1 August 8, 2006 Joseph Sternola Permagas, Inc N. Machias Road Lake Stevens, WA Re: IAPMO Standards Council Decision TIA UPC Decision Date: August 8, 2006** Uniform Plumbing Code Dear Mr. Sternola: I am transmitting to you herewith the following decision of the Standards Council. At its teleconference meeting on August 8, 2006, the Standards Council considered your request for the issuance of proposed TIA UPC on the 2006 edition of the Uniform Plumbing Code. The proposed TIA requests the following changes: Delete the exception to section which is a duplication of item (C), (16) of section General. The regulations of this chapter shall govern the installation of all fuel gas piping in or in connection with any building or structure or within the property lines of any premises up to 5 psi, other than service pipe. Fuel oil piping systems shall be installed in accordance with NFPA 31. Exception: Gas piping, meters, gas-pressure regulators, and other appurtenances used by the serving gas supplier in distribution of gas, other than undiluted LP-Gas [NFPA 54: (16)] Amend Section as follows: The following regulations, as set forth in this section and in Section , Required Gas Piping Size, shall be the standard for the installation of gas piping. All natural gas regulations and tables are based on the use of gas having a specific gravity of sixty hundredths (0.60), supplied at six (6) to eight (8) inches ( mm) water column pressure at the outlet of the meter or regulator. Where the natural gas supplier cannot maintain a minimum inlet pressure of six (6) inches (152 mm) water column pressure, Table 12-7 allowing a maximum pressure drop of 0.3-inch (7.6 mm) water column shall be used. For undiluted liquefied petroleum gas, gas piping may be sized for 2,500 Btu per cubic foot (25.9 Watt-hours/L) at eleven (11) inches (279 mm) water column pressure at the outlet of the meter or regulator and specific gravity of one and fifty-two hundredths (1.5250). Ph: Fax: International Association of Plumbing and Mechanical Officials 5001 East Philadelphia Street Ontario, California USA

2 J. Sternola IAPMO Standards Council Decision TIA UPC Page 2 of 5 August 8, 2006 Delete existing and replace with Sections through amended as follows: Where the maximum demand does not exceed two hundred fifty (250) cubic feet per hour (2 L/sec.) and the maximum length of piping between the meter and the most distant outlet is not over two hundred fifty (250) feet (76,200 mm), the size of each section and each outlet of any system of gas piping shall be determined by means of Table 12-7 for steel pipe, or Table for copper tubing systems, or Table for CSST systems. Other Systems within the range of Table 12-7 or or Table may be sized from that table or by means of the methods set forth in Section Pipe Sizing Methods Where the pipe size is to be determined using any of the methods in Sections through , the diameter of each pipe segment shall be obtained from the pipe-sizing tables in Section or from the sizing equations in Section [NFPA 54: 6.1] Longest Length Method. The pipe size of each section of gas piping shall be determined using the longest length of piping from the point of delivery to the most remote outlet and the load of the section (see calculation example in Figure 12-2). [NFPA 54: 6.1.1] Branch Length Method. Pipe shall be sized as follows: [NFPA 54: 6.1.2] (A) Pipe size of each section of the longest pipe run from the point of delivery to the most remote outlet shall be determined using the longest run of piping and the load of the section. (B) The pipe size of each section of branch piping not previously sized shall be determined using the length of piping from the point of delivery to the most remote outlet in each branch and the load of the section Hybrid Pressure. The pipe size for each section of higher-pressure gas piping shall be determined using the longest length of piping from the point of delivery to the most remote line pressure regulator. The pipe size from the line pressure regulator to each outlet shall be determined using the length of piping from the regulator to the most remote outlet served by the regulator. [NFPA 54: 6.1.3] Tables for Sizing Gas-Piping Systems. Tables 12-7 through shall be used to size gas piping in conjunction with one of the methods described in Sections through [NFPA 54: 6.2,6.3] Sizing Equations. The inside diameter of smooth-wall pipe or tubing shall be determined by the sizing equations 12-1 or 12-2, using the equivalent pipe length determined by Sections through [NFPA 54: 6.4] Equation 12-1 Low-Pressure Gas Formula (Less than 1.5 psi [10.3 kpa]): [NFPA 54: 6.4.1] (Remains unchanged.) Equation 12-2 High-Pressure Gas Formula (1.5 psi [10.3 kpa] and above): [NFPA 54: 6.4.2] (Remains unchanged.)

3 J. Sternola IAPMO Standards Council Decision TIA UPC Page 3 of 5 August 8, 2006 Table 12-4 Cr and Y for Natural Gas and Undiluted Propane at Standard Conditions [NFPA 54: Table 6.4.2] (To be renumbered accordingly.) Amend Figure 12-2 Example as follows: Figure 12-2 Example Illustrating Use of Tables 12-1 and Solution: (1) Maximum gas demand of outlet A 32 cubic feet per hour (0.21 L/sec.) (from Table 12-1). Maximum gas demand of outlet B 3 cubic feet per hour (0.02 L/sec.) (from Table 12-1). Maximum gas demand of outlet C 59 cubic feet per hour (0.46 L/sec.) (from Table 12-1). Maximum gas demand of outlet D 136 cubic feet per hour (1.1 L/sec.) (150,000 Btu/hour [43,950 W]) divided by 1,100 Btu per cubic foot (11.4 Watt-hour/L) (2) The length of pipe from the gas meter to the most remote outlet (outlet A) is 60 feet (18,288 mm). (3) Using the length in feet column row marked 60 feet (18,288 mm) in Table 12-78: Outlet A, supplying 32 cubic feet per hour (0.21 L/sec.), requires one-half (1/2) inch (15 mm) pipe. Section 1, supplying outlets A and B, or 35 cubic feet per hour (0.24 L/sec.) requires one-half (1/2) inch (15 mm) pipe. Section 2, supplying outlets A, B, and C, or 94 cubic feet per hour (0.7 L/sec.) requires three-quarter (3/4) inch (20 mm) pipe. Section 3, supplying outlets A, B, C, and D, or 230 cubic feet per hour (1.8 L/sec.), requires one and one quarter (1-1/4) inch (32 25 mm) pipe. (4) Using the column marked 60 feet (18288 mm) in Table (no column for actual length of 55 feet [16,764 mm]: Outlet B supplying 3 cubic feet per hour (0.02 L/sec.), requires one-half (1/2) inch (15 mm) pipe. Outlet C, supplying 59 cubic feet per hour (0.46 L/sec.), requires one-half (1/2) inch (15 mm) pipe. (5) Using the column marked 50 feet (15,240 mm) in Table : Outlet D, supplying 136 cubic feet per hour (1.1 L/sec.), requires (1 3/4) inch (25 20 mm) pipe. Amend Section through as follows: To determine the size of each section of pipe in any system within the range of the Table 12-7, proceed as follows: (1A) Measure the length of the pipe from the gas meter location to the most remote outlet on the system.

