MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

Size: px
Start display at page:

Download "MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE"

Transcription

1 Arizona State University NanoFab MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE Rev A

2 Title: MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE Table of Contents Issue: Rev A Contents Table of Contents Purpose / Scope Reference Documents Equipment / Supplies / Material Safety Set Up Procedures Operation Procedures Process Data Revision History...6 Page 1

3 1. Purpose / Scope 1.1. The Thermco Minibrute tube furnace is used to anneal 4 inch wafers and smaller samples for times greater than five minutes in a controlled ambient of either argon, nitrogen, oxygen, or forming gas (5% H2 / N2) at temperatures up to 700C. This SOP provides the procedures to setup and anneal a film or multiple films on any substrate. 2. Reference Documents none 3. Equipment / Supplies / Material 3.1. Tweezers 3.2. Pushrod and boat 3.3. Insulated gloves 4. Safety 4.1. Follow all safety procedures outlined in the CSSER Handbook 4.2. This system operates at high temperatures (up to 700C) and contact with samples, the boat, the pushrod, and the endcap will result in severe burns if care is not taken. Be extremely careful not to touch any of these parts until sufficient time has been given for them to cool. Seek medical attention for severe burns. 5. Set Up Procedures 5.1. Four gases are available for use in the system: argon, nitrogen, oxygen, or forming gas (5% H2 / N2). There are shutoff valves located on the floor behind the system for the desired gases and these should normally be found in the open positions. Each gas has a toggle valve shutoff and flowmeter (rotometer) on the front panel for user control. Nitrogen will typically be used for purging the tube during heating and cooling steps and sometimes in combination with a process gas during the timed anneal Check the system logbook and temperature readout to confirm that the system is not in use and that the temperature is low enough to safely handle the hardware Temporarily open the gas toggle valves on the front of the system for the gases that will be used and confirm that the purge and process gas flows are set correctly (N2 setting = 50; Ar setting = 70; H2N2 = 3; O2 = variable). Adjust the rotometer needle valves if needed and then shut off the gas toggle valves. 6. Operation Procedures 6.1. Furnace heat-up Turn on both the control and element switches on the front panel. Adjust the exhaust center load setpoints to heat to the desired temperature which will be indicated by the digital readout on top of the system. Control setpoints can be taken from the table below or from user s notes in the logbook and do not directly indicate the temperature. It will take approximately 15 to 20 minutes for the furnace to reach temperature and stabilize. Page 2

4 A calibration T/C measurement can be taken by the staff to provide a more accurate indication of the real sample temperature. This is done by inserting a thermocouple into the core of the tube and measuring the temperature over a +/- 10 cm distance from the system centerpoint. Request help from the NanoFab staff if this needs to be done. Temperature (C) Setpoints Exhaust Center Load Calibration (C) 6.2. Loading Select one of the four quartz boats that is most appropriate for your samples. Load the boat and samples in the cool zone at the load end while the furnace is heating to the setpoint temperature. Remove the end cap, load the samples, and replace the end cap, gently hand tightening the bolts holding it in place Switch on the nitrogen (or argon) purge gas to a flow of 7 LPM (N2 setting = 50 or Ar setting = 70) and wait for the furnace to reach setpoint and stabilize. Nitrogen is preferred as a purge gas since it is house supplied whereas argon is supplied from a bottle and will deplete that bottle in 19 hours Use the quartz pushrod to push the samples into the center zone of the furnace. Remove the small flange on the endcap to insert the rod, push to the mark, and remove the pushrod. Caution!! The end may become quite hot so be careful both where you touch it and where you place it upon removal. Replace the flange and continue purging with nitrogen (or argon) for at least 10 minutes to allow the samples to heat to temperature Processing Switch on (using the toggle valves) the oxygen, or forming gas as desired for your process and turn off the nitrogen (or argon) purge. The recommended flow for forming gas is 3 LPM, which is a setting of 3 on the rotometer. Oxygen typically will be mixed with argon or nitrogen for a total flow of 3 LPM. The oxygen flowmeter has a maximum flow of 2 LPM and reads directly Time the anneal process as needed. Typical times are 20 to 30 minutes. An upper limit is defined by depletion of the gas cylinder, which takes about 40 hours for a full tank. Please discuss very long anneals with the NanoFab staff Switch (using the toggle valves) on the nitrogen (or argon) purge gas to a flow of 7 LPM and switch off the oxygen or forming gas, if they have been used Switch off the furnace heater elements and control circuit. Use the quartz pushrod to pull the samples into the cool zone at the load end of the furnace. Remove the small flange on the endcap to insert the rod, pull the boat from the hot zone, remove the pushrod, and Page 3

