PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)

Size: px
Start display at page:

Download "PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)"

Transcription

1 Matrix Assessment Date: Consequences Likelihood or Probability Plant Type: CRANE Plant Make: TADANO Plant Model: TL250E Fleet: 281 Plant Serial No Assessment Facilitated by: A WHEELER (Name & Title) Assessment Participants: (Name & Title) B HALL Plant Owner Name: Albie Wheeler Initial Assessment X Follow up Assessment (eg plant modified) People No Incident or First Aid Injury Medical Treatment Alternate Work or Lost Time Injury Serious or Permanent Injury Fatality Almost Certain (expected) High 15 High 10 Extreme 6 Extreme 3 Extreme 1 Likely (will probably occur) Medium 19 High 14 High 9 Extreme 5 Extreme 2 Moderate (might occur has happened) Low 22 Medium 18 High 13 Extreme 8 Extreme 4 Unlikely (could occur known to happen) Low 24 Low 21 Medium 17 High 12 Extreme 7 Rare (practically impossible) Low 25 Low 23 Medium 20 High 16 High 11 Purpose of PHA: TO CONTROL HAZARD ASSOCIATED WITH PLANT Any hazard assessed as presenting a low and/or medium risk level will be controlled using a combination of controls as appropriate. Any hazard assessed as presenting a high risk level must be controlled using a combination of at least one engineering control and lower level controls as appropriate. Where this is not possible, Workplace Manager consultation must take place. Is the plant designed to perform the task? es X No Has the plant been modified from the original condition? es No X Any hazard assessed as presenting an extreme risk level will be controlled using elimination and engineering as the primary source of controls. Where this is not possible, Workplace Manager consultation must take place. Is the plant in good working condition? es X No All identified action items closed out/addressed (plant checks)? es X No Is the plant safe to operate? (On completion of PHA and action closure) es X No Date: Signature: Page 1 of 18

2 1. Are there any specific warnings or conditions (manufactures or other) relating to potential hazards from the operation of the item of plant? Refer to technical or operating manuals, SOPs, safe use instructions List any relevant safety warning hazards & controls Describe UNAUTHORISED / UNTRAINED PERSONEL OPERATING PLANT E4 OPERATORS & DOGMAN TO BE SUITABL TICKETED FOR PLANT B WORKCONVER OPERATOR TO BE FAMILIAR & HAVE ACCESS TO OPERATORS MANUAL FOLLOW LIFT STUD IF REQUIRED FOR WORK AN ADDITIONAL ITEMS LISTED IN JSA FOR WORK L24 OPERATOR DOGMAN OPERATOR DOGMAN & & 2. Are there any COMMUNICATION requirements in relation to the safe operation of the plant? Active signalling processes. Point to point communications. Whistle Spotter (with/without whistles) Flag signalling COLLISION ONSITE WITH PEDESTRIAN OR OTHER PLANT INCORRECT OPERATION OF CRANE MOVEMENT WHILST WORKING H13 UTILISE VHF IF REQUIRED FOR SITE UTILISE DOGMAN AS SPOTTER WHEN REVERSING OR MANOUVERING IN TIGHT SPOTS ESTABLISH COMMUNICATIONS BEFORE COMMENCING WORK ie: VISUAL HAND SIGNALS, NO VISUAL- WHISTLE / TWO WA RADIO FOLLOW JSA FOR JOB L23 OPERATOR DOGMAN & Page 2 of 18

3 3. Can anyone be ENTANGLED in the plant? Describe ENTANGLEMENT IN WINCH WIRE E8 PPE TO BE WORN WHILST RIGGING & REEVING ROPE L22 Hair or other body parts caught in moving parts PPE caught in moving parts Isolation devices Warning decals Guarding FAN BELT E8 ENGINE COVER IN PLACE. AUTHORISED PERSONS ie: MECHANIC TO ACCESS WHILST ENGINE RUNNINGF L23 Page 3 of 18

4 Describe 4. Can anyone be CRUSHED? (e.g. through unexpected movement, lack of capability for plant or equipment to be slowed, stopped or immobilised, plant tipping or rolling, being thrown from plant) Emergency stop (E Stop) Service or parking brake Battery isolator ROPs/FOPs Being crushed between moving parts Unexpected movement Neutral Start Reversing/travel alarm Warning horn Amber flashing beacon Rear swing warning lights Pedals non slip surface Appropriate controls Rear view mirror Seat belt Door inter locks Crush zone decals Guarding devices CRUSHING BETWEEN; LOAD & STRUCTURE LOAD & RIGGING LOAD & PLANT PLANT & STRUCTURE OUTRIGGER & HOUSING E4 TICKETED & TRAINED PERSONEL TO OPERATE & DO PLANT TAGLINES TO BE USED IF REQUIRED. FOLLOW JSA FOR WORK OPERATOR TO HAVE ACCESS TO PLANT MANUAL CRUSH ZONE DECALS AT APPROPRIATE POINTS E STOPS FITTED BATTER ISOLATIONS FITTED SAFET LIGHTS & ALARMS FITTED TRAFFIC CONTOL IF REQUIRED B JSA OR SITE INSPECTION L23 OPERATOR & DOGMAN INSPECTOR Page 4 of 18

