in determining extreme wave heights at the site. The model was run over the full 11.8 years for which environmental data are available, generating output at 1 hour intervals over the duration of the simulation Model Results Extreme value analyses (EVA s) on modelled wave height were carried out using the MIKE by DHI EVA (Extreme Value Analysis) toolbox (DHI, 2012a). Figure 4-13 presents the results of the extreme value analysis of the modelled wave height at the proposed FSRU berth, while Table 4-3 presents a summary of these results. Figure 4-13: Extreme value analysis of modelled wave height at the proposed FSRU berth. See Figure 4-5 for location of data. XARIS Concept Study Report Page 22 of 36

30 Table 4-3: Extreme value analysis of wind speed at modelled wave height at the proposed FSRU berth. See Figure 4-5 for location of data. Return period H m0 (m) (years) Lower 95% confidence limit Best estimate Upper 95% confidence limit It must be borne in mind that the presented EVA s have been based on 11.8 years of modelled environmental conditions. There is therefore inherent uncertainty in estimates of wave height in the order of the 100 year return period. Due to this unavoidable uncertainty, it is suggested that the upper 95% confidence limit be used to define extreme wave heights for this study. A wave height (Hm0) of 2.5 m, defined as the survivability limit for a moored vessel at the FSRU berth (PRDW, 2014), is therefore estimated to have a return period of significantly greater than 100 years. A wave height (Hm0) of 1.5 m, defined as the operational limit for a moored vessel at the FSRU berth (PRDW, 2014), is estimated to have a return period of approximately 40 years. Figure 4-14 provides a scatter plot of the modelled relationship between Hm0 and Tp over the full duration of the 11.8 year simulation at the proposed FSRU berth. While the data indicates two distinct populations (sea and swell), the highest waves are due to swells, with Tp s between ranging between 14 s and 18 s. This highlights the range of periods which would be expected to be associated with the extreme wave heights presented above. Figure 4-14: Scatter plot of H m0 vs T p at the proposed FSRU berth. 4.5 Geology The area underlying the site recently formed part of a geotechnical investigation for the future tanker berths and access channel of the Walvis Bay SADC port. The field work consisted of onshore and offshore boreholes XARIS Concept Study Report Page 23 of 36

31 and vibrocores. In-situ testing consisted of Standard Penetration Tests (SPT). Laboratory testing consisted of particle size distribution, Atterberg limits and Uniaxial Compressive Strength tests. An interpretive report detailing the findings of this investigation was compiled by WSP Environmental (WSP Environmental (Pty) Ltd, 2014). This report has been made available by Namport and has been used as the basis for this high level geological interpretation of the site. The upper part of the stratigraphy is made up of recent to late quaternary sediments. This is underlain by cemented coarse grained lithic sandstones and conglomerates which are said to form part an alluvial fan formed by an extinct river system. These sandstones and conglomerates unconformably overlie the bedrock horizon. The bedrock in this instance forms part of the Precambrian Damara Metamorphic Complex being intruded over time by granites, pegmatites and granodiorites. No boreholes have been drilled in the direct vicinity of the proposed LNG berth. So information is inferred from the boreholes drilled at the proposed tanker berths, which are approximately 1300 m to the south-east, as well as the vibrocores completed along the alignment of the proposed access channel. Four main layers have been identified and are listed below: Layer 1: Layer 2: Layer 3: Layer 4: Layer thickness ranging from 1 m 4 m consisting of very soft clayey silts, silty clays and diatomaceous oozes. Layer thickness ranging from 2 m 20 m medium dense to very dense fine grained sand. Layer thickness ranging from 4 m 32 m soft to medium hard rock consisting of lithic arenites and conglomerates. Weathered soft to hard bedrock consisting of granites, gneisses and migmatites. In summary, the anticipated geotechnical conditions at the nominated LNG berth site and access channel are relatively favourable. Dredging in Layers 1 and 2 may be undertaken using a trailer hopper suction dredger. A preliminary estimate of the dredge material composition is 68% sand and 32% silt. While Layers 2 and 3 provide suitable founding for the proposed piled berth structure. XARIS Concept Study Report Page 24 of 36

32 5. VESSEL NAVIGATION SIMULATION 5.1 Introduction A desktop ship manoeuvring simulation study was conducted in order to determine if there is an acceptable margin of safety for vessel navigation in the proposed layout. 5.2 Description of the Simulator The ship manoeuvring simulation study was carried out using SimFlex Navigator, a simulation software application developed by Force Technology. Force Technology is based in Denmark and is seen as a market leader in the provision of ship simulation software technology. SimFlex Navigator was operated on a Desktop Simulator at the offices of PRDW. The capability of advanced manoeuvring is due to the fact that the SimFlex simulator model includes a motion platform incorporating the six-degrees of freedom of movement of the vessel. This comprises surge, sway, yaw, heave, roll and pitch. The importance of the six-degrees of freedom of movement is that it ensures the simulation model reacts as expected to the predetermined environmental conditions. The six-degrees of freedom of vessel motion are illustrated in Figure 5-1. Figure 5-1: Six-degrees of freedom of movement Hydrodynamic effects such as ship-ship interaction, bank interaction and squat are incorporated in the model which is a fundamental requirement for simulation in restricted waterways. 5.3 Simulation Environment (2D Model) The proposed berth infrastructure and navigation layout design were modelled within a 2D simulation environment. The 2D model was constructed by PRDW and the environment consisted of the following layers: Land Sounding Depth Contour Navigation Mark XARIS Concept Study Report Page 25 of 36

