1 PUBLISHED PROJECT REPORT PPR850 Optimisation of water flow depth for SCRIM S Brittain, P Sanders and H Viner

2 Report details Report prepared for: Project/customer reference: Copyright: Highways England, Network Services 359(1308)HALC TRL Limited Report date: November 2011 Report status/version: Quality approval: Stuart Brittain (Project Manager) Martin Greene (Technical Reviewer) Disclaimer This report has been produced by TRL Limited (TRL) under a contract with Highways England. Any views expressed in this report are not necessarily those of Highways England. The information contained herein is the property of TRL Limited and does not necessarily reflect the views or policies of the customer for whom this report was prepared. Whilst every effort has been made to ensure that the matter presented in this report is relevant, accurate and up-to-date, TRL Limited cannot accept any liability for any error or omission, or reliance on part or all of the content in another context. When purchased in hard copy, this publication is printed on paper that is FSC (Forest Stewardship Council) and TCF (Totally Chlorine Free) registered. PPR850

3 Table of Contents Executive summary 1 1 Introduction 2 2 Testing on TRL test track Method of testing Results 4 3 Supporting data from MIRA track Method of testing Results 10 4 Discussion and recommendations Method of testing Results and recommendations 15 Appendix A Plots of SC data against chainage 17 i PPR850

4 Executive summary Highways England, via its supply chain, undertakes annual surveys of skid resistance using Sideways-force Coefficient Routine Investigatory Machines (SCRIMs). During testing, these machines apply a controlled water flow onto the pavement directly in front of the test wheel to provide a nominal water depth of 0.5 mm. This report outlines a programme of testing to determine if it is possible, for devices fitted with a speed-controlled water flow system, to reduce this water depth without adversely affecting the results. If a lower water depth could be used it would reduce the water usage during surveys and therefore increase the length of the network that could be surveyed before the SCRIM needed to be refilled. As a result, survey costs could be reduced. The results for the test programme are presented and discussed. Analysis of the data shows that reducing the water depth to 0.4mm does not have a statistically significant effect on the survey results. The data at 0.3 mm were ambiguous and exhibited a greater degree of variability for individual measurements. It is therefore recommended that for testing on the HE network a water depth of 0.4mm should be adopted, subject to a satisfactory test during a SCRIM accreditation trial, as the standard water depth for SCRIMs fitted with speed-controlled water flow systems. Were such a change to be stipulated it should take place prior to the start of a survey season and apply to all SCRIMs with speed-controlled water flow systems. There should be no change to the 0.5 mm requirement for machines which do not use the speed-controlled system. These devices are set up to produce a water depth of 0.5 mm at the standard 50 km/h test speed and this water flow rate is used at all speeds. They therefore produce higher water depths at lower speeds, and lower depths at higher speeds. A reduction in water depth for these devices would be exaggerated at high speed, and this could affect the data quality on high-speed roads where the target speed is 80km/h. For these devices, the nominal water depth should remain at 0.5 mm It is recognised that this will result in different water depth requirements for different SCRIMs. However it has already been found that SCRIMs fitted with speed-controlled water flow use less water in comparison to the gravity-fed system and the application of a lower water depth requirement will further improve upon this efficiency, which includes reduced use of fuel and travelling time associated with refilling the water tank, as well as the reduction in the actual use of water. 1 PPR850

5 1 Introduction The Sideways-force Coefficient Routine Investigatory Machine (SCRIM) (Figure 1.1) was introduced in the 1970s and has been used for routine surveys of the skid resistance on strategic roads in the UK since the late 1980s. The machine uses the sideways-force principle: a freely rotating wheel, fitted with a smooth test tyre, is angled at 20 to the direction of travel of the vehicle and applied to the road surface under a known vertical load. A flow of water wets the road surface in front of the test wheel so that when the vehicle moves forward the test wheel slides and the wet skid resistance can be measured. Figure 1.1 SCRIM Principle of operation Currently, water is applied to the pavement to create a nominal water film depth of 0.5mm. This report provides details of a study to investigate the effect on SCRIM results of reducing this water film thickness. If a lower depth could be used then this would reduce water usage and so increase the survey distance achievable before the water tank requires refilling. In turn this would also provide savings in the cost of routine surveys as down-time resulting from refilling the water tank would be reduced. Additional benefits derive from the reduction in use of fuel and water. The SCRIM used for this test programme was the one purchased by Highways England (HE) and operated on its behalf by TRL. This device controls the water flow rate to deliver a constant nominal depth of water film irrespective of vehicle speed and has the capability to deliver in increments of 0.1mm between 0.3 and 1.2mm. Currently the standard method for SCRIM testing requires a nominal water depth of 0.5mm to be provided. Therefore to evaluate the effect of reducing water depth, testing was conducted at 0.3, 0.4 and 0.5mm. Tests were conducted at three different speeds that aimed to cover the range of speeds found during routine testing. 2 PPR850

6 2 Testing on TRL test track 2.1 Method of testing The testing conducted on the TRL test track was carried out at 30, 50 and 70 km/h. The highest test speed would have preferably been 80 km/h, the speed for routine surveys on dual carriageways, but in practice this was not achievable due to the position of the test sections used. Tests were conducted on a selection of surfaces on the TRL test track that provided a range of texture depths and skid resistance levels. For the purposes of this analysis only data collected whilst the survey machine was travelling in a straight line were used (i.e. the bends were excluded). This resulted in the test circuit being split into four sections of different nominal skid resistance values. Following each test, the test machine remained stationary for 1-2 minutes in order to store the data and set up for the next test. This would allow time for the track to dry between runs. It was noted however, that the track remained visibly damp between runs. Due to the effect of water remaining after a pass, the tests at each water depth were conducted in ascending order; however the test speeds at each water depth were randomised within the programme. The test plan is shown in Table 2.1. Table 2.1 Test order TRL track Water depth (mm) Speed (km/h) Pass PPR850

7 2.2 Results Three repeat runs of the test surfaces were conducted for the majority of the speed and water depth combinations. Unfortunately, due to operator error, only two passes were conducted for the 30 km/h, 0.3 mm water depth test. The data from each run were then plotted against distance and aligned so that the peaks and troughs in each dataset coincided. The graphs of the average SCRIM Coefficient (SC) values for each water depth and speed are provided in Appendix A.1. These graphs only show the data from the four test sections with the lengths between the sections removed. During the alignment exercise it was found that the third test section showed a significant difference in the pattern of the skid resistance data. The most likely reason for this variation would be due to differences in the test line and therefore the data from this section were removed from the subsequent analysis. If water depth does not have a significant effect on the SC values being recorded then it would be expected that the measurements at the alternative water depths would be similar to those at the standard depth of 0.5mm. In addition the spread of the individual readings in comparison to the average would be expected to be similar for each water depth (i.e. the between run variation is similar) Difference between water depths To determine whether the tests at the different water depths were producing similar results, the average of the three runs at the 0.5 mm water depth for each 10 m length was taken as the reference value at each speed. Each test conducted at the other water depths was then compared to the reference value at the appropriate speed. A comparison of the data from the 0.3 and 0.5 mm water depth tests is presented in Figure 2.1 and those at the 0.4 and 0.5 mm water depths are compared in Figure 2.2. The data shown are SC values at the given test speed (s), referred to as SC(s), and have not been corrected to the standard test speed of 50 km/h. 4 PPR850

