1 Gas Absorption Draft Standard Operating Procedure R.C Scope Page 1 Equipment Overview Page 1 Safety Page 2 Operating Procedure Page 4 Equipment Description Page 16

2 Gas Absorption Experiment Draft Standard Operating Procedure R.Cox 9/2014 Scope This document is intended to serve as a guide to the operation of the gas absorption experiment located in the Senior Laboratory at the Department of Chemical Engineering, University of Utah. This procedure details system operation using column # 1 with blower # 2. Before operating this equipment, all personnel must receive equipment specific training from the lab manager. Be sure to read this entire document before beginning you experiment. Equipment description In gas absorption a soluble component is absorbed by contact with a liquid phase in which the component is soluble. This system is used for scrubbing gas streams of components such as sulfur dioxide, carbon dioxide and ammonia. In this experiment, a mixture of water and sodium hydroxide is used to remove CO2 from air. The system demonstrates mass transfer for two-phase systems. The gas absorption experiment consists of two columns, each filled with different packing material. The gas absorber experiment is comprised of the following systems: Absorption columns Column number 1 is packed with ceramic Berl saddles. Column number 2 is packed with metal Pahl Rings. Both columns have a six -inch inside diameter and a length of approximately nine and one-half feet. Liquid Circuit The liquid circuit consists of two 140-gallon tanks; an 80 gallon jacketed mixing tank, and associated pumps & valves. In addition, the liquid circuit includes two heat exchanges that are currently not operational. All piping for the liquid circuit is 1-inch schedule 80 CPVC, 1-inch schedule 40 PVC or 1-inch 304 stainless steel. 1

3 Air circuit The air circuit consists of two blowers, associated valves and 2-inch schedule 80 PVC rated to 400 PSI. The gas injection and analysis system consist of a CO2 cylinder, regulator, regulator heater, rotameter and associated gas analyzers. A detailed list of the equipment incorporated in the gas absorption experiment is included at the end of this document. Safety Safety glasses and hardhats must be worn when operating this equipment. Do not operate this equipment alone. Note that certain procedures require the coordinated efforts of two people. When filling the mixing tank do not exceed the 50-gallon level. Under no circumstances should this equipment be left unattended while in operation. The use of caustic solutions, compressed gas, large volumes of water and multiple sources of electrical power make attention to safety paramount when operating this equipment. Accidental flooding will result in caustic liquid exposure to equipment and personnel working on both floors below the gas absorber experiment. Sodium Hydroxide is extremely corrosive and highly reactive. Use Chloroflex gloves and wear safety glasses and a face shield when mixing sodium hydroxide and water. Never add water to a corrosive. Always add corrosives to water. When mixing with water, stir in small amounts of corrosives slowly. Label containers. All chemical containers must be clearly labeled with the chemical contents and concentrations. Keep containers closed when not in use. Empty containers may contain residues which are hazardous. Triple rinse all empty containers before discarding them to the trash. Anytime the basement neutralization tank is in use, a team member must remain in room 2505 to monitor the basement tank system for leaks. 2

4 Operating Procedure This procedure describes the operation of the gas absorber experiment with the following restrictions. Some valves are not labeled or mentioned in this SOP these valves should not be adjusted. Heat exchangers are not used Cooling water is not used This operating procedure details system operation using column # 1 with blower # 2. Prior to startup: Disconnect the gas sample lines from both the desiccant modules. Verify that all tanks are empty, including the basement neutralization tank. Both tanks have a sight glass indicating the tank level, however, the sight glass does not read to the bottom of the tank. If the sight glass does not indicate liquid in the tank, it is possible that the tank may contain liquid below the level of the sight glass. To confirm that the tanks are empty the tank pumps must be operated until no flow is observed. Care must be taken not to run the pumps without liquid in the line. Consult the lab manager for assistance. Verify that the column pressure transducers are connected to the column you will be using. Switch on the Validyne pressure sensor module located below the computer. Open both the 9500 and 9510 gas analyzer bypass needle valves. To feed column # 2 set the liquid circuit valves as listed above but close V8L and open V9L. A. Startup B. Log on to the computer control system. C. The password and user name are posted on the computer monitor. D. Double-click on the GAS ABSORBER icon located on desktop. E. The event log viewer screen is displayed, you will see a series of about five messages, close the event log viewer. F. The opening control window is displayed; note the information regarding system operation and data storage. G. Select start. The main control window is displayed. 3

5 H. Tank level alarms may be active depending on tank levels. I. If a high level alarm is active stop operation and neutralize and drain tanks as required. 2. Set Valves to fill mixing tank. A. Close V1L and V2L. B. Close V16L, basement tank main output valve. C. Before filling the mixing tank with water: The water supply line incorporates a totalizing meter, before opening the main water valve note the reading on the totalizer, once you have filled the mixing tank to the 50 gallon level shut of the main water feed valve and again note the reading on the totalizer. Use these totalizer readings to verify the amount of water in the mixing tank. Do not fill the mixing tank above the 50-gallon mark. 3. Fill the mixing tank. Before operating with caustic, the system should be tested with water. Once the correct flow rates are established using water, then the system may be operated with caustic. A. Place the water feed hose in the mixing tank, while one person is firmly holding the water hose a second person will slowly open the main water supply valve (green ball valve) located behind and to the left of the mixing tank. B. Fill the mixing tank to the 50-gallon mark. 4. Adding sodium hydroxide: o o o Never add water to a corrosive. Always add corrosives to water in small amounts. Wear lab coat, safety glasses, Chloroflex gloves and a face shield when mixing NaOH & water. Gently mix the solution using the detachable mixer located next to the mixing tank. 5. Set the valves to pump liquid from the mixing tank to the feed tank. Open: V1L Close: V2L 4

