7 Greystone Oil & Gas Rig Telephone Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 7 4/26/ Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma Joe Bordayo County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $14,365 $227,576 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 #25 Casing Information Type OD ID Weight Grade Connection Top MD Conductor weld SURFACE 8 5/ J-55 STC 0 Intermediate Drlg Liner Production Top TVD Bot MD Bot TVD Shoe Test 40' 1805 Daily Activity Information Present 0600 Hrs 3022 From To Hrs RIG SERVICE 0:00 0: DRLG F/2145 TO FT/HR W/15K WT, 80 RPM, GPM, 1000 PSI PP DEVATION DEGREES DRLG F/2524 TO HR. FORWARD PLAN: DRILL 7 7/8 HOLE Total Hours 24.0 Diesel Received Diesel Total 1,540 Diesel Used 715 Diesel Left 825 Directional Survey Information MD ANGLE Azimuth TVD V S +N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 5:00 Bit No 1 1 BIT Date 4/26/2010 Size SS /8 REG Temperature Make VAREL 1 DC /8 REG TVD 3000 Serial RMR /16 6 5/8 REG 6.00 Weight 10.0 Type HEO4J 1 DC /8 REG Viscosity 29 Nozzles RMR /8 REG 7.09 PV Depth Out 1 DC /8 REG YP Depth In 1805 Gels Footage 1217 Filtrate 30 min N/C Hours 32.5 HTHP ROP 37 Cake 0 WOB 15 %Solids 0 Rot RPM 80 %Oil TFA %Water MM RPM %Sand Torque PH 9 Grade BHA Hrs 32.5 Total BHA MBT Pump & Hydraulics Information Mud Log Information BOP Test Pm COMBO Pump #1 Pump #2 Bg Gas Last Test 4/23/2010 Pf Type TRI Con Gas 35 Next Test Mf Liner 6 Tr Gas Test PSI Chloride Stroke 10 MAX 38 Safety Topic Calcium 4400 %Eff 600 RPM Gal/Strk 3.70 Lithology NO 300 RPM Bbl/Strk SPM 110 Est PP 95 ECD %Shale 10% %LGS Gal/Min %Sand Contractor System bbls Pressure 1000 %Lime 10% Service Co Mud Loss AV DP %Other 80% Co-Rep Cum Mud Loss AV DC DEPTH 3000 Totals Accident Personnel
8 Greystone Oil & Gas Rig Telephone Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 9 4/28/ Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma Joe Bordayo County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $14,103 $262,541 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 $6,884 #25 Casing Information Type OD ID Weight Grade Conductor SURFACE 8 5/ J-55 Intermediate Drlg Liner Production Connection Top MD Top TVD Bot MD Bot TVD Shoe Test weld 40' STC Daily Activity Information Present 0600 Hrs DRILLING 7 7/8" HOLE TO TD From To Hrs DRLG F/3762 TO :00 0: RIG SERVICE DRLG F/3826 TO DEVATION 4017' - 3/4 DEGREE DRLG F/4049TO 4207 DRLG W/30K,65 RPM, 112 SPM, 400 GPM, 1250 PSI PP. 24 HR FORWARD PLAN: POOH 5 JTS, REPLACE HYDRAULIC MOTOR AND CONTINUE DRLG 7 7/8 HOLE TO TD Total Hours 24.0 Diesel Received 2,501 Diesel Total 3,325 Diesel Used 935 Diesel Left 1,485 Directional Survey Information MD ANGLE Azimuth TVD V S +N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 0:00 Bit No 1 1 BIT Date 4/28/2010 Size SS /8 REG Temperature Make VAREL 1 DC /8 REG TVD 4090 Serial RMR /16 6 5/8 REG 6.00 Weight 10.0 Type HEO4J 1 DC /8 REG Viscosity 29 Nozzles RMR /8 REG 7.09 PV Depth Out 1 DC /8 REG YP Depth In 1805 Gels Footage 2402 Filtrate 30 min N/C Hours 77.5 HTHP ROP 31 Cake 0 WOB 30 %Solids 0 Rot RPM 65 %Oil TFA %Water MM RPM %Sand Torque PH 10.0 Grade BHA Hrs 77.5 Total BHA MBT Pump & Hydraulics Information Mud Log Information BOP Test Pm.1 COMBO Pump #1 Pump #2 Bg Gas 19-Feb Last Test 4/23/2010 Pf.1 Type TRI Con Gas 0 Next Test Mf.3 Liner 6 Tr Gas Test PSI Chloride Stroke 10 MAX 50 Safety Topic SPM 112 Est PP COMMUNICATION Calcium 4400 %Eff 95 ECD Accident 600 RPM Gal/Strk 3.70 Lithology NO 300 RPM Bbl/Strk %Shale 60% Personnel %LGS Gal/Min %Sand Contractor 10 System bbls Pressure 1100 %DOLO 30% Service Co 2 Mud Loss AV DP 225 % LIME 10% Co-Rep 1 Cum Mud Loss AV DC 361 DEPTH 4206 Totals 13
9 Greystone Oil & Gas Rig Telephone Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 10 4/29/ Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma Joe Bordayo County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $15,889 $278,431 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 $4,920 $11,804 #25 Casing Information Type OD ID Weight Grade Connection Top MD Top TVD Bot MD Bot TVD Shoe Test Conductor weld 40' SURFACE 8 5/ J-55 STC Intermediate Drlg Liner Production Daily Activity Information Present 0600 Hrs DRLG 7 7/8 HOLE From To Hrs DRLG F/4207 TO :00 0: RIG REPAIR- CHANGE OUT HYDROLIC PUMP & 2 HYDROLIC MOTORS ON TOP DRIVE DRLG F/4230 TO 4523 W/25K WT., 80 RPM, GPM, 1100 PSI PP DEVATION /2 DEGREE DRLG F/4523 TO 4711 START MUD HR FORWARD PLAN: DRILL TO TD (4737) CIRC & CONDITION MUD, TOH, LOG. Total Hours 24.0 Diesel Received 2,501 Diesel Total 3,325 Diesel Used 770 Diesel Left 715 Directional Survey Information MD ANGLE Azimuth TVD V S N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 0:00 Bit No 2 1 BIT Date 4/29/2010 Size 7 7/8 1 SS /8 REG Temperature Make VAREL 1 DC /8 REG TVD Serial RMR /16 6 5/8 REG 6.00 Weight 10.0 Type VTD616X 1 DC /8 REG Viscosity 38 Nozzles RMR /8 REG 7.09 PV Depth Out 1 DC /8 REG YP Depth In 1805 Gels Footage 2906 Filtrate 30 min Hours 93 HTHP ROP 31 Cake WOB 25 %Solids Rot RPM 80 %Oil TFA %Water MM RPM %Sand Torque PH 10 Grade BHA Hrs 93 Pf Total BHA MBT Pump & Hydraulics Information Mud Log Information BOP Test Pm Mf COMBO Type Pump #1 Pump #2 Bg Gas Last Test 4/23/2010 TRI Liner 6 SPM Con Gas 56 Next Test Test PSI Chloride Stroke 10 MAX 140 Safety Topic Calcium 4400 %Eff 95 Tr Gas 112 Est PP 600 RPM Gal/Strk 3.70 Lithology 300 RPM Bbl/Strk %Shale 10% ECD PPE Accident %LGS Gal/Min %Sand Contractor 10 System bbls Pressure 1100 %DOLO 80% Service Co NO Personnel Mud Loss AV DP 225 % LIME 10% Co-Rep 1 Cum Mud Loss AV DC 361 DEPTH 4700 Totals 19 8