4 J. Sternola IAPMO Standards Council Decision TIA UPC Page 4 of 5 August 8, 2006 (2B) (3C) (4D) (5E) (6F) In Table 12-7 sselect the length in feet column and row showing that distance, or the next longer distance if the table does not give the exact length. Starting at the most remote outlet, find in the row just selected the gas demand for that outlet. If the exact figure of demand is not shown, choose the next larger figure in the row. At the top of this column will be found the correct size of pipe. Using this same row, proceed in a similar manner for each section of pipe serving this outlet. For each section of pipe, determine the total gas demand supplied by that section. Where gas piping sections serve both heating and cooling equipment and the installation prevents both units from operating simultaneously, only the larger of the two demand loads needs be used in sizing these sections. Size each section of branch piping not previously sized by measuring the distance from the gas meter location to the most remote outlet in that branch and follow the procedures of steps 2 B, 3 C, 4 D, and 5 E above. Note: Size branch piping in the order of their distance from the meter location, beginning with the most distant outlet not previously sized For conditions other than those covered by Section , such as longer runs or greater gas demands, the size of each gas piping system shall be determined by standard engineering methods acceptable to the Authority Having Jurisdiction, and each such system shall be so designed that the total pressure drop between the meter or other point of supply and any outlet when full demand is being supplied to all outlets, will at no time exceed five-tenths (0.5) inches (12.7 mm) water column pressure Where the gas pressure may be higher than fourteen (14) inches (356 mm) or lower than six (6) inches (152 mm) of water column, or when diversity demand factors are used, the design, pipe, sizing, materials, location, and use of such systems first shall be approved by the Authority Having Jurisdiction. Piping systems designed for pressures higher than the serving gas supplier's standard delivery pressure shall have prior verification from the gas supplier of the availability of the design pressure. Systems using undiluted liquefied petroleum gas may be sized using Table for steel pipe and Table for CSST for eleven (11) inches (279 mm) of water column and in accordance with the provisions of Sections and For copper tubing systems using undiluted liquefied petroleum gas, the capacity of the tubing shall be determined by multiplying the values of Table by the appropriate factor from Table The Council notes that the identical changes are proposed to the 2006 edition of the Uniform Mechanical Code in proposed TIA-UMC and the Council addresses both requests simultaneously. Proposed TIA UPC was balloted through the Plumbing Technical Committee in accordance with the Regulations Governing Committee Projects to determine if there existed the necessary three-fourths majority support on technical merit and emergency nature to establish the recommendation for issuance. In each case, the letter ballot failed to achieve the required threefourths majority to establish the recommendation for issuance although a majority of committee

5 J. Sternola IAPMO Standards Council Decision TIA UPC Page 5 of 5 August 8, 2006 members voted to recommend the issuance of the TIA on both accounts. The identical issue was presented to the Mechanical Technical Committee who recommended by three-fourths majority on both accounts to issue TIA-UMC In determining whether or not to issue a TIA, the Council looks to the TC letter ballot for a recommendation of support, which was not achieved by the Plumbing TC in this instance. Notwithstanding the absence of a clear recommendation by the Plumbing TC, the Council agrees by unanimous vote that substantial reasons exist for the issuance of the TIA requested by proponent. The Council is persuaded by the compelling argument made by the proponent within the body of proponent s submission and notes that the issuance of this TIA will serve to further harmonize the 2006 edition of the Uniform Plumbing Code with the National Fuel Gas Code. The Council concurs with the substantiation set forth by the proponent and after a full review and consideration of all of the information available to it, the Council voted to issue proposed TIA UPC (attached). Parenthetically, the Council also notes the issuance of TIA UMC placing the identical language into the 2006 edition of the Uniform Mechanical Code. Sincerely, Gabriella Davis Secretary, IAPMO Standards Council Encl. CC: Neil Bogatz, General Counsel Jay Peters, Recording Secretary, ISC IAPMO Standards Council Members of the Plumbing TC Lynne Simnick, Plumbing TC Liaison Carl Marbery, Mechanical TC Liaison NOTE: Participants in IAPMO s codes and standards making process are advised that limited review of this decision may be sought from the NFPA Standards Council. For the rules describing the available review and the method for petitioning the NFPA Standards Council for review, please consult Section 1-7 of the IAPMO Regulations Governing Committee Projects and the IAPMO Regulations Governing Petitions to the NFPA Standards Council from Decisions of the IAPMO Standards Council. Notice of the intent to file such a petition must be submitted to the Secretary of the NFPA Standards Council within 15 calendar days of the Date of Decision noted in the subject line of this letter. As this document has been designated by the American National Standards Institute (ANSI) as an American National Standard (ANS), any persons who have directly and materially affected interests by this decision have the right to appeal to ANSI in accordance with ANSI procedures.

6 UNIFORM PLUMBING CODE TM 2006 TIA Log No. UPC Reference : Sections , , , , , , , and Figure 12-2 (example) Comment Closing Date: July 17, 2006 Submitter: Joe Sternola, Permagas, Inc. Proposed language for TIA: 1. Delete the exception to section which is a duplication of item (C), (16) of section General. The regulations of this chapter shall govern the installation of all fuel gas piping in or in connection with any building or structure or within the property lines of any premises up to 5 psi, other than service pipe. Fuel oil piping systems shall be installed in accordance with NFPA 31. Exception: Gas piping, meters, gas-pressure regulators, and other appurtenances used by the serving gas supplier in distribution of gas, other than undiluted LP-Gas [NFPA 54: (16)] 2. Amend Section as follows: The following regulations, as set forth in this section and in Section , Required Gas Piping Size, shall be the standard for the installation of gas piping. All natural gas regulations and tables are based on the use of gas having a specific gravity of sixty hundredths (0.60), supplied at six (6) to eight (8) inches ( mm) water column pressure at the outlet of the meter or regulator. Where the natural gas supplier cannot maintain a minimum inlet pressure of six (6) inches (152 mm) water column pressure, Table 12-7 allowing a maximum pressure drop of 0.3-inch (7.6 mm) water column shall be used. For undiluted liquefied petroleum gas, gas piping may be sized for 2,500 Btu per cubic foot (25.9 Watt-hours/L) at eleven (11) inches (279 mm) water column pressure at the outlet of the meter or regulator and specific gravity of one and fifty-two hundredths (1.5250). 3. Delete existing and replace with Sections through amended as follows: Where the maximum demand does not exceed two hundred fifty (250) cubic feet per hour (2 L/sec.) and the maximum length of piping between the meter and the most distant outlet is not over two hundred fifty (250) feet (76,200 mm), the size of each section and each outlet of any system of gas piping shall be determined by means of Table 12-7 for steel pipe, or Table for copper tubing systems, or Table for CSST systems. Other Systems within the

