1 IMITATIONS City of Victoria Johnson Street Bridge Maritime Simulation Study 13, May 2016 Prepared by: MITAGS-PMI 07/01/2016

2 Inherent in any simulation is the accuracy of the data programmed into the simulator. Simulated environmental conditions used in the MITAGS-PMI simulators (wind, sea, current) are based on the information provided by requesting company, and are typically based on actual values and modeled data based on real world conditions. The visual scenes are also based on data provided by the client and the electronic charts for these areas. The accuracy of the data provided has a significant impact on the validity of the test results. Errors in the electronic charts may also create errors in the database. This is especially true of electronic charts that are using dated surveys and datum references other than WGS-84. Errors may also occur when converting AutoCAD drawings of channels and terminals to the WGS-84 datum reference. The hydrodynamic ship models from the MITAGS-PMI Ship Library have been previously vetted by experienced pilots, MITAGS-PMI staff, and British Columbia pilots prior to the start of the tests. The models are a very good approximation of the particular classes of vessels. Specific vessels in real-world situations may handle significantly different from those programmed into the simulator. Ship to bank interaction is not a fully understood science. The simulated ship interaction effects are highly dependent on the accuracy of the width of the channels, the bottom contours, the bank slopes, the under-keel clearances, the currents, and speed of the models during the simulation runs. Only where required were the forces adjusted based on the collective experiences of the ship handling experts and client representatives. However, most of the exercises were at low speeds thereby reducing the impact of any interaction forces. The test results assume highly experienced pilots and tug masters operating vessels with the latest technology. Since this is a new bridge structure operational limits should take into account the need for local pilots and tug masters to gain experience. MITAGS-PMI accepts no liability for the use of the conclusions and recommendations contained within this report. Additionally, MITAGS-PMI cannot be held responsible for errors in the data provided by third parties used to program the simulator hydrodynamic models and databases. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 2 of 68

3 Table of Contents Table of Contents... 3 Table of Tables... 4 Table of Figures Executive Summary... 7 Background Project Charter Project Stakeholders Study Objectives and Setup Simulator Setup Vessel Modeling Area Modeling: Spatial database Environmental Modeling Simulation Run Method Simulation Runs & Analysis Phase 1 (Impact Force Transit Testing) Simulation Run Summary Phase 2 (Best Practices) Simulation Run Summary Appendices Appendix A: Run Data Phase Appendix B: Run Data Phase Appendix C: Pilot Cards Appendix D: Glossary of Terms Appendix E: References City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 3 of 68

4 Table of Tables Table 1 - Participants Table 2 - Vessel model particulars Table 3 - Phase 1 Runs Parameters Summary (less familiarization, unused line items) Table 4 - Phase 1 Runs Composite Data Table Table 5 - Phase 2 Tug Models Employed Table 6 - Phase 2 Barge Models Employed Table 7 - Towing Mode: Towing Astern (advantages and disadvantages) Table 8 - Towing Mode: Towing Alongside (advantages and disadvantages) Table 9 - Towing Mode: Push/Pull (advantages and disadvantages) Table 10 - Diagnostics graphs parameters and sample key Table 11 - Vessel model particulars City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 4 of 68

5 Table of Figures Figure 1 - General arrangement of new Johnson Street Bridge, with identified risk impact zones... 7 Figure 2 - New Johnson Street Bridge, closed, viewed from Lower Harbour looking North... 8 Figure 3 - New Johnson Street Bridge, open, viewed from Upper Harbour looking South... 8 Figure 4-North-East Plaza... 8 Figure 5-South-East Plaza, looking West... 8 Figure 6-South-East Plaza, looking East... 8 Figure 7-West Plaza... 8 Figure 8 - Phase 1 Visual Summary of Impact Forces Maximums by Location on Bridge Structure... 9 Figure 9 - Example Risk Assessment Code Matrix Figure 10 - Phase 2 Visual Summary of Impact Forces Maximums by Location on Bridge Structure Figure 11 - Map overview of Victoria Harbor and Johnson Street Bridge (source: maps.google.com) Figure 12 - Rendering of new Johnson Street Bridge, East view, no boat, bridge closed Figure 13 Visual images of Large, Medium, and Small tugs built by MITAGS-PMI for this study Figure 14 - Ledcor L6000 Series Barge Specifications (excerpt) Figure 15 - New bridge modeling overhead view (Phase 1 Run 116) Figure 16 - View toward South end and at East side of visually modeled bridge from Lower Harbour Figure 17 - Closer view toward South end at East side of visually modeled bridge from Lower Harbour. 23 Figure 18 - View toward West Bridge showing camel fender on the West side (Phase 1, Run 16) Figure 19 - View in bridge hole area: old bridge pier, stake piles, Graving Dock (Phase 1 Run 17) Figure 20 - Detailed view of fendering and stake piles at water line (Phase 1 Run 79) Figure 21 - Unobstructed view of West side of bridge fender and camel (Phase 2, Run 10) Figure 22 - Underwater view of West and East sides of Bridge (phase 2, Run 11b) Figure 23 - Phase 1 (Runs 1-123) Composite Data Analysis: Location and Force of Impact Figure 24 - Phase 1 Visual Summary of Impact Forces Maximums by Location on Bridge Structure, with percent occurrence Figure 25 - Graph showing Forces by Amount and Location (North end of East Bridge) Figure 26 - Graph showing Forces by Amount and Location (South end of old East Bridge) Figure 27 - Graph showing Forces by Amount and Location (North end of West Bridge) Figure 28 - Graph showing Forces by Amount and Location (South end of old West Bridge) Figure 29 - Graph showing Forces by Amount and Location (East Fender) Figure 30 - Graph showing Forces by Amount and Location (West Fender) Figure 31 - Pivot Point with towing mode illustration Figure 32 - Pivot Point illustration Figure 33 - Six (6) towing configurations utilized during these Phase 2 simulation trials Figure 34 - Phase 2 Impact Risk Graphic (tonnes, t, of impact force, % of runs that impacted) Figure 35 - diagnostics graphs key... Error! Bookmark not defined. Figure 36 - Boat Nomenclature and Terminology (source: AmericanBoating.org) Figure 37 - Bridge structure locations and angles of strike City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 5 of 68

6 (BLANK BETWEEN TABLE OF CONTENTS AND FIRST PAGE OF REPORT TEXT) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 6 of 68

7 CITY OF VICTORIA JOHNSON STREET BRIDGE MARITIME SIMULATION STUDY, 13, MAY Executive Summary This report, City of Victoria Johnson Street Bridge Maritime Simulation Study, records and analyzes test runs conducted at Pacific Maritime Institute (PMI) in Seattle, Washington, U.S.A. The Johnson Street Bridge Maritime Simulation Study involved one day of hydrodynamic and vessel modeling validation on May 13, followed by two phases of simulation-based testing on May 23-26, The Johnson Street Bridge project is studying the severity of forces on the bridge and its associated structures resulting from impacts during tug and barge transit through the waterway between the Upper and Lower Harbors passing through the new Johnson Street Bridge when open. The City of Victoria is also studying the best practices of conducting such tug and barge transits in order to reduce the probability of such impacts. North end of West Bridge North end of East Bridge Figure 1 - General arrangement of new Johnson Street Bridge, with identified risk impact zones West fender East fender South end of Old West Bridge South end of Old East Bridge Phase I involved an assessment of risk to the bridge structure from identified plausible impact forces by vessels transiting to/from the upper harbor past the bridge. The scenarios simulated barge strikes of the bridge fendering structure and record the various impact and shearing forces imparted to the bridge, in order to provide data to consider in designing suitable protection systems for the bridge structure itself (e.g. dolphins, absorption barriers, etc.). A total of 90 runs were performed in the Phase 1 Impact Forces testing. Phase 2 involved an exploration of operational considerations (speed, number of tugs, towing configurations, barge displacement, environmental conditions etc.) that affect the potential for bridge strikes. This entailed the use of a tug operating expert to help explore various combinations/numbers of tugs, tow configurations, and any speed or operational constraints that will factor into recommended best practices. Operational recommendations resulted from explorative navigational trials. A total of 25 runs were performed in the Phase 2 Best Practices testing. A combined total of 115 runs in this maritime simulation study have yielded two main results. First, the study quantified the severity of impact forces as risks to be mitigated. Engineered risk mitigation controls such as fender solutions could be modified and implemented to protect the bridge structure from these forces. The study also produced a set of operational best practice and recommendations to operationally further mitigate the likelihood of such risks occurring. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 7 of 68

8 These runs primarily used three different hypothetical tug models (Large, Medium, and Small) and one hypothetical barge model (Loaded and Empty conditions). The tugs represented a composite of dimensions and capabilities of the primary vessels presently transiting this waterway while not call out any specific existing tug working in this region. The barge represented a worst case composite dimension of present and future barges used in this region and not the specific dimensions of any specific company barge used in this waterway. (Appendix C: Pilot Cards) The below design illustrations provide visual representation of the general arrangement, and show the layout with integration of amenities to the surrounding community (Figures 2 7). South end of Old West Bridge South end of Old East Bridge Figure 2 - New Johnson Street Bridge, closed, viewed from Lower Harbour looking North North end of East Bridge North end of West Bridge Figure 3 - New Johnson Street Bridge, open, viewed from Upper Harbour looking South Figure 4-North-East Plaza Figure 5-South-East Plaza, looking West Figure 6-South-East Plaza, looking East Figure 7-West Plaza City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 8 of 68

9 SUMMARY OF FINDINGS Phase 1 (Impact Force Transit Testing) Simulation Run Summary A total of ninety (90) simulation trials were run. Forty seven (47) were run with a loaded barge and forty three (43) with empty barge. In Phase 1 testing, the North end of the East and West Bridge sections sustained the greatest force of impact (Severity). The East and West Fenders sustained the least force of impact (Severity). North end of West Bridge 1100t 1200t North end of East Bridge West fender 250t 370t East fender South end of Old West Bridge 1060t 900t South end of Old East Bridge Figure 8 - Phase 1 Visual Summary of Impact Forces Maximums by Location on Bridge Structure Key: Force of Impact (tonnes, t) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 9 of 68

10 The last group of Phase 1 runs served as an excellent transition to the Phase 2 tests, and began to identify some potential best practices in terms of operational considerations such as environmental conditions, operating configurations, and human factors such as training and experience. Below is a summary of these early Best Practice Observations, gleaned from Phase 1: Operators should transit with windows open to provide additional sensory input. Shorten towline to place shackle at tug stern in most situations, including extreme conditions of 30 knots of wind from SW Avoid outbound transits with an empty barge in winds approaching 30 knots from SW. Be especially cautious of the challenges of transiting an extended length of bridge (new bridge plus old bridge pilings), further increasing need to run with short tow. Consider a 20 knot wind operational limit for bridge transits. During high winds (30Kts from SW), consider using visual references of old West Bridge, allowing barge to set to East largely from the wind effect on an empty barge. Also, consider using escort tug on port quarter into turn, through turn, and then reposition onto starboard quarter when coming out of turn. Fender considerations are obviously the impact forces, but it appears that the floating fender on the west side might not stop a light barge with rake (very small draft) from riding up and contacting the rest piers. Tether medium assist tug port quarter astern with empty barge inbound in high 30 knot winds, to create drag and facilitate twisting barge. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 10 of 68

11 Phase 2 (Best Practices) Simulation Run Summary: 25 total runs Towing best practices are procedure tools to manage the risk of allision during a Johnson Bridge Transit. In combination with engineering, human factor and protective equipment controls, they bring the risk of bridge allision to an acceptable level. An acceptable level of risk for this analysis is defined as a combination of probability and severity of the risk, that once mitigated, results in a mid-level, MODERATE or better rating on a 4 by 4 risk assessment scale, as demonstrated in the example Figure 9. In Phase 1, the operators were working Figure 9 - Example Risk Assessment Code Matrix to make a normal or routine passage with their tow, but were asked to allow the barge to intentionally strike the bridge structure, as if they lost control or experienced a mechanical failure, in order to measure the impact forces (Severity). In Phase 2, the operators were attempting to safely transit during more extreme weather conditions and using difference barge make-up configurations and trying to avoid contact with the bridge structure, as they would normally do when operating in the waterway. During this second Phase, the East Fender sustained both the greatest force of impact (Severity) and the highest percentage of total number of impacts (Probability). The majority of the bridge strikes during Phase 2 were to the East span and fender system. The Primary tug made up alongside allowed for lower speed of approach while maintaining control. The Primary tug towing astern requires a faster speed in order to maintain directional stability of the barge. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 11 of 68