33 Current Wave; Fender The simulation environment was made in-house using a software application known as SimFlex Area Engineer. SimFlex Area Engineer provides users with the capability to design the 2D and 3D environments to be used on the SimFlex Navigator ship simulator. The simulation environment combined the proposed berth layout, the surveyed bathymetry and the proposed navigation channel geometry as defined in the navigation layout. The simulation environment is illustrated in Figure 5-2. Figure 5-2: Simulation environment layout 5.4 Simulator Programme Two days of simulation runs were carried out at the PRDW offices from 31 July 2014 to 1 August A simulation test programme scheduled a possibility of completing 6 simulation runs and incorporated both berthing and sailing manoeuvres in the predetermined environmental conditions. The test results for the simulation runs are presented and analysed in Section 5.9. The simulation runs were carried out by John Burns, a PRDW simulation pilot and maritime specialist. 5.5 Simulation of Environmental Conditions The environmental conditions considered for the simulation study were categorised into operational and extreme event limitations based on the environmental conditions at the site (Refer to Section 4). The selected environmental conditions are presented in Table 5-1. The operational limitations would typically consider the berthing (and/or sailing) of the LNG carrier at the berth. The extreme event limitations would typically represent the limiting conditions when the FSRU will need to sail prior to an extreme event occurrence. This XARIS Concept Study Report Page 26 of 36

34 is in the case when the predicted environmental conditions are forecasted to exceed the survival conditions of the FSRU at the berth. For the purposes of this study, the operational limitations were considered for berthing manoeuvres while the extreme event limitations were considered for sailing manoeuvres. Table 5-1: Summary of simulated environmental conditions Environment Operational Limitations Extreme Event Limitations Condition Wind SSW x m/s SSW x m/s Current NE x 0.1 m/s NE x 0.1 m/s Waves - Berth (Direction/H s/t p) NW/0.7 m/10-12 s NW/1.5 m/10-12 s Waves - Channel (Direction/H s/t p) WNW/1.8 m/10-12 s WNW/2.9 m/10-12 s The wind conditions were simulated over the entire simulation environment area. No shielding of the wind from other structures was considered in the study. The wave conditions that were simulated included a northwesterly swell which was progressively reduced or increased as per the vessel s movement through the channel. 5.6 Simulator Ship Model The ship models used in the ship simulation study included a fully laden LNG carrier. The simulation runs were undertaken to verify that there were no navigational risks associated with the proposed navigation channel and manoeuvring area. The characteristics of the simulator ship model is shown in Table 5-2 below. Table 5-2: Characteristics of the simulator ship model Ship Model No Parameters ( m³) Vessel Type LNG Carrier Displacement (m 3 ) LOA(m) 315 L pp (m) 305 Beam (m) 50.0 Draft (m) 12.0 Block Coefficient 0.76 Main Thrust (kw) 2 x Bow Thruster (kw) - Rudders Twin Lateral Windage (m 2 ) The simulator ship model selected for the study is seen as representative of the manoeuvring characteristics of both the fully laden FSRU and LNG carrier design vessels considered in the study. A ballast condition was not considered as part of the study and should be considered in a more detailed analysis. XARIS Concept Study Report Page 27 of 36

35 5.7 Tug Simulation Vector tug models were used in the desktop simulation study. The tug power requirements i.e. bollard pull was calculated empirically based on the methods described in PIANC (2012). The characteristics and calculated bollard pull of the simulator tug models are shown in Table 5-3. Table 5-3: Simulator tug characteristics Characteristics TUG Length Overall (m) 25 Beam (m) 11.0 Draft (m) 3.3 Bollard Pull (t) 50 Tug power used in the simulation study considered the reduced tug efficiency that results from tugs operating in wave conditions greater than 1.5 m Hs (PIANC, 2012). Full tug power was made available for the manoeuvre once the vessel was within the protected areas, i.e. less than 1.5 m Hs. The tug positions used in the study considered centre lead forward (bow) and aft (stern) of the vessel. 5.8 Evaluation Criteria After each simulation run, comments were recorded based on: the track keeping ability, the general manoeuvring conditions, the layout, the aids to navigation and the comfort of the simulator pilot during vessel manoeuvres. This data assists in identifying potential areas of navigational risk and ensures that an adequate margin of safety is included in the design. Each simulation run was analysed qualitatively and quantitatively. The qualitative assessments were based on the pilot s comments after each simulation run on presentation of the replay of the run. The quantitative assessment was based on the measuring of the vessel s speed as well as the tug usage and the engine and rudder movements during each simulation run. 5.9 Simulation Runs A total of 6 simulation runs were completed during the course of the study. The results of the simulation runs are presented as Annexure D. The simulation runs in Annexure D illustrate the vessel s track, list the input parameters and include graphs presenting the following output data where applicable: Longitudinal ground speed (kn) Engine power (kw) Rudder angle (deg.) Tug Force (t) Table 5-4 provides a summary of the simulation runs completed. XARIS Concept Study Report Page 28 of 36

