1 Mechanical Integrity Report for the CURI Pierside Stainless Diesel Tank at 208 North Palmetto Boulevard Clemson, South Carolina Inspection: 26 September 2012 Prepared by: George E. Matthews, E.I.T. Senior Consultant Reviewed by: Jeremy M. Orr, P.E., C.W.I. Principal Engineer - Manager Purchase Order Number: CU ATS Job Number: Page 1 of 10
2 Table of Contents Table of Contents General Information, Background, Equipment Orientation and Access Page 3 Present Condition and Analysis Page 4 Action Items Page 6 Future Inspections, Personnel Qualifications and Reference Industry Codes and Standards Page 7 Photographs Page 8 Appendix A: NDE Report Appendix B: Calculations Page 2 of 10
3 General Information, Background, Equipment Orientation and Access Design Pressure Design Temperature Operating Pressure Operating Temperature Contents Specific Gravity Shell Height / Length Diameter Manufacturer Year Constructed Serial Number UL Number Material Previous Inspection Drawing(s) NDE Performed by Background Unknown Unknown Atmospheric Ambient Diesel Fuel 1.0 (Used for calculations) 4 feet 4 feet Unknown Unknown Not applicable Not applicable Unknown Stainless Steel None None George Matthews (VT) Peter Dudley / Joey Laprade (UTT) Overall View This report contains the results of the inspection, analysis and action items regarding the CURI Pierside Stainless Steel Diesel Tank. The inspection included an external visual inspection and applicable NDE to the accessible portions of the tank. Equipment Orientation The zero references as discussed in this report were as follows: The tank was oriented beginning with 0 at the top of the shell as viewed from the North Head and progressing to 360 in a counter-clockwise direction (refer to the roll-out in Appendix A). All nozzles and manways were individually oriented with 0 at the top of the individual nozzle and manway necks (towards the top of the tank) and progressed to 360 in a counterclockwise direction. Equipment Access No access equipment was required for the inspection. Page 3 of 10
4 External Present Condition Present Condition and Analysis Minor mechanical damage and staining near the weld seams was observed throughout. Minor general surface corrosion was observed at areas of coating failure on the support system. No visible deterioration or damage was observed on the normal vent at nozzle N4. The normal vent was observed to be necked down to 1/2 from the 2 threaded connection. An emergency vent was not observed. A possible leak was observed at the threaded connection of nozzle N2. A grounding cable was not located. Analysis The tank was analyzed as STI SP001 Category 3 for the operating parameters as provided by the client. A possible leak was observed at nozzle N2. Emergency venting provisions were not met. The existing normal vent does not satisfy the normal venting requirements of UL 142. The tank required a NPS 3 or larger emergency vent, per UL 142. A summary of the ultrasonic thickness measurements is located in the Summary of Measurements table that immediately follows. The completed NDE Report is located in Appendix A. The calculations summary is located in Appendix B. Calculated minimum required thicknesses are exclusive of any corrosion allowance. Page 4 of 10
5 Summary of Measurements Present Condition and Analysis Component East Head Shell West Head Previous Average Minimum Minimum Required Corrosion Rate (inches/year) Remaining Life (years) Assumed, per STI SP Stainless steel - no generalized corrosion rate in this service. Legend > 10% Above Minimum Required Within 10% of Minimum Required At Minimum Required or Below Page 5 of 10
6 Action Items Action Items The following are the prioritized action items based on the observations and findings at the time of the inspection: No. Item Priority 1 A 3 or larger emergency vent should be installed on the tank, per UL The normal vent at nozzle N4 should be replaced with a vent sized 1 ¼ inches or larger The leak at nozzle N2 should be verified and corrected as necessary. 2 Priority 1 Priority 2 Priority 3 Legend High likelihood and consequence of failure. Critical Code or Standard deficiency. May not be fit for continued service without repair. Medium likelihood and consequence of failure. Low likelihood and consequence of failure. Non-critical Code or Standard deficiency. Industry best practice or preventative maintenance. Housekeeping items. Page 6 of 10