5 Describe 5. Can anyone be CUT, STABBED or PUNCTURED? Flying objects Moving parts Pinch points Sharp edges Isolation devices Warning decals Guarding LIMBS PINCHED / CAUGHT IN RIGGING H9 CLEAR COMMUNICATION TO BE ESTABLISHED PPE ie: GLOVES & GLASSES TO BE WORN AREA TO BE BARRICADED WITH FENCES IF REQUIRED OR IN JSA L21 OPERATOR & DOGMAN 6. Can SHEARING occur? N Between two moving and rotating parts Warning decals Guarding Page 5 of 18

6 7. Can FRICTION occur? N Describe Continuous contact with moving parts Warning decals Guarding 8. Can anyone be STRUCK whilst operating the plant? Plant disintegrating Mobility of plant travelling Reversing/travel alarm Amber flashing beacon Work pieces thrown out Moving parts Warning decals Guarding HOOK BLOCK / CHAINS OR LOAD SWING. STRIKING CREW MEMBER H9 CLEAR COMMUNICATION ESTABLISHED. PPE HARD HAT. KEEP SAFE DISTANCE. USE OF TAGLINES BARRICADE OR FENCE AREA IF REQUIRED OR IN JSA L21 OPERATOR & DOGMAN Page 6 of 18

7 Describe 9. Can a hazardous PRESSURE be produced? Hydraulic hoses Radiator Come into contact with fluids and high pressure HDRAULIC / PNEUMATIC PRESSURE BURST H13 DAILCHECKS PERFORMED BEFORE STARTING PLANT. SERVICE & REPAIR WORK TO BE UNDERTAKEN B QUALIFIED PERSONEL. PPE TO BE WORN ie: GOLVES, GLASSES, HARD HATS, SAFET BOOTS L Can an ELECTRICAL hazard be created? Lack of insulation Contact with electrical conductors Poor earthing Water near equipment Lack of isolation Warning decals BOOM OR WINCH ROPE CONTACTINGLINE APPARATUS E4 PERFORM JSA AND NOTE POTENTIAL HAZARDS ONSITE. HAVE ACCESS TO OPERATORS MANUAL. ONL TICKETED OPERATORS TO OPERATE PLANT. AN CONTROLS NECESSART BROUGHT ABOUT B ONSITE JSA H16 OPERATOR & DOGMAN Page 7 of 18

8 11. Can an EXPLOSION occur? N Describe Gas emission, Dusts Vapours, lubricants Fuel tank Storage of Hazsub s/dg s near plant Warning decals 12. Can anyone using or near the plant SLIP, TRIP or FALL? Uneven surface Fall from a height Weather conditions Slippery surfaces TRIP / SLIP ON DECK OF CRANE E5 USE OF GRIP TAPE WHERE POSSIBLE 3 POINTS OF CONTACT TO BE MAINTAINED ACCESS PLANT FROM DESIGNATED ACCESS POINTS M17 Page 8 of 18

9 13. Are there ERGONOMIC - MANUAL HANDLING hazards associated with the plant? Describe PERSONAL INJUR B WA OF LIFTING MANUALL E8 REFER TO W/C S MANUAL HANDLING PROCEDURE LIST IN JSA FOR SITE M17 OPERATOR & DOGMAN Poor posture Repetitive or sustained movements Awkward positions Strained movements Poorly designed seating 14. Are there ERGONOMIC - OPERATING CONTROL hazards associated with the plant? Difficult to understand Inappropriate colouring Function not identified Inappropriate controls & switches SMBOLISED SWITCHES M18 UNDERSTAND & HAVE ACCESS TO OPERATORS MANUAL L25 Page 9 of 18

10 15. Can anyone be SUFFOCATED? N Describe Lack of oxygen Contaminated atmosphere Confined spaces Spaces where air flow is inadequate Page 10 of 18

