IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

Size: px
Start display at page:

Download "IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011"

Transcription

1 IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 Report: Wiping performance Pressure drop-rupture disc function-gas kick circulation Ketil Botnmark, Kjell Mikalsen This report resumes the operational performance of 2K Tools Drill String Internal Wiper-System at ConocoPhillips installation Eldfisk Alpha.

2 CONTENT The DSIW -System... 3 Executive summary... 5 Wiping performance... 6 DSIW pressure drop verification Rupture disc test... 8 Realistic gas kick incident... 8 DSIW exposure during circulation... 8 Performance summary... 9 Wiping action... 9 Pressure drop tests... 9 Rupture disc function... 9 Operational findings... 9 Conclusion... 9 Attachments Data gas circulation TEST DSIW-S ELDFISK ALPHA Side 2

3 The DSIW -System The Drill String Internal-System (DSIW-System) is designed for wiping the internal of drill string during tripping out of the borehole in operations off and onshore. Below the package delivered to ConocoPhillips; Typical DSIW Tool Rack located at drill floor that contains all required tools for internal wiping operations. (Storage position) 2K Tools Landing Sub with required dimensions. 2K Landing Sub designed to catch the DSIW tool. TEST DSIW-S ELDFISK ALPHA Side 3

4 Below in detail, DSIW-System components; Drill Floor Rack Permanently installed on driil floor Winch System Capacity to fish the DSIW appr. 248 mtrs. from RKB with wireline Transport tube For replacement and transport of tool to and from site Fishing tool Applied with the Winch system or the rig wireline unit Contingency DSIW Delivered with the system as back up tool DSIW Wiper tool 2K Tools Landing Sub Approx. 9 ft. Normally located on top of HWDP TEST DSIW-S ELDFISK ALPHA Side 4

5 Executive summary A Drill String Internal Wiper-System (DSIW-S) is rented by ConocoPhillips and was installed at Eldfisk Alpha 2. of Mars The DSIW-System contains a complete tool package to perform safe and efficient internal wiping of drill string when tripping out of the borehole. The DSIW-System has been applied during tripping operations since the installation of the system at Eldfisk Alpha. Satisfactory Wiping performance is verified trough several trips and is to ConocoPhillips satisfaction with practically no mud spills on the drill floor, drains, etc. Reliability of DSIW safety systems has been verified in the operations. Both water based (WBM) and Oil based (OBM) drilling fluids has been applied in the operations. An incident with a gas kick with the DSIW trapped inside the drill string was handled in a controlled way. The DSIW was during circulation pumped down to the 2K Landing Sub and landed in the seat. The circulation continued through the DSIW when seated the 2K Landing Sub and according to normal procedures and drilling practices. The system is easy to install and use by the rig crew. There is no need for service personal to install or operate the system. CONCLUSIONS The DSIW-System has proven it's capability and efficiency through field runs at the ConocoPhillips Eldfisk A. Numerous of wiper trips out of the hole has been performed through 5" drill pipe with satisfactory wiping efficiency. The DSIW has shown that it don't represent any restrictions in the string when it comes to free circulation. Any gain or kick situation during drilling operations can be performed as normal with the DSIW inside the string. The DSIW-System is easy to install, operate and handle by the rig crew. TEST DSIW-S ELDFISK ALPHA Side 5

6 Wiping performance The Wiping performance shown in the photos below gave minimum mud spills on drill floor and improved the working environment for the rig crew. The pictures below shows drill floor after wiping approx. 4,888 ft (1.489 mtrs.) of 5" DP. (Photo, ConocoPhillips) Prior to running the DSIW a few stands were pulled wet. This led to mud spills on the set back due to drain off from the drill pipe stands. (DSIW not applied) After pulling wet stands, a slug was pumped and DSIW was dropped into the string. The free fall of the DSIW inside the string was estimated to mtrs. before the DSIW got buoyant at the top of slug column. 2K Tools personal attend when pulling the first 3-5 stands and monitored satisfactory wiping function. The drill crew pulled the rest of the string problem free until the 2K Landing Sub reached the drill floor and the DSIW was picked out of the 2K Landing Sub. Photos above shows rotary table and set back after internal wiping of the total length of drill string mentioned above. To be observed in the photos, practically no mud spills on the drill floor, drains and DP threads. TEST DSIW-S ELDFISK ALPHA Side 6

