1 CONTRACTOR WHS HAZARD STANDARD HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER EXTERNAL USE ONLY
2 Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition WHS hazard areas are a key consideration in the selection of the appropriate procurement channel. PROCUREMENT CHANNEL SELECTION SPECIFICATION EVALUATION APPROVAL AND RELEASE Specification Hazard areas and Optus expectations in relation to these are communicated to potential providers in relevant project / task requirements (e.g. tenders, statement of works, purchase orders). Appropriate WHS specifications are included in the tender / statement of work conditions / purchase order (if required) and are reflective of Optus role (e.g. principal contractor). Evaluation The contractor submission suggests they are competent to manage the task and WHS risks of their workplace. ENGAGEMENT Engagement All parties have a consistent understanding of their mutual accountabilities as they relate to WHS risk management. Appropriate WHS specifications and obligations are included in the relevant contracts negotiated and signed by Optus. MONITORING Monitoring Relevant WHS controls are implemented and monitored at the workplace to manage the specific conditions and WHS risks of that workplace. SATISFACTORY PERFORMANCE? HANDOVER CLOSE AND REVIEW Handover Customers (internal and external) are made aware of potential risk areas and legislative expectations at handover. Close and review Contractor WHS performance is assessed and considered when using the contractor in future. Project feedback is captured and used to enhance the contractor WHS management process.
3 IMPORTANT NOTE THIS CONTRACTOR WORKPLACE HEALTH SAFETY (WHS) STANDARD HAS BEEN DEVELOPED TO ASSIST OPTUS CONTRACTORS IN THE EXECUTION OF OPTUS CONTRACTED WORKS. THE STANDARD MUST BE ENACTED IN CONJUNCTION WITH OTHER APPLICABLE OPTUS CONTRACT CONDITIONS REGARDING WHS AND THE GOVERNING LEGAL REQUIREMENTS. WHILE THIS STANDARD HAS BEEN DEVELOPED IN CONSIDERATION OF THE LEGAL REQUIREMENTS IT IS NOTED THAT WHERE ANY LEGAL REQUIREMENT EXCEEDS THIS STANDARD THE LEGAL REQUIREMENT SHALL TAKE PRECEDENCE. Purpose and scope This Contractor WHS Standard (Standard) Heat, Cold, Solar Ultraviolet and Inclement Weather aims to ensure minimum WHS requirements are met by Optus Contractors when undertaking works that expose them to such issues. In addition, this Standard supports the Commonwealth WHS Act 2011 (Act) where a duty is imposed (under the Act) on a person to ensure health and safety, it requires the person to eliminate so far as is reasonably practicable, and if it is not reasonably practicable to eliminate risks to health and safety, to minimise those risks so far as is reasonably practicable to workers. The Commonwealth WHS Regulations (Regulations) 2011, generally documents provisions for heat, cold, solar ultraviolet (UV), and inclement weather in Chapter 3 General Risk and Workplace Management: Managing Risk to Health and Safety and Regulation 40 Duty in relation to the general workplace facilities which in part states: a person conducting a business or undertaking must ensure, so far as is reasonably practicable, that workers exposed to extremes of heat or cold are able to carry out work without risk to their health and safety. The Commonwealth Code of Practice (CoP) Managing the Work Environment and Facilities 2011, Section 2 Sub-section titled 2.8 Heat and Cold supports the Regulations by establishing provisions for work in extreme heat and / or cold. The provision also provides information on heat strain, exposure to high thermal radiation, high levels of humidity and hypothermia from cold environments. This Standard applies to entities contracted by Optus where workers may be exposed to heat, cold, UV and inclement weather and these issues are a part of their scope of works. Roles and responsibilities Optus Contractors are, so far as is reasonably practicable, responsible for: Complying with all contractual obligations for WHS including Optus and legislative requirements. Reviewing Optus risk management processes such as Risk Register(s) and this Standard and to factor this information into their safe systems of work. Establishing accountability and authorities for managing the safety of workers who may be exposed to heat, cold, UV, and inclement weather when conducting their work. Securing and verification of accreditation, certification, licencing, training and competencies for supervisors and workers. Conducting a risk assessment and documenting the outcome as a Safe Work Method Statement or similar, and in accordance with applicable legislative requirements. Providing communication and consultation to workers and their representatives. Conducting inspections of their works to ensure compliance with safe systems of work and making such reviews / records available to Optus where and as requested. Keeping and maintaining a risk assessment/swms after the completion of work or where a notifiable incident occurs, a copy for a period of 2 years.
