Channel Turns. Cape Fear River

Size: px
Start display at page:

Download "Channel Turns. Cape Fear River"

Transcription

1 A Look at the Channel Turns in the Cape Fear River Revised November 5, 2011 Prepared for Save the Cape, Inc. Southport, North Carolina Contents The Channel in the Cape Fear River...2 Experience...7 Corps of Engineers Standards for Channel Turns The PIANC Design Guide The CH2M Hill, Inc., Cut-through Recommendation Conclusion... 15

2 A Look at the Channel Turns in the Cape Fear River All you gotta do is keep it between the lines -Russell Smith and Kathy Louvin (Recorded by Ricky van Shelton) The channel in the Cape Fear River permits ocean-going vessels to call at the Port of Wilmington, approximately 26 miles upriver from the mouth. The port includes the State Port, operated by the North Carolina State Ports Authority, and several private facilities, some on the property of the State Port. The channel is maintained at a depth of 42 feet, with a width of 400 feet, widened to 500 feet at the lower reaches at the mouth of the river. Because the continental shelf falls off only gradually at the river mouth, the dredged channel extends six and a half miles out to sea. The channel has a sharp turn in the lower reaches near Southport, followed by a reverse turn through the mouth of the river between Fort Caswell on Oak Island and Bald Head Island, describing a large S. That turn has been a problem for the larger ships navigating the river. The North Carolina State Ports Authority, a component of the North Carolina state government, has purchased 600 acres of undeveloped land on the Cape Fear River near Southport, and plans to develop an international container terminal to facilitate the import of goods from Asia in a new generation of very large container ships. The terminal would have an annual capacity of 3,000,000 twentyfoot equivalent units (TEU), larger than any container terminal in the eastern United States except the combined terminals at Port Elizabeth and Port Newark, New Jersey. The new terminal would be called the North Carolina International Terminal (NCIT). The design vessel for the NCIT is a a new generation of container ships (called post-panamax ) are too large to transit the Panama Canal, now or after the capacity increases under construction for opening in 2014: 1260 feet long, 185 feet in beam, and drawing 50 feet. Such vessels would require a channel 52.5 feet deep (plus a two-foot overdredge for maintenance of that depth) and 600 feet wide. Consultants to the North Carolina State Ports Authority, in preparing preliminary plans for the proposed container terminal, concluded that the standards of the US Army Corps of Engineers for channel width and turns cannot be met on a channel following the route of the existing channel because of the confines creating the S-curve at Battery Island. The consultants recommend bypassing the turn with a new channel on a relatively straight route from the proposed terminal site to the mouth of the river. We find that the existing channel turns do not comply with the standards of the Corps of Engineers for the vessels now using the Cape Fear River, cannot be enlarged to accommodate larger vessels, and indeed are unsafe for existing vessels. However, we do not endorse the proposal to create a new channel. The capacity of the Cape Fear River for a deepdraft navigation channel has already been exhausted.

3 The Channel in the Cape Fear River This is the chart of the lower Cape Fear River: The Corps of Engineers maintains the channel at a depth of 42 feet within the river, and at 44 feet south of the mouth to deep water. The width of the channel from Lower Swash northwards is 400 feet. The Battery Island, Southport Channel, and Smith Island Range sections are widened to 500 feet. The inshore channel at the Military Ocean Terminal at Sunny Point, shown at the top of the chart, is maintained at a depth of 32 feet. 2

4 The configuration of this channel follows the natural channel in the Cape Fear River. However, when first measured in Colonial times the depth of the river in the natural channel was three to six feet; the entrance to the river over the bar was ten feet deep. The present depth and dimensions of the channel are the result of this succession of dredging projects: 3

5 All of those projects followed the natural course of the river, which includes these turns near the river mouth: 4

6 The Wilmington District of the US Army Corps of Engineers initiated a project called the Wilmington Harbor Deepening project in 2000 to increase the depth of the channel from 38 to 42 feet. The channel was opened at a depth of 42 feet in Certain aspects of the project environmental mitigation and dredging of a turning basin at the Port of Wilmington remain in progress, and are planned for completion in The charts presented above reflect the dimensions and course of the channel resulting from that project. In the 1996 feasibility study leading to that project, the issue of the channel turns arose. The design vessel for that study and engineering analysis was a Panamax vessel the largest vessel then able to transit the Panama Canal with an overall length of 965 feet, beam of 106 feet, and design draft of 39 feet. Such a vessel raised issues of the configuration of the turns in the channel, which follows the natural course of the river. In Appendix D, Engineering and Design, to the Record of Decision released for that project in 1996, the Wilmington District compared the turns to the recently released criteria for channel turns in the Corps of Engineers Engineering Manual : Some of the turns did not fit the new criteria as far as the combinations of turn deflection angle and ratio of turn radius to ship length. It was decided that the authorized turn designs were adequate at this time. The turn widths will be studied during preparation of the plans and specifications as part of the ship simulation model. Although not mentioned, the turn in question is the turn at Battery Island. Moving downriver, this has a 65-degree turn immediately followed by a 30-degree turn, resulting in a 95-degree change of direction for vessels using the channel. This is immediately followed by a reverse turn to pass through the river mouth at Bald Head Island. The Corps of Engineers arranged for tests to be conducted at a private ship simulator, the Raymond T. McKay Simulation Training and Research Center at Dania, Florida, in The facility has a full-size mockup of a ship s bridge, and the ability to simulate response of a vessel in a programmed channel configuration under various conditions of current. Test runs were conducted for a design vessel of 950 feet overall length and 106-foot beam, drawing 38 or 42 feet, in both ebb and flood tides. In all runs, five for each test condition, the vessels left the marked channel. Although in a few runs grounding would have occurred, most runs were without incident because the naturally deep water on the outside of the marked channel provided the necessary space to execute the turn. At the suggestion of the pilots conducting the tests, a widener was added to the apex of the turn between Bald Head Shoal and Smith Island Range. Otherwise, the project proceeded with the original design of the channel configuration. This issue was not addressed in a later report, an Environmental Assessment issued by the Wilmington District in February 2000 for modifications of the alignment of the offshore part of the channel. A composite diagram of the simulation runs conducted with an inbound vessel of 42- foot draft in flood tide is shown on the next page. 5

