1 Policy: Installation, Testing, and Maintenance of Medical Gas Page 1 of 2 APPLICATION NYU Langone Medical Center (NYULMC) PURPOSE To provide guidelines for safe and proper installation, testing and maintenance of medical gas outlets and piping. POLICY AND GENERAL INFORMATION 1.0 Prior to any installation, testing, maintenance of, or work on medical gas outlets or piping: Authorization shall be obtained from Facilities Operations, HJD Facilities Engineering or Real Estate, as applicable. Facilities Operations, HJD Facilities Engineering or Real Estate, as applicable, shall locate the nearest isolation valve and determine shutdown requirements. 2.0 Medical air, nitrous oxide, and oxygen piping shall: Comply with the standards outlined in the most current version of National Fire Protection Association (NFPA) 99 (see excerpt in Appendix A). Be installed only by qualified personnel meeting American Society of Sanitary Engineering (ASSE) 6010 requirements. Have brazed fittings and be installed in accordance with NFPA 99 procedures. During brazing, joints shall be continuously purged with oil-free, dry nitrogen to prevent the formation of copper oxide on the inside surfaces of the joint. 3.0 Medical gas outlets shall be manufactured by BeaconMedaes through Hill Rom using the Diameter-Index Safety System (DISS).
2 Policy: Installation, Testing, and Maintenance of New Medical Gas Page 2 of Testing shall be conducted by an approved contractor. It shall be witnessed at start and finish by the Project Manager and/or a representative of Facilities Operations (e.g., Plumbing Foreman), HJD Facilities Engineering or Real Estate, as applicable. Documentation of findings shall be kept in the project folder. The tests are to be performed in accordance with ASSE 6010 requirements. An Initial Pressure Test shall be conducted when all rough assemblies are completed. It shall be conducted at 1.5 times the working pressure but not less than 150 pounds per square inch (psi). It shall include a check for leaks and retest. For vacuum systems, it shall be conducted at 60 psi with soapy water or equivalent. A Standing Pressure Test shall be conducted for 24 hours at 20% above normal working pressure. It shall include a check for leaks and retest. For vacuum systems, it shall be conducted at no less than 12 inches of mercury (Hg). Following pressure testing, the contractor shall perform a Piping Purge Test by purging lines with oil-free, dry nitrogen in accordance with NFPA 99 to ensure that no debris remains in the piping. Purity testing (of all lines affected) shall be conducted with oil-free, nitrogen gas. Results shall be reviewed by Facilities Operations, HJD Facilities Engineering or Real Estate, as applicable. A Final Tie-In Test shall be conducted at normal system pressure. 5.0 All piping shall be labeled in accordance with NFPA 99 (see Appendices A and B). 6.0 Facilities Operations, HJD Facilities Engineering or Real Estate, as applicable, shall coordinate preventive maintenance of medical gas systems. Maintenance shall include periodic inspection and testing of the entire medical gas distribution systems on a frequency of not less than one year (annual). The testing shall be completed by qualified personnel meeting the requirements of ASSE Maintenance and repairs shall be conducted by qualified personnel meeting the requirements of ASSE 6030 and/or 6040.