5 replace the flange. Caution!! The pushrod end may be quite hot so be careful both where you touch it and where you place it upon removal. Continue purging with nitrogen (or argon) for at least 10 minutes (or more) to allow the samples and endcap to cool to a safe handling temperature before you proceed to remove them Switch off all gases to the system and remove the endcap to retrieve your samples System shutdown Replace the endcap Confirm that all gas toggle valves are closed and that control and element power switches are turned off. 7. Process Data 7.1. Minibrute Brooks flow meter tubes There are four Brooks rotometers located on the front panel to control gas flows to the system. These are rated as shown in the table below when the gas pressure is regulated to 15 psi. The recommended flow rates for purging and for processing are 7 LPM and 3 LPM, respectively. The oxygen flowmeter is sized to allow controllable mixtures with nitrogen or argon. Gas Max. Flow (SLPM) Notes: Argon LPM = setting of 70 Nitrogen 43.8 Min flow 50/150 setting Oxygen 2 Direct read LPM Forming gas 5 Direct read LPM 7.2. Calculate flow rate / purge time for tube to reach clean conditions: Calculate the tube volume (V) in liters: a. Tube length L = 140 cm b. Tube inner diameter D = 14 cm c. V = (πd 2 x L)/4000 = 21.5 L Choose the exchange rate time (defined as the time to achieve one gas exchange within the process tube) that will reduce the atmospheric contamination level to an insignificant number. Air is about 20% oxygen, which is reduced by dilution by half for each gas change of the chamber. After N changes of gas the oxygen level is expected to be below (20%) x (0.5)N. Six gas exchanges will drop the atmospheric level to ½ 6 = 1/64 and it takes approximately 15 minutes for the sample to reach full temperature. So, the exchange rate time should be about 3 minutes The main gas flow rate is then calculated by dividing the volume of the process tube by the exchange rate time. Since the volume of the process tube is 21.5 liters and an exchange rate time of 3 minutes was chosen, then the main carrier gas flow rate will be 7 SLPM. Page 4

6 A size 1A argon cylinder from Matheson contains 7930 liters of gas the cylinder will last 19 hours at this purge rate Maintenance flow to use during processing: Flows chosen by various labs vary widely. A reasonable choice is 3 SLPM which (for Argon) would deplete the cylinder in 44 hours. Page 5

7 Title: MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE 8. Revision History Effective Date Originator DESCRIPTION OF REVISION Issue 4/6/15 C. Tracy Initial Release A Issue: Rev A B C D E F G H Page 6

Birck Nanotechnology Center

Birck Nanotechnology Center EFFECTIVE DATE: October 20, 2016 PAGE 1 of 8 This instruction covers the set-up and use of the bench-top for annealing and oxidizing samples within the cleanroom. 1. SAFETY REQUIREMENTS 1.1 Safety glasses

More information

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system Revision date September 2014 2 Emergency Plan for Diffusion Furnaces Standard Operating Procedures for Emergencies Contact information

More information

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System) Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System) Revision date October 2014 2 Emergency Plan for Nano Furnace Standard Operating Procedures for Emergencies Contact information Person

More information

Thermcraft Tube Furnace General Use

Thermcraft Tube Furnace General Use Page 1 of 9 Thermcraft Tube Furnace General Use The Thermcraft furnace is a general use, 3 zone tube furnace capable of reaching temperatures of 1200 C. The large 6 diameter quartz tube is capable of holding

More information

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA Page 1 of 9 SSI Solaris 150 RTA The Solaris 150 RTA is a rapid thermal annealing system capable of handling sample sizes up to 100mm (4 diameter) or smaller. The system can anneal in N 2 and Forming gas

More information

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012 JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012 UNIVERSITY OF TEXAS AT ARLINGTON Nanofabrication Research and Teaching Facility TABLE OF CONTENTS 1. Introduction....2 1.1 Scope of Work.....2

More information

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7 Title: Heat Pulse 610 Operating Procedure Page 1 of 7 Table of Contents 1.0 Purpose/Scope... 2 2.0 Reference Documents... 2 2.1 Heat Pulse Operations Manual... 2 2.2 Solaris software Operations Manual...