7 TM UNIFORM PLUMBING CODE 2006 TIA Log No. UPC Page 2 range of Table 12-7 or or Table may be sized from that table or by means of the methods set forth in Section Pipe Sizing Methods Where the pipe size is to be determined using any of the methods in Sections through , the diameter of each pipe segment shall be obtained from the pipe-sizing tables in Section or from the sizing equations in Section [NFPA 54: 6.1] Longest Length Method. The pipe size of each section of gas piping shall be determined using the longest length of piping from the point of delivery to the most remote outlet and the load of the section (see calculation example in Figure 12-2). [NFPA 54: 6.1.1] Branch Length Method. Pipe shall be sized as follows: [NFPA 54: 6.1.2] (A) Pipe size of each section of the longest pipe run from the point of delivery to the most remote outlet shall be determined using the longest run of piping and the load of (B) the section. The pipe size of each section of branch piping not previously sized shall be determined using the length of piping from the point of delivery to the most remote outlet in each branch and the load of the section Hybrid Pressure. The pipe size for each section of higher-pressure gas piping shall be determined using the longest length of piping from the point of delivery to the most remote line pressure regulator. The pipe size from the line pressure regulator to each outlet shall be determined using the length of piping from the regulator to the most remote outlet served by the regulator. [NFPA 54: 6.1.3] Tables for Sizing Gas-Piping Systems. Tables 12-7 through shall be used to size gas piping in conjunction with one of the methods described in Sections through [NFPA 54: 6.2,6.3] Sizing Equations. The inside diameter of smooth-wall pipe or tubing shall be determined by the sizing equations 12-1 or 12-2, using the equivalent pipe length determined by Sections through [NFPA 54: 6.4] Equation 12-1 Low-Pressure Gas Formula (Less than 1.5 psi [10.3 kpa]): [NFPA 54: 6.4.1] (Remains unchanged.) Equation 12-2 High-Pressure Gas Formula (1.5 psi [10.3 kpa] and above): [NFPA 54: 6.4.2] (Remains unchanged.)

8 TM UNIFORM PLUMBING CODE 2006 TIA Log No. UPC Page 3 Table 12-4 Cr and Y for Natural Gas and Undiluted Propane at Standard Conditions [NFPA 54: Table 6.4.2] (To be renumbered accordingly.) 4. Amend Figure 12-2 Example as follows: Figure 12-2 Example Illustrating Use of Tables 12-1 and Solution: (1) Maximum gas demand of outlet A 32 cubic feet per hour (0.21 L/sec.) (from Table 12-1). Maximum gas demand of outlet B 3 cubic feet per hour (0.02 L/sec.) (from Table 12-1). Maximum gas demand of outlet C 59 cubic feet per hour (0.46 L/sec.) (from Table 12-1). Maximum gas demand of outlet D 136 cubic feet per hour (1.1 L/sec.) (150,000 Btu/hour [43,950 W]) divided by 1,100 Btu per cubic foot (11.4 Watt-hour/L) (2) The length of pipe from the gas meter to the most remote outlet (outlet A) is 60 feet (18,288 mm). (3) Using the length in feet column row marked 60 feet (18,288 mm) in Table 12-78: Outlet A, supplying 32 cubic feet per hour (0.21 L/sec.), requires one-half (1/2) inch (15 mm) pipe. Section 1, supplying outlets A and B, or 35 cubic feet per hour (0.24 L/sec.) requires one-half (1/2) inch (15 mm) pipe. Section 2, supplying outlets A, B, and C, or 94 cubic feet per hour (0.7 L/sec.) requires three-quarter (3/4) inch (20 mm) pipe. Section 3, supplying outlets A, B, C, and D, or 230 cubic feet per hour (1.8 L/sec.), requires one and one quarter (1-1/4) inch (32 25 mm) pipe. (4) Using the column marked 60 feet (18288 mm) in Table (no column for actual length of 55 feet [16,764 mm]: Outlet B supplying 3 cubic feet per hour (0.02 L/sec.), requires one-half (1/2) inch (15 mm) pipe. Outlet C, supplying 59 cubic feet per hour (0.46 L/sec.), requires one-half (1/2) inch (15 mm) pipe. (5) Using the column marked 50 feet (15,240 mm) in Table : Outlet D, supplying 136 cubic feet per hour (1.1 L/sec.), requires (1 3/4) inch (25 20 mm) pipe. 5. Amend Section through as follows: To determine the size of each section of pipe in any system within the range of the Table 12-7, proceed as follows: (1A) Measure the length of the pipe from the gas meter location to the most remote outlet on the system.

9 TM UNIFORM PLUMBING CODE 2006 TIA Log No. UPC Page 4 (2B) (3C) (4D) (5E) (6F) In Table 12-7 sselect the length in feet column and row showing that distance, or the next longer distance if the table does not give the exact length. Starting at the most remote outlet, find in the row just selected the gas demand for that outlet. If the exact figure of demand is not shown, choose the next larger figure in the row. At the top of this column will be found the correct size of pipe. Using this same row, proceed in a similar manner for each section of pipe serving this outlet. For each section of pipe, determine the total gas demand supplied by that section. Where gas piping sections serve both heating and cooling equipment and the installation prevents both units from operating simultaneously, only the larger of the two demand loads needs be used in sizing these sections. Size each section of branch piping not previously sized by measuring the distance from the gas meter location to the most remote outlet in that branch and follow the procedures of steps 2 B, 3 C, 4 D, and 5 E above. Note: Size branch piping in the order of their distance from the meter location, beginning with the most distant outlet not previously sized For conditions other than those covered by Section , such as longer runs or greater gas demands, the size of each gas piping system shall be determined by standard engineering methods acceptable to the Authority Having Jurisdiction, and each such system shall be so designed that the total pressure drop between the meter or other point of supply and any outlet when full demand is being supplied to all outlets, will at no time exceed five-tenths (0.5) inches (12.7 mm) water column pressure Where the gas pressure may be higher than fourteen (14) inches (356 mm) or lower than six (6) inches (152 mm) of water column, or when diversity demand factors are used, the design, pipe, sizing, materials, location, and use of such systems first shall be approved by the Authority Having Jurisdiction. Piping systems designed for pressures higher than the serving gas supplier's standard delivery pressure shall have prior verification from the gas supplier of the availability of the design pressure. Systems using undiluted liquefied petroleum gas may be sized using Table for steel pipe and Table for CSST for eleven (11) inches (279 mm) of water column and in accordance with the provisions of Sections and For copper tubing systems using undiluted liquefied petroleum gas, the capacity of the tubing shall be determined by multiplying the values of Table by the appropriate factor from Table