6 V3L V4L This valve must always be closed Once you are ready to pump the contents of the mixing tank to the feed tank, set the mixing / feed valves as indicated above. The mixing tank pump is controlled by two switches; 17C located on the rear switch panel and a second 17C switch located on the front switch panel. The 17C (mixing tank switches) must both be in the on position to power the mixing tank pump. 6. Pump from the mixing tank to the feed tank. A. Confirm that the mixing tank pump switch located on the rear panel is in the off position. B. Turn on the mixing tank pump switch located on the front switch panel. C. The mixing tank pump may now be controlled by switch 17C on the rear switch panel, this allows the operator to monitor the tank level and stop the pump before the mixing tank runs dry or before the feed tank is over-filled. D. Stop mixing tank pump as soon as the mixing tank is empty. E. Repeat procedures 1-3 as required to fill the feed tank to the desired level. F. Constantly monitor the level of the feed tank do not allow the feed tank to fill above the 115 gallon / 43 inch mark on the sight glass. 7. Set liquid flow valves to pump liquid from feed tank to column 1. Open V5L recycle valve V6L Close V9L V3L V8L V10L V12L V14L To feed column # 2 set the liquid circuit valves as listed above but close V8L and open V9L then adjust column 2 liquid input flow using V11L. Adjust column 2 output flow using V15L. 8. Set airflow valves 5

7 A. Open airflow vent valve 1A 100% B. Set air flow column select valve 2A to direct flow to the desired column. 9. Select blower -Only one air blower may be operated at a time A. Adjust the blower select valve (yellow ball valve located between the blowers) to select blower #2. B. Before operating the blowers make sure that there are no power cords or materials obstructing the rear intake side of the blower. C. Open the main airflow bleed valve V1A to 100% open. D. Verify that the blower #1 power switch (13A) and blower #2 power switch, located on the front panel, are in the off position. E. Insert the Blower # 2 power cord into the blower #2 (13A) outlet located on the wall above the blower. F. If you select blower #1, plug it into the outlet labeled blower #1. Read Section 10 and 11 Before Pumping Liquid into the Column. 10. Pump liquid from the feed tank to the column. A. Verify that the feed tank recycle valve - valve 5L is open 100 %. B. Switch on the feed tank (Tank 1) pump. The switch is located on the front switch panel. C. With the feed pump on, the column flow must be constantly monitored for flooding. Do not leave the column unattended. D. Monitor liquid flow to column 1 using the flow meter located below V10L. 11. Adjust the liquid feed flow-rate. Liquid flow is controlled by adjust the recycle / flow control valve V5L This procedure requires two people: one to adjust valve 5L and one to monitor the liquid flow rate on rotameter. 6

8 To adjust the flow rate to column 1, verify that feed valve V10L and drain valve V14L are open 100% then gradually close the recycle valvev5l on the feed tank until the desired flow rate is achieved. For fine flow rate adjustment use a combination of recycle valve 5L and valve 10L. It will take a few minutes for the liquid flow to stabilize within the column. Once the flows are reasonably stable, adjust V14L located at the bottom of column #1 by slightly closing valve V14L to maintain a level of liquid in the bottom of the column that just reaches the wide part of the column, about 4 inches of liquid in the bottom of the column. This will prevent gas from going out the bottom of the column. Monitor the liquid flow out of the column, watch for flooding at the bottom of the column, if liquid backs up at the bottom of the column to the point where it is about to enter the gas flow inlet immediately reduce the flow of liquid into the column and open V14L. 12. Switch on the air blower A. Once the liquid flows are stable, switch on the selected air blower. B. The blower are switched on and off from the switches located on the front panel. C. Monitor airflow by measuring the pressure drop across orifice plate # 1 as displayed on the Fluke 725 meter and on the computer. The system is generally operated at an airflow that is lower than the air flow rotameter range. D. The air flow is controlled by venting part of the blower output to atmosphere using valve 1A. E. Adjust air and liquid flow to the desired set points taking care not to flood the bottom of the column. F. Once the air and liquid flows have stabilized, adjust the CO2 flow as described in the next section. Gas sampling instruments System description The 9510 and 9500 gas analyzers measure volumetric percent of gas concentration, the range on both instruments is 0 25 %. Refer to the instrument documentation for further information. Exceeding the pressure and flow ratings for the gas analyzers will permanently damage the gas analyzers. 7

9 Follow the procedure below to insure that the sample gas pressures and flows are within the operating parameters for the gas analyzers. The maximum pressures and flow rates are: 9510 CO2 Monitor: ml/min at 2.0 psig (55.35 inches of water) maximum O2 & CO2 Monitor: L/min at 1 psig (27.68 inches of water) maximum. The gas flow to each analyzer is feed through a desiccant to remove moisture prior to entering the pressure and flow measurement apparatus. This pressure and flow measurement equipment which consist of a magnehelic pressure gauge and flow meter for each instrument, allows the user to measure the pressure and flow of the gas sample before it is fed to the gas analyzers. Before connecting the column pressure lines to the desiccant connection points make sure that the analyzer bypass valves are 100% open. 13. Connecting the gas sampling instruments All measurements should be taken with the air and liquid systems running at steady state. A. Before connecting the gas sample line to the analysis equipment. Open the gas analyzer bypass valves 100%, these valves are located on the back / inlet of each gas analyzer. With the bypass valves open monitor the pressure and flow gauges to insure the system does not exceed the analyzers maximum ratings. B. Once the gas and liquid flows have reached steady state connect the gas sample line labeled (Bottom of column 1) to the input of the desiccant labeled bottom of column to 9510 then connect the gas sample line labeled (Top of Column 1) to the input side of the small desiccant labeled top of column to C. Partially close both the 9500 and 9510 needle valves to establish optimal flow and pressure to the analyzers. Consult the lab manager for assistance if needed. 14. Adjust the CO2 flow. A. Plug the regulator heater into the power strip, turn on the power strip and set the regulator heater to 25 % power. The normal operating range for the heater is %. B. Verify that the CO2 regulator adjustment is rotated counter-clockwise such that the regulator output pressure will be zero when the main tank valve is opened. C. Open the CO2 flow needle valve 100%. This valve is located at the input to the CO2 rotameter. D. Open the main CO2 cylinder tank valve ½ turn. 8