7 6

8 Experience The S turn has caused difficulty since the larger Panamax vessels began using the river after the channel was opened at the 42-foot depth. The problems with this configuration were addressed in a recent Corps of Engineers report, the Wilmington Harbor Initial Appraisal ( section 216 report ) dated July 2010: This turn is problematic for certain container vessels under specific conditions of wind and tide. These particular vessels are being forced to delay their transit and await favorable tide conditions in order to serve the harbor. These delays are expensive and result in increased transportation costs. Certain vessels are being subject to draft restrictions as a result of this turn (see Attachment 1). Contributing factors influencing safe maneuvering of these ships through the channel include the ship handling characteristics and size, channel configuration, tide conditions, and inbound or outbound transit operation. The handling characteristics of certain companies' container ships are less responsive than other container ships of the same class. Turning these ships is challenging due to the dimensions of the turn and the adjacent channels. Battery Island Channel is 2,589 feet long with a 30 degree, 36 minute turn angle at the southern end and a 65 degree, 3 minute turn angle at the northern end. Given the dimensions of the channel and a combined north and south turning maneuver of95 degree, 39 minute, safely navigating these ships through the Battery Island Channel, and the turns at either end, is an extremely complex maneuver. Strong ebb and flood tidal currents significantly affect ship maneuverability. The most difficult transit of the Battery Island Channel occurs when a ship is inbound with a maximum ebb tide current. These issues have resulted in vessel delays and issues of vessel safety in serving the Port of Wilmington. The river pilots have been obliged to impose draft restrictions on the larger vessels calling at Wilmington. With that precaution, the Cape Fear River pilots have been able to pilot the two Panamax vessels calling at Wilmington each week around that turn. By starting the turn at or outside the outer edge of the channel (and perhaps using bank effects to help start the turn), clipping the inside apex of the turn and finishing the turn at or outside the outer edge, pilots have been able to fit the arc of a turn with a radius of about 3000 feet, about three times the length of a Panamax vessel, into the space available in the river, if not in the marked channel. But not always. The turn is challenging, with no room for error, and there have been groundings. Coast Guard records show three grounding incidents in the Cape Fear River since the channel was opened at the new depth in One grounding, the Lijnbaansgrach in August 2005, occurred at the Battery Island turn. 7

9 Corps of Engineers Standards for Channel Turns The Corps of Engineers Engineering Manual, Hydraulic Design of Deep Draft Navigation Projects, in chapter 8, has this table of recommendations for channel turns: 8

10 Looking at the two turns around Battery Island, we find these discrepancies between the recommended configuration for such vessels and the actual channel: Deflection Configuration Radius Turn Angle Recommended Actual Recommended Actual Southport Channel- Battery I. Channel 30 Apex Angle Battery I. Channel Lower Swash 65 Circle Cutoff 9650 feet 1280 feet 1 The most troublesome of these discrepancies is the radius of the 65 turn between Battery Island Channel and Lower Swash. (Shown on the right.) Instead of the recommended radius of ten times the ship length, the turn has a radius only slightly longer than the length of the design vessel, 965 feet. The Corps of Engineers manual advises that Channel turns should not be designed for turn radius-to-ship length ratios less than 3, because ships cannot hydrodynamically maneuver around a sharper turn. This is consistent with the the standard for maneuverability of the International Maritime Organization (IMO), which requires vessels to have a maximum turning circle with a radius of 2.5 times the ship length, at 35 degrees rudder angle (or the maximum angle, if less). However, the IMO standard relates to open water turns at speed; there are not any standards for the turning circle at reduced speed in shallow water. 1 This is approximate. The turn is not a circle, but a 65 intersection of straight channel sections, with a cutoff of approximately 1000 feet at the inside feet is the radius of a channel arc of the required width that would fit within the part enlarged by the cutoff, connecting the straight sections. 9

11 The dilemma for the Wilmington District of the Corps of Engineers was that a channel conforming to the recommendations and standards for width and turns cannot be fit between the banks of the Cape Fear River. This is demonstrated by the line on this chart, which represents the centerline of a channel conforming to the recommendations for turn radius. (But this line does not have a transition zone between reverse curves a straight section of five times vessel length is recommended by the Corps of Engineers manual.) 10

12 The PIANC Design Guide A working group of the Permanent International Association of Navigation Congresses (PIANC) and the International Association of Ports and Harbors (IAPH) developed and published in 1997 a design guide: Approach Channels, a Guide for Design. This is more comprehensive than the section of the Corps of Engineers manual, taking into account many factors and explaining the rationale in some detail. The Corps is a member of PIANC. The PIANC guidelines offer this advice:! Vessel maneuverability diminishes with channel depth. Although a vessel with good maneuverability may be able to execute a hard-over turn with a radius of two to three times vessel length in deep water, that radius increases to about five times vessel length in a shallow channel with a depth to vessel draft ratio of 1.1 (a depth of 44 feet for a vessel draft of 40 feet).! Designing a channel turn for hard-over turns is inadvisable. Designing for no more than 20 rudder is recommended to provide a margin of safety. For a water depth to draft ratio of 1.1, the recommended radius at 20 rudder angle is 8.5 times vessel length.! Bank interaction, a phenomenon that causes the stern of the vessel to be drawn to the side of a dredged channel and results in instability, must be taken into account in determining channel width. For the design vessel used by the Corps of Engineers for the 1996 study, 965-foot length and 106-foot beam, application of the PIANC guidelines would require a minimum turn radius of 8200 feet, with a width of 500 feet. The channel turn from Battery Island Channel to Lower Swash, with an effective radius of 1000 feet, is far sharper than the recommended radius. Increasing the assumed rudder angle from 20 to 30 (which PIANC does not recommend) would reduce the necessary radius to 6000 feet, still much greater than the actual turn. The CH2M Hill, Inc., Cut-through Recommendation The North Carolina State Ports Authority engaged CH2M Hill, Inc., a respected engineering firm with experience in port projects, to provide preliminary engineering analysis of the proposed North Carolina International Terminal and related infrastructure. In establishing design parameters, the firm selected as the design vessel the latest generation of container ships, such as the Emma Maersk, with a length overall of 1263 feet, a beam of 185 feet, drawing 50 feet of water when fully loaded. In the firm s Conceptual Dredging Study, provided to the State Ports Authority in 2008, channel dimensions of 52.5 foot depth and 600-foot width were determined for the design vessel. The matter of the channel turn was addressed: A recent engineering manual (USACE EM , Hydraulic Design of Deep Draft Navigation Projects, Chapter 8 Channel Width,