10 TM UNIFORM PLUMBING CODE 2006 TIA Log No. UPC Page 5 Substantiation for TIA: Technical Merit: 1. The exception to section is a duplication and is not required. 2. Table 12-7 allowing a maximum pressure drop of 0.3-inch water column was added to the code without any explanation or reason for the addition. If this table was routinely used in would result in oversizing of the system. The 2500 BTU per cubic foot heating value for LPG was removed from NFPA 54 and is not required for sizing an LPG system. All the new LPG tables in the code reflect a specific gravity of one and fifty hundredths (1.50). 3. Section is no longer applicable to the new tables in the code. The designer of the system must select the table which best describes the piping material and the source of gas supplied. Section through Section including equations 12-1 and 12-2 are relocated to Section so that pipe sizing is covered in one location in the code instead of two. 4. Figure 12-2 Example Illustrating the use of Table 12-1 and 12-7 is amended to illustrate the use of Table 12-8 which provide for a pressure drop of 0.5 inches water column. This is the most commonly used table instead of Table 12-7 which as stated in the amended Section is for systems that cannot supply a minimum pressure of six (6) inches water column pressure. 5. Section is amended to remove reference to any specific table as the method described would apply to all of the tables. Section is amended to remove the last two sentences as separate tables for LPG are now provided. Emergency Nature: In processing the 2006 edition, tables were added, taken from NFPA 54, National Fuel Gas Code. As these tables cover a greater number of conditions, such as pressure and pressure drop, which were not previously included in the Uniform Plumbing Code. The changes to the UPC are needed to explain the use of these new tables.

SIZING AND CAPACITIES OF GAS PIPING

SIZING AND CAPACITIES OF GAS PIPING APPENDIX A (IFGS) SIZING AND CAPACITIES OF GAS PIPING (This appendix is informative and is not part of the code. This appendix is an excerpt from the 2003 International Fuel Gas Code, coordinated with

More information

SIZING AND CAPACITIES OF GAS PIPING

SIZING AND CAPACITIES OF GAS PIPING APPENDIX A (IFGS) SIZING AND CAPACITIES OF GAS PIPING (This appendix is adopted as part of the code.) A.1 General. To determine the size of piping used in a gas piping system, the following factors must

More information

SIZING AND CAPACITIES OF GAS PIPING Reserved

SIZING AND CAPACITIES OF GAS PIPING Reserved APPENDIX A (IFGS) SIZING AND CAPACITIES OF GAS PIPING Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 529R APPENDIX A SIZING AND CAPACITIES OF GAS PIPING This page left intentionally blank. 530R 2003 INTERNATIONAL

More information

SIZING AND CAPACITIES OF GAS PIPING

SIZING AND CAPACITIES OF GAS PIPING SIZING AND CAPACITIES OF GAS PIPING A.1 General piping considerations. The first goal of determining the pipe sizing for a fuel gas piping system is to make sure that there is sufficient gas pressure at

More information

SIZING AND CAPACITIES OF GAS PIPING

SIZING AND CAPACITIES OF GAS PIPING (IFGS) SIZING AND CAPACITIES OF GAS PIPING (This appendix is informative and is not part of the code. This appendix is an excerpt from the 2006 International Fuel Gas Code, coordinated with the section

More information

GAS DELIVERY PRESSURE AND MEASUREMENT

GAS DELIVERY PRESSURE AND MEASUREMENT GAS DELIVERY PRESSURE AND MEASUREMENT I. PURPOSE: To establish a uniform basis on which to provide gas measurement and pressure regulation facilities on customers premises. II. DELIVERY PRESSURES AND PROVISIONS:

More information

NFPA 1124, Code for the Manufacture, Transportation, Storage, and Retail Sales of Fireworks and pyrotechnic Articles, 2006 edition.

NFPA 1124, Code for the Manufacture, Transportation, Storage, and Retail Sales of Fireworks and pyrotechnic Articles, 2006 edition. NFPA 5000-2012 and Proposed 2015 Edition Building Construction and Safety Code TIA Log No. 1139 Reference: Various Comment Closing Date: May 16, 2014 Submitters: Gary Keith, FM Global TIA language for

More information

Fuel Gas Piping Systems CEU 240. Continuing Education from the American Society of Plumbing Engineers. October ASPE.

Fuel Gas Piping Systems CEU 240. Continuing Education from the American Society of Plumbing Engineers. October ASPE. Fuel Gas Piping Systems Continuing Education from the American Society of Plumbing Engineers October 2016 ASPE.ORG/ReadLearnEarn CEU 240 READ, LEARN, EARN Note: In determining your answers to the CE questions,

More information

IAPMO IS PUBLIC REVIEW DRAFT Thrust Blocking for Rubber Gasketed and Solvent Cement Joints

IAPMO IS PUBLIC REVIEW DRAFT Thrust Blocking for Rubber Gasketed and Solvent Cement Joints IAPMO IS 33-2019 PUBLIC REVIEW DRAFT Thrust Blocking for Rubber Gasketed and Solvent Cement Joints IAPMO Standard IAPMO IS 33 2019 Published: Month Year Published by International Association of Plumbing

More information

appendix a recommended rules For sizing the water supply system PRE-PRINT Chart a 1.2 FriCtion losses For Disk-type water Meters

appendix a recommended rules For sizing the water supply system PRE-PRINT Chart a 1.2 FriCtion losses For Disk-type water Meters recommended rules For sizing the water supply system Because of the variable conditions encountered, it is impractical to lay down definite detailed rules of procedure for determining the sizes of water

More information

Piped Air SCBA Refilling System Standard

Piped Air SCBA Refilling System Standard WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Piped Air SCBA Refilling System Standard SCOPE: This specification

More information

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM CHART A 1.2 FRICTION LOSSES FOR DISK-TYPE WATER METERS 1-1/2"

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM CHART A 1.2 FRICTION LOSSES FOR DISK-TYPE WATER METERS 1-1/2 RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM Because of the variable conditions encountered, it is impractical to lay down definite detailed rules of procedure for determining the sizes of water

More information

2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE

2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE TITLE 14 CHAPTER 8 PART 3 HOUSING AND CONSTRUCTION PLUMBING CODES 2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE 14.8.3.1 ISSUING AGENCY: Construction Industries Division (CID) of the Regulation and

More information

Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet)

Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet) Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet) INSTALLATION INSTRUCTIONS For R7 Series Light Commercial Packaged Gas Electric Units IIMPORTANT: Please

More information

SIZING OF WATER PIPING SYSTEM

SIZING OF WATER PIPING SYSTEM SIZING OF WATER PIPING SYSTEM (This appendix is informative and is not part of the code.) SECTION AP101 GENERAL AP101.1 Scope. AP101.1.1 This appendix outlines two procedures for sizing a water piping