11 16. Does operation of the plant cause extreme TEMPERATURE changes? N Describe Fire Burns through conduction Convection Cryogenic burns Operation in extreme heat or cold 17. Can certain WEATHER conditions create a hazard? Hypothermia / extreme cold Heat stroke / extreme hot Wet conditions Electrical storms PLANT & LOAD BECOMING UNSTABLE DUE TO HIGH WINDS. LIGHTNING STRIKE ELECTROCUTION E8 CEASE OPERATIONS IN EXTREME WEATHER CONDITIONS. REFER TO OPERATIONS MANUAL FOR CORRECT PROCEDURE. LIST FORSEEABLE WEATHER HAZARDS IN JSA FOR SITE & APPROPRIATE CONTROLS. L23 Page 11 of 18

12 18. Does VIBRATION of the plant create a hazard? N Describe Plant becomes unstable Causes physical problems for the operator whilst operating Vibration of equipment 19. Can the plant emit toxic FUMES or VAPOURS? Exhaust fumes Chemicals Hazsub s/dgs BREATHING EXHAUST FUMES H13 EXHAUST TIP AT A HEIGHT TO RESTRICT ACCESS FOR ANONE TO COME INTO ACCIDENTAL CONTACT WITH FUMES L25 Page 12 of 18

13 20. Does the plant emit RADIATION? N Describe Eg X-rays EMR Laser Page 13 of 18

14 21. Can operation of the plant create DUST? N Describe Explosive atmosphere Breathing hazard Decrease visibility 22. Can the plant become UNSTABLE during operation? Working on uneven / unstable ground Shifting load Lack of plant support Outriggers PLANT BECOMES UNSTABLE DUE TO; SOFT GROUND CRANE NOT SUITABLE FOR LOAD TO BE LIFTED LOAD NOT RIGGED CORRECTL E5 E5 E5 PERFORM JSA FOR SITE TICKETED OPERATORS & DOGMAN USE SUFFICIENT PACKING ASSESS LOAD PRIOR TO LIFT COMPETENT & TICKETED PERSONEL TO RIG LOAD L23 L25 L21 Page 14 of 18

15 23. Could LOSS of LOAD occur? Failure of ropes/slings Overloading Entanglement in surrounding structures Maintenance requirements 24. Is there anything in the SURROUNDING ENVIRONMENT that may produce a hazard? Power lines Low ceiling Other plant Storage areas Co-located equipment Isolation requirements Describe FAILURE OF RIGGING OVERLOADING ENTANGLEMENT OF LOAD CATCHING IN STRUCTURES MECHANICAL FAILURE STRICKING STRUCTURE WITH BOOM OR LOAD E5 E1 E8 E5 M18 CURRENT RIGGING REGISTER & REGULAR INSPECTIONS & TAGGING TICKETED & COMPETENT OPERATORS USED. LOAD CHART & COMPUTER IN VIEW OF OPERATOR CLEAR & PRECISE COMMUNICATION VIA 2 WA AND OR VISUAL / WHISTLE COMPETENT & TICKETED DOGMAN UTILISED PLANT MAINTAINED & SERVICED AT REGULAR INTERVALS B QUALIFIED PERSONEL PERFORM JSA FOR SITE & NOTE ALL RELEVENT HAZARDS FOLLOW AN SITE RULES & REQUIREMENTS L21 M17 L21 L21 L23 Page 15 of 18

16 25. Can CHEMICALS create a hazard? Leaking from plant Splashing Explosion PPE considerations Describe OIL OR WATER LEAKING FROM PLANT M18 MSDS LOCATED IN PLANT FOLLOW INSTRUCTIONS. UTILISE SPILL KIT IN PLANT L Operator TRAINING / QUALIFICATIONS? Training requirements Qualification requirements Competency assessments Documentation Operators manual 27. Are there AN OTHER potential hazards generated by or during the use of this item of plant and/or any attachments? N OPERATOR OR DOGMAN NOT SUITABLE TO WORK WITH PLANT M18 TICKETED & COMPETENT PERSONEL UTILISED RANDOM AUDITS PERFORMED OPERATORS MANUALON BOARD L23 Page 16 of 18

17 ALL OPERATOR S OF THE PLANT OR EQUIPMENT MUST BE BRIEFED ON THE PLANT HAZARD ASSESSMENT (PHA) PRIOR TO FIRST TIME USE. AN RELEVANT CONDITIONS WHICH MA IMPACT ON THE OPERATION OF THIS ITEM OF PLANT OR EQUIPMENT MUST BE TRANSFERRED TO THE JSA. Strike out if not applicable NOISE REPORT Strike out if not applicable LIGHTING REPORT Equipment Type: Serial/Asset No. Test by (print): Date: Make: Model: Signature: Test by (print): Date: Lux Meter used: Signature: Results Operator s station Sound Meter Unit Used: At controls Lux Manufactures specified noise level: dba At emergency control Lux Background level: dba In front/over task Lux Results Operator s Station Left side task Lux dba High Idle dba Low Idle Right side task Lux (Equipment Operating) Comments: Comments: Results Bystander Position: Results Surroundings: Front dba Clearly seen by others? es No Comments: Rear dba Decrease lighting in walkways? es No Left dba Decrease lighting to other workstations? es No Right dba At 7 metres from side of equipment Equipment Operating (High Idle) Comments: Page 17 of 18

