1 Safety Audit / Risk Assessment Of Hino 2 Tonne Dutro Tipper Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147

2 Mark Zimmer Unit 3, 16 Herbert St, Equipment manager Artarmon. NSW 2064 Ph: (02) Fax: (02) Re: Hazard Identification and Risk Assessment of Hino Dutro Tipper at Artarmon on 26th November Assessment Tools: NSW Occupational Health and Safety Act 2000 NSW Occupational Health and Safety Regulation 2001 Australian Standard Safeguarding of Machinery (General Principles) 2006Australian Standard 1755 Conveyers Safety Requirements. Australian Standard 1319 Safety Signs for the Occupational Environment Australian/ New Zealand Standard 3760:2001 In-service Safety Inspection of Electrical Equipment Risks Assessed: Entanglement Crushing Cutting, Stabbing, Puncturing Shearing Friction Striking High Pressure Fluid/Air Electrical Explosion Slipping, Tripping & Falling Ergonomic Suffocation High Temperature of Fire Temperature Noise Other Hazards (Chemicals, Fumes, Dusts, Vibration, Radiation.)

3 Categorisation Tool: Hazpak was developed by WorkCover NSW with the University of NSW, Department of Safety Science. The Australian Chamber of Manufacturers, the Labor Council and Worksafe Australia contributed to the development of the package. Personal Protective Equipment: It is recommended that suitable and approved ear, footwear and depending on the materials involved breathing protection be worn. Introduction: As required under Occupational Health and Safety Legislation, all equipment hired out to the public must have a risk assessment undertaken.

4 Inspection: Inspection was undertaken in company with Simon Foord at Artarmon. Conclusion: A category (3) has been allocated to this equipment. In-house. Use the safety bar when working under the tipper tray. Ensure wheels are chocked also. Customer. Tipper engaging lever not to be engaged whilst the vehicle is in motion. Use the safety bar to hold the tipper tray if it needs to be in the up position for an extended time. TE: While this risk assessment has been as exhaustive as possible, no survey can identify all hazards on a plant or all risks to personnel. A reliable system of regular safety surveys by a competent person or persons needs to be put in place for future identification of hazard and risk. All care has been taken in preparing this report; however the responsibility for hazard identification and risk minimisation remains with the designer, manufacturer, supplier, installer and employer. This responsibility can not be transferred or wavered in any way. Mark Zimmer National Equipment Manager Kennards Hire

5 Potential for injury or illness Hazard Y or N Risk Hazard Priority Control Method. Attachment: Results of assessment. 1. Entanglement. Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags, or other materials become entangled with the moving parts of the plant or materials in motion? 2. Crushing. Can anyone be crushed due to material falling off the equipment, uncontrolled movement of the equipment or load, the equipment or plant tipping or rolling over, parts of the plant or equipment collapsing, being trapped between the equipment and materials or fixed structures, or becoming crushed by guards or clamps?. Tipper tray descending. YES Persons working under the tipper tray. 3 Ensure safety bar is used when working under the tray, Keep persons away from a dscending tray. 3. Cutting, Stabbing or Puncturing. Can anyone be cut, stabbed or punctured due to coming into contact with sharp or flying objects, coming in contact with moving parts of the equipment during testing, inspection, maintenance, cleaning or repair, coming in contact with parts being ejected, or uncontrolled movement of the plant during operation?

6 4. Shearing. Can anyone s body parts be sheared between two parts of the plant or equipment or between a part of the plant and the work piece or structure? See No: 2 YES Lowering of the tipper tray and possibly between the tailgate and tipper tray. 3 Keep hands clear of the tailgate when in operation. 5. Friction. Can anyone be burnt due to contact with moving parts or surfaces of the plant or equipment? 6. Striking. Can anyone be struck by moving objects due to uncontrolled or unexpected movement of the plant or equipment, the parts or plant disintegrating, the work pieces or parts of the work pieces being ejected at speed? Debris and material from tipper tray YES Persons being struck from debris or materials while the tipper is being deployed or in motion. 4 Keep persons at a safe distance, ensure the load is covered when travelling. 7. High Pressure Fluid/Air. Can anyone come in contact with fluids or air under pressure due to plant or equipment failure or misuse of plant, damage to valves or poor maintenance?