4 Establish emergency preparedness and response, including plans and procedures, communications and hardware. Investigating and reporting events such as incidents, accidents, dangerous occurrences and serious illness, within the required contractual period to Optus and where required, to the applicable Regulator. In addition to the above, Optus Contractors, so far as is reasonably practicable, are specifically responsible for: Ensuring personal protective equipment selected is, suitable, used and maintained. Ensuring workers are fit for work, and have no medical condition that increases the risk to them at the workplace. Work planning Work planning includes, but is not limited to: Identifying a risk management process in order to manage the hazards and risks associated with work in heat, cold, UV, and inclement weather environments. Ensuring the risk management process is carried out by a competent person(s). Identifying the required accreditations, licences, certification, training and / or competencies to supervise and perform work in hot, cold, UV, and inclement weather environments (e.g. emergency preparedness, first aid and assistance, bush survival, recognition of the early symptoms of heat strain or hypothermia etc.). Determining the need for a Fitness for Work program including requirements for drug and alcohol testing as appropriate. Identifying all Commonwealth, State, Territory and local statutory requirements for heat, cold, UV and inclement weather. Securing the required information and compliance conditions (e.g. Geographical Information System, Plans, bushfire mapping data, storm, wind, etc.) from, and notifications are provided to, the asset / network owner / operator / local supply authorities and any other affected party such as private owners / occupiers. Planning for emergency preparedness and response for work in heat, cold, UV and inclement weather. Document control Uncontrolled when Printed. Control Source: Optus Document System: Document CWHSS_H_St23_OM38075_V1F 23 rd June Authorised / Owner: Optus WHS Team.
5 Implement work planning In order to establish a safe workplace, the implementation of the above Work Planning, may include, but not be limited to the following: No SAMPLE - WORK PLANNING CHECKLIST YES NO NA 1. Approve, communicate and implement the risk assessment prior to, during operation and decommissioning of works conducted in hot, cold, UV and inclement weather environments. Note 1: The risk assessment should consider both personal and environmental factors. Personal factors may include the level of physical activity, the amount and type of clothing worn, and duration of exposure while environmental factors may include working at heights on towers, poles or roofs, air temperature, the level of humidity, air movement and radiant heat (sun penetration). Note 2: The risk assessment may also include use of an appropriate heat stress index. A commonly used and recognised index is the Wet Bulb Globe Temperature (WBGT). This takes into account air temperature, radiant heat, humidity and air movement. Adjustments can take into account such things as physical workload, clothing and work organisation. The Thermal Work Limit (TWL) accounts for all of the major factors as mentioned above and provide guidance on managing workloads and fluid intake. 2. Authorise and issue any required work permit and / or licence for undertaking work in heat, cold, UV and / or inclement weather. 3. Verify that workers are fit for work and do not have medical conditions, including not being under the influence of alcohol or illegal drugs that would make them unsuitable for working in heat, cold, UV and / or inclement weather. 4. Ensure workers do not work on poles (monopole or lattice towers), roof tops, or on cable and equipment connected to the Network side of the isolator during or whilst an electrical storm is in the close vicinity and where local weather reports clearly indicate the approach of an electrical storm. 5. Verify the workers undertaking work in hot or cold environments have access to cool palatable drinking water, toilets, sheltering facilities (as to protect them in adverse weather conditions), hygienic storage for food and water, emergency and first aid kits as required by the nature of the works. Note 1: Access to clean shelters should be provided, for example, air conditioned buildings / structures, sheds, caravans, tents, windbreaks or portable shade canopies. 6. Verify the workers undertaking extended work in hot environments have access to cool palatable drinking water (at least 200 ml every minutes), as required by the nature of the works. Note 1: An adequate supply of clean drinking water must be provided free of charge for workers at all times. The supply of the drinking water should be positioned where it can be easily accessed by workers; close to where hot or strenuous work is being undertaken to reduce the likelihood of dehydration or heat stress and separate from toilet or washing facilities to avoid contamination of the drinking water. Note 2: For work in hot-environments of between minutes duration, consideration may be given to the inclusion of fluids that contain some form of carbohydrate additive of less than 7% concentration. For work periods exceeding 240 minutes, fluids should also be supplemented with electrolytes. The suitability of the type of electrolytes should be assessed against the work task and the environment. Note 3: Alcohol and caffeine drinks (such as tea, coffee, energy drinks etc.) should be avoided as these can have a diuretic effect and hence increase fluid loss, leading to dehydration and hindering rehydration before and after work 7. Inspect the work environment prior to the commencement of work in inclement weather conditions to ensure it is safe to undertake the works. 