7 DSIW pressure drop verification. One of the issues with a DSIW inside a drill string is if the tool represent any significant pressure drop if trapped inside the string. Therefore a controlled flow test was requested and performed. The following assembly was rigged up on the drill floor; 1) wash tool w/3 nozzles (to obtain SPP during tests) 2) 2K Landing Sub and 3)one stand 5" DP. It was pumped at 3 different flow rates to observe if there were any significant pressure drop caused by the DSIW tool located inside 2K Landing Sub. Similar test (flowrates) was performed without the DSIW located inside the 2K Landing Sub to compare the difference SPP. The table below confirms that the DSIW inside a drill string (2K Landing Sub) represent a minor difference pressure drop when circulating. Test results shown in table and diagram below: TEST SET UP STEP 1 STEP 2 STEP 3 With DSIW installed 93,5 psi (6,41 bar) 102 psi (7,03 bar) 130 psi (8,96 bar) Without DSIW installed 85 psi (5,85 bar) 88 psi (6,07 bar) 108,3 psi (7,45 bar) ΔP 8,5 psi (0,55 bar) 14 psi (0,97 bar) 21,7 psi (1,45 bar) FLOW RATE (SPM) FLOW RATE (l/min) FLOW RATE (GPM) MW: 1,5 sg. TEST DSIW-S ELDFISK ALPHA Side 7

8 Rupture disc test An important function of the DSIW is the rupture disc function. The function is to equalize the pressure inside the string and the buoyancy volume in the DSIW by filling up the buoyancy volume with mud. Equalizing the pressure eliminates the danger of collapsing the DSIW body when high SPP, and maintain the flow area and circulation function of the DSIW. After the "pressure drop verification" it was necessary to increase the standpipe pressure by increasing the flow rate to brake the rupture disc. The pumps where taken to 123 stroke/min (970 l/min) (256 GPM) that gave approx. 430 psi or 30 bar SPP. After achieving the rupture pressure, the DSIW was picked out from the 2K Landing sub and rupture of the disc was confirmed. (Photos below.) The DSIW rupture disc design pressure is approximate 290 psi (20 bar). The rupture function worked as it should by breaking the rupture disc and filling up the float volume of the DSIW. The DSIW body was in normal condition without any deformation due to the pipe pressure. Realistic gas kick incident During tripping out from the hole a positive gain was observed after the DSIW was dropped. Connecting and pumping had to be initiated with the DSIW inside the string. The DSIW was then gradually pumped down to the 2K Landing Sub. The gas kick was circulated out with the DSIW in the landing sub. The effective circulation time with the DSIW in the landing sub was 18 hrs. The operation confirmed very low pressure drop over the DSIW and it further confirmed that the DSIW can be circulated through without any negative operational consequences. The tool was recovered from the 2K Landing sub after the operation. DSIW exposure during circulation Hours circulated 18,75 hours Total flow volume GPM (1.684 m3) Average flowrate 395 GPM (1.497 l/min) Peak (max) flowrate 603 GPM (2.283 l/min) Duration peak flowrate 2,75 hours The figures shows the exposure to the DSIW tool during the kick circulation period. TEST DSIW-S ELDFISK ALPHA Side 8