10 Greystone Oil & Gas Rig Telephone Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 11 4/30/ Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma WES DAVIS County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $92,020 $370,451 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 $7,228 $19,032 #25 Casing Information Type OD ID Weight Grade Connection Top MD Top TVD Bot MD Bot TVD Shoe Test Conductor weld 40' SURFACE 8 5/ J-55 STC Intermediate Drlg Liner Production 5 1/ J-55 LTC Daily Activity Information Present 0600 Hrs CIRCULATING 5 1/2 CSG From To Hrs DRLG F/4711 TO 4737 TD W/20K WT, 80 RPM, GPM, 1100 PSI PP 0:00 0: CIRC AND CONDITION MUD, PUMP HIGH VIS SWEEP, SPOT 50 BBLS HIGH VIS PILL ON BOTTOM TOH, LDDP & BHA RIG UP HOWCO WL, RUN SONIC, DUAL LATEROLOG, DENSITY, DUAL SPACED NEUTRON, & GR LOGS FROM 4733 WLTD TO 1800 W/NEUTRON & GR TO SURFACE RIG DOWN LOGGERS, RIG UP CSG CREWS RUN AND LAND 105 JTS. ( ') 5 1/2 15.5# J-55 LTC CSG 4736, CIRCULATE CSG, RIG UP HOWCO CMTERS. 24 HR FORWARD PLAN: CMT. CSG, NIPPLE DOWN BOP, SET SLIPS, JET PITS Total Hours 24.0 Diesel Received 2,501 Diesel Total 2,575 Diesel Used 725 Diesel Left 1,850 Directional Survey Information MD ANGLE Azimuth TVD V S N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 0:00 Bit No 2 Viscosity 36 Nozzles RMR /8 REG 7.09 Gels 5 7 Footage BIT Date 4/29/2010 Size 7 7/8 1 SS /8 REG Temperature Make VAREL 1 DC /8 REG TVD 4737 Serial RMR /16 6 5/8 REG 6.00 Weight 10.1 Type VTD616X 1 DC /8 REG PV 6 Depth Out DC /8 REG YP 16 Depth In 1805 Filtrate 30 min 8.0 Hours 93.5 HTHP ROP 31 Cake 1 WOB 25 %Solids 13 Rot RPM 80 %Oil TFA %Water 87 MM RPM %Sand 1 Torque PH 10.0 Grade BHA Hrs Pf.1 Total BHA MBT 12 Pump & Hydraulics Information Mud Log Information BOP Test Pm.1 COMBO Mf Type Pump #1 Pump #2 Bg Gas Last Test 4/23/2010 TRI 4 Liner 6 SPM Con Gas Next Test Test PSI Chloride Stroke 10 MAX Safety Topic Calcium 5200 %Eff 95 Tr Gas 112 Est PP 600 RPM Gal/Strk 3.70 Lithology 300 RPM Bbl/Strk %Shale ECD MIXING CHEMICALS Accident %LGS Gal/Min %Sand Contractor 10 System bbls Pressure 1100 %DOLO Service Co NO Personnel Mud Loss AV DP 217 % LIME Co-Rep 1 Cum Mud Loss AV DC 348 DEPTH Totals 26 15
11 Greystone Oil & Gas Rig Telephone Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 12 5/1/ Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma Joe Bordayo County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $11,697 $382,148 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 #25 Casing Information Type OD ID Weight Grade Connection Top MD Top TVD Bot MD Bot TVD Shoe Test Conductor weld 40' SURFACE 8 5/ J-55 STC Intermediate Drlg Liner Production 7 7/ J-55 LTC Daily Activity Information Present 0600 Hrs From To Hrs CMT 5 1/2" CSG W/375 SKS ECONOCEM-C 11.9 PPG, 2.47 YLD, FB 250 SKS VERSACEM-C +.5% LAP-1.3% CFR-3,.25 #/SK D-AIR 3000, 14.4 PPG, 1.24 YLD, 8 BPM & PSI, DISPLACED W/112 BFW, BUMP PLUG TO 1700 PSI, FLTS HELD, W/FULL RETURNS THRU OUT JOB, RECIPRICATED 25' RIG DOWN CMTERS NIPPLE DOWN BOP SET SLIPS W/70K WT, CUT OFF CSG 1200 NU B SECTION W/ABANDAMENT CAP JET & CLEAN PITS RIG 1300, 4/30/2010 RDMO RT NOTIFIED CINDY W/TRRC OF PRODUCTION 8:15 AM 4/29/2010 Total Hours 5.5 Diesel Received 2,501 Diesel Total 3,325 Diesel Used 935 Diesel Left 1,485 Directional Survey Information MD ANGLE Azimuth TVD V S N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 0:00 Bit No 2 1 BIT Date Size 7 7/8 1 SS /8 REG Temperature Make VAREL 1 DC /8 REG TVD Serial RMR /16 6 5/8 REG 6.00 Weight Type VTD616X 1 DC /8 REG Viscosity Nozzles RMR /8 REG 7.09 PV Depth Out 1 DC /8 REG YP Depth In 1805 Gels Filtrate 30 min HTHP Footage Hours ROP Cake WOB %Solids Rot RPM %Oil TFA %Water MM RPM %Sand Torque PH Grade BHA Hrs Pf Total BHA MBT Pump & Hydraulics Information Mud Log Information BOP Test Pm Mf COMBO Type Pump #1 Pump #2 Bg Gas Last Test 4/23/2010 TRI Liner 6 SPM Con Gas Next Test Test PSI Chloride Stroke 10 MAX Safety Topic Calcium %Eff 95 Tr Gas 112 Est PP 600 RPM Gal/Strk 3.70 Lithology 300 RPM Bbl/Strk %Shale ECD Accident Personnel %LGS Gal/Min %Sand Contractor 10 System bbls Pressure 1100 %DOLO Service Co Mud Loss AV DP 225 % LIME Co-Rep 1 Cum Mud Loss AV DC 361 DEPTH Totals 13 2
12 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/13/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days County ANDREWS Mud, Chemicals and Fluids $12,075 $12,075 Location NW ODESSA 35 M Fuels & Lubricants Size Depth Rental Equipment $1,750 $1,750 Surf Csg ' Cementing Int Csg Trucking Liner Perforation and Wireline $9,596 $9,596 Prod Csg 5.50" 4736' Acidizing and Fracturing Tubing Engineering Supervision $1,000 $1,000 Tot. Jts on Loc Contract Labor $1,420 $1, FRAC TANKS $4,480 $4,480 TD 4736' Production Casing PBTD 4661' Tubing Wellhead $6,925 $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher Tanks Operator Co. Rep. A.E. VICKERY Total $37,246 Cumulative Work Summary ND 11" 3K# X 7 1/16" 3K# TBG. HEAD. NU 11" 3K# X 7 1/16" 5K# TBG. HEAD. CAMERON PRESS. TEST TO 2800#. 10 MIN. OK. NU 7 1/16" 5K# FRAC VALVE. PRESS. TEST 5.50" CSG. TO 1000#. OK. MIRU APOLLO PERFORATORS INC. RAN GUAGE RING & JUNK BASKET F/ ' + RAN GAMMA RAY COLLAR LOG F/ '. APOLLO PERF. 5.50" CSG. IN THE SAN ANDRES FORM. 1 JS/FT. W/ A 120 DEGREE PHASED 3 1/18" CSG. GUN AS FOLLOWS: ' ( 5 HOLES ) ' ( 5 ) ' ( 5 ) ' ( 5 ) ' ( 5 ) ' ( 5 ) TOTAL OF 30 HOLES. RIGGED DOWN APOLLO WIRELINE HRS LOGGERS PBTD=4661'. CISDFN. SET 6 FRAC TANKS & NOW FILLING W/ 10# BRINE. 24 HR. PLAN: NU GOAT HEAD & ACIDIZE SAN ANDRES PERFS '. $37,246