12 North end of West Bridge North end of East Bridge West fender 205t (14%) East fender South end of Old West Bridge 250t (2%) 110t (2%) South end of Old East Bridge Figure 10 - Phase 2 Visual Summary of Impact Forces Maximums by Location on Bridge Structure The inbound transits with a loaded barge were most challenging due the 90 turn, set towards the marina on the east side, and limited distance and time to attain an effective line-up for the bridge. The outbound transits were less challenging because the required 30 turn prior to bridge lineup was shallower than on the inbound and allowed more time and distance to make a good approach to the bridge span. It is critical to have sufficient time and distance to establish an effective approach line and regain directional stability on the inbound transits. Managing speed is a critical factor in creating an effective ratio between the tow s rate of turn and advance on the inbound 90 turn to port. Positive control of the tow s trailing end is critical to checking the stern and slide to starboard on the inbound transit. Positive control of the tow s trailing end can be achieved by making up the primary tug on the hip or tethering the assist tug on the stern. A tug running free and pushing on the starboard quarter of the barge is of limited use in checking the starboard slide on the inbound transit. Towing astern is an effective towing mode for controlling the leading end of the tow. Tug masters use visual cues to judge heading, rate of turn and distance. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 12 of 68

13 A fixed maximum speed limit is not appropriate in the context of a bridge transit. Rather, transit speed should meet safe speed criteria. Safe speed is slow enough to build a cushion of space and time for the towing operators to perceive a deviation from the intended track, maneuver the tug to apply a corrective force and have the tow respond in a timely and effective manner. Safe speed is also fast enough to add directional stability to the tow. Both these factors will vary depending on tug capability and towing configuration. The speed associated with a successful bridge transit is a consequence, not the cause, of tug operators successfully balancing these factors. The simulator trial data indicates a range of 2.5 to 4.5 knots as the speed over ground associated with successful transits. Speed varied widely from light barge to loaded and towing alongside vs. towing astern. Light barge outbound was over 5 knots most of the time when line haul tug towing astern. Loaded barge was less than 4 most of the time. Made up alongside allows tug to approach slower and maintain adequate control. Line haul tug alongside speed was below 4knots consistently. Being made up alongside the tow does not depend on directional stability as much as towing astern because a tug made up alongside has more direct control. Line haul tug towing astern will always require more speed to maintain directional stability. The data indicates that the Johnson bridge transit presents a moderate maneuvering challenge that requires experienced tug operators and tugs positioned in a towing configuration that enables positive control of both the leading and trailing end of the tow. This last is a critically important point. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 13 of 68

14 Recommendations Both known factors (environmental conditions, tug capability, tug master familiarity and experience, and barge size, load and trim) and unknown factors (e.g., current anomalies or high vessel traffic density) are required to determine an effective towing configuration and bridge transit plan. Rather than being prescriptive, these best practice recommendations describe critical elements that towing companies and operators should consider in their policies, procedures and training programs as tools to minimize the risk of allision. Two tugs for each transit Minimum 1500 aggregate HP between the two tugs, for the big barge Maximum environmental conditions of 30 knots of wind and 1 knot of current for a loaded barge, and 25 knots of wind and 1 knot of current for an empty barge. Towing configurations should enable o Direct control of the tow leading and trailing ends o Minimal added width to the tug/tow unit o Checking the starboard slide on inbound transits with strong westerly winds Recommended Inbound Towing Configurations are: o Primary tug towing astern/assist tug tethered to the barge starboard stern o Primary tug towing on the hip, made up on the barge port stern, assist tug towing astern o Primary tug towing on the hip, made up on the barge starboard stern, assist tug tethered forward of primary tug. (Most control, slowest speed required) Recommended Outbound Towing Configurations are: o Primary tug towing astern/assist tug tethered to one or the other side of the stern o Primary tug towing on the hip, assist tug towing astern o Primary tug towing on the hip, assist tug tethered forward of the Primary tug. With strong NW wind this configuration should have both tugs made up on port side of barge to better enable barge to be held up into the wind and control barge setting into the south span. Towing companies to hold additional trials to establish standard towing configurations suitable for each companies tug and barge specifications Towing companies to develop tug/barge communication protocols to establish standardized terminology and procedures to communicate the barge set, line-up, distance to obstructions and corrective actions Towing companies to establish tug master qualification standards for Johnson Street Bridge Transits including: o General towing experience o Tug familiarization o Number of route familiarization transits o Required training o Route standard of competency criteria Install visual navigation aids such as range markers or lights to assist vessels in determining effective line up for safe bridge transit City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 14 of 68

15 Consider removal or reduction in size of old bridge west pier to allow more clearance for the 90 degree turns City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 15 of 68

16 Background Project Understanding The City of Victoria is in the process of replacing the Johnson Street Bridge in Victoria Harbor and Ralmax is proposing development of Port Hope shipyard. In the interest of public safety and the alleviation of potential damage to the revised bridge, the City of Victoria would like to know the minimum fender requirements to mitigate potential damage from allision with local vessel traffic. Figure 11 - Map overview of Victoria Harbor and Johnson Street Bridge (source: maps.google.com) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 16 of 68

17 Figure 12 - Rendering of new Johnson Street Bridge, East view, no boat, bridge closed Scope of Work Once model validation is complete (single day), the maritime simulation study testing is proposed in two phases (to occur within a week s sequence of testing days): 1. Phase 1 (Impact Force Transit Testing) is an assessment of possible impact forces to the bridge structure by vessel or barges transiting to/from the upper harbor past the bridge. The transit will allow the tug to tow the barge in such a manner and speed (based on routine cargos and operations) as to allow the barge to make worst case contact with the bridge structure, and to record the various collision/allision forces imparted to the bridge and the means by which contact can occur. This will provide information about possible scenarios leading to contact with the bridge structure and data from which to create suitable protection systems for the bridge structure itself (e.g. dolphins, absorption barriers, etc.). This phase will culminate with a report detailing the situations and forces as well as any other noted conclusions. 2. Phase 2 (Best Practices) is an exploration of operational considerations (speed limits or minimums, number of tugs, load of barge, etc.) to prevent or minimize the potential for impact with the bridge structure. This will entail the use of a tug operating expert to help explore various combinations/numbers of tug, configuration of barge tow, and any speed or operational constraints, resulting in a report summarizing the recommendations. Project Charter Using maritime simulation, validate area and vessel hydrodynamic modeling; assess possible impact forces to the bridge structure by vessel or barges transiting to/from the upper harbor past the bridge; and explore operational considerations to prevent or minimize the potential for impact with the bridge structure. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 17 of 68

18 Project Stakeholders MITAGS-PMI conducted testing at the request of City of Victoria, as sponsors of the Johnson Street Bridge Replacement Project. The following individuals took part in or were present during these maritime simulation studies at PMI. Taaj Daliran Jonathan R. Huggett, P.Eng Hugh Tuttle, P.Eng Angus English, P. Eng. Peter Action, P. Eng. Capt. Russell Johnson Capt. Darren Kleaman Malcolm Fiander Capt. Brent Biggins Kevin Ashley Capt. Bill Anderson, Jr. Pasha Amigud Richard Jewart Drew Pine Mark Hokenson Sarah McGann, P.M.P. Table 1 - Participants City of Victoria Engineering and Public Works, Manager, Waste Management and Cleaning Services J.R. Hugget Company Lead Consulting Engineer to City of Victoria Independent Consultant, retained by WSP MMM Group Consulting Engineer WSP MMM Group Vice President, Regional Manager PJA Consulting Consulting Engineer Ports and Harbours RJ Maritime Associates LLC Maritime Projects Investigations and Legal Consulting LedCor Resources and Transportation Captain (500/3000 towing) Ledcor Resources and Transportation LP, Manager, Vessel Operations SeaSpan Marine Port Captain and Captain (towing) SeaSpan Marine Superintendent, Vancouver Island Marine Operations PMI Director, Simulation Project Director PMI Vessel Modeler PMI Area Modeler PMI Simulator Operator PMI Simulator Operator PMI Facilitator, Simulation Analyst, and Report Author City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 18 of 68

19 2 Study Objectives and Setup Simulator Setup The PMI simulation environment consisted of three interconnected vessel bridges, with visualizations of two manned working tug bridges and one manned barge. The simulation environment initial run setup was operated from a single simulation operator workstation at which virtual displays of both operating area visuals from numerous camera angles as well as virtual repeaters of bridge equipment and indicators were available The vessel bridges visual displays were interconnected, such that the visual distances apparent from the barge were fully aligned with those from the tugs and from all elements of the simulation environment components such as the Johnson Street Bridge. Visuals were also repeated into the associated monitoring and debriefing room for additional stakeholders to observe during each run. The adjoining visual displays of the simulation environment included the engineering specifications draft of the completed bridge, with the proposed graving dock on the north and west of the new bridge, as well as certain structural elements such as remaining old bridge components, log buffers, and dolphins, built into the simulator database. The Simulator Operator controlled the simulator functions, not including vessel model operation, set requested environmental parameters and vessel starting positions and configurations for each run, and initiated introduced events such that run contingencies would be required. The interconnected and Mariner-operated vessel approach allowed for practical evaluation of transits of the revised operating area due to the new bridge design, while capturing direct feedback from the Mariners who already regularly operate tug-and-barge runs in this area as experienced captains. For force impact only runs, the modeled barge was operated directly by the Simulation Operator. The Facilitator managed sequencing and data collection for each of the runs, making notes and annotations of each test. Vessel Modeling Small: No. 1_PMI (7.6t bp) Medium: No. 2_PMI (13t bp) Large: No. 7_PMI (18t bp) Figure 13 Visual images of Large, Medium, and Small tugs built by MITAGS-PMI for this study City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 19 of 68

20 Particulars Vessel tug and barge models were built specifically for this research Maritime Simulation Study, vice using existing vessel models from the PMI library. The tug vessels were designed to mimic dimensions, specifications, visual layouts, and handling characteristics of three different horsepower capacities, closely replicating some of the actual tug vessels already employed by routine operators (e.g. SeaSpan and Ledcor) in the area of the City of Victoria Harbor or approaches. The barge models were designed to test worst case scenarios in terms of upper limits, notably the vessel specifications of length, width, breadth, draft, and displacement in both loaded or full/heavy and unloaded or light/empty conditions. For force calculations, all models reacted as non-deformable bodies, transferring forces without any consideration for deformation of either the vessel or the fender structures. Barge Model upper limits by draft and displacement informed by existing L6000 Series: Figure 14 - Ledcor L6000 Series Barge Specifications (excerpt) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 20 of 68

21 Details of the various models used in the simulation runs are shown in the table below. Appendix C: Pilots Cards contains this table and the full Pilot Cards for each vessel. Table 2 - Vessel model particulars Name Condition Length /Beam/Draft No. 1_PMI Small No. 2_PMI Medium No. 7_PMI Large Displacement / Bollard Pull (t) N/A 11m /4.77m/1.5m 40t / 7.6t N/A 27.02m /9.1m/2.7m 350t / 13t N/A 28.75m /7.78m/2.72m t / 18t Victoria Barge Empty 79.87m /21.70m/0.85m 1267t N/A Victoria Barge Loaded 79.87m /21.70m/4.9m 8145t N/A ASD Tug 1 N/A 25.3m /10.36m/2.74m 366t / 53t Key: bp FPP kw m t ZD bollard pull (tractive force of a tug, expressed here in metric tons) Fixed pitch propeller kilowatt (1000 kw = 1341 mechanical horse power) meters tons (or Metric Tons; 1000 tonnes = 1102 tons) Azimuthing drive Power (kw) 2 x 162 kw FPP 100% = 440 rpm 2 x 1119 kw FPP 100% = rpm 2 x 486 kw FPP 100% = rpm 2 x 1566 kw Azimuth FPP City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 21 of 68

22 Area Modeling: Spatial database The spatial database for the City of Victoria Johnson Street Bridge Maritime Simulation Study (Figures 15-20) was built from electronic chart data using PMI s Transas simulator, and incorporated the design of the proposed Johnson Street Bridge and Point Hope Graving Dock, with specifications from Appendix A (Items 15-22). Figure 37 - Bridge structure locations and angles of strike City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 22 of 68

23 Appendix E: References The La Farge Silo was deliberately included in the spatial database and visual model, as the current tug and barge operators use this as a quick visual reference point aiding to accuracy and safety of navigation. The footings from the old bridge were retained as per current intentions of the construction project, at a height 3m above the high water mark. Also included was a series of 20 stake piles as a roller system, shown in the engineering AutoCAD fender drawings. Figure 15 - New bridge modeling overhead view (Phase 1 Run 116) Figure 16 - View toward South end and at East side of visually modeled bridge from Lower Harbour Figure 17 - Closer view toward South end at East side of visually modeled bridge from Lower Harbour The camel fender on the west side is represented by a solid vertical structure on the outboard face of the camel. In effect, this prevents the barge from running over the camel and impacting the Rest Pier support structure. Any impact scenario on the camel fender needs to be further investigated for the potential for impact with the Rest Pier due to the barge s bow rake light barge in particular, but also loaded or other intermediate loads. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 23 of 68

