Document No.: OPS09.1A Issue: Page Rev.: 1 Page: 41 of 205 Date: July 2009 EMERGENCY PROCEDURES PLAN SITE A

Size: px
Start display at page:

Download "Document No.: OPS09.1A Issue: Page Rev.: 1 Page: 41 of 205 Date: July 2009 EMERGENCY PROCEDURES PLAN SITE A"

Transcription

1 Document No.: OPS09.1 Page: 41 of 205 now send out the LL CLER and reset all stations to the digital display EVCUTION If necessary, the Site B Technicians should evacuate the Site B Control Room to a safe location (either on-site or off-site), taking with him/her if available:- Vopak Terminals ustralia two-way radio Personnel and Vehicle Movement Logs. 6.4 WHRF EMERGENCY NOTE: n emergency warning signal consisting of a flashing light and siren is located on top of the wharf shelter. On seeing or hearing the warning signal all transfer operations must stop immediately. (Refer ppendix.9 SPC Emergency Warning Signal) This section has been prepared to include relevant details from the Port Botany Emergency Plan, the SPC Bulk Liquids Berth Emergency Shutdown Procedure (refer ppendix B.11), and the SPC Ship/Shore Checklist Fire Instructions (refer ppendix B.12) PERSON DISCOVERING FIRE OR HZRDOUS SITUTION T THE WHRF MUST: VOPK TERMINLS USTRLI OPERTIONS PERSONNEL: a) INITITE THE EMERGENCY WRNING SIGNL by pressing the emergency warning signal button located on the inside or outside of the Wharf Shelter. b) IMMEDITELY STOP LL WORK. If a shipping transfer is occurring INSTRUCT THE SHIP (OR TERMINL) TO STOP PUMPING and then CLOSE WHRF LINE BLOCK VLVES at the Vopak manifold. c) NOTIFY the Vopak Terminals ustralia Security Officer and Terminal Operations personnel by two-way radio. d) NOTIFY the SPC Port Officer (SSO). e) MINTIN CLOSE TWO-WY RDIO COMMUNICTION with the Vopak Emergency Controller or TEMO (or other Terminal Operating personnel), who will activate the Terminal Emergency Procedures Plan to

2 Document No.: OPS09.1 Page: 42 of 205 provide assistance and take appropriate action to close all necessary valves to isolate wharf to Terminal pipelines and tanks. f) EVCUTE the wharf and CLOSE ISOLTING VLVES IN THE CULVERT. g) SSEMBLE at the EMERGENCY SSEMBLY RE, if accessible and safe, located at the Bulk Liquids Berth (BLB) menities Building and await further instructions. We may be required to stand by to disconnect wharf hoses from the ship VOPK CONTRCTORS, VOPK VISITORS, VOPK NON-OPERTIONS PERSONNEL: a) NOTIFY the Terminal Operations personnel (either Vopak Terminals ustralia or other berth operators) who are operating facilities at the wharf. b) EVCUTE the wharf and SSEMBLE at the EMERGENCY SSEMBLY RE, if accessible, located at the Bulk Liquids Berth (BLB) menities Building and await further instructions PERSON HERING OR SEEING THE EMERGENCY WRNING SIGNL, HERING THE FIRE LRM, OR BEING NOTIFIED OF FIRE OR HZRDOUS SITUTION T THE WHRF MUST: VOPK TERMINLS USTRLI OPERTIONS PERSONNEL: a) IMMEDITELY INSTRUCT THE SHIP (OR TERMINL) TO STOP PUMPING (unless the ship has been notified) and close the wharfline block valve at the Vopak manifold. b) NOTIFY other Terminal Operations personnel by two-way radio (unless they have been notified). c) MINTIN CLOSE TWO-WY RDIO COMMUNICTION with the Vopak Emergency Controller, TEMO (or other Terminal Operating personnel), who will activate the Emergency Procedures Plan to provide assistance and take appropriate action to close all necessary valves to isolate wharf to Terminal pipelines and tanks. d) EVCUTE the wharf and shut isolating valves in the culvert. e) SSEMBLE at the EMERGENCY SSEMBLY RE, if accessible and safe, located at the Bulk Liquids Berth (BLB) menities Building and await further instructions.

3 Document No.: OPS09.1 Page: 43 of 205 We may be required to standby to disconnect wharf hoses from the ship NON-VOPK OPERTIONS PERSONNEL (I.E. VOPK CONTRCTORS, VOPK VISITORS, ETC.): a) STOP WORK IMMEDITELY, turn off or isolate all equipment ND NOTIFY the Terminal Operations personnel (either Vopak Terminals ustralia or other berth operators). b) EVCUTE the wharf and assemble at the EMERGENCY SSEMBLY RE, if accessible and safe, located at the Bulk Liquids Berth (BLB) menities Building and await further instructions. 6.5 PIPELINE CORRIDOR EMERGENCY PERSON DISCOVERING FIRE OR HZRDOUS SITUTION IN THE PIPELINE CORRIDOR: VOPK OPERTIONS PERSONNEL: a) INITITE THE EMERGENCY LRM by immediately CONTCTING THE SENIOR OPERTION TECHNICIN activate the following responses as appropriate: Terminal assistance (internal alert) Emergency Services as required Fire Brigade, mbulance, Police Terminal Fire larm Terminal Evacuation larm Port Botany Emergency Radio & larm System b) IMMEDITELY STOP LL WORK. If a shipping transfer is occurring INSTRUCT THE SHIP (OR TERMINL) TO STOP PUMPING ND TO CLOSE WHRF PIPELINE VLVES at the VOPK WHRF MNIFOLD and at the MIN HOSE EXCHNGE. c) UNLESS DELING WITH THE EMERGENCY, EVCUTE THE PIPELINE CORRIDOR and SSEMBLE at the nearest safe location (or the Vopak Terminals ustralia emergency assembly area) and await further instructions.

4 Document No.: OPS09.1 Page: 44 of OTHER PERSONNEL a) NOTIFY THE SENIOR PERSON T THE WORK SITE (either Vopak Terminals ustralia supervisor or other supervisor) and NOTIFY (via radio or telephone - internal ext. 941, external ) THE SECURITY OFFICER of the emergency situation details. b) EVCUTE THE PIPELINE CORRIDOR (IF NECESSRY) and SSEMBLE at the nearest safe location (or emergency assembly area) and await further instructions PERSON HERING N EMERGENCY LRM OR BEING NOTIFIED OF N EMERGENCY MUST: VOPK OPERTIONS ND OTHER PERSONNEL: a) STOP WORK IMMEDITELY, CLOSE DOWN OPERTIONS, REMOVE LL SOURCES OF IGNITION (i.e. turn off or isolate all power tools, welding machines, equipment, etc. in use). b) SSEMBLE T THE NEREST SFE LOCTION (or emergency assembly areas) where a headcount will be made, and await further instructions.

5 Document No.: OPS09.1 Page: 45 of EMERGENCY RESPONSE & CONTROL INTRODUCTION The main consideration of Emergency Planning is the protection of people, property and the environment from hard during an emergency situation. This is achieved by developing an emergency plan that implements a system able to respond automatically to any emergency and that leads to the most effective outcome possible under the circumstances. The Plan must be dynamic and interactive, ensuring ongoing relevance to the needs of the faulty and all stakeholders by continual monitoring, review and consultation. ll of the stages are inter-related and details of the Plan must be continually evaluated and revised as appropriate. The Vopak Site Emergency Planning process is based on the following illustration. DEFINE IM CONSULTTION DEFINE OBJECTIVES DEFINE PRMETERS DEFINE SYSTEM MNGE SYSTEM MONITOR ND REVIEW The critical part of the preparation of the Plan is that it needs to be preceded by careful planning, based on an appreciation of the hazards and understanding of the possible emergency scenarios, their possible impacts and the availability of emergency response resources both internal and external to the facility.

6 Document No.: OPS09.1 Page: 46 of EMERGENCY ORGNISTIONL STRUCTURE The organisational structure during the initial period of an emergency, and for the particular internal or external alert, shall be: In certain circumstances the level of emergency may require the activation of the: VOPK USTRLI CRISIS MNGEMENT PLN This plan is integrated with the Terminal Emergency Plans and is primarily intended to manage the business recovery and insurance, media liaison and corporate reporting aspects of a significant emergency situation. FIGURE 7.1: EMERGENCY ORGNISTIONL STRUCTURE The Emergency Controller will be the first available person, as shown on the "List of uthorised Company Personnel for Emergency Controller and TEMO (Terminal Emergency Management Officer)" (refer ppendix B.6). The TEMO will be the second available person, as shown on the list. EMERGENCY CONTROLLER For example: Operations Coordinator TEMO Site Terminal Manager Rescue Evacuation Traffic Control First id Control and Damage Control Communications (Internal & External) The following sections describe the duties and responsibilities of Company Personnel involved in an emergency at this site.