7 Future Inspections, Personnel Qualifications and Reference Industry Codes and Standards Future Inspections Per STI SP001 Table 5.5 for Category 3 tanks, the tank should be externally re-inspected and leak tested in 10 years. The tank should be periodically inspected by a competent person, according to the guidelines in STI SP001 Section 6. According to the Clemson University Spill Prevention Control and Countermeasure (SPCC) Plan, the tank should be re-inspected within 10 years. Personnel Qualifications Jeremy M. Orr SC PE # GA, AL, ME, FL, LA, TX, SC, CA registered Professional Engineer; Mechanical Engineer with 13 years experience in inspection, evaluation, repair and design in various industries; AWS CWI, API 653 / 510 / 570 / 580 / 571/ 577 certified; STI certified inspector; NACE coating inspector level I certified; ASNT certified level II VT; SPRAT level I certified rope access technician; ATS certified Level II UTT, MT, PT, VT per SNT-TC- 1A; active member of TAPPI, AWS, NACE International, ASME George E. Matthews GA Registered Engineer-in-Training, Mechanical Engineer with 3 years experience in inspection, evaluation, repair and design in various industries Jesse B. Showalter GA Registered Engineer-in-Training, Mechanical Engineer with 3 years experience in inspection, evaluation, repair and design in various industries Peter Dudley Joey Laprade Reference Industry Codes and Standards ATS certified Level II UTT, MT, PT per SNT-TC-1A ATS certified Level II UTT, MT, PT per SNT-TC-1A Clemson University, Spill Prevention Control and Countermeasure Plan STI SP001, Standard for the Inspection of Aboveground Storage Tanks UL 142, Steel Aboveground Tanks for Flammable and Combustible Liquids Page 7 of 10
8 Photographs Photo 1: Overall view of the tank. Page 8 of 10
9 Photographs Photo 2: View of the East Head. Page 9 of 10
10 Photographs Photo 3: View of nozzle N2. Page 10 of 10
11 Appendix A: NDE Report External Visual Inspection: Component Condition / Comments East Head Minor mechanical damage was observed. Staining was observed near weld seams. Shell Minor mechanical damage was observed. Staining was observed near weld seams. Insulation / Coating None. West Head Minor mechanical damage was observed. Staining was observed near weld seams. Floor Plate Extension Not applicable. Nozzle / Manway / Repad Nozzle N2 was observed with a possible leak at the threads. Otherwise, no visible deterioration or damage was observed. Relief / Vent Jacket / Coils Weld Seam No visible deterioration or damage was observed. Not applicable. Minor staining near weld seams. Support System Minor general surface corrosion was observed at areas of coating failure. Anchor Bolt / Saddle / Lug Grounding Cable Minor general surface corrosion was observed at areas of coating failure. None located. Notes: ATS460, 4/18/12 Pierside Stainless Diesel Tank Calcs.xls
12 Appendix A: NDE Report Rollout / Nozzle Locations (NOT TO SCALE): End View: (AS SEEN FROM THE SIDE) East Head: West Head: Shell: Plan View: ATS460, 4/18/12 Pierside Stainless Diesel Tank Calcs.xls
13 Appendix A: NDE Report Ultrasonic Measurements: East Head: Distance Across (feet) Minimum Required 0 to 180 Minimum 90 to 270 Minimum Legend > 10% Above Minimum Required Within 10% of Minimum Required At Minimum Required or Below ATS460, 4/18/12 Pierside Stainless Diesel Tank Calcs.xls
14 Appendix A: NDE Report Ultrasonic Measurements: West Head: Distance Across (feet) Minimum Required 0 to 180 Minimum 90 to 270 Minimum Legend > 10% Above Minimum Required Within 10% of Minimum Required At Minimum Required or Below ATS460, 4/18/12 Pierside Stainless Diesel Tank Calcs.xls
15 Appendix A: NDE Report Shell Ultrasonic Measurements: Elevation (feet) Minimum Required 0 Minimum 90 Minimum 180 Minimum 270 Minimum Legend > 10% Above Minimum Required Within 10% of Minimum Required At Minimum Required or Below ATS460, 4/18/12 Pierside Stainless Diesel Tank Calcs.xls