More information

Eco Snow CO2 Clean System Operation

Eco Snow CO2 Clean System Operation Eco Snow CO2 Clean System Operation This equipment is to be operated only by individuals that have been trained and qualified by the MNFC staff. Do NOT use or attempt to use this tool unless you are qualified

More information

All Molybdenum Hot Zone & Elements. All Insulators are made of High Alumina. Element style - 1/8 Molybdenum Wire.

All Molybdenum Hot Zone & Elements. All Insulators are made of High Alumina. Element style - 1/8 Molybdenum Wire. Specification Sheet Equipment Model: J-1600 [18x30] Furnace Type Chamber Maximum Temperature Hot Zone Frame Dimensions Power Requirements Gas Requirements Thermocouple Vertical Bell with lifting hoist

More information

MCQ Gas Blender 100 Series 3 Channels Gas Mixer

MCQ Gas Blender 100 Series 3 Channels Gas Mixer Channels Gas Mixer Revision 1.8 October 2016 High Performance Digital Gas flow Gas Dilutor Blender & Gas for Mixing flow Mixing Gases System and Calibration Routines Technical Data Sheet Lab in a box From

More information

Nordiko Metal Sputtering System Standard Operating Procedure

Nordiko Metal Sputtering System Standard Operating Procedure Nordiko Metal Sputtering System Standard Operating Procedure Specifications : Target Size Gases used in the system Base pressure Sputtering pressure Substrates used Substrate size : 2 inch or 4 inch :

More information

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching Standard Operating Procedure for PlasmaQuest ECR II Etching Authors: Rev. 00: Al Schmalz, Vighen Pacradouni and Jeff Young, December 21, 1998 Rev. 01: Dr. Andras G. Pattantyus-Abraham, May 24, 2005 Rev.

More information

Birck Nanotechnology Center

Birck Nanotechnology Center EFFECTIVE DATE: October 20, 2016 PAGE 1 of 14 This instruction covers the set-up and use of the bench-top Rapid Thermal Annealing (RTA) systems for processing and annealing samples within the cleanroom.

More information

SPUTTER STATION STANDARD OPERATING PROCEDURE

SPUTTER STATION STANDARD OPERATING PROCEDURE SPUTTER STATION STANDARD OPERATING PROCEDURE Purpose of this Instrument: This instrument is used for deposition of thin metal or oxide films. Source materials supplied by WVU Shared Research Facilities:

More information

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler. Exercise 5-2 Bubblers EXERCISE OBJECTIVE Learn to measure the level in a vessel using a bubbler. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Bubblers How to measure

More information

CLEANLINESS STANDARD NCPRE tool contamination classification

CLEANLINESS STANDARD NCPRE tool contamination classification Tool Identifier NCPRE Phosphorous diffusion furnace Document version 1.0 24 th May 2013 Documented by Karthick Murukesan CONTENTS I. CLEANLINESS STANDARD 1 II. PERFOMANCE OF THE TOOL 1 III. WAFER PRE REQUISITE

More information

March CS-1701F Reactive Ion Etcher

March CS-1701F Reactive Ion Etcher March CS-1701F Reactive Ion Etcher Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any

More information

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator Procedure No: SOP-034 Revision No: 1.0 Revised Dec. 29, 2010 Page No.: 1 of 10 1. INTRODUCTION AND SCOPE This procedure is intended to describe the operations of the Dasibi model 5008 calibrator. The Dasibi

More information

University of Minnesota Nano Center Standard Operating Procedure

University of Minnesota Nano Center Standard Operating Procedure University of Minnesota Nano Center Standard Operating Procedure Equipment Name: Controlled Atmosphere Glove Box Model: Labconco Protector Location: PAN 185 Badger Name: Not on Badger Revision Number:

More information

OXFORD PLASMALAB 80PLUS (CLOEY)

OXFORD PLASMALAB 80PLUS (CLOEY) Arizona State University NanoFab OXFORD PLASMALAB 80PLUS (CLOEY) Rev D Table of Contents Contents Table of Contents...1 1. Purpose / Scope...2 2. Reference Documents...2 3. Equipment / Supplies / Material...2

More information

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure This document covers the procedure that should be followed for normal operation of the Cambridge NanoTech: Savannah S100 (Atomic Layer Deposition ALD). This tool is design to be used with whole 4inch wafers.

More information

Discovery HP-TGA 75/750. Site Preparation Guide

Discovery HP-TGA 75/750. Site Preparation Guide Discovery HP-TGA 75/750 Site Preparation Guide Revision A Issued August 2018 Table of Contents Table of Contents... 2 Ideal Setup... 3 System Components... 4 Instrument Measurements... 5 Utility Requirements...