7 Document No.: OPS09.1 Page: 47 of PERSONNEL RESPONSIBILITIES ll personnel must have a sound working knowledge of this plan. ll operating personnel present on the premises will be responsible for the initial local control of the emergency EMERGENCY CONTROLLER This function is to operate at the site of the emergency to co-ordinate and direct Vopak Terminal Emergency Teams. He will provide information and assistance to the Emergency Services at the scene of the emergency. The Emergency Controller, during operational hours, will be the first available person on the "List of uthorised Company Personnel for Emergency Controllers & TEMO s" (refer ppendix B6 List of uthorised Company Personnel Contact List). Outside operational hours the Emergency Controller will be the first person on the list to arrive on site and will remain Emergency Controller until relieved by a more senior person on the list. The Emergency Controller will make certain at all times that the minimum number of people are used during an emergency, and that only those people concerned are at the scene of the emergency. The four most critical keys for prompt control are:- 1. COMMUNICTION - internal alarm systems, then 000 for fire brigade, ambulance and police, Port Botany Radio and larm System. 2. PRESERVTION OF LIFE - evacuate to the assembly area or offsite evacuation. Rescue if risks allow. 3. CONTINMENT 4. COOLING/EXTINGUISHING - With water or foam. Duties & Responsibilities: 1. Obtain two-way radio, obtain and wear Emergency Controller's orange safety helmet and orange vest for easy recognition. (Note: Three sets of safety helmets (ie. Emergency Controller and TEMO) are kept at the Security Office, the Site Terminal Manager s office and the Safety Equipment Shed (near Operations Building). 2. Establish as quickly as possible radio contact with the TEMO

8 Document No.: OPS09.1 Page: 48 of 205 and account for all personnel on site, in particular those in the affected area. 3. Proceed directly to the site of the emergency and take direct control of the emergency. Take action as required utilising facilities and personnel. 4. Upon the arrival of the Emergency Services, the Emergency Controller must brief the Officer-in-charge with the following information: a) location and type of emergency b) details of personnel injured or trapped c) action taken to date d) location of all personnel on site e) details of product involved (eg MSDS etc) f) any other relevant information The Emergency Controller will then hand over the responsibilities of directing the emergency operations to the Officer-in-charge of the relevant Emergency Service and will offer whatever assistance may be required. t this stage, the Port Botany Emergency Plan is activated at the discretion of the head of a Combat gency in consultation with the Terminal Emergency Controller. 5. Determine the magnitude of the Emergency and liaise with the TEMO for assistance, as required. 6. Keep TEMO informed of the emergency status. 7. When additional personnel and equipment are available, deploy as necessary. 8. Decide whether to cancel alarm if conditions warrant a cancellation. 9. Decide on the requirements for evacuation of affected area, the entire site and/or from the Port Botany area. 10. Notify as soon as practicable those customers whose products have been involved in the emergency. 11. Liaise with TEMO on release of personnel and equipment during termination stage. 12. Following an emergency, decide, after consultation with the TEMO, emergency services and authorities as appropriate, how/when/if to resume normal operations.

9 Document No.: OPS09.1 Page: 49 of Notify the EP immediately if there has been pollution of the Environment. 14. Decide whether other uthorities need to be informed of the Emergency, eg, Sydney Water, Energy ustralia, Natural Gas Co, WorkCover (Dangerous Goods Branch). 15. llocate personnel if required to do so by an uthority to assist cleaning or containing waste residue resultant from an emergency. 16. t completion of the emergency, hold debriefing meeting and minute all proceedings. 17. Set up a recovery strategy in line with the SPC Port Botany Emergency Plan. 18. Prepare investigation reports and recommendations for actioning. 19. Contact all major clients (and relevant product owners) - refer requirements in Section Revoke all existing Work Permits and re-issue as appropriate. 21. Refer ppendix D.1 Emergency Controller Checklist for guidance TERMINL EMERGENCY MNGEMENT OFFICER (TEMO) The TEMO will assist the Emergency Controller and is responsible for: establishing and coordinating the emergency communications in support of the Emergency Controller and Emergency Services. providing technical assistance providing back-up coordination for the emergency During an emergency the TEMO will be stationed at the Security Office with a Vopak radio (to maintain contact with Vopak personnel at the actual emergency site). The magnitude of the emergency may require the setting up of the Port Botany Emergency Operations Centre (EOC) and activating the Port Botany Emergency Plan. The EOC is located at the Port Services Botany Survey Compound Meeting Room (Inter-Terminal access road off Penrhyn Road). This action is decided by the Police Site Controller or head of a Combat gency. If so, the TEMO must report to the Emergency Operations Centre. The TEMO, during operational hours, will be the second available

10 Document No.: OPS09.1 Page: 50 of 205 person on the "uthorised List of Company Personnel as Emergency Controllers & TEMO s" refer ppendix B.6. Outside operational hours, the TEMO will be the second person on the list to arrive at site, and will remain TEMO until relieved by a more senior person (if available) on the list. The TEMO will utilise the two-way radio situated at the Security Office and establish radio contact with the Emergency Controller. Duties & Responsibilities: 1. Obtain two-way radio, obtain and wear the TEMO's orange safety helmet and orange vest for easy recognition. (Note: Three sets of safety helmets (ie Emergency Controller and TEMO) are kept at the Security Office, the Site Terminal Manager s Office, and the Safety Equipment Shed (near Operations Building). 2. Set up emergency control centre in the Security Office. 3. Immediately establish radio contact with the Emergency Controller and confirm the level of emergency. 4. Meet all requests and obtain all information for the Emergency Controller. 5. s people become available, advise the Emergency Controller who may direct them to duties as required. 6. llocate Vopak personnel as necessary to assist the Security Officer in performing his/her duties, e.g. traffic control, telephone system, etc. 7. Notify as soon as practicable all customers whose products have been involved in the emergency (refer customer contractual requirements as appropriate). 8. rrange: - Headcount - First id or Medical help - Security - Telephone manning - Traffic control - Manning of evacuation point, if evacuation is ordered - Handover to the appropriate external emergency services. Notify, as required: (refer ppendix B.1 - Emergency Telephone Log) - Emergency Services - Neighbouring companies and Sydney Ports Corporation

11 Document No.: OPS09.1 Page: 51 of 205 via Port Botany Emergency Radio and larm System. - Government Departments (i.e. N.S.W. EP, WorkCover uthority, etc.) - Prince Henry Hospital - Utilities providers (i.e. Water Board, GL, Sydney Electricity) NOTE: Copies of the checklists are kept in the Security Office - Emergency Information Boards. 9. Should additional personnel be required, the TEMO will arrange for call-ins. 10. rrange for maintenance aid, as required. 11. Ensure that there is constant observation and control of the operation of the fire pumps in the fire water and foam pump house. The person designated to do this must have a two-way radio. 12. t the conclusion of the emergency, call a meeting of operators and contractor personnel, and as appropriate, Emergency Services and relevant authorities, to discuss the start-up procedure. 13. For guidance, refer ppendix D.2 TEMO Checklist NOTE: ll work permits should be revoked and must be renewed before work recommences DURING NORML HOURS THE SECURITY OFFICER ROLE IS FUNCTION OF THE LOGISTICS CO-ORDINTOR OR HIS DELEGTE. DURING OTHER HOURS THE SECURITY ROLE IS FUNCTION OF THE SENIOR OPERTIONS TECHNICIN ON SITE. The Security Officer is responsible for contacting the Emergency Controller and TEMO, contacting emergency services for all emergencies, contacting neighbouring companies and SPC (via Port Botany Emergency Radio and larm System), and for contacting the Contract Security Company Security Centre for after operational hours emergencies. The Security Officer is also responsible for site security and to control movement through the main gate. Only properly authorised personnel are to be admitted during an emergency. MEMBERS OF THE PRESS, OTHER NEWS MEDI, ND THE PUBLIC, MUST NOT BE DMITTED. ll media enquires are to be handled by the Managing Director or his nominated media liaison representative.

12 Document No.: OPS09.1 Page: 52 of 205 Note: dditional Vopak personnel may be appointed by the TEMO to assist the Security Officer in his/her duties or the Security Officer may request nearby Vopak personnel to assist. Duties & Responsibilities: 1. On hearing the Fire larm, or being notified of an emergency, stop all traffic from entering the Terminal. Traffic to be parked away from the entrance gate. 2. On receipt of details of emergency, if requested, contact Emergency Services immediately through one of the following (in order of preference): 3. Phone 000 and request appropriate emergency service(s). 4. Using the SPC Port Botany Emergency Radio and larm System to request assistance from BLB and/or neighbouring site to notify the appropriate emergency service(s). 3. Inform the Emergency Controller and TEMO of emergency, if available. 4. If required, activate the Terminal Evacuation larm and evacuate the Security Office taking relevant personnel and truck movement logs. 5. Standby to attend to the phone system, the Port Botany Emergency Radio and larm System, and to inform appropriate authorities or neighbouring companies, as directed by the Emergency Controller or TEMO. 6. If emergency occurs after operational hours, contact the Site Terminal Manager immediately upon discovery of emergency situation. 7. Facilitate the exit of all trucks sent from the emergency area and instruct drivers to park at a safe distance away from the main entrance gate. 8. Two-way radio contact to be maintained between Emergency Controller and TEMO. The TEMO must respond to any requests made by the Emergency Controller. 9. Close traffic and pedestrian gates. Lock one set (exit gate), but leave the other set unlocked. 10. Manually open the security gates using the key provided. (Note: The Logistics staff shall ensure that when they evacuate their office that the two boom gates at the Weighbridge are raised.) 11. Man the gate. Permit access of emergency vehicles and essential personnel. Log all vehicles and personnel entering the

13 Document No.: OPS09.1 Page: 53 of 205 Terminal, enabling a detailed check to be made at the conclusion of the emergency. Personnel admitted to the site must be authorised by the TEMO. 12. KEEP THE TERMINL ENTRNCE CLER T LL TIMES. Direct all vehicles not authorised to enter the Terminal, away from the entry road. 13. Emergency Service vehicles required at the emergency scene, by the Emergency Controller, should be directed to the scene without delay. 14. Emergency vehicles not immediately required at the emergency scene should be marshalled outside the main entrance in Friendship Road. 15. Police are responsible for traffic control on the public road, to keep the roadway clear and spectators away from the Terminal entrance. 16. The emergency situation MUST NOT be discussed with members of the news media or the public. The news media should be directed to await a press release from the Managing Director or his nominated media liaison representative. 17. ttend all other duties as requested by the TEMO. 18. The Security Officer will continue to operate under emergency conditions until instructed to resume normal duties by the TEMO FIRST ID TTENDNT The health and safety of personnel, and provision of First id to the injured, is of prime importance. ll efforts should be directed to caring for the injured. First id ttendant(s) will be designated by the TEMO. Each must be a Vopak employee having a current First id Certificate. The TEMO will also designate an Emergency First id rea(s) where injured persons shall be treated if practicable. This area may, or may not, be the existing First id Centre, depending on the situation. Duties & Responsibilities: 1. The person(s) manning the Emergency First id rea(s) will establish and maintain contact with the TEMO as soon as possible. Radio communication must be used and maintained. 2. The Emergency Controller will arrange for the injured to be sent to the Emergency First id rea(s). If it is necessary for the