16 Appendix A: NDE Report Nozzles / Manways / Reinforcement Ultrasonic Measurements: Notes: A Threaded Nozzle NPS Elevation Nozzle 0 Scan 180 Reinforcement Pad Width Internal Projection N A A A None N/A Unknown N A A A None N/A Unknown N A A A None N/A Unknown N A A A None N/A Unknown N A A A None N/A Unknown N6 2 0 A A A None N/A Unknown N7 2 0 A A A None N/A Unknown ATS460, 4/18/12 Pierside Stainless Diesel Tank Calcs.xls
17 APPLIED TECHNICAL SERVICES, INCORPORATED Corporate Headquarters 1049 Triad Court, Marietta, Georgia Fax APPENDIX B: CALCULATIONS SUMMARY UL 142: MINIMUM THICKNESS (s.g. less than or equal to 1.0) Horizontal Construction (with flat heads) Actual Capacity = 376 U.S. gallons (calculated) Minimum Design = in. (per UL 142, Section 13) STI Min. Required = in. (per STI SP001, Section 10) Per STI SP , the minimum required thickness for Category 3 tanks is 75% of the original construction thickness. The original construction thickness for this tank was assumed to be 0.109" (12 gauge) based on measuring an uncorroded area per STI SP The minimum required thickness was calculated as 75% of that value. Where: D = Diameter of Tank (ft.) = 4.00 L = Length of the Tank (ft.) = 4.00 (cannot be greater than 6 times D) UL 142: VENTING Actual Capacity = 376 U.S. gallons Wetted Surface Area (horizontal) = 57 ft 2 (assumes flat heads) Normal Venting Minimum Opening = 1 1/4 NPS (per Table 8.2) A vent opening must be in addition to the fill, withdrawal and liquid level gauge openings. The normal vent must be at least as large as the filling or withdrawal connection, whichever is larger. Emergency Venting Horizontal Minimum Opening = 3 NPS (per Table 8.1) Emergency vents are not prohibited from use for normal venting. The pipe size applies to lengths of not more than 12 in. Page 1 of 2
18 APPLIED TECHNICAL SERVICES, INCORPORATED Corporate Headquarters 1049 Triad Court, Marietta, Georgia Fax APPENDIX B: CALCULATIONS SUMMARY UL 142: SADDLES The tank was supported by non-standard saddles. The geometry of the saddles could not be analyzed without performing a finite element analysis (FEA). No damage to the tank shell was observed at the saddle attachment locations. Page 2 of 2
Regulated Oil and Gas Companies under National Energy Board Jurisdiction
File 185-A000-41 8 August 2003 Regulated Oil and Gas Companies under National Energy Board Jurisdiction Dear Sir / Madam: Guidance Notes for Pressure Equipment under National Energy Board Jurisdiction
More informationMSC Guidelines for Pressure Vessels
References: a. 46 CFR Part 54 Pressure Vessels S. T. Brady, CDR, Chief, Engineering Division b. ASME Boiler and Pressure Vessel Code (BPVC), Section VIII, Division 1, (1998 Edition) c. Navigation and Inspection
More informationMSC Guidelines for Independent Fuel Tanks
References: Contact Information a. 46 CFR 58.50 (Independent Fuel Tanks) b. 46 CFR 119.440 (Independent Fuel Tanks) c. 46 CFR 182.440 (Independent Fuel Tanks) C. J. Robuck, LCDR, Chief, Engineering Division
More informationWHEATLEY Series 500 Swing Check Valve
Document Number: TC003001-13 Revision: 02 WHEATLEY Series 500 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...5 INSTALLATION AND OPERATION
More informationPIP PNE00012 Piping Examination and Leak Test Guide
October 2017 Piping PIP PNE00012 Piping Examination and Leak Test Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has
More informationFOAM TANK (1/2) DATA SHEET
FIRE FIGHTING EQUIPMENT DATA SHEET FOAM TANK (1/2) DATA SHEET JOB NO. : RFQ. NO. : ISSUE : SHEET OF 01 CUSTOMER : ITEM NO. : 02 PROJECT : QUANTITY : 03 LOCATION : SERVICE : FOAM SYSTEM 04 05 CODE & STANDARDS
More informationVertical and Horizontal Bladder Tanks
DATA SHEET Vertical and Horizontal Tanks Application The ANSUL bladder tank is one component in a balanced pressure proportioning system. Its operation requires no external power other than a pressurized
More informationPRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:
PRESSURE RETEST 49 CFR, 180.407(g) Co#: Vin#: Spec: MAWP: Retest Date: Location: *External Inspection Performed: *Internal Inspection Performed: Test Pressure: psig Held for: min. (Must be at least 10
More informationSHOP WELDED TANKS STANDARD CONNECTIONS
STEEL WELDED TANKS Tanks are constructed using 3/16 and ¼ inch A36 material. Welding and testing are performed according to API 12F specifications. Shop welded tanks are also available in special sizes
More informationCERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION
CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION I, the undersigned, being experienced and competent in the applicable field of design related to pressure vessel requirements relative to
More informationInstallation, Operation and Maintenance Manual for Back Pressure Regulator
Installation, Operation and Maintenance Manual for Back Pressure Regulator Model 8860 2009 Groth Corporation IOM-8860 Rev. B 12541 Ref. ID: 95565 Page 2 of 13 Table of Contents I. INTRODUCTION 3 II. DESIGN
More informationFLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS
CHAPTER 35 FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS SECTION 3501 GENERAL 3501.1 Scope. The storage and use of flammable gases shall be in accordance with this chapter. Compressed gases shall also
More informationINNOVATIVE ENGINEERING SUPERIOR SERVICES. Robotic Online Storage Tank Floor Inspection Services
INNOVATIVE ENGINEERING SUPERIOR SERVICES Robotic Online Storage Tank Floor Inspection Services Storage Tank Floor Condition Assessment Without Taking Tanks Out of Service Eliminate the high cost of tank
More informationSection 6. Inspection, Evaluation and Testing. (as applicable to APSA tank facilities)
Section 6 Inspection, Evaluation and Testing (as applicable to APSA tank facilities) Inspections and Testing Summary Two primary requirements for inspecting and testing, and associated recordkeeping 1.
More informationWHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual
WHEATLEY SERIES 500 SWING CHECK VALVE STANDARD INTEGRAL SEAT & OPTIONAL REMOVABLE SEAT 2" FP - 6" FP 150# - 1500# 8" FP - 12" FP 150# - 900# API 6D and B16.34 2" FP - 4" FP 5000# DRILLING PRODUCTION VALVE
More informationDIVER INSPECTION REPORT Canyon South, Raw Water Tank
City of Glenwood Springs 101 West 8th Street, Glenwood Springs, CO 81601 DIVER INSPECTION REPORT Canyon South, Raw Water Tank 10.23.2012 250,000 Gallon on-grade WELDED STEEL RESERVOIR Summary of Contents:
More informationDesign of Pressure vessel for the Hydrocarbon release from the Vent Header Lines
Design of Pressure vessel for the Hydrocarbon release from the Vent Header Lines Bhargav Mangesh Joshi 1 1Student, Department of mechanical engineering, Modern college of engineering, Pune-5 ---------------------------------------------------------------------***---------------------------------------------------------------------
More informationHEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS
Page 1 of 15 1.0 PURPOSE 1.1. Axiall, Plaquemine Complex, has developed this Hot Tap Permit Program to eliminate potential accidents, injuries, and to enhance employee protection. 1.2. To provide for the
More informationInstallation Operation Maintenance
682 Seal Cooler New generation seal cooler to meet and exceed the seal cooler requirements stated in the 4th Edition of API Standard 682 Installation Operation Maintenance Experience In Motion Description
More informationHorizontal Bladder Tanks
DATA SHEET Horizontal Bladder Tanks Features UL Listed and FM Approved for use with various ANSUL proportioners and foam concentrates 175 psi (12.1 bar) maximum allowable working pressure (design pressure)
More informationMLS Series Liquid Level Switches. Installation and Operations Manual Section 15
MLS Series Liquid Level Switches Installation and Operations Manual 00-02-0730 2012-11-11 Section 15 In order to consistently bring you the highest quality full featured products, we reserve the right
More informationSTANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)
STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) TEE (HOT TAPPING MATERIAL) S-04-02-040 Page 1 of 7 1.0 SCOPE This specification covers the basic requirements for the design, manufacture and supply
More informationVERTICAL BLADDER TANK
Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Tight Spaces UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure
More informationGUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS
Page 1 of 5 GUIDELINES FOR CONDUCTING 1. Definition of Hydrogenation and Hydrogenolysis Reactions Hydrogenation reactions are synthetic transformations involving hydrogen, metallic catalysts (such as nickel,
More informationACME Energy. Orlando, FL. OUT-OF-SERVICE Inspection Report For. Propane Tank. Tank Farm