8 Individual SC(s) value at 0.4mm Individual SC(s) value at 0.3mm km/h 50km/h 70km/h Equality Average SC(s) value at 0.5mm Figure 2.1 Summary results from TRL test track comparison of SC(s) values at 0.3 and 0.5mm water depths km/h 50km/h 70km/h Equality Average SC(s) value at 0.5mm Figure 2.2 Summary results from TRL test track comparison of SC(s) values at 0.4 and 0.5mm water depths On first examination of the results there appears to be a good correlation between the data collected at 0.5 mm and the other water depths. However it can be seen that there is a tendency for the points in the 0.3/0.5 mm plot (Figure 2.1) to lie below the line of equality, particularly for the 30 km/h tests. This translates to a slightly lower SC value for the 0.3 mm tests in comparison to the 0.5 mm tests. To determine if these variations are statistically 5 PPR850

9 significant the mean difference and the standard deviation of the differences were compared. From this data the standard error (standard deviation divided by the square root of the number of results) was calculated. The standard error is used to provide the upper and lower confidence limits for the mean value calculated (the upper limit is the mean + standard error, and the lower limit is the mean the standard error). These confidence limits define the range of values that the mean can be expected to lie between if the test was repeated. All of these statistics are shown in Table 2.2. In the table the i next to the water depth refers to individual readings and the a refers to the average reading. Table 2.2 Statistics on difference between water depths TRL track Water depths Speed km/h Mean difference Standard deviation of difference Number of results Standard error Confidence limits on mean difference Lower Upper 0.3i -0.5a 0.4i 0.5a The results suggest that the SC values generated with a water depth of 0.4 mm are not significantly different from the values generated with a water depth of 0.5 mm for the speeds tested (a mean of zero no difference - is within the confidence limits). The results produced with a water depth of 0.3 mm at 30 km/h are significantly lower than those at 0.5 mm at 30 km/h. It is possible that the structure of the testing (all of the 0.3 mm water depth tests followed by 0.4 mm and 0.5 mm in turn) allows for conditioning of the surfaces during the testing and may have influenced the results. It has been observed at the annual SCRIM correlation trials that the repeated passage of the test machines causes a polishing effect which lowers the SC values recorded. Prior to this polishing effect an initial cleaning effect can also cause an increase in SC values. The number of passes required for a polishing effect was unlikely to occur during this test programme (it usually requires 10 or more SCRIM machines in line, each conducting the same amount of testing as in this programme). However it is possible that a cleaning effect may have been occurring. To investigate if this was the case, the statistics for each individual run were compared with the appropriate 0.5mm average (this is done to normalise the data) and are shown in Table 2.3. The runs are ordered to match the order they were carried out in. 6 PPR850

10 Table 2.3 Statistics changes through testing TRL track Water depths Speed km/h Mean difference Standard deviation of difference Number of results Standard error Confidence limits on mean difference Lower Upper 0.3r1-0.5a r1-0.5a r1-0.5a r2-0.5a r2-0.5a r2-0.5a r3-0.5a r3-0.5a r1-0.5a r1-0.5a r1-0.5a r2-0.5a r2-0.5a r2-0.5a r3-0.5a r3-0.5a r3-0.5a It can be seen from the statistics that there does not appear to be any consistent increase or decrease in the values within each water depth with time. This suggests that the changes in mean difference are not a result of a cleaning effect on the surface of the test sections Between run variability To investigate the variability of individual tests at each water depth the results were compared to the average value for that water depth. These data are presented in Figure 2.3, Figure 2.4 and Figure 2.5 for the 0.3, 0.4 and 0.5 mm water depths respectively. The 30 km/h tests are excluded from the 0.3 mm graph as there were only two runs at this speed which would not provide a consistent comparison with the other data. 7 PPR850

11 Individual SC(s) value at 0.4mm Individual SC(s) value at 0.3mm km/h 70 km/h Equality Average SC(s) value at 0.3mm Figure 2.3 Summary results from TRL test track comparison of the individual 0.3mm SC(s) values to the average 0.3mm value km/h 50 km/h 70 km/h Equality Average SC(s) value at 0.4mm Figure 2.4 Summary results from TRL test track comparison of the individual 0.4mm SC(s) values to the average 0.4mm value 8 PPR850

12 Individual SC(s) value at 0.5mm km/h 50 km/h 70 km/h Equality Average SC(s) value at 0.5mm Figure 2.5 Summary results from TRL test track comparison of the individual 0.5mm SC(s) values to the average 0.5mm value The standard deviation of the differences between the individual readings and the average were calculated and are shown below in Table 2.4. The mean difference is not shown, as by definition this was zero for each pairing. Table 2.4 Statistics on between run variability TRL track Water depths Speed km/h Standard deviation of difference Number of results 0.3i 0.3a 0.4i 0.4a 0.5i 0.5a The data suggests that there may be a slightly lower variability for the 0.5 mm water depth tests. However, there does not seem to be a major difference between the values at the different water depths, especially considering that SC is reported to only two decimal places. 9 PPR850

13 3 Supporting data from MIRA track 3.1 Method of testing The method of testing used at the TRL test track was repeated on the Twin Horizontal Straights facility at MIRA. However, it was decided that this time the higher speed testing would be conducted at 80 km/h (the standard survey speed on dual carriageways) rather than 70 km/h (80 km/h was originally planned for the testing on the TRL track but the positioning of the test sections meant that a maximum speed of only 70 km/h was achievable). As before, only the data collected whilst the survey machine was travelling in a straight line were used in the subsequent analysis (i.e. the bends were excluded). This approach resulted in the test loops being split into four sections, two for lane 1 and two for lane 2. The testing length (including bends) was approximately 8.9 km, and equates to 17.8, 10.7 and 6.7 minutes per pass (for the 30, 50 and 80 km/h tests respectively). As before the test machine remained stationary for 1-2 minutes following each test to save the file and set up the next test. A similar test pattern to that on the TRL track was used (i.e. the speeds were randomised and the water depths were conducted in ascending order). 3.2 Results Due to the time available and the longer length of the test sections on the twin horizontal straights, in comparison to the TRL track, the original test programme involved two passes at the high and low speeds (30 and 80 km/h) and three at the standard speed (50 km/h) for each water depth. Due to a code red incident on another part of the MIRA complex which required all testing to stop, not all of the planned tests were completed. The number of passes achieved for each test condition is shown in Table 3.1. Table 3.1 Number of passes conducted at MIRA track Water depth Speed (km/h) Number of passes 0.3 mm 0.4 mm 0.5 mm Due to the restricted number of runs it was not possible to investigate the between run variability with this dataset. However it was still possible to look at the differences in SC 10 PPR850

