1 An investigation into the feasibility of piloting large cruise ships to and from a proposed terminal within the Gold Coast Broadwater Part A Simulation Plan Captain John Watkinson Meridian Maritime Services 15 th November 2012
2 Contents 1. Introduction Objective Methodology Participating Parties and persons Physical Environment Channel Design Environmental Conditions Tides and Tidal Streams Winds Wave Climate Design Ships Simulation Program Definition of Safe Navigation Ship s Position in Channel Use of Ship s internal Forces Ship Pilot/Operator Navigational Risk Assessment Attachments 1 Plan of Gold Coast Seaway and proposed Terminal location. 2 - Tidal Stream Atlas 3 - BOM Wind/Weather Statistics 3a - Annual mean wind rose for 0900hours0. 3b -Annual Mean wind rose for 1500hours 4 - Run Sheets Part A Simulation Plan Page 2 of 9
3 1. Introduction The Gold Coast City Council has recently decided to investigate the feasibility of navigating large cruise vessels to a proposed terminal within the Gold Coast Broadwater 1. This plan will provide the basis for undertaking real time navigation simulation of a number of selected vessels entering and departing the study area in a variety of operational situations. This plan will recognise and in some cases build upon previous similar studies undertaken at another simulation establishment. Previous Studies Two previous studies/simulations into the navigation and pilotage of cruise vessels into and out of the seaway to a proposed terminal situated at the NW corner of the Spit, were conducted in November 2004 and August Both simulations were commissioned by the Queensland Government and carried out at the Star Cruises Ship Simulator at Port Klang, Malaysia. Both studies generally concluded that well equipped cruise vessels of less than 300mLOA 2 could access the Port in nearly all weather conditions that the Port normally experiences. 2. Objective To determine the feasibility of navigating selected cruise ships to and from the proposed terminal within the Gold Coast Broadwater in the most safe and effective way having regard to the proposed limits and depths of the dredged areas and real time environmental forces. The study will be divided into the following components: i) To determine the safe operational limits for selected vessels arriving and departing at the terminal facility. ii) To determine the safe operational limits for selected vessels navigating all access channels including the seaway. iii) To determine the best physical positioning of the berth from a navigational point of view. iv) To determine the minimum safe physical characteristics of all access channels and maneuvering areas required to support objectives i) and ii). 1 See Attachment 1 - option 3. 2 LOA Length Overall Part A Simulation Plan Page 3 of 9
4 3. Methodology The study will be undertaken at Smartship Australia in Brisbane from the 26 th to 30 th November All simulators at Smartship Australia are high fidelity Full Mission Bridge simulators recognized as world class and well regarded in the use of modern bridge training techniques and the application to complex developmental projects. All simulators are equipped with SAM Electronics bridge equipment and systems 3. This equipment consists of advanced integrated electronic bridge systems providing enhanced arrangements to assist in the handling, maneuvering and navigation of vessels particularly in confined waters. The study will use Smartship s primary simulator, which is fitted with bride wings that allows greater fidelity and situational awareness for the pilot and bridge crew. Part of the simulation on day 1 will be used to familiarise all participants with the objectives and plan and carry out tests to ensure validity of the data model. 4. Participating Parties and persons For Gold Coast City Council Mr. Darren Stewart Mr. Michael Parish Mr. Luke Adair Other Officials as advised Manager Major Projects Executive Coordinator Program and Project Delivery. Coordinator Major Projects For Smartship Australia Captain Peter Listrup Captain Jeremy Brew Mr. Hugh Ferrer Director and Principal Instructor Senior Instructor Systems and Technical Manager For Maritime Safety Queensland Captain Richard Johnson Captain Trond Kildal Regional Harbour Master Brisbane Pilot Manager, Cairns For Gold Coast Waterways Authority Mr. Russell Witt A/CEO Gold Coast Waterways Authority For Meridian Maritime Services Captain John Watkinson Maritime Advisor and Simulation Project Coordinator For Brisbane Marine Pilots Captain Graham Stratton Senior Pilot 3 SAM Electronics bridge systems are fitted to over 90% of the worlds current cruise fleet. Part A Simulation Plan Page 4 of 9
5 5. Physical Environment. The area to be included in this study will generally cover a footprint extending from approximately 2nm 4 seaward of the Seaway and include all physical aspects and attributes that would normally be seen from the bridge of a ship entering and departing from the proposed cruise terminal situated just north of Seaworld 5. Greater detail will be more focused in those areas required for safe navigation, e.g. dredged channels. 5.1 Channel Design The concept access channels will be divided into four distinct areas ie. 1. Approach Channel (the channel seaward of the Seaway breakwaters) 2. Seaway Channel (area within the Seaway breakwaters) 3. Channel Bend (the curved channel joining channels 2 and 4.) 4. South Channel (the channel joining 3 and the swing basin off the terminal) The designed access channels for simulation will be initially set with the following parameters which in part was recommended from the previous studies: Channel width for the Approach, Seaway and the South Channels =130m. Swing Basin Diameter = 500m Navigation depth for all channels and swing basins = -12mLAT. Channel between Wavebreak Island and western extremity of the Spit = 210m (Channel Bend) Batter slopes 6 1v:6h(vertical:horizontal) offshore of the seaway training walls. 1v:4h(vertical:horizontal) inner channel and swing basin. Channel depths, alignments, widths and maneuvering areas will be adjusted during the simulations if required. It should be noted that the above design criteria has been set without fully considering PIANC 7 guidelines. All criteria will be subject to and considered in detail with PIANC guidelines after completion of the simulation exercises. 4 Nautical Miles 5 See Attachment 1. 6 Derived from Dredging Strategy Report conducted in support of the EIS 2006 by GHD, will be further considered after completion of the simulation exercises. 7 PIANC Permanent International Association of Navigation Congresses. An Association that inter alia, sets guidelines for Approach Channel Design Parameters. Part A Simulation Plan Page 5 of 9