More information

GAS SUPPLY DESIGN GUIDE

GAS SUPPLY DESIGN GUIDE GAS SUPPLY DESIGN GUIDE Natural Gas, Propane Gas, or Dual Fuel Fired Modulating, Condensing Boilers BENCHMARK Series Gas-Fired Boilers For models: BMK750 to BMK6000 Last Update: 06/20/2014 PR1 06/20/14

More information

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEMS CHART A-1 FRICTION LOSSES FOR DISK-TYPE WATER METERS 1-1/2"

APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEMS CHART A-1 FRICTION LOSSES FOR DISK-TYPE WATER METERS 1-1/2 RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEMS Because of the variable conditions encountered, it is impractical to lay down definite detailed rules of procedure for determining the sizes of water

More information

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations MINIMUM Pipeline Safety Regulations Application for Jurisdictional LPG Operators 1 Pipeline Safety Regulations 49 CFR Part 192 (NOTE:

More information

SIZING OF WATER PIPING SYSTEM

SIZING OF WATER PIPING SYSTEM SIZING OF WATER PIPING SYSTEM The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance. E101.1 Scope. SECTION E101 GENERAL E101.1.1 This appendix

More information

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES

DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment proposal must address climate,

More information

* William A. Sala, Jr. John A. Roscher. Columbia Gas Transmission, LLC * Sorana Linder 700 Louisiana Street, Suite 700 Director, Regulated Services

* William A. Sala, Jr. John A. Roscher. Columbia Gas Transmission, LLC * Sorana Linder 700 Louisiana Street, Suite 700 Director, Regulated Services December 1, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Columbia Gas Transmission, LLC 700 Louisiana Street, Suite 700 Houston, TX

More information

Pro-Flex,LLC. Flexible Gas Piping Systems. & Flak Jacket TM CSST. Installation/Training Guide. Pro-Flex,LLC

Pro-Flex,LLC. Flexible Gas Piping Systems. & Flak Jacket TM CSST. Installation/Training Guide. Pro-Flex,LLC Pro-Flex,LLC Flexible Gas Piping Systems Pro-Flex & Flak Jacket TM CSST Installation/Training Guide Pro-Flex,LLC 501 South State Road 341 Hillsboro, IN 47949 Patented System: #5,845,946, #5,857,716, &

More information

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC 157-20067 1 PURPOSE 1.1 The purpose of this standard is to establish an acceptable standard

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Heat Recovery Steam Generators Jeanne Moreau DATE: April 23, 2010 SUBJECT: NFPA 85 F10 ROC Letter Ballot The ROC letter ballot

More information

Installation/Training Guide PRO-FLEX CSST

Installation/Training Guide PRO-FLEX CSST TRU-FLEX METAL HOSE CORP. is an ISO Registered Company Installation/Training Guide PRO-FLEX CSST Patented System #5,845,946, #5,857,716 & #6,102,445 and other patents pending 2391 S. St. Rd. 263 PO Box

More information

September 2018 Pressure Test

September 2018 Pressure Test September 2018 Pressure Test The requirements for a pressure test are found in NFPA 54, Chapter 8, Sections 8.1-8.1.53 of the 2012 edition. A pressure test shall not be confused with a leak check. The

More information

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1* INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1* THIS KIT CONTAINS: AOPS7741 (NATURAL TO PROPANE CONVERSION PARTS FOR MODEL SIZE, 50) AOPS7742(NATURAL

More information

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS ORDINANCE NO. 1267 AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER 14.28 OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS THE CITY COUNCIL OF THE CITY OF FOLSOM HEREBY DOES

More information

Certified LP/Propane Line Pressure Regulator Guidebook

Certified LP/Propane Line Pressure Regulator Guidebook 3rd Edition Certified LP/Propane Line Pressure Regulator Guidebook 2 & 5 PSI Systems 2 3 The specifications in this Handbook refer to Maxitrol line pressure regulators used in LP/Propane applications only.

More information

LINE PRESSURE REGULATOR GUIDEBOOK 7TH EDITION

LINE PRESSURE REGULATOR GUIDEBOOK 7TH EDITION CERTIFIED LINE PRESSURE REGULATOR GUIDEBOOK 7TH EDITION 2 AND 5 PSI SYSTEMS 2 3 This Handbook contains information from national heating and plumbing ordinances or codes that may have been adopted or incorporated

More information

Effective Date: May 2017 Void After: May Product: Press and Nail Connections File No. M-8332

Effective Date: May 2017 Void After: May Product: Press and Nail Connections File No. M-8332 IAPMO Research and Testing, Inc. is a product certification body which tests and inspects samples taken from the supplier's stock or from the market or a combination of both to verify compliance to the

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS 1NP0680 - PROPANE CONVERSION FOR USE WITH MODELS: PM8, PC8, PM9, PC9, FL9M, FL9C, FC9M, FC9C This conversion kit is to be installed by a qualified service agency

More information

2009 DESIGN & INSTALLATION GUIDE

2009 DESIGN & INSTALLATION GUIDE 2009 DESIGN & INSTALLATION GUIDE June 2009 DESIGN AND INSTALLATION GUIDE FOR CORRUGATED STAINLESS STEEL TUBING FUEL GAS* PIPING *Includes Natural Gas and Propane P.O. BOX 9 BLOSSBURG, PA. 16912 570 638-2131

More information

4.3 Objectionable Properties. The gas received and delivered hereunder:

4.3 Objectionable Properties. The gas received and delivered hereunder: Page 1 of 5 4. QUALITY OF GAS 4.1 Composition of Gas. The gas received by Algonquin for Customer's account, or delivered by Algonquin to Customer, shall be a combustible gas consisting wholly of, or a

More information

GAS SUPPLY APPLICATION GUIDE

GAS SUPPLY APPLICATION GUIDE GAS SUPPLY APPLICATION GUIDE Natural Gas or Propane Modulating & Condensing Boilers and Water Heaters This document applies to the following models: Boilers AM 399B AM 500B AM 750B AM 1000B Gas-Fired Boilers

More information

Type , , S2.20 Specialized test procedure Procedure for testing LPG bulk meters using a vapour displacement prover

Type , , S2.20 Specialized test procedure Procedure for testing LPG bulk meters using a vapour displacement prover Field Inspection Manual Part: 4-STP Section: 26 Page: 1 of 14 Type 52.11-13, 52.21-23, S2.20 Specialized test procedure Procedure for testing LPG bulk meters Application This test is applied to LPG bulk

More information

The Application of Temperature and/or Pressure Correction Factors in Gas Measurement

The Application of Temperature and/or Pressure Correction Factors in Gas Measurement The Application of Temperature and/or Pressure Correction Factors in Gas Measurement COMBINED BOYLE S CHARLES GAS LAWS To convert measured volume at metered pressure and temperature to selling volume at