More information

Usage Policies Notebook for Parylene Coating System

Usage Policies Notebook for Parylene Coating System Usage Policies Notebook for Parylene Coating System Revision date September 2014 2 Emergency Plan for Parylene Coating System Standard Operating Procedures for Emergencies Contact information Person Lab

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

Equipment Operating Procedure Glove Box

Equipment Operating Procedure Glove Box Equipment Operating Procedure Glove Box Page 1 0.0 Changing the Compressed Gas Cylinder 1. Complete Compressed Gas Cylinder training from EHS website before manually exchanging gas cylinders. In order

More information

University of Minnesota Nano Fabrication Center Standard Operating Procedure

University of Minnesota Nano Fabrication Center Standard Operating Procedure Equipment Name: TYLAN Furnace Coral Name: tylan Revision Number: 5 Model: titian Revisionist: Tony Whipple Location: Bay 1 Date: 7 Nov 2006 1 Description The Tylan system is a furnace system for oxidation,

More information

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1 Project: Novel Electron Bubble Particle Detector Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat Version 5.1 (Using side filling line) Hand Processed Changes HPC No. Date

More information

Cambridge NanoTech: Savannah S100. Table of Contents

Cambridge NanoTech: Savannah S100. Table of Contents Table of Contents 1.0 Purpose/Scope... 2 2.0 Reference Documents... 2 3.0 Equipment/Supplies/Material... 2 4.0 Safety... 2 5.0 Logbook... 3 6.0 Login and Launch Software... 3 7.0 Session Setup... 3 8.0

More information

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC Commonwealth Dual Ion Beam Deposition System (CDIBS) Version 2010 February 14 I. Purpose This Standard

More information

Purge Star & Ring Purge Systems

Purge Star & Ring Purge Systems March 2013 Operator s Manual Purge Star & Ring Purge Systems Additional instruction for Purge Star Single Hose, Purge Star Double (bypass) Hose and Ring Purge with bypass hose and gas dump valve feature.

More information

Douglas Call 4/11/2008 1/5. Ammonia Treatment

Douglas Call 4/11/2008 1/5. Ammonia Treatment Douglas Call 4/11/2008 1/5 Ammonia Treatment Department: Chemical Engineering Location: Fenske 102 Contact: Zachary Pace Smith BillyPaul Matthew Holbrook zps5000@psu.edu 166 Fenske bmh200@psu.edu 5-9734

More information

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure Version: 1.0 February 2014 UNIVERSITY OF TEXAS AT ARLINGTON Nanotechnology Research Center (NRC) 1 TABLE OF CONTENTS 1 Introduction 3 1.1

More information

Usage Policies Notebook for Trion RIE / ICP Dry Etch

Usage Policies Notebook for Trion RIE / ICP Dry Etch Usage Policies Notebook for Trion RIE / ICP Dry Etch Revision date September 2014 2 Emergency Plan for Trion RIE/ICP Dry Etch Standard Operating Procedures for Emergencies Contact information Person Lab

More information

Columbus Instruments

Columbus Instruments 0215-003M Portable O 2 /CO 2 /CH 4 Meter User s Manual Columbus Instruments 950 NORTH HAGUE AVENUE TEL:(614) 276-0861 COLUMBUS, OHIO 43204, USA FAX:(614) 276-0529 1 www.colinst.com TOLL FREE 1-800-669-5011

More information

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts. Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the PE4400. All users are expected to have read and understood this document. It is

More information

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual Prepared by- Hitesh Kamble Akhil Kumar S Materials not allowed: 1. Processing of Si wafers having back-side metal deposition. 2. Organic material

More information

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions. Oxford Instruments Plasma Technology www.oxford-instruments.com About this data sheet This data sheet provides basic information about the installation of a tool. Floor and wall loadings Table 1 lists

More information

Instruction Bulletin Addendum For Pressure-Balanced In Situ Oxygen Probes

Instruction Bulletin Addendum For Pressure-Balanced In Situ Oxygen Probes Instruction Bulletin Addendum For Pressure-Balanced In Situ Oxygen Probes Instruction Bulletin Addendum IB PB1000 Part no. Serial no. Order no. Oxymitter 4000 Applicability: Used with pressure-balancing

More information

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments Pegas 4000 MF Gas Mixer InstructionManual Contents I Table of Contents Foreword Part I Introduction 1 2 1 System overview... 2 2 Specifications... 3 Part II Installation 4 1 Rear panel connections...