8. Ensure protection for workers against UV exposure such as reorganising outdoor work so that workers carry out alternative tasks, job rotation, acclimatisation (especially for new workers or where workers have breaks from work of 5-7 days), work in shade or when the sun is most intense, time exposure reduction and / or additional rest breaks. 9. Ensure the environmental conditions and physiological wellbeing of workers is monitored when work involves prolonged or repeated exposure to heat or cold. Note 1: Physiological monitoring is based on workers reactions to the thermal stress to which the worker is being exposed. Monitoring may take into account a number of variables such as age and fitness. Physiological monitoring also provides for a more accurate result and a greater level of confidence as to the impact on the worker regardless of the conditions and, importantly, includes the impact of personal protection such as clothing. 10. Workers are provided with safety protection / devices (e.g. fresh drinking water, high visibility vests, safety helmets / broad brims, cooling vests, air supplied respirators, wet weather clothing, safety rated sunglasses, insulated gloves, SPF30+ sunscreen / zinc, loose comfortable fitting cotton clothing etc.) 11. Ensure the risk assessment is verified / audited at specified intervals and records kept. 12. Ensure emergency preparedness and response provisions and hardware such as first aid kits are in place prior to the commencement of the works and they are scheduled for testing at regular intervals.
CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY
CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition
More informationCONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY
CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition WHS
More informationLADDERS FIXED AND PORTABLE
CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition
More informationTHERMAL COMFORT GUIDELINES
UOW SAFE@WORK THERMAL COMFORT GUIDELINES HRD-WHS-GUI-244.6 Thermal Comfort Guidelines 2016 July Page 1 of 8 Contents 1 Introduction... 3 2 Responsibilities... 3 2.1 Managers... 3 2.2 Supervisors... 3 2.3
More informationHealth & Safety Policy & Plan. Rightway Roofing.
Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring
More informationSafety Management System. Initial Revision Date: Version Revision No. 02 GENERAL SAFETY HEALTH PROVISION
Revision Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 5 Purpose This program is written to be in compliance with local regulatory requirements and provide directives
More informationHEAT MANAGEMENT PROCEDURE
TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD AND RISK ASSESSMENT... 2 5.1 HEAT RELATED ILLNESS... 3 5.1.1 Risk Factors... 3 5.1.2 Controls...
More informationHealth, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure
Health, Safety and Environment Management System HSE-PRO-008 HSE Responsibilities Procedure 1 Table of Contents 1 Intent... 3 2 Scope... 3 3 Definitions... 3 4 Duty, Obligations and Responsibilities...
More informationSUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers
SUPPLIER HEALTH AND SAFETY Supporting a healthy and safe working environment for our people and customers Document Template Control Prepared by Georgina East May 2017 Date Approved by May 2017 Mark Beder
More informationACTU GUIDELINES FOR WORKING IN SEASONAL HEAT
ACTU GUIDELINES FOR WORKING IN SEASONAL HEAT December 1998 1. INTRODUCTION Working in seasonal heat presents particular health and safety hazards, which may be influenced by a number of risk factors. Over
More informationNewtown Neighbourhood Centre
Policy Name Policy Number 1.10.1.1 Relevant procedures Work Health and Safety All procedures relating to the health, safety and well being of individuals in the workplace are relevant to this policy. Author
More informationProject & Task Work Health and Safety Risk Management Procedure
Project & Task Work Health and Safety Risk Management Procedure Related Policy Work Health and Safety Policy Responsible Officer Executive Director Human Resources Approved by Executive Director Human
More informationTo comply with the OHS Act, the responsible manager must carry out and document the following:
Owner: Manager Health, Wellbeing and Safety Last Update: 10 January 2018 Contents 1. Purpose... 1 2. Minimum Compliance Requirements... 1 3. Definitions... 2 4. Legislative requirements under the OHS Act
More information2.0 Management Systems and Documentation
SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This
More informationAt prescribed workplaces with 20 or more workers an OHS program is required. Legal Issues in Sun Safety for Workplaces in the Yukon
This fact sheet provides an overview of legal issues in sun safety for workplaces in the Yukon. This covers jurisdiction-specific occupational health and safety (OHS) legislation for both solar UV radiation
More informationHow volunteer organisations can comply with the model Work Health and Safety Act LEGISLATIVE FACT SHEET SERIES