18 COMMENTS: Page 18 of 18

PLANT RISK ASSESSMENT WORKSHEET (PRA)

PLANT RISK ASSESSMENT WORKSHEET (PRA) Matrix Assessment Number: 00001 Assessment Date: 01 Jul 2015 Type: HA25 Dump Truck Make: KOMATSU Model: Highline Articulated Asset/Fleet/Rego No: 11-101 Serial No. 710872 Assessment Facilitated by: Tahir

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Entanglement Hired From All Master Hire Stores Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

Static, Hazard & Risk Assessment of Mobile Plant

Static, Hazard & Risk Assessment of Mobile Plant Static, Hazard & Risk Assessment of Mobile Plant Company Name ELITE ROADS Make / Model SAKAI TS160-2 Meter Reading: 477 Multi-Wheel Roller Plant Registration or ID. OU-047 Assessed by GREG CORNELL 03 9763

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

PLANT RISK ASSESSMENT

PLANT RISK ASSESSMENT PLANT RISK ASSESSMENT Forktruck: Year of Manufacture Make: Model: Serial : TCM FD30T3 Attachment: Name: Mfg: Model : Owner: Business/Organisation: Address: This header page and the following 5 pages have

More information

Print this activity then complete it and keep it as evidence in your folder, or portfolio.

Print this activity then complete it and keep it as evidence in your folder, or portfolio. Workplace hazards Workplace Learning and Assessment Activity Workplace Learning and Assessment Activity Print this activity then complete it and keep it as evidence in your folder, or portfolio. Hazard

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT PLAT HAZARD AD EQUIPMET RISK ASSESSMET Plant Identification : HAULOTTE STAR 10 Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or struck

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT PLAT HAZARD AD EQUIPMET RISK ASSESSMET Plant Identification : HAULOTTE OPTIMUM 8.1 Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or

More information

ONSITE PLANT ASSESSMENT: PH: MOBILE PLANT RISK ASSESSMENT 2010.

ONSITE PLANT ASSESSMENT: PH: MOBILE PLANT RISK ASSESSMENT 2010. OSITE PLAT ASSESSMET: PH: 0400 536 983 MOBILE PLAT RISK ASSESSMET 2010. This form is to be completed in accordance with the Hazard Management Policy/Procedure and Plant and Equipment Safety Management

More information

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11 Issue Date: Review Date: Page Number: 1 of 11 1. Hazard Management Details General Plant/Equipment Item: WOOD LATHE Make/Model No.: Serial No.: School: Work Location: Name of Person(s) Conducting Activity:

More information

University College Dublin Machinery/Equipment Risk Assessment Template

University College Dublin Machinery/Equipment Risk Assessment Template 1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment

More information

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0 EF26 Risk Assessment Kubota U35-4 s Requiring Attention: AS AT Friday, 1 April 2016 0 Next Review Saturday, 1 April 2017 Total s Recorded 43 Critical Risk s 0 High Risk s 0 Moderate Risk s 10 Low Risk

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT Plant Identification : HAULOTTE LIGHT BOOMS 3522A (HTA 13P); 4527A (HTA 16P); 5533A (HTA 19P) and 3632T (HTT 13) Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking

More information

Plant hazard checklist

Plant hazard checklist 110797 VWA PlantHazard Cvr 21/11/05 10:28 AM Page 1 Plant hazard checklist Some of the questions you should ask to help identify hazards arising from plant WorkSafe Victoria is a division of the Victorian

More information

Product Risk Assessment

Product Risk Assessment Product Risk Assessment Flextool (Aust.) Pty Ltd, Brunswick, Vic. Product Description Artizan ub Floor Grinder Model Number ART-UB Risk Assessment Date 19-Jun-08 Product Risk Assessment Number 0010 PRA

More information

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0 EF26 Risk Assessment CAT Excavator Hazards Requiring Attention: AS AT Friday, 29 January 2016 0 Next Review Saturday, 28 January 2017 Total Hazards Recorded 39 Critical Risk Hazards 0 High Risk Hazards