Report No.: 11033.033.1 Inspector: Jeff Walling Employer: Eagle Inspection Inspection Date: 5/26/2011 ACME Energy Orlando, FL OUT-OF-SERVICE Inspection Report For Propane Tank 0480 Tank Farm An API Standard
More informationINSPECTION OF RECOVERY BOILERS
INSPECTION OF RECOVERY BOILERS W. B. A. (Sandy) Sharp SharpConsultant, Columbia, Maryland, U.S.A. TAPPI Kraft Recovery Short Course St. Petersburg, Florida, January 7-10, 2008 OUTLINE Purpose of inspections
More informationHORIZONTAL BLADDER TANK
Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Low Ceilings UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure
More informationSABERINDO PACIF SABERINDO PACIFIC CIFIC SABERINDO PA. A Tyco International Company
CIF A Tyco International Company 1 Foam Concentrate CIF 3% AFFF -UL Listed -UL Canada Listed 6% AFFF 6 parts AFFF concentrate to 94 parts water -UL Listed- Foam Liquid -UL Canada Listed 3% FLUOROPROTEIN
More informationAmerican Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM
American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1003 - REVISED: 2009 Water Pressure Reducing Valves for Domestic Water Distribution Systems MANUFACTURER: CONTACT
More informationFLAME ARRESTOR MODEL L76C-UF
FLAME ARRESTOR MODEL L76C-UF Model L76C-UF The L76C-UF model is designed to inhibit flame propagation in gas piping systems and to protect low pressure tanks containing flammable liquids. Arrestors protect
More informationBODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION May and September, 2017 and January 2018 (Replaces May 2016) API Authorized Pressure Vessel Inspectors must have a broad knowledge
More informationTECHNICAL DATA. Q = C v P S
Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler
More informationTitle: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.
Preparer: Team Member, North America, Process Safety Center of Expertise No.: BC032.020 Page: 1 of 7 Owner: Manager, North America Process Safety Center of Expertise Approver: Sr. Vice President, Ecology
More informationCONDITION ASSESSMENT REPORT
CONDITION ASSESSMENT REPORT ALAMEDA ISLES PROPERTY ASSOCIATION - SMALL CRAFT HARBOR PREPARED BY: 564 AVALON PARK BLVD. E., SUITE 1 # 111 ORLANDO, FLORIDA 88 C.O.A. # 876 SCES Job No.: 106.05-15 MAY 015
More informationAPI-510 PRESSURE VESSEL INSPECTOR
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION July 2013 (Replaces July 2012) API Authorized Pressure Vessel Inspectors must have a broad knowledge base relating to maintenance,
More informationPRESSURE TANKS HANDLING & INSTALLATION INSTRUCTIONS INSTALLATION MANUAL CONTROL VALVES
PRESSURE TANKS HANDLING & INSTALLATION INSTRUCTIONS CONTROL VALVES INSTALLATION MANUAL TABLE OF CONTENTS Receiving & Handling 3 Basic Handling Continued 4 Approved Lifting Methods 5 Installing Pressure
More informationHealth and Safety at Work (Hazardous Substances Reduced Secondary Containment for Certain Above Ground Stationary Tanks) Safe Work Instrument 2017
Health and Safety at Work (Hazardous Substances Reduced Secondary Containment for Certain Above Ground Stationary Tanks) Safe Work Instrument 2017 This safe work instrument is approved under section 227
More informationTECHNICAL DATA. Q= Cv S
Page 1 of 13 1. DESCRIPTION The Viking 4 inch Model G-4000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry
More informationTechnical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure
Technical Standard API6D Ball & Plug Valve Inspection & Test Procedure 1 Scope This standard provides specific inspection items to be performed on all ball & plug valves. The valves shall be provided with
More informationTesting Procedures of Watertight Compartments
(1996) (Rev.1 Feb 2001) (Rev.2 May 2001) (Rev.3 May 2010) (Rev.4 Aug 2012) Testing Procedures of Watertight Compartments.1 Application Revision 4 of this UR is to be complied with in respect of the testing
More informationAPPS-160 Gen 2 User Manual
APPS-160 Gen 2 User Manual Applicable Products: PN 11914406 - APPS-160 10 to 50 PSIG operating pressure PN 11918618 - APPS-160 40 to 85 PSIG operating pressure Rev 9/16/2004 Chart Ind. www-chart-ind.com
More informationInstallation, Operation, & Maintenance Manual NX Seal Cooler
