1 EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 324 PRELIMINARY RISK ANALYSIS OF THE LHC CRYOGENIC SYSTEM M. Chorowski, 1 Ph. Lebrun, 2 and G. Riddone 2 Abstract The Large Hadron Collider (LHC), presently under construction at CERN, will require a helium cryogenic system unprecedented in size and capacity, with more than 1600 superconducting magnets operating in superfluid helium and a total inventory of almost 100 tonnes of helium. The objective of the Preliminary Risk Analysis (PRA) is to identify all risks to personnel, equipment or environment resulting from failures that may accidentally occur within the cryogenic system of LHC in any phase of the machine operation, and that could not be eliminated by design. Assigning a gravity coefficient and one analyzing physical processes that will follow any of the recognised failure modes allows to single out worst case scenarios. Recommendations concerning lines of preventive and corrective defence, as well as for further detailed studies, are formulated. 1 Wroclaw University of Technology, Wroclaw, Poland 2 CERN, LHC Division, 1211 Geneva, Switzerland Presented at the 1999 Cryogenic Engineering and International Cryogenic Materials Conference (CEC-ICMC'99), July 1999, Montreal, Canada Administrative Secretariat LHC Division CERN CH Geneva 23 Switzerland Geneva, 1 December 1999

2 PRELIMINARY RISK ANALYSIS OF THE LHC CRYOGENIC SYSTEM M. Chorowski, 1 Ph. Lebrun, 2 G. Riddone 2 1 Wroclaw University of Technology Wroclaw, Poland 2 CERN, LHC Division 1211 Geneva, Switzerland ABSTRACT The Large Hadron Collider (LHC), presently under construction at CERN, will require a helium cryogenic system unprecedented in size and capacity, with more than 1600 superconducting magnets operating in superfluid helium and a total inventory of almost 100 tonnes of helium. The objective of the Preliminary Risk Analysis (PRA) is to identify all risks to personnel, equipment or environment resulting from failures that may accidentally occur within the cryogenic system of LHC in any phase of the machine operation, and that could not be eliminated by design. Assigning a gravity coefficient and one analyzing physical processes that will follow any of the recognised failure modes allows to single out worst case scenarios. Recommendations concerning lines of preventive and corrective defence, as well as for further detailed studies, are formulated. INTRODUCTION The safety philosophy of the LHC cryogenic system 1 rests on specific design features that differ from the options chosen for the cryogenic systems of other large superconducting accelerators, 2 and contribute to make the LHC cryogenic system inherently safe, with a limited number of possible risks and failures. These features are: the presence of a high-capacity, cold recovery header D (see Figures 1 and 2) which has a nominal working pressure of 1.3 bar (design pressure of 20 bar), a nominal working temperature of 20 K and a volume of about 60 m 3 per 3.3 km sector of the collider. Helium expelled from the magnet cold mass after a loss of insulation vacuum or magnet resistive transitions will discharge into header D. The header will also accommodate helium relieved from other cryogenic distribution line (QRL) headers 1

3 after degradation of insulation vacuum. The only header protected with safety valves venting directly to underground areas is header B because of its low design pressure. the absence of nitrogen (liquid or gaseous) in the tunnel, in any operating mode; liquid nitrogen is only used for helium pre-cooling at ground surface during cool-down. the absence of forced helium flow by mechanical devices (pumps) in cooling loops, resulting in limited discharge of fluid in case of header rupture. The cryogenic flow-scheme considered in the PRA is that described in reference 3. The LHC operation modes have been defined on the basis of a tentative yearly operation schedule 4 : machine warm, drifting, 75 K stand-by, cool-down, 1.9 K stand-by, system test or ramp down, normal operation, warm up. Additionally, operation modes that will not happen on a regular basis have also been considered: short intervention on a cold sector and limited quench of a maximum of 8 cells of the LHC machine. ELEMENTS OF PRELIMINARY RISK ANALYSIS The cryogenic system of LHC is treated as being composed of separate helium enclosures, called nodes in the following. Each node is characterised by the amount and thermodynamic parameters of the helium enclosed. For the enclosures that are vacuum insulated, the volume of the vacuum space is also relevant. This conceptual scheme based on nodes is shown in Figure 3. LHC Standard Cell (106.9 m) F Thermal shield B D C Z TCV943 QV920 TCV920 TCV915 TCV910 HX910 TCV947 Cryogenic Distribution Line Valve Box TCV943 QV923 QV927 TCV915 TCV910 HX910 TCV947 Jumper Connection K W KD2 LD1 CC' CY XB KD1 Beam screens KD2 LD2 LD1 CC' CY XB KD1 MQ C' Supports MB MB MB MQ MB MB MB MQ MB MB MB MQ MB MB MB MQ MB X Y M L E N Supports and thermal shield LHC magnet cryostat Legend: TCV= Temperature Control Valve HX= Heat Exchanger MQ= main Quadrupole QV= Quench Relief Valve hydraulic plug MB= main Dipole Figure 1. Flow-scheme of LHC elementary cooling loop 2

4 IP IP QUI medium-pressure storage tanks safety valve safety valve directly blowing to the tunnel QRL LHC cryomagnets F C B E QRL Return Module medium-pressure storage tanks Tunnel Caverns and shaft Surface DFB cold mass Warm recovery line Figure 2. Simplified flow-scheme of a LHC sector (3.3 km) showing safety valve locations. He 4 I Insulation vacuum air 1 He 6 Helium enclosure (>1 atm) Q 8 9 He 2 I 5 air Beam vacuum 7 He Sub-atmospheric helium air I 3 He/air Mass transfer Q Energy release 3 Failure mode I Instrumentation Figure 3. A generic view of the nodes in the LHC cryogenic system. 3