7 8. Electrical. Can anyone be injured by electrical shock or burns due to coming into contact with live electrical conductors, in close proximity to electrical conductors, overloaded circuits, damaged or poorly maintained electrical leads, damaged electrical switches, leads in floor exposed to traffic damage or water near electrical equipment? Electrical wires YES Contact between the vehicle and electrical wires 3 Utmost care should be taken when deploying the tipper. 9. Explosion. Can anyone be injured by explosion of gases, vapours, liquids, dusts or other substances, triggered by the operation of the pant or equipment or by material handled by the plant? 10. Slipping, Tripping and Falling. Can anyone using the plant, or in the vicinity of the equipment, slip, trip or fall due to uneven or slippery surfaces, poor housekeeping, obstacles placed in the vicinity of the plant, working at a height, lack of proper work platform, lack of proper stairs, lack of guard rails, unprotected holes, poor working surfaces or steep walking surfaces?

8 11. Ergonomic. Can anyone be injured due to poorly designed seating, repetitive body movement, constrained body posture, the need to use excessive effort, inadequate or poorly designed lighting, lack of consideration given to human error or a mismatch of the plant with human traits and natural limitations? Slipping when entering or leaving the vehicle cabin YES Injury from slipping 4 Ensure footwear is clean underneath when entering or leaving the vehicle cabin 12. Suffocation. Can anyone be suffocated due to lack of oxygen or be restricted by atmospheric contamination? 13. High Temperature or Fire. Can anyone be injured by coming into contact with objects at high temperature or can anyone be injured by fire? 14. Temperature. Can anyone suffer ill health due to exposure due to high or low temperature?

9 15. Noise. Can anyone be subjected to noise in excess of the daily noise dose of one(1)? Loading and unloading of large materials eg. rocks, metal YES High noise level 3 Wear approved and suitable ear protection 16. Other hazards to consider. Chemicals, Fumes, Dusts, Vibration, Radiation. This risk assessment has been completed as thoroughly as possible. Hirer of the equipment should use it in a safe manner and be aware of requirements for the safety of others at the work site. Review No1. Next review date

Safety Audit/Risk Assessment

Safety Audit/Risk Assessment Safety Audit/Risk Assessment Of Airrex HSC2500 Large Air Conditioner For Kennards Hire Cnr. Old Windsor Rd. And Powers Rd. Seven Hills. Jim Macbeth. ABN 36 895 254 895 3 Shade Place, O.H. & S. Consultant.

More information

Print this activity then complete it and keep it as evidence in your folder, or portfolio.

Print this activity then complete it and keep it as evidence in your folder, or portfolio. Workplace hazards Workplace Learning and Assessment Activity Workplace Learning and Assessment Activity Print this activity then complete it and keep it as evidence in your folder, or portfolio. Hazard

More information

Plant hazard checklist

Plant hazard checklist 110797 VWA PlantHazard Cvr 21/11/05 10:28 AM Page 1 Plant hazard checklist Some of the questions you should ask to help identify hazards arising from plant WorkSafe Victoria is a division of the Victorian

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Entanglement Hired From All Master Hire Stores Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT PLAT HAZARD AD EQUIPMET RISK ASSESSMET Plant Identification : HAULOTTE OPTIMUM 8.1 Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT PLAT HAZARD AD EQUIPMET RISK ASSESSMET Plant Identification : HAULOTTE STAR 10 Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or struck

More information

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11 Issue Date: Review Date: Page Number: 1 of 11 1. Hazard Management Details General Plant/Equipment Item: WOOD LATHE Make/Model No.: Serial No.: School: Work Location: Name of Person(s) Conducting Activity:

More information

Product Risk Assessment

Product Risk Assessment Product Risk Assessment Flextool (Aust.) Pty Ltd, Brunswick, Vic. Product Description Artizan ub Floor Grinder Model Number ART-UB Risk Assessment Date 19-Jun-08 Product Risk Assessment Number 0010 PRA

More information

Material Lift Risk and Hazard Management

Material Lift Risk and Hazard Management Material Lift Risk and Hazard Management Models GH 3.8 Safe 136 kg Maximum 3.80 m GH5.6 Working 113 kg Lifting 5.60 m LL Load (kg) 91 kg Height (m) 1.70 m GL-4 227 kg 1.80 m GL-8 181 kg 3.06 m GL-10 159