Installation, Operation, & Maintenance Manual NX Seal Cooler 1 1. INTRODUCTION 1.1 About this Manual This manual is intended to ensure a safe installation and operation of the NX sealcooler. All involved
More informationDEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers
g DEH 40050 Instructions Three-Phase, Platform-Mounted Distribution Transformers Introduction The equipment covered by these instructions should be operated and serviced only by competent technicians familiar
More informationTHE PROCESS OF JOINT INTEGRITY
BOLTED JOINTS A.333 THE PROCESS OF JOINT INTEGRITY To assist in managing a process, ask yourself the following questions: why, what, who, and how? Why do we need a Flange Joint Integrity program? This
More informationFOAM TANK (1/2) DATA SHEET
FIRE FIGHTING EQUIPMENT DATA SHEET FOAM TANK (1/) DATA SHEET JOB NO. : RFQ. NO. : ISSUE : SHEET OF 01 CUSTOMER : ITEM NO. : 0 PROJECT : QUANTITY : 0 LOCATION : SERVICE : FOAM SYSTEM 0 05 CODE & STANDARDS
More informationHigh Pressure Iron (HPI) Recertification Guidelines & Procedures
Page 1 of 5 HPI Shop 6201 Andrews Hwy Odessa, Tx 79762 Ph: 432-362-1818 Fx: 432-362-3118 Howard Supply Company www.howard-supply.com High Pressure Iron (HPI) Recertification Guidelines & Procedures Page
More informationTECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY
Page 1 of 13 1. DESCRIPTION The Viking 3 Model G-3000 Dry Valve Riser Assembly is equipped with a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry
More informationFlange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing
Flange Bolt Torquing for Resistoflex Plastic-Lined Piping Products Torquing When assembling flange connections, always use a full complement of clean, new high strength A193-B7 bolting. If using stainless
More informationModel MTB-ASME Horizontal Bladder Tanks
DATA SHEET Model MTB-ASME Horizontal Bladder Tanks Features n UL Listed and FM Approved for use with various proportioners and foam concentrates n 175 psi (12.1 bar) maximum allowable working pressure
More informationRules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)
Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) December 5, 1994 TM Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on
More informationTECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13
Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler
More informationDate of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1
Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Page 16, Section 4.6, delete the entire section and renumber all subsequent
More informationTHE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)
THE BP-301 SERIES Operating and Service Manual Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) Issue B October 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation...
More informationVertical Bladder Tanks
DATA SHEET Vertical Bladder Tanks Features UL Listed and FM Approved for use with various ANSUL proportioners and foam concentrates 175 psi (12.1 bar) maximum allowable working pressure (design pressure)
More informationAnnex G (normative) Requirements for Nondestructive Examination
Purchase API Spec online at http://www.techstreet.com/api Annex G (normative) G.1 General Requirements for Nondestructive Examination This annex specifies the requirements for NDE that shall be performed
More informationUse equation for the cylindrical section and equation or for the ends.
Solution 13.1 See section 13.3.4, equations 13.7 to 13.18 Solution 13.2 Use equation 13.34. (a) rigid constant C = 0.43 (b) free to rotate, C = 0.56 Solution 13.3 See section 13.5.1 Use equation 13.39
More informationTECHNICAL DATA. Q = C v P S
Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction
More informationWATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity
WATER HEATER THERMAL EXPANSION TANKS Owner s Manual Safety Instructions Installation Maintenance Warranty Models: 2-5 Gallon Capacity Thank You for purchasing this Thermal Expansion Tank. Properly installed
More informationDESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE
February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically
More informationStandard Pneumatic Test Procedure Requirements for Piping Systems
the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...