5 A cryogenic-related failure mode is defined as an accidental event (see Table 1) that may involve mass transfer of helium or air between helium enclosure, insulation or beam vacuum space and environment, a result of any constructional element break or malfunction (eg. broken bellows or leaking valve). A cryogenic failure mode may also be an unexpected energy release to helium in the magnet cold mass as a result of an extended resistive transition or an electrical arc. It is then possible to split a complex cryogenic system into a moderate number of nodes and perform a PRA even in the early stage of the system design. From their consequences, the LHC cryogenic related failures have been classified into three groups of increasing gravity, numbered from 1 to 3: Gravity 1: failure does not involve helium relief from the machine, Gravity 2: helium is blown out of the machine directly to the environment at ground surface, Gravity 3: helium is blown out of the machine to the confined area (e.g. tunnel). For each cryogenic related failure mode, an attempt to assign a probability of mishap has been made and with following descriptive scale of probability used 5 : A (Frequent): failure likely to occur repeatedly during the life-cycle of the system. B (Occasional): failure likely to occur several times in the life-cycle of the system. C (Occasional): failure likely to occur sometimes in the life-cycle of the system D (Remote): failure not likely to occur in the life-cycle, but nevertheless possible. E (Improbable): probability of failure occurrence cannot be distinguished from zero. The Preliminary Risk Analysis of the LHC cryogenic system has been performed in three steps: The first step (Identification) has consisted of listing all the machine nodes, cryogenics related failures and operation modes. Data have been collected through dedicated hearings, discussions and experience gathered at CERN. The objective of the second step (Combination) has been to list all potential failures for every node in any mode of the collider operation. The third step (Analysis) has been conducted in two parts. First, for each potential failure a YES/NO decision has been made, with the aim of retaining credible failures only. Then a descriptive analysis of the causes and consequences of each credible failure has been made and to each event a gravity level, as defined above, has been assigned. For the failures of gravity 2 and 3, the associated risks have been described and recommendations formulated. Finally worst case scenarios for the nodes located in the tunnel, caverns, shafts and surface have been identified and a descriptive probability for each of the mishaps estimated. The technique used for performing the PRA of the LHC cryogenic system is based on FEMECA (Failure Mode and Effect Criticality Analysis) 6. It fulfils the general requirements of the Preliminary Risk Analysis of a complex technical system, and in particular of a superconducting cryogenic system 7, 8. Table 1: Cryogenic failure modes No. Cryogenic failure No. Cryogenic failure 1 Air flow to insulation vacuum 6 Helium flow to beam vacuum 2 Helium flow to insulation vacuum 7 Pressurised helium flow to sub-atmospheric helium 3 Air flow to sub-atmospheric helium 8 Energy release to cold mass helium due to a sector quench 4 Helium flow to environment 9 Energy release to cold mass helium due to electrical arc 5 Air flow to beam vacuum 10 Oil flow to environment (in case of helium compressors only) 4

6 RESULTS OF THE PRELIMINARY RISK ANALYSIS The PRA of the cryogenic system for the whole LHC machine was performed 9, however this paper focuses on the detailed analysis concerning the nodes located in the tunnel; for the whole machine, we give only summary results. A typical cross-section of the LHC tunnel is shown in Figure 4. The accelerator will be composed of the LHC cryomagnets paralleled by the cryogenic distribution line. Both will be linked by jumper connections every 107 m. The nodes of LHC cryogenic system located in the tunnel, together with the amount of helium enclosed and vacuum insulation volume are listed in Table 2 and schematically represented in Figure 5. All potential failures at the cryogenic nodes located in the tunnel have been identified, which may happen in any phase of the collider operation. In this way, over five hundred (namely 540) of the failures have been defined. Subsequently, for each potential failure a YES/NO decision has been made to eliminate events that are not credible and 183 credible failures have been retained. Finally, some of the credible failures have been qualified as worst case scenarios on the criterion of mass of helium discharged and access to the tunnel. Twelve events of gravity level 3 have been identified. Table 3 lists these events, gives the amounts of helium that might be relieved to the tunnel together with approximate peak mass flow rates. R=1900 Warm recovery line (QRP) Jumper connection LHC cryomagnets Cold mass F D B C E He ring line (QRP) Cryogenic distribution line (QRL) Figure 4. LHC machine components located in the tunnel. 5

7 Insulation Vacuum sectorization: QRL vacuum jacket Jumper vacuum barriers Cryogenic distribution line vacuum barriers 428 m LHC cryomagnet vacuum vessel LHC cryomagnet vacuum barriers 214 m Cold-mass sectorization: Bus-bar plugs Safety relief valves Cooldown and fill valves A B A B A B A B A B A C D A B A B A B A B A B A B A LHC sector 214 m Figure 5. Vacuum and cold mass sub-sectorisation in LHC sector. QRL: Table 2. Maximum He masses and volumes in the tunnel (see also Figure 5) P [bar] T [K] Mass-flow [kg/s] Mass per sub-sector [kg] Residence time (1) [s] Volume per subsector [m3] He subsectorisation [m] Vacuum subsectorisation Header B Header C Header D (2) (2) Header F Cryomagnets: Cold mass Header E DFB (3) (3) RF cavities (4) He ring line = Warm recovery line = (1) residence time is calculated as element length divided by the fluid velocity. (2) helium parameters in header D as after a limited quench (maximum 8 cells). (3) DFB: Electrical feedbox. The longest DFB is situated at Point 2 left side. (4) volume per module. [m]

8 Table 3. Gravity 3 failures at the nodes located in the tunnel. No. Node and failure description, remarks Probability Maximum amount of helium relieved to the tunnel [kg]/ approximate peak flow rate [kg/s] 1 LHC cryomagnets: He flow to cryostat D 475 / < 2 insulation vacuum 2 LHC cryomagnets: He flow to air D 475 / He leakage only 3 LHC cryomagnets He flow to beam vacuum D 475 / < 2 4 LHC cryomagnets energy release electrical D 475 kg / < 2 arc Not directly related to cryogenics 5 He flow to QRL insulation vacuum, D 3300 kg / <2 assumption of header C break Worst case scenario of the probability higher than E 6 He flow to air, assumption of jumper E 4250 / < 20 connection break Worst case scenario 7 He flow to air, He ring line break D 321 kg / < 7 8 He flow to air, warm He recovery line break D 9 kg / He leakage only 9 He flow to DFB insulation vacuum D 79 kg / < 2 10 DFB He flow to air D 79 kg / He leakage only 11 He flow to RF cavities insulation vacuum D 34 kg / < 2 12 RF cavities cooling He flow to air D 34 kg / He leakage only As it follows from Table 3, two worst case scenarios can be identified based on the criterion of mass of helium involved and peak flow rate to the tunnel: helium flow to QRL insulation vacuum (assumption of a full break of header C) and a break of a jumper connection. More generally, table 4 summarises the PRA of the LHC cryogenic system giving worst case scenarios following the failures of the modes located in the tunnel, caverns, shaft and surface buildings. Table 4: Worst case scenario failures for the LHC cryogenic system nodes located in the tunnel, caverns, access shafts and surface buildings. Location Failure Probability Max. amount of helium relieved [kg] / peak flow rate [kg/s] Tunnel He flow to QRL insulation vacuum D 3300 / < 2 (break of header C) Tunnel He flow to air (jumper connection E 4250 / < 20 break) Cavern & shaft He flow to QURA 1 insulation D 176 / < 2 vacuum, LP circuit break Surface building He flow to QSRB 2 insulation D 190 / < 2 vacuum Surface building Break of LN2 storage vessel. Nitrogen flow to environment D / may be of the order of hundreds (1) QURA: Underground lower cold box. The given values correspond to the low pressure circuit. (2) QSRB: Surface integrated cold box. The given values correspond to the subcooler. 7