More information

Revised: June 7, 2017

Revised: June 7, 2017 LC Technologies Thermal Evaporator Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual Allwin21 AW610 RTP Page 1 of 18 Contents 1 Picture and Location 2 Process Capabilities 2.1 Cleanliness Standard 2.2 Recipes 2.3 Performance of Allwin21 AW610 RTP 3 Contact List

More information

Ammonia Treatment Instructions Page 1 of 5

Ammonia Treatment Instructions Page 1 of 5 Page 1 of 5 Original version by Douglas Call Updated January 21, 2009 by David Jones Department: Chemical Engineering Location: Fenske 102 (access thru room 103) Contact: BP Matthew Holbrook 161 Fenske

More information

AC : ACCURATE CRYOCHAMBER FOR A SMALL LABORATORY WITH SMALL BUDGET

AC : ACCURATE CRYOCHAMBER FOR A SMALL LABORATORY WITH SMALL BUDGET AC 2007-1108: ACCURATE CRYOCHAMBER FOR A SMALL LABORATORY WITH SMALL BUDGET Matthew Braley, University of Idaho Paul Anderson, University of Idaho Tracey Windley, University of Idaho Kevin Buck, University

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 5-3 Wet Reference Leg EXERCISE OBJECTIVE Learn to measure the level in a vessel using a wet reference leg. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Measuring

More information

Solvent System Walkthrough

Solvent System Walkthrough v2.0 1 Solvent System Walkthrough The Contour Glass solvent system is designed to give you air-free anhydrous solvent with minimal effort. However, the system is only as good as its users so please read

More information

Information Sheet. About this information sheet. Floor and wall loadings. Attachment of process module to floor. PlasmaPro Estrelas100

Information Sheet. About this information sheet. Floor and wall loadings. Attachment of process module to floor. PlasmaPro Estrelas100 Information Sheet PlasmaPro Estrelas100 About this information sheet This data sheet provides basic information about the installation of a PlasmaPro Estrelas100 tool. Some of the information in this sheet

More information

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet: OXY Integral INTERCON ENTERPRISES INC Tel: 800 665 6655 Fax: 604 946 5340 E-Mail: sales@intercononline.com Internet: www.intercononline.com Manual Integral 2006 1 INDEX 2-3 PREFACE 4 INTRODUCTION 5 Principle

More information

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1. Nanomaster NSC-3000 DC Magnetron Sputter Tool Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly

More information

Medical Oxygen Concentrator Systems. Generate gases on site generate savings

Medical Oxygen Concentrator Systems. Generate gases on site generate savings Medical Oxygen Concentrator Systems Medical Oxygen is a critical and important commodity to all Heath Care Facilities (HCF s) How is Oxygen Supplied? The supply of Oxygen to the HCF can typically be done

More information

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8 Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8 Table of Contents 1.0 Purpose/Scope... 2 2.0 Reference Documents... 2 3.0 Equipment/Supplies/Material... 2 4.0 Safety... 2 5.0 Set Up Procedures... 2

More information

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Engineered Solutions, Guaranteed Results.

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Engineered Solutions, Guaranteed Results. Laboratory Hardware Custom Gas Chromatography Solutions Engineered Solutions, Guaranteed Results. WASSON - ECE INSTRUMENTATION Laboratory Hardware Wasson-ECE Instrumentation offers hardware-only solutions

More information

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem Rev. B 2017, January, 20 Next > Preconditions 7900, 7800, 7700, 8800, or 8900 ICP-MS is used. Sample introduction type is PeriPump.

More information

5890II GC Standard Operating Procedure 9/2/2005

5890II GC Standard Operating Procedure 9/2/2005 5890II GC Standard Operating Procedure 9/2/2005 This procedure is for the analysis of natural gas using the HP 5890II GC with the Restek ShinCarbon column. Detector Type: TCD Column Type: Restek Micropacked,

More information

Gas Absorption Draft Standard Operating Procedure

Gas Absorption Draft Standard Operating Procedure Gas Absorption Draft Standard Operating Procedure R.C. 9-14 Scope Page 1 Equipment Overview Page 1 Safety Page 2 Operating Procedure Page 4 Equipment Description Page 16 Gas Absorption Experiment Draft

More information

Arizona State University NanoFab XACTIX ETCHER. Rev A

Arizona State University NanoFab XACTIX ETCHER. Rev A Arizona State University NanoFab XACTIX ETCHER Rev A Table of Contents Contents Table of Contents... 1 1. Purpose / Scope... 2 2. Reference Documents... 2 3. Equipment / Supplies / Material... 2 4. Safety...