24 Figure 18 - View toward West Bridge showing camel fender on the West side (Phase 1, Run 16) Figure 19 - View in bridge hole area: old bridge pier, stake piles, Graving Dock (Phase 1 Run 17) Figure 20 - Detailed view of fendering and stake piles at water line (Phase 1 Run 79) Figure 21 - Unobstructed view of West side of bridge fender and camel (Phase 2, Run 10) Figure 22 - Underwater view of West and East sides of Bridge (phase 2, Run 11b) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 24 of 68

25 Environmental Modeling The overall environmental model for this testing was based on bathymetry and climate data provided by the City of Victoria. The source data included excerpts from coast pilot references for Juan De Fuca Strait, including Esquimalt, Victoria and Port Angeles Harbours (4864), which describe the port, harbor and other local landmarks, and provide local knowledge of weather and vessel operations. To meet the testing objectives, little weather variation was required except for variation of velocity and direction of the winds as they would affect maneuvering and handling of either the barge or tugs. For this reason, analysis was conducted of historical wind patterns for the immediate vicinity of the Johnson Street Bridge based on provided source data, resulting in the identification of the predominant winds likely to impact the safety of these maneuvers. Wind Direction and Speed Both wind direction and speed impact the ability of the operators to maintain position of both tugs and barge when transiting through the Johnson Street Bridge passage. Wind analysis based on data provided from the City of Victoria (Locations of Wind Data), which included tabular summary of wind direction and magnitude over a 365 day period, provided the basis for establishing a default worse-case condition of wind forces. Based on this provided data, it was established that the most frequent wind direction was 230 degrees. While the wind speeds would range from zero to average sustained speeds of 23 knots, the operational limits of bridge operation were stated to be no more than 30 knots (the bridge would not be operated in winds gusting to 30 knots), and established the upper limit of 30 knots for the purpose of testing. Winds were then included in the simulation scenarios by setting the environmental wind speed and direction as required for each test (see the test matrix), but typically at 230 degrees at 30 knots for the most extreme situations. The simulator then created these steady conditions for the operators to experience during the testing. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 25 of 68

26 Tides and Currents Currents are also a significant variable for the maritime operator to experience, and must be mitigated during the transits of the bridge. Tidal data was based on provided tide charts of Victoria Harbor (2015 Canadian Hydrographic Service) allowing identification of the extreme conditions (lowest low tide and highest high tide) present during a typical 365 day cycle. The tidal range spanned between 1.0 and 8.9 feet during this period, and characterizes a typical range of tides to be found in this geographic area. While there are weather conditions that could exceed these expected conditions, for the purpose of testing only the typical range was required as most prudent mariners would not venture during the situations which would create the more extreme conditions. The simulation was adjusted to account for these tides, and specific depths were set for each of tests according to the test matrix. Of great importance to the mariner and the safe transit of the bridge is the water current present through the channel. Current data used in the testing consisted of tabular data (node number, latitude, longitude, North vector magnitude, East vector magnitude) of surface currents expected at eight different times throughout the tidal flow cycle. The data was sourced from models created by ASL Environmental Sciences Inc. of Saanichton, BC, Canada. The resulting model produced expected current patterns at peak Ebb and peak Flood as measured at the narrowest point of the bridge passage, and six additional time points evenly spaced between these two extremes. These depth averaged current maps were imported into the simulator and can be activated through toggle settings in the software. The testing called for measuring performance at the most extreme situations, and knowing that the maximum Ebb and Flood conditions create the most difficult handling conditions of tugs and barges, then the Maximum Flood and Maximum Ebb were used within a majority of the test cases presented in the text matrix. The current modeling data used by ASL was based on both present day samples and the 1973 study A Numerical Model Of Victoria Harbour To Predict Tidal Response To Proposed Hydraulic Structures by A. B. Ages of Environment Canada Fisheries And Marine Service Marine Sciences Directorate Pacific Region (March 1973). City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 26 of 68

27 Simulation Run Method A simulation run matrix was organized prior to beginning the simulation runs. The purpose of the matrix is to guide the discovery process with a sequence of runs in conditions selected for particular objectives. Observations are considered, and the original run matrix is modified according to team consensus. The Simulator Operator and the Facilitator ensure all parameters match the scenario design criteria, and actively capture data and visual snapshots for the run records. A full day was spent on model validation on 13 May, in preparation for the Simulation Runs May. Feedback from the model validation yielded some adjustments to operating and handling characteristics as well as visual details for the various tug models. Spatial modeling adjustments were also made, and bathymetric modeling was validated against the data. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 27 of 68

28 3 Simulation Runs & Analysis Appendix A: Run Data contains the complete run sequence, test matrix, observations, and analysis. For each run, a standard set of run information is included in the report (e.g.run Number, Force Diagram, Track History, and relevant visuals from the Simulation Control Station). See Table 4 and subsequent figures. Phase 1 (Impact Force Transit Testing) Simulation Run Summary The goals of the Phase 1 testing Simulation Runs included: Quantified impact force Location of Impact force Severity analysis of impact force by impact location for Inbound and Outbound transits with Loaded and Empty barges Phase 1 was designed as an assessment of possible impact forces to the bridge structure by vessels transiting to/from the upper harbor past the bridge. The run scenarios simulated barge strikes of the bridge fender structure and recorded the various impact and shearing forces imparted to the bridge. These scenarios provide data to consider in designing suitable protection systems for the bridge structure itself (e.g. dolphins, absorption barriers, etc.), and culminated in a report detailing the situations and forces as well as any other noted conclusions. Phase 1 Scope of Work: For a given set of operational conditions ("average passage"), runs determined the impact forces imparted from a towed cargo barge (in two draft conditions, loaded and empty) to the surrounding structure of the new Johnson St. Bridge. Operational conditions include: Nominal winds and currents (5 kts winds and slack water) Limiting winds (30 kts) roughly perpendicular to the direction of transit Maximum expected currents (based on current model) Typical speed of towing vessel (4-6 knts) Typical tow cable length (50ft bridle with shackle 15ft off stern of towing vessel) No use of assist tug Varying degrees of offset angle with approach to bridge (ranging from 0 degree offset to 10 degree maximum) Both north (inbound) and south (outbound) runs with same above conditions Both fully loaded and empty conditions, in both north and south directions Runs 1-13 are for Familiarization only Runs 36, 38-54, 56, 58, 60-61, 63, 68, 70-71, 74-77, 80, 82-83, 85-87, were unused or spare line items Table 3 - Phase 1 Runs Parameters Summary (less familiarization, unused line items) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 28 of 68

29 Run Angle of Impact Location of Impact Speed (kts) Summary Force (t) Tug Barge Transit Wind speed (kts) Wind Direction (Deg T) Tide Difficulty Safety 14 Head-On Perpendicular North End of East Bridge Medium Loaded Outbound Slack NA NA 15 Head-On Perpendicular North End of East Bridge Medium Loaded Outbound Slack NA NA 16 Head-On Off-Perpendicular North End of East Bridge Medium Loaded Outbound Slack NA NA 17 Head-On Off-Perpendicular North End of East Bridge Medium Loaded Outbound Slack NA NA 18 Glancing Bow Corner Strike East Fender Medium Loaded Outbound Slack NA NA 19 Glancing Bow Corner Strike East Fender 5 0 Medium Loaded Outbound Slack NA NA 20 Shearing Parallel to Bridge Fender East Fender Medium Loaded Outbound Slack NA NA 21 Shearing Parallel to Bridge Fender East Fender 5 55 Medium Loaded Outbound Slack NA NA 22 Head-On Perpendicular North End of West Bridge Medium Loaded Outbound Slack NA NA 23 Head-On Perpendicular North End of West Bridge Medium Loaded Outbound Slack NA NA 24 Head-On Off-Perpendicular North End of West Bridge Medium Loaded Outbound Slack NA NA 25 Head-On Off-Perpendicular North End of West Bridge Medium Loaded Outbound Slack NA NA 26 Shearing Parallel to Bridge Fender West Fender Medium Loaded Outbound Slack NA NA 27 Shearing Parallel to Bridge Fender West Fender Medium Loaded Outbound Slack NA NA 28 Glancing Bow Corner Strike West Fender Medium Loaded Outbound Slack NA NA 29 Glancing Bow Corner Strike West Fender Medium Loaded Outbound Slack NA NA 30 Head-On Perpendicular North End of East Bridge Large Loaded Outbound Slack NA NA 31 Head-On Off-Perpendicular North End of East Bridge Large Loaded Outbound Slack NA NA 32 Glancing Bow Corner Strike East Fender Large Loaded Outbound Slack NA NA 33 Shearing Parallel to Bridge Fender East Fender Large Loaded Outbound Slack NA NA 34 Head-On Perpendicular North End of West Bridge Large Loaded Outbound Slack NA NA 35 Head-On Off-Perpendicular North End of West Bridge Large Loaded Outbound Slack NA NA 37 Glancing Bow Corner Strike West Fender 5 55 Large Loaded Outbound Slack NA NA 55 Head-On Perpendicular South End of old East Bridge Large Loaded Inbound Slack NA NA 57 Glancing Bow Corner Strike East Fender Large Loaded Inbound Slack NA NA 59 Head-On Perpendicular South End of old West Bridge Large Loaded Inbound Slack NA NA 62 Glancing Bow Corner Strike West Fender 5 40 Large Loaded Inbound Slack NA NA City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 29 of 68

30 Run Angle of Impact Location of Impact Speed (kts) Summary Force (t) Tug Barge Transit Wind speed (kts) Wind Direction (Deg T) Tide Difficulty Safety 64 Head-On Perpendicular South End of old East Bridge non Empty Inbound Slack NA NA 65 Head-On Perpendicular South End of old East Bridge 5 0 non Empty Inbound Slack NA NA 66 Head-On Off-Perpendicular South End of old East Bridge non Empty Inbound Slack NA NA 67 Head-On Off-Perpendicular South End of old East Bridge non Empty Inbound Slack NA NA 69 Glancing Bow Corner Strike East Fender non Empty Inbound Slack NA NA 72 Head-On Perpendicular South End of old West Bridge non Empty Inbound Slack NA NA 73 Head-On Perpendicular South End of old West Bridge non Empty Inbound Slack NA NA 78 Glancing Bow Corner Strike West Fender non Empty Inbound Slack NA NA 79 Glancing Bow Corner Strike West Fender 5 35 non Empty Inbound Slack NA NA 81 Head-On Perpendicular North End of East Bridge non Empty Outbound Slack NA NA 84 Glancing Bow Corner Strike East Fender non Empty Outbound Slack NA NA 88 Head-On Perpendicular North End of West Bridge non Empty Outbound Slack NA NA 89 Head-On Perpendicular North End of West Bridge non Empty Outbound Slack NA NA 97 Head-On Perpendicular North End of East Bridge Large Loaded Outbound Ebb NA NA 98 Head-On Off-Perpendicular North End of East Bridge Large Loaded Outbound Ebb NA NA 99 Glancing Bow Corner Strike North End of East Bridge Large Loaded Outbound Ebb NA NA 100 Shearing Parallel to Bridge Fender East Fender Large Loaded Outbound Ebb NA NA 101 Head-On Perpendicular North End of West Bridge Large Loaded Outbound Ebb NA NA 102 Head-On Off-Perpendicular North End of West Bridge Large Loaded Outbound Ebb NA NA 104 Glancing Bow Corner Strike North End of East Bridge Large Loaded Outbound Ebb NA NA 105 Head-On Perpendicular South End of old East Bridge Large Loaded Inbound Ebb NA NA 106 Head-On Off-Perpendicular South End of old East Bridge Large Loaded Inbound Ebb NA NA 107 Glancing Bow Corner Strike East Fender Large Loaded Inbound Ebb NA NA 109 Head-On Perpendicular South End of old West Bridge Large Loaded Inbound Ebb NA NA 110 Head-On Off-Perpendicular South End of old West Bridge Large Loaded Inbound Ebb NA NA 112 Glancing Bow Corner Strike West Fender Large Loaded Inbound Ebb NA NA City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 30 of 68