14 Individual SC(s) value at 0.3mm values between the three water depths to add supporting data to the work discussed in section As before, the data from each pass were plotted and aligned and are presented in Appendix A.2 (lane 1) and A.3 (lane 2). During the alignment exercise it was found that the 2nd half of the 2nd section (on lane 1) had variations due to the test line and so these data were excluded from the subsequent analysis. The individual values for the alternative water depths were then compared to the average (or only) values from the tests conducted at the 0.5 mm depth, and are shown in Figure 3.1 and Figure km/h 50km/h 80km/h Equality Average SC(s) value at 0.5mm Figure 3.1 Summary results from MIRA test track comparison of SC(s) values at 0.3 and 0.5mm water depths 11 PPR850

15 Individual SC(s) value at 0.4mm km/h 50km/h 80km/h Equality Average SC(s) value at 0.5mm Figure 3.2 Summary results from MIRA test track comparison of SC(s) values at 0.4 and 0.5mm water depths As with the testing conducted at the TRL track, on first inspection there appears to be a good correlation between the data collected at 0.5 mm and the other two water depths. However this time there appears to be a tendency for the values at 0.3 mm to be slightly higher than those recorded at 0.5 mm (Figure 3.1), i.e. to lie above the 1:1 line. As before to determine if these variations are statistically significant the mean difference and the standard deviation of the differences were compared. These data are shown in Table 3.2. Table 3.2 Statistics on difference between water depths MIRA track Water depths 0.3i -0.5a 0.4i 0.5a Speed km/h Mean difference Standard deviation of difference Number of results Standard error Confidence limits on mean difference Lower Upper These data suggest that there is no significant difference between the SC values generated with a water depth of 0.4 mm and those generated at 0.5 mm. However, the results for the 0.3mm water depth are significantly higher than those at 0.5 mm. 12 PPR850

16 Individual SC(50) value at 0.3mm For the 0.4mm water depth, this agrees with the findings from the tests on the TRL track. However the results at the 0.3 mm water depth are the opposite of what was found at the TRL test track (0.3 mm was significantly lower). During testing at MIRA it was noticed that on some lengths (outside of the test sections) very high SCRIM readings were being recorded. Due to these high readings the condition of the tyre was inspected periodically throughout the testing to determine if a replacement was necessary. Following the majority of the testing at 0.3 mm water depth (2 passes at each speed) it was observed that a tyre change would be required soon. In order to obtain data to allow a comparison of the two tyres the final pass at 0.3 mm was postponed and the initial 0.4 mm test was conducted. The tyre was then changed and the final 0.3mm test undertaken followed by the remaining 0.4 mm tests (and the 0.5 mm tests). A comparison of the data obtained from the two tyres is shown in Figure 3.3 and Figure 3.4, and summary statistics are provided in Table 3.3. Note in all cases the 0.5mm data are from tyre Tyre 1 Tyre 2 Equality Average SC(50) value at 0.5mm Figure 3.3 Summary results from MIRA test track comparison of the two tyres at 0.3 and 0.5 mm water depths (50 km/h) 13 PPR850

17 Individual SC(30) value at 0.4mm Tyre 1 Tyre 2 Equality Average SC(30) value at 0.5mm Figure 3.4 Summary results from MIRA test track comparison of the two tyres at 0.4 and 0.5 mm water depths (30 km/h) Table 3.3 Statistics on difference between Tyres MIRA track Test condition Tyre for 0.3/0.4 mm test Mean difference Standard deviation of difference Number of results Standard error Confidence limits on mean difference Lower Upper 0.3i 0.5a at 50 km/h 0.4i 0.5a at 30 km/h The results from this analysis suggest that the SC values measured using tyre 1 were higher than those produced with tyre 2. If this effect is taken into account in interpreting the results from the MIRA tests, it suggests that the tests at a water depth of 0.3 mm produced results significantly lower than at 0.5 mm, i.e. the results now agree with those found from the tests on the TRL track. The influence of the tyre has not altered the conclusion that the results at water depths of 0.4 and 0.5 mm are comparable. 14 PPR850

18 4 Discussion and recommendations 4.1 Method of testing The test programme reported herein was undertaken to determine whether reducing the water depth below 0.5mm would have a significant impact on the level of skid resistance measured during SCRIM surveys. Testing was carried out at two test tracks (the TRL test track and the twin horizontal straights at MIRA), and involved tests at three speeds (30, 50 and 70 or 80 km/h) and three water depths (0.3, 0.4 and 0.5 mm) on each track. While the structure of the testing (i.e. all of the tests at a water depth of 0.3mm followed by 0.4mm and 0.5 mm in turn) meant that it was possible that conditioning of the track may have taken place during the testing and altered the results, investigation found no significant change in the SC values over the course of the testing on the TRL track. During the testing on the MIRA track it was necessary to change the SCRIM test tyre part way through the testing. The degree of tyre wear was unexpected and is likely to be due to the particularly high levels of friction generated on sections outside of the test sections, especially during the 30km/h testing. As the change in test tyre appeared to have an effect on the results, this was taken into account when reviewing the results and in drawing conclusions. The test surfaces were visibly damp on most repeat tests so it is possible that the water depths tested were not precisely the target depths of 0.3, 0.4 and 0.5 mm. Further testing would be required to fully eliminate this effect. However, an elapsed time of several minutes between runs should mean that the effect of water remaining between runs was minimised in the test programme being reported. 4.2 Results and recommendations The results from the TRL track suggest that SC values measured by a SCRIM with speedcontrolled water flow and a water depth set to 0.4 mm are consistent with those measured at the standard water depth of 0.5 mm. This conclusion is supported by the results of the MIRA testing: although these data are complicated by the change of tyre, the confidence limits of the data from both tyres indicate no statistically significant difference between the water depths (Table 3.3). The results at 0.3 mm are less clear cut. The TRL track data indicate a statistically significant change of 0.02 units SC, with lower skid resistance measured for the lower water depth. This result is counter intuitive, as higher skid resistance measurements are produced from dry tests in comparison to wet tests. A trend in the opposite direction was observed at MIRA for 0.3 mm water depth, but the two tyres used produced inconsistent results. For both test sites, the 0.3 mm data exhibited considerably more noise in the individual data points than was the case for the higher water depth. It is therefore recommended that for testing on the HE network a minimum water depth of 0.4mm should be adopted as the standard depth for SCRIMs fitted with speed-controlled water flow systems. At 0.3 mm the current data are ambiguous and do not support a 15 PPR850