3 Policy: Installation, Testing, and Maintenance of New Medical Gas Page 3 of 2 Issue date 03/15 Replaces 09/06 Reviewed by J. Goldberg, Environmental Health and Safety D. Bensimon, Facilities Operations R. Cohen, Facilities Operations D. Rubbo, HJD Facilities Engineering B. Everett, Real Estate NYUHC Environment of Care Committee
4 Safety Policy 133, Appendix A Selected Standards from NFPA 99 (2005 ed.), Chapter 5: Gas and Vacuum Systems Medical-Surgical Vacuum Source Exhaust The exhaust shall be piped of materials approved for medical-surgical vacuum piping under Piping Materials for Field-Installed Positive Pressure Medical Gas Systems Tubes, valves, fittings, station outlets, and other piping components in medical gas systems shall have been cleaned for oxygen service by the manufacturer prior to installation in accordance with CGA G-4.1, Cleaning Equipment for Oxygen Service, except that fittings shall be permitted to be cleaned by a supplier or agency other than the manufacturer Each length of tube shall be delivered plugged or capped by the manufacturer and kept sealed until prepared for installation Fittings, valves, and other components shall be delivered sealed, labeled, and kept sealed until prepared for installation Tubes shall be hard-drawn seamless copper ASTM B 819, Standard Specification for Seamless Copper Tube for Medical Gas Systems, medical gas tube, Type L, except that where operating pressures are above a gauge pressure of 1275 kpa (185 psi) Type K shall be used for sizes larger than DN80 (NPS 3) (3⅛ in. O.D.) ASTM B 819, Standard Specification for Seamless Copper Tube for Medical Gas Systems, medical gas tube shall be identified by the manufacturer s markings OXY, MED, OXY/MED, OXY/ACR, or ACR/MED in blue (Type L) or green (Type K) The installer shall furnish documentation certifying that all installed piping materials comply with the requirements of Piping Materials for Field-Installed Medical-Surgical Vacuum and WAGD Systems Piping for vacuum systems shall be constructed of any of the following: (1) Hard-drawn seamless copper tube: a) ASTM B 88, Standard Specification for Seamless Copper Water Tube, copper tube (Types K, L, or M) b) ASTM B 280, Standard Specification for Seamless Copper Tubing for Air Conditioning and Refrigeration Field Service, copper ACR tube c) ASTM B 819, Standard Specification for Seamless Copper Tube for Medical Gas Systems, copper medical gas tubing (Type K or Type L) (2) Stainless steel tube Pipe Labeling Piping shall be labeled by stenciling or adhesive markers that identify the patient medical gas, the support gas, or vacuum system, and include: (1) The name of the gas/vacuum system or the chemical symbol per Table (2) The gas or vacuum system color code per Table (3) Where positive pressure gas piping systems operate at pressures other than the standard gauge pressure in Table , the pipe labeling shall include the operating pressure in addition to the name of the gas Pipe labels shall be located as follows: (1) At intervals of not more than 6.1 m (20 ft) (2) At least once in or above every room (3) On both sides of walls or partitions penetrated by the piping (4) At least once in every story height traversed by risers
5 Safety Policy 133, Appendix B Table Standard Designation Colors and Operating Pressures for Gas and Vacuum Systems Gas Service Abbreviated Name Colors (Background/Text) Standard Gauge Pressure Medical air Med Air Yellow/black Carbon dioxide CO 2 Gray/black or gray/white Helium He Brown/white Nitrogen N 2 Black/white 1,100-1,275 kpa ( psi) Nitrous oxide N 2 O Blue/white Oxygen O 2 Green/white or white/green Oxygen/carbon dioxide mixture O 2/ CO 2 n% (n is % of CO 2) Green/white Medical-surgical vacuum Med Vac White/black 380mm to 760 mm (15in. to 30 in. HgV) Waste anesthetic gas disposal WAGD Violet/white Varies with system type Other mixtures Gas A%/ Gas B% Colors as above Major gas for background/ minor gas for text Nonmedical air (level 3 gas-powered device) Nonmedical and Level 3 vacuum Laboratory air Laboratory vacuum Yellow-and-white diagonal stripe/black White-and-black diagonal stripe/black boxed Yellow-and-white checkerboard/black White-and-black checkerboard/black boxed Instrument air Red/white 1,100-1,275 kpa ( psi) Source: NFPA 99, 2005 Ed. National Fire Protection Association.
CHAPTER 13. HEAlTH CARE FACiliTiEs And MEdiCAl GAs And VACuuM systems. Part i special Requirements for Health Care Facilities.