31 Run Angle of Impact Location of Impact Speed (kts) Summary Force (t) Tug Barge Transit Wind speed (kts) Wind Direction (Deg T) Tide Difficulty Safety 113 Head-On Perpendicular North End of East Bridge Large Empty Outbound Ebb Glancing Bow Corner Strike North End of East Bridge 4 40 Large Empty Outbound Ebb Head-On Perpendicular North End of East Bridge Large Empty Outbound Ebb NA NA 5 0 Large Empty Outbound Ebb Shearing Parallel to Bridge Fender East Fender 5 60 Large Empty Outbound Ebb Glancing Bow Corner Strike North End of East Bridge Large Empty Outbound Ebb Head-On Off-Perpendicular South End of old East Bridge Large Empty Outbound Ebb Shearing Parallel to Bridge Fender East Fender Large Empty Outbound Ebb NA NA 5 0 Large Empty Inbound Ebb Shearing Parallel to Bridge Fender East Fender 5 50 Large Empty Inbound Ebb NA NA Large Empty Inbound Ebb 3 6 Table 4 - Phase 1 Runs Composite Data Table The following figures provide analysis of the results of the above runs, by location on the bridge structure and summary force of impact in tonnes. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 31 of 68

32 Phase 1 Runs (1-123): Summary Force (t) by Location of Impact East Fender East Fender East Fender East Fender East Fender East Fender East Fender NA NA North End of East Bridge North End of East Bridge North End of East Bridge North End of East Bridge North End of East Bridge North End of East Bridge North End of East Bridge North End of West Bridge North End of West Bridge North End of West Bridge North End of West Bridge North End of West Bridge South End of old East Bridge South End of old East Bridge South End of old East Bridge South End of old East Bridge South End of old West Bridge South End of old West Bridge South End of old West Bridge West Fender West Fender West Fender West Fender Summary Force (t) Figure 23 - Phase 1 (Runs 1-123) Composite Data Analysis: Location and Force of Impact City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 32 of 68

33 North end of West Bridge 1100t (17%) 1200t (28%) North end of East Bridge West fender 250t (16%) 370t (19%) East fender South end of Old West Bridge 1060t (9%) 900t (12%) South end of Old East Bridge Figure 24 - Phase 1 Visual Summary of Impact Forces Maximums by Location on Bridge Structure, with percent occurrence City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 33 of 68

34 North end of East Bridge Summary Force (t) 0 Head-On Head-On Head-On Off- Head-On Off- Head-On Head-On Off- Head-On Head-On Head-On Off- Glancing Bow Glancing Bow Head-On Glancing Bow Head-On Glancing Bow Figure 25 - Graph showing Forces by Amount and Location (North end of East Bridge) South end of old East Bridge Summary Force (t) Figure 26 - Graph showing Forces by Amount and Location (South end of old East Bridge) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 34 of 68

35 North end of West Bridge Summary Force (t) Figure 27 - Graph showing Forces by Amount and Location (North end of West Bridge) South end of old West Bridge Summary Force (t) Figure 28 - Graph showing Forces by Amount and Location (South end of old West Bridge) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 35 of 68

36 East Fender Outlier: this was actually a Head-On, Off-Perpendicular Impact (Run 32) Summary Force (t) Figure 29 - Graph showing Forces by Amount and Location (East Fender) West Fender Summary Force (t) Figure 30 - Graph showing Forces by Amount and Location (West Fender) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 36 of 68

37 Summary Analysis of Phase 1 Simulation Runs A total of ninety (90) simulation trials were run. Forty seven (47) were run with loaded barges and forty three (43) with empty barges. In Phase 1 testing, the North end of the East and West Bridge sections sustained both the greatest force of impact (Severity). The East and West Fenders sustained both the least force of impact (Severity). The last group of Phase 1 runs served as an excellent transition to the Phase 2 tests, and began to identify some potential best practices in terms of operational considerations such as environmental conditions, operating configurations, and human factors such as training and experience. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 37 of 68

38 Phase 2 (Best Practices) Simulation Run Summary The number and type of tugs, towing configuration and operating procedures are also effective risk management tools for tug and barge transits. Phase 2 was an analysis of towing operations in this context, specific to transiting the Victoria Johnson Street Bridge. Phase 2 simulation trials were an exploration of operational considerations (speed, number of tugs, towing configurations, barge displacement, environmental conditions etc.) that affect the potential for bridge strikes. This entailed the use of experienced tug masters, subject matter experts and tug masters with local knowledge to conduct bridge transit trials. The trials were a combination of discovery and validation for different combinations of: Tug types Towing configurations Barge conditions Environmental factors Tug master experience The objective of the Phase 2 simulation trials was to provide: Quantitative data points to evaluate risk factors Qualitative data from tug masters and subject matter experts as to: o Safety factor associated with each specific transit scenario o Difficulty associated with each specific transit scenario o Towing configuration and procedure recommendations Recommend Best Practices that identify critical equipment, procedural and human factors Exploration of best practices is a logical extension of current practices presently used during transits of the Johnson Street Bridge waterway. Specifically, tugs are used by at least two different service providers to move barge cargo north and south (in and out) of the waterway channel between the Upper and Lower Harbor, through the waterway. Typically, this transit is made with a single tug towing ahead on a short wire and roughly 50 foot barge bridle, with a much smaller escort tug running free astern of the barge. The free running tug is then directed by the lead towing tug to assist as required, and is in compliance with the City of Victoria regulations concerning the need for a free running assist tug. These standard procedures were confirmed by representatives of the two leading service providers who participated in the testing. Phase 2 Scope of Work: Based on both given and additional tugs, and different methods of makeup, assist and speed management, determine best practices in order to increase control over positioning of barge when passing through Johnson St Bridge, and to decrease the possibility of the barge striking the bridge structures. Operational conditions include: Nominal winds and currents (5 kts winds and slack water) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 38 of 68

39 Limiting winds (30 kts) roughly perpendicular to the direction of transit Maximum expected currents (based on current model provided) Appendix B: Run Data Phase 2 contains the complete run sequence, test matrix, observations, and analysis. For each run, a standard set of run information is included in the report: Run Number, Force Diagram, Track History, and relevant visuals from the Simulation Control Station. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 39 of 68

40 Towing Best Practices Tug Capacity Tug capacity is the establishment of the number and performance specification of tugs required to maneuver a vessel safely in the specified maximum working conditions with inherent safety and redundancy factors. One purpose of the Phase 2 Simulation trials was to establish a best practice for the size, specification and number of tugs required to transit the Johnson Street Bridge. Risk Management Risk management is a process of risk discovery, assessment and implementation of risk control measures. In this case, the identified risk is an allision and consequence of a bridge strike. Risk controls fall into four (4) categories, listed in order of priority and effectiveness: Engineering controls Procedural controls Human factor controls Protective Equipment A bridge transit is a complex maneuver that is affected by multiple factors acting in a variety of combinations. No single risk control measure can eliminate or reduce the risk to an acceptable level. Managing the risk of a bridge strike takes a multi-layered approach that incorporates risk control measures from all four (4) categories. Engineering Controls Examples of engineering controls built into the bridge design are: Height and width of the span Alignment with the navigable channel Design and construction of bridge supporting structure Depth of the channel Removal or placement of previous bridge structural components Please note that fendering is not included as an engineering control. Procedural Controls In the context of the Johnson Street Bridge procedural controls are: Best Towing Practices Victoria Harbor Practices and Procedures City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 40 of 68

41 Human Factor Controls Human performance is a critical element in making a safe bridge transit. In other words, it takes skilled, experienced hands on the helm to maximize the effectiveness of design, equipment and procedures controls. Human factor risk controls include establishing standards for: Familiarization Experience Training Demonstrations of Proficiency Protective Equipment Protective equipment is the last line of defense in managing risk. Protective equipment can never eliminate a risk. Rather it is designed to augment the other risk management tools should the engineering, procedural and human factor controls either fail or have reduced effectiveness. This is the role of the bridge protective fender design and construction. The focus of the Phase 2 simulations was to accumulate data, utilize the input of experienced tug masters and subject matter experts and make recommendations of Towing Best Practices. These recommendations are in the context Procedural and Human Factor risk controls for the Johnson Street Bridge transit. Participants Key participants in the simulation trials were two (2) tug masters with local knowledge, two (2) vessel operations managers with towing experience and a maritime consultant with extensive experience and expertise in towing operations. They provided invaluable feedback toward validating the vessel and area models, and ultimately the realism of the simulated scenarios, and constitute subject matter expertise concerning the transit of this waterway. Methodology A hybrid methodology was utilized throughout the simulation trials. The initial intent of the trials was to follow a previously established test matrix. However, it quickly became apparent that the most productive use of the limited time would be to test different towing configurations, and evaluate transit safety and control in various environmental conditions. In other words, it was more productive to leverage the fusion of the five (5) participants experience and expertise to discover, test and evaluate towing practices than follow a prescriptive trial matrix. Limiting Conditions The simulation trials created worst case environmental conditions by utilizing previously established wind, current and number of tug limits. These were: Maximum wind of 30 knots Maximum predicted ebb or flood current (Approximately 1 knot) Two (2) tug towing configurations City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 41 of 68

42 Models Employed The simulation trials employed the use of (3) three tug models in different combinations, and two (2) barge models. The models employed are discussed in detail in Section 2. Table 5 - Phase 2 Tug Models Employed Tug Size/Name HP # Propellers Bollard Pull Small 435 Twin-screw 6 Tons (Est) Medium 750 Twin-screw 13 Tons (Est) Large 1300 Twin-screw 18 Tons Table 6 - Phase 2 Barge Models Employed Barge Condition Length x Beam x Depth Displacement (Meters) Victoria Barge Loaded x x 4.9 8,145 Tons Victoria Barge Empty x x Tons Principles of Effective Towing Configurations There are multiple towing configurations that can be effective for any given transit. An effective configuration must account for a variety of critical factors in order to enable maneuvering the tow safely and efficiently. These factors include: Tug Performance Tow Specifications Maneuvers required on the intended route Pivot Point location and migration on the tow Transit parameters Tug Performance Factors Tug horsepower (Bollard Pull) Tug propulsion type (Conventional, Z-drive, Voith) Tug steering system (rudder, nautical systems, rudder propeller etc.) Tug dimensions Tug fendering Tug winch Tug stability Towing point on tug Tug connection to barge Tow Specification Factors Barge dimensions Barge displacement Barge trim City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 42 of 68

43 Maneuvering Requirements of the Intended Route Speed over ground Steering Stopping Headway Sternway Directional stability Lateral Movement Pivot Point Factors Location,-forward, amidships, aft Pivot point relative to position of tugs Length of maneuver arm Number and extent of pivot point transitions Transit factors Length of transit Number and angle of required turns Depth restrictions Width restrictions Docks/Moored Vessels/Obstructions Berth configurations Vessel Traffic Navigation Aids City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 43 of 68

44 Pivot Point In general a vessel moving through the water will have pivot around a point located roughly 1/4 to 1/3 of the barge s length, aft of the leading end of the tow. Figure 32 - Pivot Point illustration Figure 31 - Pivot Point with towing mode illustration The position of the assist tug relative to the pivot point defines a maneuvering lever that can increase the effectiveness of corrective forces applied by the tug to the tow. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 44 of 68

45 Towing Configurations An effective towing configuration must have tugs in positions in which there is enough control of the barge to have time to perceive a deviation from the desired course, determine the appropriate corrective action, apply the corrective force, and have the tow respond within the space and time restrictions of the intended route. The towing vessels must be in positions that account for the time it takes for the tug(s) to: Position itself relative to the barge to apply a force in the correct direction and amount. Apply sufficient force to create the desired change in the tow s course, speed or swing. In addition, the towing configuration must account for the drag effect of the tug when in a neutral position and the time it takes the tow to react to a corrective force applied by the tug. An effective towing configuration will leverage the advantages of the various towing modes and minimize the disadvantages. Towing Modes There are three basic towing modes: Towing astern Towing alongside (on the hip) Push/pull Each type of towing mode has advantages and disadvantages and each may be particularly suited or illsuited for a particular type of tug. Each towing mode is associated with a capability to propel the tow, manage its speed, maintain its directional stability, steer the tow, stop the tow and control the barge as a unit. The various advantages and disadvantages by towing mode are shown in the below tables. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 45 of 68

46 Towing Astern Table 7 - Towing Mode: Towing Astern (advantages and disadvantages) TOWING MODE Towing Astern ADVANTAGE Wheelwash can augment directional stability of the tow Creates an effective maneuvering lever between barge pivot point and tow connection on the leading end of the tow Able to apply steering forces at acute angles to the leading end of the tow Able to have fine control of the rate of turn on the leading end of the tow. Able to have fine steering control of the leading end of the tow Able to manage speed of tow Excellent view of course to steer, ranges, and future points of execution DISADVANTAGE Dependent on tow line and bridle connection Must shift tug position relative to the barge to create desired steering angle Difficult to apply retarding force to the tow Indirect but not positive control of the tow s trailing end Time consuming to recover from a mistake that placed the tug out of position relative to the barge Potential for girting of tug City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 46 of 68