9 Performance summary Wiping action The DSIW has wiped the 5" drill string and almost eliminated mud spills on drill floor, set back and DP threads. This is the conclusion through a number of wiper trips with the DSIW at Eldfisk A. Pressure drop tests The DSIW tool does not introduce any pressure drop of significance when it is landed in the landing sub during a kick situation. This is verified during controlled testing and also verified in the realistic gas kick incident described in this report. Circulation was performed as "normal" with DSIW inside the string. After stabilizing the well and finishing tripping out, the DSIW was recovered from the 2K Landing sub. Rupture disc function The rupture disc function is also verified as reliable. The rupture disc did break as predicted both during controlled tests and through the realistic kick incident down hole. The main function of the disc is to keep the tool body in a "as build" condition and to obtain the designed flow area for safe circulations. Operational findings After the 18 hours of circulation a wash out was observed in the DSIW fish neck. The neck is now replaced and installed at Eldfisk A with a new designed neck, to eliminate future wash outs. Other wear on the tool was of a minor (normal) character, and concluded as non critical. Conclusion The DSIW-System has successfully been implemented on Eldfisk Alpha as a part of the drilling equipment on the drill floor. The equipment has improved the working environment to the satisfaction of ConocoPhillips and the drilling contractor. Secondly the system has proven to be easy and safe to handle and operate by the rig crew. Ketil Botnmark Gen. Mngr. 2K TOOLS AS Kjell Mikalsen Technical Mngr. 2K TOOLS AS Dag Helge Breivik Director Drilling Eldfisk operations ConocoPhillips Norge AS Hans-Jacob Lund Eldfisk Drilling Superintendent ConocoPhillips Norge AS TEST DSIW-S ELDFISK ALPHA Side 9

10 Attachments Data gas circulation Date Duration Duration Flow Total flow FLOW Tot. Flow Tot flow hours minutes GPM Gallon l/min litres m , , , , , , , , , , , , , , , , , , , , , , , , , , , ,10 SUMS 18, Vital data kick situation, exposure DSIW tool Duration operation 18,75 hours 1125,00 mins. Total flow volume Gallon m3 Average flowrate 395,45 GPM l/min Peak flowrate 603 GPM l/min Duration peak (max) flowrate 2,75 hours TEST DSIW-S ELDFISK ALPHA Side 10

11 Drill String Internal Wiper -System TEST DSIW-S ELDFISK ALPHA Side 11

12 2K TOOLS AS Postboks NARVIK. N-Norway Visit address Teknologiveien Narvik N-Norway Phone Fax Ketil Botnmark Kjell Mikalsen Gen. mngr. Tech. mngr. Mob TEST DSIW-S ELDFISK ALPHA Side 12

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems As a result of a recent job incident utilizing a Ball Drop Type firing system deployed on coiled tubing, the following

More information

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing ECD Reduction Tool R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing Drilling Engineering Association, Fourth Quarter Meeting November 20, 2008 1 Presentation outline Description

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

E NGINEERED C EMENTING S OLUTIONS

E NGINEERED C EMENTING S OLUTIONS DART CATCHER TOOL Blackhawk s Dart Catcher Tool provides indication of the exact location of downhole fluids during inner string cement jobs, cementing squeezes, or balanced cement plugs for temporary/permanent

More information

Restoring Fluid Flow in Tubing Strings

Restoring Fluid Flow in Tubing Strings Restoring Fluid Flow in Tubing Strings Andrew Roth, Product Manager Fike Corporation Fike Hydraulic Tubing Drains (HTD) for use with deep hole drilling tools, downhole devices and other oil and off shore

More information

DRILLSCENE PROACTIVE DRILLING DECISIONS

DRILLSCENE PROACTIVE DRILLING DECISIONS DRILLSCENE PROACTIVE DRILLING DECISIONS RISE TO THE CHALLENGE OF REAL-TIME DRILLING CONTROL Today s oil and gas drilling operations present significant technical challenges in remote locations and increasingly

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 1. Introduction. 2. Data Input. Header. Bit Information. Mud Information. Casing Program. P.D.M./Turbine. Drill String Design.