CHAPTER 13 HEAlTH CARE FACiliTiEs And MEdiCAl GAs And VACuuM systems Part i special Requirements for Health Care Facilities. 1301.0 Application. 1301.1 Where Required. Construction and equipment requirements
Oxygen and other Compressed Medical Gas Rules and Regulations Complying with the Law. Regulatory agencies:
Oxygen and other Compressed Medical Gas Rules and Regulations Complying with the Law BACKGROUND Cylinders containing gases (i.e. oxygen, nitrogen, nitrous oxide) are under high pressure and can be a combustion,
Operation and Maintenance Manual for GENTEC Medical Gas Outlets
Operation and Maintenance Manual for GENTEC Medical Gas Outlets Genstar Technologies Co., Inc. 4525 Edison Avenue Chino, CA 91710 USA TEL 909-606-2726 FAX 909-606-6485 www.gentechealthcare.com IMPORTANT
Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane
Gas requirements Gases for packed columns The carrier gas you use depends upon the type of detector and the performance requirements. Table 520-1 lists gas recommendations for packed column use. In general,
MEDICAL EQUIPMENT CATALOG
THE MOST TRUSTED MEDICAL EQUIPMENT IN NORTH AMERICA MEDICAL EQUIPMENT CATALOG Total Components Including Bulk Oxygen Supply, Back up and Delivery Equipment Designs for High Pressure, Liquid or Bulk Applications
Product Description 3 Cleaning and Lubricating 4 Inspection and Testing 4
Installation and Maintenance Manual Medical Gas Outlets DISS, Ohmeda, Chemetron, Puritan-Bennett & Oxequip / MedStar Compatible Puritan-Bennett Compatible Chemetron Compatible Ohmeda Compatible DISS Oxequip/
Nitrous Oxide / Oxygen FLOOR MOUNTED OUTLET STATION Installation and Instructions
FM-171 Rev. B 8/00 Nitrous Oxide / Oxygen FLOOR MOUNTED OUTLET STATION Installation and Instructions MODEL 6300-1 PORTER INSTRUMENT COMPANY, INC. 245 TOWNSHIP LINE RD. P.O. BOX 907 HATFIELD, PA 19440-0907
Medical Gas Control Panel
Medical Gas Control Panel INSTALLATION & MAINTENANCE MANUAL 255105 (Rev. 6) 2018-04 2 255105 (Rev. 6) 2018-04 1.0 User Responsibilities The information contained in this installation and operation maintenance
M E M O R A N D U M. NFPA 99 First Draft Correlating Committee FINAL Ballot Results (A2017 Cycle)
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Correlating Committee on Health Care Facilities
Economy Manifold Alert -2. Installation and Maintenance Manual V1.6
Economy Manifold Alert -2 Installation and Maintenance Manual V1.6 Corporation Table of Contents User Responsibility 4 Introduction 4 Features 4 Description of the Manifold 5 Shipment Details 5 The Collapsible
PURPOSE OF THE POLICY
Title: Safe Storage, Handling, Use and Disposal Procedures of Compressed Gas Cylinders Effective Date: November 2005 Revision Date: March 1, 2017 Issuing Authority: Responsible Officer: VP, Capital Projects
Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series
Introduction Powerex manifolds are cleaned, tested and prepared for the indicated gas service and are built in accordance with the Compressed Gas Association guidelines. The manifold consists of a regulator
NGP-250/500 Nitrogen Generator Quick Start Guide
NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document
NITROGEN PURGING SYSTEMS FOR THE HVAC INDUSTRY VISION INNOVATION SOLUTION
NITROGEN PURGING SYSTEMS FOR THE HVAC INDUSTRY The Purge-N2-Test is a nitrogen regulator/cylinder system, utilizing a lightweight aluminum cylinder and a state of the art regulator with an integrated cylinder
PERMA-CYL 230/450/1000/1500/2000. Installation Manual Manual # Revision B
PERMA-CYL 230/450/1000/1500/2000 Installation Manual Manual #11630833 - Revision B TABLE OF CONTENTS SAFETY 3 THE PERMA-CYL FAMILY 4 CONDUCTING A SITE EVALUATION 5 OUTDOOR INSTALLATION EXTERNALLY SITED/GAS
Eliminating Medical Gas Shutdowns for 10 years
Eliminating Medical Gas Shutdowns for 10 years Smart Tap is a tool used by hospitals. It has been used OVER 5000 TIMES to accomplish: Relocation of Bulk Gas Systems Relocation of zone valves Tie-ins of
Compressed Gas Cylinders - Guideline
Environmental Health and Safety Compressed Gas Cylinders - Guideline Date of Issuance: 1/10/18 Revision Number: Initial Revision Date: Prepared by: EH&S 1. Purpose Carnegie Mellon University has developed
ASYBCO 90 O ELBOW LONG RADIUS O.D. I.D.
90 O ELBOW LONG RADIUS Standard weight Extra strong Schedule 160 Double extra strong ASTM A-234 ASME / ANSI B16.9 Carbon and ferritic alloy steel Produced from X-rayed, stress-relieve welded pipe. Welds
Type 1 - Nitrogen Generation System. Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity up to 750 gallons
Type 1 - Nitrogen Generation System Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity up to 750 gallons 1.0 Nitrogen Generation Corrosion Inhibiting System 1.1 The Fire
Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.