9 CONCLUSIONS AND RECOMMENDATIONS Due to its specific design features (cold recovery header, absence of nitrogen in the tunnel, no pump driven forced flow in cooling loops) the LHC cryogenic system is inherently safe with a limited number of possible risks and failures, especially those resulting in helium relief to a confined space. Out of almost 1000 analysed failure modes there are only 29 events that may be followed by helium discharge to a confined space. Worst-case failure modes have been identified and potential amount of helium that might be vented into the machine tunnel, caverns, shafts and surface building as well as peak discharge flow rate have been estimated. More detailed studies are being conducted to assess the development over time of such events and the resulting propagation and diffusion of helium in confined spaces (tunnel, caverns, shafts buildings). ACKNOWLEDGEMENTS The authors would like to thank S. Claudet. L. Tavian, U. Wagner and M. Barranco, W. Erdt, G. Rau, V. Sergo, R. Trant and R. van Weelderen for their help during preparation of this study. REFERENCES 1. Ph. Lebrun, Superfluid helium cryogenics for the Large Hadron Collider project at CERN, Cryogenics 34, ICEC Suppl. (1994). 2. G. Horlitz, Refrigeration of large scale superconducting systems for high energy accelerators, Cryogenics 32, ICEC Suppl., 44:49 (1992). 3. M. Chorowski, W. Erdt, Ph. Lebrun, G. Riddone, L. Serio, L. Tavian, U. Wagner and R. van Weldeeren, A simplified cryogenic distribution scheme for the Large Hadron collider, in: Adv. Cryo, Eng. 43, Plenum Press, New York, (1998), pp L. Bottura, P. Burla, R. Wolf, LHC main dipoles proposed baseline current ramping, LHC Project Report- 172, CERN, Geneva (1998). 5. B. L. Hendrix, Application of system safety engineering techniques for hazard prevention at the superconducting super collider, in: Supercollider 3, Plenum Press, New York (1991), pp H. Garin, AMDEC, MADE, AEEL, L essentiel de la méthode, AFNOR (1994). 7. S. W. Malasky, System Safety, Hayden Book Company, Inc., ISBN (1974). 8. B. G. Blyukher, L.E. Reznikov, Design phase safety and risk assessment for superconducting cryogenic system, ASME International, 74:80 (1997). 9. M. Chorowski, Ph. Lebrun, G. Riddone, Preliminary risk analysis of the LHC cryogenic system, LHC Project Note 177, CERN, Geneva (1999). 8

Figure 1 The LHC cryogenic islands and plants layout

Figure 1 The LHC cryogenic islands and plants layout The LHC cryogenic operation for first collisions and physics run Brodzinski K, Barth K, Benda V, Bremer J, Casas-Cubillos J, Claudet S, Delikaris D, Ferlin G, Fernandez Penacoba G, Perin A, Pirotte O,

More information

EXPERIENCE WITH A PRE-SERIES SUPERFLUID HELIUM TEST BENCH FOR LHC MAGNETS

EXPERIENCE WITH A PRE-SERIES SUPERFLUID HELIUM TEST BENCH FOR LHC MAGNETS EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 388 EXPERIENCE WITH A PRE-SERIES SUPERFLUID HELIUM TEST BENCH FOR LHC

More information

SUMMARY OF THE EXPERIMENTAL STUDIES OF COLD HELIUM PROPAGATION ALONG A SCALE MODEL OF THE LHC TUNNEL

SUMMARY OF THE EXPERIMENTAL STUDIES OF COLD HELIUM PROPAGATION ALONG A SCALE MODEL OF THE LHC TUNNEL EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 684 SUMMARY OF THE EXPERIMENTAL STUDIES OF COLD HELIUM PROPAGATION ALONG

More information

European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire

European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire Safety Task Force SC, BE, EN, PH, TE, Staff Ass. [CERN-ATS-2009-002] External Advisory Committee [CERN-ATS-2009-003]

More information

Available online at ScienceDirect. Physics Procedia 67 (2015 )

Available online at   ScienceDirect. Physics Procedia 67 (2015 ) Available online at www.sciencedirect.com ScienceDirect Physics Procedia 67 (2015 ) 1074 1082 25th International Cryogenic Engineering Conference and the International Cryogenic Materials Conference in

More information

Cryogenic Benches for Superfluid Helium Testing of Full-Scale Prototype Superconducting Magnets for the CERN LHC Project

Cryogenic Benches for Superfluid Helium Testing of Full-Scale Prototype Superconducting Magnets for the CERN LHC Project neun ~ R Y W EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH hk. R I+ 9 CERN LIBRARIES, GENEVA POO024685 CERN MT/94-02 LHC Note 275 Cryogenic Benches for Superfluid Helium Testing of Full-Scale Prototype Superconducting

More information

Jaime Perez Espinos on behalf of all contributors to LHC insulation vacuum (TE/VSC, AL4030 and ICIT)

Jaime Perez Espinos on behalf of all contributors to LHC insulation vacuum (TE/VSC, AL4030 and ICIT) OLAV IV Jaime Perez Espinos on behalf of all contributors to LHC insulation vacuum (TE/VSC, AL4030 and ICIT) Contents Before LS1 Introduction to LS1 LHC insulation vacuum system overview LS1 activities

More information

Magnet and RF Cavity Test Stand Design. Tom Peterson, SLAC USPAS January, 2017

Magnet and RF Cavity Test Stand Design. Tom Peterson, SLAC USPAS January, 2017 Magnet and RF Cavity Test Stand Design, SLAC Outline Test dewars and test stands Saturated bath test dewars Double bath test dewars SRF test cryostats SRF cryomodule test stands Horizontal magnet test

More information

QUALIFICATION OF SUB-ATMOSPHERIC PRESSURE SENSORS FOR THE CRYOMAGNET BAYONET HEAT EXCHANGERS OF THE LARGE HADRON COLLIDER

QUALIFICATION OF SUB-ATMOSPHERIC PRESSURE SENSORS FOR THE CRYOMAGNET BAYONET HEAT EXCHANGERS OF THE LARGE HADRON COLLIDER EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 980 QUALIFICATION OF SUB-ATMOSPHERIC PRESSURE SENSORS FOR THE CRYOMAGNET

More information

First Experimental Data of the Cryogenic Safety Test Facility PICARD

First Experimental Data of the Cryogenic Safety Test Facility PICARD First Experimental Data of the Cryogenic Safety Test Facility PICARD C. Heidt, A. Henriques, M. Stamm and S. Grohmann 26 th International Cryogenic Engineering Conference 2016 in New Delhi, India KIT,