19 further reduction. There should be no change to the 0.5 mm requirement for machines which do not use the speed-controlled water flow system. These SCRIMs are set up to produce a water depth of 0.5 mm at the standard 50 km/h test speed and this water flow rate is used at all speeds. They therefore produce higher water depths at lower speeds, and lower depths at higher speeds. At 80 km/h these machines provide approximately 0.3 mm of water depth which is already lower than the recommendation made above for devices with speed-controlled water flow. Prior to implementing this change, it is recommended that its implications are tested at the annual SCRIM accreditation trial, where the number of devices and varied conditions on the network route would provide an effective additional test, particularly of whether an acceptable degree of consistency is observed between the machines that do or do not have the speed-controlled system fitted. The speed-controlled water flow system has already been found to provide a reduction in water usage in comparison to the gravity-fed system, and the lower water depth proposed here will improve upon this efficiency, which includes reduced use of fuel and travelling time associated with refilling the water tank as well as the reduction in the actual use of water. 16 PPR850

20 Average SC(50) of three runs Average SC(30) of three runs Appendix A Plots of SC data against chainage A.1 TRL Track mm 0.4mm 0.5mm Chainage in metres (length between sections removed) Figure A.1 TRL track Average SC values at 30km/h mm 0.4mm 0.5mm Chainage in metres (length between sections removed) Figure A.2 TRL track Average SC values at 50km/h 17 PPR850

21 Average SC(70) of three runs mm 0.4mm 0.5mm Chainage in metres (length between sections removed) Figure A.3 TRL track Average SC values at 70km/h 18 PPR850

22 Average SC(50) of repeat runs Average SC(30) of repeat runs A.2 MIRA horizontals lane mm 0.4mm 0.5mm Chainage in meters (length between sections removed) Figure A.4 MIRA lane 1 Average SC values at 30km/h mm 0.4mm 0.5mm Chainage in meters (length between sections removed) Figure A.5 MIRA lane 1 Average SC values at 50km/h 19 PPR850

23 Average SC(80) of repeat runs mm 0.4mm 0.5mm Chainage in meters (length between sections removed) Figure A.6 MIRA lane 1 Average SC values at 80km/h 20 PPR850

24 Average SC(50) of repeat runs Average SC(30) of repeat runs A.3 MIRA horizontals lane mm 0.4mm 0.5mm Chainage in meters (length between sections removed) Figure A.7 MIRA lane 2 Average SC values at 30km/h mm 0.4mm 0.5mm Chainage in meters (length between sections removed) Figure A.8 MIRA lane 2 Average SC values at 50km/h 21 PPR850

25 Average SC(80) of repeat runs mm 0.4mm 0.5mm Chainage in meters (length between sections removed) Figure A.9 MIRA lane 2 Average SC values at 80km/h 22 PPR850

26 This report outlines a programme of skid resistance testing, undertaken using a SCRIM fitted with a speed-controlled water flow system, to determine if it is possible to reduce the standard nominal water depth without adversely affecting the results. It is recommended that reducing the nominal water depth from 0.5mm to 0.4mm should be implemented, subject to satisfactory testing at a SCRIM accreditation trial. (No change should be made to devices not fitted with the speedcontrolled water system.) This change would reduce water usage during surveys and reduce the fuel use and travelling time associated with water refills. As a result, survey costs could be reduced. Other titles from this subject area PPR768 Performance review of skid resistance measurement devices. P D Sanders, S Brittain and A Premathilaka PPR587 Speed correction for SCRIM survey machines. S Brittain PPR729 Highways Agency skid resistance current policy 2014: a review. A Dunford, P D Sanders, S Brittain, N Sidaway and R Smith PPR815 Better understanding of the surface tyre interface. P D Sanders, M Militzer and H E Viner TRL Crowthorne House, Nine Mile Ride, Wokingham, Berkshire, RG40 3GA, United Kingdom T: +44 (0) F: +44 (0) E: enquiries@trl.co.uk W: ISSN ISBN PPR850

NRA Pavement Cost Model manual

NRA Pavement Cost Model manual Published Project Report NRA Pavement Cost Model manual T Buckland Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT NRA Pavement Cost Model Manual T Buckland Prepared

More information

The skid resistance behaviour of thin surface course systems HA/MPA/RBA Collaborative Programme : Topic 1 Final Report

The skid resistance behaviour of thin surface course systems HA/MPA/RBA Collaborative Programme : Topic 1 Final Report Transport Research Laboratory The skid resistance behaviour of thin surface course systems HA/MPA/RBA Collaborative Programme 2008-11: Topic 1 Final Report by P G Roe and A Dunford PPR564 PUBLISHED PROJECT

More information

Skid Resistance Policy. July 2008

Skid Resistance Policy. July 2008 July 2008 JOB NUMBER: DOCUMENT REF: Rev 4 Rev 3 Rev 2 Rev 1 1 st Draft AT KH Revision Purpose Description Originate Checked Review Authorised Date Safer Roads, Better Journeys Page 1 of 13 1.0 Introduction

More information

Road Condition Statistics: Notes and definitions

Road Condition Statistics: Notes and definitions Road Condition Statistics: Notes and definitions This note provides definitions used for road condition statistics. It also includes useful information on the source of the data 1. Source The statistics

More information

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication

More information

Copy of my report. Why am I giving this talk. Overview. State highway network

Copy of my report. Why am I giving this talk. Overview. State highway network Road Surface characteristics and traffic accident rates on New Zealand s state highway network Robert Davies Statistics Research Associates http://www.statsresearch.co.nz Copy of my report There is a copy

More information

ROUNDABOUT CAPACITY: THE UK EMPIRICAL METHODOLOGY

ROUNDABOUT CAPACITY: THE UK EMPIRICAL METHODOLOGY ROUNDABOUT CAPACITY: THE UK EMPIRICAL METHODOLOGY 1 Introduction Roundabouts have been used as an effective means of traffic control for many years. This article is intended to outline the substantial

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT PPR704 TfL Cycle Facility Trials: Alternative Separation Methods for Cycle Lanes G Beard Prepared for: Project Ref:

More information

Management of Skid Resistance

Management of Skid Resistance Management of Skid Resistance AM-PAV-06045 November 2011 AM Asset Management & Maintenance Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)

More information

It is a simple mobile rig, some 3.4 metres high and uses a sample of rope around 800 mm long under a load from the test weight of 100 kg.