Gas Lines Technical Manual Sumitomo (SHI) Cryogenics of America, Inc. 1833 Vultee Street Allentown, PA 18103-4783 U.S.A. Revision F: April 2008 261320A TABLE OF CONTENTS Page DESCRIPTION...1 SPECIFICATIONS...2
Bauman Machine Inc. COMPRESSED GAS CYLINDER SAFETY
Bauman Machine Inc. COMPRESSED GAS CYLINDER SAFETY Many industrial and laboratory operations require the use of compressed gases for a variety of different operations. Compressed gases present a unique
High-Purity. Ball Valves
High-Purity s Components MANUFACTURING ASSEMBLY TESTING HP High-Purity s CFOS Applications Cost-effective systems where cleaning for oxygen-grade services are required, such as: Clean-Dry Air (CDA), Oil-Free
I. Subject: Compressed gas cylinders, regulators, and portable liquid systems.
I. Subject: Compressed gas cylinders, regulators, and portable liquid systems. II. Objective: To provide safe and effective use, storage, and transport of therapeutic gases. II. Procedure: A. Compressed
TITAN Oxygen Regulators
EMS OXYGEN REGULATORS TITAN Oxygen Regulators EMS TITAN SERIES OXYGEN EMS AND FIRE SERVICE APPLICATIONS CLICK-STYLE REGULATOR Whether its EMS, ambulance, fire rescue or tactical medical use, Titan Oxygen
Pumping Apparatus Driver/Operator Apparatus Testing. Chapter Test. Directions: Write the correct letter on the blank before each question.
Chapter 15 Test Name: Date: Directions: Write the correct letter on the blank before each question. Objective 1: Distinguish among preperformance tests for pumping apparatus. 1. Which standard is commonly
South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)
South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System Designed for: Dry or Preaction Fire Protection Systems (FPS) 1.0 Description of Work 1.1 The Fire Sprinkler Contractor shall provide
Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848
Cal/OSHA Gas Systems for Welding GAS WELDING Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 When performing gas welding, the following precautions, work procedures,
Type 3 - PSA Nitrogen Generation System
Type 3 - PSA Nitrogen Generation System Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity from 6,000 to 18,000 gallons 1.0 Nitrogen Generation Corrosion Inhibiting System
VACUUM TESTING PRECAST CONCRETE MANHOLES
1 OF 5 testing is a quick, safe and practical way to validate manhole system integrity. Manhole sections can be tested at the precast concrete plant prior to delivery or on site prior to backfilling. Here
Instruction Bulletin Addendum For Pressure-Balanced In Situ Oxygen Probes
Instruction Bulletin Addendum For Pressure-Balanced In Situ Oxygen Probes Instruction Bulletin Addendum IB PB1000 Part no. Serial no. Order no. Oxymitter 4000 Applicability: Used with pressure-balancing
INSTALLATION INSTRUCTIONS FOR SSI WIDEBAND DIFFUSER
INSTALLATION INSTRUCTIONS FOR SSI WIDEBAND DIFFUSER Comment Sheet: 1. Installation, Operation and Maintenance Manual contains detailed information on the SSI-Cap Diffuser unit. This manual covers start-up,
U S E R M A N U A L CAUTION. SAVE THESE INSTRUCTIONS Federal (USA) law restricts this device to sale by or on the order of a physician.