More information

LARGE CRYOGENIC SYSTEMS AT 1.8 K

LARGE CRYOGENIC SYSTEMS AT 1.8 K LARGE CRYOGENIC SYSTEMS AT.8 K L. Tavian, CERN, Geneva, Switzerland Abstract Cryogenics is now widely present in large accelerator projects using applied superconductivity. Economical considerations permanently

More information

Cryogenics of SRF Spoke Cavity Development at SMTF

Cryogenics of SRF Spoke Cavity Development at SMTF Cryogenics of SRF Spoke Cavity Development at SMTF Michael White SRF Development Technical Division Fermi National Accelerator Laboratory May 11, 2006 Overview of Topics SMTF Overview CTF Cryogen Supply

More information

RECENT PROGRESS IN POWER REFRIGERATION BELOW 2 K FOR SUPERCONDUCTING ACCELERATORS

RECENT PROGRESS IN POWER REFRIGERATION BELOW 2 K FOR SUPERCONDUCTING ACCELERATORS RECENT PROGRESS IN POWER REFRIGERATION BELOW 2 K FOR SUPERCONDUCTING AELERATORS S. Claudet, CERN, Geneva, Switzerland Abstract As a result of technico-economical optimization and quest for increased performance,

More information

DEVELOPMENT OF LARGE-CAPACITY REFRIGERATION AT 1.8 K FOR THE LARGE HADRON COLLIDER AT CERN. Philippe Lebrun*, Laurent Tavian*, Gérard Claudet**

DEVELOPMENT OF LARGE-CAPACITY REFRIGERATION AT 1.8 K FOR THE LARGE HADRON COLLIDER AT CERN. Philippe Lebrun*, Laurent Tavian*, Gérard Claudet** EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 6 DEVELOPMENT OF LARGE-CAPACITY REFRIGERATION AT 1.8 K FOR THE LARGE

More information

The LHC Cryogenic System and Operational Experience from the First Three Years Run

The LHC Cryogenic System and Operational Experience from the First Three Years Run Focused Review The LHC Cryogenic System and Operational Experience from the First Three Years Run Dimitri DELIKARIS *1 and Laurent TAVIAN *2 Synopsis: The LHC (Large Hadron Collider) accelerator helium

More information

Research activities on cryogenic safety

Research activities on cryogenic safety Research activities on cryogenic safety Steffen Grohmann, Carolin Heidt, Andre Henriques (CERN), Christina Weber European Cryogenics Days, CERN, June 9-10, 2016 INSTITUTE OF TECHNICAL PHYSICS (ITEP) INSTITUTE

More information

Cooling Strings of Superconducting Devices below 2 K: The Helium II Bayonet Heat Exchanger. Ph. Lebrun, L. Serio, L. Tavian and R.

Cooling Strings of Superconducting Devices below 2 K: The Helium II Bayonet Heat Exchanger. Ph. Lebrun, L. Serio, L. Tavian and R. EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 144 Cooling Strings of Superconducting Devices below 2 K: The Helium

More information

Safety in Cryogenic Operations at RHIC *

Safety in Cryogenic Operations at RHIC * Safety in Cryogenic Operations at RHIC * Anthony Nicoletti, Dewey Lederle, Ahmed Sidi-Yehklef, Tom Tallerico, Roberto Than, Joe Tuozzolo Collider-Accelerator Department Brookhaven National Laboratory Upton,

More information

Loss of Vacuum Experiments on a Superfluid Helium Vessel

Loss of Vacuum Experiments on a Superfluid Helium Vessel 1 Loss of Vacuum Experiments on a Superfluid Helium Vessel Stephen M. Harrison 1 Abstract The Alpha Magnetic Spectrometer (AMS) is a particle physics experiment for use on the International Space Station

More information

Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety. Eric Sun. October 12, Experiment Readiness Review of Physics Division.

Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety. Eric Sun. October 12, Experiment Readiness Review of Physics Division. Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety Eric Sun 1 Outline Cryogenic Control Reservoir Relief Valves Rupture Discs Parallel Relief Plates Independent Sizing Calculation Pressure Safety of

More information

REVIEW OF THE CONSOLIDATION WORKS SCHEDULED FOR THE LHC CRYOGENIC INSTALLATIONS DURING A LONG SHUTDOWN

REVIEW OF THE CONSOLIDATION WORKS SCHEDULED FOR THE LHC CRYOGENIC INSTALLATIONS DURING A LONG SHUTDOWN REVIEW OF THE CONSOLIDATION WORKS SCHEDULED FOR THE LHC CRYOGENIC INSTALLATIONS DURING A LONG SHUTDOWN O. Pirotte, on behalf of the CRG group, CERN, Geneva, Switzerland. Abstract The operation of the LHC

More information

MODIFICATION OF THE LHC VENTILATION SYSTEM

MODIFICATION OF THE LHC VENTILATION SYSTEM MODIFICATION OF THE LHC VENTILATION SYSTEM M. Nonis EN/CV INTRODUCTION The aim of the present document is to review the current LHC ventilation configuration and evaluate the need to modify part of the

More information

Session 3 - What repair activity can be done today on a locally warmed-up sub-sector

Session 3 - What repair activity can be done today on a locally warmed-up sub-sector Session 3 Optimise Interventions and Recovery from Collateral Damage on Cold Sectors What repair activity can be done today on a locally warmed-up sub-sector? Paul Cruikshank on behalf of TE/VSC The Issues.

More information

Cryogenics The Basics. Lesson 2 D. Kashy

Cryogenics The Basics. Lesson 2 D. Kashy Cryogenics The Basics Lesson 2 D. Kashy Lecture 1 Review Lesson 1 - Objectives Looked at common liquids and gases to get a feeling for their properties Looked at Nitrogen and Helium Discussed Pressure

More information

FAILURE SCENARIOS AND MITIGATIONS FOR THE BABAR SUPERCONDUCTING SOLENOID

FAILURE SCENARIOS AND MITIGATIONS FOR THE BABAR SUPERCONDUCTING SOLENOID SLAC-PUB-11601 December 2005 FAILURE SCENARIOS AND MITIGATIONS FOR THE BABAR SUPERCONDUCTING SOLENOID EunJoo Thompson, A. Candia, W. W. Craddock, M. Racine, J. G. Weisend II Stanford Linear Accelerator

More information

Large Hadron Collider

Large Hadron Collider Cryo-Disasters: Life at CERN Large Hadron Collider 4-6 tons of liquid helium escaped Two of the most severely broken interconnects, which are between the magnets in LHC sectors 3 and 4. The superconducting