6 6. Environmental Conditions 6.1 Tides and Tidal Streams The tides at the Seaway are typically semi-diurnal and tidal planes for the site are briefly summarized in Table 1. Table 1 Tidal Planes for the Gold Coast Seaway Tidal Plane Acronym Water Level above LAT Highest Astronomical Tide HAT 1.89 Mean High Water Springs MHWS 1.41 Mean High Water Neaps MHWN 1.15 Mean Sea Level MSL 0.85 Mean Low Water Neaps MLWN 0.49 Mean Low Water Springs MLWS 0.23 Lowest Astronomical Tide LAT 0.00 A hydrodynamic model was created by the GCCC and this model forms the basis of the tides and tidal streams built in to the Gold Coast Port Data Base. For the purposes of the simulation exercise, tidal streams are selected and input in real time according to the time that is nominated for the commencement of the simulation. Further, peak tidal velocities may be input manually to focus on particular pilotage areas. An additional tidal stream of 0.5kts to the north will be input manually to represent general northerly drift in the approach channel and beyond. Tidal stream velocities and vectors are shown on the tidal atlas in Attachment 2 and summarised in Table2. Table2 Maximum tidal stream in Knots Tidal Stream direction Tidal Streams at Indicated Locations. Approach Channel Flood Ebb Seaway Channel Flood Ebb Channel Bend Flood Ebb Winds Wind records are sourced from the Bureau of Meteorology by way of a recording station located at the Seaway. Wind statistics in Attachment 3 graphically illustrate annual, summer and winter data. Wind Roses in Appendix 3a and 3b illustrate mean annual wind speed/direction for 0900 hours and 1500 hours respectively. Predominate winds in the summer at the seaway are generally from the South to South East with strengths in some, albeit lesser periods of 30+knots. Winds from the western sector are very limited. Part A Simulation Plan Page 6 of 9
7 Winter winds are characteristically from a southerly direction but with a significant reduction in wind speed. Most simulation runs will be conducted with winds from the southeast of varying strength up to a maximum force where the ship cannot be safely handled. Wind conditions will be combined with real time tidal streams and increased to a level to represent the worst conditions for entry, departure and maneuvering. Some runs will be undertaken with winds from the north and east and will be increased as determined to provide the worst conditions on the day. All wind conditions will be constant (including gusting) for each run and will be input manually. 6.3 Wave Climate The Approach Channel from the pilot boarding ground offshore of the seaway breakwaters is characterized by varying wave regimes. The Approach channel is exposed to a more severe wave climate than the area between the seaway walls and this further diminishes as the distance from Wavebreak Island reduces. No significant wave data will be used or input from The Bend into the Broadwater proper. Wave heights and direction will be taken from the Hydrodynamic model or otherwise input manually in ascending heights with a 12 sec period from various directions that would provide the worst and limiting conditions for vessels entering and departing the inner and outer sections of the entrance channel. 7. Design Ships The simulation study will use five different cruise ships representing vessels that are or about to trade in Australian waters and are available as validated models at the Smartship facility in Brisbane. The five ships were also selected to provide the best range of size and propulsion systems that could be simulated over the time available. The selected ships are: Name Length Beam Draft Propulsion Thrusters Pacific Dawn/Jewel Twin prop. 2x1.8mW bow 245m 32.3m 7.83m (Regal Princess) Single rudder 2x2.08mW stern Queen Victoria 294m 32.26m 8.0m Twin Azipod 3x2.2mW bow Emerald Princess 289m 36.05m 8.5m Twin prop. 3x2.2mW bow Twin rudders 3x1.7mW stern Queen Mary 2 345m 41m 10.4m Twin Azipod Twin fixed 3x3.2mW bow Voyager of the Seas m 38.6m 8.6m Twin Azipod Single fixed 4x3.omW bow Part A Simulation Plan Page 7 of 9
8 8. Simulation Program The program for all simulation exercises will broadly align with the following timetable and the run sheets at attachment 4: Day 1 Initial briefing and familiarization with the Gold Coast Port model and selected ships and their equipment. Validation of the Port Model if untested prior to Day 1. Commence simulation exercises using Emerald Princess as per run sheets. Day 2 Simulation with Queen Victoria As per run sheet Day 3 Simulation with Voyager of the Seas Review Day 1 and 2, determine and modify run sheets if required. Day 4 Simulation with Pacific Dawn and Queen Mary 2 As per run sheet Day 5 Review all simulation runs, re test any simulation if required. Undertake variation to runs if required by Client and/or Harbour Master. Consider results and agree findings and further steps. Notes: a) All simulation exercises will be run in simulated daylight conditions. b) Arriving vessels will normally commence simulation runs approximately 2nm from the southern breakwater. c) Departing vessels will generally complete simulation as soon as vessel is steady on outbound heading. d) The simulation area will generally be identified as The Port. e) All simulation exercises will be performed without tug assistance. f) Exercise runs will nominally align with the run sheets however runs will be altered or amended if required on the results of previous exercises. Part A Simulation Plan Page 8 of 9
9 9. Definition of Safe Navigation The assessment of safe navigation for the simulation exercise is determined by noting the dimensions of each ship to ensure it will remain within the limits and criteria as determined in the following three categories: 9.1 Ship s Position in Channel Ship s swept path not to encroach within one beams width of the channel toe lines Maximum increase in draft when underway = 1.4m. or 2.0m in the Approach Channel Maximum increase in draft due to heeling = 1.0m. Maximum increase in draft due to squat = 1.0m. 9.2 Use of Ship s internal Forces. Speed in inner channels not to exceed 10knots. Use of the rudder limited to 20 degrees. Periods of 60 seconds in excess of this amount will be considered to be outside of safe limits. Use of engines/propulsion limited to provide agreed safe speeds but not to exceed 50% of power. Periods of 60 seconds in excess of this amount will be considered to be outside safe limits. Use of thrusters in the channel and when ship s speed exceeds 6 knots will be considered to be outside safe limits. 9.3 Ship Pilot/Operator Navigational Risk Assessment. This is a subjective assessment of each simulation exercise made by the Pilot, Observer and if necessary the Instructor based on their practical experience in regard to details of the particular run including the handling, behavior and operational aspects of the ship navigating within the port. Part A Simulation Plan Page 9 of 9
10
11 Attachment 2 TIDAL ATLAS: Tidal speed and direction are illustrated below for both flood and ebb tides for both the base case and Option 3. The base case does not include any dredging associated with a potential cruise terminal and Option 3 includes dredging associated with the development of a cruise terminal on the site immediately north of Seaworld. The dredged channel to accommodate Option 3 includes approx. 3.7M m3 of dredging to develop a channel of 130m wide. The depth of the channel varies slightly along its length. Offshore of the Seaway the channel depth is 13m below LAT (-13.76m AHD), inside the Seaway the depth is 12.5m LAT (-13.25m AHD) and 11m LAT in the South Channel (-11.76m AHD). The tidal velocities indicated in the document are for a Spring Tide which exhibits close to HAT and LAT characteristics. This will derive the maximum tidal velocities expected under normal tidal cycles without any climate change allowances. The images displayed in this document are snap shots in time at a specified time step. The image below is a time series plot of the modelled tide. The red line is the water level and the green line is the tidal speed in the middle of the Seaway. The figure shows a maximum flood tide velocity of approx. 1.4m/s at approx. 6:40am. The maximum ebb tide velocity of 1.6m/s arrives at 1:15pm on the 11 January Maximum velocities vary within the modelled area and those plotted in the time series below are indicative of that single cell only.