U S E R M A N U A L 1600 SERIES OXYGEN REGULATOR 168715G (Shown) SAVE THESE INSTRUCTIONS Federal (USA) law restricts this device to sale by or on the order of a physician. 300 Held Drive Tel: (+001) 610-262-6090
Manifolds & pressure reducing sets
Manifolds & pressure reducing sets Automatic Changeover Manifold (Electronic) Providing continuous supply of medical gases Pneumatech Medical Gas Solutions (PMGS) PureGAS Manifolds provide a duty or standby
GUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS
Page 1 of 5 GUIDELINES FOR CONDUCTING 1. Definition of Hydrogenation and Hydrogenolysis Reactions Hydrogenation reactions are synthetic transformations involving hydrogen, metallic catalysts (such as nickel,
STANDARD OPERATING PROCEDURES
PAGE: 1 of 14 CONTENTS 1.0 SCOPE AND APPLICATION 2.0 METHOD SUMMARY 3.0 SAMPLE PRESERVATION, CONTAINERS, HANDLING AND STORAGE 4.0 INTERFERENCE AND POTENTIAL PROBLEMS 5.0 EQUIPMENT/APPARATUS 6.0 REAGENTS
Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions
Compact Triple Cabinet Outlet Station Model 6258-1 Installation and Operating Instructions The Porter Compact Triple Outlet Station (6258-1) provides a quick, safe, and reliable method of connection to
Medical Gas Solutions
WHN YOU ND from OKRING okring Technology, C offers a patented, permanent, axially swaged tube fitting. This technology for medical gas applications has been approved by NFP 99-005 (Paragraph 5..0.7 (4)).
RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE
March 22, 2013 RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE Regulators: Symptom: Pressure Drop Cause: External leaks detected at pigtail hose MPT fitting connection(s) to regulator body
Material Handling and Storage of compressed gases and Air equipment
Material Handling and Storage of compressed gases and Air equipment Compressed gases can be toxic, flammable, oxidizing, corrosive, inert, or some combination of these hazards. Compressed gas cylinders
Optimizing Gas Supply for Industrial Lasers
Optimizing Gas Supply for Industrial Lasers Laser cutting of metals and other materials has grown rapidly due to developments in laser power, advancements in CNC automation, and decreasing costs. The industrial
RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005
RDK-408D2 Cold Head Technical Manual SHI-APD Cryogenics Inc. 1833 Vultee Street Allentown, PA 18103-4783 U.S.A. Revision A: September 2005 (Reference SHI Manual: December 18, 2003 266404A CD32ZZ-160A)
EXD SERIES PRESSURE DIFFERENTIAL SWITCHOVER SYSTEM
EXD SERIES PRESSURE DIFFERENTIAL SWITCHOVER SYSTEM INSTALLATION AND OP ER A TION IN STRUC TIONS Before Installing or Operating, Read and Comply with These Instructions IMD0611B 6.2012 Certified ISO 9001
AIR DRIVEN. Gas Boosters & SYSTEMS. Accepting VISA, MasterCard and American Express
AIR DRIVEN Gas Boosters & SYSTEMS Accepting VISA, MasterCard and American Express Gas Boosters AIR DRIVEN FROM 30 PSI TO 21,750 PSI MAXIMATOR Maximator gas boosters are an excellent alternative to high
Installation Instructions
48011HW NATURAL GAS TO PROPANE CONVERSION KIT 58HDX, 359AAV, PG9YAB, PG9YAA Installation Instructions SAFETY REQUIREMENTS Installing and servicing heating equipment can be hazardous due to gas and electrical
PIP PNE00012 Piping Examination and Leak Test Guide
October 2017 Piping PIP PNE00012 Piping Examination and Leak Test Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has
NITROGEN PRESSURE REGULATOR LEAK TESTING KIT
7 OPERATING INSTRUCTIONS NITROGEN PRESSURE REGULATOR LEAK TESTING KIT 1 15 15 2 c o o l 25 m 2 3 1 2 3 4 5 5 35 25 4 3 4 5 3 1 1 2 6 8 5 53-3 1 9 6 53-7 7 99 Washington Street Melrose, MA 2176 Phone 781-665-14
Air Operated Hydraulic Pumping Systems to 50,000 psi
High Pressure Equipment Air Operated Hydraulic Pumping Systems to 50,000 psi PS-10: 10,000 psi PS-20: 20,000 psi PS-30: 30,000 psi PS-40: 40,000 psi PS-50: 50,000 psi PS-90: 90,000 psi High Pressure air
SECTION ACCEPTANCE TESTING FOR SANITARY SEWERS
SECTION 33 01 30.13 ACCEPTANCE TESTING FOR SANITARY SEWERS PART 1: GENERAL 1.01 PERFORMANCE REQUIREMENTS A. Gravity flow sanitary sewers are required to have straight alignment and uniform grade between
TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1
Dry 131h 1. DESCRIPTION The Viking Model G-1 Maintenance Air Compressor is an electric motor-driven, aircooled, single-stage, oil-less compressor. The unit is equipped with a check valve and provides a
WHAT ARE THE SPECIFICATIONS FOR THE ARGON GAS OPTION USED IN JOULE THOMSON REFRIGERATORS?