More information

CNS In-Pool Assembly Mechanical Design for OYSTER Project

CNS In-Pool Assembly Mechanical Design for OYSTER Project CNS In-Pool Assembly Mechanical Design for OYSTER Project JINBOK CHOI, JUNGHYUN RYU Korea Atomic Energy Research Institute (KAERI) 111 Deadeok-daero 989Beon-gil, Yuseong-gu, Daejeon, Republic of Korea

More information

Helium recovery at the National High Magnetic Field Laboratory

Helium recovery at the National High Magnetic Field Laboratory IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Helium recovery at the National High Magnetic Field Laboratory Related content - Helium recovery and purification at CHMFL J Li,

More information

A Brief Introduction to Helium Liquefaction At ITER

A Brief Introduction to Helium Liquefaction At ITER ITER Cryogenic System LHe PLANTS A Brief Introduction to Helium Liquefaction At ITER ITER Organization PLANT ENGINEERING DIVISION CRYOGENIC SECTION LHe PLANTS TRO: Eric FAUVE A Brief Introduction to to

More information

Spallation target cryogenic cooling design challenges at the European Spallation Source

Spallation target cryogenic cooling design challenges at the European Spallation Source IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Spallation target cryogenic cooling design challenges at the European Spallation Source To cite this article: J Jurns et al 2015

More information

Specifications of Cryogenic vacuum jacketed valves

Specifications of Cryogenic vacuum jacketed valves TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. SECTION - C Technical Specifications for Supply of Cryogenic Vacuum ed Control Valves Specifications of Cryogenic vacuum jacketed valves Contents 1 INTRODUCTION

More information

Transient Analyses In Relief Systems

Transient Analyses In Relief Systems Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances

More information

Proposal for the Cryogenic Supply of a Single TTF / FEL - Cryomodule Test Bench

Proposal for the Cryogenic Supply of a Single TTF / FEL - Cryomodule Test Bench Proposal for the Cryogenic Supply of a Single TTF / FEL - Cryomodule Test Bench TESLA Report No. 2001-09 W.D.Moeller, B.Petersen, B.Sparr Deutsches Elektronen Synchrotron Abstract A test bench for the

More information

Normal Cryogenic Fluid Behavior (emphasis on helium, but not superfluid, which will be covered later) Tom Peterson, SLAC January 2017

Normal Cryogenic Fluid Behavior (emphasis on helium, but not superfluid, which will be covered later) Tom Peterson, SLAC January 2017 Normal Cryogenic Fluid Behavior (emphasis on helium, but not superfluid, which will be covered later), SLAC January 2017 Outline Cooling modes for superconducting devices Forced flow cooling Two-phase

More information

Refrigeration Plants for the SSC

Refrigeration Plants for the SSC h. 5 i : i \ d Refrigeration Plants for the SSC c.>/

More information

Short Introduction to Cryo-Pumps and Refrigerators. Dr Graham Rogers Leybold UK Ltd.

Short Introduction to Cryo-Pumps and Refrigerators. Dr Graham Rogers Leybold UK Ltd. Short Introduction to Cryo-Pumps and Refrigerators Dr Graham Rogers Leybold UK Ltd. Cryo Pumps Topics Physical principles of cryo-pumping Design and control of modern refrigerator cryo-pumps UHV and XHV

More information

Cable in Conduit Conductor (CICC) quench modelling

Cable in Conduit Conductor (CICC) quench modelling DEMO SAMPLE Cable in Conduit Conductor (CICC) quench modelling This demo gives an example of quench simulation for a Central Solenoid (CS). CS is divided into geometrically identical sections (see Fig.

More information

Overview of Earlier Lecture

Overview of Earlier Lecture 4 1 Overview of Earlier Lecture Hydrogen Helium Phase Diagram of Helium Super fluid Helium 2 Outline of the Lecture Uses of Helium 4 Thermomechanical, Mechanocaloric, Fountain, Rollin Film Effects. Sound

More information

SUMMARY AND RESULTS OF THE CRYOPLANT OPERATION FOR HERA

SUMMARY AND RESULTS OF THE CRYOPLANT OPERATION FOR HERA Proceedings of ICEC 22-ICMC 2008, edited by Ho-Myung CHANG et al. c 2009 The Korea Institute of Applied Superconductivity and Cryogenics 978-89-957138-2-2 SUMMARY AND RESULTS OF THE CRYOPLANT OPERATION

More information

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS INTRODUCTION The Janis Research Company's Superconducting Magnet/Cryostat System is one of the most versatile tools available to the scientist

More information

CONTAINMENT OF CO2 REFRIGERATION INSTALLATIONS

CONTAINMENT OF CO2 REFRIGERATION INSTALLATIONS CONTAINMENT OF CO2 REFRIGERATION INSTALLATIONS X. CAZAURAN, S. GUYOT, C. HERMON CETIM, Centre Technique des Industries Mécaniques, 74 route de la Jonelière, 44326 Nantes, France Fax : +33 ()251 86 73,

More information

Design of Relief Valves/Devices/Systems for Cryogenic Apparatuses and Installations

Design of Relief Valves/Devices/Systems for Cryogenic Apparatuses and Installations Design of Relief Valves/Devices/Systems for Cryogenic Apparatuses and Installations Fridolin Holdener fridolin.holdener@shirokuma-gmbh.ch CERN Cryogenic Safety - HSE Seminar 21-22 September 2016 Agenda

More information

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005 RDK-408D2 Cold Head Technical Manual SHI-APD Cryogenics Inc. 1833 Vultee Street Allentown, PA 18103-4783 U.S.A. Revision A: September 2005 (Reference SHI Manual: December 18, 2003 266404A CD32ZZ-160A)

More information

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00 D R A F T Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13 Version 1.00 October 06, 2010 Operating Procedures for the NPDGamma Liquid Hydrogen Target V1.00 6/10/10 2 Table of Content

More information

Design and Safety Document for the Vacuum Windows of the NPDGamma Liquid Hydrogen Target at SNS

Design and Safety Document for the Vacuum Windows of the NPDGamma Liquid Hydrogen Target at SNS Design and Safety Document for the Vacuum Windows of the NPDGamma Liquid Hydrogen Target at SNS Prepared: Checked: Approved: H. Nann W. Fox M. Snow The NPDGamma experiment is going to run at BL13 at SNS

More information

MEANS TO LIMIT THE COLLATERAL DAMAGES IN THE BEAM VACUUM CHAMBERS

MEANS TO LIMIT THE COLLATERAL DAMAGES IN THE BEAM VACUUM CHAMBERS MEANS TO LIMIT THE COLLATERAL DAMAGES IN THE BEAM VACUUM CHAMBERS J.M. JIMENEZ, CERN, Geneva, Switzerland Technology Department, Vacuum, Surfaces & Coatings Group Abstract The incident in the sector 3-4

More information

National Accelerator Laboratory

National Accelerator Laboratory Fermi National Accelerator Laboratory FERMILAB-Conf-97/268 A 1400 Liter 1.8K Test Facility T.J. Peterson, R.J. Rabehl and C.D. Sylvester Fermi National Accelerator Laboratory P.O. Box 500, Batavia, Illinois

More information

Earlier Lecture. In the earlier lecture, we have seen Kapitza & Heylandt systems which are the modifications of the Claude System.