47 Towing Alongside (On the Hip) Table 8 - Towing Mode: Towing Alongside (advantages and disadvantages) TOWING MODE Towing Alongside (On the Hip) ADVANTAGE Can be positioned on the opposite end of the tow s pivot point to create a highly effective maneuvering lever Is made up hard to the tow so that it is one with the tow. Doesn t require repositioning the tug to apply different propelling and steering forces Immediate transfer of propelling and turning forces from tug to tow Able to transfer steering forces to the tow by shifting the tugs rudder and/or twin-screwing Tug s position offset from the tow centerline creates additional leverage for an outside turn (tug scribes an arc on the outside of the turn radius) Able to have fine control of the rate of turn of the tow Able to have fine steering control of the trailing end of the tow Able to manage speed of tow Able to apply retarding force and stop the tow Excellent sightline down one side of the tow to steer on landmarks, gauge rate of turn and clearance on obstructions DISADVANTAGE Dependent on lines holding the tug fast to the tow Creates added beam to the tow (tow width + tug width) Exposed to damage should clearance to an obstruction close on the side of the tow the tug is on the hip Indirect but not positive control of the tow s leading end Tug s offset position from tow centerline reduces leverage for inside turns (tug scribes an arc on the inside of the turn radius) Tug s offset position from tow creates drag and may affect tow s directional stability Limited or no vision of side of tow opposite of where the tug is made fast (blind side). Unable to judge clearance on obstructions on side of tow opposite of tug Dependent on accurate and timely communication from barge pilot to safely pass obstructions on blind side City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 47 of 68

48 Push/Pull Note for the purposes of this report Push/Pull is defined as a tug in contact with the tow and tethered to the tow by a single headline. The tug can apply force to the tow by pushing on the tow structure or pulling on its headline. A variation on this is a tug in contact with the tow but with no headline up in which case it can only apply corrective force by pushing. Table 9 - Towing Mode: Push/Pull (advantages and disadvantages) TOWING ADVANTAGE MODE Push/Pull Can assume a variety of positions relative to the tow s pivot point to create maneuvering levers of various lengths and effectiveness Able to apply lateral force to the tow by pushing at an angle perpendicular to the tow s centerline Able to shift position relative to the barge if required Immediate transfer of propelling and turning forces from tug to tow when pushing Able to adjust its angle of push relative to the barge When positioned on the trailing end can act as a steering tug Excellent sightline down the side of the tow the tug is push/pulling on DISADVANTAGE Dependent on headline to the tow (when pulling) Creates added beam to the tow (tow width + tug length) Exposed to damage should clearance to an obstruction close on the side of the tow the tug is push/pulling Tug s offset position from tow creates drag and may affect tow s directional stability Difficult for tug to remain in effective pulling position if the tow has headway Limited or no vision of side of tow opposite of where the tug is push/pulling (blind side). Unable to judge clearance on obstructions on side of tow opposite of tug Dependent on accurate and timely communication from barge pilot to safely pass obstructions on blind side City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 48 of 68

49 Application of Effective Towing Configuration Principles to the Johnson Street Bridge Transit The two primary functions of the tugs during a bridge transit are to steer and manage the tow speed. Tug Performance Three (3) twin-screw, conventionally propelled tugs of 6, 13 and 18 ton bollard pull were available to be deployed in different towing modes and positions relative to the barge. Tow Specifications The barge was approximately 79 meters long, 21 meters wide and loaded either at 8,145 tons displacement or empty at 1267 tons displacement. Tow maneuvering requirements The maneuvering requirements varied depending on whether the transit was inbound or outbound. Inbound transit Inbound transits require: 1) Executing a 90 turn to port 2) Checking the swing of the barge 3) Maneuvering clear of a marina and piling obstructions on the southeast side of the bridge 4) Attaining an approach line in advance of the bridge transit to: a. Attain directional stability of the tow b. Maintain a course heading for the middle of the bridge span and parallel to the bridge fenders. 5) Maneuvering through the restricted width between bridge fenders Outbound transit Outbound transits require: 1) Executing a 30 turn to starboard 2) Attaining an approach line in advance of the bridge transit to: a. Attain directional stability of the tow b. Maintain a course heading for the middle of the bridge span and parallel to the bridge fenders. 3) Maneuvering through the restricted width between bridge fenders 4) Maneuvering clear of a marina and piling obstructions on the southeast side of the bridge 5) Executing a 90 turn to starboard 6) Checking the swing of the barge Pivot Point Location Because the barge always has headway during the bridge transit, the pivot point of the barge is stable and located approximately 1/4 to 1/3 aft of the leading end of the barge. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 49 of 68

50 Additional Notes: The tug masters are dependent on visual cues to judge the heading, rate of turn, set of the barge, and clearance of obstructions. The sight lines from the tug master s station should be considered in determining an effective towing configuration. In addition, the exploration of different methods or techniques to transit the bridge with tug and barge was new to the subject matter experts in that they predominantly tow the barges from the front with an assist tug in the vicinity. Transiting with an assist tug made up on the barge stern or with the primary tug made fast to the barge on the hip were considered new methods to these mariners for the specific purpose of this transit, and their initial performance on the these runs may be viewed either less safe or less controlled. However, these alternative techniques are considered industry best practices, and it was evident that after allowing the operators time to practice these alternative techniques that they become quickly acclimated to the maneuver and rapidly saw the value of the new configuration. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 50 of 68

51 Towing Configurations Johnson Bridge Transit In consideration of the above factors, six (6) towing configurations were utilized. Figure 33 - Six (6) towing configurations utilized during these Phase 2 simulation trials City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 51 of 68

52 Summary Analysis of Phase 2 Simulation Runs A total of twenty-five (25) simulation trials were run o Seventeen (17) inbound and seven (8) outbound. Nineteen (19) were run with a loaded barge and six (6) with empties. o Ten (10) were successful transits Five (5) of these were with tugs made up alongside (50%) Three (3) of these were with primary tug towing Two (2) of these were with a head line up. Only two (2) of these were with a tug towing, without a tug tethered astern. o Three (3) were marginal (grazing contact) o Nine (9) were unsuccessful o Three (3) were not completed. Two (2) were conducted using a Z Drive (ASD) Tug. Ten (10) transits were in a tow configuration with the primary tug towing and the assist tug running free. o Two (2) were successful. 20% success rate. o This configuration required the highest speed (4 to 7 knots typical) to maintain barge directional stability. Three (3) transits were in a tow configuration with the primary tug towing and the assist tug tethered to the trailing end. o Three (3) were successful. 100% success rate. o This configuration required moderate speed (3.5 to 5 typical) to maintain directional stability due to the drag of the assist tug. Ten (10) transits were in a tow configuration with the primary tug made up alongside on the hip and the assist tug tethered of the primary tug before the bridge. o Five (5) were successful. 50% success rate. o This configuration required the lowest speed (3 to 4 knots typical) to maintain directional stability of the barge. o Having the assist tug forward of and on the same side as the primary tug is critical. o Having the tugs on starboard side, inbound, proved much less difficult and much safer than on the port side. (Difficulty 1/Safety 8.5, compared Difficulty 8 /Safety 2)) ( 10 being most difficult and also most safe ) Most unsuccessful transits were inbound and due to either direct or indirect consequence of the tugs ineffectiveness in checking the starboard slide of the barge. This occurred after the 90 turn to port, and/or the swing of the stern to starboard. The effect was that the barge hit pilings by the marina, struck the bridge, or placed a tug in extremis. Operator familiarity with specific towing modes was a performance factor. Tug masters rated the degree of difficulty on a scale of 1 to 10. Ratings ranged from 1 to 8 with an average of 5.3. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 52 of 68

53 North end of West Bridge North end of East Bridge West fender 205t (14%) East fender South end of Old West Bridge 250t (2%) 110t (2%) South end of Old East Bridge Figure 34 - Phase 2 Impact Risk Graphic (tonnes, t, of impact force, % of runs that impacted) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 53 of 68

54 Recommendations Both known factors (environmental conditions, tug capability, tug master familiarity and experience, and barge size, load and trim) and unknown factors (e.g., current anomalies or high vessel traffic density) are required in determining an effective towing configuration and bridge transit plan. Rather than being prescriptive, these best practice recommendations describe critical elements that towing companies and operators should consider in their policies, procedures and training programs as tools to minimize the risk of allision. Two tugs for each transit Minimum 1500 aggregate HP between the two tugs, for the big barge Maximum environmental conditions of 30 knots of wind and 1 knot of current (25 mph winds) Towing configurations should enable o Direct control of the tow leading and trailing ends o Minimal added width to the tug/tow unit o Checking the starboard slide on inbound transits with strong westerly winds Recommended Inbound Towing Configurations are: o Primary tug towing astern/assist tug tethered to the barge starboard stern o Primary tug towing on the hip, made up on the barge port stern, assist tug free forward opposite side o Primary tug towing on the hip, made up on the barge starboard stern, assist tug tethered forward of primary tug. (Most control, slowest speed required) Recommended Outbound Towing Configurations are: o Primary tug towing astern/assist tug tethered to one or the other side of the stern o Primary tug towing on the hip, assist tug towing astern o Primary tug towing on the hip, assist tug tethered forward of the Primary tug. With strong NW wind this configuration should have both tugs made up on port side of barge to better enable barge to be held up into the wind and control barge setting into the south span. Towing companies to hold additional trials to establish standard towing configurations suitable for each companies tug and barge specifications Towing companies to develop tug/barge communication protocols to establish standardized terminology and procedures to communicate the barge set, line-up, distance to obstructions and corrective actions Towing companies to establish tug master qualification standards for Johnson Street Bridge Transits including: o General towing experience o Tug familiarization o Number of route familiarization transits o Required training o Route standard of competency criteria Install visual navigation aids such as range markers or lights to assist vessels in determining effective line up for safe bridge transit City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 54 of 68

55 Summary Conclusions Towing best practices are procedure tools to manage the risk of allision during a Johnson Bridge Transit. They, in combination with engineering, human factor and protective equipment controls, will bring the risk of bridge allision to an acceptable level. The inbound transits with a loaded barge were most challenging due the 90 turn, set towards the marina on the east side, and limited distance and time to attain an effective line-up for the bridge. The outbound transits were less challenging because the required 30 turn prior to bridge lineup was shallower than on the inbound and allowed more time and distance to make a good approach to the bridge span. It is critical to have sufficient time and distance to establish an effective approach line and regain directional stability on the inbound transits. Managing speed is a critical factor in creating an effective ratio between the tow s rate of turn and advance on the inbound 90 turn to port. Positive control of the tows trailing end is critical to checking the stern and slide to starboard on the inbound transit. Positive control of the tow s trailing end can be achieved by making up the primary tug on the hip or tethering the assist tug on the stern. A tug running free and pushing on the starboard quarter of the barge is of limited use in checking the starboard slide on the inbound transit. Towing astern is an effective towing mode for controlling the leading end of the tow. Tug masters use visual cues to judge heading, rate of turn and distance. Sight lines should be considered as a factor in towing configurations Comment about Safe Speed A limit on the maximum transit speed is commonly considered as a risk management tool. There are circumstances when a fixed maximum speed is appropriate, such as areas of high vessel traffic density, or to minimize wake damage. However, a fixed maximum speed limit is not appropriate in the context of a bridge transit. Rather transit speed should meet safe speed criteria. Safe speed is slow enough to build a cushion of space and time for the towing operators to perceive a deviation from the intended track, maneuver the tug to apply a corrective force and have the tow respond in a timely and effective manner. Safe speed is also fast enough to add directional stability to the tow. Both these factors will vary depending on tug capability and towing configuration. Tug masters are constantly balancing these criteria and thus safe speed is not a fixed number but varies throughout the transit. And safe speed depends on how the tugs are made up. The speed associated with a successful bridge transit is a consequence, not the cause, of tug operators successfully balancing these factors. The simulator trial data indicates a range of 2.5 to 4.5 knots as the speed over ground associated with successful transits. Speed varied widely from light barge to loaded and towing alongside vs. towing astern. Light barge outbound was over 5 knots most of the time when line haul tug towing astern. Loaded barge was less than 4 most of the time. Made up alongside allows tug to approach slower and maintain adequate control. Line haul tug alongside speed was below 4knots consistently. Being made up alongside the tow City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 55 of 68

56 does not depend on directional stability as much as towing astern because a tug made up alongside has more direct control. Line haul tug towing astern will always require more speed to maintain directional stability. The data indicates that the Johnson bridge transit presents a moderate maneuvering challenge that requires experienced tug operators and tugs positioned in a towing configuration that enables positive control of both the leading and trailing end of the tow. This last is the most critical point. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 56 of 68