36 Simulation Run Table 5-4: Simulation runs completed Ship Type Condition Manoeuvre Environmental Condition A01 LNG Carrier Laden Berthing Extreme (wind - 12m/s) A02 LNG Carrier Laden Berthing Operational A03 LNG Carrier Laden Sailing Extreme A04 LNG Carrier Laden Sailing Extreme A05 LNG Carrier Laden Berthing Operational A06 LNG Carrier Laden Berthing Operational 5.10 Simulation Run Analysis The analysis of the berthing and sailing manoeuvres is provided below Berthing Manoeuvres The berthing manoeuvre of the FSRU will consist of transiting the access channel, turning in the turning circle adjacent to the berth and berthing port side alongside the jetty berth. The pilot should board the arriving vessel in the port approaches, a minimum of one nautical mile from the access channel. Once the pilot has been transferred to the arriving vessel, the vessel will manoeuvre towards the access channel at a speed of approximately 5 to 6 knots heading south-easterly on a course of 153 (t). The vessel s speed will be reducing continually but an attempt will be made to maintain steerage way of the vessel. The vessel s tracks can be seen to be unstable at this stage due to the decreasing headway and reduced steering efficiency. The tugs are connected to the arriving vessel prior to the vessel reaching the turning circle. Due to the nature of the commodity, a consideration should be given to meet the arriving vessel prior to entering the channel. The vessel will be reducing speed continuously until it reaches the turning circle. The vessel will engage the main engine astern in order to further reduce headway. Once the vessel is stopped in the centre of the turning circle it will proceed to turn in order to berth port side alongside (i.e. bow to sea). Once the vessel has completed its turn, it will approach the berth. As the vessel approaches the berth, at an angle of approximately 30 degrees and a speed of less than 1 knot, both tugs prepare to push the vessel in to the berth. The tugs should be controlled in order to manoeuvre the arriving vessel into the berth, parallel and with little or no longitudinal speed and minimal lateral speed. Once the vessel has made contact with the fenders and the mooring lines are fast (secured), the tugs can stop pushing-in and prepare to disconnect their tow lines. Once the tugs are released, the pilot will disembark the vessel and the berthing manoeuvre is complete. Simulation Run A01 provides an example of the berthing of the LNG carrier on to the jetty berth (Refer to Annexure D). Simulation Run A01 is illustrated below in Figure 5-3. The simulation results showed that the LNG carrier could be successfully berthed port side alongside in the extreme event limiting conditions (Refer to Table 5-1). The wind speed simulated was 12m/s. This manoeuvre was extremely challenging and required three tugs to push the vessel alongside against the SSW wind condition. Simulation runs A05 and A06 considered berthing manoeuvres in the operational limiting condition with wind speeds from 10 to 12m/s. This proved to be less challenging and provided successfully results (refer to Annexure D). XARIS Concept Study Report Page 29 of 36

37 Figure 5-3: Simulation run A Sailing Manoeuvres Simulation Run s A03 and A04 considered sailing manoeuvres of the FSRU from the jetty berth in the extreme event conditions. Both runs comprised of the vessel being lifted off the berth by the aid of tugs and being towed into the channel. The sailing manoeuvres showed that the vessel was easily lifted off the berth due to the assistance but was only course-stable once the vessel was able to achieve sufficient headway. The simulation runs showed that the vessel could be successfully sailed from the berth in the extreme event condition. However, it is essential that the vessel efficiently gather headway or it will be set across the channel. Simulation Run A04 (illustrated in Figure 5-4) shows the vessel tracks of the FSRU sailing from the berth in a south-westerly extreme wind condition with a wind speed of 17 m/s. XARIS Concept Study Report Page 30 of 36

38 Figure 5-4: Simulation run A Tug Power Evaluation Time series results are available for each simulation run (refer to Annexure D). A bollard pull of 50t each with a tug fleet of three tugs was calculated empirically based on the methods described in PIANC (2012). The time series results show that the vector tug models of 50t bollard pull was sufficient for the manoeuvring of the design vessels. XARIS Concept Study Report Page 31 of 36

DUKC DYNAMIC UNDER KEEL CLEARANCE

DUKC DYNAMIC UNDER KEEL CLEARANCE DUKC DYNAMIC UNDER KEEL CLEARANCE Information Booklet Prepared in association with Marine Services Department 10/10/2005 Dynamic Under Keel Clearance (DUKC) integrates real time measurement of tides and

More information

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY Bâtiment Infrastructures municipales Transport Industriel Énergie Environnement BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY N. Guillemette 1, C. Glodowski 1, P.

More information

DUXBURY WAVE MODELING STUDY

DUXBURY WAVE MODELING STUDY DUXBURY WAVE MODELING STUDY 2008 Status Report Duncan M. FitzGerald Peter S. Rosen Boston University Northeaster University Boston, MA 02215 Boston, MA 02115 Submitted to: DUXBURY BEACH RESERVATION November

More information

Port Sections Guide Section 01

Port Sections Guide Section 01 s Guide 01 Cow Bay Marina Date 10/1/2016 Position (lat / lon) Minimum controlled water depth Chart datum Range of water densities Tidal range alongside Bottom type Dredging regime Distance pilot station

More information

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX Preventing Damage to Harbour Facilities and Ship Handling in Harbours PART 2 INDEX 1 Vessel handling is based on the basic knowledge that a vessel floats in the water and returns to its original position

More information

BWS ONLINE FORECASTING BERTH OPERATING SAFETY. Matthew R. O Halloran, Daphne Choong

BWS ONLINE FORECASTING BERTH OPERATING SAFETY. Matthew R. O Halloran, Daphne Choong BWS ONLINE FORECASTING BERTH OPERATING SAFETY Matthew R. O Halloran, Daphne Choong OMC International Pty Ltd, 2/2 Walmer St, Abbotsford, Vic 3067, Australia matthew@omc-international.com.au daphne@omc-international.com.au

More information

Dynamic analyses of tankers moored at berth

Dynamic analyses of tankers moored at berth Dynamic analyses of tankers moored at berth Marin byggteknikkdagen 18.4.2018 Martin Thuve Hovden Department of Marine Tecnology, Multiconsult Tromsø Department of Marine Tecnology, Tromsø 27 marine & coastal

More information

Influence of Marine Operations on Site Selection & Design of Marine Terminals

Influence of Marine Operations on Site Selection & Design of Marine Terminals SOCIEDAD CHILENA DE INGENIERIA HIDRÁULICA V SEMINARIO INTERNACIONAL DE INGENIERÍA Y OPERACIONES PORTUARIAS OCTUBRE 2008, CONCEPCIÓN, CHILE Influence of Marine Operations on Site Selection & Design of Marine

More information

Assessment Simulation study, Phase 2. Port of Roenne. FORCE / Rev. B

Assessment Simulation study, Phase 2. Port of Roenne. FORCE / Rev. B / Rev. B i LIST OF CONTENTS: PAGE: 0. EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 1.1. General... 2 1.2. Objectives... 3 2. SUMMARY... 4 2.1. Observations... 5 2.2.1 General... 5 2.2.2 Weather conditions...