14 Document No.: OPS09.1 Page: 54 of 205 First id ttendant to go to the injured person, the TEMO will arrange for manning of the Emergency First id rea(s). The Emergency First id rea(s) are not to be left unmanned during an emergency. If extra help is required, the First id ttendant should contact the TEMO. 3. The First id ttendant will do one of the following, depending on the seriousness of the injury: a) MINOR - render the proper First id and, if practical, return the employee to work. If not practical, allow recuperation time at the Emergency First id rea. b) CHEMICL to render the proper first aid reference to the MSDS of the chemical involved may be required c) OTHER - injuries requiring professional medical treatment. The First id ttendant will call the TEMO to arrange to have the injured person taken to: Prince Henry Hospital, nzac Parade, Little Bay; or Prince of Wales Hospital, High Street, Randwick. When the injury is caused by exposure to a chemical, a copy of the MSDS for the chemical involved will be sent to the hospital with the injured person. The TEMO will arrange immediate access of the ambulance to the Terminal, and have it directed to the proper location. Company vehicles may be used in place of an ambulance if the First id ttendant judges it to be quicker, and the injury allows transport by car. The TEMO will arrange transport. NOTE: The names of any casualties that occur during an emergency must remain confidential TERMINL EMERGENCY TEMS The Terminal Emergency Teams, or Hose Teams, shall be made up of Vopak Staff and Operators as designated at the time of the emergency by the Emergency Controller. Duties & Responsibilities: Under the direction of the Emergency Controller, provide all assistance necessary to control, reduce or stop the cause of the emergency, and to minimise any secondary damage which may propagate the incident. Where necessary, and if safe to do so, carry out search and rescue operations for persons unaccounted for.

15 Document No.: OPS09.1 Page: 55 of EMERGENCY OPERTIONS CENTRE (EOC) The magnitude of the emergency may require the setting up of the Port Botany Emergency Operations Centre (EOC) and activating the Port Botany Emergency Plan. The EOC is located at the Port Services Botany Survey Compound Meeting Room (Inter-Terminal access road off Penrhyn Road). This action is decided by the Police Site Controller or head of a Combat gency. If so, the TEMO must report to the Emergency Operations Centre (EOC). 7.3 PROCEDURES The Vopak Site Emergency Planning process is designed to identify all hazards, which will reasonably be expected to initiate, or contribute to, an emergency. This process involved identifying hazards of several different types:- hazards arising from the Dangerous Goods (generally Class 3) stored in the facility hazards arising from activities or equipment associated with the facility (Loss of Containment (LOC), plant, machinery, transport, electrical), and natural hazards (floods, cyclones, lightning strikes) that could impact upon the safe operation of the facility. Each development stage of Vopak Site included a range of Safety Studies:- Preliminary Hazard nalysis HZOP Final Hazard nalysis Fire Safety Study From these studies a list of potential incidents were derived. It is not feasible, or appropriate, to develop individual systems to respond to every potential incident identified in the above-mentioned hazards identification exercises. screening technique was utilised to produce a representative set of incidents; the screening stops were:- eliminate localised incidents that would not require activation of the emergency plan consolidate incidents that have similar materials, inventories, discharge rates, discharge locations and types of emergency response actions and taking into account the potential impacts, potential escalation and the manner in which a release (LOC) or failure scenario could escalate; and

16 Document No.: OPS09.1 Page: 56 of 205 select one incident to represent each group identified and produce a flowchart for the related emergency response actions GENERL EMERGENCIES GENERL EMERGENCY PLN The sequence of actions to be used in principle for all emergencies is described in ppendix B.1. The General Emergency Flow Chart (ppendix B.1) will be used in emergencies such as:- - Windstorm - Electrical storms - Earthquakes - Bomb threat - Civil disturbance - Terrorism/sabotage - Loss of external services

17 Document No.: OPS09.1 Page: 57 of WHRF EMERGENCY Figure Wharf Emergency Emergency Discovered/Declared Immediately stop work & operations, i.e. stop ship pumping Notify Senior Operations Technician on site and Terminal Operations personnel by twoway radio Terminal Emergency Procedures ctivated or on Standby Notify SPC Support Services Officer Maintain close two-way radio communication Evacuate wharf & shut isolating valves in culvert ssemble at BLB ssembly rea & await instructions (standby to disconnect ship hoses if required) Notify or Call Manager

18 Document No.: OPS09.1 Page: 58 of PIPELINE CORRIDOR EMERGENCY Figure Pipeline Corridor Emergency Emergency Discovered/Declared Immediately stop work & operations, i.e. stop ship pumping and instruct Vopak personnel to shut isolating valves at wharf and Main Hose Exchange Notify Senior Operations Technician on site and Terminal Operations personnel by: two-way radio (or telephone - internal ext. 941, external ph ) Terminal Emergency Procedures ctivated or on Standby Maintain close two-way radio communication Consider consequences of a fire in corridor, impinging onto the site from the site boundary to the pipeline corridor, eg tank cooling, portable monitors Evacuate Pipeline Corridor ssemble at nearest safe location or Vopak ssembly rea(s) and await instructions Notify SPC Port Officer

19 Document No.: OPS09.1 Page: 59 of SPILLGE CONTROL PLN Product spillages or leakages could occur from: - Product Pipelines - Storage Tanks - Transfer Hoses - Road Tankers - Pressure Vessels - Drums - Slops Tanks - Collision of on-site vehicles The spillage or leakage may well occur without an actual fire risk being present. Many of the products stored in the Terminal are non-flammable, i.e. Combustible C1 or C2, Class 6, Class 8, or non-dangerous goods. Some products have the potential to generate a toxic/flammable vapour cloud. It is imperative to ascertain the actual product involved in a spillage or leakage incident as quickly as possible in order to verify if a fire risk, or toxic vapour risk is present. This information is critical in deciding which of the following action plans must be put into place. For spillages or leakage with fire risk and/or a toxic vapour cloud risk refer Figure 7.4. For spillages or leakage without fire risk refer Figure 7.5. Decontamination Procedure The following sets out the procedure to contain and decontaminate areas that have been affected by a loss of containment. - Contain the spill using sand or soil prevent run off into drains and waterways. - Do not allow vapour or liquid to collect and remain in hollows or sumps.

20 Document No.: OPS09.1 Page: 60 of If appropriate cover with foam to reduce vapour. - Use an absorbent (sail, sand or other appropriate material refer to MSDS if necessary). - Collect with clean non-sparking tools and seal in properly labelled drums for disposal. - Dilute residual liquid with water to at least 25:1 (to elevate flash point). - Wash down area with excess water. - If contamination of sewers or waterways has occurred advise local emergency services. - lways wear appropriate protective equipment to prevent skin and eye contact and breathing vapours. NOTE: This plan has been prepared accordance with Vopak Standards Spill Control and Response.

21 Document No.: OPS09.1 Page: 61 of 205 FIGURE SPILLGE OR LEKGE WITH FIRE RISK and/or TOXIC VPOUR CLOUD RISE EMERGENCY LRM CTION FOR TEMO ESTBLISH Source/Type/Product/Quantity ny Injuries/People Trapped CESE ll operations & product movement EVCUTE To Emergency ssembly reas or off site by activating evacuation alarm USE Safety Equipment + PPE Refer Hazchem Code & MSDS ISOLTE Source/Product/Flow EVLUTE TOXICITY & FLMMBILITY OF VPOURS refer MSDS sheets for product and treat accordingly ie, foam, decontaminant, absorbent, or water REMOVE ll remaining sources of ignition CONTIN Spread of product, isolate immediate drainage, close final stormwater isolation valves NOT CONTINED Pump back from downstream pit PREVENT Further escape of product ENSURE Ignition is not possible by foam blanket CTIVTE Fixed fire system to standby BRRICDE ppropriate areas for uthorised Entry for Personnel COMMENCE Decontamination procedure CONSULT Emergency Controller NOTIFY SENIOR OPERTION TECHNICIN ON SITE dvise Location/Nature/Product EMERGENCY CONTROLLER dvise Location/Nature/Product EMERGENCY CONTROLLER Will determine extent & activate major plan if necessary TEMO dvise Location/Nature/Product EMERGENCY SERVICES dvise Nature. Request ssistance. Regular updating of current situation. SPC and NEIGHBOURING PROPERTIES Notify via SPC PBER&S CUSTOMERS dvise any customers whose products are involved PORT UTHORITY If Product Flow is to Port rea NOTIFY as required - Relevant Company Personnel - Security Company Control Room MEDI LIISON Location/Nature/Status PPROPRITE UTHORITIES e.g. EP, WorkCover uthority, Water Board, as required EMERGENCY CONTROLLER LL CLER