57 4 Appendices Appendix A: Run Data Phase 1 contains the complete run sequence, test matrix, observations, and analysis for Phase 1. Data points captured for Phase 1 included: Average Force of impact Maximum force of impact Direction of impact relative to fender structure Sheering force (estimated) Appendix B: Run Data Phase 2 contains the complete run sequence, test matrix, observations, and analysis for Phase 2. Data points captured for Phase 2 included: SOG at Bridge Swept Path of Barge through Bridge Minimum clearance between barge and bridge Average clearance between barge and bridge (estimate) Average power used of Tug 1 Peak power used of Tug 1 Average amount of rudder angle used of Tug 1 Peak rudder angle used of Tug 1 For each run, a standard set of run information is included in the report Run Number, Force Diagram, Track History, and relevant visuals from the Simulation Control Station.) A Table provides the set of run information. This correlates the Run Number, detailing each vessel model condition and configuration, with the environmental parameters such as wind, current, and sea state conditions, followed by a narrative of observations and captured data points from the run. Diagnostics and other visual screen shots are also provided to further analyze more complex runs and to illustrate the observations. The diagnostics graphs include the following parameters: Table 10 - Diagnostics graphs parameters and sample key Vertical axis: Horizontal axis: Fender, Summary Force (t) Heading (º) Fender, Lateral Force (t) Course Over Ground (COG) (º) Fender, Longitudinal Force (t) Speed Over Ground (SOG) (knots) Appendix C: Pilots Cards contains a summary table identical to that found within the body of the report, in section 2, and copies of the detailed pilot cards for each modeled vessel. Appendix D: Glossary contains various terms used in the report, and Appendix E: References contains a complete listing of published references relevant to this study. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 57 of 68

58 Appendix A: Run Data Phase 1 Appendix A contains the complete run sequence, test matrix, observations, and analysis for Phase 1. Data, diagrams and figures for Appendix A are contained in a separate document titled Appendix A and B. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 58 of 68

59 Appendix B: Run Data Phase 1 Appendix B contains the complete run sequence, test matrix, observations, and analysis for Phase 1. Data, diagrams and figures for Appendix A are contained in a separate document titled Appendix A and B. City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 59 of 68

60 Appendix C: Pilot Cards The ship modeling program for the simulator renders a pilot card for each model. A pilot card is reproduced below for each model used Table 11 - Vessel model particulars Name Condition Length /Beam/Draft No. 1_PMI Small No. 2_PMI Medium No. 7_PMI Large Displacement / Bollard Pull (t) N/A 11m /4.77m/1.5m 40t / 7.6t N/A 27.02m /9.1m/2.7m 350t / 13t N/A 28.75m /7.78m/2.72m t / 18t Victoria Barge Empty 79.87m /21.70m/0.85m 1267t N/A Victoria Barge Loaded 79.87m /21.70m/4.9m 8145t N/A ASD Tug 1 N/A 25.3m /10.36m/2.74m 366t / 53t Key: bp FPP kw m t ZD bollard pull (tractive force of a tug, expressed here in metric tons) Fixed pitch propeller kilowatt (1000 kw = 1341 mechanical horse power) meters tons (or Metric Tons; 1000 tonnes = 1102 tons) Azimuthing drive Power (kw) 2 x 162 kw FPP 100% = 440 rpm 2 x 1119 kw FPP 100% = rpm 2 x 486 kw FPP 100% = rpm 2 x 1566 kw Azimuth FPP City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 60 of 68

61 City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 61 of 68

62 City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 62 of 68

63 City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 63 of 68

64 City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 64 of 68

65 City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 65 of 68

66 Appendix D: Glossary of Terms Amidships - in the middle of a ship: Difficulty subjective, quantified evaluation from tug master on a scale of 1 to 10, with 10 being most difficult, regarding the level of challenge of completing a particular transit Inbound track of vessel is proceeding in from sea to harbour Outbound - track of vessel is proceeding out from harbour to sea Pt qtr port quarter; see graphic below Safety - subjective, quantified evaluation from tug master on a scale of 1 to 10, with 10 being most safe, regarding the danger in safely completing a particular transit Skeg - a sternward extension of the keel of boats and ships which have a rudder mounted on the centre line. The term also applies to the lowest point on an outboard motor or the outdrive of an inboard/outboard. Stbd qtr starboard quarter; see graphic below Figure 35 - Boat Nomenclature and Terminology (source: AmericanBoating.org) City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 66 of 68

67 Figure 36 - Bridge structure locations and angles of strike City of Victoria Johnson Street Bridge Maritime Simulation Study 2016 Page 67 of 68

Port Sections Guide Section 01

Port Sections Guide Section 01 s Guide 01 Cow Bay Marina Date 10/1/2016 Position (lat / lon) Minimum controlled water depth Chart datum Range of water densities Tidal range alongside Bottom type Dredging regime Distance pilot station

More information

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017 Commander United States Coast Guard Sector New York 212 Coast Guard Drive Staten Island, NY 10305 Staff Symbol: (spw) Phone: (718) 354-2353 Fax: (718) 354-4190 COAST GUARD ADVISORY NOTICE (CGAN 2017-016)

More information

All comments received will be taken into consideration before the proposed amendments are implemented.

All comments received will be taken into consideration before the proposed amendments are implemented. Notice of Amendment Port Information Guide Notification date: February 13 th, 2018 Preamble In accordance with the Canada Marine Act, 1998, Section 57 Notice, the Vancouver Fraser Port Authority is proposing

More information

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX Preventing Damage to Harbour Facilities and Ship Handling in Harbours PART 2 INDEX 1 Vessel handling is based on the basic knowledge that a vessel floats in the water and returns to its original position

More information

Assessment Simulation study, Phase 2. Port of Roenne. FORCE / Rev. B

Assessment Simulation study, Phase 2. Port of Roenne. FORCE / Rev. B / Rev. B i LIST OF CONTENTS: PAGE: 0. EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 1.1. General... 2 1.2. Objectives... 3 2. SUMMARY... 4 2.1. Observations... 5 2.2.1 General... 5 2.2.2 Weather conditions...

More information

ABP South Wales and River Usk Towage Guidelines

ABP South Wales and River Usk Towage Guidelines Date of issue: Jan 2012 ABP South Wales and River Usk wage January 2012 Page 1 of 17 Approved by: Deputy Harbour Master South Wales Issue 1.0 Date of issue: Jan 2012 AMENDMENTS Amendment issue number Page

More information

Columbia River Pilots Vessel Movement Guidelines. Table of Contents

Columbia River Pilots Vessel Movement Guidelines. Table of Contents Columbia River Pilots Vessel Movement Guidelines Table of Contents I. Introduction.... 2 II. Pilot Transfers.. 3 III. General Information.... 4 Harbor Safety Plan... 4 Restricted Main Engine RPMs 4 Channel

More information

DUKC DYNAMIC UNDER KEEL CLEARANCE

DUKC DYNAMIC UNDER KEEL CLEARANCE DUKC DYNAMIC UNDER KEEL CLEARANCE Information Booklet Prepared in association with Marine Services Department 10/10/2005 Dynamic Under Keel Clearance (DUKC) integrates real time measurement of tides and

More information

2005 ABC. Chapter 3 Part 2. Navigating with ATON's. Revision to D-13 Local Notes. Instructor Notes for Mike Brough. Mike Brough

2005 ABC. Chapter 3 Part 2. Navigating with ATON's. Revision to D-13 Local Notes. Instructor Notes for Mike Brough. Mike Brough 2005 ABC Chapter 3 Part 2 Navigating with ATON's Revision to D-13 Local Notes Instructor Notes for Mike Brough Mike Brough June 24 2008 June 24 2008 Slide 1 June 24 2008 New graphics Navigating on Water

More information

New generation of Electronic Card Systems: The 4-D Card

New generation of Electronic Card Systems: The 4-D Card New generation of Electronic Card Systems: The 4-D Card Capt. Alain Richard Project director Maritime Innovation arichard@imar.ca Context In the present context of globalization and competitiveness, it

More information

APPENDIX J REQUIRED NAVIGATION PERFORMANCE IMPACTS EVALUATION REPORT

APPENDIX J REQUIRED NAVIGATION PERFORMANCE IMPACTS EVALUATION REPORT APPENDIX J REQUIRED NAVIGATION PERFORMANCE IMPACTS EVALUATION REPORT February 01, 2007 Naverus, Inc. Seattle, WA This document contains commercially sensitive information and must be treated as Naverus,

More information

Wexford Harbour. Yachting Guide. Navigation

Wexford Harbour. Yachting Guide. Navigation Wexford Harbour Yachting Guide Navigation This document supersedes all previous editions. Approvals: Yacht Club Committee April, 2015 Wexford Board of Directors April, 2015 # Date Section Revision 1 6.5.2015

More information

The addition of information about Transport Canada s Navigation Protection Program.

The addition of information about Transport Canada s Navigation Protection Program. Notice of Amendment Port Information Guide Date issued: September 8, 2017 Date effective: October 8, 2017 Introduction This notice of amendment is posted publicly to notify industry, stakeholders and the

More information

INTERNATIONAL HYDROGRAPHIC SURVEY STANDARDS

INTERNATIONAL HYDROGRAPHIC SURVEY STANDARDS INTERNATIONAL HYDROGRAPHIC SURVEY STANDARDS by Gerald B. MILLS 1 I. Background The International Hydrographic Organization (IHO) traces its origin to the establishment of the International Hydrographic

More information

COURSE OBJECTIVES CHAPTER 9

COURSE OBJECTIVES CHAPTER 9 COURSE OBJECTIVES CHAPTER 9 9. SHIP MANEUVERABILITY 1. Be qualitatively familiar with the 3 broad requirements for ship maneuverability: a. Controls fixed straightline stability b. Response c. Slow speed

More information

DP Ice Model Test of Arctic Drillship

DP Ice Model Test of Arctic Drillship Author s Name Name of the Paper Session DYNAMIC POSITIONING CONFERENCE October 11-12, 211 ICE TESTING SESSION DP Ice Model Test of Arctic Drillship Torbjørn Hals Kongsberg Maritime, Kongsberg, Norway Fredrik

More information

Serenity Houseboat. Standard Operating Procedures for:

Serenity Houseboat. Standard Operating Procedures for: Serenity Houseboat Standard Operating Procedures for: Docking I. Safety a. Never get between the houseboat and the dock or other larger object. b. Always wear PFDs during docking. c. Always wear snug fitting,

More information

Data Collection and Processing: Elwha Estuary Survey, February 2013

Data Collection and Processing: Elwha Estuary Survey, February 2013 Data Collection and Processing: Elwha Estuary Survey, February 2013 Ian Miller, WA Sea Grant Olympic Peninsula Field Office, 1502 E. Lauridsen Blvd #82, Port Angeles, WA 98362 immiller@u.washington.edu

More information

The LA/LB Harbors handle more than 5,500 commercial vessel arrivals per year (excluding local coastwise and Catalina Island traffic).