Earlier Lecture. In the earlier lecture, we have seen Kapitza & Heylandt systems which are the modifications of the Claude System. 17 1 Earlier Lecture In the earlier lecture, we have seen Kapitza & Heylandt systems which are the modifications of the Claude System. Collins system is an extension of the Claude system to reach lower

More information

Gianluca Gemme LN2 DISTRIBUTION PLANT

Gianluca Gemme LN2 DISTRIBUTION PLANT Gianluca Gemme LN2 DISTRIBUTION PLANT Design parameters Cryogen Liquid Nitrogen Volume 200 l (one trap) Heat load 300 W (one trap) Trap cold mass 500 Kg Number of traps 4 Liquid nitrogen input 7.10 l/h

More information

ESS SPOKE CRYOMODULE AND TEST VALVE BOX

ESS SPOKE CRYOMODULE AND TEST VALVE BOX ESS SPKE CRYMDULE AND TEST VALVE BX Denis Reynet, Sylvain Brault, Patxi Duthil, Matthieu Pierens, Patricia Duchesne, Guillaume lry, Nicolas Gandolfo, Emmanuel Rampnoux, Sébastien Bousson, IPN, UMR 8608

More information

Safety Engineering - Hazard Identification Techniques - M. Jahoda

Safety Engineering - Hazard Identification Techniques - M. Jahoda Safety Engineering - Hazard Identification Techniques - M. Jahoda Hazard identification The risk management of a plant 2 Identification of the hazards involved in the operation of the plant, due to the

More information

Thomas Jefferson National Accelerator Facility Newport News, Virginia, 23606, USA

Thomas Jefferson National Accelerator Facility Newport News, Virginia, 23606, USA PROCESS OPTIONS FOR NOMINAL 2-K HELIUM REFRIGERATION SYSTEM DESIGNS P. Knudsen, V. Ganni Thomas Jefferson National Accelerator Facility Newport News, Virginia, 23606, USA ABSTRACT Nominal 2-K helium refrigeration

More information

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Operating Procedures for the NPDGamma Liquid Hydrogen Target V0.03 11/26/05 1 DRAFT Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Version 0.03 November 26, 2005

More information

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM Brookhaven National Laboratory Major Plant Equipment Categories / Locations Compressor Refrigerator Service Buildings The Maintenance program is based on the

More information

Challenges in Relief Design for Pilot Plants

Challenges in Relief Design for Pilot Plants Challenges in Relief Design for Pilot Plants Published on July 5, 2017 Michael Trainor Relief system design at the pilot scale presents unique challenges that don t always apply at the commercial scale.

More information

Preliminary Failure Mode and Effect Analysis for CH HCSB TBM

Preliminary Failure Mode and Effect Analysis for CH HCSB TBM Preliminary Failure Mode and Effect Analysis for CH HCSB TBM Presented by: Chen Zhi Contributors by HCSB TBM Safety Group, in China June 21, 2007 E-mail: chenz@swip.ac.cn Outline Introduction FMEA Main

More information

MONROE BROTHERS LTD Customer Sigmaphi Project JLab Dipole Safety Relief MB / Description Chimney Vent Capacity & Pressure Drop 301 Issue 1

MONROE BROTHERS LTD Customer Sigmaphi Project JLab Dipole Safety Relief MB / Description Chimney Vent Capacity & Pressure Drop 301 Issue 1 1 INTRODUCTION The JLab Dipole has three connecting pipes from the Magnet Assembly Helium Vessel to the CCR. These pipes are referred to as the Chminey and this report examines the pressure drop in Chimney

More information

LEAK-TIGHT WELDING EXPERIENCE FROM THE INDUSTRIAL ASSEMBLY OF THE LHC CRYOSTATS AT CERN

LEAK-TIGHT WELDING EXPERIENCE FROM THE INDUSTRIAL ASSEMBLY OF THE LHC CRYOSTATS AT CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 1072 LEAK-TIGHT WELDING EXPERIENCE FROM THE INDUSTRIAL ASSEMBLY OF THE

More information

PRELIMINARY PIPE STRESS ANALYSIS OF HIGH PRESSURE, HIGH TEMPERATURE EXPERIMENTAL HELIUM COOLING SYSTEM

PRELIMINARY PIPE STRESS ANALYSIS OF HIGH PRESSURE, HIGH TEMPERATURE EXPERIMENTAL HELIUM COOLING SYSTEM A.K. VERMA, B.K. YADAV, A. GANDHI, A. SARASWAT, S. VERMA, E.R. KUMAR PRELIMINARY PIPE STRESS ANALYSIS OF HIGH PRESSURE, HIGH TEMPERATURE EXPERIMENTAL HELIUM COOLING SYSTEM A.K.VERMA Institute for Plasma

More information

Vacuum System at IUAC

Vacuum System at IUAC Vacuum System at IUAC A. Mandal Inter-University Accelerator Centre, Aruna Asaf Ali Marg, Post Box - 10502, New Delhi 110067, Fax:011-26893666. email: mandal@iuac.res.in Abstract: Vacuum technology is

More information

TESTING SAFETY OF HYDROGEN COMPONENTS

TESTING SAFETY OF HYDROGEN COMPONENTS TESTING SAFETY OF HYDROGEN COMPONENTS Wastiaux, S. 1, Willot F. 1, Coffre E. 1 and Schaaff J.P 1. 1 Air Liquide, Centre de Technologie et d Expertise, 180 avenue Charles Floquet, 93155 Le Blanc Mesnil,

More information

Storage and transfer of cryofluids

Storage and transfer of cryofluids Storage and transfer of cryofluids Christian Gianese Guilty 1: Arsène d Arsonval (1851-1940) He invented a glass container with double wall, the vacuum being done in the space between the outer and inner

More information

Oil-Lubricated Compressors for Regenerative Cryocoolers Using an Elastic Membrane

Oil-Lubricated Compressors for Regenerative Cryocoolers Using an Elastic Membrane Oil-Lubricated Compressors for Regenerative Cryocoolers Using an Elastic Membrane E.C. Luo, Z.H. Wu, G.Y. Yu, J.Y. Hu, and W. Dai Technical Institute of Physics and Chemistry Chinese Academy of Sciences