22 Document No.: OPS09.1 Page: 62 of 205 FIGURE SPILLGE OR LEKGE WITHOUT FIRE RISK RISE EMERGENCY LRM CTION FOR TEMO ESTBLISH Source/Type/Product/Quantity ny Injuries/People Trapped CESE ll operations & product movement EVCUTE To Emergency ssembly reas or off site by activating evacuation alarm USE Safety Equipment + PPE Refer Hazchem Code & MSDS ISOLTE Source/Product/Flow EVLUTE TOXICITY & FLMMBILITY OF VPOURS refer MSDS sheets for product and treat accordingly ie, foam, decontaminant, absorbent, or water CONTIN Spread of product, isolate immediate drainage, close final stormwater isolation valves NOT CONTINED Pump back from downstream pit PREVENT Further escape of product BRRICDE ppropriate areas for uthorised Entry for Personnel COMMENCE Decontamination procedure CONSULT Emergency Controller NOTIFY SENIOR OPERTION TECHNICIN ON SITE dvise Location/Nature/Product EMERGENCY CONTROLLER dvise Location/Nature/Product EMERGENCY CONTROLLER Will determine extent & activate major plan if necessary TEMO dvise Location/Nature/Product EMERGENCY SERVICES dvise Nature. Request ssistance. Regular updating of current situation. SPC and NEIGHBOURING PROPERTIES Notify via SPC PBER&S CUSTOMERS dvise any customers whose products are involved NOTIFY as required - Relevant Company Personnel - Security Company - Control Room PORT UTHORITY If Product Flow is to Port rea MEDI LIISON Location/Nature/Status PPROPRITE UTHORITIES e.g. EP, WorkCover uthority, Water Board, as required EMERGENCY CONTROLLER LL CLER

23 Document No.: OPS09.1 Page: 63 of FIRE OR RISK OF FIRE Refer Figure 7.6 for Minor Fire / Figure 7.7 for Major Fire FIGURE MINOR FIRE OR RISK OF MINOR FIRE RISE EMERGENCY LRM CTION ESTBLISH Location/Nature/Status for extinguishment ny Injuries/People Trapped CESE ll operations & product movement EVCUTE To Emergency ssembly reas or off site by activating evacuation alarm USE Safety Equipment + PPE Refer Hazchem Code & MSDS USE Correct extinguisher. Put fixed fire system on standby. DO NOT Use direct water jets on product fires. Use fog pattern ISOLTE Fuel source if feeding or adjacent to fire PREVENT Further escape of fuel Isolate immediate drainage, close final stormwater isolation valves ENSURE Fire is extinguished and re-ignition is not possible CONSULT Emergency Controller COMMENCE Decontamination procedure NOTIFY SENIOR OPERTION TECHNICIN ON SITE dvise Location/Nature/Product EMERGENCY CONTROLLER dvise Location/Nature/Product EMERGENCY CONTROLLER Will determine extent & activate major plan if necessary TEMO dvise Location/Nature/Product EMERGENCY SERVICES lways call Fire Brigade. dvise Nature. Request ssistance. Regular updating of current situation. SPC and NEIGHBOURING PROPERTIES Notify via SPC PBER&S NOTIFY as required - Relevant Company Personnel - Customers PORT UTHORITY If Fire is in Port rea or Pier rea MEDI LIISON Location/Nature/Status PPROPRITE UTHORITIES e.g. EP, WorkCover uthority, Water Board, as required CUSTOMERS dvise any customers whose products are involved EMERGENCY CONTROLLER LL CLER

24 Document No.: OPS09.1 Page: 64 of 205 FIGURE MJOR FIRE OR RISK OF MJOR FIRE RISE EMERGENCY LRM CTION ESTBLISH Location/Nature/Status for extinguishment ny Injuries/People Trapped CESE ll operations & product movement EVCUTE To Emergency ssembly reas or directly offsite by activating evacuation alarm USE Safety Equipment + PPE Refer Hazchem Code & MSDS CONTROL/EXTINGUISH Fire using Fixed Fire Protection Systems CONTIN Spread of Fire/Fuel Isolate Drainage COOL djacent area to fire Keep vessels cool/wet PREVENT Further escape of fire/fuel Isolate immediate drainage, close stormwater isolation valves ENSURE Fire is extinguished and re-ignition is not possible CONSULT Emergency Controller COMMENCE Decontamination procedure NOTIFY SENIOR OPERTION TECHNICIN ON SITE dvise Location/Nature/Product EMERGENCY CONTROLLER dvise Location/Nature/Product EMERGENCY CONTROLLER Will determine extent & activate major plan if necessary TEMO dvise Location/Nature/Product EMERGENCY SERVICES lways call Fire Brigade. dvise Nature. Request ssistance. Regular updating of current situation. SPC and NEIGHBOURING PROPERTIES Notify via SPC PBER&S NOTIFY as required - Relevant Company Personnel - Customers PORT UTHORITY If Fire is in Port rea or Pier rea MEDI LIISON Location/Nature/Status PPROPRITE UTHORITIES e.g. EP, WorkCover uthority, Water Board, as required CUSTOMERS dvise any customers whose products are involved EMERGENCY CONTROLLER LL CLER

25 Document No.: OPS09.1 Page: 65 of BOMB THRET Bomb Threat is a warning received by any means of a threatening intention to detonate an explosive device having been placed to cause risk or damage to the Terminal, pipeline corridor or Bulk Liquids Berth. ll bomb warnings are to be treated seriously. Necessary actions and precautions must be taken to minimise danger to the public, employees and the plant until the risk has been removed or until the warning has been proved to be unfounded. Quick and accurate communications are essential. ll staff who may have to handle these initial communications must be thoroughly familiar with these procedures. 1) blank copy of a Bomb Threat Checklist (ustralian Bomb Data Centre form) is kept near every telephone except those in public areas, i.e. at the following locations: - Logistics Office Foyer - Extension 924. copy of the Bomb Threat Checklist is provided in ppendix B.4. The Bomb Threat Checklist should not be kept where it may be visible to the general public, i.e. Contractors, Truck Drivers, etc. 2) ny person receiving a (telephone) bomb threat should:- i) Take it seriously. ii) iii) iv) Keep the person talking and seek as much information as possible. Utilise the Bomb Threat Checklist during, or immediately after receiving, the threat. Share the call, where possible.

26 Document No.: OPS09.1 Page: 66 of 205 3) ny person discovering a device, or where suspicious circumstances suggest the possible presence of a device, shall ensure they DO NOT TOUCH the device or even approach it. CLER personnel away from the immediate vicinity, and SECURE the area. 4) The person shall then contact the Security Officer (or his nominee) who will inform the Emergency Controller and also contact the Police on telephone number "000" for assistance. 5) Proceed with Terminal shutdown. Procedure as for larm Initiation (see Sections 6.2 and 6.3). 6) Stand by for further instructions from the Emergency Controller (or his nominee). 7) The Emergency Controller should consider: i) Evacuating the site. ii) Initiating a search of the area. 8) bomb threat received by a neighbouring companies will be handled in the following manner: i) When information regarding a bomb threat to adjacent facilities is received, the Security Officer must be informed immediately. ii) The Emergency Procedures Plan will be implemented fully or partially, depending upon the circumstances and the information received. Note: ll enquiries from the media must be referred to the Managing Director. When referring media enquiries, no indication or acknowledgment as to the existence of a bomb threat should be conveyed to the enquirer. Refer Figure 7.8 for a Bomb Threat or Potential Threat or Notice.

27 Document No.: OPS09.1 Page: 67 of 205 FIGURE BOMB THRET OR POTENTIL THRET OR NOTICE RISE EMERGENCY LRM CTION ESTBLISH Location/Nature/Status ny Injuries/People Trapped CESE ll operations & product movement EVCUTE To Emergency ssembly reas or off site by activating evacuation alarm USE Safety Equipment + PPE Refer Hazchem Code & MSDS CTIVTE ll fixed fire systems to standby MOVE VEHICLES Only if safe to do so Emergency Services will advise dditional action, as necessary DO NOT Initiate search or touch any object found SERCH By Police/Bomb Squad/Company Personnel DEFUSE By Bomb Squad NOTIFY SENIOR OPERTION TECHNICIN ON SITE dvise Location/Nature/Product EMERGENCY CONTROLLER dvise Location/Nature/Product TEMO dvise Location/Nature/Product EMERGENCY SERVICES Police - Fire Brigade. dvise location/details. Regular updating of current situation. SPC and NEIGHBOURING PROPERTIES Notify via SPC PBER&S NOTIFY as required - Relevant Company Personnel - Customers MEDI LIISON Location/Nature/Status PPROPRITE UTHORITIES e.g. EP, WorkCover uthority, Water Board, as required CUSTOMERS dvise any customers whose products are involved EMERGENCY CONTROLLER LL CLER

28 Document No.: OPS09.1 Page: 68 of CIVIL DISTURBNCE Refer Figure 7.9 for Civil Disturbance or Threat or Notice of Disturbance FIGURE CIVIL DISTURBNCE OR THRET OR NOTICE OF DISTURBNCE RISE EMERGENCY LRM CTION ESTBLISH Location/Nature/Status CESE ll operations & product movement CLOSE ll access/entry gates Isolate plant facilities DO NOT dmit public to plant without authority SSEMBLE Spare fire extinguishers at Security Office CTIVTE ll fixed fire systems to standby NOTIFY SENIOR OPERTION TECHNICIN ON SITE dvise Location/Nature/Product EMERGENCY CONTROLLER dvise Location/Nature/Product TEMO dvise Location/Nature/Product POLICE dvise location/nature/status. Regular updating of current situation. SPC and NEIGHBOURING PROPERTIES Notify via SPC PBER&S EMERGENCY SERVICES - If necessary, Fire Brigade NOTIFY as required - Relevant Company Personnel Customers MEDI LIISON Location/nature/status EMERGENCY CONTROLLER LL CLER

29 Document No.: OPS09.1 Page: 69 of NTURL PHENOMEN Refer Figure 7.10 For Emergency Situation Caused By Natural Phenomena. FIGURE 7.10 NTURL PHENOMEN High Wind Earthquake Electrical storm Cease all work at heights t 35 knots, cease ship discharge (Port uthority has an anemometer) t 40 knots, disconnect hoses and/or loading arms ssess wind damage. Consider cessation of Operations and evacuate if necessary Cease operations Evacuate Inspect tanks and pipelines and equipment before resumption of operations Notify customers Cease tank top operations If direct lightning activity, cease operations

30 Document No.: OPS09.1 Page: 70 of PERSONNEL INJURY Refer Figure 7.11 For Personnel Injury FIGURE 7.11 Personnel Injury S PER ST JOHNS FIRST ID TRINING HNDBOOK Danger Response irway Breathing Circulation ssess injury Splint Wash and water and keep washing Obtain copy of MSDS of product involved Call ambulance (if necessary) and provide MSDS to ambulance personnel dvise customer if product injury is involved.