More information

FULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT

FULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT FULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT Mr. Gary Rolph Chief Hydrographic Surveyor Port of Brisbane Corporation Mr. Peter Rumball Surveyor Port of Brisbane Corporation Dr. Terry O'Brien

More information

Implications of proposed Whanganui Port and lower Whanganui River dredging

Implications of proposed Whanganui Port and lower Whanganui River dredging PO Box 637 Wanganui 4540 Attention: Rowan McGregor Dear Rowan 1 Summary We understand that it has been proposed to bring large vessels into the Port at Whanganui requiring the excavation of a channel up

More information

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters Transport Infrastructure Act 1994 Gladstone Ports Corporation Port Notice 04/17 LNG Vessel Operating Parameters 1. These operating parameters have been developed based on navigation simulations with LNG

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

Appendix E Cat Island Borrow Area Analysis

Appendix E Cat Island Borrow Area Analysis Appendix E Cat Island Borrow Area Analysis ERDC/CHL Letter Report 1 Cat Island Borrow Area Analysis Multiple borrow area configurations were considered for Cat Island restoration. Borrow area CI1 is located

More information

5.0 Channel Design and Alternatives

5.0 Channel Design and Alternatives 5.0 Channel Design and Alternatives The dimensions of the navigational areas such as approach channel, manoeuvring areas, anchorage, etc. are based on the type and size of the vessel envisaged to visit

More information

WOODFIBRE LNG VESSEL WAKE ASSESSMENT

WOODFIBRE LNG VESSEL WAKE ASSESSMENT Woodfibre LNG Limited WOODFIBRE LNG VESSEL WAKE ASSESSMENT Introduction Woodfibre LNG Limited (WLNG) intends to build a new LNG export terminal at Woodfibre, Howe Sound, British Columbia. WLNG has engaged

More information

Understanding of Meteorology. for. Handling LNG at Ports

Understanding of Meteorology. for. Handling LNG at Ports Understanding of Meteorology for Handling LNG at Ports All environmental forces on the berth and the berthed ship are considered. When evaluating environmental forces, first estimates are obtained for

More information

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling Marine Renewables Industry Association Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling October 2009 Table of Contents 1. Introduction... 1 2. Measurements

More information

ITTC Recommended Procedures and Guidelines

ITTC Recommended Procedures and Guidelines Page 1 of 6 Table of Contents 1. PURPOSE...2 2. PARAMETERS...2 2.1 General Considerations...2 3 DESCRIPTION OF PROCEDURE...2 3.1 Model Design and Construction...2 3.2 Measurements...3 3.5 Execution of

More information

Hydrodynamic and hydrological modelling to support the operation and design of sea ports

Hydrodynamic and hydrological modelling to support the operation and design of sea ports Hydrodynamic and hydrological modelling to support the operation and design of sea ports Data needs and examples Martijn de Jong (port/nautical requirements, waves, currents) Sofia Caires (mean and extreme

More information

ROYAL VANCOUVER YACHT CLUB

ROYAL VANCOUVER YACHT CLUB ROYAL VANCOUVER YACHT CLUB PROPOSED EXPANSION PROJECT NAVIGATION CHANNEL DESIGN COAL HARBOUR Prepared for: Royal Vancouver Yacht Club Prepared by: Typlan Consulting Ltd. March 2016 Page 1 of 17 March 23,

More information

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL L Boddy and T Clarke, Austal Ships, Australia SUMMARY CFD analysis has been conducted on a 100m catamaran hull

More information

MIKE Release General product news for Marine software products, tools & features. Nov 2018

MIKE Release General product news for Marine software products, tools & features. Nov 2018 MIKE Release 2019 General product news for Marine software products, tools & features Nov 2018 DHI 2012 MIKE 3 Wave FM New advanced phase-resolving 3D wave modelling product A MIKE 3 FM Wave model - why?

More information

Passing Vessel Analysis in Design and Engineering. Eric D. Smith, P.E. Vice President, Moffatt & Nichol

Passing Vessel Analysis in Design and Engineering. Eric D. Smith, P.E. Vice President, Moffatt & Nichol moffatt & nichol Passing Vessel Analysis in Design and Engineering Eric D. Smith, P.E. Vice President, Moffatt & Nichol Passing Vessel Analysis in Port Engineering and Design Passing Vessel Effects Data

More information

POS 02 VTS Guidelines

POS 02 VTS Guidelines 4.00 BERTHING FACILITIES OF AQABA PORT Name Length (m) Max loaded draft (m) Max Vessel Length (m) Max Displacement (tonne) # 1 160 11.0 250,000 # 2 180 10.0 250 45,000 # 3 180 13.0 250 53,000 # 4 180 12.5

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

The Usage of Propeller Tunnels For Higher Efficiency and Lower Vibration. M. Burak Şamşul

The Usage of Propeller Tunnels For Higher Efficiency and Lower Vibration. M. Burak Şamşul The Usage of Propeller Tunnels For Higher Efficiency and Lower Vibration M. Burak Şamşul ITU AYOC 2014 - Milper Pervane Teknolojileri Company Profile MILPER is established in 2011 as a Research and Development

More information

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 Agenda Item 3 Accidents and ship traffic in the Baltic Sea Document

More information

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario Technical Brief - Wave Uprush Analysis RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 October 31, 2014 Table of Contents Section Page Table of Contents... i List

More information

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Minggui Zhou 1, Dano Roelvink 2,4, Henk Verheij 3,4 and Han Ligteringen 2,3 1 School of Naval Architecture, Ocean and Civil Engineering,