MMR Technologies, Inc. WHAT ARE THE SPECIFICATIONS FOR THE ARGON GAS OPTION USED IN JOULE THOMSON REFRIGERATORS? Joule Thomson refrigerators operate using high pressure gas to cool a sample stage with
Rare Gas Applications
Rare Gas Applications Specializing in EPA, Electronic, Medical, and NMR & MRI GLOBAL REACH, LOCAL SERVICE 1.800.649.6704 WWW. MIDDLESEXGASES.COM The Middlesex specialty gas advantage Middlesex Gases &
OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4
TABLE OF CONTENTS OVERVIEW pg 3 Major Points to Consider pg 3 Minor Points to Consider pg 3 INSTRUCTIONS pg 4 How Does Nordic Freeze Work pg 4 How Long Will the Ice Plug Take to Form pg 4 How Do I Know
POWER FLUSH KIT INSTRUCTIONS
1 GENERAL INFORMATION POWER FLUSH KIT INSTRUCTIONS ACE Power Flush is an ozone-safe solvent engineered specifically for flushing refrigeration and air conditioning systems. Used exactly like the old R-11
Safety Policy Manual Policy No. 138
Policy: Confined Space Entry Program Page 1 of 10 APPLICATION NYU Langone PURPOSE To protect personnel who enter permit-required confined spaces (PRCS) from potential hazards. To comply with the Occupational
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
Oxygen Dialflow Meter. Instructions for Use
Oxygen Dialflow Meter Instructions for Use 702-0031.9 May 2014 1. Symbols Warning! Caution! Indicates a potentially hazardous situation which, if not avoided, could result in personal injury to the user
623 Series Dome Load Regulators
ADI 3202C Certified ISO 9001 623 Series Dome Load Regulators INSTALLATION AND OPERATION INSTRUCTIONS This Equipment is intended to be installed and operated by trained personnel. Before Installing or Operating,
Compressed Gas Properties. Introduction. Compressed Gas Properties. Definition of a Compressed Gas
1. Properties of gases 2. Cylinders 3. Storage of Gases 4. Regulators 5. Cryogenic Liquids Introduction All compressed gases by definition can be hazardous Know the properties of the gases you are working
Your safety and the safety of others are very important.
NATURAL GAS TO PROPANE CONVERSION KIT ALPKT57- INSTALLATION INSTRUCTIONS PROPANE CONVERSION KIT SAFETY... INSTALLATION REQUIREMENTS... Tools and Parts... LP Gas Requirements... Table of Contents INSTALLATION
WSC Performance Standard and Recommended Installation Procedures for Sanitary Water Well. Pitless Adapters, Pitless Units, And Well Caps
WSC Performance Standard and Recommended Installation Procedures for Sanitary Water Well Pitless Adapters, Pitless Units, And Well Caps History of the WSC PAS Standard he Water Systems Council (WSC) has
Glasgow City Council EDUCATION SERVICES. Technician Support Service
Glasgow City Council EDUCATION SERVICES Technician Support Service Technician Guidance Sheets TGS/10a Use & Inspection of Gas Cylinders & Associated s Issued by Technician Support Service Date September
SECTION 25 TESTING AND DISINFECTING WATER MAINS General
SECTION 25 TESTING AND DISINFECTING WATER MAINS 25-1.01 Scope 25-1 General This section describes the requirements for pressure and leak testing, and disinfecting of water mains and appurtenances, including
SECTION ACCEPTANCE TESTING FOR SANITARY SEWERS
SECTION 33 01 30.13 ACCEPTANCE TESTING FOR SANITARY SEWERS PART 1: GENERAL 1.01 PERFORMANCE REQUIREMENTS A. Gravity flow sanitary sewers are required to have straight alignment and uniform grade between
TECHNICAL DATA. Q = C v P S
January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated
Tri-Tech Medical Inc.
Introduction Tri-Tech Medical manifolds are cleaned, tested and prepared for the indicated gas service and are built in accordance with the Compressed Gas Association guidelines. The manifold consists
MB-SP Series Solvent Purification System
Operation Manual MB-SP Series Solvent Purification System Table of contents 1. System overview 2 2. Column activation.. 5 3. System purging.. 6 4. Glove box integration.... 7 5. Solvent reservoir installation....