12 Base Case Flood Tide:
13 Base Case Ebb Tide:
14 Option 3 Flood Tide
15 Option 3 Ebb Tide
16 Wider Area Images: Base Case Flood Tide:
17 Base Case Ebb Tide:
18 Option 3 Flood Tide
19 Option 3 Ebb Tide
20 Current information in the open ocean external to the Seaway has been developed. This information is sourced from a regional scale hydrodynamic model extending along the Gold Coast coastline. This information illustrates the direction of the current in the Ocean during both a flood and ebb tide. Base Flood Tide
21 Base Ebb Tide
22
23 10% 20% 30% Rose of Wind direction versus Wind speed in km/h (01 Dec 1991 to 30 Sep 2010) Custom times selected, refer to attached note for details GOLD COAST SEAWAY Site No: Opened Jan 1987 Still Open Latitude: Longitude: Elevation 2.9m An asterisk (*) indicates that calm is less than 0.5%. Other important info about this analysis is available in the accompanying notes. NW N NE CALM km/h W CALM E SW SE S >= 0 and < 10 >= 10 and < 20 >= 30 and < 40 >= 20 and < 30 >= 40 9 am 6511 Total Observations Calm 1% Copyright Commonwealth of Australia Prepared on 29 Mar 2012 Prepared by National Climate Centre of the Bureau of Meteorology. Contact us by phone on (03) , by fax on (03) , or by on climatedata@bom.gov.au We have taken all due care but cannot provide any warranty nor accept any liability for this information. TCZANNUAL Page 1
24
25 GOLD COAST - SIMULATION RUN PLAN. DAY 1 RUN SHIP WIND TIDE PILOT BERTH MODEL SHIP NAME FROM - TO SIDE DIREC SPEED Knots MOVE DURATIO N REMARKS Emerald Princess Sea to Terminal SE 10 Slack SST Familiarisation and Validation, check control turn at Wavebreak- set speed Emerald Princess Sea to Terminal SE 10 Ebb SST Validation, introduce tide at half tide cycle at Wavebreak Emerald Princess Sea to Terminal SE 20 Flood SST Flood at half tide cycle at Wavebreak Emerald Princess Sea to Terminal SE 20 Flood SST Peak food tide at Wavebreak. Outside swell Test movement Emerald Princess Sea to Terminal SE 25 Flood SST Peak food tide at Wavebreak. Outside wave climate 2.5m@12secs. Test movement Emerald Princess Sea to Terminal SE 30 Flood SST Peak food tide at Wavebreak. This run dependent on results of run Emerald Princess Terminal to Sea SE 20 Ebb PST Ebb at half tide cycle at Wavebreak Emerald Princess Terminal to Sea SE 25 Ebb SST Peak Ebb at Wavebreak
26 GOLD COAST - SIMULATION RUN PLAN DAY 2 SHIP WIND TIDE BERTH PILOT RUN MODEL SHIP NAME FROM - TO DIREC SPEED Knots Queen Victoria Sea to Terminal SE 30 Flood SST Queen Victoria Sea to Terminal E 20 Flood PST Queen Victoria Sea to Terminal N 20 Flood SST Queen Victoria Terminal to Sea S 25 Ebb PST Queen Victoria Terminal to Sea E 20 Ebb SST Queen Victoria Terminal to Sea SE 30 Ebb PST Queen Victoria 8 SIDE MOVE DURATIO N Peak Flood at Wavebreak and wind dependant on Da dependant on results day 1. Peak Flood at Wavebreak Continue outside wave climate test from run 1. Check Speed and Turn Check speed and ability to stay in inner channel REMARKS Check swing with upper limit wind strength and speed Determine other runs as required from previous exerc
27 GOLD COAST - SIMULATION RUN PLAN. DAY 3 SHIP RUN MODEL SHIP NAME FROM - TO DIREC WIND SPEED Knots TIDE BERTH SIDE PILOT MOVE DURATIO N REMARKS VOYAGER of the SEAS Sea to Terminal E 25 Flood VOYAGER of the SEAS Sea to Terminal E 25 Flood VOYAGER of the SEAS Sea to Terminal SE 25 Flood NA Check UKC with outside wave climate 2.5m NA Check UKC with outside wave climate 3.0m NA Depending on results of Runs 1 & 2, Check upper limit wave clim VOYAGER of the SEAS Sea to Terminal SE 30 Flood SST Peak Flood at Wavebreak VOYAGER of the SEAS Sea to Terminal N 20 Flood PST Peak Flood at Wavebreak VOYAGER of the SEAS Sea to Terminal E 25 Flood SST Peak Flood at Wavebreak, check ability to keep to inner channel VOYAGER of the SEAS Terminal to Sea E 30 Ebb SST Peak ebb at Wavebreak, check ability to keep to inner channel, c VOYAGER of the SEAS Terminal to Sea SE 30 Ebb SST Peak ebb at Wavebreak, check ability to keep to inner channel, c