More information

CONDITIONS OF USE OF THIS REPORT COPYRIGHT NAMIBIAN MARINE PHOSPHATE (PTY) LTD 2014 ALL RIGHTS RESERVED

CONDITIONS OF USE OF THIS REPORT COPYRIGHT NAMIBIAN MARINE PHOSPHATE (PTY) LTD 2014 ALL RIGHTS RESERVED CONDITIONS OF USE OF THIS REPORT COPYRIGHT NAMIBIAN MARINE PHOSPHATE (PTY) LTD 2014 ALL RIGHTS RESERVED. All rights to the intellectual property and/or contents of this document remain vested in Namibian

More information

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012) PORTS AUSTRALIA PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012) PREFACE These Principles have been prepared by the Hydrographic Surveyors

More information

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary MARINE GUIDANCE NOTE MGN 301 (M+F) Manoeuvring Information on Board Ships Note to Shipbuilders, shipowners, ship Managers and Masters This note supersedes Marine Guidance Note MGN 201 (M+F) Summary The

More information

Learn more at

Learn more at Full scale model tests of a steel catenary riser C. Bridge 1, H. Howells 1, N. Toy 2, G. Parke 2, R. Woods 2 1 2H Offshore Engineering Ltd, Woking, Surrey, UK 2 School of Engineering, University of Surrey,

More information

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Paper for consideration by ENC Working Group Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Submitted by: Alvaro Sanchez (AHS) Executive Summary: Compilation of high density bathymetric

More information

Measurement of vertical motions of bulk carriers navigating in port entrance channels

Measurement of vertical motions of bulk carriers navigating in port entrance channels HYDROGRAPHIC CONFERENCE Technical Awareness Seminar 2007 Cape Town, 19 21 June 2007 Measurement of vertical motions of bulk carriers navigating in port entrance channels J Moes CSIR, PO Box 320, Stellenbosch,

More information

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 June 12, 2013 Table of Contents Section Page Table

More information

: Hydrodynamic input for 2D Vessel Simulations (HY- 0027)

: Hydrodynamic input for 2D Vessel Simulations (HY- 0027) Technical Note To : Christian Taylor (PoHDA) From : Rohan Hudson Cc : Ben Gray Date : 1/04/2015 (Final Draft) Subject : Hydrodynamic input for 2D Vessel Simulations (HY- 0027) Introduction This Technical

More information

DP Ice Model Test of Arctic Drillship

DP Ice Model Test of Arctic Drillship Author s Name Name of the Paper Session DYNAMIC POSITIONING CONFERENCE October 11-12, 211 ICE TESTING SESSION DP Ice Model Test of Arctic Drillship Torbjørn Hals Kongsberg Maritime, Kongsberg, Norway Fredrik

More information

ITTC Recommended Procedures Testing and Extrapolation Methods Loads and Responses, Seakeeping Experiments on Rarely Occurring Events

ITTC Recommended Procedures Testing and Extrapolation Methods Loads and Responses, Seakeeping Experiments on Rarely Occurring Events Loads and Responses, Seakeeping Page 1 of 5 CONTENTS 1. PURPOSE OF PROCEDURE 2. STANDARDS FOR EXPERIMENTS ON RARELY OCCURRING EVENTS 2.1 Previous Recommendations of ITTC 2.2 Model Design and Construction

More information

Wave Transformation, Prediction, and Analysis at Kaumalapau Harbor, Lanai, Hawaii

Wave Transformation, Prediction, and Analysis at Kaumalapau Harbor, Lanai, Hawaii Wave Transformation, Prediction, and Analysis at Kaumalapau Harbor, Lanai, Hawaii Jessica H. Podoski, P.E. Coastal Engineer, USACE Honolulu District Christopher Goody, P.E. Sea Engineering, Inc. Thomas

More information

A methodology for evaluating the controllability of a ship navigating in a restricted channel

A methodology for evaluating the controllability of a ship navigating in a restricted channel A methodology for evaluating the controllability of a ship navigating in a restricted channel K. ELOOT A, J. VERWILLIGEN B AND M. VANTORRE B a Flanders Hydraulics Research (FHR), Flemish Government, Antwerp,

More information

An Investigation into the Capsizing Accident of a Pusher Tug Boat

An Investigation into the Capsizing Accident of a Pusher Tug Boat An Investigation into the Capsizing Accident of a Pusher Tug Boat Harukuni Taguchi, National Maritime Research Institute (NMRI) taguchi@nmri.go.jp Tomihiro Haraguchi, National Maritime Research Institute

More information

CALCULATIONS OF THE MOTIONS OF A SHIP MOORED WITH MOORMASTER UNITS

CALCULATIONS OF THE MOTIONS OF A SHIP MOORED WITH MOORMASTER UNITS CALCULATIONS OF THE MOTIONS OF A SHIP MOORED WITH MOORMASTER UNITS By J. de Bont 1, W. van der Molen 2, J. van der Lem 3, H. Ligteringen 4, D. Mühlestein 5 and M. Howie 6 ABSTRACT Container ships should

More information

WESTRIDGE MARINE TERMINAL VANCOUVER, BC PASSING SHIP ANALYSIS

WESTRIDGE MARINE TERMINAL VANCOUVER, BC PASSING SHIP ANALYSIS WESTRIDGE MARINE TERMINAL VANCOUVER, BC PASSING SHIP ANALYSIS Prepared for: Prepared by: WESTRIDGE MARINE TERMINAL VANCOUVER, BC PASSING SHIP ANALYSIS M&N Project No. 7773 01 Revision Description Issued

More information

WAVE FORECASTING FOR OFFSHORE WIND FARMS

WAVE FORECASTING FOR OFFSHORE WIND FARMS 9 th International Workshop on Wave Hindcasting and Forecasting, Victoria, B.C. Canada, September 24-29, 2006 WAVE FORECASTING FOR OFFSHORE WIND FARMS Morten Rugbjerg, Ole René Sørensen and Vagner Jacobsen

More information

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;

More information

Pilotage Directions 2017

Pilotage Directions 2017 Pilotage Directions 2017 1. Commencement These Pilotage Directions shall come into force on 31 st August 2017 on which date the existing Pilotage Directions are revoked. 2. Short Title These Pilotage Directions

More information

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903

More information

Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs.

Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs. Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs. PANELISTS: Paul Amos: President, Columbia River Pilots. Larry

More information

Baird. Innovation, Excellence & Service Oceans, Lakes & Rivers

Baird. Innovation, Excellence & Service Oceans, Lakes & Rivers Profile Capabilities Innovation, Excellence & Service Oceans, Lakes & Rivers Baird provides professional engineering and technical services related to the design of coastal structures and facilities that

More information

Concept Channel Design & Channel Development Strategy D R A F T. Document Ref: AGH-CEP0-EG-REP-0012

Concept Channel Design & Channel Development Strategy D R A F T. Document Ref: AGH-CEP0-EG-REP-0012 Concept Channel Design & Channel Development Strategy Document Ref: AGH-CEP0-EG-REP-0012 In May 2016 the Special Minister of State asked Infrastructure Victoria to provide advice on the future capacity

More information

Règlement pour la navigation pour la zone arctique. Alexey DUDAL Marine Division Bureau VERITAS

Règlement pour la navigation pour la zone arctique. Alexey DUDAL Marine Division Bureau VERITAS Règlement pour la navigation pour la zone arctique Alexey DUDAL Marine Division Bureau VERITAS 1 Contents 1. Introduction 2. BV Rules and Guidelines for Ice-Going Vessels 3. Direct Calculation Tool 4.

More information

SHORELINE EVOLUTION DUE TO HIGHLY OBLIQUE INCIDENT WAVES AT WALVIS BAY, NAMIBIA

SHORELINE EVOLUTION DUE TO HIGHLY OBLIQUE INCIDENT WAVES AT WALVIS BAY, NAMIBIA SHORELINE EVOLUTION DUE TO HIGHLY OBLIQUE INCIDENT WAVES AT WALVIS BAY, NAMIBIA Berry Elfrink, 1 Gordon Prestedge 2, Cesar B.M. Rocha 3, and Jørgen Juhl 4 Abstract: This paper describes the development

More information

DETRMINATION OF A PLUNGER TYPE WAVE MAKER CHARACTERISTICE IN A TOWING TANK

DETRMINATION OF A PLUNGER TYPE WAVE MAKER CHARACTERISTICE IN A TOWING TANK The 9 th International Conference on Coasts, Ports and Marine Structures (ICOPMAS 2010) 29 Nov.-1 Dec. 2010 (Tehran) DETRMINATION OF A PLUNGER TYPE WAVE MAKER CHARACTERISTICE IN A TOWING TANK sayed mohammad

More information

Offshore engineering science

Offshore engineering science Offshore engineering science In this research stream theoretical models advanced geotechnical models and new numerical techniques were used in applied offshore engineering topics such as loading, design

More information

Figure 1: The squat effect. (Top) Ship at rest. (Bottom) Ship under way.

Figure 1: The squat effect. (Top) Ship at rest. (Bottom) Ship under way. Under-Keel Clearance of Frigates and Destroyers in Shallow Water Tim Gourlay, Centre for Marine Science and Technology, Curtin University CMST Research Report 013-53 Abstract For RAN ships operating in

More information

COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION

COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION Luke McAvoy Undergraduate Engineer (Civil) Griffith School of Engineering, Griffith University, Gold Coast, Australia Daniel Rodger Senior Engineer Water

More information

Available online at ScienceDirect. Procedia Engineering 116 (2015 )

Available online at  ScienceDirect. Procedia Engineering 116 (2015 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 116 (2015 ) 320 325 8th International Conference on Asian and Pacific Coasts (APAC 2015) Department of Ocean Engineering, IIT

More information

SAMPLE MAT Proceedings of the 10th International Conference on Stability of Ships

SAMPLE MAT Proceedings of the 10th International Conference on Stability of Ships and Ocean Vehicles 1 Application of Dynamic V-Lines to Naval Vessels Matthew Heywood, BMT Defence Services Ltd, mheywood@bm tdsl.co.uk David Smith, UK Ministry of Defence, DESSESea-ShipStab1@mod.uk ABSTRACT

More information

DUKC Chart Overlay. Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014

DUKC Chart Overlay. Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014 DUKC Chart Overlay Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014 Outline Who is OMC? DUKC description & methodology. DUKC Chart Overlay concept. Chart Overlay application example.

More information

The development of the historical harbour of Paphos, Cyprus H.J. van Wijhe*, M. Meletiou^ Division, P.O. Box 152, 8300 AD Emmeloord, The Netherlands

The development of the historical harbour of Paphos, Cyprus H.J. van Wijhe*, M. Meletiou^ Division, P.O. Box 152, 8300 AD Emmeloord, The Netherlands The development of the historical harbour of Paphos, Cyprus H.J. van Wijhe*, M. Meletiou^ Division, P.O. Box 152, 8300 AD Emmeloord, The Netherlands Abstract The harbour of Paphos originates from ancient

More information

PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA)

PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA) PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA) DALIBOR CAREVIĆ (1), GORAN LONČAR (1), VLADIMIR ANDROČEC (1) & MARIN PALADIN (1) 1.

More information

Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool

Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool Xiaobing Shi, American Global Maritime Torbjørn Hals, Kongsberg Maritime AS Suman Muddusetti, Shell Oct. 11, 2011

More information

Metocean criteria for fatigue assessment. Rafael V. Schiller 5th COPEDI Seminar, Oct 8th 2014.