10 E. Slowly rotate the regulator output pressure adjustment to the right until the tank outlet pressure displayed on the psi regulator gauge on the left- reads ~ 10 psi. F. Read the CO2 flow on the rotameter. Adjust the CO2 flow rate by adjusting the regulator outlet pressure and the needle valve at the input to the rotameter. The regulator is the primary means of flow the control the needle vale is for fine control. G. Monitor the CO2 regulator and copper feed line for accumulation of frost. If the regulator and line are becoming too cold increase the regulator heater out level. Consult the lab manager for more detailed information regarding regulator freezing. H. If the regulator becomes so cold that control of the CO2 flow is lost, immediately close the main CO2 cylinder valve. 15. Reading CO2 in the Gas Stream A. Once the CO2 flow has reached steady state and this might take a minute - you should see an increase on the CO2 meter displays. B. If the 9510 analyzer is not reading gas flow try turning on the 9510 sample pump to pull gas into the instrument, the pump switch is located on the top right side. C. Constantly monitor the pressure and flow to insure that you do not exceed the ratings for the gas analyzers. 16. A. Complete the run until the feed tank is empty. B. Constantly monitor the basement tank level to insure that it does not exceed 100 gallons. C. Constantly monitor the computer display to insure that a high level alarm is not triggered. If a high level alarm is triggered immediately shut off the pump, then neutralize the basement tank contents if required. Once neutralized the basement tank contents may be pumped to drain as outlined in the following steps. 17. Set valves to recycle basement / neutralization tank Verify that the ph of the liquid in the basement / neutralization tank is within disposal range. A. Set neutralization / basement tank valves to recycle the contents of the basement tank. 9

11 B. Set V19L flow output to the right C. Open V16L 18. Switch OFF the basement tank pump power switch located next to the neutralization tank. Switch ON the neutralization tank switch that is located on the front system control panel. Once the operator is in front of the basement neutralization tank you can now switch the tank pump onn and off as desired suing the switch next to the tank. Switch on the basement / neutralization tank pump. Monitor the ph reading on the computer, if the ph does 19. Set valves to pump from neutralization tank in basement to mixing tank Do not pump more that 50 gallons at a time into the mixing tank. Open V16L V18L Close V2L V4L Set V19L to the left Set V20 L to PVC pipe 20. Neutralizing caustic prior to disposals Wear Chloroflex gloves, lab coat and face mask when working with concentrated acid. Mix all concentrated acid solutions in the fume hood. A. Set neutralization / basement tank valves to recycle the contents of the basement tank. B. Set V19L flow output to the right C. Open V16L D. Calculate the amount of acid required to lower the ph of the liquid in the basement tank to within the safe disposal range of (5 10pH). E. Disconnect the acid container from the metering pump located next to the feed tank. Take the acid container to a fume hood and add the required amount of acid. 10

12 F. Cap the acid container and return it to the the metering pump. Connect the metering pump acid feed line to the acid container. G. Verify that the metering pump output line is connected to the PVC acid line. H. Start the basement neutralization pump. I. Start the acid metering pump at 10 ml/min. J. Monitor the ph in the basement neutralization tank. K. Adjust the flow rate of the acid metering pump as required. L. Stop the acid metering pump as soon as the ph of the neutralization tank drops below a ph of 10. M. Disconnect the acid metering pump line from the acid container and cap the acid container. N. Place the acid metering pump feed line and cap on an 8 liter water container that is 50 % full of water. O. Label the water container. P. Store any remaining acid in the 8-liter Nalgene container remember to label the container with the contents and concentration. 21. Set the neutralization tank valves to pump the contents of the neutralization tank to drain. A. Open V16L B. Set V19L to flow to the left, towards V20L. C. Set V20L to flow to the hose. D. Verify that V16L is open. 22. Pump liquid from the neutralization / basement tank to drain Two person procedure: Coordinate with team to switch on the basement /neutralization tank pump, while the pump is on, a team member must remain in room 2505 to monitor the flow of liquid until the tank is empty. Once the tank is empty, immediately notify the pump operator to shut off the pump. 23. Final Shutdown: 11

13 A. Verify that all pump and blower power switches on both the outlet panel and the equipment control panel are in the off position B. Close the main CO2 tank valve C. Close basement tank main valve V16L D. Set basement valve V19L to flow output to the right E. Close Feed tank main valve V6L F. Unplug all blowers G. Close the mixing tank outlet valves V1L, V2L and V3L H. Properly label and store any chemicals in use I. Exit the Opto22 control software; do not log off the computer J. Switch off the power to the Validyne pressure module. K. Check out with the lab manager Gas Absorber Valve Directory Do not adjust equipment valves that are not listed Liquid Circuit Valves Location Function Comments V1L Main Mixing tank out V2L V3L Mixing tank drain Mixing tank to feed tank V4L Mixing tank to heat exchanger ALWAYS CLOSED V5L V6L V7L V8L V9L Feed tank recycle Feed tank main output valve Not Used Column # 1 feed Column # 2 feed 12

14 V10L V11L Column #1 flow control Column #2 flow control V12L Column # 1 feed ALWAYS OPEN V13L Column # 2 feed ALWAYS OPEN V14L V15L Column #1 drain Column #2 drain V16L Basement- Room 2505 Neutralizing tank, (tank 2) main output valve V17L Basement Not Used V18L Basement Basement pump output : Refer to flow indicator arrows on valve V19L Basement Basement pump output: 3-way: Recycle / To Mixing Tank / To Drain Location Function Comments Main Air Blower Selection Yellow Ball Valve Air flow control Main Air Flow Control 13

15 Gas Absorption Experiment Equipment Description Air Flow Circuit Blower #1 Spencer Turbo-Compressor 30 CFM - 64 oz, s/n 51219, lot # Blower motor: Black & Decker 2 HP, 60 cycle, 240 VAC, 10 Amp, 10,000 RPM, Type CSC Blower #2 Spencer Turbo-Compressor 12 CFM - 35 oz, s/n 43903, lot # Rotometer: Air Flow Omega Engineering FL45200A series Range: SCFM Air velocity transmitter: JLC International model EE66 Range ft/min Orifice Plate #1: inches i.d, no bevel - Pipe Size 1.9 inch o.d, 1.5 inch i.d Orifice Plate # 2: inches i.d, no bevel - Pipe size 1.4 inch o.d, 1.0 inch i.d Liquid Circuit Rotometer: Liquid Flow 14