More information

Operating Procedures for the. SAMCO ICP RIE System

Operating Procedures for the. SAMCO ICP RIE System Operating Procedures for the SAMCO ICP RIE System General Overview: The purpose of the SAMCO Model 200iP Inductively Coupled Plasma Reactive Ion Etcher (ICP RIE) is to etch III-V compound semiconductors

More information

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents Title: CHA E-Beam Evaporator Page 1 of 7 Table of Contents Purpose/Scope... 2 2.0 Reference Documents... 2 3.0 Equipment/Supplies/Material... 2 4.0 Safety... 2 5.0 Set Up Procedures... 2 5.1 PC Logon and

More information

What is Oxy-Fuel Welding?

What is Oxy-Fuel Welding? Oxy-Fuel Welding What is Oxy-Fuel Welding? Process the fuses metal together Does not require electricity Uses a torch and filler rod Similar equipment as Oxy-Fuel Cutting Where is Oxy-Fuel Welding used?

More information

Workhorse-15 Oxygen Generator

Workhorse-15 Oxygen Generator 11436 Sorrento Valley Road, San Diego CA 92121 USA 858-558-0202 Fax 858-558-1915 Workhorse-15 Oxygen Generator Model No. 5719, 5727, 5735 for Domestic and International Units Part number 1432 Revision

More information

Hot Compressed Air Lance Operation Manual. LAB Manufacturing 9483 Reading Road Cincinnati, OH (800)

Hot Compressed Air Lance Operation Manual.  LAB Manufacturing 9483 Reading Road Cincinnati, OH (800) Hot Compressed Air Lance Operation Manual www.heatlances.com LAB Manufacturing 9483 Reading Road Cincinnati, OH 45215 (800) 776-5830 PARTS CHECK LIST NOTE: Check all fittings & connections prior to operation.

More information

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Custom solutions for your analytical needs.

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Custom solutions for your analytical needs. Laboratory Hardware Custom Gas Chromatography Solutions Custom solutions for your analytical needs. Laboratory Hardware Wasson-ECE Instrumentation offers hardware-only solutions for advanced chromatography

More information

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility. Olis DSM-20 instructrions and rules p. 1 BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility. Signup On a first-come, first-served

More information

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021 Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021 For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4 Calibration....

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual Denton Explorer 14 RF/DC Sputter Version 1.0 Page 1 of 11 Contents 1. Picture and Location 2. Process Capabilities 1. Cleanliness Standard 2. Available for Sputtering Materials

More information

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007 Author: Rev. 00: David Webster, TRIUMF, February 22, 1995. Rev. 01: A. Schmalz, October 12, 1999 Rev. 02: Doug Wong, August 2, 2002 (STS File: S02-014) Rev. 03: Mario Beaudoin, April 2006 Rev. 04: Bahador

More information

8.1 Calibration of gas sensors

8.1 Calibration of gas sensors 8.1 Calibration of gas sensors! CAUTION! Calibration gas handling and precautions Observe safety regulation and accident prevention regulations when using or handling test gases. Use test gases in well-ventilated

More information

INSTRUCTIONS FOR FM4460N SERIES HIGH PRESSURE, METAL TUBE FLOWMETERS

INSTRUCTIONS FOR FM4460N SERIES HIGH PRESSURE, METAL TUBE FLOWMETERS INSTRUCTIONS FOR FM4460N SERIES HIGH PRESSURE, METAL TUBE FLOWMETERS THIS BOOKLET CONTAINS PROPRIETARY INFORMATION OF ADVANCED SPECIALTY GAS EQUIPMENT CORP. AND IS PROVIDED TO THE PURCHASER SOLELY FOR

More information

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021-PR Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021-PR For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4

More information

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Contributors: Devin Brown, Kevin Klein, Ben King, Eric Woods Anything that is BOLD UNDERLINED ITALICS means that you should press that

More information

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

RADIATION PROCEDURES MANUAL Procedure Cover Sheet RADIATION PROCEDURES MANUAL Procedure Cover Sheet Procedure Title: Calibration of Eberline Portable Particulate Noble Gas Monitor Procedure Number: TSO-08-13-REV 1 Effective Date: July 1, 2008 Approved

More information

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT ATTENTION SYRINGE REPLACEMENT Please read through the document completely before starting any repairs. Refer to the proper section in the service manual for complete removal and replacement procedures.