13 APPENDIX B) was used as the basis for the channel width and channel curves. One-way ship traffic was the design criterion for determining channel width. The existing channel into the Cape Fear River has a dramatic S curve in the first 4 miles inside the inlet. Once a ship passes through Baldhead and Jaybird Shoals, it makes a 45-degree turn to port, immediately followed by a 105-degree turn to starboard around Battery Island, before straightening into the channel reach known as the Lower Swash Channel and heading upriver. This area is known to have a high current state on both the incoming and falling tide. Multiple attempts were made to design a channel that followed the existing course; however, it was found that the standards in Chapter 8 of the manual (USACE, 2006) could not be met without causing obvious impacts at the east end of Caswell Beach or the riverfront at Southport. Another consulting team, TEC Inc. and PF Richardson Associates, engaged to find ways to reduce the cost of the planned container terminal, reached the same conclusion: And: With assistance from Gahagan and Bryant Associates, Inc.(GBA) and references to USACE Channel Width Design Manual, it was concluded that this alignment did not meet USACE design standards and there were no viable modifications that could be performed to meet these standards. According to USACE Engineering Manual EM , reverse turns (Sbends) require a straight segment at least five times the design ship length between successive turns. This is not possible to accomplish within the confinements of the existing waterway In 2011, Moffatt & Nichol revisited the issue in the NCSPA Port Business Case Project prepared for the North Carolina State Ports Authority. Using ship simulation software developed by Maritime Research Institute Netherlands, Moffatt & Nichol tested an existing container ship of the type currently calling at the Port of Wilmington (950 foot length, 106 foot beam) and a future vessel with a capacity of 8000 twenty-foot equivalent units (TEU), 1043 foot length and 140-foot beam. Tests were run inbound and outbound, with and without wind and tide. Moffatt & Nichol reported that The SHIPMA numerical modeling tool indicates that the existing channel alignment at the Battery Island Reach is not satisfactory to safely transit an 8,000 TEU vessel. In the simulation, the larger vessel was obliged to follow a path 264 feet outside of the channel boundary at the apex of the turn. In all cases, the vessels reached or breached the boundaries of the channel. The table below shows the minimum channel width and turn radius the Corps of Engineers manual and the PIANC guidelines would require for the CH2M Hill design vessel, and for the slightly narrower new Panamax vessel that would be able to transit the Panama Canal after the new locks and other improvements are completed, sometime after Such a vessel would also be about 1260 feet in overall length, but the beam would be 160 feet. Design Vessel Channel Width Minimum Turn Radius Corps of Engineers PIANC Corps of Engineers PIANC CH2M Hill design vessel 800 feet 700 feet 12,600 feet 10,700 feet New Panamax ,600 10,700 12

14 This chart shows the path of the centerline of a channel with turns conforming to the Corps of Engineers manual for the design vessel for the planned container terminal. Although it is evident that a conforming turn cannot be fit in the confines of the river, this diagram does not show a transition zone to recover from a turn in one direction before beginning a turn in the opposite direction. The Corps of Engineers manual specifies a straight section of five times vessel length between such turns, in this case 6300 feet. 13

15 The observations of CH2M Hill, Inc., and TEC/PFRichardson that a conforming channel cannot be fit within the banks of the river at the turn between Southport and Battery Island is quite obviously correct. Even if the existing channel at the intersection of the Battery Island Channel and Lower Swash could be widened to 600 feet by enlarging it on the outside, a full-width channel with a radius of only about 1400 feet could be accommodated, only a fraction of the recommended radius. However, just as in the case of the existing channel, by using the entire width of the widened channel a path 160 feet wide with a radius of 4000 feet can be followed, starting at the outside edge of the straight section leading to the turn, clipping the inside at the apex, and completing the turn at the outside edge of the straight section after the exit. Whether a 1260-foot vessel can turn in a radius of 4000 feet without tugboat assistance is another matter. Such a turn would be much sharper than specified by the Corps manual and the PIANC design guide. There is also the issue, not mentioned by CH2M Hill, Inc., of three Civil War era shipwrecks lying along the side of the channel in this area. All are regarded as being of archeological interest by the North Carolina Department of Cultural Resources. One is the CSS North Carolina, one of two ironclads built in Wilmington. That has already been damaged by dredging operations. As for the riverbank on the outside of Lower Swash, where a conforming turn would have to be cut, that is occupied by the historic district of the City of Southport, which district is on the National Register of Historic Places. That district includes two buildings on the Register, including Fort Johnston, which dates to the Colonial era. CH2M Hill, Inc., consequently recommended a new channel on the east side of Battery Island, by-passing the S-curve. That is shown below (red): This was not a conclusion reached without some concern. The proposed route would be through undisturbed areas with depths measured in single digits. The additional dredging involved would be much more expensive than simply enlarging the existing channel. That portion of the river is part of the John H. Chaffee Coastal Barrier Resource System, a Federal reserve, and the Bald Head Island Natural Area, a State reserve. There would be significant implications for environmental effects from loss of habitat and the increase in tidal amplitude that would result from creating this large, direct path up the river. 14

16 Conclusion The existing channel in the Cape Fear River cannot be widened sufficiently to accommodate larger vessels than now navigate the river. Indeed, the channel is not adequate for those vessels. This is not a healthy situation. In a recent paper presented to the New York Metropolitan Section of the Society of Naval Architects and Marine Engineers, the authors, staff members of the Naval Academy, the Coast Guard, and the Maritime Administration, pointed out that as vessel size has increased, channels have been dredged deeper, but not wider, and maneuverability issues have not been adequately addressed. This is a particular problem with container ships. The authors identified these problems with newer generations of such ships:! Container ships have large windage that can complicate ship controllability in narrow channels as well as during slow speed maneuvering;! Increases in service speeds may also increase the bare steerage speed. Direct-drive diesel ships with high installed power to achieve design service speeds can, in some cases, have a minimum bare steerage speed of about 8 knots quite a high speed in confined waters;! Even the largest container ships usually have single screws, a maneuvering handicap.! There is a trend to smaller rudders. While such rudders may be adequate at service speeds in open water, maneuverability in confined waters at low speed is compromised.! Marine architects are taking advantage of the beam increases that will be possible with the opening of new locks in the Panama Canal to decrease the ratio of vessel length to beam, which improves load capacity without increasing draft. However, decreasing that ratio also decreases directional stability. Although this makes it easier to initiate a turn, it also makes it more difficult to check a turn. Thus while the inadequacies of the channel in the Cape Fear River and the difficulties of maneuvering large container ships so far have been overcome by skillful piloting, this conflict should not be exacerbated by opening this channel to even larger vessels. Groundings are usually only inconvenient, but if the channel is deepened into the rock that lies at the bottom in many places, the risk of hull damage to the deepest draft vessels and consequent spills must be considered. To create access to the site of the proposed North Carolina International Terminal for the post-panamax container ships for which it is intended, a new channel would be required over a different alignment east of the lower reaches of the existing channel. This does not constitute an endorsement of such a new channel. Such a new channel would introduce substantial environmental and economic problems, which may overwhelm any potential benefits from admitting larger ships to the Cape Fear River. There are clear indications that the succession of channel deepening projects over the years has exhausted the capacity of the Cape Fear River for more deepening. The most notable effect is that on beaches of Bald Head Island and Caswell Beach, at the mouth of the river. Those beaches had remained stable and even grown through the centuries, but as the channel in the Cape Fear River was enlarged, the beaches have lost sand and now require regular nourishment by adding sand dredged from the ocean bottom and from the channel. 15