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT Plant Identification : HAULOTTE LIGHT BOOMS 3522A (HTA 13P); 4527A (HTA 16P); 5533A (HTA 19P) and 3632T (HTT 13) Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking

More information

Manually Propelled Risk and Hazard Management

Manually Propelled Risk and Hazard Management Manually Propelled Risk and Hazard Management Models AWP-20S Safe 159 Maximum N/A Maximum 6.12 AWP-25S Working 159 Platform N/A Working 7.57 AWP-30S Load (kg) 159 Height (m) N/A Height (m) 9.00 AWP-36S

More information

Risk and Hazard Management

Risk and Hazard Management Risk and Hazard Management Models S40 Safe 227 Maximum 12.2 Maximum 14.2 S45 Working 227 Platform 13.7 Working 15.7 S60 Load (kg) 227 Drive 18.3 Height (m) 20.3 S65 227 Height (m) 19.8 21.8 S65 TRAX 227

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT Plant Identification : HAULOTTE HA16RTJ Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or struck by moving objects due to: Risk es

More information

Risk and Hazard Management

Risk and Hazard Management Risk and Hazard Management Models GS1532 Safe 272 Maximum 4.6 Maximum 6.6 GS1930 Working 227 Platform 5.8 Working 7.8 GS1932 Load (kg) 227 Drive 5.8 Height (m) 7.8 GS2032 363 Height (m) 6.1 8.1 GS2632

More information

Runabout Risk and Hazard Management

Runabout Risk and Hazard Management Runabout Risk and Hazard Management Models GR-15 Safe 227 Maximum 4.47 Maximum 6.47 GR-20 Working 159 Platform 6.07 Working 8.07 GRC-12 Load (kg) 227 Drive 3.66 Height (m) 5.66 QS-15 227 Height (m) 4.47

More information

Risk and Hazard Management

Risk and Hazard Management Risk and Hazard Management Models S40/45 Safe 227 Maximum 12.2/13.72 Maximum 14.2/15.72 S60/65 Working 227/499 Platform 18.34/19.8 Working 20.34/21.8 S80/85 Load (kg) 227/454 Drive 24.2/25.7 Height (m)

More information

PLANT RISK ASSESSMENT

PLANT RISK ASSESSMENT PLANT RISK ASSESSMENT Forktruck: Year of Manufacture Make: Model: Serial : TCM FD30T3 Attachment: Name: Mfg: Model : Owner: Business/Organisation: Address: This header page and the following 5 pages have

More information

Risk and Hazard Management

Risk and Hazard Management Risk and Hazard Management Models TZ34 Safe 200 Maximum 12.4 Maximum 10.4 TZ50 Working 200 Platform 15 Working 17 Z30/20NRJ Load (kg) 227 Drive 8.9 Height (m) 10.9 Z33/18 200 Height (m) 10 12 Z34/22 227

More information

Static, Hazard & Risk Assessment of Mobile Plant

Static, Hazard & Risk Assessment of Mobile Plant Static, Hazard & Risk Assessment of Mobile Plant Company Name ELITE ROADS Make / Model SAKAI TS160-2 Meter Reading: 477 Multi-Wheel Roller Plant Registration or ID. OU-047 Assessed by GREG CORNELL 03 9763

More information

ONSITE PLANT ASSESSMENT: PH: MOBILE PLANT RISK ASSESSMENT 2010.

ONSITE PLANT ASSESSMENT: PH: MOBILE PLANT RISK ASSESSMENT 2010. OSITE PLAT ASSESSMET: PH: 0400 536 983 MOBILE PLAT RISK ASSESSMET 2010. This form is to be completed in accordance with the Hazard Management Policy/Procedure and Plant and Equipment Safety Management

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Plant and equipment safety Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of Risk Document

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-08001-011 : Harrison 550 CNC Lathe Large Sale Type For what use is this asset being sold? Re-Use þ Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information

University College Dublin Machinery/Equipment Risk Assessment Template

University College Dublin Machinery/Equipment Risk Assessment Template 1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-09100-060 : Gantry hoist system Sale Type For what use is this asset being sold? Re-Use Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other use is at the