28 GOLD COAST - SIMULATION RUN PLAN. DAY 4 SHIP RUN MODEL SHIP NAME FROM - TO DIREC WIND SPEED Knots TIDE BERTH SIDE PILOT MOVE DURATION REMARKS PACIFIC DAWN (REGAL PRINCESS) PACIFIC DAWN (REGAL PRINCESS) PACIFIC DAWN (REGAL PRINCESS) PACIFIC DAWN (REGAL PRINCESS) Sea to Terminal SE 25 Flood SST Peak flood at Wavebreak, Check ability to steer and kee Sea to Terminal SE 30 Flood SST Peak flood at Wavebreak, Check ability to steer and kee Check for upper limit wind speed. Terminal to sea S 25 Ebb SST Peak Ebb at Wavebreak, check ability to steer and maint Terminal to sea E 25 Ebb SST Peak Ebb at Wavebreak, check ability to steer and maint QUEEN MARY 2 Sea to Terminal SE 25 Flood NA QUEEN MARY 2 Sea to Terminal E 30 Flood NA QUEEN MARY 2 Sea to Terminal SE 25 Flood SST QUEEN MARY 2 Sea to Terminal SE 30 Flood PST QUEEN MARY 2 Terminal to sea E 25 Ebb PST Check UKC with outside wave Dependanton results of run 5 and previous days, check f Peak flood at Wavebreak, check swept path on turn and Peak flood at Wavebreak, check swept path on turn. Peak Ebb at Wavebreak, check ability to steer and maint
29 GOLD COAST - SIMULATION RUN PLAN. DAY 5 RUN SHIP MODEL SHIP NAME DIREC WIND SPEED Knots TIDE BERTH SIDE PILOT MOVE DURATIO N REMARKS 1 TBD All Runs undertaken on Day 5 will be determined by results of prev concerning and covering upper operational limits
APPROACH DEPTH(m) From East 15.0 From West From East 15.0 From West From East 15.0 From West ) ) From East 15.0 ) From West 16.
UNIVERSAL TERMINAL (OMU) JETTY DEPTH A/S (m) APPROACH DEPTH(m) MAX LOA (m) MAX DISPL. (tonnes) REMARKS OMU1 23.0 From East 15.0 From West 22.5 346 384,604 VLCC berth OMU2 23.0 From East 15.0 From West
More informationTransport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters
Transport Infrastructure Act 1994 Gladstone Ports Corporation Port Notice 04/17 LNG Vessel Operating Parameters 1. These operating parameters have been developed based on navigation simulations with LNG
More informationCode Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)
Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines) This Code Covers The Use Of Tugs And Towage In The Port Of St Helier Page number Contents 2 Introduction 3 Communication
More informationConcept Channel Design & Channel Development Strategy D R A F T. Document Ref: AGH-CEP0-EG-REP-0012
Concept Channel Design & Channel Development Strategy Document Ref: AGH-CEP0-EG-REP-0012 In May 2016 the Special Minister of State asked Infrastructure Victoria to provide advice on the future capacity
More informationAssessment Simulation study, Phase 2. Port of Roenne. FORCE / Rev. B
/ Rev. B i LIST OF CONTENTS: PAGE: 0. EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 1.1. General... 2 1.2. Objectives... 3 2. SUMMARY... 4 2.1. Observations... 5 2.2.1 General... 5 2.2.2 Weather conditions...
More informationPort of Burnie. Port Map TASPORTS PORT INFORMATION. West Beach. Island Breakwater. No.4 Berth. No.5 Berth. No.6 Berth. No.7 Berth
Port Map West Beach N 1 Island Breakwater No.4 Berth No.5 Berth 2 No.6 Berth 3 No.7 Berth 4 5 1 Northern Marshalling Area 6 2 Concentrates Storage 3 Port Coporation Offices 4 Australian National Railways
More informationPort of Burnie. Port Map. Burnie TASPORTS PORT INFORMATION. 5 Toll Shipping
Port Map West Beach 1 Island Breakwater No.4 Berth 3 No.5 Berth 2 No.6 Berth 4 No.7 Berth 6 7 5 Burnie 1 2 3 4 5 Toll Shipping Tasrail Concentrate Storage Tasrail Concentrate Shiploader Tasports Office
More informationCurrents measurements in the coast of Montevideo, Uruguay
Currents measurements in the coast of Montevideo, Uruguay M. Fossati, D. Bellón, E. Lorenzo & I. Piedra-Cueva Fluid Mechanics and Environmental Engineering Institute (IMFIA), School of Engineering, Research
More informationWOODFIBRE LNG VESSEL WAKE ASSESSMENT
Woodfibre LNG Limited WOODFIBRE LNG VESSEL WAKE ASSESSMENT Introduction Woodfibre LNG Limited (WLNG) intends to build a new LNG export terminal at Woodfibre, Howe Sound, British Columbia. WLNG has engaged
More informationPort Sections Guide Section 01
s Guide 01 Cow Bay Marina Date 10/1/2016 Position (lat / lon) Minimum controlled water depth Chart datum Range of water densities Tidal range alongside Bottom type Dredging regime Distance pilot station
More informationGorgon - Pilotage - Passage Plan Materials Offloading Facility (MOF) to PBG
Gorgon - Pilotage - Passage Plan Materials Offloading Facility (MOF) to PBG 1.0 Introduction Vessels transiting within port limits from the Materials Offloading Facility (MOF) to the Barrow Island Pilot
More informationMAC Transit Advisories as of April 30, 2018
MAC Transit Advisories as of April 30, 2018 The Mariners Advisory Committee for the Bay and River Delaware was established in October 1964. Its members and associate members are mainly comprised of master
More informationForth Ports Limited. Ruling Depths & Under Keel Clearances
Forth Ports Limited - Forth Vessels are scheduled into / out of ports on the Forth & Tay in accordance with the under keel clearance criteria specified in this section of the Marine Guidelines & Port Information.
More informationHELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014
HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 Agenda Item 3 Accidents and ship traffic in the Baltic Sea Document
More informationForth Ports Limited. Port of Dundee. Rig Move Guidelines
Forth Ports Limited Port of Dundee Contents 1 Introduction... 4 2 Pre-Arrival... 4 2.1 Planning Meetings... 4 2.2 Priority of Movements... 4 2.3 Confirmation/Cancellations... 5 2.4 Weather Parameters...
More informationNAEST(M) training Course Structure and Session Objectives. Day Introduction and enrolment
NAEST(M) training Course Structure and Session Objectives Day 1 0830-0930 Introduction and enrolment 0930-1330 Effective Bridge Procedures & Rule of the Road Lecturer will go through the PowerPoint on
More informationPreventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX
Preventing Damage to Harbour Facilities and Ship Handling in Harbours PART 2 INDEX 1 Vessel handling is based on the basic knowledge that a vessel floats in the water and returns to its original position
More informationCOAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017
Commander United States Coast Guard Sector New York 212 Coast Guard Drive Staten Island, NY 10305 Staff Symbol: (spw) Phone: (718) 354-2353 Fax: (718) 354-4190 COAST GUARD ADVISORY NOTICE (CGAN 2017-016)
More informationGorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF)
1.0 Introduction Vessels transiting within port limits from the Barrow Island Pilot Boarding Ground (PBG) to the require an approved passage plan which can be shared between Pilots and vessel Masters.
More informationADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION
ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION LOCATION Mundra Port is all weather, independent, commercial port with geographical and hydrological advantages on the West Coast of India,
More informationFOR INFORMATION ONLY. Gold Coast Seaway Channel Scour and Rock Wall Stability Investigation. R.B doc December 2011
A part of BMT in Energy and Environment Gold Coast Seaway Channel Scour and Rock Wall Stability Investigation R.B18625.001.00.doc December 2011 Gold Coast Seaway Channel Scour and Rock Wall Stability Investigation
More informationE4014 Construction Surveying. Hydrographic Surveys
E4014 Construction Surveying Hydrographic Surveys Charts And Maps Hydrographic Chart an information medium and a tool for maritime traffic for the safety and ease of navigation contains information on
More informationChart Specifications of the IHO Publication S-4 (Formerly M-4)
TWLWG3/4/11A Publication S-4 (Formerly M-4) Attached to this document is an extract from IHO Publication S-4 which relate to Tidal and Water Level Information. The TWLWG is requested to review this information
More informationInfrastructure Victoria Second Container Port Advice
Infrastructure Victoria 4 May 2017 Infrastructure Victoria Second Container Port Advice Navigation Study Revision 0 3 May 2017 Navigation Study Client: Infrastructure Victoria ABN: 83 184 746 995 Prepared
More informationROYAL VANCOUVER YACHT CLUB
ROYAL VANCOUVER YACHT CLUB PROPOSED EXPANSION PROJECT NAVIGATION CHANNEL DESIGN COAL HARBOUR Prepared for: Royal Vancouver Yacht Club Prepared by: Typlan Consulting Ltd. March 2016 Page 1 of 17 March 23,
More information5.0 Channel Design and Alternatives
5.0 Channel Design and Alternatives The dimensions of the navigational areas such as approach channel, manoeuvring areas, anchorage, etc. are based on the type and size of the vessel envisaged to visit
More informationAbstract. Introduction
Computer assisted analysis of Aviles Port extension: hydraulic conditions, navigation and training of pilots J.R. Iribarren & J.M. Montero Port Research Program, CEPYC-CEDEX, Antonio Lopez, 81. 28026 Madrid,
More informationGENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)
RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 AMENDED EFFECTIVE JANUARY
More informationABP South Wales Towage Guidelines. Date of issue: January ABP South Wales and River Usk Towage Guidelines
Date of issue: January 2017 ABP South Wales and River Usk wage January 2017 Date of issue: January 2017 AMENDMENTS Amendment issue number Page Amendment made by (Initials) Date of amendment One 15 & 16
More informationUNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION
UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION TO: All Shipping Agents and Interested Parties January 19, 2017 SUBJECT: Anchorage
More informationapplied to Port Development and Inland Waterway Transport
applied to Port Development and Inland Waterway Transport Wytze de Boer March 12, 2018 w.d.boer@marin.nl CHALLINGING WIND AND WAVES applied to port development and inland waterway transport AGENDA 1. Introduction
More informationDEVELOPING PILOTAGE PLANS ON BRIDGE SIMULATORS: METHODOLOGY, BENEFITS AND CHALLENGES
MARSIM 2018, International Conference on Marine Simulation and Ship Manoeuvrability Halifax, Canada, 12-16 August 2018 DEVELOPING PILOTAGE PLANS ON BRIDGE SIMULATORS: METHODOLOGY, BENEFITS AND CHALLENGES
More informationAppendix 3. Hydrodynamic and sedimentation studies
Appendix 3 Report EX 4945 Rev 3.0 November 2004 Document Information Project Report title Client Borough of Poole Client Representative Mr Stuart Terry Project No. DDR3553 Report No. EX 4945 Doc. ref.
More informationTHE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE
THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE Toon Verwaest, Flanders Hydraulics Research, toon.verwaest@mow.vlaanderen.be Sarah Doorme, IMDC, sarah.doorme@imdc.be Kristof Verelst, Flanders Hydraulics Research,
More informationTerrestrial Observations Chart Plot - Chesapeake Bay Entrance - Operational Level
USCG 00326-NP-5 The following questions are based on chart 12221TR, Chesapeake Bay Entrance, and the supporting publications. The draft of your tow is 27 feet (8.2 meters). Use 10 W variation where required.