Metocean criteria for fatigue assessment. Rafael V. Schiller 5th COPEDI Seminar, Oct 8th 2014. Metocean criteria for fatigue assessment Rafael V. Schiller 5th COPEDI Seminar, Oct 8th 2014. Metocean requirements along the lifecycle of a project Metocean criteria for fatigue Analysis techniques and

More information

TITLE: The Importance of Model Validation: Two Case Studies. AUTHOR:Julie Thomas. Scripps Institution of Oceanography, La Jolla, CA.

TITLE: The Importance of Model Validation: Two Case Studies. AUTHOR:Julie Thomas. Scripps Institution of Oceanography, La Jolla, CA. TITLE: The Importance of Model Validation: Two Case Studies AUTHOR:Julie Thomas Scripps Institution of Oceanography, La Jolla, CA jothomas@ucsd.edu CO-AUTHOR: Corey Olfe Scripps Institution of Oceanography,

More information

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines) Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines) This Code Covers The Use Of Tugs And Towage In The Port Of St Helier Page number Contents 2 Introduction 3 Communication

More information

Table of Contents. Bakkafjara Ferry Port. Icelandic Maritime Administration. Review of IMA provided reports. 1 General

Table of Contents. Bakkafjara Ferry Port. Icelandic Maritime Administration. Review of IMA provided reports. 1 General Icelandic Maritime Administration Bakkafjara Ferry Port Review of IMA provided reports COWI A/S Parallelvej 2 DK-2800 Kongens Lyngby Denmark Tel +45 45 97 22 11 Fax +45 45 97 22 12 wwwcowicom Table of

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences. Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)

More information

Abstract. Introduction

Abstract. Introduction Computer assisted analysis of Aviles Port extension: hydraulic conditions, navigation and training of pilots J.R. Iribarren & J.M. Montero Port Research Program, CEPYC-CEDEX, Antonio Lopez, 81. 28026 Madrid,

More information

THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE

THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE Toon Verwaest, Flanders Hydraulics Research, toon.verwaest@mow.vlaanderen.be Sarah Doorme, IMDC, sarah.doorme@imdc.be Kristof Verelst, Flanders Hydraulics Research,

More information

Risk-Based Design of Entrance Channel Depths: A Case Study At the Entrance Channel of Mombasa Port, Kenya

Risk-Based Design of Entrance Channel Depths: A Case Study At the Entrance Channel of Mombasa Port, Kenya Risk-Based Design of Entrance Channel Depths: A Case Study At the Entrance Channel of Mombasa Port, Kenya Quy N.M., Vrijling J.K., and Pieter van Gelder Delft University of Technology, Delft, the Netherlands

More information

Deepwater Floating Production Systems An Overview

Deepwater Floating Production Systems An Overview Deepwater Floating Production Systems An Overview Introduction In addition to the mono hull, three floating structure designs Tension leg Platform (TLP), Semisubmersible (Semi), and Truss Spar have been

More information

Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour

Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour Amsterdam, The Netherlands Organised by the ABR Company Ltd Day Paper No. 2 9 Voith Water Tractor Improved Manoeuvrability and Seakeeping Behaviour Dr Dirk Jürgens and Michael Palm, Voith Turbo Schneider

More information

applied to Port Development and Inland Waterway Transport

applied to Port Development and Inland Waterway Transport applied to Port Development and Inland Waterway Transport Wytze de Boer March 12, 2018 w.d.boer@marin.nl CHALLINGING WIND AND WAVES applied to port development and inland waterway transport AGENDA 1. Introduction

More information

STUDY ON TSUNAMI PROPAGATION INTO RIVERS

STUDY ON TSUNAMI PROPAGATION INTO RIVERS ABSTRACT STUDY ON TSUNAMI PROPAGATION INTO RIVERS Min Roh 1, Xuan Tinh Nguyen 2, Hitoshi Tanaka 3 When tsunami wave propagation from the narrow river mouth, water surface is raised and fluctuated by long

More information

High-Resolution Measurement-Based Phase-Resolved Prediction of Ocean Wavefields

High-Resolution Measurement-Based Phase-Resolved Prediction of Ocean Wavefields DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. High-Resolution Measurement-Based Phase-Resolved Prediction of Ocean Wavefields Dick K.P. Yue Center for Ocean Engineering

More information

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation

More information

Preliminary Wake Wash Impact Analysis Redwood City Ferry Terminal, Redwood City, CA

Preliminary Wake Wash Impact Analysis Redwood City Ferry Terminal, Redwood City, CA Technical Memorandum Preliminary Wake Wash Impact Analysis Redwood City Ferry Terminal, Redwood City, CA 1. Introduction The following preliminary wake wash impact analysis was initiated by the Port of

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

CMS Modeling of the North Coast of Puerto Rico

CMS Modeling of the North Coast of Puerto Rico CMS Modeling of the North Coast of Puerto Rico PRESENTED BY: Dr. Kelly Rankin Legault, Ph.D., P.E. 1 Dr. Alfredo Torruella, Ph.D. 2 1 USACE Jacksonville District 2 University of Puerto Rico October 2016

More information

NAVIGATION IN CONFINED WATERS: INFLUENCE OF BANK CHARACTERISTICS ON SHIP-BANK INTERACTION

NAVIGATION IN CONFINED WATERS: INFLUENCE OF BANK CHARACTERISTICS ON SHIP-BANK INTERACTION NAVIGATION IN CONFINED WATERS: INFLUENCE OF BANK CHARACTERISTICS ON SHIP-BANK INTERACTION Evert LATAIRE, Maritime Technology Division, Ghent University, Ghent, Belgium Marc VANTORRE, Maritime Technology