16 Omega Engineering FL46300 series Range: 0-17 GPM Mixing tank Capacity: 80 Gal Maximum allowable level - mixing tank: 50 Gal Capacity of feed & neutralization tanks: 115 Gal ph transmitter - neutralization tank: Alpha ph 500 transmitter ph probe: Cole-Parmer p/n Pump data Mixing tank pump motor: AMT Model , Pump head # Feed Tank Pump: Eastern Industries, model B 34 Max flow rate into column #1 = 10 GPM adjustable from 1-10 GPM Neutralization Tank Pump: Same as feed pump Metering Pump: Pulsatron E Plus Series, Maximum flow mil/min, Min flow 6.3 mil/min CO2 Flow Control CO2 gas feed system Mass Flow Controller Omega model FMA5542 / Rotameter - manual valve 15

17 Range = 0-80 L/min CO2 insertion points: Multiple locations CO2 Measurement System Alpha Omega Instruments: Series 9510 CO2 Analyzer Maximum input sample pressure: < 2.0 psi Sample flow rate: ml/min, 300 ml/min maximum Range 0-25 % Alpha Omega Instruments: Series 9500 CO2 / O2 monitor: O2 / CO2 range: 0-25 % Sample flow rate L/min Maximum input sample pressure < 1.0 psi Calibration standard: 20% CO2 in nitrogen balance Temperature Measurement Type T Thermocouples Control & data logging Opto22 16

Armfield Distillation Column Operation Guidelines

Armfield Distillation Column Operation Guidelines Armfield Distillation Column Operation Guidelines 11-2016 R.Cox Safety SAFETY GLASSES ARE REQUIRED WHEN OPERATING THE DISTILLATION COLUMN Wear gloves when mixing alcohol feedstock The column will become

More information

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289 3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS Item #31289 The EASTWOOD 3 GALLON, OILLESS PANCAKE COMPRESSOR, with an Integral Air Regulator, efficiently supplies all compressed air requirements for

More information

1. Study the performance of a binary distillation column operated in batch mode.

1. Study the performance of a binary distillation column operated in batch mode. Goals for batch distillation using the East distillation column: 1. Study the performance of a binary distillation column operated in batch mode. 2. Determine the overall and local efficiency of the column

More information

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC. 4075 East Market Street York, PA 17402 Manual P/N 035-80589-02 Table of Contents Components... 2 Test... 4 Recovery/Recycling... 5 Evacuation... 7 Charging...

More information

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL Capital Controls Series 71V3000 The Series 71V3000 electrically-heated vaporizer automatically vaporizes and superheats liquid chlorine, sulfur dioxide or ammonia at a rate controlled by the gas feed system.

More information

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13 Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon Background Safety Concerns Description of the Unit Switching the Unit On Preparation of the Unit Configuration of the Unit for

More information

accidents which arise due to non-observance of these instructions and the safety information herein.

accidents which arise due to non-observance of these instructions and the safety information herein. 3 GALLON PANCAKE COMPRESSOR Model: 50959 CALIFORNIA PROPOSITION 65 WARNING: You can create dust when you cut, sand, drill or grind materials such as wood, paint, metal, concrete, cement, or other masonry.

More information

Operating Instructions

Operating Instructions Operating Instructions Preparation for Start-up 1. If the computer system is logged off, log into the computer system. Log into the operator account on the computer. Please ask your TA for username and

More information

NTF-515. Operation Manual

NTF-515. Operation Manual NTF-515 Operation Manual RTI Technologies, Inc. 10 Innovation Drive York, Pennsylvania 17402 USA Phone: 717-840-0678 Toll Free: 800-468-2321 Web-site: www.rtitech.com Manual P/N: 035-81474-00 (RevA) TABLE

More information

Air Operated Hydraulic Pumping Systems to 50,000 psi

Air Operated Hydraulic Pumping Systems to 50,000 psi High Pressure Equipment Air Operated Hydraulic Pumping Systems to 50,000 psi PS-10: 10,000 psi PS-20: 20,000 psi PS-30: 30,000 psi PS-40: 40,000 psi PS-50: 50,000 psi PS-90: 90,000 psi High Pressure air

More information

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1 Dry 131h 1. DESCRIPTION The Viking Model G-1 Maintenance Air Compressor is an electric motor-driven, aircooled, single-stage, oil-less compressor. The unit is equipped with a check valve and provides a

More information

Chapter 3 EXPERIMENTAL: EQUIPMENT, SET-UP, AND PROCEDURE

Chapter 3 EXPERIMENTAL: EQUIPMENT, SET-UP, AND PROCEDURE Chapter 3 EXPERIMENTAL: EQUIPMENT, SET-UP, AND PROCEDURE 72 3.0 Introduction The experimental work was carried out in three stages. First stage: a laboratory scale single nozzle horizontal jet ejector

More information

LNG Regulator Test Kit

LNG Regulator Test Kit OVERVIEW Chart provides a LNG Economizer/Regulator Test Kit to help save money and time by allowing a technician to more accurately and easily diagnose the operability of the pressure control regulator/economizer

More information

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels 12.09 product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels Introduction: This manual covers the installation and operation of Humboldt FlexPanels for Triaxial and Permeability

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE Page 1 of 6 A. PURPOSE AND SCOPE This procedure establishes safe working practices for handling sulfur hexafluoride (SF 6 ) gas and release minimization practices. This document also specifies methods

More information

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2. STANDARD OPERATING PROCEDURES Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.5 ) Sampler (RAAS) AMBIENT AIR MONITORING PROGRAM for the 130 LIBERTY STREET DECONSTRUCTION

More information

INSTALLATION INSTRUCTIONS FOR FUME SCRUBBERS

INSTALLATION INSTRUCTIONS FOR FUME SCRUBBERS The scrubber and its components are manufactured out of PVC, polypropylene and acrylic. Gaskets are typically EPDM and Viton. Any chemicals fed into the unit, whether as a scrubbing fluid or as fumes being