It is a simple mobile rig, some 3.4 metres high and uses a sample of rope around 800 mm long under a load from the test weight of 100 kg. This is an extract from a lecture I gave on the results and other matters some while ago. What follows were my slides and speaking notes. If you want more information or clarification then feel free to

More information

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 Aiming for Zero Road Worker Safety Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 1. Road Worker Safety Strategy. RWS Strategic Target No. 1: achieve a substantial

More information

Applying Hooke s Law to Multiple Bungee Cords. Introduction

Applying Hooke s Law to Multiple Bungee Cords. Introduction Applying Hooke s Law to Multiple Bungee Cords Introduction Hooke s Law declares that the force exerted on a spring is proportional to the amount of stretch or compression on the spring, is always directed

More information

ASSET MANAGEMENT & SCRIM: A TARGETED APPROACH TO THE MANAGEMENT OF SKIDDING RESISTANCE

ASSET MANAGEMENT & SCRIM: A TARGETED APPROACH TO THE MANAGEMENT OF SKIDDING RESISTANCE ASSET MANAGEMENT & SCRIM: A TARGETED APPROACH TO THE MANAGEMENT OF SKIDDING RESISTANCE Andrew Stevenson - Cornwall Council, UK Anuradha Premathilaka W.D.M. Limited, UK John Donbavand - W.D.M. Limited,

More information

Trial 3: Interactions Between Autonomous Vehicles and Pedestrians and Cyclists

Trial 3: Interactions Between Autonomous Vehicles and Pedestrians and Cyclists Trial 3: Interactions Between Autonomous Vehicles and Pedestrians and Cyclists What is VENTURER? VENTURER is a 5m research and development project funded by government and industry and delivered by Innovate

More information

INTERIM ADVICE NOTE 188/16

INTERIM ADVICE NOTE 188/16 INTERIM ADVICE NOTE 188/16 Guidance on Omission of Warning Lights (Road Danger Lamps) for Relaxation Works on Dual Carriageways Summary Guidance for omission of warning lights (road danger lamps) in temporary

More information

PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT

PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT Sean Rainsford Chris Parkman MWH NZ Ltd Transit New Zealand PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT Inadequate texture is one of the key

More information

Investigations into the identification and control of outburst risk in Australian underground coal mines

Investigations into the identification and control of outburst risk in Australian underground coal mines Investigations into the identification and control of outburst risk in Australian underground coal mines Dennis J Black 1,2 1. Principal Consultant, PacificMGM, Bulli NSW 2516, Australia 2. Honorary Fellow,

More information

INTERIM ADVICE NOTE 150/11. Temporary Traffic Management Signing: Simplification of lane change zone signing for relaxation schemes.

INTERIM ADVICE NOTE 150/11. Temporary Traffic Management Signing: Simplification of lane change zone signing for relaxation schemes. INTERIM ADVICE NOTE 150/11 Temporary Traffic Management Signing: Simplification of lane change zone signing for relaxation schemes Summary Guidance to those planning traffic management on omission of certain

More information

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS Authors: Randhir Karma NDip: Eng (Civil) B. Tech Eng (Civil) M Eng (Hons) (Transportation) Auckland Traffic Service Group Manager

More information

Chicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction

Chicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction Traffic Advisory Leaflet 12/97 December 1997 Chicane Schemes Introduction Traffic Advisory Leaflet 9/94 "Horizontal Deflections" reported on the results of track trials carried out by the Transport Research

More information

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System Appendix A Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report 2000 A.1 of A.10 A.2 of A.10 STAFF REPORT January 26, 2000 To: From: Works Committee Barry

More information

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen Communication 1779 Assessing the risks from high pressure Natural

More information

Algebra I: A Fresh Approach. By Christy Walters

Algebra I: A Fresh Approach. By Christy Walters Algebra I: A Fresh Approach By Christy Walters 2016 A+ Education Services All rights reserved. No part of this publication may be reproduced, distributed, stored in a retrieval system, or transmitted,

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways. INTERIM ADVICE NOTE 150/12 Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the approach

More information

DRAFT INTERIM ADVICE NOTE 150/17

DRAFT INTERIM ADVICE NOTE 150/17 DRAFT INTERIM ADVICE NOTE 150/17 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the

More information

Calculation of Trail Usage from Counter Data

Calculation of Trail Usage from Counter Data 1. Introduction 1 Calculation of Trail Usage from Counter Data 1/17/17 Stephen Martin, Ph.D. Automatic counters are used on trails to measure how many people are using the trail. A fundamental question

More information

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015 Highways England Road Safety Ambition David Stones PACTS Autumn 2015 Conference 3 nd November 2015 Highways England Strategic Road Network 4,300 miles (40% Motorway & 60% All Purpose Trunk Road). 34% of

More information

Spatial Methods for Road Course Measurement

Spatial Methods for Road Course Measurement Page 1 of 10 CurtinSearch Curtin Site Index Contact Details Links LASCAN Spatial Sciences WA Centre for Geodesy COURSE MEASUREMENT This page is a summary of results of some of the research we have recently

More information

An Assessment of Quality in Underwater Archaeological Surveys Using Tape Measurements

An Assessment of Quality in Underwater Archaeological Surveys Using Tape Measurements An Assessment of Quality in Underwater Archaeological Surveys Using Tape Measurements Peter Holt 3H Consulting Ltd, 6 Honcray, Oreston, Plymouth, Devon, PL9 9XB The quality of a typical underwater archaeological

More information

Designing a Model Rocket

Designing a Model Rocket Designing a Model Rocket Design Components In the following pages we are going to look at the design requirements for a stable single stage model rocket. From the diagram here you can see that the rocket

More information

Domestic Energy Fact File (2006): Owner occupied, Local authority, Private rented and Registered social landlord homes

Domestic Energy Fact File (2006): Owner occupied, Local authority, Private rented and Registered social landlord homes Domestic Energy Fact File (2006): Owner occupied, Local authority, Private rented and Registered social landlord homes Domestic Energy Fact File (2006): Owner occupied, Local authority, Private rented

More information

Equation 1: F spring = kx. Where F is the force of the spring, k is the spring constant and x is the displacement of the spring. Equation 2: F = mg

Equation 1: F spring = kx. Where F is the force of the spring, k is the spring constant and x is the displacement of the spring. Equation 2: F = mg 1 Introduction Relationship between Spring Constant and Length of Bungee Cord In this experiment, we aimed to model the behavior of the bungee cord that will be used in the Bungee Challenge. Specifically,

More information

Designing and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser

Designing and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser Designing and Benchmarking Mine Roads for Safe and Efficient Haulage Roger Thompson Alex Visser Departments of Mining and Civil & Bio-systems Engineering University of Pretoria, South Africa Aim of Presentation

More information

Safer Verges and the Strategic Road Network

Safer Verges and the Strategic Road Network Safer Verges and the Strategic Road Network Gavin Williams Senior Technical Advisor Vehicle Restraints Outline The Journey from Highways Agency to Highway England Overview of the Highways England Health

More information

INTERIM ADVICE NOTE 150/14 Revision 02. Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways

INTERIM ADVICE NOTE 150/14 Revision 02. Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways INTERIM ADVICE NOTE 150/14 Revision 02 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM),

More information

To: The results of these surveys have been analysed and are summarised within this Technical Note.