17 Sources CH2M Hill, Inc., Conceptual Dredging Study, North Carolina State Ports Authority (2008). William O. Gray, Jennifer Waters, Alan Blume, and Alexander C. Landsburg, Channel Design and Vessel Maneuverability - Next Steps (2002) International Maritime Organization, Standards for Ship Manoeuverability, Resolution MSC.137(76) (2002). Moffatt & Nichol, NCSPA Port Business Case Project (2011). Permanent International Association of Navigation Congresses (PIANC), Approach Channels, a Guide for Design, Final Report of the Joint Working Group PIANC-IAPH, Supplement to Bulletin No. 95 (1997). TEC Inc./PF Richardson Associates, North Carolina International Terminal, Review of Planning Concepts and Privatization Options (2010). United States Army Corps of Engineers, Deep-Draft Coastal Navigation Entrance Channel Practice, Coastal and Hydraulic Engineering Technical Note IX-1 (1999). United States Army Corps of Engineers, Hydraulic Design of Deep Draft Navigation Projects, Chapter 8 Channel Width APPENDIX B (USACE EM , 2006) United States Army Corps of Engineers, Wilmington District, Record of Decision, Cape Fear Northeast Cape Fear Rivers Comprehensive Study, Appendix D, Engineering and Design (1996). United States Army Corps of Engineers, Wilmington District, Section 905(b) Analysis, Wilmington Harbor Navigation Improvements, North Carolina International Terminal (2011) United States Army Corps of Engineers, Wilmington District, Wilmington Harbor Initial Appraisal (2010). 16

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters Transport Infrastructure Act 1994 Gladstone Ports Corporation Port Notice 04/17 LNG Vessel Operating Parameters 1. These operating parameters have been developed based on navigation simulations with LNG

More information

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch CORPS ON THE COAST North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, 2015 Jim Medlock Chief, Programs Management Branch US Army Corps of Engineers OVERVIEW What Are The Corps

More information

WOODFIBRE LNG VESSEL WAKE ASSESSMENT

WOODFIBRE LNG VESSEL WAKE ASSESSMENT Woodfibre LNG Limited WOODFIBRE LNG VESSEL WAKE ASSESSMENT Introduction Woodfibre LNG Limited (WLNG) intends to build a new LNG export terminal at Woodfibre, Howe Sound, British Columbia. WLNG has engaged

More information

World Shipping Council. U.S. Coast Guard. Port Access Route Study: The Atlantic Coast From Maine to Florida

World Shipping Council. U.S. Coast Guard. Port Access Route Study: The Atlantic Coast From Maine to Florida Comments of the World Shipping Council Submitted to the U.S. Coast Guard In the matter of Port Access Route Study: The Atlantic Coast From Maine to Florida Docket Number: USCG-2011-0351 April 13, 2016

More information

ROYAL VANCOUVER YACHT CLUB

ROYAL VANCOUVER YACHT CLUB ROYAL VANCOUVER YACHT CLUB PROPOSED EXPANSION PROJECT NAVIGATION CHANNEL DESIGN COAL HARBOUR Prepared for: Royal Vancouver Yacht Club Prepared by: Typlan Consulting Ltd. March 2016 Page 1 of 17 March 23,

More information

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida Final Report Submitted By Ping Wang, Ph.D., Jun Cheng Ph.D., Zachary Westfall, and Mathieu Vallee Coastal Research Laboratory

More information

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017 Commander United States Coast Guard Sector New York 212 Coast Guard Drive Staten Island, NY 10305 Staff Symbol: (spw) Phone: (718) 354-2353 Fax: (718) 354-4190 COAST GUARD ADVISORY NOTICE (CGAN 2017-016)

More information

New Locks Alignment at the Pacific Side. Alignment PMD

New Locks Alignment at the Pacific Side. Alignment PMD New Locks Alignment at the Pacific Side Alignment PMD CHAPTER 1 BACKGROUND Several alignments have been proposed for the construction of a new lane of locks at the Pacific side of the Panama Canal. In

More information

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION TO: All Shipping Agents and Interested Parties January 19, 2017 SUBJECT: Anchorage

More information

MAC Transit Advisories as of April 30, 2018

MAC Transit Advisories as of April 30, 2018 MAC Transit Advisories as of April 30, 2018 The Mariners Advisory Committee for the Bay and River Delaware was established in October 1964. Its members and associate members are mainly comprised of master

More information

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP) MOREHEAD CITY HARBOR, NC Dredged Material Management Plan (DMMP) Public Meeting/Info Session 15 January 2014 US Army Corps of Engineers Morehead City Harbor DMMP Presentation Topics Morehead City Harbor

More information

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA 1. PROJECT PURPOSE AND NEED 1.1. PROJECT AUTHORITY. 1.1.1. INITIAL AUTHORIZATION.