13 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/14/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days County ANDREWS Mud, Chemicals and Fluids $12,075 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $70 $1,820 Surf Csg 8.625" 1805' Cementing Int Csg Trucking Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $8,712 $8,712 Tubing Engineering Supervision $1,000 $2,000 Tot. Jts on Loc Contract Labor $600 $2, FRAC TANKS $245 $4,725 TD 4736' Production Casing PBTD 4661' Tubing Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher Tanks Operator Co. Rep. A.E. VICKERY Total $10,627 Cumulative $47,873 Work Summary NU 7 1/16" 5K# GOAT HEAD. PRESS. TEST LINES TO 4500#. OK. BJ ACIDIZE SAN ANDRES PERFS ' DOWN 5.50" CSG. W/ 2500 GALS. 15% NEFE HCL ACID + 50 RCNBS & FLUSHED W/ 113 BBLS. 10# BRINE. FORMATION 1924#. AVG. 6 BPM MAX 6 BPM. BALLED 3600#. 6 BPM ISICP=135# 5 MIN.=87# 10 MIN.=77# 15 MIN.=68# 60 MIN.=47#. SURGE BALLS OFF & SHUT IN. CISDFN, SAT, SUN, MON & TUES. ( -276 BLW LEFT TO REC. ) 1000 HRS HR. PLAN: CONTINUE HAULING WTR. FOR FRAC JOB. WATING ON FRAC CREW: WILL 0800 HRS
14 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/18/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days County ANDREWS Mud, Chemicals and Fluids $12,075 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $700 $2,520 Surf Csg 8.625" 1805' Cementing Int Csg Trucking Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $8,712 Tubing Engineering Supervision $1,000 $3,000 Tot. Jts on Loc Contract Labor $2, FRAC TANKS $780 $5,505 TD 4736' SLICKLINE $1,190 $1,190 PBTD 4661' Tubing Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher Tanks Operator Co. Rep. A.E. VICKERY Total Cumulative Work Summary 95 HR. SICP=0# STRONG VACUUM. MIRU ARC PRESSURE DATA ARC RAN 4.57" GUAGE RING TO 4500'. POH W/ THE SAME. RIG DOWN ARC PRESSURE DATA. NU FLOW BACK MANIFOLD & LINES. CISDFN. ( -276 BLW LEFT TO RECOVER ) $3,670 $51, HR. PLAN: BJ WTR. & SAND FRAC SANDRES PERFS ' DOWN 5.50" 0800 HRS
15 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/19/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days County ANDREWS Mud, Chemicals and Fluids $12,075 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $70 $2,590 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,400 $1,400 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $69,445 $78,157 Tubing Engineering Supervision $1,000 $4,000 Tot. Jts on Loc Contract Labor $2, FRAC TANKS $450 $5,955 TD 4736' SLICKLINE $1,190 PBTD 4661' Tubing Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher Tanks Operator Co. Rep. A.E. VICKERY Total $72,365 Cumulative $123,908 Work Summary 10 HR. SICP=0# VACUUM. MIRU BJ SERVICES 0930 HRS. BJ SAND & WTR. FRAC SAN ANDRES PERFS ' DOWN 5.50" CSG W/ 121,926 GALS. 10# BRINE # 20/40 BROWN PROP # 14/ C LITE PROP. PRO TECHNICS TAGGED PROP W/ 3 MCI IRIDIUM MCI SCANDIUM MCI ANTIMONY 124. AVG BPM MAX 54.8 BPM. ISICP=256# 5 MIN.=165# 10 MIN.=147# 15 MIN.=135# HRS ( BLW LFET TO REC. ) RIGGED DOWN BJ SERVICES. 1 HR. AFTER FRAC SICP=110#. FLOWED 141 BLW IN 6.5 HRS. ON VARIOUS SIZE CHOKES FCP=110-0# & DIED. LEFT OPEN TO TEST TANK 12 HRS. NO RECOVERY.( BLW LEFT TO REC.) 24 HR. PLAN: MIRU DD UNIT. RUN SINKER BAR & CHECK PBTD. RIH W/ PKR. ON 2.375" TBG. SET 4050' +-. SWAB TEST SAN ANDRES PERFS ' NOTE: WILL RUN AFTER FRAC 0800 HRS
16 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/20/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $3,200 $3,200 County ANDREWS Mud, Chemicals and Fluids $465 $12,540 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $3,750 $6,340 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $350 $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,000 $5,000 Tot. Jts on Loc Contract Labor $2, FRAC TANKS $100 $6,055 TD 4736' SLICKLINE $1,000 $2,190 PBTD 4661' Tubing $23,000 $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CC FORBES Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher MANNI Tanks Operator LUIS Co. Rep. A.E. VICKERY Total $32,865 Cumulative $156,773 Work Summary ARC PRESS. DATA RAN 2.50" GUAGE RING TO 4650' & TAG BTM. POH W/ THE SAME & RIG DOWN. MIRU CC FORBES DD UNIT #111 ND FRAC VALVE & NU 7 1/16" 3K# MANUAL BOP. UNLOAD & RACK 148 JTS " J55 8RT TBG. TIH W/ HALLIBURTON 5.50" RTTS PKR " SN JTS " J55 TBG. TO 4060'. PUMPED 20 BBLS.10# BRINE DOWN 2.375" TBG. NO BLOW ON CSG. PUMPED 75 BBLS. 10# BRINE DOWN 5.50" CSG. SET HALLIBURTON 5.50" RTTS 4055' IN 12K# COMPRESSION. PRESS. TEST PKR. & 5.50" CSG. TO 500#. 10 MIN. OK. RIGGED UP SWAB. UNABLE TO NU FLOW TO PUMPING TEE. DID NOT HAVE X-OVER. CISDFN. ( BLW LEFT TO RECOVER ) 24 HR. PLAN: RUN AFTER FRAC LOG. FIN. NU FLOW-LINE & SWAB TEST SAN ANDRES PERFS.