To: The results of these surveys have been analysed and are summarised within this Technical Note. Technical Note Project: Histon Road / Milton Road, Cambridge Parking Surveys To: Andy Harrison Subject: Survey Report v1.6 From: Jonathan Barlow Date: 18 th February 2016 cc: Richard Jones / Dave Boddy

More information

HS2 Ltd HS2 London to West Midlands Route Corridor Reviews Journey Time Analysis. January 2012

HS2 Ltd HS2 London to West Midlands Route Corridor Reviews Journey Time Analysis. January 2012 HS2 Ltd HS2 London to West Midlands Route Corridor Reviews Journey Time Analysis January 2012 High Speed 2 Limited HS2 London to West Midlands Route Corridor Reviews Journey Time Analysis Contents 1 Introduction

More information

CORESTA RECOMMENDED METHOD N 6

CORESTA RECOMMENDED METHOD N 6 CORESTA RECOMMENDED METHOD N 6 DETERMINATION OF VENTILATION DEFINITIONS AND MEASUREMENT PRINCIPLES (2015 Revision September 2016) 1. SCOPE This CORESTA Recommended Method specifies a method for the determination

More information

The table below shows how the thinking distance and braking distance vary with speed. Thinking distance in m

The table below shows how the thinking distance and braking distance vary with speed. Thinking distance in m Q1.The stopping distance of a car is the sum of the thinking distance and the braking distance. The table below shows how the thinking distance and braking distance vary with speed. Speed in m / s Thinking

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT PPR730 Off-street trials of a Bus Stop Bypass An assessment of user perceptions, safety, capacity and accessibility

More information

On street parking manoeuvres and their effects on design

On street parking manoeuvres and their effects on design On street parking manoeuvres and their effects on design Purnawan, and Yousif, S Title Authors Type URL Published Date 1999 On street parking manoeuvres and their effects on design Purnawan, and Yousif,

More information

Cyclists at road narrowings

Cyclists at road narrowings Traffic Advisory Leaflet 1/97 February 1997 Cyclists at road narrowings Introduction Traffic calmed streets can offer a more attractive environment for cycling, by reducing motor vehicles speeds to a level

More information

Determining bicycle infrastructure preferences A case study of Dublin

Determining bicycle infrastructure preferences A case study of Dublin *Manuscript Click here to view linked References 1 Determining bicycle infrastructure preferences A case study of Dublin Brian Caulfield 1, Elaine Brick 2, Orla Thérèse McCarthy 1 1 Department of Civil,

More information

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL

A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL A STUDY OF THE LOSSES AND INTERACTIONS BETWEEN ONE OR MORE BOW THRUSTERS AND A CATAMARAN HULL L Boddy and T Clarke, Austal Ships, Australia SUMMARY CFD analysis has been conducted on a 100m catamaran hull

More information

Goodyear Safety Research Project 2008 Presentation by Competitive Measure at the FEI Eventing Safety Forum. Presented by Tim Deans and Martin Herbert

Goodyear Safety Research Project 2008 Presentation by Competitive Measure at the FEI Eventing Safety Forum. Presented by Tim Deans and Martin Herbert Goodyear Safety Research Project 2008 Presentation by Competitive Measure at the FEI Eventing Safety Forum Presented by Tim Deans and Martin Herbert The presentation discusses the Goodyear Safety Research

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

4. Guided Bus Explained

4. Guided Bus Explained 4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5

More information

Safety Assessment of Installing Traffic Signals at High-Speed Expressway Intersections

Safety Assessment of Installing Traffic Signals at High-Speed Expressway Intersections Safety Assessment of Installing Traffic Signals at High-Speed Expressway Intersections Todd Knox Center for Transportation Research and Education Iowa State University 2901 South Loop Drive, Suite 3100

More information

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd Australasian College of Road Safety Conference A Safe System: Making it Happen! Melbourne 1-2 September 2011 Reduction of Speed Limit at Approaches to Railway Level Crossings in WA Radalj T 1, Kidd B 1

More information

Dick Bowdler Acoustic Consultant

Dick Bowdler Acoustic Consultant Dick Bowdler Acoustic Consultant 01383 882 644 077 8535 2534 dick@dickbowdler.co.uk WIND SHEAR AND ITS EFFECT ON NOISE ASSESSMENT OF WIND TURBINES June 2009 The Haven, Low Causeway, Culross, Fife. KY12

More information

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure

More information

from ocean to cloud HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS

from ocean to cloud HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS HEAVY DUTY PLOUGH PERFORMANCE IN VERY SOFT COHESIVE SEDIMENTS Geoff Holland, Sarah Dzinbal (Alcatel-Lucent Submarine Networks) Email: geoff.holland@alcatel-lucent.com Alcatel-Lucent Submarine Networks

More information

Gas Gathering System Modeling The Pipeline Pressure Loss Match

Gas Gathering System Modeling The Pipeline Pressure Loss Match PETROLEUM SOCIETY CANADIAN INSTITUTE OF MINING, METALLURGY & PETROLEUM PAPER 2005-230 Gas Gathering System Modeling The Pipeline Pressure Loss Match R.G. MCNEIL, P.ENG. Fekete Associates Inc. D.R. LILLICO,

More information

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015 // RoWSaF Making roads safer for road workers rowsaf.org.uk Working in partnership with clients, industry and key stakeholders to improve worker safety Often working close to live traffic, activities conducted

More information

Generic Safe Method for placing TTM on MM-ALR

Generic Safe Method for placing TTM on MM-ALR Summary 1. This paper describes a generic safe method for setting up and taking down Temporary Traffic Management (TTM) on Managed Motorway All Lane Running (MM-ALR) schemes. 2. An understanding of how

More information

Is lung capacity affected by smoking, sport, height or gender. Table of contents

Is lung capacity affected by smoking, sport, height or gender. Table of contents Sample project This Maths Studies project has been graded by a moderator. As you read through it, you will see comments from the moderator in boxes like this: At the end of the sample project is a summary

More information

Project Manager: Neil Beckett. Prepared by: Peter Howe. Reviewed by: Neil Beckett. Approved for issue by:

Project Manager: Neil Beckett. Prepared by: Peter Howe. Reviewed by: Neil Beckett. Approved for issue by: Annual Weigh-In-Motion (WiM) Report 2009 This report has been prepared for the benefit of the NZ Transport Agency (NZTA). No liability is accepted by this company or any employee or sub-consultant of this