More information

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible) Page 1 of 6 How to use the Assessment Charts 1. Determine the Likelihood on the Qualitative Assessment Process Chart (pick a letter applicable to the task). 2. Determine the Consequence on the Qualitative

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT Plant Identification : HAULOTTE HA16RTJ Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or struck by moving objects due to: Risk es

More information

Material Lift Risk and Hazard Management

Material Lift Risk and Hazard Management Material Lift Risk and Hazard Management Models GH 3.8 Safe 136 kg Maximum 3.80 m GH5.6 Working 113 kg Lifting 5.60 m LL Load (kg) 91 kg Height (m) 1.70 m GL-4 227 kg 1.80 m GL-8 181 kg 3.06 m GL-10 159

More information

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147 Safety Audit / Risk Assessment Of Hino 2 Tonne Dutro Tipper Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147 Mark Zimmer Unit 3, 16 Herbert St, Equipment manager Artarmon. NSW 2064 Ph: (02)

More information

Hazard Identification and Risk Management

Hazard Identification and Risk Management Hazard Identification and Risk Management Australian Workcover Authorities [supported by the Company] currently use a risk management approach in developing their legislative controls. This means that:

More information

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010) (Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/201-03 Assessment Date: 5 th June 2012 Company: Wacker Neuson Plant Type: Twin Drum Rollers Assessment Purpose: Operational

More information

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015 Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039 Name Date Signature Author Jarred Hearle 27/11/2015 Reviewed FMG Site Team 27/11/2015 ---------- Approved Geoff Selfe 27/11/2015

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-08001-011 : Harrison 550 CNC Lathe Large Sale Type For what use is this asset being sold? Re-Use þ Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information

Safety Audit/Risk Assessment

Safety Audit/Risk Assessment Safety Audit/Risk Assessment Of Airrex HSC2500 Large Air Conditioner For Kennards Hire Cnr. Old Windsor Rd. And Powers Rd. Seven Hills. Jim Macbeth. ABN 36 895 254 895 3 Shade Place, O.H. & S. Consultant.

More information

Plant Hazard Identification and Risk Assessment

Plant Hazard Identification and Risk Assessment Plant information Plant item: Water Truck Plant identification details (asset/plant no.): Project: Competency required to operate the plant: MR/HR Licence / VOC List all legislation, codes of practice

More information

Manually Propelled Risk and Hazard Management

Manually Propelled Risk and Hazard Management Manually Propelled Risk and Hazard Management Models AWP-20S Safe 159 Maximum N/A Maximum 6.12 AWP-25S Working 159 Platform N/A Working 7.57 AWP-30S Load (kg) 159 Height (m) N/A Height (m) 9.00 AWP-36S

More information

Plant Hazard Identification and Risk Assessment

Plant Hazard Identification and Risk Assessment Plant information Plant item: Drott Plant identification details (asset/plant no.): Project: Competency required to operate the plant: LS Ticket / VOC List all legislation, codes of practice and Australian

More information

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2 PO Box 50, Hornsby, NSW 2077 Phone: 1800 643 853 Web: www.bobcat.com.au RISK ASSESSMENT For Bobcat Excavator Models 322 341, (Series D & G) CONTENTS Applicability Standards referenced in the preparation

More information

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2 PO Box 50, Hornsby, NSW 2077 Phone: 1800 643 853 Web: www.bobcat.com.au RISK ASSESSMENT For Bobcat Skid Steer Loader Series F & G (incl. S Models) CONTENTS Applicability Standards referenced in the preparation

More information

Risk and Hazard Management

Risk and Hazard Management Risk and Hazard Management Models S40 Safe 227 Maximum 12.2 Maximum 14.2 S45 Working 227 Platform 13.7 Working 15.7 S60 Load (kg) 227 Drive 18.3 Height (m) 20.3 S65 227 Height (m) 19.8 21.8 S65 TRAX 227

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-09100-060 : Gantry hoist system Sale Type For what use is this asset being sold? Re-Use Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other use is at the

More information

Risk and Hazard Management

Risk and Hazard Management Risk and Hazard Management Models GS1532 Safe 272 Maximum 4.6 Maximum 6.6 GS1930 Working 227 Platform 5.8 Working 7.8 GS1932 Load (kg) 227 Drive 5.8 Height (m) 7.8 GS2032 363 Height (m) 6.1 8.1 GS2632

More information

Risk and Hazard Management

Risk and Hazard Management Risk and Hazard Management Models TZ34 Safe 200 Maximum 12.4 Maximum 10.4 TZ50 Working 200 Platform 15 Working 17 Z30/20NRJ Load (kg) 227 Drive 8.9 Height (m) 10.9 Z33/18 200 Height (m) 10 12 Z34/22 227