More information

Plant Hazard Identification and Risk Assessment

Plant Hazard Identification and Risk Assessment Plant information Plant item: Water Truck Plant identification details (asset/plant no.): Project: Competency required to operate the plant: MR/HR Licence / VOC List all legislation, codes of practice

More information

Plant Hazard Identification and Risk Assessment

Plant Hazard Identification and Risk Assessment Plant information Plant item: Drott Plant identification details (asset/plant no.): Project: Competency required to operate the plant: LS Ticket / VOC List all legislation, codes of practice and Australian

More information

Hazard Identification and Risk Management

Hazard Identification and Risk Management Hazard Identification and Risk Management Australian Workcover Authorities [supported by the Company] currently use a risk management approach in developing their legislative controls. This means that:

More information

in Australian Workplaces

in Australian Workplaces Copyright 2011 - OnGuard Safety Training Pty Ltd 1 of 7 in Australian Workplaces Introduction Part 2 Part 3 Part 4 Part 5 SafeWork SA Introduction Hazard identification is the process used to identify

More information

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA) Matrix Assessment Date: 15.2.2011 Consequences Likelihood or Probability Plant Type: CRANE Plant Make: TADANO Plant Model: TL250E Fleet: 281 Plant Serial No. 335347 Assessment Facilitated by: A WHEELER

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-0001-003 - Overhead Transfer System and EMS. Sale Type For what use is this asset being sold? Re-Use Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information

RISK & HAZARD MANAGEMENT

RISK & HAZARD MANAGEMENT & MANAGEMENT JLG Machine R6 Safe Working 230 Max. Drive 5.72 Max. Height (m) 5.72 Type Load (kg) Height(m) INTRODUCTION/SCOPE The aim of this report is to conduct an investigation into the hazards 1 and

More information

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2 PO Box 50, Hornsby, NSW 2077 Phone: 1800 643 853 Web: www.bobcat.com.au RISK ASSESSMENT For Bobcat Excavator Models 322 341, (Series D & G) CONTENTS Applicability Standards referenced in the preparation

More information

PLANT RISK ASSESSMENT WORKSHEET (PRA)

PLANT RISK ASSESSMENT WORKSHEET (PRA) Matrix Assessment Number: 00001 Assessment Date: 01 Jul 2015 Type: HA25 Dump Truck Make: KOMATSU Model: Highline Articulated Asset/Fleet/Rego No: 11-101 Serial No. 710872 Assessment Facilitated by: Tahir

More information

Revision 1. Review Date 1/9/2013

Revision 1. Review Date 1/9/2013 /9/203 Page of 2 Description: Toyota 5 Series Huski Skid Steer Loader. 5SDK5, 5SDK8, 5SDK9, 5SDK0 and 5SDK. Material Structure: A steel framed, internal combustion powered with a hydraulic boom arm which

More information

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw PLANT HAZARD REPORT Plant Description: Circular Saw PLEASE NOTE This plant information has been prepared to assist the purchaser in identifying hazards associated with the plant prior to the purchaser

More information

Revision 4. Review Date 1 Septrmber 2014

Revision 4. Review Date 1 Septrmber 2014 SERIES Page 1 of 9 Description: Toyota Series Skid Steer Loader. SDK, SDK5, SDK8 and SDK10. Material Structure: A steel framed, internal combustion powered / hydraulic boom arm which allows the driver

More information

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2 PO Box 50, Hornsby, NSW 2077 Phone: 1800 643 853 Web: www.bobcat.com.au RISK ASSESSMENT For Bobcat Skid Steer Loader Series F & G (incl. S Models) CONTENTS Applicability Standards referenced in the preparation

More information

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010) (Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:

More information

RISK & HAZARD MANAGEMENT

RISK & HAZARD MANAGEMENT & MANAGEMENT JLG Machine 340AJ Safe Working 230 Max. Drive 10.35 Max. Height (m) 10.35 Type Load (kg) Height(m) INTRODUCTION/SCOPE The aim of this report is to conduct an investigation into the hazards

More information

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16 All

More information

Recognition, Evaluation, and Control of Hazards

Recognition, Evaluation, and Control of Hazards Recognition, Evaluation, and Control of Hazards Latest revised date: October 26, 2011 Page 1 of 8 1.0 Introduction Memorial University has established a system for the recognition, evaluation, and control