More informationTABLE OF CONTENTS PART 2 - CONFINED SPACES
May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3
More informationDraft. Not yet Approved
201178 Part 12.5.20 Recommended Safety Instructions for LP-Gas Winter Switch Protection Devices Revised 201178 (6 Pages) A. Purpose 1. This Manual Part recommends instructions for LP-Gas systems servicing
More informationCORPORATE SAFETY MANUAL
CORPORATE SAFETY MANUAL Procedure No. 32-0 Revision: Date: May 2005 Total Pages: 10 PURPOSE To provide general guidelines for the inspection of all ropes, chains, cables, slings, etc. used for personnel
More informationOBSOLETE. Wet pipe low flow manifold system
June 1, 2008 Foam 15a 1. Description Multiple risers can be supplied from a single proportioning device. A riser manifold is installed with various riser types and sizes that are to supply foam solution
More informationEast Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (ELEVENTH REVISION)
East Building, PHH-30 U.S. Department 1200 New Jersey Avenue S.E. of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 11808 (ELEVENTH REVISION) EXPIRATION
More informationP-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints
Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS
More informationRegulations Respecting Compressed Gas Pressure Vessels
COMPRESSED GAS PRESSURE VESSELS SR 99/70 1 Regulations Respecting Compressed Gas Pressure Vessels Repealed by Chapter B-5.1 Reg 1 (effective January 1, 2007) Formerly Saskatchewan Regulations 99/70 (effective
More informationPTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump
Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S
SPECIFICATIONS - DETAILED PROVISIONS Section 15103 - Butterfly Valves C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 VALVE MANUFACTURER... 1 1.03 GUARANTEE... 1 PART 2 - PRODUCT... 1
More informationTECHNICAL DATA OBSOLETE
June 1, 2008 Foam 240a 1. DESCRIPTION The Chemguard Bladder Tank is one component in a balanced pressure foam proportioning system. It requires no external power, other than the water pressure to ensure
More informationAPI 575 Study Guide. API 653 Cert Prep
JJ This following is a Study Guide that you can use to help you learn the details and content of API RP-575, Inspection of Atmospheric and Low-Pressure Storage Tanks (3 rd Edition-2014). There will be
More informationOperating Procedures for GripTight 15.5 SDR & IPS Test Plugs
EST Group DC2518 08/01 REV 3 12/12 Page 1 of 6 Operating Procedures for GripTight SDR & IPS Test Plugs WARNING For proper operation, GripTight plugs must be assembled as shown in Figure 1. Pressure testing
More informationOther Si min/max. Cr min/max. 0.4/ / / / Bal.
178.46 Specification 3AL seamless aluminum cylinders. (a) Size and service pressure. A DOT 3AL cylinder is a seamless aluminum cylinder with a imum water capacity of 1000 pounds and minimum service pressure
More informationAmerican Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM
American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1048 - REVISED: 2009 Double Check Detector Fire Protection Backflow Prevention Assemblies Separate, complete laboratory
More informationWHEATLEY Series 822/820 Swing Check Valve
Document Number: TC003001-12 Revision: 02 WHEATLEY Series 822/820 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...4 INSTALLATION AND OPERATION
More informationCompany Profile.. About Sammi Machinery
Company Profile.. About Sammi Machinery What is Line Blind Valve? Line blinding has been used to pipe lines in various indutries wherever either positive shut-off is most concerned or full flow should
More information5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS
5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS 23 24 5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS INSPECTING, FILLING AND LABELING SMALL CYLINDERS Pre-fill Visual Check Safely inspecting
More informationTECHNICAL DATA. Q = C v P S
January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated
More informationModel MTB-ASME Vertical Bladder Tanks
DATA SHEET Model MTB-ASME Vertical Bladder Tanks Features n UL Listed for use with various proportioners and foam concentrates n 175 psi (12.1 bar) maximum allowable working pressure (design pressure)
More informationWELCOME to CAUx Local India 2018
WELCOME to CAUx Local India 2018 Flange Design In Detail Prepared by Sachin Pol and Fauzan Badiwale Some Typical Flange Images 3 Some Typical Gasket Images 4 Flange Design As Per ASME Sec.VIII Div.1 Mandatory
More informationLiquefied gas cargo tanks and process pressure vessels