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/201-03 Assessment Date: 5 th June 2012 Company: Wacker Neuson Plant Type: Twin Drum Rollers Assessment Purpose: Operational

More information

Risk and Hazard Management

Risk and Hazard Management Risk and Hazard Management Models S40/45 Safe 227 Maximum 12.2/13.72 Maximum 14.2/15.72 S60/65 Working 227/499 Platform 18.34/19.8 Working 20.34/21.8 S80/85 Load (kg) 227/454 Drive 24.2/25.7 Height (m)

More information

Runabout Risk and Hazard Management

Runabout Risk and Hazard Management Runabout Risk and Hazard Management Models GR-15 Safe 227 Maximum 4.47 Maximum 6.47 GR-20 Working 159 Platform 6.07 Working 8.07 GRC-12 Load (kg) 227 Drive 3.66 Height (m) 5.66 QS-15 227 Height (m) 4.47

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/201-11B Assessment Date: 30 th January 2013 Company: Wacker Neuson Plant Type: Excavator Models: 803, 1404, 1703, ET18, 2003,

More information

WORK METHOD STATEMENT STRUCTURAL STEEL

WORK METHOD STATEMENT STRUCTURAL STEEL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING Personal Protective Equipment Foot Hearing High Visibility Head Eye Face Hand Protective Clothing Breathing Normal Requirements: Safety footwear, hearing

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-0001-003 - Overhead Transfer System and EMS. Sale Type For what use is this asset being sold? Re-Use Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

Revision 4. Review Date 1 Septrmber 2014

Revision 4. Review Date 1 Septrmber 2014 SERIES Page 1 of 9 Description: Toyota Series Skid Steer Loader. SDK, SDK5, SDK8 and SDK10. Material Structure: A steel framed, internal combustion powered / hydraulic boom arm which allows the driver

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

SAFE WORK METHOD STATEMENT SWMS No Version

SAFE WORK METHOD STATEMENT SWMS No Version SAFE WORK METHOD STATEMENT SWMS No Version Company Name: Hunter Readymixed Concrete Pty Ltd 00 004 Location: Thornton Cessnock Tea Gardens Gateshead ABN: 6 076 08 695 SWMS Developed By: Duane Harrison

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/752 Assessment Date: 5 th May 2015 Company: Wacker Neuson Plant Type: Telescopic Light Balloon Make: Wacker Neuson Model:

More information

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Traineeship Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE: DATE: / /

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Plant and equipment safety Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of Risk Document

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/751 Assessment Date: 5 th May 2015 Company: Wacker Neuson Plant Type: Telescopic Light Tower Make: Wacker Neuson Model: LTN6

More information

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014 Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028 Name Date Signature Author Jarred Hearle 30/11/2014 Reviewed John Nulty 30/11/2014 Approved Geoff Selfe 01/12/2014 Key Safety Acts Complete a 5

More information

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT Personal Protective Equipment Foot Hearing High Visibility Head Eye Day Operations Normal Requirements: Safety footwear, hearing protection,

More information

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw PLANT HAZARD REPORT Plant Description: Circular Saw PLEASE NOTE This plant information has been prepared to assist the purchaser in identifying hazards associated with the plant prior to the purchaser

More information

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 ABN: 34 088 229 190 This SWMS has been developed and authorised by: Name Albie Wheeler Position Managing Director Date 1/7/12 Signature Phone 0249649991 Mobile

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Dogging of Crane General Loading and Unloading SWMS No. 20 Authorized

More information

Safe Work Method Statements (SWMS)

Safe Work Method Statements (SWMS) Safe Work Method Statements (SWMS) The purpose of a SWMS is to list the steps of a particular task in your workplace, identify the hazards and associated risks in each step and recommend key safety controls

More information

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/ Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041 Name Date Signature Author Geoff Selfe 25/01/2016 Reviewed Solomon Site 25/01/2016 ----- Approved Michael Garkaklis 25/01/2016 Key Safety Acts Complete

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work ethod Statement Task details Description Transmission Tower Work D 10696821 Approved by Work Practices anager Review team SWS Development Approval date October 2015 Qualifications

More information

Temporary load-bearing support for structural alterations or repairs

Temporary load-bearing support for structural alterations or repairs CRITICAL NOTE This document only becomes a Safe Work Method Statement where the High Risk Construction Work section of this document is completed Company: ABN: Contact Person: Ph: Project/Site: Principal

More information

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs Personnel Involved Manager Project Operators Assistant Notes re Operator/Off-Sider Training Allan McConnell In situ testing is a niche business with very few rigs in Australia. There are no specific training

More information

Job Hazard Analysis Analysis by:

Job Hazard Analysis Analysis by: Job Analysis Possible s or Task Machinery e.g. Mowers Chainsaws Grinders Floor polisher Power tools Weed trimmers Sweepers Snow blowers Hedge trimmer Tiller Auto scrubbers Burnishers Ford tractor Sand

More information

Revision 1. Review Date 1/9/2013

Revision 1. Review Date 1/9/2013 /9/203 Page of 2 Description: Toyota 5 Series Huski Skid Steer Loader. 5SDK5, 5SDK8, 5SDK9, 5SDK0 and 5SDK. Material Structure: A steel framed, internal combustion powered with a hydraulic boom arm which

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

Potential risk of injury to staff

Potential risk of injury to staff Register Fire, Earthquake - other Emergencies Manual Handling and Repetitive Work Repetitive, Forceful Work Poor Housekeeping Not Wearing PPE (Personal Protective Equipment) Potential risk of injury to

More information

FACULTY OF EDUCATION LOW RISK HEALTH AND SAFETY FORM FORM B

FACULTY OF EDUCATION LOW RISK HEALTH AND SAFETY FORM FORM B FACULTY OF EDUCATION LOW RISK HEALTH AND SAFETY FORM FORM B Research Projects Date / / Faculty of Education Staff/Student No. Research Project Information Circle the appropriate research activity pertaining

More information

Safe Work Method Statement (SWMS)

Safe Work Method Statement (SWMS) Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project

More information

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process: Initiators of JSEAs are responsible for consulting the Project Supervisor,

More information

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details. SAFE WORK METHOD STATEMENT Part 1 Company Details Company Name: ABN: Contact Name, Position and Phone number: Address: Project details Project: Area: Job Address: Job Description: Activity: Installation

More information

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable). OCCUPATIONAL HEALTH & SAFETY MANUAL Section OHS-005, Job Safety Analysis SCORESBY, VIC 3179 GEELONG, VIC 3218 MALAGA, WA 6090 DUDLEY PARK, SA 5008 MANSFIELD, QLD 4122 NORTH ROCKS, NSW, 2641 ACT 2609 LAVINGTON,

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work ethod Statement Task details Description Substation aintenance D 10721527 Approved by anager, Work Practices Review team SWS Development Approval date October 2015 Qualifications/icences

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work ethod Statement Task details Description Transmission conductor stringing D 10696968 Approved by Work Practices anager Review team SWS Development Approval date October 2015 Qualifications/icences

More information

TASK DAY RISK ASSESSMENT FORM

TASK DAY RISK ASSESSMENT FORM TASK DAY RISK ASSESSMENT FORM Assessment date Location and Activity details: Site Address Step One - Identify the activity and hazards Consider the activity or work area and identify if any of the hazards

More information

Removing Frozen Clips

Removing Frozen Clips Removing Frozen Clips Warning You cannot undertake this activity in the rail corridor unless you have completed a pre work brief and work site protection plan. Reference should also be made to the Protocol

More information

High Pressure Washer Safe Work Procedure PTES_HSE_SWP_006. Name Date Signature. Author John Nulty 12/05/2015. Reviewed Jarred Hearle 12/05/2015

High Pressure Washer Safe Work Procedure PTES_HSE_SWP_006. Name Date Signature. Author John Nulty 12/05/2015. Reviewed Jarred Hearle 12/05/2015 High Pressure Washer Safe Work Procedure PTES_HSE_SWP_006 Name Date Signature Author John Nulty 12/05/2015 Reviewed Jarred Hearle 12/05/2015 Approved Geoff Selfe 12/05/2015 Key Safety Acts Complete a 5

More information

Contractor Hazard Identification and Control Guide

Contractor Hazard Identification and Control Guide Exposure to Asbestos Containing Materials (ACM) Accidental disturbance or removal of ACM. Asbestos Containing Materials are to be removed outside school hours. No DET employees, students or visitors are

More information

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 HIGH RISK APT AM Holdings Pty. Ltd. [ABN] 95124754383 Principal Contractor (PC) APA Group Level 19, HSBC Building 580 George

More information

RISK & HAZARD MANAGEMENT

RISK & HAZARD MANAGEMENT & MANAGEMENT JLG Machine R6 Safe Working 230 Max. Drive 5.72 Max. Height (m) 5.72 Type Load (kg) Height(m) INTRODUCTION/SCOPE The aim of this report is to conduct an investigation into the hazards 1 and

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Operate Diesel Road Saw This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd

More information

Meuangvang Development Co.LTD Standard Working Procedure 058 Use of Hydraulic Torqueing Devices