More information

4.1 The Vice-Chancellor and University Executive Committee

4.1 The Vice-Chancellor and University Executive Committee UON Key Risk Area: KRA 1.4 Plant and Equipment 1. Purpose This procedure describes how the University meets its obligation to ensure the health and safety of people, through the processes of selection,

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

RISK ASSESSMENT TANDEM ASPHALT ROLLERS TYPES CC series rollers

RISK ASSESSMENT TANDEM ASPHALT ROLLERS TYPES CC series rollers RISK ASSESSMENT TANDEM ASPHALT ROLLERS TYPES CC series rollers Dynapac CC roller Risk Assessment 1 Contents INDEX Page Objective 3 Commentary 3 Definitions 5 How to use the Risk Assessment 6 Index of Significant

More information

PPE and Tools PPE and Tools

PPE and Tools PPE and Tools PPE and Tools PPE and Tools PPE Definition Personal protective equipment (PPE) refers to protective clothing, helmets, goggles, or other garments or equipment designed to protect the wearer's body from

More information

SAFETY/RISK/HAZARD ASSESSMENT

SAFETY/RISK/HAZARD ASSESSMENT POLE CHAIN SAW SAFETY/RISK/HAZARD ASSESSMENT PLANT INFORMATION NHG Ref/Part No. Plant Name: Potential Noise Level in Db: Pole Chain Saw 110db to less than 115db Required hearing protection class: 5 Operator

More information

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE. TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Using Angle Grinders SWMS No. 8 Authorized and email Signed by the

More information

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE PLAN Kenyon College

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE PLAN Kenyon College HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE PLAN Kenyon College PURPOSE The purpose of this Emergency Response Plan is to plan for and execute an organized response to hazardous waste spills or releases

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/752 Assessment Date: 5 th May 2015 Company: Wacker Neuson Plant Type: Telescopic Light Balloon Make: Wacker Neuson Model:

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

HAZARD RECOGNITION EVALUATION and CONTROL

HAZARD RECOGNITION EVALUATION and CONTROL What is a hazard? HAZARD RECOGNITION EVALUATION and CONTROL Hazard - a dangerous object, event, behaviour or condition (in the workplace) which has the potential to cause injury, illness or property damage.

More information

Working safely in an engineering environment

Working safely in an engineering environment Unit 001 Working safely in an engineering environment Level: 2 Credit value: 5 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to work

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/201-03 Assessment Date: 5 th June 2012 Company: Wacker Neuson Plant Type: Twin Drum Rollers Assessment Purpose: Operational

More information

75 Years of Health and Safety Guidance

75 Years of Health and Safety Guidance H&S Guide: 60 Working Risks Personal Protective Equipment Personal Protective Equipment (also known as PPE) Employers have duties concerning the provision and use of personal protective equipment at work.

More information

ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT

ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT PERSONAL PROTECTIVE EQUIPMENT Table of Contents A. Scope... 1 B. General Requirements... 1 C. Responsibility... 1 1. Supervisor... 1 2. Department

More information

Management of risk. Definition of terms. Managing risks. Risk

Management of risk. Definition of terms. Managing risks. Risk Definition of terms Risk Management of risk Risk is the possibility that harm (death, injury or illness) might occur when exposed to a hazard. A hazard is anything with the potential to cause injury or

More information

Section 5: Hazard Identification ( version)

Section 5: Hazard Identification ( version) Section 5: Hazard Identification (2010.06.16 version) 5.1 Introduction Purpose The hazard assessment process is a system to identify health hazards, occupational factors or illnesses, arising in and from

More information

TRADE AREA: ELECTRICAL INDUSTRY

TRADE AREA: ELECTRICAL INDUSTRY TRADE AREA: ELECTRICAL INDUSTRY Some possible workplace hazards and possible ways for Host employers and Apprentices/Trainees in controlling these hazards. What are possible hazards? What could be possible

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

Dalgety Bay Sailing Club; Raft Use Risk Assessment

Dalgety Bay Sailing Club; Raft Use Risk Assessment A. Dalgety Bay Sailing Club; Raft Use Risk Assessment Project Title: Mooring Maintenance Prepared by D Adrain Risk Assess. No.: RA 21/03/10 Task/Activity: B. A. Club Member Others (state) C. Lifting, maintenance