More information

Use of High Level Signs for Static Relaxation Works

Use of High Level Signs for Static Relaxation Works Transport Research Laboratory Use of High Level Signs for Static Relaxation Works by R Wood, M Palmer, C Reeves, I Rillie RPN2084 PSF E158 DRAFT PROJECT REPORT Transport Research Laboratory DRAFT PROJECT

More information

INTERIM ADVICE NOTE 98/07 GUIDANCE FOR HA SERVICE PROVIDERS ON IMPLEMENTING THE SKID RESISTANCE POLICY (HD28/04)

INTERIM ADVICE NOTE 98/07 GUIDANCE FOR HA SERVICE PROVIDERS ON IMPLEMENTING THE SKID RESISTANCE POLICY (HD28/04) INTERIM ADVICE NOTE 98/07 GUIDANCE FOR HA SERVICE PROVIDERS ON IMPLEMENTING THE SKID RESISTANCE POLICY (HD28/04) Summary This interim advice note provides guidance to facilitate the effective application

More information

Mapping Cycle-friendliness towards a national standard

Mapping Cycle-friendliness towards a national standard Mapping Cycle-friendliness towards a national standard Cyclenation in collaboration with CTC would like the guidance contained in the appendices to this paper to be adopted as the national standard for

More information

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Introduction Transport for London (TfL) operates the most frequent

More information

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths Road Asset Technical Accord - RATA The Centre of Excellence for Road Asset Planning in the Waikato Region Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

More information

A REVIEW OF AGE ADJUSTMENT FOR MASTERS SWIMMERS

A REVIEW OF AGE ADJUSTMENT FOR MASTERS SWIMMERS A REVIEW OF ADJUSTMENT FOR MASTERS SWIMMERS Written by Alan Rowson Copyright 2013 Alan Rowson Last Saved on 28-Apr-13 page 1 of 10 INTRODUCTION In late 2011 and early 2012, in conjunction with Anthony

More information

In addition to reading this assignment, also read Appendices A and B.

In addition to reading this assignment, also read Appendices A and B. 1 Kinematics I Introduction In addition to reading this assignment, also read Appendices A and B. We will be using a motion detector to track the positions of objects with time in several lab exercises

More information

Motorway-to-motorway: a potential technological solution to motorway congestion

Motorway-to-motorway: a potential technological solution to motorway congestion 108 Roger Higginson Principal Engineer Intelligent Transport Systems Atkins Jill Hayden Principal Engineer Intelligent Transport Systems Atkins Sukhvinder Ubhi Project Sponsor Highways Agency Motorway-to-motorway:

More information

LECTUR 10 CHARACTERISTICS OF THE DRIVER, THE PEDESTRIAN, THE VEHICLE AND THE ROAD. One problem that faces traffic and transportation engineers is:

LECTUR 10 CHARACTERISTICS OF THE DRIVER, THE PEDESTRIAN, THE VEHICLE AND THE ROAD. One problem that faces traffic and transportation engineers is: LECTUR 10 CHARACTERISTICS OF THE DRIVER, THE PEDESTRIAN, THE VEHICLE AND THE ROAD 3.1 DRIVER CHARACTERISTICS Physiological Measurable and Usually Quantifiable Psychological Much more difficult to measure

More information

Comparative Tests on Differential Pressure Control Valves

Comparative Tests on Differential Pressure Control Valves Comparative Tests on Differential Pressure Control Valves Final Report 56148/1 Edition 2 This report supersedes Final Report No: 56148/1 dated 10 October 2013 Carried out for Danfoss A/S Hydronic Balancing

More information

Real-Time Smoothness Measurements on Concrete Pavements During Construction

Real-Time Smoothness Measurements on Concrete Pavements During Construction Recommended Practice for Real-Time Smoothness Measurements on Concrete Pavements During Construction XX-## (2017) 1. SCOPE 1.1. This document provides language that can be used by an Owner-Agency to develop

More information

Measurements of the grip level and the water film depth for real accidents of the German In-Depth Accident Study (GIDAS).

Measurements of the grip level and the water film depth for real accidents of the German In-Depth Accident Study (GIDAS). Measurements of the grip level and the water film depth for real accidents of the German In-Depth Accident Study (GIDAS). Henrik Liers*, Pierre Fevrier**, Christian Mignot**, Frédéric Sarazin** *Verkehrsunfallforschung

More information

Streets for All : 9 Use of white lines

Streets for All : 9 Use of white lines Streets for All : 9 Use of white lines On 1st April 2015 the Historic Buildings and Monuments Commission for England changed its common name from English Heritage to Historic England. We are now re-branding

More information

Tension Cracks. Topics Covered. Tension crack boundaries Tension crack depth Query slice data Thrust line Sensitivity analysis.

Tension Cracks. Topics Covered. Tension crack boundaries Tension crack depth Query slice data Thrust line Sensitivity analysis. Tension Cracks 16-1 Tension Cracks In slope stability analyses with cohesive soils, tension forces may be observed in the upper part of the slope. In general, soils cannot support tension so the results

More information

Influence of wind direction on noise emission and propagation from wind turbines

Influence of wind direction on noise emission and propagation from wind turbines Influence of wind direction on noise emission and propagation from wind turbines Tom Evans and Jonathan Cooper Resonate Acoustics, 97 Carrington Street, Adelaide, South Australia 5000 ABSTRACT Noise predictions

More information

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge. TECHNICAL NOTE: TIDAL FLOW BUS LANE OPTION ASSESSMENT Purpose 1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS

CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS NOLRS VERSION 2.2 October 2009 Outdoor Council of Australia Ph: (08) 9248 6677 1800 660 540 Fax: (08) 9248 5799 Email: nolrs@outdoorcouncil.asn.au

More information

PIG MOTION AND DYNAMICS IN COMPLEX GAS NETWORKS. Dr Aidan O Donoghue, Pipeline Research Limited, Glasgow

PIG MOTION AND DYNAMICS IN COMPLEX GAS NETWORKS. Dr Aidan O Donoghue, Pipeline Research Limited, Glasgow PIG MOTION AND DYNAMICS IN COMPLEX GAS NETWORKS Dr Aidan O Donoghue, Pipeline Research Limited, Glasgow A model to examine pigging and inspection of gas networks with multiple pipelines, connections and

More information

Municipal waste management in Cyprus

Municipal waste management in Cyprus Municipal waste management in Cyprus Prepared by Ioannis Bakas ETC/SCP February 2013 EEA project manager Almut Reichel 1 Author affiliation Ioannis Bakas, Copenhagen Resource Institute, http://www.cri.dk/

More information

1 Monash University Accident Research Centre, Monash University, Victoria, RACV, 550 Princes Highway Noble Park, Victoria, 3174.