The LA/LB Harbors handle more than 5,500 commercial vessel arrivals per year (excluding local coastwise and Catalina Island traffic). X. SMALL CRAFT For the purpose of the Los Angeles and Long Beach Harbor Safety Plan, pleasure vessels, commercial fishing vessels and sportfishing boats are designated as small craft. A. BACKGROUND: The

More information

PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016

PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016 PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016 REVISION LIST Revision No. Date Details Approved by: Original All sections 12 Dec 2013 First edition of C W Brand v1.0 Pilotage Directions Revision 2 all sections

More information

Delaware River Vessel Reporting System Mariners Advisory Committee For

Delaware River Vessel Reporting System Mariners Advisory Committee For Delaware River Vessel Reporting System Mariners Advisory Committee For the Bay and River Delaware The Mariner's Advisory Committee is comprised of Master Mariners, River Pilots, and concerns itself with

More information

Passing Vessel Analysis in Design and Engineering. Eric D. Smith, P.E. Vice President, Moffatt & Nichol

Passing Vessel Analysis in Design and Engineering. Eric D. Smith, P.E. Vice President, Moffatt & Nichol moffatt & nichol Passing Vessel Analysis in Design and Engineering Eric D. Smith, P.E. Vice President, Moffatt & Nichol Passing Vessel Analysis in Port Engineering and Design Passing Vessel Effects Data

More information

HOUSTON SEA CHEST CLOGGING SURVEY

HOUSTON SEA CHEST CLOGGING SURVEY HOUSTON SEA CHEST CLOGGING SURVEY *** YOUR HELP IS VOLUNTARY AND ANONYMOUS*** ***PLEASE DO NOT INCLUDE VESSEL NAME OR NUMBER *** IT IS 2015 MENHADEN SEASON IN THE HOUSTON SHIP CHANNEL To Vessel Master/Chief

More information

TRIAXYS Acoustic Doppler Current Profiler Comparison Study

TRIAXYS Acoustic Doppler Current Profiler Comparison Study TRIAXYS Acoustic Doppler Current Profiler Comparison Study By Randolph Kashino, Axys Technologies Inc. Tony Ethier, Axys Technologies Inc. Reo Phillips, Axys Technologies Inc. February 2 Figure 1. Nortek

More information

Experience and Future Potential of the Oblique Icebreaker

Experience and Future Potential of the Oblique Icebreaker SHIP Design & Engineering CONSULTING & Project Development ICE MODEL & Full Scale Testing OFFSHORE Development Experience and Future Potential of the Oblique Icebreaker Mika Hovilainen Project Manager

More information

S-44 edition 5 The IHO s New Standard For Hydrographic Surveys Chris Howlett Head of Seabed Data Centre United Kingdom Hydrographic Office

S-44 edition 5 The IHO s New Standard For Hydrographic Surveys Chris Howlett Head of Seabed Data Centre United Kingdom Hydrographic Office S-44 edition 5 The IHO s New Standard For Hydrographic Surveys Chris Howlett Head of Seabed Data Centre United Kingdom Hydrographic Office Chairman of IHO Working Group that created S-44 edition 5 S-44

More information

City of Port Aransas Shoreline Analysis and Improvements

City of Port Aransas Shoreline Analysis and Improvements City of Port Aransas Shoreline Analysis and Improvements FINAL Technical Report August 24, 2016 Submitted To: City of Port Aransas Prepared for: City of Port Aransas This document is intended for planning

More information

Introduction of the term Traffic Control Zone and formalization of Fraser River Traffic Control Zone procedures

Introduction of the term Traffic Control Zone and formalization of Fraser River Traffic Control Zone procedures Consideration Report Introduction of the term Traffic Control Zone and formalization of Fraser River Traffic Control Zone procedures Background Under the Canada Marine Act, all Canada Port Authorities

More information

Mentoring in the USCG Auxiliary Boat Crew Program Coxswain Mentoring Template

Mentoring in the USCG Auxiliary Boat Crew Program Coxswain Mentoring Template Notes: 1. When there is no reading assignment specified, the entire chapter contains references to the topic. 2. The study questions in the Qualification Guide should be completed for each task. Boat Crew

More information

Navigation with Leeway

Navigation with Leeway Navigation with Leeway Leeway, as we shall use the term, means how much a vessel is pushed downwind of its intended course when navigating in the presence of wind. To varying extents, knowledge of this

More information

Description of Underwater Noise Attenuation System Design Unit 2. New NY Bridge Project

Description of Underwater Noise Attenuation System Design Unit 2. New NY Bridge Project New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 2 Description of Underwater Noise Attenuation System Design Unit 2 for the New NY Bridge Project Revision 1 May

More information

for Naval Aircraft Operations

for Naval Aircraft Operations Seakeeping Assessment of Large Seakeeping Assessment of Large Trimaran Trimaran for Naval Aircraft Operations for Naval Aircraft Operations Presented by Mr. Boyden Williams, Mr. Lars Henriksen (Viking

More information

Root Cause Determination of Excessive Hull Vibration On a First-In-Class Tugboat Design By Wylie Moreshead, P.E., Azima DLI

Root Cause Determination of Excessive Hull Vibration On a First-In-Class Tugboat Design By Wylie Moreshead, P.E., Azima DLI Root Cause Determination of Excessive Hull Vibration On a First-In-Class Tugboat Design By Wylie Moreshead, P.E., Azima DLI In August of 2002, Azima DLI was tasked to collect vibration data on a new tug

More information

Rule 8 - Action to avoid collision

Rule 8 - Action to avoid collision a) Any action to avoid collision shall be taken in accordance with the Rules of this Part and shall, if the circumstances of the case admit, be positive, made in ample time and with due regard to the observance

More information

Appendix 12: Marine Transportation Study. (Gartner Lee Ltd. 2008)

Appendix 12: Marine Transportation Study. (Gartner Lee Ltd. 2008) Appendix 12: Marine Transportation Study (Gartner Lee Ltd. 2008) memorandum to: John Woods, Minas Basin Pulp and Power Co. Ltd from: Joseph Kozak date: ref: GLL 80308 re: FINAL Technical Marine Transportation

More information

TICES TO MARINERS 1 TO 46 ANNUAL EDITION 2018 SECTION A AIDS TO NAVIGATION AND MARINE SAFETY

TICES TO MARINERS 1 TO 46 ANNUAL EDITION 2018 SECTION A AIDS TO NAVIGATION AND MARINE SAFETY A5 NAVIGATION SAFETY 10 Routeing of Ships 1 GENERAL 1.1 Rule 10 of the Collision Regulations applies to all ships navigating in or near a routeing system. 1.2 The information on ships' routeing in this

More information

Modeling Results for Glacier Bay

Modeling Results for Glacier Bay Chapter 9 Modeling Results for Glacier Bay Finally, attention is now turned to a number of specific results of interest for the Glacier Bay domain. 9.1 Water Surface Elevation In the previous chapter,

More information

WORKBOOK NAVIGATION Tr. For Power-driven and Sailing Vessels DAVID BURCH LARRY BRANDT

WORKBOOK NAVIGATION Tr. For Power-driven and Sailing Vessels DAVID BURCH LARRY BRANDT Piloting Dead reckoning Special publications Lights and buoys Electronic fixes Chart reading and plotting Compass use Navigation Rules Tides and currents Depth sounding navigation STARPATH This book provides

More information

Bollard Pull. Bollard Pull is, the tractive force of a tug, expressed in metric tonnes (t) or kn.

Bollard Pull. Bollard Pull is, the tractive force of a tug, expressed in metric tonnes (t) or kn. Bollard Pull (Capt. P. Zahalka, Association of Hanseatic Marine Underwriters) Bollard Pull is, the tractive force of a tug, expressed in metric tonnes (t) or kn. This figure is not accurately determinable

More information

Rules Practice Exam 11

Rules Practice Exam 11 1 BOTH INTERNATIONAL & INLAND While underway in fog, you hear a vessel sound one prolonged blast followed by two short blasts on the whistle. What does this signal indicate? A. A vessel towing B. A vessel

More information

Maneuverability characteristics of ships with a single-cpp and their control

Maneuverability characteristics of ships with a single-cpp and their control Maneuverability characteristics of ships with a single-cpp and their control during in-harbor ship-handlinghandling Hideo YABUKI Professor, Ph.D., Master Mariner Tokyo University of Marine Science and

More information

HARBOUR OPERATIONS MANUAL. Vancouver Fraser Port Authority

HARBOUR OPERATIONS MANUAL. Vancouver Fraser Port Authority HARBOUR OPERATIONS MANUAL Vancouver Fraser Port Authority Updated January 2014 Table of Contents Table of Contents... 2 Section 1: Introduction... 8 Section 2: General Information... 8 2.1 General Information...

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

FULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT

FULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT FULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT Mr. Gary Rolph Chief Hydrographic Surveyor Port of Brisbane Corporation Mr. Peter Rumball Surveyor Port of Brisbane Corporation Dr. Terry O'Brien

More information

BWS ONLINE FORECASTING BERTH OPERATING SAFETY. Matthew R. O Halloran, Daphne Choong

BWS ONLINE FORECASTING BERTH OPERATING SAFETY. Matthew R. O Halloran, Daphne Choong BWS ONLINE FORECASTING BERTH OPERATING SAFETY Matthew R. O Halloran, Daphne Choong OMC International Pty Ltd, 2/2 Walmer St, Abbotsford, Vic 3067, Australia matthew@omc-international.com.au daphne@omc-international.com.au

More information

OPERATIONS Western Gulf Coast Edition TX DOT Ports & Waterways Conference 2009

OPERATIONS Western Gulf Coast Edition TX DOT Ports & Waterways Conference 2009 Click to edit Master title style 1 OPERATIONS Western Gulf Coast Edition TX DOT Ports & Waterways Conference 2009 Section 5 Click to edit Master title style 5.1 Towing 2 5.1 Towing Click to edit Master

More information

Tidal streams and tidal stream energy device design

Tidal streams and tidal stream energy device design Tidal streams and tidal stream energy device design This technical article introduces fundamental characteristics of tidal streams and links these to the power production of tidal stream energy devices.

More information

International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g.

International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g. International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g. wind farms) Introduction This is a summary of the most important international

More information

Job Sheet 1 Blade Aerodynamics

Job Sheet 1 Blade Aerodynamics Job Sheet 1 Blade Aerodynamics The rotor is the most important part of a wind turbine. It is through the rotor that the energy of the wind is converted into mechanical energy, which turns the main shaft

More information

Kennedy Bridge - Summary of Pier 6 Movement Records

Kennedy Bridge - Summary of Pier 6 Movement Records KENNEDY BRIDGE - SUMMARY OF PIER 6 MOVEMENT RECORDS TECHNICAL MEMORANDUM Kennedy Bridge - Summary of Pier 6 Movement Records PREPARED FOR: COPY TO: MnDOT Dale Thomas / CH2M HILL File PREPARED BY: DATE:

More information

STATIC AND DYNAMIC EVALUATION OF THE DRIVER SPEED PERCEPTION AND SELECTION PROCESS

STATIC AND DYNAMIC EVALUATION OF THE DRIVER SPEED PERCEPTION AND SELECTION PROCESS STATIC AND DYNAMIC EVALUATION OF THE DRIVER SPEED PERCEPTION AND SELECTION PROCESS David S. Hurwitz, Michael A. Knodler, Jr. University of Massachusetts Amherst Department of Civil & Environmental Engineering

More information

ICE LOADS MONITORING SYSTEMS

ICE LOADS MONITORING SYSTEMS Guide for Ice Loads Monitoring Systems GUIDE FOR ICE LOADS MONITORING SYSTEMS MAY 2011 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2011 American

More information

APC Operating Procedures Oil Tankers

APC Operating Procedures Oil Tankers APC Operating Procedures Oil Tankers August 2013 The APC Operating Procedures were developed to aid the Master and Operator of oil tankers in ensuring all aspects of the APC are complied with when transiting

More information

Uncontrolled document if printed.

Uncontrolled document if printed. APPENDIX 3 APPRENTICE PILOT S TRAINING SYLLABUS Issue Date: 16 th March, 2010 Date of Revision: 22nd May, 2013 Revision #2 i THE PURPOSE OF THIS SYLLABUS The purpose of this training syllabus is to ensure

More information

Surf Kayak Leader Training Notes

Surf Kayak Leader Training Notes Surf Kayak Leader Training Notes Technical Syllabus Training at Surf Kayak leader level should aim to equip the paddler with the skills to control their craft with purpose on the wave face. The paddler

More information

Chittagong, Bangladesh (Asia Region)

Chittagong, Bangladesh (Asia Region) General Information: Port Information (Asia Region) Extract of port information from Chittagong Port Authority: The Port of Chittagong is the principal Port of the People's Republic of Bangladesh. It is

More information

MARINE INVESTIGATION REPORT M14P0014 GROUNDING

MARINE INVESTIGATION REPORT M14P0014 GROUNDING MARINE INVESTIGATION REPORT M14P0014 GROUNDING CONTAINER VESSEL CAP BLANCHE FRASER RIVER, BRITISH COLUMBIA 25 JANUARY 2014 The Transportation Safety Board of Canada (TSB) investigated this occurrence for

More information

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras

Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras Ship Resistance and Propulsion Prof. Dr. P. Krishnankutty Ocean Department Indian Institute of Technology, Madras Lecture - 6 Bulbous Bow on Ship Resistance Welcome back to the class we have been discussing

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 19 Choose the best answer to the following multiple choice questions. NO reference materials are authorized for

More information

SIDRA INTERSECTION 6.1 UPDATE HISTORY

SIDRA INTERSECTION 6.1 UPDATE HISTORY Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA ABN 79 088 889 687 For all technical support, sales support and general enquiries: support.sidrasolutions.com SIDRA INTERSECTION

More information

GUIDE TO THE ARCTIC SHIPPING CALCULATION TOOL

GUIDE TO THE ARCTIC SHIPPING CALCULATION TOOL ØRTS HANSEN, GRØNSEDT, LINDSTRØM GRAVERSEN AND HENDRIKSEN GUIDE TO THE ARCTIC SHIPPING CALCULATION TOOL THE NORTHERN SEA ROUTE VS. THE SUEZ CANAL ROUTE CBS MARITIME CROSS DISCIPLINARY PROBLEM-FOCUSED RESEARCH

More information

A real time vessel air gap monitoring system

A real time vessel air gap monitoring system Journal of Physics: Conference Series A real time vessel air gap monitoring system To cite this article: D McStay and K Thabeth 2009 J. Phys.: Conf. Ser. 178 012038 View the article online for updates

More information

PERFORMANCE STANDARDS FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEMS (ECDIS) [IMO Resolutions A.817 (19), MSC.64 (67) and MSC.