More information: Hydrodynamic input for 2D Vessel Simulations (HY- 0027)
Technical Note To : Christian Taylor (PoHDA) From : Rohan Hudson Cc : Ben Gray Date : 1/04/2015 (Final Draft) Subject : Hydrodynamic input for 2D Vessel Simulations (HY- 0027) Introduction This Technical
More informationRisk-Based Design of Entrance Channel Depths: A Case Study At the Entrance Channel of Mombasa Port, Kenya
Risk-Based Design of Entrance Channel Depths: A Case Study At the Entrance Channel of Mombasa Port, Kenya Quy N.M., Vrijling J.K., and Pieter van Gelder Delft University of Technology, Delft, the Netherlands
More informationFundamental Study of Evaluation at Berthing Training for Pilot Trainees Using a Ship Maneuvering Simulator
http://www.transnav.eu the International Journal on Marine Navigation and Safety of Sea Transportation Volume 7 Number 1 March 2013 DOI: 10.12716/1001.07.01.18 Fundamental Study of Evaluation at Berthing
More informationRiver Tay. Passage Plan
River Tay Passage Plan Inward and Outward Passage Plan For the River Tay within the Port of Dundee Pilotage Area. This plan has been prepared with the co-operation of personel from The Association of Dundee
More informationA New Strategy for Harbor Planning and Design
A New Strategy for Harbor Planning and Design Xiuying Xing, Ph.D Research Associate Sonny Astani Department of Civil and Environmental Engineering University of Southern California Los Angeles, CA 90089-2531
More informationFigure 1: The squat effect. (Top) Ship at rest. (Bottom) Ship under way.
Under-Keel Clearance of Frigates and Destroyers in Shallow Water Tim Gourlay, Centre for Marine Science and Technology, Curtin University CMST Research Report 013-53 Abstract For RAN ships operating in
More informationWORK-REST REQUIREMENTS FOR PILOTS
AN ORDER OF THE BOARD OF PILOT COMMISSIONERS FOR THE PORT OF CORPUS CHRISTI AUTHORITY REGARDING WORK-REST REQUIREMENTS FOR PILOTS AND COMBINED BEAM RESTRICTION Whereas, the current Rules and Regulations
More informationGorgon - Pilotage - Passage Plan - Gorgon Marine Terminal to PBG Alternative Route
Gorgon - Pilotage - Passage Plan - Gorgon Operating Procedure - Gorgon - Pilotage - Passage Plan - Gorgon 1.0 Introduction Vessels transiting within port limits from the Gorgon Marine Terminal
More informationInfluence of Marine Operations on Site Selection & Design of Marine Terminals
SOCIEDAD CHILENA DE INGENIERIA HIDRÁULICA V SEMINARIO INTERNACIONAL DE INGENIERÍA Y OPERACIONES PORTUARIAS OCTUBRE 2008, CONCEPCIÓN, CHILE Influence of Marine Operations on Site Selection & Design of Marine
More informationA methodology for evaluating the controllability of a ship navigating in a restricted channel
A methodology for evaluating the controllability of a ship navigating in a restricted channel K. ELOOT A, J. VERWILLIGEN B AND M. VANTORRE B a Flanders Hydraulics Research (FHR), Flemish Government, Antwerp,
More informationPilotage Directions 2017
Pilotage Directions 2017 1. Commencement These Pilotage Directions shall come into force on 31 st August 2017 on which date the existing Pilotage Directions are revoked. 2. Short Title These Pilotage Directions
More informationImplications of proposed Whanganui Port and lower Whanganui River dredging
PO Box 637 Wanganui 4540 Attention: Rowan McGregor Dear Rowan 1 Summary We understand that it has been proposed to bring large vessels into the Port at Whanganui requiring the excavation of a channel up
More informationVisiting Lake Macquarie
Visiting Lake Macquarie Lake Macquarie is the largest coastal salt water lake in Australia and is a prime boating destination for both small and large vessels. Many sailing regattas and fishing activities
More informationForth Ports Limited. Port of Dundee. Marine Guidelines and Port Information
Forth Ports Limited Port of Dundee Marine Guidelines and Port Information LIST OF AMENDMENTS DATE PAGE NUMBER 22 NEW EDITION 7 March 2016 Ruling Depths 18 23 rd Application updated 3 23 rd - Tug fleet
More informationLocal Notice to Mariners 02/2018
Local Notice to Mariners 02/2018 ABERDEEN HARBOUR PILOTAGE DIRECTIONS 2018 1. PILOTAGE DIRECTIONS Aberdeen Harbour Board as the competent harbour authority for the port and harbour of Aberdeen pursuant
More informationPort Melville Information Booklet
August 2017 Contents 1 General Information... 4 1.1. Port Description... 4 1.2. Berth Details... 5 1.3. Weather Parameters... 5 1.4. Berthing... 5 1.5. Remaining Alongside... 5 1.6. Sailing... 5 1.7. Time
More informationPORT INFO GENERAL BERTH INFO
s ervices SHIPWRIGHT WWW.SHIPWRIGHTSERVICES.CO.ZA 9 DE DUINE CLOSE, BLUEWATERBAY, SALDANHA, 7395, WESTERN CAPE, SOUTH AFRICA TEL. +27 71 040 6022 EMAIL. DERICK@SHIPWRIGHTSERVICES.CO.ZA PORT INFO GENERAL
More informationGorgon - Pilotage - Passage Plan - PBG to Gorgon Marine Terminal - Alternative Route
1.0 Introduction This work instruction outlines the passage plan to be used by vessels transiting from the Port of Barrow Island PBG to the Gorgon Marine Terminal, via the alternative route, with a Pilot
More informationUnderstanding of Meteorology. for. Handling LNG at Ports
Understanding of Meteorology for Handling LNG at Ports All environmental forces on the berth and the berthed ship are considered. When evaluating environmental forces, first estimates are obtained for
More information13. TIDES Tidal waters
Water levels vary in tidal and non-tidal waters: sailors should be aware that the depths shown on the charts do not always represent the actual amount of water under the boat. 13.1 Tidal waters In tidal
More informationGENERAL LIMITATIONS AND RESTRICTIONS. Draft Restrictions
RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 I GENERAL The Rules and
More informationThe development of the historical harbour of Paphos, Cyprus H.J. van Wijhe*, M. Meletiou^ Division, P.O. Box 152, 8300 AD Emmeloord, The Netherlands
The development of the historical harbour of Paphos, Cyprus H.J. van Wijhe*, M. Meletiou^ Division, P.O. Box 152, 8300 AD Emmeloord, The Netherlands Abstract The harbour of Paphos originates from ancient
More informationABP South Wales and River Usk Towage Guidelines
Date of issue: Jan 2012 ABP South Wales and River Usk wage January 2012 Page 1 of 17 Approved by: Deputy Harbour Master South Wales Issue 1.0 Date of issue: Jan 2012 AMENDMENTS Amendment issue number Page
More informationPORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)
PORTS AUSTRALIA PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012) PREFACE These Principles have been prepared by the Hydrographic Surveyors
More informationPRE-ARRIVAL INFORMATION FOR VESSELS INTENDING TO ENTER THE PORT OF BLUFF
PRE-ARRIVAL INFORMATION FOR VESSELS INTENDING TO ENTER THE PORT OF BLUFF Note to Masters Please familiarize yourself and your bridge team with the contents of this compendium. Version 7-20 October 2016
More informationNational Maritime Center
National Maritime Center Providing Credentials to Mariners Q301 Rules of the Road-Inland (Sample Examination) Page 1 of 19 Choose the best answer to the following Multiple Choice Questions. NO reference
More informationAccommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs.
Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs. PANELISTS: Paul Amos: President, Columbia River Pilots. Larry
More informationFULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT
FULL SCALE MEASUREMENT OF DYNAMIC SHIP MOTIONS AND SQUAT Mr. Gary Rolph Chief Hydrographic Surveyor Port of Brisbane Corporation Mr. Peter Rumball Surveyor Port of Brisbane Corporation Dr. Terry O'Brien
More informationHarbourmaster s Office Operation of Superyacht in the Auckland Region Navigation Safety Operating Requirements
Harbourmaster s Office Operation of Superyacht in the Auckland Region Navigation Safety Operating Requirements Foreword Maritime Rule 90 requires that every vessel of 500 Gross tonnage or greater carries
More informationAPPENDIX G WEATHER DATA SELECTED EXTRACTS FROM ENVIRONMENTAL DATA FOR BCFS VESSEL REPLACEMENT PROGRAM DRAFT REPORT
APPENDIX G WEATHER DATA SELECTED EXTRACTS FROM ENVIRONMENTAL DATA FOR BCFS VESSEL REPLACEMENT PROGRAM DRAFT REPORT Prepared for: B.C. Ferries Services Inc. Prepared by: George Roddan, P.Eng. Roddan Engineering
More informationPILOTAGE INFORMATION
PILOTAGE INFORMATION Revised A PILOTAGE DIRECTIONS The Gloucester Harbour Trustees is the Competent Harbour Authority for the Gloucester Harbour under the Pilotage Act 1987 and responsible for the provision
More informationCrew Training for NSR Shipping
Crew Training for NSR Shipping Standards for Training, Certification & Watchkeeping (STCW) IMO s STCW -- is the international set of rules regulating the overall education and training requirements for
More informationSURFACE CURRENTS AND TIDES
NAME SURFACE CURRENTS AND TIDES I. Origin of surface currents Surface currents arise due to the interaction of the prevailing wis a the ocean surface. Hence the surface wi pattern (Figure 1) plays a key
More informationASSOCIATED BRITISH PORTS - LOWESTOFT
ASSOCIATED BRITISH PORTS - LOWESTOFT PILOTAGE DIRECTION (With Amendments To 01/02/2012) 1. AUTHORISATION Pilotage Act 1987. Associated British Ports Lowestoft (Pilotage) Harbour Revision Order 1988. 2.
More informationCOURSE OBJECTIVES CHAPTER 9
COURSE OBJECTIVES CHAPTER 9 9. SHIP MANEUVERABILITY 1. Be qualitatively familiar with the 3 broad requirements for ship maneuverability: a. Controls fixed straightline stability b. Response c. Slow speed
More informationNote to Shipbuilders, shipowners, ship Managers and Masters. Summary
MARINE GUIDANCE NOTE MGN 301 (M+F) Manoeuvring Information on Board Ships Note to Shipbuilders, shipowners, ship Managers and Masters This note supersedes Marine Guidance Note MGN 201 (M+F) Summary The
More informationColumbia River Pilots Vessel Movement Guidelines. Table of Contents
Columbia River Pilots Vessel Movement Guidelines Table of Contents I. Introduction.... 2 II. Pilot Transfers.. 3 III. General Information.... 4 Harbor Safety Plan... 4 Restricted Main Engine RPMs 4 Channel
More informationPaper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)
Paper for consideration by ENC Working Group Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Submitted by: Alvaro Sanchez (AHS) Executive Summary: Compilation of high density bathymetric
More informationStars and Compass Trophy and Novice Paper 2014!
Stars and Compass Trophy and Novice Paper 2014 The Stars and Compass Trophy was established to promote the use and development of traditional navigation skills. This year, in a bid to encourage novice
More informationGENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS
GENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS Revised: March 5, 2018 TABLE OF CONTENTS GENERAL DEFINITIONS... 2 VESSEL SPACING... 3 HORIZONTAL CLEARANCE... 3 UNDER-KEEL CLEARANCE
More informationLat. & Long. Review. Angular distance N or S of equator Equator = 0º Must indicate N or S North pole = 90º N
Navigation Part 2 1 Lesson Objectives Understand how a ships compass works and how it is used for navigation Measure distances on nautical charts Plot a course on a nautical chart Correct course headings
More informationWheatstone Marine Operations - Pilotage - Passage Plan - Onslow Port Limit to WMT
Wheatstone Marine Operations - Pilotage - Passage Plan - Onslow Port Limit to WMT 1.0 INTRODUCTION Vessels entering the Port of Ashburton require an approved berth to berth passage plan in accordance with
More informationCOUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST
Lake Cathie Progress Association Inc. ABN 28 251 433 854 P.O. Box 247 Lake Cathie NSW 2445 PHONE/FAX: 02 6584 8211 EMAIL: r3packag@bigpond.com 20 th October 2009 Port Macquarie Hastings Council PO Box
More information(Refer Slide Time: 0:36)
Port and Harbour Structures. Professor R. Sundaradivelu. Department of Ocean Engineering. Indian Institute of Technology, Madras. Module-2. Lecture-8B. Wave Rose Diagram. (Refer Slide Time: 0:36) We will
More informationRequired knowledge for Cook Strait endorsement
Required knowledge for Cook Strait endorsement Last updated: March 2018 This document is uncontrolled if printed, please refer to the Maritime New Zealand website for the latest version. Cook Strait is
More informationAll comments received will be taken into consideration before the proposed amendments are implemented.