More information

MEMORANDUM. SUBJECT: NFPA 69 Proposed Tentative Interim Amendment (TIA) No.1212

MEMORANDUM. SUBJECT: NFPA 69 Proposed Tentative Interim Amendment (TIA) No.1212 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Explosion Protection Systems

More information

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only Natural Gas High Altitude Conversion Kit United States Installations Only Installation Instructions Light Commercial Packaged Gas Electric Units R7TQ Series 6, - 7 1/2, & 10 Ton (2,001 FT - 10,000 FT)

More information

Dry Plant Measurement Information

Dry Plant Measurement Information Dry Plant Measurement Information Fertilizer - Information Pages DRY PLANT MEASUREMENT Basic Formula: Pounds of Product = Cubic Feet x Product Weight Area A: 14' x 28' x width = cubic feet x product weight

More information

DESIGN AND INSTALLATION GUIDE

DESIGN AND INSTALLATION GUIDE DESIGN AND INSTALLATION GUIDE FOR CORRUGATED STAINLESS STEEL TUBING FUEL GAS* PIPING *Includes Natural Gas and Propane P.O. BOX 9 BLOSSBURG, PA. 16912 570 638-2131 www.wardflex.com C US THROUGH-PENETRATION

More information

1 Exam Prep. Tabs and Highlights

1 Exam Prep. Tabs and Highlights 1 Exam Prep NFPA 14: Standard for the Installation of Standpipe and Hose Systems Tabs and s These 1 Exam Prep tabs are based on the NFPA 14: Standard for the Installation of Standpipe and Hose Systems,

More information

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage Leak testing of Valves Standards for acceptable Rates of Valve Leakage American Petroleum Institute (API) The API standard 598: Valve Inspection and Testing, covers the testing and inspection requirements

More information

Committee Input No. 59-NFPA [ Section No. 5.9 ]

Committee Input No. 59-NFPA [ Section No. 5.9 ] Committee Input No. 59-NFPA 54-2012 [ Section No. 5.9 ] 5.9 Overpressure Protection Devices. 5.9.1 General 1 Where required. Overpressure Where the serving gas supplier delivers gas at a pressure greater

More information

Part 1: Decimals. The decimal point separates the whole numbers from the fractional part of a

Part 1: Decimals. The decimal point separates the whole numbers from the fractional part of a Part 1: Decimals Decimal Place Values The decimal point separates the whole numbers from the fractional part of a number. 1328. 1095 In a whole number the decimal point is all the way to the right, even

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 30-2013 [ Section No. 21.4.1.1 ] 21.4.1.1 The materials of construction for tanks and their appurtenances shall be compatible with the liquid to be stored. In case of doubt about

More information

LP Gas Odorization and Testing

LP Gas Odorization and Testing LP Gas Odorization and Testing CFR 29 Labor OSHA Storage and Handling of Liquefied petroleum Gases CFR 29 1910 (b) 1 (b) Basic rules (1) Odorizing gases. (i) All liquefied petroleum gases shall be effectively

More information

Installation Instructions

Installation Instructions 48011HW NATURAL GAS TO PROPANE CONVERSION KIT 58HDX, 359AAV, PG9YAB, PG9YAA Installation Instructions SAFETY REQUIREMENTS Installing and servicing heating equipment can be hazardous due to gas and electrical

More information

LIQUEFIED PETROLEUM GAS (LPG) AND NATURAL GAS (NG) - FIRE PREVENTION ISSUES

LIQUEFIED PETROLEUM GAS (LPG) AND NATURAL GAS (NG) - FIRE PREVENTION ISSUES p. 53-62, DOI 10.2478/v10281-012-0012-y LIQUEFIED PETROLEUM GAS (LPG) AND NATURAL GAS (NG) - FIRE PREVENTION ISSUES Seamus MURPHY 1 Review article Abstract: Key words: In this paper it is proposed to identify

More information

Module 6. Tightness Testing

Module 6. Tightness Testing Module 6 Tightness Testing IGE / UP / 1B New Tightness Testing Procedure Covers pipework up to 35mm and installation volumes of 0.035m3 Objectives By the end of Module 6, Tightness Testing and Direct Purging

More information

MEMORANDUM. NFPA Technical Committee on Lightning Protection Systems. NFPA 780 Supplement ROC TC FINAL Ballot Results (F2012Cycle)

MEMORANDUM. NFPA Technical Committee on Lightning Protection Systems. NFPA 780 Supplement ROC TC FINAL Ballot Results (F2012Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Lightning Protection

More information

DESIGN AND INSTALLATION GUIDE

DESIGN AND INSTALLATION GUIDE DESIGN AND INSTALLATION GUIDE CORRUGATED STAINLESS STEEL TUBING FUEL GAS* PIPING *Includes Natural Gas and Propane P.O. BOX 9 BLOSSBURG, PA. 16912 570 638-2131 WWW.WARDFLEX.COM C US THROUGH-PENETRATION

More information

Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine Exhaust Systems

Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine Exhaust Systems Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine Exhaust Systems Date: March 5, 2010 To: Technical Committee on Heat Recovery Steam Generators and Other Combustion Turbine

More information

Natural Gas Conversion Kit

Natural Gas Conversion Kit SERIAL #: Attention: Centro recommends that a qualified gas technician perform the gas supply conversion and orifice replacement for this BBQ model. Natural Gas Conversion Kit F O R U S E W I T H M O D

More information

KC Series Gas Components and Supply Design Guide

KC Series Gas Components and Supply Design Guide Technical Bulletin KC Series Gas Components and Supply Design Guide GF-1030 General AERCO KC Series gas fired potable water heaters and boilers are modulating input devices that require an adequate volume

More information

22. Specialty Valves.

22. Specialty Valves. 22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,

More information

SIZING THE EXTROL DIAPHRAGM-TYPE HYDRO-PNEUMATIC TANK

SIZING THE EXTROL DIAPHRAGM-TYPE HYDRO-PNEUMATIC TANK SIZING THE EXTROL DIAPHRAGM-TYPE HYDRO-PNEUMATIC TANK 1400 Division Road, West Warwick, RI 02893 T: 401.884.6300 F: 401.885.2567 www.amtrol.com Sizing the ExTrol Diaphragm-Type Hydro-Pneumatic Tank For

More information

NOTES ON WATER HAMMER. 55

NOTES ON WATER HAMMER. 55 NOTES ON WATER HAMMER. 55 NOTES ON WATER HAMMER. By A. B. Robison. When the flow conditions of a liquid in a pipe line are varied by the opening or closing of a valve or the equivalent, a change in the