PERFORMANCE STANDARDS FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEMS (ECDIS) [IMO Resolutions A.817 (19), MSC.64 (67) and MSC. 1 PERFORMANCE STANDARDS FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEMS (ECDIS) [IMO Resolutions A.817 (19), MSC.64 (67) and MSC.86 (70)] (amended March 1999) Note: The IMO Performance Standards for

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners Able Seaman Unlimited, Limited, Special, Special OSV, Sail, Fishing Industry (Sample Examination) Page 1 of 17 Choose the best answer to the following

More information

The OTSS System for Drift and Response Prediction of Damaged Ships

The OTSS System for Drift and Response Prediction of Damaged Ships The OTSS System for Drift and Response Prediction of Damaged Ships Shoichi Hara 1, Kunihiro Hoshino 1,Kazuhiro Yukawa 1, Jun Hasegawa 1 Katsuji Tanizawa 1, Michio Ueno 1, Kenji Yamakawa 1 1 National Maritime

More information

Caltrans compendium of underwater sound data from pile driving 2014 update

Caltrans compendium of underwater sound data from pile driving 2014 update Caltrans compendium of underwater sound data from pile driving 2014 update Richard RODKIN 1 ; Keith POMMERENCK 2 1 Illingworth & Rodkin, Inc., United States 2 Illingworth & Rodkin, Inc., United States

More information

MSC Guidelines for the Submission of Stability Test (Deadweight Survey or Inclining Experiment) Results

MSC Guidelines for the Submission of Stability Test (Deadweight Survey or Inclining Experiment) Results S. E. HEMANN, CDR, Chief, Hull Division References a. 46 CFR 170, Subpart F Determination of Lightweight Displacement and Centers of Gravity b. NVIC 17-91 Guidelines for Conducting Stability Tests c. ASTM

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 7 Choose the best answer to the following Multiple Choice Questions. 1. On a small boat, which knot is best suited

More information

IMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea

IMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 48th session Agenda item 6 DE 48/6/1 17 November 2004 Original: ENGLISH ANCHORING, MOORING AND TOWING EQUIPMENT Shipboard

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 12 Choose the best answer to the following Multiple Choice Questions. 1. An alternating light. (A) shows a light

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

Swimming Stroke Mechanics

Swimming Stroke Mechanics Swimming Stroke Mechanics What we continue to learn from High-speed Videography and Biomechanical Motion Analysis Jan Prins, Ph.D. Aquatic Research Laboratory University of Hawaii Swimming Biomechanics,

More information

MARINE INVESTIGATION REPORT M03W0237 GROUNDING

MARINE INVESTIGATION REPORT M03W0237 GROUNDING MARINE INVESTIGATION REPORT M03W0237 GROUNDING CONTAINER VESSEL CIELO DEL CANADA FRASER RIVER, BRITISH COLUMBIA 08 NOVEMBER 2003 The Transportation Safety Board of Canada (TSB) investigated this occurrence

More information

Incident Management Guidelines for Initial Actions and Communications

Incident Management Guidelines for Initial Actions and Communications Lower Columbia Region Harbor Safety Committee Incident Management Guidelines for Initial Actions and Communications Page 1 of 16 Table of Contents A. INCIDENT MANAGEMENT GUIDELINES... 3 1. PURPOSE... 3

More information

MARINE ACCIDENT REPORT April 2013

MARINE ACCIDENT REPORT April 2013 MARINE ACCIDENT REPORT April 2013 SKULD Contact damage on 28 June 2012 The Danish Maritime Accident Investigation Board Carl Jacobsens Vej 29 DK-2500 Valby Tel. +45 91 37 63 00 E-mail: dmaib@dmaib.dk Website:

More information

Plot the Path into the Harbor

Plot the Path into the Harbor Plot the Path into the Harbor By Mary Anne Otten, Rudyard Area Schools and Joan Chadde, Michigan Technological University Subject/Grade: Grade 3 6, Math, Social Studies, Science Duration: 35 minutes Lesson

More information

The 11 th International Scientific Conference elearning and Software for Education Bucharest, April 23-24, 2015

The 11 th International Scientific Conference elearning and Software for Education Bucharest, April 23-24, 2015 The 11 th International Scientific Conference elearning and Software for Education Bucharest, April 23-24, 2015 10.12753/2066-026X-14-067 SIMULATION TECHNIQUES FOR TRAINING AND COACHING OF NAVY OFFICERS

More information

WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.)

WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.) Page 1 of 18 Water Monitoring Program WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.) No. 1 FLOW MONITORING Page 2 of 18 Water Monitoring Program Standard Operating Procedure No.

More information

COOPERATIVE VESSEL TRAFFIC SERVICE (CVTS) TAMPA BAY, FLORIDA

COOPERATIVE VESSEL TRAFFIC SERVICE (CVTS) TAMPA BAY, FLORIDA COOPERATIVE VESSEL TRAFFIC SERVICE (CVTS) TAMPA BAY, FLORIDA USERS MANUAL Oct 2010 1 st Edition Serving the Port of Tampa, Port Manatee, Port of Saint Petersburg, and the Waterways of Tampa Bay 1 Table

More information

Roundabouts along Rural Arterials in South Africa

Roundabouts along Rural Arterials in South Africa Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation

More information

NOTICE TO SHIPPING #1 NIAGARA REGION WELLAND CANAL GENERAL INSTRUCTIONS 1. HOLDING POSITION - 'HEAD OF THE LOCK'

NOTICE TO SHIPPING #1 NIAGARA REGION WELLAND CANAL GENERAL INSTRUCTIONS 1. HOLDING POSITION - 'HEAD OF THE LOCK' 2014 - NOTICE TO SHIPPING #1 NIAGARA REGION WELLAND CANAL GENERAL INSTRUCTIONS 1. HOLDING POSITION - 'HEAD OF THE LOCK' Mariners are advised that when a vessel is dispatched to hold at the Head of the

More information

Application of the probabilistic-fuzzy method of assessing the risk of a ship manoeuvre in a restricted area

Application of the probabilistic-fuzzy method of assessing the risk of a ship manoeuvre in a restricted area Application of the probabilistic-fuzzy method of assessing the risk of a ship manoeuvre in a restricted area L. ~ucrna', Z. pietrzykowski2 Maritime University of Szczecin ul. Waly Chrobrego 1/2 70-500

More information

Bonanza/Debonair Pilots

Bonanza/Debonair Pilots Bonanza/Debonair Pilots Completing this worksheet is a great way to reinforce the proper speeds for operating your Bonanza or Debonair under varying operating conditions, and to understand the changes

More information

MARINE INCIDENT SUMMIT INCIDENT BRIEFS FROM THE 2ND & 3RD QUARTERS OF CY 2014

MARINE INCIDENT SUMMIT INCIDENT BRIEFS FROM THE 2ND & 3RD QUARTERS OF CY 2014 MARINE INCIDENT SUMMIT INCIDENT BRIEFS FROM THE 2ND & 3RD QUARTERS OF CY 2014 MARINE SAFETY UNIT PITTSBURGH Office: (412) 644-5808 Fax (412) 644-3479 Pittsburgh2692@uscg.mil Disclaimer: This document is

More information

Homework 2a Bathymetric Charts [based on the Chauffe & Jefferies (2007)]

Homework 2a Bathymetric Charts [based on the Chauffe & Jefferies (2007)] 14 August 2008 MAR 110 HW-2a: ex1bathymetric Charts 1 2-1. BATHYMETRIC CHARTS Homework 2a Bathymetric Charts [based on the Chauffe & Jefferies (2007)] Nautical charts are maps of a region of the ocean

More information

What s Up in Navigation Displays?

What s Up in Navigation Displays? What s Up in Navigation Displays? Captain PAUL CHAPMAN paul.chapman@compassadjuster.com.au 2009 What s up in Navigation Displays? Captain Paul Chapman Situation Awareness When following a passage plan,

More information

Harbor Safety Committee HEAVY WEATHER (WX)

Harbor Safety Committee HEAVY WEATHER (WX) HEAVY WEATHER (WX) SOC Quick Reference Risk Petroleum transfers Mooring buoys- Operating Policies and Weather Criteria General mooring policies, breakaway prevention Derelict and unattended vessels (abandoned

More information

Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments

Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments Vessel Modification and Hull Maintenance Considerations Options & Pay Back Period or Return On Investments By Dag Friis Christian Knapp Bob McGrath Ocean Engineering Research Centre MUN Engineering 1 Overview:

More information

Design and Calculation of Double Buoys Mooring System in Estuary of Yalu River

Design and Calculation of Double Buoys Mooring System in Estuary of Yalu River Applied Mechanics and Materials Online: 2012-12-13 ISSN: 1662-7482, Vols. 253-255, pp 2071-2075 doi:10.4028/www.scientific.net/amm.253-255.2071 2013 Trans Tech Publications, Switzerland Design and Calculation

More information

Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program

Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program 1 Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program Jim Meacham, CTG Energetics Agenda 2 In Situ Testing Results Reduced Ventilation after

More information

Homework 2 Bathymetric Charts [based on the Chauffe & Jefferies (2007)]

Homework 2 Bathymetric Charts [based on the Chauffe & Jefferies (2007)] 1 MAR 110 HW-2 - Bathy Charts Homework 2 Bathymetric Charts [based on the Chauffe & Jefferies (2007)] 2-1. BATHYMETRIC CHARTS Bathymetric charts are maps of a region of the ocean used primarily for navigation

More information

INTRODUCTION TO NETWORK WIND 3 MOUNTING THE UNIT 14 SELECTING THE DISPLAY MODE 5 ABBREVIATIONS AND DEFINITIONS 17

INTRODUCTION TO NETWORK WIND 3 MOUNTING THE UNIT 14 SELECTING THE DISPLAY MODE 5 ABBREVIATIONS AND DEFINITIONS 17 CONTENTS CONTENTS 1 INSTALLATION 14 GENERAL INTRODUCTION TO B&G NETWORK 2 SITING THE UNIT 14 INTRODUCTION TO NETWORK WIND 3 MOUNTING THE UNIT 14 EXAMPLE SYSTEMS USING NETWORK WIND 4 SPECIFICATION 16 SELECTING

More information

WIND DATA REPORT. Vinalhaven

WIND DATA REPORT. Vinalhaven WIND DATA REPORT Vinalhaven January - December, 2003 Prepared for Fox Islands Electric Cooperative by Anthony L. Rogers May 12, 2004 Report template version 1.1 Renewable Energy Research Laboratory 160

More information

Chart Features Maritime maps and Admiralty charts have these features:

Chart Features Maritime maps and Admiralty charts have these features: Introduction to Charts A chart or map of the area is an important safety item to carry on board. It allows the Master to obtain knowledge of the area to be travelled, and indicates the navigable channels

More information

See the diagrams at the end of this manual for judging position locations.

See the diagrams at the end of this manual for judging position locations. Landing Events Penalties General Judges should use airport diagrams, satellite pictures or other means to determine, as accurately as possible, assessments of landing pattern penalties. Judges should be

More information

Harbor Safety Plan 2017 Edition

Harbor Safety Plan 2017 Edition Harbor Safety Plan Table of Contents Table of Contents I. Introduction II. Aids to Navigation III. Anchorage Guidelines IV. Bunkering Guidelines V. Dead Ship Tow Guidelines VI. East of Ryan Pt. Guidelines*

More information

from ocean to cloud HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS

from ocean to cloud HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS Geoff Holland, Sarah Dzinbal (Alcatel-Lucent Submarine Networks) Email: geoff.holland@alcatel-lucent.com Alcatel-Lucent Submarine Networks

More information

A Guide to Steering without a Rudder Methods and Equipment Tested Michael Keyworth

A Guide to Steering without a Rudder Methods and Equipment Tested Michael Keyworth A Guide to Steering without a Rudder Methods and Equipment Tested Michael Keyworth This guide is the result of multiple tests conducted in the fall of 2013 off of Newport, RI. The test vessel was a modified

More information

Appendix 1 Transit Network Analysis

Appendix 1 Transit Network Analysis Appendix 1 Transit Network Analysis APPENDIX 1 TRANSIT NETWORK ANALYSIS The purpose of this appendix is to provide an update on the transit network analysis as it pertains to: i. SmartTrack ii. Scarborough

More information