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

Engineered solutions for complex pressure situations

Engineered solutions for complex pressure situations SPECIAL SERVICES Engineered solutions for complex pressure situations Cudd Energy Services (CES) delivers custom engineered solutions to resolve complex pressure situations resulting from equipment failure

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS Jay Miller Sales Manager Production Lift Companies Inc. Artificial Lift & Production Congress January 29, 2019 Unconventional Wells

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

Model A Sleeve Valve Cement Retainer

Model A Sleeve Valve Cement Retainer Ret. O.D. Model A Sleeve Valve Cement Retainer DIMENSIONAL DATA A B C D E F G H J K L M N P Q R 3.593 3.593 3.500 2.500 3.531 3.531 1.345 3.375.750.437 2.437 2.187 7.062 2.437 5.312 11.685 20.093 3.937

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

1 Exam Prep. Tabs and Highlights

1 Exam Prep. Tabs and Highlights 1 Exam Prep NFPA 14: Standard for the Installation of Standpipe and Hose Systems Tabs and s These 1 Exam Prep tabs are based on the NFPA 14: Standard for the Installation of Standpipe and Hose Systems,

More information

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director SPE Forum: Source Control for Wells in Shallow Water Lars Herbst, Gulf of Mexico Regional Director Agenda Introduction and Background Historical Well Control Events Scope of Discussion Scenario Driven

More information

SEMI-SUB AND JACK UP DRILL RIGS SPECIALIST CLEANING SERVICES & EQUIPMENT RENTAL SOLUTIONS

SEMI-SUB AND JACK UP DRILL RIGS SPECIALIST CLEANING SERVICES & EQUIPMENT RENTAL SOLUTIONS SEMI-SUB AND JACK UP DRILL RIGS SPECIALIST CLEANING SERVICES & EQUIPMENT RENTAL SOLUTIONS PONTOON BALLAST / FUEL TANKS DRILL WATER TANKS POTABLE WATER TANKS SPECIALIST CLEANING FUEL OIL DAY TANK & SETTLING

More information

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General... American Petroleum Institute Contents Page 1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General... 7 Apparatus and Materials... 8 High-temperature/high-pressure

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

Dynamic Underbalance (DUB)

Dynamic Underbalance (DUB) Dynamic Underbalance (DUB) Perforating Cam Le Perforating Product Champion Agenda Overview DUB Software Tools Case histories 2011 HALLIBURTON. ALL RIGHTS RESERVED. 2 Dynamic Underbalance Software Dynamic

More information

Top Drive System. 1. AC VFD Top Drive System. Technical characters

Top Drive System. 1. AC VFD Top Drive System. Technical characters Top Drive System The top drive system is a high-tech content products, which integrates mechanical, electrical hydraulic, and communications integration, and was used to replace traditional rotary table-kelly

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm Return-Suction Filters E 8 E 98 Tank top mounting Connection up to G½ / - SE and SE Nominal flow rate up to 6 l/min / 8. gpm Description pplication For operation in units with hydrostatic drives, when

More information

EMERGENCY WALL MOUNTED HAND OPERATED DELUGE SHOWER

EMERGENCY WALL MOUNTED HAND OPERATED DELUGE SHOWER EMERGENCY WALL MOUNTED HAND OPERATED DELUGE SHOWER Installation, Operating & Maintenance Instructions EW1050 I00232_Mar 2016 NOTE: THIS DOCUMENT IS TO BE LEFT ONSITE WITH FACILITY MANAGER AFTER INSTALLATION

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

HIGH-PRESSURE HIGH-FLOW PUMP UNITS TYPE BMS

HIGH-PRESSURE HIGH-FLOW PUMP UNITS TYPE BMS VALVES AN D FITTINGS UP TO 14,000 BAR TEST AND CONT ROL EQUIPMENT H IGH PRESSU RE TECH NOLOGY HIGH-PRESSURE HIGH-FLOW PUMP UNITS TYPE BMS Max. flow up to 50 L/min Max. pressure 52,200 psi / 3650 bar All