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION Installation, Operation, and Maintenance Balston 75-96 and 75-98 Nitrogen Generation System Tower Pressure Gauge 5'-1" 3'-6" 7'-4" 6'-10 1/2" PLAN VIEW Figure 1 - Balston 75-96 and

More information

CAPITAL CONTROLS SERIES NXT3000

CAPITAL CONTROLS SERIES NXT3000 CAPITAL CONTROLS SERIES NXT3000 Modular design gas feed system with self contained automatic switchover capability. The Series NXT3000 Gas Feed System is a family of vacuumoperated, solution-feed gas dispensing

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 3-2 Orifice Plates EXERCISE OBJECTIVE In this exercise, you will study how differential pressure flowmeters operate. You will describe the relationship between the flow rate and the pressure drop

More information

HGC-200 Hydro Gas Chlorinator

HGC-200 Hydro Gas Chlorinator HGC-200 Hydro Gas Chlorinator ProMinent Fluid Controls Pty Ltd Head Office: Unit 4, 4 Narabang Way BELROSE NSW 2085 AUSTRALIA (PO Box 85, BELROSE WEST NSW 2085) Phone: (02) 9450 0995 Fax: (02) 9450 0996

More information

24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13 24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: 2244010 OPERATION & MAINTENANCE INSTRUCTIONS LS01/13 INTRODUCTION Thank you for purchasing this product. Before attempting to use this product, please

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated

More information

I. Subject: Compressed gas cylinders, regulators, and portable liquid systems.

I. Subject: Compressed gas cylinders, regulators, and portable liquid systems. I. Subject: Compressed gas cylinders, regulators, and portable liquid systems. II. Objective: To provide safe and effective use, storage, and transport of therapeutic gases. II. Procedure: A. Compressed

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete

More information

GUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS

GUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS Page 1 of 5 GUIDELINES FOR CONDUCTING 1. Definition of Hydrogenation and Hydrogenolysis Reactions Hydrogenation reactions are synthetic transformations involving hydrogen, metallic catalysts (such as nickel,

More information

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation Page 1 of 19 : SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor Description and Principle of Operation The photoacoustic multi-gas monitor (INNOVA 1412, Innova AirTech Instruments, Denmark) is a highly

More information

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions L 100 Bubble-Tube Level System Installation, Operation and Maintenance Instructions Figure 1 Contents Section Description Page 1.0 Introduction 2 2.0 Specifications 3 3.0 Installation 3 4.0 Warranty 6

More information

The Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range

The Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range Exercise 4-3 Zero Suppression and Zero Elevation EXERCISE OBJECTIVE In this exercise, you will learn the effect that mounting a pressure transmitter above or below the reference level has on the hydrostatic

More information

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury. 2 GALLON AIR COMPRESSOR Model: 7517 DO NOT RETURN TO STORE. Please CALL 800-348-5004 for parts and service. CALIFORNIA PROPOSITION 65 WARNING: You can create dust when you cut, sand, drill or grind materials

More information

ABRASIVE REGULATOR II

ABRASIVE REGULATOR II ABRASIVE REGULATOR II 13096 Abrasive Regulator II TABLE OF CONTENTS 1 Introduction... 1 2 Abrasive Regulator... 2 2.1 Regulator Installation... 2 Location... 2 Attaching the Regulator to the Machine...

More information

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4 TABLE OF CONTENTS OVERVIEW pg 3 Major Points to Consider pg 3 Minor Points to Consider pg 3 INSTRUCTIONS pg 4 How Does Nordic Freeze Work pg 4 How Long Will the Ice Plug Take to Form pg 4 How Do I Know

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction

More information

Gas Absorption Column CAG

Gas Absorption Column CAG Gas Absorption Column CAG Engineering and Technical Teaching Equipment PROCESS DIAGRAM AND UNIT ELEMENTS ALLOCATION ISO 9001: Quality Management (for Design, Manufacturing, Commercialization and After-sales

More information

INSTALLATION. and INSTRUCTION MANUAL. for QUALITY AIR BREATHING SYSTEMS. Model 50 Systems Outfitted with ABM-725 Monitor C O M P A N Y

INSTALLATION. and INSTRUCTION MANUAL. for QUALITY AIR BREATHING SYSTEMS. Model 50 Systems Outfitted with ABM-725 Monitor C O M P A N Y INSTALLATION and INSTRUCTION MANUAL for QUALITY AIR BREATHING SYSTEMS Model 50 Systems Outfitted with ABM-725 Monitor M A R T E C H S E R V I C E S C O M P A N Y OFFICE: (507) 843-4700 P.O. BOX 7079 Toll

More information

PumpAgents.com - Click here for Pricing/Ordering Nominal psi (bar) Cut-In Cut-Out

PumpAgents.com - Click here for Pricing/Ordering Nominal psi (bar) Cut-In Cut-Out PumpAgents.com - Click here for Pricing/Ordering Model 31670-Series Dual Max 7.5 GPM (28 LPM) AUTOMATIC TWO STAGE WATER SYSTEM WITH ACCUMULATOR TANK AND PUMPGARD STRAINER IDEAL FOR PLEASURE AND COMMERCIAL

More information

300 Held Drive Northampton Pa

300 Held Drive Northampton Pa 300 Held Drive Northampton Pa 18067 610.262.6090 June 10, 2015 Recommended testing for verifying device performance. Intervals of testing are to be set by the Healthcare Provider / Dealer. Table of Contents

More information

Copyright, 2005 GPM Hydraulic Consulting, Inc.