More information

Noth American 7347 High Pressure Gas Regulators

Noth American 7347 High Pressure Gas Regulators Combustion Noth American 7347 High Pressure Gas s Bulletin 7347 7347 s reduce high gas supply pressures to practical use levels. Since capacities will vary with the pressure drop across the regulator (see

More information

2014 DESIGN & INSTALLATION GUIDE

2014 DESIGN & INSTALLATION GUIDE 2014 DESIGN & INSTALLATION GUIDE WFDI-072014 JULY, 2014 www.wardmfg.com (800) 248-1027 DESIGN AND INSTALLATION GUIDE CORRUGATED STAINLESS STEEL TUBING FUEL GAS* PIPING * Includes Natural Gas and Propane

More information

First Stage Regulators

First Stage Regulators DOMESTIC First stage regulators are typically used to reduce tank pressure to an intermediate pressure, usually 5 to 10 PSI for further pressure reduction by a second stage regulator located closer to

More information

Report on Proposals Copyright, NFPA NFPA 1192 Report of the Committee on

Report on Proposals Copyright, NFPA NFPA 1192 Report of the Committee on Report of the Committee on Alternates Recreational Vehicles Mark Luttich, Chair Nebraska Public Service Commission, NE [E] Bruce Hopkins, Secretary Recreation Vehicle Industry Association, VA [M] Rep.

More information

Installation Instructions For Natural Gas Conversion

Installation Instructions For Natural Gas Conversion Installation Instructions For Natural Gas Conversion (Kit Part No. 1175405) This kit is designed to convert PGX4 and PX4 Two -Stage Gas units for use with Natural Gas. Table 1 Heating Value at Altitude

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR WATER HEATER SUPPLY SHUTOFF VALVE WITH A / THERMAL EXPANSION CONTROL VALVE IGC 128-2006a8 1. PURPOSE 1.1 The purpose

More information

Design and Application Details MICRO-RATIO Valves

Design and Application Details MICRO-RATIO Valves Flow Control Valves Page 7003 Design and Application Details MICRO-RATIO Valves Principle of Operation MICRO-RATIO Valve assemblies typically consist of a fixed-gradient air butterfly valve mechanically

More information

OPERATING INSTRUCTIONS AND OWNER S MANUAL READ AND FOLLOW ALL INSTRUCTIONS

OPERATING INSTRUCTIONS AND OWNER S MANUAL READ AND FOLLOW ALL INSTRUCTIONS READ INSTRUCTIONS CAREFULLY: OPERATING INSTRUCTIONS AND OWNER S MANUAL Model # MH500LPT MH400PT READ AND FOLLOW ALL INSTRUCTIONS Place instructions in a safe place for future reference. Do not allow anyone

More information

Gas Appliance & Water Heater Connectors

Gas Appliance & Water Heater Connectors Gas Appliance & Water Heater Connectors Innovative solutions delivered Better engineering, better selection, better results GAS CONNECTORS WATER HEATER CONNECTORS GAS VALVES EXCESS FLOW VALVES TANKLESS

More information

A centrifugal pump consists of an impeller attached to and rotating with the shaft and a casing that encloses the impeller.

A centrifugal pump consists of an impeller attached to and rotating with the shaft and a casing that encloses the impeller. Centrifugal pump How centrifugal pumps work A centrifugal pump consists of an impeller attached to and rotating with the shaft and a casing that encloses the impeller. In centrifugal pump, liquid is forced

More information

SPECIFICATION SHEET. OMEGAFLEX, Ltd. TracPipe Flexible Gas Piping Specification Sheet Specification date. ProjectName

SPECIFICATION SHEET. OMEGAFLEX, Ltd. TracPipe Flexible Gas Piping Specification Sheet Specification date. ProjectName OMEGAFLEX, Ltd. TracPipe Flexible Gas Piping Specification Sheet Specification date ProjectName Model Number(s) - FGP-SS4-50 FGP-SS4-40 FGP-SS4-32 FGP-SS4-28 FGP-SS4-22 FGP-SS4-15 FGP-SS4-12 Note: This

More information

BYLAW NUMBER

BYLAW NUMBER THE CORPORATION OF THE TOWN OF MONO BYLAW NUMBER 2011-46 BEING A BYLAW RELATING TO FENCES ENCLOSING PRIVATELEY OWNED OUTDOOR SWIMMING POOLS WHEREAS section 210, paragraph 30 of the Municipal Act (R.S.O.

More information

Technical Committee on LP-Gas at Utility Gas Plants

Technical Committee on LP-Gas at Utility Gas Plants Technical Committee on LP-Gas at Utility Gas Plants Addendum to the Agenda Sheraton Denver Downtown 1550 Court Place Denver, CO 80202 August 7-8, 2013 The following items relate to item 5.B of the Agenda:

More information

Air Operated Hydraulic Pumping Systems to 50,000 psi

Air Operated Hydraulic Pumping Systems to 50,000 psi High Pressure Equipment Air Operated Hydraulic Pumping Systems to 50,000 psi PS-10: 10,000 psi PS-20: 20,000 psi PS-30: 30,000 psi PS-40: 40,000 psi PS-50: 50,000 psi PS-90: 90,000 psi High Pressure air

More information

SECTION 1. READING AND WRITING NUMBERS PLACE VALUE

SECTION 1. READING AND WRITING NUMBERS PLACE VALUE Ten Millions Millions Hundred-thousands Ten-thousands Thousands Hundreds Tens Ones Decimal point Tenths Hundredths Thousandths Ten-thousandths Hundred-thousandths Millionths SECTION 1. READING AND WRITING

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS For Burner Kit replacement of 553010021 Burners in GUI, GDI & GNI Gas Furnaces Using Natural Gas Please read these instructions completely before attempting installation. SAFETY

More information

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES LAST REVIEW DATE: REVIEW CYCLE: 6/22/11 5 Years SPECIFICATION: TITLE: VOLUME: G-2040-9 REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED 4 and Gas Blue Book REVISIONS: (See

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Electrical Equipment

More information

Suspensions under the Teacher Tenure Act

Suspensions under the Teacher Tenure Act Suspensions under the Teacher Tenure Act 469 Chapter 21 Suspensions under the Teacher Tenure Act Detailed Contents Section 2100 Suspension without Pay as Punishment 471 Grounds for the Suspension 472 Maximum

More information

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE March 22, 2013 RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE Regulators: Symptom: Pressure Drop Cause: External leaks detected at pigtail hose MPT fitting connection(s) to regulator body

More information

installation instructions

installation instructions installation instructions GAS CONVERSION KIT PROPANE-TO-NATURAL P/N 315572-71201 4GAD 6GAD Cancels: IIK 4G-50-4 IIK 4G-50-5 7/15/91 NOTE: Read the entire instructions before starting the installation.