Notice of Amendment Port Information Guide Notification date: February 13 th, 2018 Preamble In accordance with the Canada Marine Act, 1998, Section 57 Notice, the Vancouver Fraser Port Authority is proposing
More informationCompetency framework for Skipper Coastal / Offshore. Competency framework for Skipper Coastal/ Offshore
Competency framework for Skipper Coastal/ Offshore Table of Contents... 1... 1 Function: Safety at the management level... 11 Manage safety aboard a coastal and vessel... 11 Competency framework for Skipper
More informationGREAT YARMOUTH PORT COMPANY GENERAL PORT AND PILOTAGE INFORMATION P16
The following general information is provided as guidance only for vessels visiting the Port of Great Yarmouth. Ships Masters should carry out their passage planning taking all available and appropriate
More informationMeasurement of vertical motions of bulk carriers navigating in port entrance channels
HYDROGRAPHIC CONFERENCE Technical Awareness Seminar 2007 Cape Town, 19 21 June 2007 Measurement of vertical motions of bulk carriers navigating in port entrance channels J Moes CSIR, PO Box 320, Stellenbosch,
More informationHydrodynamic and hydrological modelling to support the operation and design of sea ports
Hydrodynamic and hydrological modelling to support the operation and design of sea ports Data needs and examples Martijn de Jong (port/nautical requirements, waves, currents) Sofia Caires (mean and extreme
More informationGorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route
Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route 1.0 Introduction Vessels transiting within port limits from the Barrow Island Outer Pilot Boarding Ground (PBG) to the Gorgon
More informationNational Maritime Center
National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 8 Choose the best answer to the following Multiple Choice questions. 1. On 1 September your 1115 zone time DR position
More informationWind Data Verification Report Arriga 50m
Page 1 of 11 Site Name Site Details 9531 - Arriga 5m Arriga 5m Date/Time of report generation 27/11/212 4:22 PM Site Number 9531 Mast Height 5m Mast Location 32568 E 811256 N Coordinate System UTM 55K
More informationMetocean criteria for fatigue assessment. Rafael V. Schiller 5th COPEDI Seminar, Oct 8th 2014.
Metocean criteria for fatigue assessment Rafael V. Schiller 5th COPEDI Seminar, Oct 8th 2014. Metocean requirements along the lifecycle of a project Metocean criteria for fatigue Analysis techniques and
More informationThe Shipowners Club. Loss Prevention. Tides
The Shipowners Club Loss Prevention Tides British Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty's Stationery Office and the UK Hydrographic Office (www.ukho.gov.uk).
More informationManeuverability characteristics of ships with a single-cpp and their control
Maneuverability characteristics of ships with a single-cpp and their control during in-harbor ship-handlinghandling Hideo YABUKI Professor, Ph.D., Master Mariner Tokyo University of Marine Science and
More informationModel of ferry captain s manoeuvres decision
Scientific Journals Maritime University of Szczecin Zeszyty Naukowe Akademia Morska w Szczecinie 212, 32(4) z. 2 pp. 98 2 212, 32(4) z. 2 s. 98 2 Model of ferry captain s manoeuvres decision Adam Kowalski
More informationTHE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND
PD TEESPORT CONSERVANCY DIVISION HARBOUR MASTER'S OFFICE THE SYLLABUS FOR WRITTEN EXAMINATION IN RESPECT OF A PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND PILOTAGE EXEMPTION CERTIFICATE (Issued
More informationTWIN SCREW VESSEL MANNED MODEL SHIPHANDLING COURSE JOINING INFORMATION
TWIN SCREW VESSEL MANNED MODEL SHIPHANDLING COURSE JOINING INFORMATION Page 1 Course and Joining Information Twin Screw Vessel Manned Model Shiphandling Course Duration 20 hours IMPORTANT: You must bring
More informationNational Maritime Center
National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 19 Choose the best answer to the following multiple choice questions. NO reference materials are authorized for
More informationTHE INEVITABLE RIPPLE 2ND OF APRIL TSUNAMI
THE INEVITABLE RIPPLE 2ND OF APRIL TSUNAMI Structure Background Preparedness for 2nd of April Response Operations 2nd of April Lessons learnt Future work Hawaii 1957 Background Approx 250,000 people live
More informationUncontrolled document if printed.
APPENDIX 3 APPRENTICE PILOT S TRAINING SYLLABUS Issue Date: 16 th March, 2010 Date of Revision: 22nd May, 2013 Revision #2 i THE PURPOSE OF THIS SYLLABUS The purpose of this training syllabus is to ensure
More informationRequest Number IR1-12: Flow Passage. Information Request
Request Number IR1-12: Flow Passage Information Request Provide additional information about the 100 metre flow passage channel scenario between the Westshore Terminals and the proposed Project terminal
More informationAvailable online at ScienceDirect. Procedia Engineering 116 (2015 )
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 116 (2015 ) 320 325 8th International Conference on Asian and Pacific Coasts (APAC 2015) Department of Ocean Engineering, IIT
More informationAstrolabe Reef Access Plan Stakeholder Presentation
Astrolabe Reef Access Plan Stakeholder Presentation *Rena s bow thruster approx 18m Agenda Overview Access Plan Introduction State of the Reef & Wreck Site What to Expect Timetable & Activity Questions
More information