More information

A methodology for evaluating the controllability of a ship navigating in a restricted channel

A methodology for evaluating the controllability of a ship navigating in a restricted channel A methodology for evaluating the controllability of a ship navigating in a restricted channel K. ELOOT A, J. VERWILLIGEN B AND M. VANTORRE B a Flanders Hydraulics Research (FHR), Flemish Government, Antwerp,

More information

World Shipping Council. Bureau of Ocean Energy Management U.S. Department of the Interior

World Shipping Council. Bureau of Ocean Energy Management U.S. Department of the Interior Comments of the World Shipping Council Submitted to the Bureau of Ocean Energy Management U.S. Department of the Interior In the matters of Commercial Leasing for Wind Power Development on the Outer Continental

More information

COURSE OBJECTIVES CHAPTER 9

COURSE OBJECTIVES CHAPTER 9 COURSE OBJECTIVES CHAPTER 9 9. SHIP MANEUVERABILITY 1. Be qualitatively familiar with the 3 broad requirements for ship maneuverability: a. Controls fixed straightline stability b. Response c. Slow speed

More information

Implications of proposed Whanganui Port and lower Whanganui River dredging

Implications of proposed Whanganui Port and lower Whanganui River dredging PO Box 637 Wanganui 4540 Attention: Rowan McGregor Dear Rowan 1 Summary We understand that it has been proposed to bring large vessels into the Port at Whanganui requiring the excavation of a channel up

More information

Simulating Narrow Channel Effect on Surge Motion of a Ship in a Virtual Environment

Simulating Narrow Channel Effect on Surge Motion of a Ship in a Virtual Environment Simulating Narrow Channel Effect on Surge Motion of a Ship in a Virtual Environment Chethaka Uduwarage Chamath Keppitiyagama Rexy Rosa Nihal Kodikara Damitha Sandaruwan Chathura Gunasekara ICTer2012-13

More information

Channel Design and Vessel Maneuverability - Next Steps 1 WHEN SHIPS GET TOO BIG FOR THEIR DITCHES - GRAY 2

Channel Design and Vessel Maneuverability - Next Steps 1 WHEN SHIPS GET TOO BIG FOR THEIR DITCHES - GRAY 2 Channel Design and Vessel Maneuverability - Next Steps 1 WHEN SHIPS GET TOO BIG FOR THEIR DITCHES - GRAY 2 William O. Gray, 3 Jennifer Waters, 4 Alan Blume, 5 and Alexander C. Landsburg 6 Several tugs

More information

C C S Technical Information

C C S Technical Information C C S Technical Information (2014) Technical Information No.7 Total No.129 Jan.28,2014 (Total 3+5+1 pages) To: CCS Surveyors, Plan Approval Surveyors, Relevant Ship Companies, Shipyards and Design Institutes

More information

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3 and 7 DATE: 23 February 2015 1.

More information

Figure 4, Photo mosaic taken on February 14 about an hour before sunset near low tide.

Figure 4, Photo mosaic taken on February 14 about an hour before sunset near low tide. The Impact on Great South Bay of the Breach at Old Inlet Charles N. Flagg and Roger Flood School of Marine and Atmospheric Sciences, Stony Brook University Since the last report was issued on January 31

More information

WINDING HOLES towards a specification for the ideal turning place

WINDING HOLES towards a specification for the ideal turning place WINDING HOLES towards a specification for the ideal turning place Introduction The term winding hole is normal in the narrow canal network, and on adjoining broad canals, for a space in which to turn a

More information

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal James Rosati III Ashley E. Frey CPT Grays Harbor, WA Wood Wood chips Flour Other CMS Shark River Inlet, NJ US Army Corps

More information

SIMULATION OF SHIP TO SHORE INTERACTION IN SHALLOW AND NARROW WATERS

SIMULATION OF SHIP TO SHORE INTERACTION IN SHALLOW AND NARROW WATERS SIMULATION OF SHIP TO SHORE INTERACTION IN SHALLOW AND NARROW WATERS Petru Sergiu ȘERBAN 1 Valeriu Nicolae PANAITESCU 2 1 PhD Student, Department of Navigation and Naval Transport, Mircea cel Bătrân Naval

More information

PHYSICAL MONITORING WILMINGTON HARBOR NAVIGATION PROJECT REPORT 1: August 2000 June 2003

PHYSICAL MONITORING WILMINGTON HARBOR NAVIGATION PROJECT REPORT 1: August 2000 June 2003 PHYSICAL MONITORING WILMINGTON HARBOR NAVIGATION PROJECT REPORT 1: August 2000 June 2003 AUGUST 2004 For questions or comment, contact Project Manager, Ms. Sharon Haggett, 910-251-4441 EXECUTIVE SUMMARY

More information

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG CORPS FACTS Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Disaster Response Sedimentation in the channel is caused by the normal cycle of silt movement, erosion from high water or heavy

More information

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background...

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background... Chapter 4 EM 1110-2-1100 THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents I-4-1. Background... Page I-4-1 a. Shore Protection Planning and Design, TR 4... I-4-1 b. Shore

More information

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3 and 7 DATE: 23 February 2015 1.

More information

Chittagong, Bangladesh (Asia Region)

Chittagong, Bangladesh (Asia Region) General Information: Port Information (Asia Region) Extract of port information from Chittagong Port Authority: The Port of Chittagong is the principal Port of the People's Republic of Bangladesh. It is

More information

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D.

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D. EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA Mohamed A. Dabees 1 and Brett D. Moore 1 The paper discusses the analysis of up-drift beach erosion near selected

More information

SHIP NAVIGATION SIMULATION STUDY MIAMI HARBOR NAVIGATION IMPROVEMENT PROJECT, MIAMI, FLORIDA. For Public Release; Distribution Unlimited

SHIP NAVIGATION SIMULATION STUDY MIAMI HARBOR NAVIGATION IMPROVEMENT PROJECT, MIAMI, FLORIDA. For Public Release; Distribution Unlimited 91 4 3 5 AD-A2 4 569TECHNICAL REPORT HL-91-6 SHIP NAVIGATION SIMULATION STUDY MIAMI HARBOR NAVIGATION IMPROVEMENT PROJECT, MIAMI, FLORIDA by J. Christopher Hewlett \ Hydraulics Laboratory -L-._.. \ \ DEPARTMENT

More information

(Refer Slide Time: 00:32)

(Refer Slide Time: 00:32) Port and Harbour Structures By Prof R. Sundaravadivelu Department of Ocean Engineering, Indian Institute of Technology Madras Module 8, Lecture 43 Detailed Project Report So last class we discussed about

More information

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3, 7 DATE: 23 April 2018 1. AUTHORIZATION:

More information

Chapter 22, Section 1 - Ocean Currents. Section Objectives

Chapter 22, Section 1 - Ocean Currents. Section Objectives Chapter 22, Section 1 - Ocean Currents Section Objectives Intro Surface Currents Factors Affecting Ocean Currents Global Wind Belts (you should draw and label a diagram of the global wind belts) The Coriolis

More information

Ship Navigation Simulation Study, Port Jersey Channel, Bayonne, New Jersey

Ship Navigation Simulation Study, Port Jersey Channel, Bayonne, New Jersey Technical Report HL-96-19 September 1996 US Army Corps of Engineers Waterways Experiment Station Ship Navigation Simulation Study, Port Jersey Channel, Bayonne, New Jersey Volume I: Main Text by Michelle

More information

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING A. DISCUSSION: For the most part, projects that involve dredging and construction require a comprehensive design and review process

More information

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 Agenda Item 3 Accidents and ship traffic in the Baltic Sea Document

More information

Building Beaches with Navigation Sand, Just Don t Forget the Dunes!!