More information

Generating Calibration Gas Standards

Generating Calibration Gas Standards Technical Note 1001 Metronics Inc. Generating Calibration Gas Standards with Dynacal Permeation Devices Permeation devices provide an excellent method of producing known gas concentrations in the PPM and

More information

STANDARD OPERATING PROCEDURES

STANDARD OPERATING PROCEDURES PAGE: 1 of 14 CONTENTS 1.0 SCOPE AND APPLICATION 2.0 METHOD SUMMARY 3.0 SAMPLE PRESERVATION, CONTAINERS, HANDLING AND STORAGE 4.0 INTERFERENCE AND POTENTIAL PROBLEMS 5.0 EQUIPMENT/APPARATUS 6.0 REAGENTS

More information

EE 432 Lab 3 PMOS source/drain lithography and diffusion

EE 432 Lab 3 PMOS source/drain lithography and diffusion EE 432 Lab 3 PMOS source/drain lithography and diffusion Group Leader: Yue Zhang Group Numbers: Yueyi Jiao, Yin Huang, Lafit Masud TA: Andy Hoyt Section: NO. 5 Introduction: In this lab, we will perform

More information

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER CAUTION: THE CHAMBER PLATE GETS EXTREMELY HOT Start Up Procedure 1) Open bottle and regulator for Helium,

More information

Pump out insert (condenser and still lines) overnight with turbo pump

Pump out insert (condenser and still lines) overnight with turbo pump Running the Dilution Fridge Before starting a run: Pump out insert (condenser and still lines) overnight with turbo pump Make sure LN and LHe traps are clean pump out with He4 rotary pump Start He3 rotary

More information

[USING THE VITROBOT April 9, Using the Vitrobot

[USING THE VITROBOT April 9, Using the Vitrobot Using the Vitrobot The Vitrobot Mk 3 (aka Mark III, Mark 3, etc.) can control both the local temperature and the local humidity during the process of plunge-freezing a grid for cryoem. It does require

More information

Bubble Tube Installations

Bubble Tube Installations Instruction MI 020-328 September 2013 Bubble Tube Installations For Liquid Level, Density, and Interface Level Measurements 2 Contents Introduction... 5 Abbreviations... 5 Principle of Operation... 5 Alternative

More information

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS Items needed for demonstrations: Fire extinguisher PPE (Personal Protective Equipment): o Lab coats/welding jackets o Leather gloves

More information

Mass Spec will not Autotune

Mass Spec will not Autotune Mass Spec will not Autotune Applies to 5973A/N MSD What could be the problem? There could be several things that would cause your Mass Spec not to Autotune. The most common, easily corrected Autotune problems

More information

Specification Sheet. Equipment Model: J-VAC-12 High Vacuum Furnace. Type. Chamber. Maximum Temperature 1250 C. Hot Zone

Specification Sheet. Equipment Model: J-VAC-12 High Vacuum Furnace. Type. Chamber. Maximum Temperature 1250 C. Hot Zone Specification Sheet Equipment Model: J-VAC-12 High Vacuum Furnace Type Vertical Bell, Turbo Pumped Chamber Stainless Steel Coldwall Maximum Temperature 1250 C. Hot Zone 18 (45 cm) Dia. x 24 (60 cm) H.

More information

B. Assemble the Method-25 sample train with a heated probe/filter.

B. Assemble the Method-25 sample train with a heated probe/filter. 6/30/2015 VOC Reporting, Inc. Method 25 Heated Controller Operating Instructions. pg. 1 of 5 INSTRUCTIONS FOR EPA METHOD-25 FIELD SAMPLE COLLECTION USING A VRi HEATED PROBE AND FILTER ASSEMBLY Introduction:

More information

Test Plans & Test Results

Test Plans & Test Results P09051 Oxygen Gas Sensor Test Plans & Test Results By: Samuel H Shin (EE), Jeremy Goodman (ue) Table of contents 1. TITLE: OXYGEN MEASUREMENT TEST VIA FABRICATED OXYGEN GAS SENSOR SYSTEM... 2 1.1. Introduction...