More information

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN). Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT June 2013 Lead Manager John Green, Health & Safety Service Manager Responsible Director Director of Human Resources Approved By Health and

More information

APPENDIX 1: HAZARD IDENTIFICATION and RISK ASSESSMENT PRO-FORMAS

APPENDIX 1: HAZARD IDENTIFICATION and RISK ASSESSMENT PRO-FORMAS FSC Operational Codes of Practice 7 July 2006 No 9: Risk Assessments Page 1 of 5 Appendix 1: Hazard Identification & Risk Assessment Pro-formas APPENDIX 1: HAZARD IDENTIFICATION and RISK ASSESSMENT PRO-FORMAS

More information

SAFE WORK METHOD STATEMENT Part B

SAFE WORK METHOD STATEMENT Part B SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS

More information

Personal Protective Equipment

Personal Protective Equipment Northland Community & Technical College June 1, 2017 Personal Protective Equipment Safety Officer Cory Feller Chemical Hygiene Officer Kristel Kizer Telephone: 218-683-8633 1 Personal Protective Equipment

More information

Accident Investigation and Hazard Analysis

Accident Investigation and Hazard Analysis Accident Investigation and Hazard Analysis June 18, 2015 Objectives: Accident Investigation Define accidents Review why accident investigations are important Review the purpose of accident investigations

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

Foot Protection 29 CFR

Foot Protection 29 CFR 2006 Foot Protection 29 CFR 1910.136 The foot hazard assessment should be completed before conducting this training so your company s findings, new personal protective equipment (PPE) policies, and recommendations

More information

OCCUPATIONAL HEALTH AND SAFETY POLICY AND PROCEDURE MANUAL

OCCUPATIONAL HEALTH AND SAFETY POLICY AND PROCEDURE MANUAL Australian Sports Sedan Association of NSW PO.BOX 3276, Putney, NSW, 2112 OCCUPATIONAL HEALTH AND SAFETY POLICY AND PROCEDURE MANUAL Version # 3 2013 Page 1 of 42 PREFACE The health and welfare of Race

More information

Surface exploration drilling

Surface exploration drilling Checklist Surface exploration drilling This checklist is intended to assist employers to identify common hazards and manage risks associated with surface exploration drilling. June 2017 Background In surface

More information

Plant Risk Assessment Self Propelled Scissorlift type Elevating Work Platform Model: S2755RT

Plant Risk Assessment Self Propelled Scissorlift type Elevating Work Platform Model: S2755RT 134 Ogilvie Avenue, Echuca 3564 Plant Risk Assessment Self Propelled Scissorlift type Elevating Work Platform This Hazard Identification & Risk Assessment has been prepared based on several key assumptions:

More information

Activity Hazard Analysis. Final Review: Dr. R. Von Burg

Activity Hazard Analysis. Final Review: Dr. R. Von Burg Appendix C Activity Hazard Analysis Mobilization/ Demobilization Physical injury from heavy equipment; heavy lifting, pinch points; slip, trip, and fall hazards Brush Clearing Cuts, slashes, dismemberment.

More information

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Traineeship Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE: DATE: / /

More information

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015 Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039 Name Date Signature Author Jarred Hearle 27/11/2015 Reviewed FMG Site Team 27/11/2015 ---------- Approved Geoff Selfe 27/11/2015

More information

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0 EF26 Risk Assessment Kubota U35-4 s Requiring Attention: AS AT Friday, 1 April 2016 0 Next Review Saturday, 1 April 2017 Total s Recorded 43 Critical Risk s 0 High Risk s 0 Moderate Risk s 10 Low Risk

More information

CLUB RISK ASSESSMENT TEMPLATE

CLUB RISK ASSESSMENT TEMPLATE CLUB / VENUE (Guidance for clubs to adapt for their own use) 1. ALL AREAS Slips, trips and falls injury from slips trips and falls from uneven or damaged surfaces, holes etc. External ground surfaces,

More information

QUEENSLAND UNIVERSITY OF TECHNOLOGY

QUEENSLAND UNIVERSITY OF TECHNOLOGY QUEENSLAND UNIVERSITY OF TECHNOLOGY SITE SPECIFIC SAFETY MANAGEMENT PLAN FOR SAMFORD HOUSE SAMFORD ECOLOGICAL RESEARCH FACILITY SAMFORD VALLEY 2007 Dylan Randall SN: 06305466 dylan.randall@student.qut.edu.au