31 Document No.: OPS09.1 Page: 71 of CHEMICL RECTION Refer Figure 7.12 For Chemical Reaction FIGURE 7.12 CHEMICL RECTION Incompatibility in tank Incompatibility in bund Polymerisation Butyl acrylate, 2 EthylHexyl crylate and VM see Section Cool Isolate product flows Cool Refer MSDS sheets Consider application of foam blanket Evaluate if evacuation is necessary dvise customers Refer MSDS sheets Consider application of foam blanket Evaluate if evacuation is necessary dvise customers Refer MSDS sheet for other actions Evacuate area dvise customers IMPCT DMGE Refer Figure 7.13 For Impact Damage FIGURE 7.13 IMPCT DMGE eg, road tanker collision ssess extent of damage Contain unbunded spills Refer spill control flowcharts (Figures 7.4, 7.5 and 7.6) dvise customer(s)

32 Document No.: OPS09.1 Page: 72 of NEIGHBOURING SITE EMERGENCY If an emergency occurs at a neighbouring site:- 1) If the neighbouring site has not notified Vopak of the emergency either directly or via the SPC PBER&S, then the Security Officer (or other nominated person) will contact the Emergency Services on telephone number "000" to advise of the emergency. Request particular service (Police, Fire Brigade, mbulance). Give brief details: i) Nature of incident (if known): fire, spillage, toxic fumes, etc. ii) Name and address of the neighbouring site. iii) Vopak contact telephone number (02) iv) Name of person calling. 2) Vopak Terminal Emergency Procedures Plan - Site activated or put on standby (i.e. monitor situation). 3) Notify other neighbouring sites and SPC of the emergency via the SPC PBER&S MOTOR VEHICLES USE DURING N EMERGENCY Motorised vehicles must be controlled so they do not become involved in any major accidents. t the time of an accident, all staff are to be made aware that vehicles, wherever possible, must not be used in an emergency. If this is not possible, then great caution must be exhibited during there use SPECIFIC EMERGENCY PLNS GENERL This section provides additional information for managing specific types of emergencies or specific hazardous materials. When managing emergencies involving specific hazardous materials, reference must be made to the relevant Material Safety Data Sheet for the latest information regarding the material.

33 Document No.: OPS09.1 Page: 73 of PROPYLENE OXIDE EMERGENCY Propylene Oxide (PO) is a flammable liquid with a low boiling point and a high vapour pressure, it is also a known carcinogen (refer Material Safety Data Sheet for further details). Propylene Oxide is stored in Tank 46. This tank is of 1650 m 3 capacity and constructed as a low pressure storage tank to PI Recommended Rules for Design and Construction of Large, Welded, Low-Pressure Storage Tanks. The tank is provided with Nitrogen gas blanketing and with a water scrubbing system for product vapours. Control Panel larms n alarm panel located in the ex-jortl Control Room (adjacent to the Logistics office), monitors the facility for various pressures, temperatures, fluid levels, and flow. Table 7.1 details the types of alarms, remarks, and action to take in the event of an alarm condition. dditionally, a siren and strobe light are mounted on the tank top that will activate in event of one of the alarms below (except the two loading pump alarms of temperature high and no flow ). TBLE PROPYLENE OXIDE CONTROL PNEL LRMS (Note: This Table is taken from Procedure OPS01.24: PO Operations Manual) LRM REMRKS CTION Tank Level High Tank Level High High Tank Temperatur e High larm could operate during ship to shore transfer. Cargo size must always be checked to ensure that cargo quantity will fit into available space. Device: Setpoint: Interlock: Radar Gauge m Nil This is a back up for the Tank Level High alarm above. Device: Setpoint: Interlock: Radar Gauge m Emergency Block Valve closes Operates when tank temperature exceeds 30 0 C. 1. Immediately instruct ship to stop pumping. 2. Check tank level less than safe fill level of 14.2 metres, it will be necessary to remove sufficient material by truck to the client plant to leave space for the balance of the cargo, before pumping operations can be resumed. 1. Same action as above. 2. Electrician or Engineer will be required to override interlock to open EBU to remove material by truck 1. Cool tank using water deluge.

34 Document No.: OPS09.1 Page: 74 of 205 Device: Setpoint: Interlock: R.T.D C Nil Gas Leak Main Tank Monitors the operation of the tank top pressure relief valve. Operation of this alarm indicates the valve is allowing PO vapour to pass. Device: Gas Detector Setpoint: (Channel 1) Warn - 20% LEL larm - 40% LEL Interlock: Nil 1. Check tank pressure on panel and if in excess of 82.6 kpag (12 psig) take action described below, under Tank Pressure High. 2. Open water valve on water snuffer around outlet of pressure relief valve.

35 Document No.: OPS09.1 Page: 75 of 205 LRM REMRKS CTION Tank Pressure High Tank Pressure Low Gas Leak Blow Down Tank (Scubber) System Operates when tank pressure reaches 75.0 kpag (11 psig). Device: Pressure Indicator alarm from pressure transmitter Setpoint: 75 kpag Interlock: Emergency Block Valve closes Operates when tank pressure reaches 15 kpag (2.2 psig). Device: Pressure Indicator alarm from pressure transmitter Setpoint: 15 kpag Interlock: Nil Operates when scrubber water is saturated with Propylene Glycol and cannot absorb further tank vent gas flow. Can also operate if water level in scrubber is low. Device: Gas Detector Setpoint: (Channel 2) Warn - 20% LEL larm - 40% LEL Interlock: Nil IF DURING PIGGING TO TNK: 1. Immediately stop flow to tank by closing pig receiver valve. 2. Follow instructions below to reduce tank pressure. IF DURING SHIP DISCHRGE TO TNK: 1. Immediately radio ship to stop pumping. 2. Check vapour return to ship. IF NOT SSOCITED WITH SHIPPING OR PIGGING: 1. Check that the vapour return pipeline vent slop tank has the correct water level in it. 2. Partially open the ball valve on the vapour return take off line to the slop tank. 3. Pressure will let down through the scrubber. 4. Cool tank with water deluge if action 1-3 fails to control pressure. 5. Check operation of nitrogen pad control valve. This valve should not be passing nitrogen into tank when tank pressure exceeds 13.8 kpag (2 psig). 1. Check pressure relief valve for faulty operation 2. Check operation of nitrogen pad control valve. This valve should not be passing nitrogen into tank when tank pressure exceeds 13.8 kpag (2 psig). 3. Tank draw-off exceeds nitrogen blanket on vapour return. 1. Check scrubber water level. 2. Check that water supply valve to scrubber open. 3. Sample and analyse glycol content. Change absorber solution transferring solution to clients plant by truck and replace with fresh make up water.

36 Document No.: OPS09.1 Page: 76 of 205 LRM REMRKS CTION Scrubber Level Low Wharf Line High Pressure Loading Pump Temperatur e High Loading Pump No Flow Operates when scrubber water level is below overall height of 4.6m. Device: Setpoint: Interlock: Float Switch 450 mm (make-up unit level) (4.6m overall scrubber level) Nil Operated during ship to shore transfer if line pressure exceeds 800 kpag. Device: Setpoint: Interlock: Pressure Switch 800 kpag Emergency Block Valve closes Stop pumping during tanker loading if pump temperature exceeds 28 0 C. Device: Setpoint: Interlock: Temperature Switch 28 0 C Nil Stops motor if flow through pump ceases. Device: Flow Switch Setpoint: - Interlock: Will shutdown pump after time delay TNK FIRE 1. Check that water supply valve is open and that water is available. Water will flow to scrubber until correct level is reached and ball cock shuts off. 2. Check that vent flow to scrubber is not excessive. If flow is high check tank pressure and operation of tank pressure control valve. 1. Immediately radio ship to stop pumping. 2. Check that all product and vapour return valves are open between ship and shore tank. 3. Recommence pumping when pressures have equalised and return to normal. 1. Check that suction & discharge valves are open. 2. Check that the outlet and the tank emergency block valves are open. 3. Check that all excess flow valves are set. 4. Check that tanker valves are correctly set to receive product. 5. Check that truck and tank pressures are balanced. 1. Check as in 1-5 above. Use alcohol foam, dry powder or carbon dioxide. Cool tank with deluge water. Use self-contained breathing apparatus and PVC suit, gloves and gumboots.

37 Document No.: OPS09.1 Page: 77 of 205 PROPYLENE OXIDE SPILLGE Minor Spillage In the event of a minor spillage, isolate area, wear coverall, PVC gloves and goggles. Hose down with large amounts of water. If spillage has occurred near a tanker, DO NOT MOVE TRUCK OR CLOSE THE BTTERY MSTER SWITCH. fter the area has been cleaned down a Gas Free clearance must be issued to ensure that all vapours have been dispersed and that there are no flammable gases in the area. Only after the issue of the Gas Free clearance can the truck be moved. Hose Leak Failure of the stainless steel loading hose will cause the excess flow valve to operate. * Immediately close the remotely operated tank emergency block valve and stop the transferring pump. * If spillage is large, isolate area. Decontaminate using large volumes of water. Persons carrying out the decontamination must wear selfcontained breathing apparatus, PVC gloves, full PVC suit and PVC gumboots. The area must not be entered by unprotected persons until after the clean up is completed, and all vapours have dissipated. Gas Free clearance must be issued to ensure, by testing, that all vapours have dissipated and that there are no explosive or flammable gas mixtures. Only after the issue of a Gas Free clearance can the truck be moved. ON NO CCOUNT MUST THE TRUCK BTTERY MSTER SWITCH BE OPERTED OR THE TRUCK STRTED UNTIL THE RE HS BEEN CERTIFIED GS FREE.