More information

CHAPTER 3.24 SWIMMING POOLS

CHAPTER 3.24 SWIMMING POOLS CHAPTER 3.24 SWIMMING POOLS SECTIONS: 3.24.005 Adoption of International Swimming Pool and Spa Code 3.24.010 Definitions 3.24.015 Health Department Approval 3.24.016 Accessory Structure 3.24.017 Board

More information

Chapter 10 SWIMMING POOLS

Chapter 10 SWIMMING POOLS 4-10-1: COMPLIANCE REQUIRED: Chapter 10 SWIMMING POOLS It shall be unlawful to construct, maintain, install or enlarge any swimming pool in the City except in compliance with the provisions of this Chapter.

More information

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT Reference: IFC, Denver Amendments, NFPA Approved: Joseph L. Gonzales, Division Chief, Fire Prevention and Investigation Division Number: IFC- 3001-1 Effective Date: February 1, 2012 Page 1 of 5 This policy

More information

GAS SAFETY Information Bulletin

GAS SAFETY Information Bulletin GAS SAFETY Information Bulletin June 2016 G-03-11-ABSA [Rev2] Page 1 of 7 Fuel Gas Pressure Piping in Plants This bulletin has been jointly developed by Safety Services, the Pressure Equipment Sub- Council,

More information

Southwest Power Pool REGIONAL STATE COMMITTEE BYLAWS

Southwest Power Pool REGIONAL STATE COMMITTEE BYLAWS Southwest Power Pool REGIONAL STATE COMMITTEE BYLAWS Approved: October 30, 2017 ARTICLE I 1. NAME: The organization shall be known as the Southwest Power Pool Regional State Committee ( SPP RSC ). The

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS HIGH ALTITUDE APPLICATION CONVERSION INSTRUCTION HIGH EFFICIENCY GAS FURNACES 1PS0306 / 1PS0307 / 1PS0308 / 1PS0309 / 1PS0901 / 1PS0902 / 1PS0903 FOR USE WITH MODELS:

More information

S300 Series. Valve Link. Features. Fisher Controls

S300 Series. Valve Link. Features. Fisher Controls S0 Series Self-Operated Type VL FIELDVUE Regulators Valve Link Fisher Controls May 198 Bulletin 71.1:S0 The S0 Series self-operated, spring-loaded regulators are used for pressure-reducing control in a

More information

Third Grade Pre/Post Test

Third Grade Pre/Post Test Third Grade Pre/Post Test Instructions: Questions 1-53 Choose the best answer for each question. What fractional part of the rectangle is shaded? How much is of 20 pennies? $.01 $.05 $.10 $.15 What is

More information

Installation Instructions For Propane Gas Conversion (Kit Part No ) This kit is designed for conversion to Propane Gas

Installation Instructions For Propane Gas Conversion (Kit Part No ) This kit is designed for conversion to Propane Gas Installation Instructions For Propane Gas Conversion (Kit Part No. 1173859) This kit is designed for conversion to Propane Gas Table 1 LP Gas Orifice Kits and Sizes Elevation Above Sea Level 0 to 2000

More information

then the work done is, if the force and the displacement are in opposite directions, then the work done is.

then the work done is, if the force and the displacement are in opposite directions, then the work done is. 1. What is the formula for work? W= x 2. What are the 8 forms of energy? 3. Write the formula for the following: Kinetic Energy Potential Energy 4. If the force and the displacement are in the same direction,

More information

ACCESSORY KIT INSTALLATION MANUAL

ACCESSORY KIT INSTALLATION MANUAL ACCESSORY KIT INSTALLATION MANUAL LP (PROPANE) CONVERSION KIT 1NP0366 FOR USE WITH MODELS: G8C & GF8 This conversion kit shall be installed by a qualified service agency in accordance with these instructions

More information

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS PROPANE CONVERSION - INDUCED COMBUSTION FURNACES 1NP0501 FOR USE WITH 95% MODELS: TG9S, GG9S (130,000 BTU ONLY) FOR USE WITH 80% MODELS: TG(8,L)S, GG(8,L)S (130,000

More information

The Andrews Kurth Moot Court National Championship January 26-29, Competition Rules

The Andrews Kurth Moot Court National Championship January 26-29, Competition Rules The Andrews Kurth Moot Court National Championship January 26-29, 2011 2011 Competition Rules The Andrews Kurth Moot Court National Championship is a competition designed to recognize a law school s sustained

More information

PROPOSED CHANGE TO THE 2015 ONTARIO FIRE CODE (O. Reg. 213/07, as amended current to January 1, 2015)

PROPOSED CHANGE TO THE 2015 ONTARIO FIRE CODE (O. Reg. 213/07, as amended current to January 1, 2015) PROPOSED CHANGE TO THE 2015 ONTARIO FIRE CODE (O. Reg. 213/07, as amended current to January 1, 2015) CHANGE NUMBER: N/A CODE REFERENCE: Division B, Subsection 6.4.3. DESCRIPTION OF PROPOSED CHANGE: Subsection

More information

Application Worksheet

Application Worksheet Application Worksheet All dimensions are nominal. Dimensions in [ ] are in millimeters. Service Conditions Medium Through Valve: Required C v : Temperature Maximum: Minimum: Normal: Flow Maximum: Minimum:

More information

North American Orifice Metering System

North American Orifice Metering System Combustion North American Orifice Metering System 8697 and M8697 Metering Orifices accurately measure gas flows to industrial burners. They are compact, inexpensive, and can be installed in individual

More information

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Regulated Oil and Gas Companies under National Energy Board Jurisdiction File 185-A000-41 8 August 2003 Regulated Oil and Gas Companies under National Energy Board Jurisdiction Dear Sir / Madam: Guidance Notes for Pressure Equipment under National Energy Board Jurisdiction

More information

Report of the Committee on Public Water Supplies for Private Fire Protection

Report of the Committee on Public Water Supplies for Private Fire Protection PWS-1 COMMITTEE ON PUBLIC WATER SUPPLIES ~ FLOW TESTING 291-5 ~ O Report of the Committee on Public Water Supplies for Private Fire Protection Recommendations for Fire Flow Testing and Marking of Hydrants

More information

Type R622 Pressure Reducing Regulator

Type R622 Pressure Reducing Regulator Type R622 Pressure Reducing Regulator June 2010 Compact Design Protective Inlet Screen High Capacity Internal Relief Light Weight W8806 Inlet and Outlet Pressure Gauge Taps Figure 1. Type R622 Pressure

More information

Decimals Worksheets. The decimal point separates the whole numbers from the fractional part of a number.

Decimals Worksheets. The decimal point separates the whole numbers from the fractional part of a number. Decimal Place Values The decimal point separates the whole numbers from the fractional part of a number. 8.09 In a whole number the decimal point is all the way to the right, even if it is not shown in

More information