17 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/21/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $1,100 $4,300 County ANDREWS Mud, Chemicals and Fluids $12,540 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $150 $6,490 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,000 $6,000 Tot. Jts on Loc Contract Labor $2, FRAC TANKS $100 $6,155 TD 4736' SLICKLINE $2,190 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CC FORBES Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher MANNI Tanks Operator LUIS Co. Rep. A.E. VICKERY Total Cumulative Work Summary 14 HR. SITP=0#. SICP 150#, BLED TO 0# IMMED. ALL AIR. WAIT ON ARC PRESS. DATA 2 HRS. MIRU ARC PRESS. DATA. & PROTECHNICS. DD UNIT DOWN FOR REPAIRS. WON'T START. HAVE SHORT. WAIT ON MECHANIC MECHANIC WORK ON UNIT. & CALL FOR ANOTHER MECHANIC. CISDFN. DOWN FOR RIG REPAIRS. ( BLW LEFT TO REC. ) $2,350 $159, HR. PLAN: REPAIR DD UNIT. RUN AFTER FRAC LOG. SWAB TEST SAN ANDRES PERFS.
18 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/22/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $2,860 $7,160 County ANDREWS Mud, Chemicals and Fluids $12,540 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $150 $6,640 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,000 $7,000 Tot. Jts on Loc Contract Labor $2, FRAC TANKS $100 $6,255 TD 4736' SLICKLINE + AFTER FRAC LOG $9,775 $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CC FORBES Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher MANNI Tanks Operator LUIS Co. Rep. A.E. VICKERY Total Cumulative Work Summary 16 HR. SITP=0#. SICP 0#, FIN. RIG UP ARC PRESS. DATA. PROTECHNICS DOWNLOAD TOOL. ARC PRESSURE DATA RAN AFTER FRAC LOG FROM '. DOWN LOAD TOOL. RIG DOWN ARC PRESSURE DATA HRS RIG UP SWAB. SWABBED 96 BLW IN 5 HRS. IFL=250' FFL=400'. MADE 18 RUNS W/ SWAB. LAST HR. SWABBED 20 BLW FL=400'. NO SHOW OF OIL OR GAS. CISDFN & SUNDAY ( BLW LEFT TO REC. ). 24 HR. PLAN: CONTINUE TO SWAB TEST SAN ANDRES PERFS '. $13,885 $173,008
19 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/24/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $3,200 $10,360 County ANDREWS Mud, Chemicals and Fluids $12,540 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $300 $6,940 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,000 $8,000 Tot. Jts on Loc Contract Labor $2, FRAC TANKS $200 $6,455 TD 4736' SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CC FORBES Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher MANNI Tanks Operator LUIS Co. Rep. A.E. VICKERY Total $4,700 Cumulative Work Summary 40 HR. SITP=0#. SICP 0#, SWABBED 241 BLW IN 10 HRS. IFL=250' FFL-450'. LAST HR. SWABBED 24 BLW. FL=450'. NO SHOW OF OIL. HAVE SMALL SHOW OF GAS. CISDFN. ( BLW LEFT TO REC. ) $177, HR. PLAN: CONTINUE TO SWAB TEST SAN ANDRES PERFS '.
20 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/25/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $3,640 $14,000 County ANDREWS Mud, Chemicals and Fluids $12,540 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $4,515 $11,455 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,000 $9,000 Tot. Jts on Loc Contract Labor $445 $2, FRAC TANKS $100 $6,555 TD 4736' SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CC FORBES Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher MANNI Tanks Operator LUIS Co. Rep. A.E. VICKERY Total $9,700 Cumulative $187,408 Work Summary 14 HR. SITP=0#. SICP 0#, SWABBED 93 BLW IN 4 HRS. IFL=250' FFL=350' NO SHOW OF OIL. SMALL SHOW OF GAS. LAST HR. SWABBED 20 BLW FL=350'. RIGGED DOWN SWAB & RELEASED 5.50" RTTS PKR. TOH W/ HALLIBURTON 5.50" RTTS PKR. RIH W/ BP + 2-JTS " TBG. + 4' PERF. SUB ON SAND LINE & TAG 4661'. POH W/ SAME TIH W/ 2.375" X 32' BPMA JT. ( ' ) " X 4' PERF. SUB ( ' ) " X 2.375" X 3' TAC ( ' ) " X 1' SN ( ' ) JTS " 4.7#/FT. J55 8RT. TBG. ( ' ). ND BOP. SET 5.50" 4116' IN 10K# TENSION. NU TBG. FLANGE & PUMPING TEE. ND PUMPING TEE. PUMPING TEE THREADS IMPROPERLY CUT. DAMAGED JT. OF TBG. REL. TAC. LAY DOWN BAD JT. RIH W/ 1 JT. RESET 5.50" 4116 IN 10K# TENSION. NU TBG. FLANGE. CISDFN. ( BLW LEFT TO REC. ). NOTE: PUMP JACK SET & READY TO GO. 24 HR. PLAN: NU PUMPING TEE. RUN PRODUCTION PUMP & RODS. HANG WELL ON & RIG DOWN.
21 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 6/14/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $1,000 $18,120 County ANDREWS Mud, Chemicals and Fluids $850 $13,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $450 $12,055 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,000 $11,000 Tot. Jts on Loc Contract Labor $2, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CC FORBES Lift Equipment, packers, hangers Rig Number Equipment Construction Labor Pusher MANNI Tanks Operator Co. Rep. LUIS A.E. VICKERY MIRU CC FORBES DD UNIT #106 LAYED DOWN POLISH ROD & 20' OF 7/8" ROD SUBS. EVALUATED RIG CREW. PICKED UP & MADE UP POLISH ROD. Total Cumulative Work Summary $3,300 $195,078 CLOSED WELL IN & RELEASED RIG CREW. WILL HAVE NEW CREW 0700 HRS HR. PLAN: TOH W/ PRODUCTION RODS. ND PUMPING TEE. RELEASE 5.50" TAC. NU BOP. TOH W/ 2.375" PRODUCTION TBG. TAG BTM W/ BP + 2- JTS " TBG. + SPLIT BULL PLUG ON SAND LINE & CHECK PBTD. TIH W/ 2.375" BPMA " PERF. SUB " HALLIBURTON PKR " SN JTS " TBG. ND BOP. SET 4310' NU PUMPING TEE. RUN PRODUCTION RODS.