How volunteer organisations can comply with the model Work Health and Safety Act LEGISLATIVE FACT SHEET SERIES Overview This fact sheet provides information about what volunteer organisations need to do
More informationMINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April
MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous
More informationChief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020
Work Health and Safety Policy Responsible Officer Chief Operating Officer Approved by Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020 Relevant Legislation, University
More informationHeat Stress Policy UFEHS-SAFE-04/04/01 Environmental Health and Safety Finance and Administration University of Florida
Heat Stress Policy UFEHS-SAFE-04/04/01 Environmental Health and Safety Finance and Administration University of Florida OBJECTIVE The objective of this policy is to reduce the risk of illness, injury or
More informationHeat Illness Prevention
Heat Illness Prevention 2 Contents Policy... 3 Authority... 3 Scope...,... 3 Definitions... 3 Accountability... 4 Program... 4 Access to Water... 4 Access to Shade... 5 Monitoring the Weather / Responding
More informationPERFORMANCE CRITERIA
FPICOR2006A Unit Descriptor Pre-requisite Unit(s) Application of the Unit Competency Field Sector Apply basic first aid This unit specifies the outcomes required to deal with the provision of essential
More informationCourse outline: 111 WH&S E101A UEENEEE101A - Occupational Health and Safety regulations, codes and practices in the workplace
RTO Code 41319 Course outline: 111 WH&S E101A UEENEEE101A - Occupational Health and Safety regulations, codes and practices in the workplace Qualification: Applicable to: Unit of competency: Related policies:
More informationRemoval of Lead-Based Paint
Safety Management System SP24-61 Process Authority: HS Manager Removal of Lead-Based Paint Approval: Chief Operating Officer Version Date:30/03/2015 Revision: B 1 Purpose To define the requirements for
More informationManagers and supervisors. 28/06/2016 Version number: v0
Managers and supervisors Introduction The Ministry of Labour (MOL) in UAE issues a Decree every year concerning the mid-day break during the summer months for those working under the sun: 15 June-15 September
More informationSAFE WORK METHOD STATEMENT
SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES
More informationSafe Work Method Statement
Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees
More informationConfined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).
Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This
More informationWildland Fire School. Heat Illness Prevention Program
Monterey County Fire Training Officers Association www.mcftoa.org Heat Illness Prevention Program I. Purpose: The purpose of this program is to provide a safe training environment for attendees and participants
More informationHEALTH GUIDELINES FOR NETBALL IN WA
HEALTH GUIDELINES FOR NETBALL IN WA Netball WA is attempting to become the first mass participation sport truly dedicated to the health of its participants. Over 39,000 people play netball every weekend
More information1.1 OHS Policy and Responsibilities
1.1 OHS Policy and Responsibilities At Canadian Rope Access Specialists Inc. safety is our primary concern and the health and safety of our employees, clients and contractors is of paramount importance
More informationSafety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1
Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2
More informationDRIVER FATIGUE MANAGEMENT PLAN
DRIVER FATIGUE MANAGEMENT PLAN Basic principles to include in a driver fatigue management plan A number of basic principles apply when developing a Driver Fatigue Management Plan. The following are detailed
More informationGUIDE. Feeling the Heat
GUIDE Feeling the Heat Hot work, either outdoors or indoors, can certainly lead to an increase in accidents and injuries. Some, unenlightened employers, see this as just a seasonal irritation over which
More informationRelease: 1. UEPOPL002A Licence to operate a reciprocating steam engine
Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)
More informationSafe work method statements
Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard
More informationBoating Activity Minimum Standard. January 2015
Boating Activity Minimum Standard January 2015 Contents 1 Executive Summary... 2 2 More Information... 2 3 Using this Standard... 2 4 Minimum Standard requirements... 2 4.1 Legislation... 2 4.1.1 Requirements
More informationHS329 Risk Management Procedure
HS329 Risk Management Procedure Work Health and Safety Act 2011 Policy hierarchy link Work Health and Safety Regulation 2011 Work Health and Safety Policy Code of Practice How to Manage Work Health and
More informationProcedure: Pressure equipment safety
Procedure: Pressure equipment safety Purpose The purpose of this procedure is to define the method for safe operation and inspection of pressure equipment and the collection and recording of associated
More informationPotential risk of injury to staff
Register Fire, Earthquake - other Emergencies Manual Handling and Repetitive Work Repetitive, Forceful Work Poor Housekeeping Not Wearing PPE (Personal Protective Equipment) Potential risk of injury to
More information(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.
Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the
More informationWHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015
5 WHS PROCEDURE P29-02 Page 1 of 7 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment within the mission
More informationCONTRACTOR SAFETY INDUCTION HANDBOOK
CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number
More informationList all key terms and acronyms used in the procedure, and their definitions.
Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,
More informationControl of Allergies to Laboratory Animals
Health and Safety Policy Control of Allergies to Laboratory Animals UHSP/21/CALA/03 This document sets out in more detail the arrangements for compliance with University Health and Safety Policy at Budget
More informationHealth and Safety Policy Statement
Health and Safety Policy Statement Agfirst Bay of Plenty Limited is committed to maintaining a safe and healthy working environment for our employees, contractors and other persons visiting the workplace.
More informationUETTDRRF06B PERFORM RESCUE FROM A LIVE LV PANEL LEARNER GUIDE
UETTDRRF06B PERFORM RESCUE FROM A LIVE LV PANEL LEARNER GUIDE TABLE OF CONTENTS Review Log... 4 Module Basis... 4 1.1 Introduction... 5 1.2 Identify And Control Risks And Hazards... 6 1.2.1 Risk Management...
More informationWHS record keeping requirements
WHS record keeping requirements The table below provides details of the record keeping requirements in the Model Work Health and Safety Regulation, covering the following areas: Air-borne contaminant levels
More informationPlant Isolation Lock out/tag out Procedure
Plant Isolation Lock out/tag out Procedure Related Policy Responsible Officer Approved by Work Health and Safety Policy Approved and commenced November, 2014 Review by November, 2017 Responsible Organisational
More informationUniversity College Dublin Machinery/Equipment Risk Assessment Template
1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment
More informationSafe Work Method Statement
TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Working at eight SWMS No. 16 Authorized and email Signed by the (Managing
More informationWHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015
5 WHS PROCEDURE P21-01 Page 1 of 7 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment for all persons
More informationInstructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading
Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of
More informationMarine Education Society of Australasia HAZARD MANAGEMENT POLICY
Marine Education Society of Australasia HAZARD MANAGEMENT POLICY Purpose of guidelines Commitment to workplace health and safety Scope Legal Framework MESA is committed to ensuring safe and healthy working
More informationPolicy Redesign Project. Plant Safety Policy. Table of Contents
Policy Redesign Project All policies and procedures are being reviewed as part of this project. This document is pending review, but remains in effect until the review is carried out. Plant Safety Policy
More informationGENERAL WORK HEALTH & SAFETY CHECKLIST INTENDED USE. St Euphemia College - General Work Health and Safety Checklist
GENERAL WORK HEALTH & SAFETY CHECKLIST INTENDED USE This document is a summary checklist intended for employees as well as the School executive, and sets out the measures that a PCBU should put in place
More informationHazardous substance risk management
November 2017 H E A LT H & S A F E T Y AT WO R K HSWA AC T QUICK GUIDE Hazardous substance risk management KEY FACTS You must proactively manage the risks that come from having hazardous substances in
More informationPOLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT
POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT June 2013 Lead Manager John Green, Health & Safety Service Manager Responsible Director Director of Human Resources Approved By Health and
More informationCompetency type. positions. All workers (including contractors), higher degree students and volunteers
Appendix A Training Required for Work Health & Safety Training WHS general and/or site/work specific induction of the emergency procedures and assembly areas Local first aid provisions. of hazards and
More informationWork Health and Safety Risk Management Procedures
Work Health and Safety Risk Management Procedures Table of Contents 1. Governing Policy 2. Purpose 3. Scope 4. Definitions 5. Responsibilities 6. Risk Management Process 6.1. Process summary 6.2. Hazard
More informationGOLDEN SAFETY RULES AFT DR
GOLDEN SAFETY RULES The Golden Safety Rules exist to keep you safe Your safety and the safety of your workmates is paramount. The Golden Safety Rules exist, above all else, to keep you safe. Since we adopted
More information19. HEAT STRESS ON THE FARM
19. HEAT STRESS ON THE FARM THE HAZARD Every farmer and farm workers must be familiar with and learn how to deal with the condition of heat stress. However, heat stress is generally not desirable, and
More informationCalifornia State University Bakersfield Heat Illness Prevention Policy. Revised November 2017
California State University Bakersfield Heat Illness Prevention Policy Revised November 2017 THIS PAGE INTENTIONALLY LEFT BLANK 1 Contents 1.0 Policy... 3 2.0 Authority... 3 3.0 Scope... 3 4.0 Definitions...