Copyright, 2005 GPM Hydraulic Consulting, Inc. Troubleshooting and Preventive Maintenance of Hydraulic Systems Learning to Read the Signs of Future System Failures Instructed by: Al Smiley & Alan Dellinger Copyright, 2005 GPM Hydraulic Consulting,

More information

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300 Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300 The Thermo Scientific icap 6300 Inductively Coupled Plasma Optical Emission

More information

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL ATD-8402 90LB PRESSURE BLASTER INSTRUCTION MANUAL SAVE THESE INSTRUCTIONS SAFETY INSTRUCTIONS FOR SANDBLASTER 1. Before opening the tank release the air pressure on the sand tank. To do this, turn off

More information

System Pressure Manager Standard & System Pressure Manager Plus

System Pressure Manager Standard & System Pressure Manager Plus System Pressure Manager Standard & System Pressure Manager Plus Installation, Commissioning & Servicing Instructions Note: THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING,

More information

STANDARD OPERATING PROCEDURES

STANDARD OPERATING PROCEDURES PAGE: 1 of 14 CONTENTS 1.0 SCOPE AND APPLICATION 2.0 METHOD SUMMARY 3.0 SAMPLE PRESERVATION, CONTAINERS, HANDLING AND STORAGE 4.0 INTERFERENCE AND POTENTIAL PROBLEMS 5.0 EQUIPMENT/APPARATUS 6.0 REAGENTS

More information

High Pressure Chem-SCAN Operating Manual

High Pressure Chem-SCAN Operating Manual GAS INLET VALVES REACTIVE GAS PRESSURE RELIEF VALVE INERT GAS VENT VENT VALVE REACTOR INLET VALVES PRESSURE TRANSDUCERS REACTORS STIRRER & THERMOWELL HEATING JACKET STIRRER MOTORS High Pressure Chem-SCAN

More information

Variable Area Flow Meters

Variable Area Flow Meters Variable Area Flow Meters Over sixty years of variable area meter expertise Brooks started designing and manufacturing variable area (VA) meters, also referred to as rotameters, in 1946. Now, with more

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL Product Manual MST Portable Air Filtration System SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the

More information

Irrigation System Winterization and Pressurization Procedures

Irrigation System Winterization and Pressurization Procedures Irrigation System Winterization and Pressurization Procedures Introduction Any time that an irrigation system is filled and pressurized, or when the system is drained and water flushed from the system,

More information

RIX COMPRESSORS. MICROBOOST Owner s Manual CONFIGURATION A MB-115 MB-230. November 21, 2002 APPLICABILITY [ A]

RIX COMPRESSORS. MICROBOOST Owner s Manual CONFIGURATION A MB-115 MB-230. November 21, 2002 APPLICABILITY [ A] RIX COMPRESSORS MICROBOOST Owner s Manual CONFIGURATION A MB-115 MB-230 November 21, 2002 APPLICABILITY [ A] INTRODUCTION Safety This electromechanical equipment is designed to produce high pressure gas.

More information

Operating Manual. Model BAC-30RT30/BAC-30DC

Operating Manual. Model BAC-30RT30/BAC-30DC Model BAC-30RT30/BAC-30DC Manual No. BAC012 (Rev 1 October 2002) Operating Manual AIR SYSTEMS INTERNATIONAL, INC. 829 Juniper Crescent, Chesapeake, Va., 23320 Telephone (757) 424-3967 Toll Free 1-800-866-8100

More information

Type 3 - PSA Nitrogen Generation System

Type 3 - PSA Nitrogen Generation System Type 3 - PSA Nitrogen Generation System Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity from 6,000 to 18,000 gallons 1.0 Nitrogen Generation Corrosion Inhibiting System

More information

Installation, operating and maintenance Instructions for Seemag bypass level indicator

Installation, operating and maintenance Instructions for Seemag bypass level indicator Issue: S Date: 05-09-14 Type G35 General information The Seetru bypass magnetic level indicator, abbreviate SEEMAG, serves to show the filling level of fluids in tanks, basins, tubes etc. The Seemag operates

More information

Brownie s. Commercial Series NMCS-30 NMCS NW 1st Street, Fort Lauderdale, FL PH Fx

Brownie s. Commercial Series NMCS-30 NMCS NW 1st Street, Fort Lauderdale, FL PH Fx Brownie s M A R I N E G R O U P Commercial Series NMCS-7.5 NMCS-10 NMCS-20 NMCS-30 940 NW 1st Street, Fort Lauderdale, FL 33311 PH. 954.462.5570 Fx. 954.462.6115 This information is believed to be accurate

More information

Series Environmental Chambers

Series Environmental Chambers 3119-600 Series Environmental Chambers Challenges in Non-Ambient Testing Testing at non-ambient temperatures adds another layer of challenges to your testing laboratory. Ensuring you get accurate and stable

More information

Winter Shut Down Procedure

Winter Shut Down Procedure Winter Shut Down Procedure Although we live in Beautiful BC, we still experience freezing temperatures. To minimize the risk of freeze damage to your irrigation system, you ll need to winterize it. Our

More information

Discharge Relief Valve Operation & Maint.

Discharge Relief Valve Operation & Maint. Relief Valve Operation & Maint. CZ Series Centrifugal Fire Relief svalve Operation and Maintenance Instructions 1410 Operation and Maintenance Form No. F-1031 Section 2302.6 2111 Issue Date 04/90 11/95

More information

RK-IR Sample Draw Aspirator Adapter Operator s Manual

RK-IR Sample Draw Aspirator Adapter Operator s Manual 30-0951RK-IR Sample Draw Aspirator Adapter Operator s Manual Part Number: 71-0018RK Revision: A Released: 6/2/10 www.rkiinstruments.com Product Warranty RKI Instruments, Inc. warrants gas alarm equipment

More information

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions Document Number: XE-ATA5PM-R1A UBEC 1AT AUTO TANK Fill System 08899155 Installation, Operation, & Setup Instructions Rev170906-EB-FRC PHYSICAL: 1302 WEST BEARDSLEY AVE ELKHART, IN 46514 WWW.ELKHARTBRASS.COM

More information

Light Commercial Reverse Osmosis System. EE-1000 Manual

Light Commercial Reverse Osmosis System. EE-1000 Manual Light Commercial Reverse Osmosis System EE-1000 Manual Nimbus Water Systems 41840 McAlby Court, Suite A Murrieta, CA 92562 800-451-9343 Fax 951-894-2801 www.nimbuswater.com Nimbus Water Systems 1 EE-1000

More information

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS) South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System Designed for: Dry or Preaction Fire Protection Systems (FPS) 1.0 Description of Work 1.1 The Fire Sprinkler Contractor shall provide

More information

Description. Chassis. Cabinet. Long chassis - Type: Dimensions (mm): 2700 x 1200 x 1678

Description. Chassis. Cabinet. Long chassis - Type: Dimensions (mm): 2700 x 1200 x 1678 1 ITV bench is equipped with a INJETVISION vision system whose purpose is to observe and study the jets from high pressure diesel injector in inert atmosphere (nitrogen or CO2) up to 50 bar (± 0.5 bar).