More information

Compliance Requirements

Compliance Requirements Compliance Requirements The compliance requirements for OSHA s Personal Protective Equipment regulations are very straightforward, and logical. GENERAL REQUIREMENTS (29 CFR 1910.132) The general OSHA Personal

More information

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Safety Risk Assessment Working at Height: Mobile Tower Scaffold Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 Working at height from Mobile Tower B Contractors/Sub contractors

More information

NOTE: Parts are no longer available for this tool. The manual will continue on the next page.

NOTE: Parts are no longer available for this tool. The manual will continue on the next page. NOTE: Parts are no longer available for this tool. The manual will continue on the next page. Form Z455 Date 12-97/D Page 1 of 6 INSTRUCTIONS & PARTS LIST FOR SIOUX 8200 POLISHER GENERAL SAFTEY RULES READ

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Hot Work Document Number OHS-PROC-128 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro PS Mica

More information

A Health & Safety Risk Management Tool that you can use today. Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC

A Health & Safety Risk Management Tool that you can use today. Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC A Health & Safety Risk Management Tool that you can use today Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC I m a safety geek What are the hazards of your work environment? Who is

More information

PART 4: IMPLEMENTATION & OP

PART 4: IMPLEMENTATION & OP TITLE PART 4: IMPLEMENTATION & OPERATION Prepared by: 4.2 Personal Protective Equipment (PPE) Learning Objectives To define what is Personal Protective Equipment (PPE). To describe the management & legal

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/201-11B Assessment Date: 30 th January 2013 Company: Wacker Neuson Plant Type: Excavator Models: 803, 1404, 1703, ET18, 2003,

More information

Portable Electric Tools

Portable Electric Tools A Health and Safety Guideline for Your Workplace Types Portable electric tools commonly used in industry are: drills, saws, sanders, buffers, grinders, impact wrenches, planers. Hazards The hazards associated

More information

Risk Assessment Form (Qualitative)

Risk Assessment Form (Qualitative) Assessment Form (Qualitative) Project / ocation:..d.a.s WATERS Contract No: RA & Issue No: 008 Prepared by:.r.smit Date: 10/10/16 Signature: ACTIVITY DESCRIPTION: Person (s) at risk: General Ground works

More information

UNDERSTANDING JOB HAZARDS

UNDERSTANDING JOB HAZARDS 1 UNDERSTANDING JOB HAZARDS Many hazards on the job are obvious, like sharp objects, slippery floors, and hot liquids. Other hazards, such as repetitive movements and chemicals, may be hidden. Sometimes

More information

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT 13.0 The purpose of this program is to ensure that, where applicable, the appropriate and necessary personal protective equipment (PPE) is selected and provided to employees to protect from illness or

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/201-03 Assessment Date: 5 th June 2012 Company: Wacker Neuson Plant Type: Twin Drum Rollers Assessment Purpose: Operational

More information

PLANT RISK ASSESSMENT REPORT

PLANT RISK ASSESSMENT REPORT PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/751 Assessment Date: 5 th May 2015 Company: Wacker Neuson Plant Type: Telescopic Light Tower Make: Wacker Neuson Model: LTN6

More information

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee. Working at Height Policy and Procedures Author: Beth Webster Assistant Safety Advisor Authorised by: Issued by: John Stephenson Safety Office On behalf of School Safety Committee Review Date: NO LATER

More information

TOOL BOX TALK NO3. Use of P.P.E

TOOL BOX TALK NO3. Use of P.P.E Combined Technical Solutions Ltd TOOL BOX TALK NO3. Use of P.P.E OBJECTIVE: Why PPE is important and why it should be looked after Personal Protective Equipment is intended to protect you from risks, which

More information

Confined Space Entry. My Experience so far.

Confined Space Entry. My Experience so far. Confined Space Entry My Experience so far My Experience so far Complacency to Confined Space working Is the area a Confined Space No company procedures Poor risk assessments A lot of confusion Staff &

More information

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Key word(s) : Work equipment. Using, maintaining and repairing. Information, instruction and supervision. Risk Assessment.

More information