Emergency Response Plans

Emergency Response Plans PO Box 2114 Woonona East NSW 2517 (WOLLONGONG) PTY LTD Ph: 0417 420 760 Fax: 02 4283 2216 A/H: 02 4283 7727 EPA Licence: 11788 ABN: 57 079 336 799 Unit 11 Lot 1 York Place Woonona NSW 2517 Emergency Response

More information

Bogo Operations Pollution Incident Response Management Plan

Bogo Operations Pollution Incident Response Management Plan Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au

More information

Two phases have been established for the classification of incidents to help in determining the appropriate course of action;

Two phases have been established for the classification of incidents to help in determining the appropriate course of action; 1.0 CLASSIFICATION OF AN EMERGENCY SITUATION Two phases have been established for the classification of incidents to help in determining the appropriate course of action; Alert phase, and Emergency phase.

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

In an emergency the safety of all personnel and the public is of priority.

In an emergency the safety of all personnel and the public is of priority. P272 : Emergency Planning & Response This DOCUMENT and any linked FORMS have been created to provide specific requirements under the Amalgamated Operating System. For additional information and guidance,

More information

Risk Analysis- Sulfuric Acid

Risk Analysis- Sulfuric Acid Sulfonation of LAB with 98% Sulfuric Acid Risk Analysis- Sulfuric Acid Being exothermic reaction, Sulfonation reaction has the potential hazard of causing serious accident. Detailed systematic HAZOP study

More information

HAZARDOUS INCIDENT SITE SAFETY PLAN

HAZARDOUS INCIDENT SITE SAFETY PLAN HAZARDOUS INCIDENT SITE SAFETY PLAN NOTE: A site-specific Site Safety Plan must be developed and implemented for each site where investigators may potentially be exposed to hazardous substances while conducting

More information

Working in Confined & Enclosed Space Policy

Working in Confined & Enclosed Space Policy Working in Confined & Enclosed Space Policy Author: Alan Bryant Page 1 of 9 Table of Contents: 1. INTRODUCTION... 3 2. DOCUMENT HISTORY... 3 3. REFERENCES... 3 4. PURPOSE... 4 5. SCOPE... 4 6. IMPLEMENTATION...

More information

Best Practice Guideline EMERGENCY PROCEDURE FOR A QUARRY

Best Practice Guideline EMERGENCY PROCEDURE FOR A QUARRY Best Practice Guideline EMERGENCY PROCEDURE FOR A QUARRY www.aspasa.co.za February 2015 Aspasa has developed a draft procedure to provide the basis for an effective emergency procedure for a quarry. This

More information

Introduction to Emergency Response & Contingency Planning

Introduction to Emergency Response & Contingency Planning & Contingency Planning Rationale Why is it important for you to learn this material? Designed for those who may witness a release, this is an introductory course designed to help ensure those who are likely

More information

Section 38 Brieser Construction SH&E Manual

Section 38 Brieser Construction SH&E Manual Brieser Construction SH&E Manual April 2015 The purpose of this plan is to document spill prevention and response requirements. Spill Prevention https://brieserconstruction.sharepoint.com/safety/safety/safety

More information

HAZARDOUS MATERIALS OPERATIONS NFPA 472, 2008 Edition

HAZARDOUS MATERIALS OPERATIONS NFPA 472, 2008 Edition 5.2 Core Competencies Analyzing the Incident JPR - HMO #1 5.2.1 Surveying the Hazardous Materials/WMD Incidents Revised: June 30, 2011 Standard Area: Competencies Analyzing the Incident STANDARD: 5.2.1.3.2

More information

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual) GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual) 1. An IU Slug Control Plan must include sufficient general information to enable the POTW to: (1) categorize and restrict

More information

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities. 11/13/1995 4 5/20/2013 1 of 10 Authority and Scope Regulation: 29 CFR 1910.146 Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

STCW Code Table A-V/1-1-1 Specification of minimum standard of competence in basic training for oil and chemical tanker cargo operations

STCW Code Table A-V/1-1-1 Specification of minimum standard of competence in basic training for oil and chemical tanker cargo operations STCW Code Table A-V/1-1-1 Specification of minimum standard of in basic for oil and chemical tanker cargo operations Ref: https://www.edumaritime.net/stcw-code Source: IMO Contribute to Basic knowledge

More information

1.0 Scope and Application. 2.0 Definitions. Cal Poly Risk Management Confined Space Program Page 1

1.0 Scope and Application. 2.0 Definitions. Cal Poly Risk Management Confined Space Program Page 1 Page 1 1.0 Scope and Application The following procedures describe safe operating practices in confined spaces. These may be sewers, pipelines, tanks, boiler compartments, ducts, vaults, pits, vats, bins

More information

Working Environment Safety Assessment

Working Environment Safety Assessment For your own safety and/or safety of your workforce, and to improve the efficiency of your business practices, you should be aware of, and be up to date with, the key safety issues and good practices relevant

More information

DISASTER MANAGEMENT PLAN

DISASTER MANAGEMENT PLAN CHAPTER-VII DISASTER MANAGEMENT PLAN 7.1 INTRODUCTION 7.1.1 Definition A major emergency in a works is one, which has the potential to cause serious injury or loss of life. It may cause extensive damage

More information

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and APPENDIX D EMERGENCY PROCEDURES IN PUBLIC SECONDARY SCHOOLS IN THE EVENT OF A CHEMICAL SPILL There are five major sources of regulations that are potentially applicable to emergencies involving a chemical

More information

Recommended Facilitator Notes: (read the following text out-loud to participants while showing this slide)

Recommended Facilitator Notes: (read the following text out-loud to participants while showing this slide) Slide 1 Confined Space Entry for General Industry These materials have been developed based on applicable federal laws and regulations in place at the time the materials were created. The program is being

More information

CONFINED SPACE PROGRAM

CONFINED SPACE PROGRAM CONFINED SPACE PROGRAM Last updated: November 2017 1.0 PURPOSE Entry into a confined space represents a significant risk of serious injury or death to individuals not prepared for the hazards they may

More information

Hazardous substances in transit depots

Hazardous substances in transit depots NOVEMBER 2013 1 November 2013 Hazardous substances in transit depots Substances that are in transit and are awaiting delivery to their final destination are held at transit depots. This could include circumstances

More information

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, without the written

More information

Pollution Incident. Response. Management Plan

Pollution Incident. Response. Management Plan Pollution Incident Response Management Plan Revised 2016 0 Pollution Incident Response Management Plan 1. Purpose & Scope. 2 2. Process 2 2.1 Definition of a pollution incident. 2 2.2 Description & likelihood

More information

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone.

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone. Lone Working Scope 1. This standard applies to anyone working; studying or taking part in any activity managed by UCL and includes staff, graduate students, contractors and visitors.. Undergraduate students

More information

Drum / cylinder handling

Drum / cylinder handling Page 1 of 8 Drum / cylinder handling This Technical Measures Document covers the storage and handling of toxic and flammable substances in drums and cylinders and refers to relevant codes of practice and

More information

Confined Space Entry Program 8 CCR 5157

Confined Space Entry Program 8 CCR 5157 TABLE OF CONTENTS 1. POLICY... 2 2. PURPOSE... 2 3. SCOPE... 2 4. DEFINITIONS... 2 5. CONFINED SPACES IN THE SACRAMENTO STATE... 4 6. PERMIT SPACE ENTRY - PERSONNEL RESPONSIBILITIES... 4 6.1. CONFINED

More information

TABLE OF CONTENTS PART 2 - CONFINED SPACES

TABLE OF CONTENTS PART 2 - CONFINED SPACES May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3

More information

Emergency Procedures for Forecourt Sites Storing and Dispensing LPG

Emergency Procedures for Forecourt Sites Storing and Dispensing LPG SECTION F7 Emergency Procedures for Forecourt Sites Storing and Dispensing LPG (Propane) This document has been designed to give essential information FOR ALL STAFF on how to deal with an emergency involving

More information

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Safe Work Practices / Procedures / Instruction CONFINED SPACE CONFINED SPACE Entry into and work in a confined space poses health and safety problems which may include: Presence or possible build up of a hazardous atmosphere Unexpected movement of equipment or materials

More information

MATERIAL SAFETY DATA SHEET Q.D. ENAMEL

MATERIAL SAFETY DATA SHEET Q.D. ENAMEL MATERIAL SAFETY DATA SHEET Q.D. ENAMEL 1. PRODUCT AND COMPANY IDENTIFICATION: TRADE / COMMERCIAL NAME Quick Drying Enamel CHEMICAL FAMILY Styrenated Alkyd & aliphatic hydrocarbon UN NO 1268 ERG NO 153

More information

Hazardous Materials Spill Response

Hazardous Materials Spill Response Hazardous Materials Spill Response The University of Iowa Rev. 02/10 Department Lab/Room Number PI/Lab Coordinator After Hours Contact Number University Public Safety (Phone 911) Fire, Police, Ambulance

More information

CONFINED SPACE PROGRAM

CONFINED SPACE PROGRAM CONFINED SPACE PROGRAM I. Purpose This Confined Space Program has been developed in accordance with the Occupational Safety and Health Administration (OSHA) regulations 29 CFR 1910.146. The purpose of

More information

Spirax Compact FREME Flash Recovery Energy Management Equipment

Spirax Compact FREME Flash Recovery Energy Management Equipment IM-UK-cFREME UK Issue 1 Spirax Compact FREME Flash Recovery Energy Management Equipment Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

SUPAGAS PTY LTD POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

SUPAGAS PTY LTD POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN SITE: INGLEBURN CONTENTS 1 INTRODUCTION 4 1.1 Background... 4 1.2 Aim of the Emergency Response Plan... 4 1.3 Definition of a Pollution Incident... 4 2 OBJECTIVES