More information

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas.

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas. Chem 366-3 Page XI - 1 EXPERIMENT XI INFRARED SPECTRUM OF SO2 (S&G, 5th ed. Expt 36, 6th ed. Expt. 35) 1. Pre-Lab preparation. The description of this experiment has disappeared from the more recent editions

More information

DRS4-RM Manual. Set Up Instructions for DRS4 Series Single Tank

DRS4-RM Manual. Set Up Instructions for DRS4 Series Single Tank Set Up Instructions for DRS4 Series Single Tank Inspect the packaging of the equipment to confirm that nothing was damaged during shipping. (Figure 1) Remove the resin tank(s) and valve(s) from the packaging.

More information

Highest Quality. Gas Chlorination Systems

Highest Quality. Gas Chlorination Systems Highest Quality Gas Chlorination Systems Application: Gas chlorination systems are used for water disinfection and other purposes in a variety of applications. Compared to other disinfection methods, chlorine

More information

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1. 2 GALLON TWIN STACK AIR COMPRESSOR Model: 9526 DO NOT RETURN TO STORE. Please CALL 800-348-5004 for parts and service. CALIFORNIA PROPOSITION 65 WARNING: You can create dust when you cut, sand, drill or

More information

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler. Exercise 5-2 Bubblers EXERCISE OBJECTIVE Learn to measure the level in a vessel using a bubbler. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Bubblers How to measure

More information

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13 100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: 2244025 OPERATION & MAINTENANCE INSTRUCTIONS LS01/13 INTRODUCTION Thank you for purchasing this product. Before attempting to use this product, please

More information

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA Page 1 of 9 SSI Solaris 150 RTA The Solaris 150 RTA is a rapid thermal annealing system capable of handling sample sizes up to 100mm (4 diameter) or smaller. The system can anneal in N 2 and Forming gas

More information

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 Cal/OSHA Gas Systems for Welding GAS WELDING Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 When performing gas welding, the following precautions, work procedures,

More information

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST OIL-LESS TYPE IMPORTANT: PLEASE READ CAREFULLY BEFORE STARTING OPERATIONS. THE CONTENTS ARE FOR GENERAL INFORMATION OF ALL THE SIMILAR MODELS. Record

More information

Technical Information

Technical Information Technical Information Installation, Operation, Installation, Operation and Maintenance and Maintenance Manual Manual Balston Model 75700-K728 Nitrogen Generator Figure 1-75700-K728 Overall Dimensions These

More information

POLYURETHANE SPRAY FOAM REFILL SYSTEM QUICK START GUIDE

POLYURETHANE SPRAY FOAM REFILL SYSTEM QUICK START GUIDE POLYURETHANE SPRAY FOAM REFILL SYSTEM QUICK START GUIDE SYSTEM DESCRIPTION The Touch n Seal Refill System is a spray polyurethane foam dispensing system for large volume foam users. The system consists

More information

hydro-pac, inc. Low-Pressure Gas Compressors 1500 to 6000 PSI

hydro-pac, inc. Low-Pressure Gas Compressors 1500 to 6000 PSI hydro-pac, inc. LX-SERIES Low-Pressure Gas Compressors 1500 to 6000 PSI hydro-pac, inc. LX-SERIES Features Hydro-Pac LX-SERIES Gas Compressors feature: Oil-free non lubricated gas pistons and cylinders

More information

Avio 500 ICP-OES. ICP-Optical Emission Spectroscopy PREPARING YOUR LAB. Preparation Checklist. Suitable Working Area

Avio 500 ICP-OES. ICP-Optical Emission Spectroscopy PREPARING YOUR LAB. Preparation Checklist. Suitable Working Area PREPARING YOUR LAB Avio 500 ICP-OES ICP-Optical Emission Spectroscopy Preparation Checklist Suitable Working Area Exhaust Vent Vent Positions Handling of Gas Cylinders and Other Suggested Safety Practices

More information

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A. Gas Lines Technical Manual Sumitomo (SHI) Cryogenics of America, Inc. 1833 Vultee Street Allentown, PA 18103-4783 U.S.A. Revision F: April 2008 261320A TABLE OF CONTENTS Page DESCRIPTION...1 SPECIFICATIONS...2

More information

PURPOSE OF THE POLICY

PURPOSE OF THE POLICY Title: Safe Storage, Handling, Use and Disposal Procedures of Compressed Gas Cylinders Effective Date: November 2005 Revision Date: March 1, 2017 Issuing Authority: Responsible Officer: VP, Capital Projects

More information

TurboDraft Fire Eductor

TurboDraft Fire Eductor TurboDraft Fire Eductor Operating Manual Introduction The TurboDraft is designed to be used for rural water supply operations. Many of us take for granted that there is a fire hydrant on every corner.

More information

Operating Procedures for Metal Evaporator I

Operating Procedures for Metal Evaporator I Operating Procedures for Metal Evaporator I Metal Evaporator I is intended as a tool and a training device. Understanding the operation of this equipment should give you a basic knowledge of vacuum and

More information

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT TABLE OF CONTENTS Contact Information and Customer & Technical Service... 1 1 Introduction... 1 2 Abrasive Regulator... 1 Description:...