1 Monash University Accident Research Centre, Monash University, Victoria, RACV, 550 Princes Highway Noble Park, Victoria, 3174. Roadside Environment Safety: a statistical analysis of collisions with fixed roadside objects in Victoria Amanda Delaney 1, Stuart Newstead 1, Bruce Corben 1, Jim Langford 1 and Peter Daly 2 1 Monash University

More information

Wade Reynolds 1 Frank Young 1,2 Peter Gibbings 1,2. University of Southern Queensland Toowoomba 4350 AUSTRALIA

Wade Reynolds 1 Frank Young 1,2 Peter Gibbings 1,2. University of Southern Queensland Toowoomba 4350 AUSTRALIA A Comparison of Methods for Mapping Golf Greens Wade Reynolds 1 Frank Young 1,2 Peter Gibbings 1,2 1 Faculty of Engineering and Surveying 2 Australian Centre for Sustainable Catchments University of Southern

More information

Effects of Geometry on Speed Flow Relationships for Two Lane Single Carriageway Roads Othman CHE PUAN 1,* and Nur Syahriza MUHAMAD NOR 2

Effects of Geometry on Speed Flow Relationships for Two Lane Single Carriageway Roads Othman CHE PUAN 1,* and Nur Syahriza MUHAMAD NOR 2 2016 International Conference on Computational Modeling, Simulation and Applied Mathematics (CMSAM 2016) ISBN: 978-1-60595-385-4 Effects of Geometry on Speed Flow Relationships for Two Lane Single Carriageway

More information

Open Research Online The Open University s repository of research publications and other research outputs

Open Research Online The Open University s repository of research publications and other research outputs Open Research Online The Open University s repository of research publications and other research outputs Developing an intelligent table tennis umpiring system Conference or Workshop Item How to cite:

More information

Discover the Safe System Approach

Discover the Safe System Approach Discover the Safe System Approach Aim Take you on a journey of discovery Inform, engage, enthuse and share with you the Safe System approach to saving death and injury on our roads Change to less graphic

More information

AIAA Brush Seal Performance Evaluation. P. F. Crudgington Cross Manufacturing Co. Ltd. Devizes, ENGLAND

AIAA Brush Seal Performance Evaluation. P. F. Crudgington Cross Manufacturing Co. Ltd. Devizes, ENGLAND AIAA 98-3172 Brush Seal Performance Evaluation P. F. Crudgington Cross Manufacturing Co. Ltd. Devizes, ENGLAND BRUSH SEAL PERFORMANCE EVALUATION AIAA-98-3172 P. F. Crudgington Cross Manufacturing Co. Ltd

More information

Application of Simulation Technology to Mitsubishi Air Lubrication System

Application of Simulation Technology to Mitsubishi Air Lubrication System 50 Application of Simulation Technology to Mitsubishi Air Lubrication System CHIHARU KAWAKITA *1 SHINSUKE SATO *2 TAKAHIRO OKIMOTO *2 For the development and design of the Mitsubishi Air Lubrication System

More information

Proposal for amendment to Regulation No

Proposal for amendment to Regulation No Proposal for amendment to Regulation No. 117-02 (Uniform provisions concerning the approval of tyres with regard to rolling sound emissions and to adhesion on wet surfaces and/or to rolling resistance)

More information

Managed Motorways Experience from the UK

Managed Motorways Experience from the UK Managed Motorways Experience from the UK Author David Kamnitzer (dkamnitzer@ibigroup.com) Director, IBI Group Project Manager of IBI Group s technical advisor commission for the Highways Agency s Managed

More information

Welsh Government Trunk Road Maintenance Manual

Welsh Government Trunk Road Maintenance Manual Welsh Government Trunk Road Maintenance Manual into Value for Money of Motorway and Trunk Road Investment. the Welsh Government's specification 'Trunk Road Maintenance Manual' (TRMM). This. 11 Materials,

More information

Blue cod 5 (BCO5) pot mesh size review

Blue cod 5 (BCO5) pot mesh size review Blue cod 5 (BCO5) pot mesh size review Discussion Document MPI Discussion Paper No: 2017/01 Prepared for public consultation by the Ministry for Primary Industries ISBN No: 978-1-77665-454-3 (o) ISSN No:

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

4-3 Rate of Change and Slope. Warm Up. 1. Find the x- and y-intercepts of 2x 5y = 20. Describe the correlation shown by the scatter plot. 2.

4-3 Rate of Change and Slope. Warm Up. 1. Find the x- and y-intercepts of 2x 5y = 20. Describe the correlation shown by the scatter plot. 2. Warm Up 1. Find the x- and y-intercepts of 2x 5y = 20. Describe the correlation shown by the scatter plot. 2. Objectives Find rates of change and slopes. Relate a constant rate of change to the slope of

More information

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy The Corporation of the City of Sarnia School Crossing Guard Warrant Policy Table of Contents Overview And Description... 2 Role of the School Crossing Guard... 2 Definition of a Designated School Crossing...

More information

An assessment of quality in underwater archaeological surveys using tape measurements

An assessment of quality in underwater archaeological surveys using tape measurements The International Journal of Nuuticul Archaeology (2003) 32.2: 246-25 1 doi: 10.1016/j.ijna.2003.04.002 W An assessment of quality in underwater archaeological surveys using tape measurements Peter Holt

More information

save percentages? (Name) (University)

save percentages? (Name) (University) 1 IB Maths Essay: What is the correlation between the height of football players and their save percentages? (Name) (University) Table of Contents Raw Data for Analysis...3 Table 1: Raw Data...3 Rationale

More information

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR - 9 - AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR O Gorman S., Nuttall R., Purchase A. Parsons Brinckerhoff, Australia ABSTRACT Recent fire tests for tunnels

More information

Roundabouts along Rural Arterials in South Africa

Roundabouts along Rural Arterials in South Africa Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation

More information

LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation

LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation A J Joubert*, S L Burnett**, and T Ueckermann* *PWV Consortium, PO Box 1109, Sunninghill 2157 **Gautrans, Gauteng Department

More information

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway. Iowa Department of Transportation Office of Design Superelevation 2A-2 Design Manual Chapter 2 Alignments Originally Issued: 12-31-97 Revised: 12-10-10 Superelevation is the banking of the roadway along

More information

Standard Recommended Practice. Field Measurement of Surface Profile of Abrasive Blast-Cleaned Steel Surfaces Using a Replica Tape

Standard Recommended Practice. Field Measurement of Surface Profile of Abrasive Blast-Cleaned Steel Surfaces Using a Replica Tape NACE Standard RP0287-2002 Item No. 21035 Standard Recommended Practice Field Measurement of Surface Profile of Abrasive Blast-Cleaned Steel Surfaces Using a Replica Tape This NACE International standard

More information