More information

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2) UN-GTR PART A INSERTION Stand 09.02.2011, 17:20 Uhr A.3.3 HYDROGEN STORAGE SYSTEM The hydrogen storage system consists of all components that form the primary pressure boundary of the stored hydrogen in

More information

Helium Loop Karlsruhe (HELOKA) large experimental facility for the in-vessel ITER and DEMO components

Helium Loop Karlsruhe (HELOKA) large experimental facility for the in-vessel ITER and DEMO components 1 /7-12 Helium Loop Karlsruhe (HELOKA) large experimental facility for the in-vessel IER and DEMO components M. Ionescu-Bujor, B.E. Ghidersa, G. Janeschitz, X. Jin orschungszentrum Karlsruhe, Germany e-mail:

More information

Heat Transfer Research on a Special Cryogenic Heat Exchanger-a Neutron Moderator Cell (NMC)

Heat Transfer Research on a Special Cryogenic Heat Exchanger-a Neutron Moderator Cell (NMC) Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2010 Heat Transfer Research on a Special Cryogenic Heat Exchanger-a Neutron

More information

Analysis of Pressure Rise During Internal Arc Faults in Switchgear

Analysis of Pressure Rise During Internal Arc Faults in Switchgear Analysis of Pressure Rise During Internal Arc Faults in Switchgear ASANUMA, Gaku ONCHI, Toshiyuki TOYAMA, Kentaro ABSTRACT Switchgear include devices that play an important role in operations such as electric

More information

Fermilab MTF Cryogenic System & Vertical RF Cavity Test Facility. Yuenian Huang, on behalf of Fermilab, TD/TID May 11, 2006

Fermilab MTF Cryogenic System & Vertical RF Cavity Test Facility. Yuenian Huang, on behalf of Fermilab, TD/TID May 11, 2006 Fermilab MTF Cryogenic System & Vertical RF Cavity Test Facility Yuenian Huang, on behalf of Fermilab, TD/TID May 11, 2006 1 Magnet Test Facility (MTF) Tevatron magnet test stands Testing temperature range

More information

Cryogenic system for SCC horizontal test

Cryogenic system for SCC horizontal test Cryogenic system for SCC horizontal test T. Ogitsu, Y.Ajima, K.Hara, K.Hosoyama, A.Kabe Yuuji Kojima, Y.Sakamoto, A.Terashima KEK, National Laboratory for High Energy Physics 1-1 Oho, Tsukuba, baraki,

More information

Cryogenic System for a Large Superconducting Magnet in Space

Cryogenic System for a Large Superconducting Magnet in Space 4LL04 1 Cryogenic System for a Large Superconducting Magnet in Space Stephen M. Harrison, Erich Ettlinger, Gunter Kaiser, Bertrand Blau, Hans Hofer, Istvan L. Horvath, Samuel C. C. Ting, Jürgen Ulbricht

More information

Hazard Operability Analysis

Hazard Operability Analysis Hazard Operability Analysis Politecnico di Milano Dipartimento di Energia HAZOP Qualitative Deductive (search for causes) Inductive (consequence analysis) AIM: Identification of possible process anomalies

More information

Procedure of Xenon Transfer

Procedure of Xenon Transfer Procedure of Xenon Transfer Feng Zhou,MIT CC: Martina Green February 28, 2005 In this write up, we discuss the procedure on how to transfer xenon to a designed gas storage vessel that supplies xenon to

More information

Bubble Chamber Detector System

Bubble Chamber Detector System Bubble Chamber Detector System 1 ANL Bubble Chamber Lead designer and fabricator Brad DiGiovine (ANL) April 2009 Chamber Received Full Operation Authorization for (C 4 F 10 ) February 2010 First Bubble

More information

Safety Aspects and Design of the Vent Isolation Chamber. Prepared: W.M. Snow Checked: H. Nann Approved: W. M. Snow

Safety Aspects and Design of the Vent Isolation Chamber. Prepared: W.M. Snow Checked: H. Nann Approved: W. M. Snow Safety Aspects and Design of the Vent Isolation Chamber Prepared: W.M. Snow Checked: H. Nann Approved: W. M. Snow 1. Scope This document addresses the safety aspects and design of the vent isolation chamber

More information

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance CVI Valve Line Exceeds the industry s highest standards for reliability and performance Available in the most standard models with the shortest lead times in the industry Exceptional quality every CVI

More information

Revision 2013 Vacuum Technology 1-3 day Good Vacuum Practice 1 Day Course Outline

Revision 2013 Vacuum Technology 1-3 day Good Vacuum Practice 1 Day Course Outline Revision 2013 Vacuum Technology 1-3 day Good Vacuum Practice 1 Day Course Outline This training course outline is intended to cover the following: Introduction to vacuum Measurement Lubricated rotary pumps

More information

Relief Systems. 11/6/ Fall

Relief Systems. 11/6/ Fall Relief Systems 1 Relief Scenarios o A single relief event requires a particulate vent area and valve size o Relief scenarios are determined based on a PHA o For each scenario, a vent area is calculated

More information

Gas Vapor Injection on Refrigerant Cycle Using Piston Technology

Gas Vapor Injection on Refrigerant Cycle Using Piston Technology Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2012 Gas Vapor Injection on Refrigerant Cycle Using Piston Technology Sophie

More information

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008 UNITY 2 TM Air Server Series 2 Operators Manual Version 1.0 February 2008 1. Introduction to the Air Server Accessory for UNITY 2...2 1.1. Summary of Operation...2 2. Developing a UNITY 2-Air Server method

More information

SUPERMETRO - Super-High-Speed-Train in Low Pressure Tunnel

SUPERMETRO - Super-High-Speed-Train in Low Pressure Tunnel SUPERMETRO - Super-High-Speed-Train in Low Pressure Tunnel Y. Sato 1, K. Konagai 2, T. Maeda 3, S. Saito 3, T. Satoh 4, M. Ishida 3 1 Railway Track System Institute, Japan; 2 University of Tokyo, Tokyo,

More information

- Brief overview of the Tevatron cryogenic system - Operations for Run II

- Brief overview of the Tevatron cryogenic system - Operations for Run II - Brief overview of the Tevatron cryogenic system - Operations for Run II * reliability and availability of the overall system and its components * helium losses and cryogens inventory (vendors, distribution,

More information

Transition your department towards more productive helium-free MR operations 1

Transition your department towards more productive helium-free MR operations 1 BlueSeal magnet BlueSeal magnet Transition your department towards more productive helium-free MR operations 1 Based on a decade of innovation, Philips BlueSeal is a fully sealed magnet designed to simplify

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER F: CONTAINMENT AND SAFEGUARD SYSTEMS 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS])

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER F: CONTAINMENT AND SAFEGUARD SYSTEMS 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS]) PAGE : 1 / 16 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS]) 7.0. SAFETY REQUIREMENTS 7.0.1. Safety functions The main functions of the EVU system [CHRS] are to limit the pressure inside the containment