More information

Wet pipe low flow foam/water system

Wet pipe low flow foam/water system December 6, 2010 Foam 14a 1. The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with Viking supplied foam concentrates. This system consists of a standard

More information

Calcium Reactor. CalcFeeder PRO. User Manual 1.1a. Model. CalcFeeder AC1 PRO CalcFeeder AC2 PRO CalcFeeder AC3 PRO CalcFeeder AC4 PRO

Calcium Reactor. CalcFeeder PRO. User Manual 1.1a. Model. CalcFeeder AC1 PRO CalcFeeder AC2 PRO CalcFeeder AC3 PRO CalcFeeder AC4 PRO Calcium Reactor CalcFeeder PRO User Manual 1.1a Model CalcFeeder AC1 PRO CalcFeeder AC2 PRO CalcFeeder AC3 PRO CalcFeeder AC4 PRO Page 1 Dear Customer, Thank you for purchasing an Pacific Sun CalcFeeder

More information

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by:

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by: 1 AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by: Materials/Reagents/Equipment Vendor 1. 0.2 um filtered Water + 0.05% sodium azide 2. 0.2 um filtered

More information

Maximum 0.85 MPa pressure setting Long-life, high flow perfect for balancer applications

Maximum 0.85 MPa pressure setting Long-life, high flow perfect for balancer applications Outstanding performance in extremely low pressure and low pressure ranges from 0.003 to. Realizing high performance, energy saving, and compact size. Realize precise pressure control in a pressure range

More information

Equipment Operating Procedure Glove Box

Equipment Operating Procedure Glove Box Equipment Operating Procedure Glove Box Page 1 0.0 Changing the Compressed Gas Cylinder 1. Complete Compressed Gas Cylinder training from EHS website before manually exchanging gas cylinders. In order

More information

A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES

A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES 1990 Nissan 240SX 1983-90 AIR CONDITIONING & HEAT General Servicing Diagnostic Procedures All Import Makes & Models Diagnosis is an important first step in A/C

More information

Compressed Gas Properties. Introduction. Compressed Gas Properties. Definition of a Compressed Gas

Compressed Gas Properties. Introduction. Compressed Gas Properties. Definition of a Compressed Gas 1. Properties of gases 2. Cylinders 3. Storage of Gases 4. Regulators 5. Cryogenic Liquids Introduction All compressed gases by definition can be hazardous Know the properties of the gases you are working

More information

OPERATION MANUAL BFX-2

OPERATION MANUAL BFX-2 OPERATION MANUAL BFX-2 Brake Fluid Exchanger IMPORTANT Test drive vehicle after service to verify proper brake system performance. MAHLE Aftermarket Inc., Service Solutions 10 Innovation Drive York, PA

More information

Hydrostatic Pressure Testing

Hydrostatic Pressure Testing General An experienced or qualified person will be put in charge of hydro and should meet with the supervisor in charge of the job prior to test. Customer expectations should be clarified prior to beginning

More information

Standard Operating Procedure (SOP)

Standard Operating Procedure (SOP) Microwave Digester #1 General Process Description Standard Operating Procedure (SOP) This instrument is used to digest small amounts of material for chemical analysis (ICP), by placing the sample in a

More information

Chemical Injection Technologies Installation/Service Bulletin

Chemical Injection Technologies Installation/Service Bulletin Bulletin 4002 Chemical Injection Technologies Installation/Service Bulletin SUPERIOR Series CL-16/26/56 Automatic Switchover Gas Chlorinator - Installation & Operation IMPORTANT!! READ THESE PRECAUTIONS

More information

TRANSDUCER KIT 2 INSTALLATION INSTRUCTIONS

TRANSDUCER KIT 2 INSTALLATION INSTRUCTIONS TRANSDUCER KITS INSTALLATION INSTRUCTIONS ELECTRICAL SHOCK HAZARD Disconnect power before installing or servicing this product. A qualifi ed service person must install and service this product according

More information

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

5 Gallon Pressure Pot with HVLP Spray Gun and Hose California Air Tools 5 Gallon Pressure Pot with HVLP Spray Gun and Hose Model No. 365 Technical Data Type of feed.pressure Maximum pressure in the tank... 0,413Mpa (60PSI) Working pressure in the tank.0,

More information

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP! Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP! PLEASE READ THE FOLLOWING INFORMATION. ITALLATION ITRUCTIO FOR THE 4410FR FTN. WITH 97243C SINGLE VALVE CONTROL ASSEMBLY ARE LOCATED

More information

9.0 Equipment Cleaning and Repair

9.0 Equipment Cleaning and Repair 9.0 Equipment Cleaning and Repair Introduction The following sections provide an overview of procedures and techniques used to prepare phosgene equipment for maintenance and return the equipment to service,

More information

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE INSTALLATION, OPERATION & MAINTENANCE MANUAL INTERFACE DEVICES, INC. 230 Depot Road, Milford, CT 06460 Ph: (203) 878-4648, Fx: (203) 882-0885, E-mail: info@interfacedevices.com

More information

PremAire INSTRUCTIONS FOR VORTEX TUBE MODE OF OPERATION

PremAire INSTRUCTIONS FOR VORTEX TUBE MODE OF OPERATION DUAL SUPPLY REGULATOR ESCAPE CYLINDER VORTEX MAIN INLET PremAire INSTRUCTIONS FOR VORTEX TUBE MODE OF OPERATION WARNING THIS MANUAL MUST BE READ CAREFULLY BY ALL PERSONS WHO HAVE OR WILL HAVE THE RESPONSIBILITY

More information

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection Instruction Manual D100343X012 Type 1367 November 2017 Type 1367 High-Pressure Instrument Supply System with Overpressure Protection TYPE 252 FILTER 2ND-STAGE TYPE 67CF FILTER-STYLE REGULATOR INLET TYPE

More information

Procedure of Xenon Transfer

Procedure of Xenon Transfer Procedure of Xenon Transfer Feng Zhou,MIT CC: Martina Green February 28, 2005 In this write up, we discuss the procedure on how to transfer xenon to a designed gas storage vessel that supplies xenon to

More information

Pressure Dump Valve Service Kit for Series 2300 Units

Pressure Dump Valve Service Kit for Series 2300 Units Instruction Sheet Pressure Dump Valve Service Kit for Series 00 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00 applicator tanks when the unit

More information