More information

UNIVERSITY OF RICHMOND

UNIVERSITY OF RICHMOND UNIVERSITY OF RICHMOND Hazardous Waste Contingency Plan University of Richmond, Safety Services and Risk Management (SSRM) March, 1991 (Revised: April, 1993) (Revised: March, 1995) (Revised: September,

More information

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN). Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This

More information

EH&S Program Occupational Safety Next Review: 5/9/19. Scope: University Wide Original date created: 2006

EH&S Program Occupational Safety Next Review: 5/9/19. Scope: University Wide Original date created: 2006 Environmental Health & Safety Policy and Procedure Subject: Confined Space Entry Policy & Procedure Published Date: 5/9/18 EH&S Program Occupational Safety Next Review: 5/9/19 Scope: University Wide Original

More information

Hazard Communication Program. San José State University

Hazard Communication Program. San José State University San José State University One Washington Square San José, California Facilities Development and Operations Department July 11, 2012 Page intentionally left blank SJSU_Hazard Communication Program_2012-0711.docx

More information

MATERIAL SAFETY DATA SHEET G.P. RED OXIDE PRIMER

MATERIAL SAFETY DATA SHEET G.P. RED OXIDE PRIMER MATERIAL SAFETY DATA SHEET G.P. RED OXIDE PRIMER 1. PRODUCT AND COMPANY IDENTIFICATION: TRADE / COMMERCIAL NAME General Purpose Red Oxide Primer CHEMICAL FAMILY Alkyd resin & aliphatic hydrocarbons UN

More information

TRANSPORT EMERGENCY REPONSE PLAN

TRANSPORT EMERGENCY REPONSE PLAN TRANSPORT EMERGENCY REPONSE PLAN The Core Objectives of the Transport Emergency Response Plan (TERP) are to Minimise adverse effects on employees and the general public, damage to property, or harm to

More information

SAFETY DATA SHEET INDUSTRIAL EP COMPOUND HEAVY DUTY GEAR LUBRICANTS Revision Date:

SAFETY DATA SHEET INDUSTRIAL EP COMPOUND HEAVY DUTY GEAR LUBRICANTS Revision Date: SAFETY DATA SHEET INDUSTRIAL EP COMPOUND HEAVY DUTY GEAR LUBRICANTS Revision Date: 06-01-2018 Section 1. Identification Product Identifier Product Name Industrial EP Compound Heavy Duty Gear Lubricants

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

rd Quarter Continuing Education Hazardous Materials Defensive Actions/ Emergency Decon

rd Quarter Continuing Education Hazardous Materials Defensive Actions/ Emergency Decon 2007 3 rd Quarter Continuing Education Hazardous Materials Defensive Actions/ Emergency Decon This Continuing Education exercise is designed to cover the general responsibilities of a response to a possible

More information

Key Technology, Inc. Confined Space Entry Program. July, 2017

Key Technology, Inc. Confined Space Entry Program. July, 2017 Key Technology, Inc. Confined Space Entry Program July, 2017 Page 1 of 11 Key Technology, Inc. CONFINED SPACE ENTRY PROGRAM OVERVIEW Purpose: The purpose of this program is to ensure the protection of

More information

SOPAN O & M COMPANY PVT. LTD.

SOPAN O & M COMPANY PVT. LTD. Introduction: The purpose of this health, safety and environmental (HSE) manual is to inform YOU about the factors affecting your personal safety during the time you are working with our clients. Study

More information

Hazardous Material Emergency Spill Response Protocol WAC

Hazardous Material Emergency Spill Response Protocol WAC Hazardous Material Emergency Spill Response Protocol WAC 296-824 1.0 Policy PLU s highest priority is to protect employee and student health and safety. On that basis, PLU employees or students will not

More information

Standbys. (Owner: Risk Management Section Supervisor)

Standbys. (Owner: Risk Management Section Supervisor) BTCP/BTRF Standbys (Owner: Risk Management Section Supervisor) Site Safety Standard 5500 Introduction Scope The purpose of this standard is to specify detailed roles and responsibilities of Standby personnel

More information

The Johns Hopkins University/The Johns Hopkins Hospital Health, Safety and Environment Manual Safety Policies:

The Johns Hopkins University/The Johns Hopkins Hospital Health, Safety and Environment Manual Safety Policies: Page 1 of 6 Keywords: Airborne Combustible, Atmospheric Monitoring, Atmospheric Oxygen, Authorized Entrant, Body Harness, Combustible Gas Meter, Communication Procedure, Confined Space, CPR, Entry, Entry

More information

Faculty/School: Pharmacy Initial Issue Date: Oct 2016

Faculty/School: Pharmacy Initial Issue Date: Oct 2016 Use this form to assist you to complete risk assessments for hazardous activities and processes. Any serious or ongoing hazards should be reported via RiskWare to ensure that appropriate corrective actions

More information

Pollution Incident. Response. Management Plan

Pollution Incident. Response. Management Plan Pollution Incident Response Management Plan Revised JULY 2018 0 Pollution Incident Response Management Plan 1. Purpose & Scope. 2 2. Process 2 2.1 Definition of a pollution incident. 2 2.2 Description

More information

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014. Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on

More information

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE RESOLUTION MSC.397(95) (adopted on 11 June 2015) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee,

More information

Control of Energy - Isolation Process

Control of Energy - Isolation Process Issue Date: 24/03/17 Last Reviewed: 24/03/17 Next Review Date: 24/03/18 Authorised By: Mike Muir Safe Operating Procedure Control of Energy - Isolation Process Purpose: This SOP is based on a Generic 12-step

More information

Chemical Entity CAS No. Proportion (to 100%)

Chemical Entity CAS No. Proportion (to 100%) Fun Dye (liquid) Revision: Number 9 Date 14 December 2016 SECTION 1 Product & Supplier Identification Product Name Fun Dye (liquid) Other Names Product Code EC100 Barcode Number Recommended Use Dyeing

More information

2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES

2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES 2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES This section of the GOSRP provides the general procedures to be followed at the time of an incident. The section is distinctively marked by a RED

More information

PERMIT-REQUIRED CONFINED SPACES PROGRAM

PERMIT-REQUIRED CONFINED SPACES PROGRAM PERMIT-REQUIRED CONFINED SPACES PROGRAM On January 14, 1993, OSHA established safety requirements to protect employees from the hazards of entry into permit-required confined spaces. It is essential to

More information

Hazardous Materials Spill Response

Hazardous Materials Spill Response Hazardous Materials Spill Response The University of Iowa Rev. 01/2019 Department: Lab/Room Number: PI/Lab Coordinator: After-hours Contact Number: University Public Safety - 911 Fire, Police, Ambulance

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Page 1 of 9 ISSUED: 5/00 REVISED: 08/06 Introduction Purpose: In accordance with applicable regulations and Temple University, this policy was developed to minimize exposure to Ethylene Oxide. Applicability

More information

Safety Data Sheet Bokundo Marbling Dye Kit

Safety Data Sheet Bokundo Marbling Dye Kit Bokundo Marbling Dye Kit Revision: Number 8 Date 26 April 2017 SECTION 1 Product & Supplier Identification Product Name Bokundo Marbling Dye Kit Other Names Marbling Ink Product Code EC1033 Recommended

More information

SAFEWORK PRACTICES EQUIVALENCY PROCEDURE FOR ACCESSING FLOATING ROOF TANKS ON STORAGE TANKS IN SERVICE CAT A-2 SOP #33

SAFEWORK PRACTICES EQUIVALENCY PROCEDURE FOR ACCESSING FLOATING ROOF TANKS ON STORAGE TANKS IN SERVICE CAT A-2 SOP #33 SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFEWORK PRACTICES EQUIVALENCY PROCEDURE FOR ACCESSING FLOATING ROOF TANKS ON STORAGE TANKS IN SERVICE Date Issued:

More information

Laboratory Preparedness Checklists for Advanced Planning, Preparing to Close & Safe Re-Entry

Laboratory Preparedness Checklists for Advanced Planning, Preparing to Close & Safe Re-Entry Laboratory Preparedness Checklists for Advanced Planning, Preparing to Close & Safe Re-Entry Disruptions, utility outages, and severe weather events may require a laboratory closure. These events have

More information

EQUIPMENT, AND SUPPLIES. Delivering Environmental, Industrial, and Emergency Solutions

EQUIPMENT, AND SUPPLIES. Delivering Environmental, Industrial, and Emergency Solutions BASIC SPILL PREPAREDNESS, EQUIPMENT, AND SUPPLIES Delivering Environmental, Industrial, and Emergency Solutions Training Objectives Response Strategies before Help Arrives What potential receptors surround

More information

Tanker Familiarisation IMO Model Course Chapter 1-9

Tanker Familiarisation IMO Model Course Chapter 1-9 IMO Model Course 1.01 Chapter 1-9 - Courseware Specification - MarineSoft Entwicklungs- und Logistikgesellschaft mbh Friedrich-Barnewitz-Straße 2 18119 Rostock GERMANY +49 381 12835-0 +49 381 12835-55

More information

Safe work in confined spaces

Safe work in confined spaces Safe work in confined spaces This leaflet is aimed at employers and the self-employed who carry out work in confined spaces, and forms part of HSE s commitment to make simple and practical guidance available

More information

RISK ENGINEERING TECHNICAL GUIDE

RISK ENGINEERING TECHNICAL GUIDE Introduction Many workspaces contain spaces that are considered to be "confined", because their configurations hinders the activities of any employee who must enter into, work in, and exit from them. In