Building Beaches with Navigation Sand, Just Don t Forget the Dunes!! Building Beaches with Navigation Sand, Just Don t Forget the Dunes!! Ken Willson Kenneth.Willson@CBI.com Introduction Decrease in Federal Funding (Shallow Draft Navigation Maintenance and Shore Protection)

More information

The Impact on Great South Bay of the Breach at Old Inlet Charles N. Flagg School of Marine and Atmospheric Sciences, Stony Brook University

The Impact on Great South Bay of the Breach at Old Inlet Charles N. Flagg School of Marine and Atmospheric Sciences, Stony Brook University The Impact on Great South Bay of the Breach at Old Inlet Charles N. Flagg School of Marine and Atmospheric Sciences, Stony Brook University The previous report provided a detailed look at the conditions

More information

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) Brazos Island Harbor, Texas Channel Improvement Study FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT This page is intentionally left

More information

State of Texas Operations and Maintenance

State of Texas Operations and Maintenance State of Texas Operations and Maintenance Barbour Terminal Ship Channel The Barbour Terminal Channel and Turning Basin is a 1.7-mile-long deep draft waterway that extends from the Houston Ship Channel

More information

VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL NUMBER AND ORDER OF VESSELS IN THE SCHEDULE

VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL NUMBER AND ORDER OF VESSELS IN THE SCHEDULE VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL This document intends to provide our clients with a better understanding of vessel scheduling in the Panama Canal. For any questions not addressed in this

More information

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. GZA GeoEnvironmental, Inc. Engineers and Scientists October 17, 2014 File No. 18.0171857.00 Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. 01929 DRAFT Re: Essex River

More information

Impact of Dredging the Lower Narrow River on Circulation and Flushing

Impact of Dredging the Lower Narrow River on Circulation and Flushing Impact of Dredging the Lower Narrow River on Circulation and Flushing Craig Swanson Ph.D. Swanson Environmental Alex Shaw Ocean Engineering, URI Prof. Malcolm L. Spaulding Ocean Engineering, URI 29 January

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

A New Strategy for Harbor Planning and Design

A New Strategy for Harbor Planning and Design A New Strategy for Harbor Planning and Design Xiuying Xing, Ph.D Research Associate Sonny Astani Department of Civil and Environmental Engineering University of Southern California Los Angeles, CA 90089-2531

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

Passing Vessel Analysis in Design and Engineering. Eric D. Smith, P.E. Vice President, Moffatt & Nichol

Passing Vessel Analysis in Design and Engineering. Eric D. Smith, P.E. Vice President, Moffatt & Nichol moffatt & nichol Passing Vessel Analysis in Design and Engineering Eric D. Smith, P.E. Vice President, Moffatt & Nichol Passing Vessel Analysis in Port Engineering and Design Passing Vessel Effects Data

More information

SURGE SUPPRESSION ACHIEVED BY DIFFERENT COASTAL SPINE (IKE DIKE) ALIGNMENTS. Bruce A. Ebersole, Thomas W. Richardson and Robert W.

SURGE SUPPRESSION ACHIEVED BY DIFFERENT COASTAL SPINE (IKE DIKE) ALIGNMENTS. Bruce A. Ebersole, Thomas W. Richardson and Robert W. SURGE SUPPRESSION ACHIEVED BY DIFFERENT COASTAL SPINE (IKE DIKE) ALIGNMENTS Abstract Bruce A. Ebersole, Thomas W. Richardson and Robert W. Whalin, Jackson State University, Jackson, Mississippi The primary

More information

Wexford Harbour. Yachting Guide. Navigation

Wexford Harbour. Yachting Guide. Navigation Wexford Harbour Yachting Guide Navigation This document supersedes all previous editions. Approvals: Yacht Club Committee April, 2015 Wexford Board of Directors April, 2015 # Date Section Revision 1 6.5.2015

More information

Figure 1 Figure 1 shows the involved forces that must be taken into consideration for rudder design. Among the most widely known profiles, the most su

Figure 1 Figure 1 shows the involved forces that must be taken into consideration for rudder design. Among the most widely known profiles, the most su THE RUDDER starting from the requirements supplied by the customer, the designer must obtain the rudder's characteristics that satisfy such requirements. Subsequently, from such characteristics he must

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

World Shipping Council. Bureau of Ocean Energy Management

World Shipping Council. Bureau of Ocean Energy Management Comments of the World Shipping Council Submitted to the Bureau of Ocean Energy Management In the matter of Potential Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore New

More information

5.0 Channel Design and Alternatives

5.0 Channel Design and Alternatives 5.0 Channel Design and Alternatives The dimensions of the navigational areas such as approach channel, manoeuvring areas, anchorage, etc. are based on the type and size of the vessel envisaged to visit

More information

CHAPTER 134 INTRODUCTION

CHAPTER 134 INTRODUCTION CHAPTER 134 NEW JETTIES FOR TUNG-KANG FISHING HARBOR, TAIWAN Chi-Fu Su Manager Engineering Department Taiwan Fisheries Consultants, Inc. Taipei, Taiwan INTRODUCTION Tung-Kang Fishing Harbor, which is about

More information

Use of AIS and AISAP for Analysis of Vessel Wakes in Charleston Harbor: A Case Study

Use of AIS and AISAP for Analysis of Vessel Wakes in Charleston Harbor: A Case Study Use of AIS and AISAP for Analysis of Vessel Wakes in Charleston Harbor: A Case Study by Brandan Scully and Anne McCartney PURPOSE: This Coastal and Hydraulics Engineering Technical Note (CHETN) describes

More information

Terrestrial Observations Chart Plot - Chesapeake Bay Entrance - Operational Level

Terrestrial Observations Chart Plot - Chesapeake Bay Entrance - Operational Level USCG 00326-NP-5 The following questions are based on chart 12221TR, Chesapeake Bay Entrance, and the supporting publications. The draft of your tow is 27 feet (8.2 meters). Use 10 W variation where required.