More information

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE Purpose of this Instrument: This instrument is for patterning photosensitive polymers with UV light. Location: White Hall 410 Cleanroom Primary

More information

256 Pneumatic Pressure Indicator

256 Pneumatic Pressure Indicator 256 Pneumatic Pressure Indicator 51425699 Copyright 2002 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any

More information

Gas Diluter Portable Gas Dilution System User s Manual

Gas Diluter Portable Gas Dilution System User s Manual Gas Diluter Portable Gas Dilution System User s Manual Defiant Technologies, Inc. 2015 Vol.1 This page is intentionally left blank. Gas Diluter Portable Gas Dilution System User s Manual Defiant Technologies,

More information

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation Page 1 of 19 : SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor Description and Principle of Operation The photoacoustic multi-gas monitor (INNOVA 1412, Innova AirTech Instruments, Denmark) is a highly

More information

STANDARD OPERATING PROCEDURES

STANDARD OPERATING PROCEDURES PAGE: 1 of 9 CONTENTS 1.0 SCOPE AND APPLICATION 2.0 METHOD SUMMARY 3.0 SAMPLE PRESERVATION, CONTAINERS, HANDLING AND STORAGE 3.1 Canister Receipt 3.2 Canister Storage 4.0 INTERFERENCE AND POTENTIAL PROBLEMS

More information

Constant Pressure Inlet (CCN) Operator Manual

Constant Pressure Inlet (CCN) Operator Manual Constant Pressure Inlet (CCN) Operator Manual DOC-0125 Revision J 2545 Central Avenue Boulder, CO 80301-5727 USA C O P Y R I G H T 2 0 1 1 D R O P L E T M E A S U R E M E N T T E C H N O L O G I E S, I

More information

OPERATION OF THE DIMPLER

OPERATION OF THE DIMPLER OPERATION OF THE DIMPLER After thinning your sample to ~80 μm you can now do a dimpling process to thin the center up to 10 μm. When you walk in and use the DIMPLER it should already be calibrated and

More information

Operating Procedures for Metal Evaporator I

Operating Procedures for Metal Evaporator I Operating Procedures for Metal Evaporator I Metal Evaporator I is intended as a tool and a training device. Understanding the operation of this equipment should give you a basic knowledge of vacuum and

More information

Dilution Refrigerator manual

Dilution Refrigerator manual Dilution Refrigerator manual Jaseung Ku November 24, 2011 Abstract This document provides a practical guide to dilution refrigerator operation and describes technical details about the hardware. It is

More information

Autocalibration Systems For In Situ Oxygen Analyzers

Autocalibration Systems For In Situ Oxygen Analyzers Product Data Sheet PDS 106-340AC SPS 4000, IMPS 4000, and MPS 3000 January, 1999 Autocalibration Systems For In Situ Oxygen Analyzers Cost-effective autocalibration systems for installations ranging from

More information

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch Revision date September 2014 2 Emergency Plan for XeF 2 Si Etcher Standard Operating Procedures for Emergencies Contact information

More information

Optimizing Gas Supply for Industrial Lasers

Optimizing Gas Supply for Industrial Lasers Optimizing Gas Supply for Industrial Lasers Laser cutting of metals and other materials has grown rapidly due to developments in laser power, advancements in CNC automation, and decreasing costs. The industrial

More information

REPLENISHING, OXYGEN SYSTEM - SERVICING

REPLENISHING, OXYGEN SYSTEM - SERVICING REPLENISHING, OXYGEN SYSTEM - SERVICING TASK 610 801 1. Quantity Check of the Oxygen System A. Reference Information REFERENCE TASK 12 00 07 861 801 TASK 12 00 07 861 802 TASK 614 801 DESIGNATION Connect

More information

Plasma Asher: March PX-500 User guide (May-30, 2017)

Plasma Asher: March PX-500 User guide (May-30, 2017) Plasma Asher: March PX-500 User guide (May-30, 2017) This is a highly versatile plasma etch tool that can etch using a direct plasma configuration (Oxygen plasma cleaner), a downstream plasma (Remote plasma),

More information

Operating Manual. Models AQT-02 & AQT-COO2 Manual No. MON004 (Rev 2 April 2000)

Operating Manual. Models AQT-02 & AQT-COO2 Manual No. MON004 (Rev 2 April 2000) Models AQT-02 & AQT-COO2 Manual No. MON004 (Rev 2 April 2000) Operating Manual AIR SYSTEMS INTERNATIONAL, INC. 829 Juniper Crescent, Chesapeake, Va., 23320 Telephone (757) 424-3967 Toll Free 1-800-866-8100

More information

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Nanofabrication Facility: PECVD SOP Rev. 00, April 24 Author: Charlie Yao & Mario Beaudoin Email: charlieyao@gmail.com; Beaudoin@physics.ubc.ca Phone: 604-822-1853(MB). Purpose This document outlines the standard operation for the Trion Plasma Enhanced Chemical

More information

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems Corporation Issued: 5/09 P/N: 600104 Rev. 2 Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems The Gas Addition Accessory permits the

More information