Meuangvang Development Co.LTD Standard Working Procedure 058 Use of Hydraulic Torqueing Devices 1. Application To provide a standard work procedure for as required in accordance with Meuangvang Development Co Ltd Safety Management Program 2. Revision Schedule Rev # Old Section Ref New Section Ref

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

A Health & Safety Risk Management Tool that you can use today. Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC

A Health & Safety Risk Management Tool that you can use today. Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC A Health & Safety Risk Management Tool that you can use today Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC I m a safety geek What are the hazards of your work environment? Who is

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

RISK & HAZARD MANAGEMENT

RISK & HAZARD MANAGEMENT & MANAGEMENT JLG Machine 340AJ Safe Working 230 Max. Drive 10.35 Max. Height (m) 10.35 Type Load (kg) Height(m) INTRODUCTION/SCOPE The aim of this report is to conduct an investigation into the hazards

More information

RISK MANAGEMENT REPORT

RISK MANAGEMENT REPORT RISK MANAGEMENT REPORT Report Number Assessment Company Lot Number Assessment Purpose State DYNA 20120612-1129 Dynapac Sale QLD TABLE OF CONTENTS Section 1 - Important Information Contains information

More information

RISK ASSESSMENT DEMAG ALL TERRAIN CRANE

RISK ASSESSMENT DEMAG ALL TERRAIN CRANE RISK ASSESSMENT DEMAG ALL TERRAIN CRANE TABLE OF CONTENTS 1.0 Introduction 2 2.0 Application 3 3.0 Generic Terminology 4 4.0 Caution 9 5.0 References 10 Page No. General Hazards 12 Operational Hazards

More information

Task/Step Potential Hazards Recommended Safe Job Procedures

Task/Step Potential Hazards Recommended Safe Job Procedures JSA No.: 08-18-14-006 JOB SAFETY ANALYSIS Position Title: Bus Washer Department: Wash Bay Work Location(s): Parking Lot Shop Wash Bay Person(s) Performing This Job: Bus Washers Analysis Start Date: 08/18/2014

More information

Job Safety & Environment Analysis

Job Safety & Environment Analysis Job Safety & Environment Analysis To be used when the risk is greater than LOW and / or Defined Hazardous Work and there is no standard procedure for the task. All sections of this JSEA form must be completed.

More information

Safe Work Method Statement Transmission Field Protection Services

Safe Work Method Statement Transmission Field Protection Services Safe Work Method Statement Transmission Field Protection Services Purpose Permits Authorisations Training Equipment Fault finding on live V changeover/distribution boards N/A Electrical worker s licence,

More information

Safe Work Method Statement (SWMS) Worksheet

Safe Work Method Statement (SWMS) Worksheet WORKPLACE / PROJECT NAME: AMS REF NO / TITLE: COMPANY NAME: NETWORK DIRECTIONAL DRILLING (GEELONG) P/L (if applicable) SWMS NO: (if applicable) WORK ACTIVITY / JOB / TASK OR PROCESS DESCRIPTION DATE SWMS

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work Method Statement Task details Description Install and Maintain V Overhead Equipment and Associated ardware (de-energised) DM 10716988 Approved by Manager, Work Practices Review

More information

MACHINE DETAILS Contains standard machine specifications and details of any extras fitted

MACHINE DETAILS Contains standard machine specifications and details of any extras fitted RISK MANAGEMENT REPORT TYPE MAKE MODEL Excavator - Small Kubota KX080-3GLA SERIAL NUMBER 27471 PLANT NUMBER AHSH22 Report Number AHH 20180314-1554 Date Created By Assessor Assist. Assessor(s) Completed

More information

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Safe Work Practices / Procedures / Instruction CONFINED SPACE CONFINED SPACE Entry into and work in a confined space poses health and safety problems which may include: Presence or possible build up of a hazardous atmosphere Unexpected movement of equipment or materials

More information

HEALTH AND SAFETY MANUAL

HEALTH AND SAFETY MANUAL HEALTH AND SAFETY MANUAL Title: Abrasive Blasting Approved by: Greg Savoy Rev. 11/1/08 1 Purpose/Scope: The purpose of this program is to provide safe guidelines for the operation and maintenance of abrasive

More information

LEARNER GUIDE. Asphalt Paver (AP) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

LEARNER GUIDE. Asphalt Paver (AP) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396 LEARNER GUIDE Asphalt Paver (AP) PO Box 06 Mountain Gate VIC 3156 p: 03 9763 5449 ABN: 37 106 951 900 RTO: 1396 Asphalt Paver Safety Part One PERFORMANCE ASSESSMENT Unit 1 Conduct Routine Checks: 1. Routine

More information