More information

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships By KATE ASCHERMARCH 21, 2014 Advertisement When it opened in 1931, the Bayonne Bridge with its parabolic arch connecting Staten

More information

Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs.

Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs. Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs. PANELISTS: Paul Amos: President, Columbia River Pilots. Larry

More information

World Shipping Council. National Oceanographic and Atmospheric Administration

World Shipping Council. National Oceanographic and Atmospheric Administration Comments of the World Shipping Council Submitted to the National Oceanographic and Atmospheric Administration In the matter of Endangered and Threatened Species; Petition for Rulemaking to Establish a

More information

CRC Inlet Management Study. Matt Slagel Shoreline Management Specialist

CRC Inlet Management Study. Matt Slagel Shoreline Management Specialist CRC Inlet Management Study Matt Slagel Shoreline Management Specialist Study Origin CRC shall study feasibility of creating new AEC for lands adjacent to mouth of Cape Fear River (HB 819) Collaborate with

More information

Oceans and Coasts. Chapter 18

Oceans and Coasts. Chapter 18 Oceans and Coasts Chapter 18 Exploring the oceans The ocean floor Sediments thicken and the age of the seafloor increases from ridge to shore The continental shelf off the northeast United States Constituent

More information

TICES TO MARINERS 1 TO 46 ANNUAL EDITION 2018 SECTION A AIDS TO NAVIGATION AND MARINE SAFETY

TICES TO MARINERS 1 TO 46 ANNUAL EDITION 2018 SECTION A AIDS TO NAVIGATION AND MARINE SAFETY A5 NAVIGATION SAFETY 10 Routeing of Ships 1 GENERAL 1.1 Rule 10 of the Collision Regulations applies to all ships navigating in or near a routeing system. 1.2 The information on ships' routeing in this

More information

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby Ping Wang and Tiffany M. Roberts Coastal Research Laboratory University of South Florida July 24, 2012 Introduction

More information

Figure 1 Example feature overview.

Figure 1 Example feature overview. 1. Introduction This case focuses on the northeastern region of Onslow Bay, NC, and includes an initial shoreline, regional contour, wave gauges, inlets, dredging, and beach fills. Most of the features

More information

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST Lake Cathie Progress Association Inc. ABN 28 251 433 854 P.O. Box 247 Lake Cathie NSW 2445 PHONE/FAX: 02 6584 8211 EMAIL: r3packag@bigpond.com 20 th October 2009 Port Macquarie Hastings Council PO Box

More information

WHAT IS IMPACT OF PANAMA CANAL WIDENING?

WHAT IS IMPACT OF PANAMA CANAL WIDENING? WHAT IS IMPACT OF PANAMA CANAL WIDENING? Introduction One hundred years ago, in 1914, the Panama canal was opened. At the time it was the biggest American engineering project. Ever since it has played

More information

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Minggui Zhou 1, Dano Roelvink 2,4, Henk Verheij 3,4 and Han Ligteringen 2,3 1 School of Naval Architecture, Ocean and Civil Engineering,

More information

Unalaska Navigation Channel Improvements

Unalaska Navigation Channel Improvements 1 237 237 237 255 255 255 0 0 0 Unalaska Navigation Channel Improvements 217 217 217 200 200 200 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56 62 102 130 102 56 48 130 120

More information

Delaware River Vessel Reporting System Mariners Advisory Committee For

Delaware River Vessel Reporting System Mariners Advisory Committee For Delaware River Vessel Reporting System Mariners Advisory Committee For the Bay and River Delaware The Mariner's Advisory Committee is comprised of Master Mariners, River Pilots, and concerns itself with

More information

Mr. Barry Dragon, March 16, 2015 Commander, Seventh Coast Guard District (dob) Brickell Plaza 909 S.E. 1st Ave. Miami, FL

Mr. Barry Dragon, March 16, 2015 Commander, Seventh Coast Guard District (dob) Brickell Plaza 909 S.E. 1st Ave. Miami, FL Mr. Barry Dragon, March 16, 2015 Commander, Seventh Coast Guard District (dob) Brickell Plaza 909 S.E. 1st Ave. Miami, FL 33130-3050 Commander, On behalf of the Florida Council of Yacht Clubs representing

More information

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California by Edward F. Thompson, Inocencio P. DiRamos, and Robert R. Bottin, Jr. PURPOSE: This Coastal and Hydraulics Engineering

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-06-11 Boston Harbor, Massachusetts, Deep-Draft Navigation Improvement Project Feasibility Study Channel Improvement Investigations Dennis W. Webb and Mark L. Habel August 2006 Coastal and Hydraulics

More information

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD ST. LOUIS SECTION PROJECT OF THE YEAR AWARD Originality and Innovation The St. Louis Harbor Project is located in the Upper Mississippi River between the entrance to the Chain of Rocks Canal at River

More information

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006 MSC 82/24/Add.2 RESOLUTION MSC.235(82) CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006 THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization

More information

International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g.

International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g. International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g. wind farms) Introduction This is a summary of the most important international

More information

PILOTAGE INFORMATION

PILOTAGE INFORMATION PILOTAGE INFORMATION Revised A PILOTAGE DIRECTIONS The Gloucester Harbour Trustees is the Competent Harbour Authority for the Gloucester Harbour under the Pilotage Act 1987 and responsible for the provision

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX Preventing Damage to Harbour Facilities and Ship Handling in Harbours PART 2 INDEX 1 Vessel handling is based on the basic knowledge that a vessel floats in the water and returns to its original position

More information

Appendix E Cat Island Borrow Area Analysis

Appendix E Cat Island Borrow Area Analysis Appendix E Cat Island Borrow Area Analysis ERDC/CHL Letter Report 1 Cat Island Borrow Area Analysis Multiple borrow area configurations were considered for Cat Island restoration. Borrow area CI1 is located

More information

1/9/2018. City Council City Hall Wilmington, North Carolina Dear Mayor and Councilmembers:

1/9/2018. City Council City Hall Wilmington, North Carolina Dear Mayor and Councilmembers: ITEM O2 OFFICE OF THE CITY MANAGER (910) 341-7810 FAX (910)341-5839 TDD (910)341-7873 1/9/2018 City Council City Hall Wilmington, North Carolina 28401 Dear Mayor and Councilmembers: On March 21, 2017,

More information

3.9 Marine Transportation

3.9 Marine Transportation 3.9 Marine Transportation 3. Affected Environment and Environmental Analysis 3.9 Marine Transportation 3.9.1 Introduction This section describes existing marine vessel transportation within the Port, the

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

SteerCert Objective. Detailed knowledge of Contents of key selected rules from ColRegs and PLA Byelaws Contents of Tideway Rowing Rules

SteerCert Objective. Detailed knowledge of Contents of key selected rules from ColRegs and PLA Byelaws Contents of Tideway Rowing Rules SteerCert Objective Detailed knowledge of Contents of key selected rules from ColRegs and PLA Byelaws Contents of Tideway Rowing Rules Knowledge of Right of way Signals Bridge passing guidelines Overtaking

More information

BookletChart. Sand Key to Rebecca Shoal NOAA Chart A reduced-scale NOAA nautical chart for small boaters

BookletChart. Sand Key to Rebecca Shoal NOAA Chart A reduced-scale NOAA nautical chart for small boaters BookletChart Sand Key to Rebecca Shoal NOAA Chart 11439 A reduced-scale NOAA nautical chart for small boaters When possible, use the full-size NOAA chart for navigation. Published by the National Oceanic

More information

Nome Harbor Page 2 of 12

Nome Harbor Page 2 of 12 Nome Harbor Nome Harbor Page 2 of 12 Condition of Improvements 30 December 2015 Nome Harbor, Alaska (CWIS No. 010422, 012270, 072742, 087755) Authorization (1) Rivers and Harbors Act, 8 August 1917 (House

More information

3.3 OCEANOGRAPHY/COASTAL PROCESSES

3.3 OCEANOGRAPHY/COASTAL PROCESSES 3.3 OCEANOGRAPHY/COASTAL PROCESSES Beaches are dynamic and conditions vary based on the onshore/offshore movement of sand both seasonally and annually. Sand also moves alongshore within a generally defined

More information

Abstract. Introduction

Abstract. Introduction Computer assisted analysis of Aviles Port extension: hydraulic conditions, navigation and training of pilots J.R. Iribarren & J.M. Montero Port Research Program, CEPYC-CEDEX, Antonio Lopez, 81. 28026 Madrid,

More information

The purpose and needs of the Figure Eight Island Inlet and Shoreline Management Project are as follows:

The purpose and needs of the Figure Eight Island Inlet and Shoreline Management Project are as follows: Chapter 2 PURPOSE AND NEEDS 1. What are the purpose and needs of this project? The main concern of residents and owners at Figure Eight Island are economic losses resulting from damages to structures and

More information

Cline s Point Marina Ship Wave Analysis

Cline s Point Marina Ship Wave Analysis Cline s Point Marina Ship Wave Analysis Draft Technical Report April 13, 2015 Submitted To: Port of Corpus Christi Authority Prepared for: Port of Corpus Christi Authority This document is intended for

More information

North Shore of Long Island, Feasibility Study

North Shore of Long Island, Feasibility Study North Shore of Long Island, Asharoken New York Asharoken, Feasibility Study Asharoken, NY Public Meeting June 30, 2015 US Army Corps of Engineers US Army Corps of Engineers New York BUILDING STRONG BUILDING

More information

SECTION II NM 11/13 NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS. Chapter 4 Paragraphs 85 to 86; read: (85)

SECTION II NM 11/13 NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS. Chapter 4 Paragraphs 85 to 86; read: (85) NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS COAST PILOT 1 42 Ed 2012 Change No. 13 LAST NM 9/13 Chapter 4 Paragraph 9; read: (9) Round Rock, which uncovers, and The Boring Stone, 3 feet high and bare,

More information

AK-APC-NTV Operating Procedures for Cargo and Passenger Non Tank Vessels Transiting and Operating in Alaska Waters December 26, 2015

AK-APC-NTV Operating Procedures for Cargo and Passenger Non Tank Vessels Transiting and Operating in Alaska Waters December 26, 2015 AK-APC-NTV Operating Procedures for Cargo and Passenger Non Tank Vessels Transiting and Operating in Alaska Waters December 26, 2015 The Alternative Planning Criteria (APC) Operating Procedures were developed

More information

3.10 TRAFFIC AND CIRCULATION

3.10 TRAFFIC AND CIRCULATION 3.10 TRAFFIC AND CIRCULATION Implementation of the Enhancement Project would require use of the local circulation system for construction activities and operations. This traffic analysis considers the

More information

REGULATORY SCOPING EXERCISE FOR THE USE OF MARITIME AUTONOMOUS SURFACE SHIPS (MASS)

REGULATORY SCOPING EXERCISE FOR THE USE OF MARITIME AUTONOMOUS SURFACE SHIPS (MASS) E MARITIME SAFETY COMMITTEE 100th session Agenda item 5 MSC 100/INF.6 28 September 2018 ENGLISH ONLY REGULATORY SCOPING EXERCISE FOR THE USE OF MARITIME AUTONOMOUS SURFACE SHIPS (MASS) Preliminary analysis

More information

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS 3654-A (OPXI v. 3-2-2011 AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS ADVISORY TO SHIPPING No. A-20-2013 August 2, 2013 TO : All Shipping Agents, Owners, and Operators SUBJECT:

More information

Uncontrolled document if printed.

Uncontrolled document if printed. APPENDIX 3 APPRENTICE PILOT S TRAINING SYLLABUS Issue Date: 16 th March, 2010 Date of Revision: 22nd May, 2013 Revision #2 i THE PURPOSE OF THIS SYLLABUS The purpose of this training syllabus is to ensure

More information

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments Planning Considerations for Nearshore Placement of Mixed Dredged Sediments PURPOSE: Dredging planning and management decisions are based on a combination of engineering and economic factors tempered by

More information

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary MARINE GUIDANCE NOTE MGN 301 (M+F) Manoeuvring Information on Board Ships Note to Shipbuilders, shipowners, ship Managers and Masters This note supersedes Marine Guidance Note MGN 201 (M+F) Summary The

More information

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT Department of the Army New England District, Corps of Engineers 696 Virginia Road

More information