.1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant
More information2018 Spring Refining and Equipment Standards Meeting
2018 Spring Refining and Equipment Standards Meeting April 16-19, 2018 Sheraton Seattle Hotel Seattle, Washington www.api.org/meetings Current as of March 25, 2018 Subject to change SOME Pre- & Post-Week
More informationType Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions
Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions 1 Scope This standard specifies the requirements and acceptance criteria (100 ppmv) for fugitive emission type testing
More informationRUPTURE HAZARD OF PRESSURE VESSELS
United States Office of Solid Waste EPA 550-F-97-002a Environmental Protection and Emergency Response Agency (5104) RUPTURE HAZARD OF PRESSURE VESSELS The Environmental Protection Agency (EPA) is issuing
More informationModel MTB-ASME Vertical Bladder Tanks
DATA SHEET Model MTB-ASME Vertical Bladder Tanks Features n UL Listed for use with various proportioners and foam concentrates n 175 psi (12.1 bar) maximum allowable working pressure (design pressure)
More informationNotice for Pressure Special Equipment Manufacture Licensing
AQSIQ Notice No.151 (2012) Notice for Pressure Special Equipment Manufacture Licensing To further enhance the implementation of the manufacture licensing system to imported pressure special equipment,
More informationACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS
ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor,
More informationTECHNICAL DATA. Q = C v P S
January 6, 2012 Preaction 347a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated
More informationFM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate
December 6, 2010 Foam 21a 1. Description With Multiple Foam/Water Deluge Systems Supplied by a Bladder Tank, multiple deluge foam risers can be supplied from a single foam concentrate source. Where a bladder
More informationGeneral Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC
United States Environmental Protection Agency RCRA Programs Branch Region IV Atlanta, GA CAA/RCRA Air Rules 27 November 2000 General Inspection Guidance for Waste Management Units Requiring Air Emission
More informationINSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE
INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE MODELS RV-1 RV-2 RV-2CP RV-3 DRAWING NUMBERS AD017A[ ] AD018A[ ] AD020A[ ] AD282BO MANUAL NUMBER IOM-033 REVISION Rev. E, 3/28/2016 TABLE
More informationPressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"
F. INTERPRETATION OF THE ESSENTIAL SAFETY REQUIREMENTS ON MANUFACTURING Guideline F-01 Guideline related to: Annex 1 Section 3.1.2 According to section 3.1.2 (permanent joining) of Annex I, the third party
More informationTECHNICAL DATA. Q = C v P S
January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete
More informationPRODUCT GUIDE Spring 2015
PRODUCT GUIDE Spring 2015 A COMPANY FOUNDED ON SERVICE During his 35 year tenure in the compressed gas and welding supply business, George Bennett identified service as the core value that leads to success.
More informationUn-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs
Un-Pressurized Orefice Fittings FIO EZ Parts List and Operation Instructions TECHNICAL MANUAL Dn 2-6 Class 150-600 Lbs US US 2 FIO EZ - MT 108-US - 05-2016 FIO EZ Important Instructions US Pietro Fiorentini
More informationTECHNICAL DATA. Q = C v P S
January 6, 2012 Preaction 333a 1. Description Viking supervised Surefire Preaction Systems Utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated Viking G-3000P Valve comes complete
More informationCoke drum Monitoring & Inspection for Fatigue Life and Safety Improvement
Coke drum Monitoring & Inspection for Fatigue Life and Safety Improvement Amish B. Jani Asstt Vice President (Corrosion & Inspection), 2012 Coking.com, Ft. McMurray, Canada Presentation Tej Chadda Chief
More informationSAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER
SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SUPPLIMENT TO eom IMPORTANT READ THIS MANUAL BEFORE PRODUCT INSTALLATION, OPERATION, INSPECTION & MAINTENANCE Tougher and more rigid guidelines are being established
More informationBVM CORPORATION TYPE AAX TONG 55,000 FT/LBS. TORQUE Part number: Serial Number:
BVM CORPORTION TYPE X TONG 55,000 FT/LBS. TORQUE Part number: Serial Number: WRNING: Manual tongs which have experienced excessive wear or are found to have cracks should be replaced or repaired by BVM
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More information