22 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 6/25/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $3,120 $25,140 County ANDREWS Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $120 $16,175 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,400 $13,400 Tot. Jts on Loc Contract Labor $1,200 $3, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CC FORBES Lift Equipment, packers, hangers $2,500 $2,500 Rig Number Equipment Construction Labor Pusher George Tanks Operator TONY Co. Rep. D. Bulman Total $8,340 Cumulative $215,318 Work Summary 13 hours. Road rig to location, MIRU CC Forbes #111, Unhang horses head, unseat pump, POOH with 60 7/8" rods, 102 3/4" rods, 8 Kbars and pump, pump was full of fluid, fluid level in tbg was high, water pulling thru surface valves after each triple pulled. ND WH, NU BOP, release BV pkr and TOOH, first 14 jts pulled had clean OD, remainder of pipe had light scale coating, LD pkr and BPMA, RIH with % 1/2" RBP and pkr, set RBP at 4311', had trouble getting RBP to set, set pkr at 4285', attempt to test RBP, tools would not test, reset pkr at 4291', tools would not test, pumping by tools at 300 psi at 1 bpm, SWI, SDON
23 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 6/26/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $3,000 $25,020 County ANDREWS Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $120 $16,175 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,400 $13,400 Tot. Jts on Loc Contract Labor $700 $3, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CC FORBES Lift Equipment, packers, hangers $2,500 $2,500 Rig Number Equipment Construction Labor Pusher George Tanks Operator TONY Co. Rep. D. Bulman Total $7,720 Cumulative $214,698 Work Summary 11 hours. Crew to location, release pkr and RBP, reset RBP at 4320', pkr at 4313', attempt to test RBP, would not test, release tools and POOH, tools covered in iron sulfide, RIH with new 5 1/2" RBP and pkr, set RBP at 4311', pkr at 4294', test RBP to 600 psi for 15 minutes ok. Release pkr and POOH. RIH with 2 3/8" BPMA, 4' x 2 3/8" perf sub, manual collar loacator, 5 1/2" BV tension pkr and 131 jts 2 3/8" tbg, loacte csg collar 15' above pkr setting depth, ND BOP, set BV pkr in 15 pts tension, NU WH, RU flowline SWI, SDFWE EOT at 4255', pkr at 4216', s.n. at 4209' 24 hr plan, Will run pump and rods Monday
24 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/7/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $500 $27,020 County ANDREWS Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $400 $16,575 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,400 $16,200 Tot. Jts on Loc Contract Labor $3, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor ANIMAS Lift Equipment, packers, hangers $1,200 $4,900 Rig Number Equipment Construction Labor Pusher MIKE Tanks Operator joe Co. Rep. LEWIS Total Cumulative Work Summary ROAD RIG AND CREW TO LOCATION,MIRU ANIMAS WELL SERVICE $3,500 $222,298
25 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/8/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $27,020 County ANDREWS Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $300 $16,875 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,400 $17,600 Tot. Jts on Loc Contract Labor $800 $3, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor ANIMAS Lift Equipment, packers, hangers $1,200 $6,100 Rig Number Equipment Construction Labor Pusher MIKE Tanks Operator joe Co. Rep. LEWIS Total $3,700 Cumulative $225,998 Work Summary CREW ROAD TO LOCATION AND ATTEMPT TO OPERATE RIG,UNABLE TO FUNCTION THE GEAR SHIFT ON DRAWORKS,INSTALLED NEW RELIEF VALVE AND GEARS WORKED,UNIT MOTOR DIED AND WERE UNABLE TO GET IT TO STAY STARTED,MECHANIC CALLED TO REPAIR AND FUNCTION TEST RIG SISDFN WAITING ON RIG REPAIRS
26 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/9/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $1,800 $28,820 County ANDREWS Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $16,875 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,400 $19,000 Tot. Jts on Loc Contract Labor $800 $4, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor ANIMAS Lift Equipment, packers, hangers $6,100 Rig Number Equipment Construction Labor Pusher MIKE Tanks Operator Co. Rep. joe LEWIS Total $4,000 Cumulative $229,998 Work Summary ROAD CREW TO LOCATION,SHOWED UP AT 0900,NEW CREW,POOH WITH RODS AND PUMP,SEND PUMP TO ANDREWS PUMP SERV,NDWH AND NUBOP,UNSET PKR AND POOH WITH PKR,LAY PKR DOWN AND TIH WITH RETRIEVE TOOL FOR RBP,LATCH ONTO RBP AND POOH,LOST RBP ON TRIP OUT OF HOLE,RERUN RETRIEVE TOOL IN HOLE ON 25 STANDS 23/8" TBG.SISDFN PLAN IS TO RIH AND CATCH RBP AND POOH,APOLLO SET UP TO RUN CBL MONDAY MORN,CAUGHT SAMPLES FROM MUD ANCHOR AND PLACED ON STEPS TO TANK BATTERY FOR CHEMICAL SERVICE
27 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/12/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $3,000 $31,820 County ANDREWS Mud, Chemicals and Fluids $1,000 $17,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $1,200 $18,075 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,400 $20,400 Tot. Jts on Loc Contract Labor $4, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $6,600 $18,565 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor ANIMAS Lift Equipment, packers, hangers $6,100 Rig Number Equipment Construction Labor Pusher MIKE Tanks Operator Co. Rep. joe LEWIS Total $13,200 Cumulative $243,198 Work Summary SITP:0 SICP:0 TIH AND ENGAGE RBP AT 4244' UNSET AND TOH WITH RBP AND ON OFF TOOL. MIRU APOLLOW WIRELINE AND RUN CEMENT BOND LOG FROM 4644' TO 1800' (TOP OF CEMENT). BOND LOG SHOWED GOOD BOND THROUGH OUT TREATED INTERVAL AND QUALITY CEMENT TO 1800'. RU RUN RBP TO 4244' SET PKR ABOVE RBP AND TEST TO 500 PSI. PICK UP AND SPACE OUT SETTING PKR AT 4088' AND HANG OFF TUBING ND BOP AND NU WELL HEAD. FORWARD PLAN: TIH WITH RODS AND PUMP, SPACE OUT, HANG OFF AND RETURN TO PRODUCTION.