300 Held Drive Northampton Pa
300 Held Drive Northampton Pa 18067 610.262.6090 June 10, 2015 Recommended testing for verifying device performance. Intervals of testing are to be set by the Healthcare Provider / Dealer. Table of Contents
GasTrak Pro TM Delivery/Control Systems
GasTrak Pro TM Delivery/Control Systems Regulator, Purifier and Outlet Sections Introduction GasTrak Pro TM Systems are a unique approach to controlling and delivering high-purity gases distributed in
Appendix A 1. -STATIC LEAK TEST (taken from BAAQMD test procedure ST-30)
3745-21-10 Appendix A 1 l. Applicability -STATIC LEAK TEST (taken rom BAAQMD test procedure ST-30) 1.1 This test procedure is used to quantiy the vapor tightness o vapor control systems installed at any
INDUSTRIAL GAS PIPING SYSTEM FOR CHEMICAL ENGINEERING LABORATORY UNIVERSITI MALAYSIA PAHANG
INDUSTRIAL GAS PIPING SYSTEM FOR CHEMICAL ENGINEERING LABORATORY UNIVERSITI MALAYSIA PAHANG ROSMIMIE BINTI ABDULLAH Thesis submitted in partial fulfilment of the requirements for the award of the degree
TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13
Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler
Manual Solvent Purification System. Innovative Technology, Inc.
Innovative Technology, Inc. 2 New Pasture Road, Newburyport, MA 01950-4054 USA Email: Info@gloveboxes.com TEL: +1 978 462 4415 FAX: +1 978 462 3338 Manual Solvent Purification System Copyright Innovative
Laboratory Gases CEU 234. Continuing Education from the American Society of Plumbing Engineers. April ASPE.ORG/ReadLearnEarn
Laboratory Gases Continuing Education from the American Society of Plumbing Engineers April 2016 ASPE.ORG/ReadLearnEarn CEU 234 READ, LEARN, EARN Note: In determining your answers to the CE questions,
product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels
12.09 product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels Introduction: This manual covers the installation and operation of Humboldt FlexPanels for Triaxial and Permeability
RK-IR Sample Draw Aspirator Adapter Operator s Manual
30-0951RK-IR Sample Draw Aspirator Adapter Operator s Manual Part Number: 71-0018RK Revision: A Released: 6/2/10 www.rkiinstruments.com Product Warranty RKI Instruments, Inc. warrants gas alarm equipment
Micro Dial-Flowmeter. Instructions for Use
Micro Dial-Flowmeter Instructions for Use 702-0082.8 May 2014 1. Symbols Warning! Caution! Indicates a potentially hazardous situation which, if not avoided, could result in personal injury to the user
Risk Management Department. Compressed Gas Safety
Risk Management Department Compressed 1 Introduction Many maintenance and vocational education operations require the use of compressed gases. 2 Introduction In this presentation we will discuss: Hazards
Shut-Off Valves and Valve Boxes
Installation and Maintenance Manual V1.2 Shut-Off Valves and Valve Boxes Alert-1 w w w. a m i c o. c o m Table of Contents Introduction 3 Medical Facility Responsibility 3 Precautions 3 Installation of
REGULATORS FOR SPECIFIC APPLICATIONS
SINGLE-STAGE REGULATORS FOR NITROUS OXIDE AND CARBON DIOXIDE (MODELS SG9011, SG9012, SG9014) Nitrous Oxide and Carbon Dioxide frequently cause ordinary regulators to freeze up. Models SG9011, SG9012 and
VIC offers a variety of Calibrated Gas Leaks
CALIBRATED GAS LEAKS VIC offers a high quality line of calibrated gas leaks traceable to National Institute of Standards Technology (NIST). Calibrated gas leaks are used to provide a controlled delivery
Customer Responsibilities. Important Customer Information Series Q-TOF LC/MS Systems Site Preparation Checklist
Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is
SEMASPEC Test Method for Determination of Cycle Life of Automatic Valves for Gas Distribution System Components
SEMASPEC Test Method for Determination of Cycle Life of Automatic Valves for Gas Distribution System Components Technology Transfer 90120395B-STD and the logo are registered service marks of, Inc. 1996,
STORAGE AND USE OF HIGH HAZARD GAS
Page 1 of 9 STORAGE AND USE OF 1. Definition of High Hazard (HH) Gases For these guidelines, any gas meeting one or more of the following definitions based on International Fire Code (IFC) and National
Installation and Maintenance Manual. Microprocessor Based Digital Manifold NFPA
Installation and Maintenance Manual Microprocessor Based Digital Manifold NFPA w w w. a m i c o. c o m Table of Contents User Responsibility 4 Introduction 5 Features 5 Description of the Manifold 6 Shipment
Anti-flood device Model B-1
December 4, 2009 Dry Systems 123a 1. DESCRIPTION The Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET
Gases and Pressure SECTION 11.1
SECTION 11.1 Gases and In the chapter States of Matter, you read about the kineticmolecular theory of matter. You were also introduced to how this theory explains some of the properties of ideal gases.