More information

CONFINED SPACE ENTRY PROGRAM FOR GOUCHER COLLEGE

CONFINED SPACE ENTRY PROGRAM FOR GOUCHER COLLEGE I. INTRODUCTION CONFINED SPACE ENTRY PROGRAM FOR GOUCHER COLLEGE The Goucher College campus has confined spaces that, due to various chemical and physical properties, may cause death or serious injury

More information

Permit-To-Work Guidance and Templates

Permit-To-Work Guidance and Templates Managing Contractors Policy - Appendix E Permit-To-Work Guidance and Templates This document has been constructed to provide guidance in how to use a permit to work correctly. The first part explains the

More information

Confined Space July 2014

Confined Space July 2014 Confined Space July 2014 How Are We Doing? LTI s 0 in last 12 months Period Location Oil & Gas Base AFR Oil & Gas Sites AFR Total AFR May 0 0 0 12 Month Rolling 0 2.14 1.35 Statistics presented one month

More information

Emergency Action Plan

Emergency Action Plan 1 Emergency Action Plan Huntington Swimming Using Lake Clair 1005 N Broadway Huntington, Indiana 46750 1-260-359-9622 Huntington Swimming and Parkview Huntington YMCA are committed to employee and park

More information

Appendix A: Induction check list

Appendix A: Induction check list Appendix A: Induction check list Name This checklist is to be completed as part of inducting a new user in the Laboratory. Permission to begin work in the Laboratory will only be given once all relevant

More information

TSS21 Sealed Thermostatic Steam Tracer Trap

TSS21 Sealed Thermostatic Steam Tracer Trap 1255050/4 IM-P125-10 ST Issue 4 TSS21 Sealed Thermostatic Steam Tracer Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

SAFETY DATA SHEET FOR FALK GMAX 6000

SAFETY DATA SHEET FOR FALK GMAX 6000 Product Name: G MAX 6000 Product Code: 425065 Trade Name: Industrial Oil Benz Oil Company 2724 W. Hampton Ave. Milwaukee, WI 53209 Telephone Numbers During normal business hours call (44)442-2900 Outside

More information

WHS CONTRACTOR INFORMATION PACKAGE

WHS CONTRACTOR INFORMATION PACKAGE WHS CONTRACTOR INFORMATION PACKAGE Introduction This information package provides Informa exhibitors and contractors with important information that will be required to plan and manage work on all stages

More information

CONFINED SPACE PROGRAM

CONFINED SPACE PROGRAM CONFINED SPACE PROGRAM A confined space, as defined in 29 CFR 1910.146: Is large enough and so configured that an employee can bodily enter and perform assigned work AND Has limited or restricted means

More information

Contractor / Exhibitor Handbook

Contractor / Exhibitor Handbook Contractor / Exhibitor Handbook Health and Safety This booklet outlines the basic rules that must be followed by contractors and other visitors working on Live Promotions Events sites. The contractors

More information

FV Flash Vessel Installation and Maintenance Instructions

FV Flash Vessel Installation and Maintenance Instructions 4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning

More information

Safety Data Sheet according to Federal Register / Vol. 77, No. 58 / Monday, March 26, 2012 / Rules and Regulations. H320 - Causes eye irritation

Safety Data Sheet according to Federal Register / Vol. 77, No. 58 / Monday, March 26, 2012 / Rules and Regulations. H320 - Causes eye irritation SECTION 1: Identification 1.1. Identification Product form Product name Product code : Mixture : : M28257 1.2. Relevant identified uses of the substance or mixture and uses advised against 1.3. Details

More information

VOLUSIA COUNTY FIRE CHIEFS ASSOCIATION MODEL OPERATING PROCEDURE

VOLUSIA COUNTY FIRE CHIEFS ASSOCIATION MODEL OPERATING PROCEDURE VOLUSIA COUNTY FIRE CHIEFS ASSOCIATION MODEL OPERATING PROCEDURE GUIDE # SUBJECT: HAZARDOUS MATERIALS INITIAL RESPONSE DATE ISSUED: 03/16/06 REVIEW DATE: PURPOSE: The purpose of this document is to outline

More information

Lockout Tagout Policy

Lockout Tagout Policy Office of Environmental Health & Safety www.moreheadstate.edu/ehs 606-783-2584 Lockout Tagout Policy PURPOSE To establish procedures for the de-energization and isolation of energy sources or the lockout

More information

SAFETY DATA SHEET ENVY 1. IDENTIFICATION OF THE MATERIAL AND SUPPLIER 2. HAZARDS IDENTIFICATION 3. COMPOSITION / INFORMATION ON INGREDIENTS

SAFETY DATA SHEET ENVY 1. IDENTIFICATION OF THE MATERIAL AND SUPPLIER 2. HAZARDS IDENTIFICATION 3. COMPOSITION / INFORMATION ON INGREDIENTS 1. IDENTIFICATION OF THE MATERIAL AND SUPPLIER Product Name Envy Other Means of - Identification Other Names - Product Use Crop environmental protection Company Name AgroBest Australia Pty Ltd Address

More information

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR 1910.119 PSM - Definition Not all refining hazards are caused by the same factors or involve ve the same degree of potential damage.

More information

Fire Safety Hot Work Permit Policy/ Procedures

Fire Safety Hot Work Permit Policy/ Procedures Fire Safety Hot Work Permit Policy/ Procedures INTRODUCTION Serious fires frequently occur during maintenance and construction operations, where work is proceeding on either machinery, plant or the fabric

More information

CONFINED SPACE WRITTEN PROGRAM

CONFINED SPACE WRITTEN PROGRAM CONFINED SPACE WRITTEN PROGRAM Maple River Public Schools ISD#2135 Confined Space Entry Plan (Permit Required) Maple River Public School Plan last updated: October, 2014 Authority and Scope Regulation:

More information

Chemical Entity CAS No. Proportion (to 100%)

Chemical Entity CAS No. Proportion (to 100%) Face and Body Paint Revision: Number 2 Date 14 November 2016 SECTION 1 Product & Supplier Identification Product Name Face Paint Other Names Product Code FACE... Barcode Number Recommended Use Face and

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents Owner: HSE Performance Assurance ALL HSE PRC 172 Approved By: Manager, HSE Performance Assurance Retention Code: CG01 CA Revised: March 2015 Review Frequency: Five years or less Table of Contents 1.0 Purpose...

More information

COMPONENT CAS NUMBER CONCENTRATION Salmon Oil %

COMPONENT CAS NUMBER CONCENTRATION Salmon Oil % Section 1. Product and Company Identification Product Name Salmon Oil CAS Number 68991-43-5 Parchem - fine & specialty chemicals 415 Huguenot Street New Rochelle, NY 10801 (914) 654-6800 (914) 654-6899

More information

Health and Safety Policy

Health and Safety Policy Snowflake School Policy Reviewed September 2018 To be reviewed September 2019 Roy English Health and Safety Policy 1. STATEMENT OF INTENT The Trustees of Snowflake School will take steps to meet their

More information

Safety Data Sheet Lyden Oil Company

Safety Data Sheet Lyden Oil Company Page 1 of 8 1 PRODUCT AND COMPANY INFORMATION Product Name: Revision Date: SDS Number: Common Name: CAS Number: Product Code: Synonyms: 06/04/2017 909251-I Propylene Glycol Blend 909251-I Inhibited PG

More information

Emergency Response Code CODE BROWN HAZARDOUS SPILLS. Purpose & Authority. Definitions

Emergency Response Code CODE BROWN HAZARDOUS SPILLS. Purpose & Authority. Definitions CODE BROWN HAZARDOUS SPILLS Purpose & Authority This plan addresses the procedures to be followed in the event of a spill involving a hazardous substance. All hazardous substance spills shall be reported

More information

RH800 & 2000 BASIC OPERATIONS

RH800 & 2000 BASIC OPERATIONS RH800 & 2000 BASIC OPERATIONS 2 General information This manual contains technical information regarding Bayer SeedGrowth Equipment. Please read and understand these instructions completely before proceeding

More information

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

"DEALING WITH HAZARDOUS SPILLS"

DEALING WITH HAZARDOUS SPILLS PRESENTER'S GUIDE "DEALING WITH HAZARDOUS SPILLS" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS OUTLINE OF MAJOR PROGRAM

More information

Safety Data Sheet Rainbow Paint

Safety Data Sheet Rainbow Paint Rainbow Paint Revision: Number 9 Date 16 August 2017 SECTION 1 Product & Supplier Identification Product Name Rainbow Paint Other Names Junior Acrylic Paint Product Code R250, PR250 & FR250... Barcode

More information

CONFINED SPACES. Procedures for Permit-required ALTERNATIVE TO A FULL PERMIT ENTRY. Written Programs

CONFINED SPACES. Procedures for Permit-required ALTERNATIVE TO A FULL PERMIT ENTRY. Written Programs THEME nº17: RESPONSIBLE: Confined Spaces (OSHA) Werson Monteiro ALTERNATIVE TO A FULL PERMIT ENTRY Under certain conditions described in the stard, the employer may use alternate procedures for worker

More information

Not classified as a Dangerous Good under NZS 5433:2007 Transport of Dangerous Goods on Land.

Not classified as a Dangerous Good under NZS 5433:2007 Transport of Dangerous Goods on Land. 1. IDENTIFICATION OF THE MATERIAL AND SUPPLIER Recommended Use: Oven, BBQ, grill and hotplate cleaner. Supplier: Street Address: Selleys - A Division of ORICA NEW ZEALAND LIMITED The Gate Industrial Park,

More information

Safety Data Sheet Air Drying Clay

Safety Data Sheet Air Drying Clay Air Drying Clay Revision: Number 1 Date 9 March 2017 SECTION 1 Product & Supplier Identification Product Name Air Drying Clay Other Names Product Code ADCT & ADCW Barcode Number Recommended Use Air drying

More information

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout) Purpose: To provide the minimum requirements for the lockout or tagout of energy isolating devices whenever work is performed or servicing is done on County of DuPage machinery, equipment, vehicles and

More information