More informationDoc. No. SP-14 Rev. No. 1 Date: 07/17/2012 Page 1 of 08
Date: 07/17/2012 Page 1 of 08 Approved: Ahmed Boomrod, CEO/President Approved: Michael G. Cadotte, Vice President Safety, Quality and Administration Change Record Rev.: Date: Responsible Person: Description
More informationSection J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS
Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives
More informationPOLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT
POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT August 2017 Important Note: The Version of this policy found on the HR Connect web page is the only version that is controlled. Any other
More informationSafety is a priority at Vault Pipelines.
Safety is a priority at Vault Pipelines. At Vault Pipelines we believe that every incident is preventable and that every task can be completed safely and efficiently. We will achieve this through our cultural
More informationSafety Checklist for Events Held at Hillbrook
Safety Checklist for Events Held at Hillbrook Hazards/ Issues or Tasks 1. EVENT ACCESS AND EGRESS Entry / Exit areas are kept clear and accessible. For an evening event, that you have appropriate Lighting.
More informationPrevention of Falls and Working at Heights
Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,
More informationWORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200
Issued by: WHS Effective Date: 1 Oct 13 Rev: A Page 1 of 7 1. Purpose Hockey NSW is committed to preventing work -elated injuries and illness from occurring, however, if an accident or injury occurs, Hockey
More informationSAFE WORK METHOD STATEMENT
SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES
More informationIGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL
IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL CONTENTS 1. INTENT... 3 2. APPLICATION... 3 3. UNDERGROUND VENTILATION... 3 3.2 Underground Ventilation Officer... 3 3.3 Risk
More informationSAFE WORK METHOD STATEMENT SWMS No Version
SAFE WORK METHOD STATEMENT SWMS No Version Company Name: Hunter Readymixed Concrete Pty Ltd 00 004 Location: Thornton Cessnock Tea Gardens Gateshead ABN: 6 076 08 695 SWMS Developed By: Duane Harrison
More informationOur commitment to safety
2 Our commitment to safety At South East Water, we have an absolute commitment to achieving and maintaining a safe and healthy workplace for our people, including our contractors and stakeholders which
More informationAccident/Incident Reporting and Investigation Procedures
Accident/Incident Reporting and Investigation Procedures Policy reference Workplace Health and Safety Policy Procedure reference Workplace Health and Safety Risk Assessment Procedures Procedure It is imperative
More informationUK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16
UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit www.ukcg.org Page 1 of 16 Contents Foreword Reference Material Initial Considerations Planning and Preparation for MEWP Activities
More informationPERSONAL PROTECTIVE EQUIPMENT
C H A P T E R 9 PERSONAL PROTECTIVE EQUIPMENT 9.1. General Personal protective equipment (PPE) when properly used and maintained saves lives and reduces injury and illness. PPE includes equipment for eyes,
More informationHealth & Safety Plan `
Rolleston Men s Shed Charitable Trust Health & Safety Plan ` 54 Dynes Rd Rolleston Ph. (03) 347-3173 Cell: 027 430-3076 E-mail: rollyshed@xtra.co.nz Version 3 15/12/2016 Page 1 of 20 TABLE OF CONTENTS
More informationWork Health & Safety Event Safety Checklist Small Event
Note: This checklist relates to the Bedford Park site and contains information specific to that site. Other sites can use the checklist but may need to adapt the information. This documentation must be
More informationJames E. Thompson, Inc. dba JTS Construction
HEAT ILLNESS PREVENTION PROGRAM: Pgs. 8-11 Complete the written procedures for water provision. DISCARD THESE INSTRUCTIONS WHEN COMPLETE HEAT ILLNESS PREVENTION 1-800-734-3574 www.eeap.net 2010 EEAP All
More informationSafe Work Method Statement
TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Dogging of Crane General Loading and Unloading SWMS No. 20 Authorized
More informationHEAT ILLNESS PREVENTION POLICY
HEAT ILLNESS PREVENTION POLICY 1 Contents 1 PURPOSE... 3 2 SCOPE... 3 3 ROLES AND RESPONSIBLITIES... 3 4 PROVISION OF WATER... 3 5 ACCESS TO SHADE... 4 6 SITE-SPECIFIC HEAT ILLNESS PREVENTION PROCEDURE...
More informationLEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE
Registered Charity No. 1096429 STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7685 7300 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS
More informationMethod Statement Author
Plan Bee Limited 3.3 Etna Industrial estate Clamp Road Motherwell Scotland ML2 7XQ Tel: 01698580572 Method Statement Method Statement Details Method Statement Number 7 Method Statement Date Monday 3rd
More informationSAFE WORK METHOD STATEMENT Part 1
SAFE WORK METHOD STATEMENT Part 1 Company Details: Aztech Integrated Systems Pty Ltd ABN: 50 142 740 172 Director : Aaron Caruana +61 418 178 719 7/227A Brisbane Road, Labrador, QLD, 4215. Project Details:
More informationCold Weather Safety Program
Title: Cold Weather Safety program Effective Date: 12/6/2014 Control Number: THG_0052 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015 Cold Weather Safety Program CONTENTS I. INTRODUCTION
More informationThis document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.
Health and Safety Guideline: HSG 10.1 Health and Safety Inspections and Testing 1. Purpose This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards
More informationSLSA Policy Statement Water Safety
SLSA Circular SLSA Policy Statement 1.1 Water Safety No: 12/2011 12 To: From: SLS Clubs and Services SLS Branches SLS States/Territory Surf Life Saving Australia Date: 25/07/2011 Subject: SLSA Policy Statement
More informationHazard Management Making your workplace safer
Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,
More informationGuidelines on Working in Cold Conditions Re-endorsed by Annual Conference 2017
Guidelines on Working in Cold Conditions Re-endorsed by Annual Conference 2017 What is cold? Cold is experienced when the body is in circumstances that deplete the body s heat and potentially reduce its
More informationContractor handbook. Purpose
Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance
More informationSwimming Pool Risk Assessment - Management Plan
Swimming Pool Assessment - Management Plan Activity Content The Swimming Pool provides a group the opportunity to engage in unstructured aquatic activity including free swim time and recreational pool
More informationGas Safety Management Policy
Date approved: 1 April 2014 Approved by: Audit and Risk Committee 1. Introduction 1.1 Every year people die and many others suffer ill-health from carbon monoxide poisoning caused by gas appliances and
More informationEVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1
EVENT SAFETY RISK ASSESSMENT (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) EVENT SAFETY MANAGEMENT INFORMATION SHEET September 2010 #3 RISK ASSESSMENT IT S A MUST The success of your event is measured in many
More informationWHS CONTRACTOR INFORMATION PACKAGE
WHS CONTRACTOR INFORMATION PACKAGE Introduction This information package provides Informa exhibitors and contractors with important information that will be required to plan and manage work on all stages
More informationThe purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.
CORPORATE SAFETY MANUAL ENVIRONMENTAL, HEALTH AND SAFETY STANDARDS TITLE: Document Number: * Issue Date: Revision Date: * 1 Purpose The purpose of this document is to establish the procedures for accident
More informationRockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Working in Hot or Cold Environments Document Number OHS-PROC-24 This document applies to the following site(s): Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya
More informationHealth and Safety Inspection Procedure
Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE
More informationSAFE WORK METHOD STATEMENT
SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES
More informationESSENTIAL SAFETY RESOURCES
ESSENTIAL SAFETY RESOURCES GS-3018 HAZARD IDENTIFICATION AND RISK ASSESSMENT Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager
More informationProcedure: Work health and safety hazard management
Procedure: Work health and safety hazard management Purpose This procedure describes how the Australian National University (ANU) manages Work Health Safety hazards for the health, safety, rehabilitation
More information