Thank You for Attending Today s Webinar. Today s Featured Speaker
Thank You for Attending Today s Webinar Your Host Mike DeLacluyse President Lesman Instrument Company miked@lesman.com Today s Featured Speaker A.J. Piskor Combustion & Controls Specialist Lesman Instrument
TECHNICAL DATA. Q = C v P S
January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete
WHAT IS GAS TANK/CYLINDER?
Introduction To use compressed gas cylinders safely, it is important that they are stored properly, handled correctly, used with the correct equipment, and that the properties of the gases they contain
MEDICAL GASES Manufacture, Storage, Transport & Delivery B.KIRUTHIGA LECTURER DEPT OF PHARMACEUTICAL CHEMISTRY
MEDICAL GASES Manufacture, Storage, Transport & Delivery B.KIRUTHIGA LECTURER DEPT OF PHARMACEUTICAL CHEMISTRY Composition of the Air We breathe earth s atmosphere composed of: Nitrogen (78%) Oxygen (21%)
632 Series Gas Distribution System
ADI3223-B Certified ISO 9001:2000 632 Series Gas Distribution System INSTALLATION AND OPERATION INSTRUCTIONS Before Installing or Operating, Read and Comply with These Instructions Controls Corporation
Compact Triple Cabinet Outlet Station Model B Installation and Operating Instructions
PORTER Parker Hannifin Corporation Porter Instrument Division 245 Township Line Rd. P.O. Box 907 Hatfield, PA 19440-0907 USA (215) 723-4000 / fax (215) 723-5106 Compact Triple Cabinet Outlet Station Model
Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual
Fisher Controls Instruction Manual Type S301 & S302 Gas Regulators October 1981 Form 5180 WARNING Fisher regulators must be installed, operated, and maintained in accordance with federal, state, and local
Sample C ylinde rs, Acce ssorie s, and O utage Tube s
www.swagelok.com Sample C ylinde rs, cce ssorie s, and O utage s Features Sizes from 10 to 3785 cm 3 (1 gal) Working pressures up to 5000 psig (344 bar) 304L and 316L stainless steel and alloy 400 2 Sample
CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES
CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES Sampling Valves Installation Commissioning and Operating Instructions SD IL 300 & SD IL 400 Inline Sampling Valve This
Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation
Page 1 of 19 : SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor Description and Principle of Operation The photoacoustic multi-gas monitor (INNOVA 1412, Innova AirTech Instruments, Denmark) is a highly
PNEUMATIC PRESSURE CONTROLLERS
PNEUMATIC PRESSURE CONTROLLERS VARIABLE VOLUME PRESSURE CONTROLLER MODELS: V-1 R AND V-2R The 3D Variable Volume Pressure Controller is available for requirements of 0-1,000 psi and 0-6,000 psi in absolute
Inert Air (N2) Systems Manual
INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing
Gas plug-in hose, straight-through form. Instructions for Use. suitable for gas socket model G2019T, G2016T. G2023 from 01/1990.
Gas plug-in hose, straight-through form Instructions for Use suitable for gas socket model G2019T, G2016T Model Year built: G2023 from 01/1990 en_int Gas plug-in hose, straight-through form 2 from 12 Table
EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC. Tennessee Operations Eastman Chemical Company
EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC Tennessee Operations Eastman Chemical Company 1 Tennessee Operations of Eastman Chemical Company Large Manufacturing