28 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/13/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $2,000 $33,820 County ANDREWS Mud, Chemicals and Fluids $17,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $18,075 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,400 $21,800 Tot. Jts on Loc Contract Labor $4, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $18,565 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor ANIMAS Lift Equipment, packers, hangers $6,100 Rig Number Equipment Construction Labor Pusher MIKE Tanks Operator Co. Rep. joe LEWIS Total Cumulative $3,400 $246,598 ROAD TO LOCTION, SITP O#,SICP 0#,RIG UP AND RIH WITH 1 X 8' GAS ANCHOR,2" X 1.5" X 16 PUMP,8 SINKER BARS,96 X 3/4",56 X 7/8",8,6,4' SUBS,22' PR,12' PR LINER,HANG WELL ON UNIT AND SPACE OU CHECK PUMP ACTION,SHUT DOWN TO RIG DOWN UNIT,TURN WELL TO PRODUCTION TBG TENSION PKR SET WITH 18,000# PKR DEPTH 4088',132 JTS 23/8" J55,SN ON TOP OF PKR IRON SULFIDE SAMPLES CARRIED TO BAKER 1300 HR 7/13/2010
29 GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date Completion Cost Daily Cum Well Name UNIVERSITY AZ # Road, Location and Damages State Texas Completion Rig Days $3,600 $37,420 County ANDREWS Mud, Chemicals and Fluids $17,390 Location NW ODESSA 35 MI Fuels & Lubricants Size Depth Rental Equipment $18,075 Surf Csg 8.625" 1805' Cementing Int Csg TESTER $1,750 Liner Perforation and Wireline $9,596 Prod Csg ' Acidizing and Fracturing $78,157 Tubing Engineering Supervision $1,400 $23,200 Tot. Jts on Loc Contract Labor $4, FRAC TANKS $6,655 TD 4736' SLICKLINE + AFTER FRAC LOG $18,565 PBTD 4661' Tubing $23, Wellhead $6,925 CIBP Production Unit/Heater Treater Ret. BP Flow Lines Formation SAN ANDRES Buildings Perfed Intvl Other Surface Equipment Contractor CCFORBES Lift Equipment, packers, hangers $6,100 Rig Number Equipment Construction Labor Pusher JORGE Tanks Operator Co. Rep. John Duncan Total Cumulative $5,000 $251,598 CHECK WELL TBG PRESSURE 15 PSI CSG PRESSURE 0 PSI OPEN TBG TO PIT RIG UP TO PULL RODS L/D POLISH ROD AND PONY RODS RACK BACK 56 7/8 RODS AND 96 3/4 RODS 8 SINKER BARS. WELL STILL FLOWING UN SET PACKER, NIPPLE UP BOP'S PUMP 37 BBLS DOWN TBG WELL WENT ON VACCUM P.O.O.H WITH 132 JTS 2-3/8 TBG AND HALLIBURTON BV PACKER L/D PACKER MAKE UP HALLIBURTON BP RETREVING TOOL T.I.H WITH 78 JTS 2-3/8 TBG SHUT WELL IN FOR NIGHT
30
31
32
33
34
35 Well Name: University AZ #1 State Texas Daily Operations 8/5/ :00-8/6/ :00 Operations at Report Time Acidize & swab back Current Perfs/ Intervals 4425' ' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # /5/2010 Field Name Emma, N. (Yates) Tubing Pressure (psi) 0.0 Greystone Oil & Gas LLP Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06: : SITP=0#. SICP=0#. MIRU Rising Star acid eqpt. Loaded csg w/ 1.5 BFW. Press tested lines to 3700# - OK. Released press. Pumped 16.8 bbls 15% NeFe acid down 2-3/8" tbg. 3190#. EIR #. Increased rate to # and then to #. Pumped total of 19 bbls acid. Pumped displacement wtr #. Press cont'd to drop to 1190# while displacing w/ total of 25 bbls wtr. SD pump. ISIP=460#. 5 min SITP=220#. 10 min = 160#. 15 min = 140#. RDMO Rising Star. RU swab and commenced swabbing per attached. Recovered 73.5 bbls to SN in 13 swab runs. 800'. Recovered some oil on 13th run. Sent water & oil samples to Baker Treat-O-Lite for analysis. Left well open to oil tank for night. Logs Date Type Top (ftkb) Btm (ftkb) Cased? 0.0 Supervisor on Site Job Contact: John Duncan Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 201,021 Cum Drilling 565, ,148 1,002, Completion
36 Swabs Well Name: University AZ #1 API/UWI Ground Elevation (ft) Total Depth (ftkb) Date 8/5/2010 Zone Wellbore Original Hole Swab # Start Time Swab Time (hr) Fdl Lvl (KB) Pull Depth (ftkb) P Cas (psi) Vol Recov (bbl) Vol Recov Cum (bbl) 1 00: , load wtr 2 00: , same 3 00:00 1, , same 4 00:00 2, , load wtr & spent acid 5 00:00 2, , spent acid & wtr 6 00:00 2, , same 7 00:00 2, , same 8 00:00 3, , black wtr 9 00:00 1, , same 10 00:00 2, , same 11 00:00 3, , same 12 00:00 3, , black wtr; wait 1 hr 13 00: , Oil & wtr Swab Company Job Total Volume Recovered (bbl) 73.5 Com Page 1/1
37
38 Well Name: University AZ #1 State Texas Daily Operations 8/6/ :00-8/7/ :00 Operations at Report Time Swab Test Middle Perfs Current Perfs/ Intervals 4425' ' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # /6/2010 Field Name Emma, N. (Yates) Tubing Pressure (psi) Greystone Oil & Gas LLP Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06: : Well flowed 8 bbls to tank over night w/ trace amt of oil. RU swab. 1st swab run - tagged surface. Pulled from 1400'. Swab line kinked on 2nd run. POOH. Well made small amts of fluid while repairing line. Made a total of 12 swab runs & recovered 51.2 bbls of fluid. SWI. SDFN. Logs Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 4, ,288 Cum Drilling 382,148 1,006, Completion
39
40 Well Name: University AZ #1 State Texas Daily Operations 8/7/ :00-8/8/ :00 Operations at Report Time No activity. Current Perfs/ Intervals 4425' ' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # /7/2010 Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06: : No activity. Logs Field Name Emma, N. (Yates) Tubing Pressure (psi) Greystone Oil & Gas LLP Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 570,288 Cum Drilling 382,148 1,006, Completion
41 Well Name: University AZ #1 State Texas Daily Operations 8/8/ :00-8/9/ :00 Operations at Report Time No activity. Current Perfs/ Intervals 4425' ' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # /8/2010 Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06: : No activity. Logs Field Name Emma, N. (Yates) Tubing Pressure (psi) Greystone Oil & Gas LLP Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 570,288 Cum Drilling 382,148 1,006, Completion
42 Well Name: University AZ #1 State Texas Daily Operations 8/9/ :00-8/10/ :00 Operations at Report Time Swab Test Middle Perfs Current Perfs/ Intervals 4425' ' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # /9/2010 Field Name Emma, N. (Yates) Tubing Pressure (psi) 20.0 Greystone Oil & Gas LLP Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06: : SITP=15#. SICP=20#. Opened well to production tank. Well flowed 100% oil for 5 mins and then 100% black wtr for 10 mins. Well died. RU swab and commenced swabbing per attached Logs Recovered 74 bbls in 14 swab runs. Total recovered fluid to date = 209 bbls. SWI. SDFN. Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 4, ,688 Cum Drilling 382,148 1,010, Completion
43 Swabs Well Name: University AZ #1 API/UWI Ground Elevation (ft) Total Depth (ftkb) Date 8/9/2010 Zone Wellbore Original Hole Swab # Start Time Swab Time (hr) Fdl Lvl (KB) Pull Depth (ftkb) P Cas (psi) Vol Recov (bbl) Vol Recov Cum (bbl) 1 00: , % black wtr w/ emulsion 2 00:00 1, , same 3 00:00 2, , same 4 00:00 3, , same 5 00: , same 6 00:00 3, , same 7 00:00 1, , same 8 00:00 2, , same 9 00:00 1, , same 10 00:00 3, , same 11 00:00 1, , same 12 00:00 3, , same 13 00:00 3, , same 14 00:00 1, , same Swab Company Job Total Volume Recovered (bbl) 74.4 Com Page 1/1
44
45
46 Well Name: University AZ #1 State Texas Daily Operations 8/10/ :00-8/11/ :00 Operations at Report Time Swab Test Middle Perfs Current Perfs/ Intervals 4425' ' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # /10/2010 Field Name Emma, N. (Yates) Tubing Pressure (psi) 20.0 Greystone Oil & Gas LLP Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06: : SITP=35#. SICP=20#. Opened well to rig tank. Well flowed 3.1 bbls. RU swab & commenced swabbing per attached Logs Recovered 49.1 bbls of black wtr w/ emulsion in 11 swab runs. Total fluid recovered to date = 261 bbls. SWI. SDFN. Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 4, ,088 Cum Drilling 382,148 1,015, Completion
D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :
Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.
More informationBENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS
11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling
More informationENDEAVOR ENERGY RESOURCES
ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA
More informationDrilling Morning Report
REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:
More informationUniversity 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:
Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12
More informationFORGE Energy UL 21 Freedom 1 API Number:
FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000
More informationFORGE Energy UL 21 Pahaska 1H API Number:
FORGE Energy UL 21 Pahaska 1H API Number: 42-495-33740 10/26/2016 07:00 HPJM 07:15 Install 1502 Adapter Flanges to Well Head. RU Pump Truck test lines to 1000 PSI no leaks. Load hole w/ 15 bbls fresh water.
More informationWellwork Chronological Regulatory Report
Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:
More informationDaily Drilling Report
Daily Drilling Report Well Name UTL 38-17-1H Report Date 05/05/2014 Field University Lands Supervisor Nate Baxter Report No. 97 Location 990' FNL & 300' FEL Supervisor 2 Kevin Evans DFS 94 County Ward
More informationTerrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas
Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move
More informationElevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top
DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill
More informationZarvona DAILY WORKOVER / COMPLETION REPORT
Lease/Well No: CURRENT WELL TEST: PURPOSE OF WORK: MIRU service companies/start frac PULLING UNIT: KOP 10,429' TD: 15,906' KB ABOVE GL: 30 10,713' PBTD: 15,885' INT CSG: 60 10,998' TVD: 10,950' PROD CSG:
More informationWellwork Chronological Regulatory Report
Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251
More informationZarvona Energy LLC DAILY OPERATIONS
DAYS FROM SPUD: 120 DAYS ON 0 Jun 28 2016 RIG SUPERVISOR: Tyler Dupriest MIRU pulling unit MIRU pulling unit, move in and tally TBG. SDFN RIH with RBP DAYS FROM SPUD: 121 DAYS ON 1 Jun 29 2016 RIG SUPERVISOR:
More informationPROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION
NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow
More informationFinal Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800
Final Well Report Revision: Version 0 Operating Company: Vulcan Minerals Inc. (Investcan Energy Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Field: Flat Bay Location: Western Newfoundland,
More informationH. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas
H. H. HOWELL, INC. Bevans & Wildcat Field Menard County, Texas API #42-327- 31235 RRC Permit # 803460 GAU letter, RRC Letter #GAU-1436 = 245 Ground Elevation GL: 2186 (Rig KB to GL =8 ) Rig KB =2194 Location:
More informationAMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary
AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig
More informationAbandonment Program for Paramount Fort Liard F 36
Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841
More informationEP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017
1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original
More informationEP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017
5/2/27 5:23:5 Report Version: 4..6R9 Generated from data in EDM/Opens/PROFILE Report 29 5/9/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326.
More informationBP SIT Testing Franks Facility Lafayette
BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight
More informationOil Well Potential Test, Completion or Recompletion Report, and Log
Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records
More informationPERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary
PRES WELL NO. Report End Date: 5/19/2016 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : : 0 Planned VS (ft): Current VS (ft): WOC WOC, CONTACTED TRRC, SPOKE TO ABRAHAM, ADVISED
More informationPractice Exam IADC WellSharp Driller and Supervisor
Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.
More informationOil Well Potential Test, Completion or Recompletion Report, and Log
Tracking No.: 15871 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records
More informationNiko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent
Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.
More informationPHE KE30-A8 WORKOVER PROGRAM
PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.
More informationRAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG
RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015
More informationOil Well Potential Test, Completion or Recompletion Report, and Log
Tracking No.: 16947 Status: Submitted RAILROAD COMMISSION OF TEAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records
More informationWELL NO: BJN-8. Lower master valve
WELL NO: BGN-8.; LOC: BGH Well BGN-8 came into production on 9 th Feb. 2009. Initially the FTHP = 4000 psi, CP=2400 psi and 5 1 / 2 9 5 / 8 annulus pressure = 600 psi. The well was produced at Baghjan
More informationPerforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP
MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study
More informationBLACK HILLS PLATEAU PRODUCTION COMPANY
BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado
More informationSCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS
SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS A DIFFERENT KIND OF ENERGY COMPANY Nine Energy Service isn t your typical oilfield services company. Our success stems from a culture driven by performance
More informationNeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:
Please read this entire document. It concerns all 9⅝ Vented Thru-tubing Bridge Plugs Read this document before proceeding to NeoProducts Recommended Best Practices for 9⅝ vented T- TBPs. Whenever running
More informationEP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017
Report 2/2/27 Company Type WBS No/API No PERMIAN Development 3259585 / 423337 Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location.94 Objective Drill - Wolfcamp Shale Original
More informationChapter 5 HORIZONTAL DRILLING
Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working
More informationBANDAR PANJI-1 WELL CONTROL INCIDENT REPORT
BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach
More informationW I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL
CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control
More informationCasing Design. Casing Design. By Dr. Khaled El-shreef
Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for
More informationDeepwater Horizon Incident Internal Investigation
Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation
More informationSUBSEA KILL SHEET EXERCISE No. 5
Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations
More informationDAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?
DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to
More informationHydroPull. Extended-Reach Tool. Applications
Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well
More informationBlowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD
1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,
More informationExtended leak off testing
Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures
More information2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM
RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the
More informationRig Math. Page 1.
Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys
More informationOCEAN DRILLING PROGRAM
BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole
More informationPost Job Summary Cement Intermediate Casing
EXXONMOBIL CORPORATION HOUSTON, Texas PCU 197-36A6 H&P 326 Post Job Summary Cement Intermediate Casing Prepared for: George McNary Date Prepared: November 16, 2010 Version: 1 Service Supervisor: ANDERSON,
More informationW I L D W E L L C O N T R O L FLUIDS
FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general
More informationDynamic Underbalance (DUB)
Dynamic Underbalance (DUB) Perforating Cam Le Perforating Product Champion Agenda Overview DUB Software Tools Case histories 2011 HALLIBURTON. ALL RIGHTS RESERVED. 2 Dynamic Underbalance Software Dynamic
More informationA Longer Lasting Flowing Gas Well
2018 Artificial Lift Strategies for Unconventional Wells Workshop Cox Convention Center, February 4 7, 2018 A Longer Lasting Flowing Gas Well New Dual-Tubing Flowing Design Paul Edwards, Production Engineer,
More informationand and Norton J. Lapeyrouse CONTENTS
and and Norton J. Lapeyrouse CONTENTS Chapter 1 Basic Formulas P. 3 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Pressure Gradient Hydrostatic Pressure Converting Pressure into Mud
More informationEP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017
4/22/217 8:23:32 Report Version: 4.1.16R9 Generated from data in EDM/Opens/PROFILE 1 RESTRICTED Report 29 4/21/217 Company Type bore WBS No/API No PERMIAN Development 3256997 / 42313354. Event Summary
More informationHydro-Mech Bridge Plug
Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with
More informationRAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG
RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 03/16/2016
More informationPasquale Imbò e Marco Pelucchi ENI S.pA;
7th European Gas Well Deliquification Conference Innovative Failsafe Capillary Injection System Resolves Liquid Loading in Gas Well with a Cost- Effective Solution that Maintaining Production and Well-Safety
More informationSuccessful Deployment of a Long Gun String Via Intelligent Coiled Tubing
Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Parry Hillis: Technical Manager BakerHughes David Ayre: BP Well Perforation Specialist Jim Gilliat: TCP/DST Business Development
More informationStudy Guide IADC WellSharp Driller and Supervisor
Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank
More information"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations
"Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG
More informationBest Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems
Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems As a result of a recent job incident utilizing a Ball Drop Type firing system deployed on coiled tubing, the following
More informationCompletions & Workovers Module 1.9
Completions & Workovers Module 1.9 CAPPA CAPPA Level 1 LAST REVISED March 20, 2013 Completions & Workovers Module Summary Students will learn what is involved in a well completion, how a completion is
More informationUnderstanding pressure and pressure
CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important
More informationRAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG
RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 06/29/2015
More informationWell Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.
Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well
More informationBridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation
Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure
More informationW I L D W E L L C O N T R O L AIR DRILLING
AIR DRILLING Air Drilling Learning Objectives You will learn the basics of: Air drilling equipment Types of air drilling Differences between mud and air drilling You will learn how to apply well control
More informationHPHT Annular Casing Packer. Obex Annular Casing Packer
HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration
More informationColorado Oil and Gas Conservation Commission
Colorado Oil and Gas Conservation Commission http://cogcc.state.co.us/ FORM 5A Completed Interval Report INDUSTRY TRAINING Denver, Colorado November 27, 2012 Form 5A Completed Interval Report Introduction
More informationAir and Gas Drilling
Air and Gas Drilling Air and Gas Drilling It is a technique in which the more common drilling fluids, (water or mud) are replaced by highly compressible Air or Natural gas. But Compressibility makes pressure
More informationRPSEA UDW Forum June 22 & 23, Secure Energy for America
RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors
More informationSUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives
SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-S Revision 0 13 February 2015 DC 2015 COPYRGHT
More informationEP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016
Report 19 5/26/216 Company Type WBS No/API No PERMIAN Exploration 324861 / 423132849. Event Summary Event Type Drilling only Event Start Date 4/24/216 Days on Location 18.67 Objective Drill - Wolfcamp
More informationRIH intermediate section casing in Bazian-1 exploration oil well
Energy and Sustainability V 559 RIH intermediate section casing in Bazian-1 exploration oil well A. K. Darwesh Petroleum Engineering Department, Engineering Faculty, Koya University, Kurdistan Abstract
More information6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)
RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at
More informationSPE MS. Copyright 2015, Society of Petroleum Engineers
SPE-173678-MS Cost Effective Solutions to Achieve Injection Post Toe Valve Failure Cody Trebing, Thru Tubing Solutions; Jeff Whitworth, Thru Tubing Solutions; Alex Beszterda, ConocoPhillips Copyright 2015,
More information5k Slickline Lightweight Pressure Control Equipment 4 ID
5k Slickline Lightweight Pressure Control Equipment 4 ID Table of Contents 5k Slickline Lightweight Pressure Control Equipment 4 ID... 1 Hydraulic Slickline Stuffing Box... 3 Wireline Lubricators... 4
More informationNorth American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug
North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide
More informationDUO-SQUEEZE H LCM Mixing Tables and Operating Procedures
BAROID DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton January 2014 1 Copyright
More informationMonte Besler Consultant FracN8R Consulting LLC UNITED STATES
Monte Besler Consultant FracN8R Consulting LLC UNITED STATES Engineered Safety and Environmental Aspects of Well Construction and Fracturing Design Monte Besler FRACN8R Consulting, LLC Surface Considerations
More informationSUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives
SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-D Revision 0 13 February 2015 DC 2015 COPYRGHT PROTECTED
More informationDB Bridge Plug. Features. Benefits. Applications
DB Bridge Plug The WELLFIRST Premium Cast Iron Bridge Plug designed to run on electric line. Rated between 2000-10000-psi differential, and 300 F from above and below. Features Field Proven Design Constructed
More informationRAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG
RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Date: Tracking No.: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Submitted
More information1. The well has been shut in on a kick and the kill operation has not started.
Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures
More informationOptimising Hydraulic Energy to Dramatically Improve Lateral Reach
Optimising Hydraulic Energy to Dramatically Improve Lateral Reach What Affects Reach? Build angle Size of completion CT size Drag Mechanical Fluid Debris in well BHA size End load CT size End load Buoyancy
More informationLive well deployment of long perforating gun system using combined CT technologies
Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker
More informationMOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve
MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation
More informationSPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director
SPE Forum: Source Control for Wells in Shallow Water Lars Herbst, Gulf of Mexico Regional Director Agenda Introduction and Background Historical Well Control Events Scope of Discussion Scenario Driven
More informationPump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013
9 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013 Pump Fillage Problem Overview Jim McCoy Lynn Rowlan Tony Podio Ken Skinner Echometer Company Jim@echometer.com
More informationAPPENDIX A1 - Drilling and completion work programme
APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme
More informationWellCAP IADC WELL CONTROL ACCREDITATION PROGRAM
WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS (WIRELINE, COILED TUBING & SNUBBING) CORE CURRICULUM AND RELATED FORM WCT-2WSI INTRODUCTORY LEVEL For information on how an course
More informationHorizontal Marmaton Wells in Beaver County, OK
Horizontal Marmaton Wells in Beaver County, OK Drilling Improvements & Lessons Learned Presented by: Michael Dunn Drilling Engineer Unit Petroleum Forward Looking Statement DISCLAIMER It is understood
More informationCoal Bed Methane (CBM) Permeability Testing
Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April 28-29, 2011 ExxonMobil Exploration / Well Testing Team CBM Flow Characteristics Flow mechanism Gas desorbs when pressure drops below
More informationColorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions
NOTE: Changes to the Form 5A, effective June 1, 2012, to accommodate the disclosure requirements are indicated by a preceding asterisk (*) and bold italics. All other fields are unchanged. FORM 5A HEADING
More informationINTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE
INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following
More informationBLOCK: CB-ONN-2010/8 GUJRAT-INDIA
Well Control Manual Bharat PetroResources Limited BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Prepared By: EnQuest PetroSloutions Pvt. Ltd. Contents 1.0.0 Definitions 2.0.0. Causes of Kicks 3.0.0. Kick indications
More informationBorais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures
Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Slot Recovery Procedures: Slot Recovery Running Procedures 1. Cut And Retrieve Operation: Borais s cut and retrieve equipment: 1.
More informationPerforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC
Perforation Design for Well Stimulation R. D. Barree Barree & Associates LLC Typical Shaped Charge Primer charge Main explosive charge Case or container Detonating cord groove ¾ point of initiation Liner
More informationFRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs
FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs Overview of Presentation BlackBrush Oil & Gas Natural Gas Liquids (NGLs) as frac fluid. Advantages
More information