More information

METHODS TO PREVENT THE PREMATURE ACTIVATION OF RELIEF DEVICES ON TRANSPORT TANKS

METHODS TO PREVENT THE PREMATURE ACTIVATION OF RELIEF DEVICES ON TRANSPORT TANKS METHODS TO PREVENT THE PREMATURE ACTIVATION OF RELIEF DEVICES ON TRANSPORT TANKS IGC Doc 184/14/E EUROPEAN INDUSTRIAL GASES ASSOCIATION AISBL AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel: +32 2 217 70 98 Fax:

More information

EXPERIENCE WITH CRYOGENICS SAFETY, PROBLEMS AND SOLUTIONS

EXPERIENCE WITH CRYOGENICS SAFETY, PROBLEMS AND SOLUTIONS EXPERIENCE WITH CRYOGENICS SAFETY, PROBLEMS AND SOLUTIONS Rajiv Sharma and Cryogenic Division SST-1 IPR, Gandhinagar 33rd DAE Safety & Occupational Health Professionals Meet at IPR, Gandhinagar, 23-25

More information

NPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators

NPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators 0. Introduction Object of this on-the-job Training (OJT) Lesson Plan is to train Senior Operators for the NPDGamma LH2 target system. After successful of this OJT and authorization by line management Senior

More information

A NEW PROCESS FOR IMPROVED LIQUEFACTION EFFICIENCY

A NEW PROCESS FOR IMPROVED LIQUEFACTION EFFICIENCY WHITE PAPER A NEW PROCESS FOR IMPROVED LIQUEFACTION EFFICIENCY Author(s): Adam Jones and Grant Johnson, Costain Natural Resources First published: GPAE, September 2014 www.costain.com A New Process for

More information

RELIEF VALVE CIRCUIT DESIGN

RELIEF VALVE CIRCUIT DESIGN ENGINEERING NOTE LH001 1011B Page 1 of 34 PROJECT TITLE LARGE HADRON COLLIDER (LHC) IR FEEDBOX RELIEF VALVE CIRCUIT DESIGN Revision B Synopsis: Revision done on November, 005 after finding that the flow

More information

Gas density monitor With integrated transmitter Model GDM-100-TI

Gas density monitor With integrated transmitter Model GDM-100-TI SF 6 gas solutions Gas density monitor With integrated transmitter Model GDM-100-TI grid Products WIKA data sheet SP 60.05 for further approvals see page 5 Applications Gas density monitoring of closed

More information

AN EXPERIMENTAL INVESTIGATION ON HELIUM LIQUEFACTION USING TWO-STAGE GIFFORD McMAHON CRYOCOOLER

AN EXPERIMENTAL INVESTIGATION ON HELIUM LIQUEFACTION USING TWO-STAGE GIFFORD McMAHON CRYOCOOLER P P P International Journal of Scientific Engineering and Applied Science (IJSEAS) - Volume-1, Issue-6, September 2015 AN EXPERIMENTAL INVESTIGATION ON HELIUM LIQUEFACTION USING TWO-STAGE GIFFORD McMAHON

More information

3-Stage ADR for the SXS Instrument on the Astro-H Mission

3-Stage ADR for the SXS Instrument on the Astro-H Mission National Aeronautics and Space Administration 3-Stage for the SXS Instrument on the Astro-H Mission Peter Shirron, Mark Kimball, Donald Wegel, Edgar Canavan, and Michael DiPirro NASA/Goddard Space Flight

More information

6.6 Relief Devices. Introduction

6.6 Relief Devices. Introduction 6.6 Relief Devices Introduction Relief devices are used to help prevent a catastrophic failure of equipment and/or minimize the effects of any unanticipated or uncontrolled events. As such, relief devices

More information

STRUCTURAL ANALYSIS OF THE VACUUM VESSEL FOR THE LHCb VERTEX LOCATOR (VELO)

STRUCTURAL ANALYSIS OF THE VACUUM VESSEL FOR THE LHCb VERTEX LOCATOR (VELO) National Institute for Nuclear Physics and High Energy Physics Kruislaan 409 1098 SJ Amsterdam The Netherlands NIKHEF Reference no.: MT-VELO 04-1 EDMS no: 432626 OF THE VACUUM VESSEL FOR THE LHCb VERTEX

More information

Cryomodule Maintenance Workshop Maintenance, Repair Strategies, and Fault Scenarios. J. Ozelis Senior SRF Coordinator

Cryomodule Maintenance Workshop Maintenance, Repair Strategies, and Fault Scenarios. J. Ozelis Senior SRF Coordinator Cryomodule Maintenance Workshop Maintenance, Repair Strategies, and Fault Scenarios J. Ozelis Senior SRF Coordinator Outline for Discussions Maintenance - routine/preventative maintenance Schedules Specific

More information

Steam generator tube rupture analysis using dynamic simulation

Steam generator tube rupture analysis using dynamic simulation Steam generator tube rupture analysis using dynamic simulation Heat Exchangers are used to transfer heat from a hot fluid to a cold fluid. Most of the times these fluids are available at different pressures

More information

Microscopy Cryogenic WORKSTATION. Performance by Design

Microscopy Cryogenic WORKSTATION. Performance by Design CRYO Microscopy Cryogenic WORKSTATION Optical cryostat for use in microscopy and spectroscopy Performance by Design RC102-CFM Microscopy Cryostat offers fast cooldown, high efficiency, excellent temperature

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC) PAGE : 1 / 11 1. PASSIVE SINGLE FAILURE ANALYSIS The aim of the accident analysis in Chapter P is to demonstrate that the safety objectives have been fully achieved, despite the most adverse single failure.

More information

Status on the DFBXF commissioning

Status on the DFBXF commissioning Status on the DFBXF commissioning Cryogenic Performance Panel C. Darve March 28th 2008 1 Procedure steps and checks Based on S78 commissioning (R. Rabehl 05 July 2007): Cool-down part 1 (cool-down from

More information

Development of High Efficiency 4K Two-Stage Pulse Tube Cryocooler

Development of High Efficiency 4K Two-Stage Pulse Tube Cryocooler Development of High Efficiency 4K Two-Stage Pulse Tube Cryocooler M. Xu, H. Takayama and K. Nakano Sumitomo Heavy Industries, Ltd. Nishi-tokyo-city, Tokyo, Japan 188-8585 ABSTRACT Sumitomo Heavy Industries

More information

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS POP Safety Valve POP Safety Valve INTRODUCTION The effects of exceeding safe pressure levels in an unprotected pressure vessel or system, can have catastrophic effects on both plant and personnel. Safety

More information