More information

14/10/2013' Bathymetric Survey. egm502 seafloor mapping

14/10/2013' Bathymetric Survey. egm502 seafloor mapping egm502 seafloor mapping lecture 10 single-beam echo-sounders Bathymetric Survey Bathymetry is the measurement of water depths - bathymetry is the underwater equivalent of terrestrial topography. A transect

More information

IMO REVISION OF THE INTACT STABILITY CODE. Proposal of methodology of direct assessment for stability under dead ship condition. Submitted by Japan

IMO REVISION OF THE INTACT STABILITY CODE. Proposal of methodology of direct assessment for stability under dead ship condition. Submitted by Japan INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON STABILITY AND LOAD LINES AND ON FISHING VESSELS SAFETY 49th session Agenda item 5 SLF 49/5/5 19 May 2006 Original: ENGLISH REVISION OF THE INTACT

More information

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version Taranaki Tsunami Inundation Analysis Prepared for Taranaki Civil Defence Emergency Management Group Final Version June 2012 AM 12/07 HBRC Plan Number 4362 Asset Management Group Technical Report Prepared

More information

ABP South Wales Towage Guidelines. Date of issue: January ABP South Wales and River Usk Towage Guidelines

ABP South Wales Towage Guidelines. Date of issue: January ABP South Wales and River Usk Towage Guidelines Date of issue: January 2017 ABP South Wales and River Usk wage January 2017 Date of issue: January 2017 AMENDMENTS Amendment issue number Page Amendment made by (Initials) Date of amendment One 15 & 16

More information

Development of TEU Type Mega Container Carrier

Development of TEU Type Mega Container Carrier Development of 8 700 TEU Type Mega Container Carrier SAKAGUCHI Katsunori : P. E. Jp, Manager, Ship & Offshore Basic Design Department, IHI Marine United Inc. TOYODA Masanobu : P. E, Jp, Ship & Offshore

More information

FOR INFORMATION ONLY

FOR INFORMATION ONLY An investigation into the feasibility of piloting large cruise ships to and from a proposed terminal within the Gold Coast Broadwater Part A Simulation Plan Captain John Watkinson Meridian Maritime Services

More information

APPENDIX D-2. Sea Level Rise Technical Memo

APPENDIX D-2. Sea Level Rise Technical Memo APPENDIX D-2 Sea Level Rise Technical Memo 2185 N. California Blvd., Suite 500 Walnut Creek, CA 94596 (925) 944-5411 Fax: (925) 944-4732 www.moffattnichol.com DRAFT MEMORANDUM To: From: Neil Nichols,

More information

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND PD TEESPORT CONSERVANCY DIVISION HARBOUR MASTER'S OFFICE THE SYLLABUS FOR WRITTEN EXAMINATION IN RESPECT OF A PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND PILOTAGE EXEMPTION CERTIFICATE (Issued

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology

More information

Dynamic Positioning Control Augmentation for Jack-up Vessels

Dynamic Positioning Control Augmentation for Jack-up Vessels DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Design and Control Session Dynamic Positioning Control Augmentation for Jack-up Vessels By Bradley Deghuee L-3 Communications 1 Introduction Specialized

More information

Wave Energy Atlas in Vietnam

Wave Energy Atlas in Vietnam Wave Energy Atlas in Vietnam Nguyen Manh Hung, Duong Cong Dien 1 1 Institute of Mechanics, 264 Doi Can Str. Hanoi, Vietnam nmhungim@gmail.com; duongdienim@gmail.com Abstract Vietnam has achieved remarkable

More information

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION LOCATION Mundra Port is all weather, independent, commercial port with geographical and hydrological advantages on the West Coast of India,

More information

2. Water levels and wave conditions. 2.1 Introduction

2. Water levels and wave conditions. 2.1 Introduction 18 2. Water levels and wave conditions 2.1 Introduction This Overtopping Manual has a focus on the aspects of wave run-up and wave overtopping only. It is not a design manual, giving the whole design process

More information

COMPARISON OF CONTEMPORANEOUS WAVE MEASUREMENTS WITH A SAAB WAVERADAR REX AND A DATAWELL DIRECTIONAL WAVERIDER BUOY

COMPARISON OF CONTEMPORANEOUS WAVE MEASUREMENTS WITH A SAAB WAVERADAR REX AND A DATAWELL DIRECTIONAL WAVERIDER BUOY COMPARISON OF CONTEMPORANEOUS WAVE MEASUREMENTS WITH A SAAB WAVERADAR REX AND A DATAWELL DIRECTIONAL WAVERIDER BUOY Scott Noreika, Mark Beardsley, Lulu Lodder, Sarah Brown and David Duncalf rpsmetocean.com

More information

Experience and Future Potential of the Oblique Icebreaker

Experience and Future Potential of the Oblique Icebreaker SHIP Design & Engineering CONSULTING & Project Development ICE MODEL & Full Scale Testing OFFSHORE Development Experience and Future Potential of the Oblique Icebreaker Mika Hovilainen Project Manager

More information

PORT INFO GENERAL BERTH INFO

PORT INFO GENERAL BERTH INFO s ervices SHIPWRIGHT WWW.SHIPWRIGHTSERVICES.CO.ZA 9 DE DUINE CLOSE, BLUEWATERBAY, SALDANHA, 7395, WESTERN CAPE, SOUTH AFRICA TEL. +27 71 040 6022 EMAIL. DERICK@SHIPWRIGHTSERVICES.CO.ZA PORT INFO GENERAL

More information

CHAPTER 6 DISCUSSION ON WAVE PREDICTION METHODS

CHAPTER 6 DISCUSSION ON WAVE PREDICTION METHODS CHAPTER 6 DISCUSSION ON WAVE PREDICTION METHODS A critical evaluation of the three wave prediction methods examined in this thesis is presented in this Chapter. The significant wave parameters, Hand T,

More information