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

Installation Operation Maintenance

Installation Operation Maintenance 682 Seal Cooler New generation seal cooler to meet and exceed the seal cooler requirements stated in the 4th Edition of API Standard 682 Installation Operation Maintenance Experience In Motion Description

More information

Debris Management Drilling Tools

Debris Management Drilling Tools Debris Management Drilling Tools Protecting BHA components during well construction Remove drilling debris from the wellbore before it creates expensive problems. Debris commonly causes downhole tool failure,

More information

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

Standard Operating and Maintenance Instructions for Pumping System Model PS-90 Standard Operating and Maintenance Instructions for Pumping System Model PS-90 High Pressure Equipment Company 2955 West 17th Street, Suite 6 PO Box 8248 Erie, PA 16505 USA 814-838-2028 (phone) 814-838-6075

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well Jace R. Larrison, P.E. Blowout Engineers, LLC Recent advances in well control modeling simulators have incorporated

More information

Air and Gas Drilling

Air and Gas Drilling Air and Gas Drilling Air and Gas Drilling It is a technique in which the more common drilling fluids, (water or mud) are replaced by highly compressible Air or Natural gas. But Compressibility makes pressure

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

Advanced Intermittent Gas Lift Utilizing a Pilot Valve Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 29 March 2, 2016 Advanced Intermittent Gas Lift Utilizing a Pilot Valve Matt Young Technical Sales Manager Intermittent Gas Lift

More information

Technote. Frese PV-SIGMA Compact Dynamic Pressure and Flow Regulation. Description. Application. Operation. Features. Benefits.

Technote. Frese PV-SIGMA Compact Dynamic Pressure and Flow Regulation. Description. Application. Operation. Features. Benefits. Page 1 of 15 Dynamic Pressure and Regulation Description The system is a dynamic valve arrangement designed to regulate flow and differential pressure. Application The system can be installed in both domestic

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

DRILLING HOSE SOLUTIONS

DRILLING HOSE SOLUTIONS DRILLING HOSE SOLUTIONS HIGH PRESSURE FLEXIBLE LINES FOR A WIDE RANGE OF DRILLING APPLICATIONS HIGH QUALITY - HIGH STANDARD WE DELIVER ACCORDING TO THE HIGHEST LEVELS OF SPECIFICATIONS AND STANDARDS WITH

More information

Manual. Bypass Feeder. Installation Maintenance Repair Manual. Chemical Addition and Filtering

Manual. Bypass Feeder. Installation Maintenance Repair Manual. Chemical Addition and Filtering Manual Bypass Feeder Chemical Addition and Filtering Installation Maintenance Repair Manual Advantage Controls P.O. Box 1472 Muskogee, OK 74402 Phone: 918-686-6211 Fax: 918-686-6212 www.advantagecontrols.com

More information

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford

More information

E 084 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 80 l/min / 21.1 gpm

E 084 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 80 l/min / 21.1 gpm Return-Suction Filters E 08 Tank top mounting Connection up to G / -6 SE Nominal flow rate up to 80 l/min /. gpm Description pplication For operation in units with hydrostatic drives, when the return flow

More information

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Chris Carstens Unocal Corporation 14141 Southwest Freeway Sugar Land, Texas 77478 Mike Breaux Unocal Corporation 14141

More information

Intermittent Gas Lift Utilizing a Pilot Valve

Intermittent Gas Lift Utilizing a Pilot Valve 39 th Gas-Lift Workshop Houston, Texas, USA May 16 20, 2016 Intermittent Gas Lift Utilizing a Pilot Valve Matt Young Technical Sales Manager May 16 20, 2016 2015 Gas-Lift Workshop 1 Intermittent Gas Lift

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

FORGE Energy UL 21 Freedom 1 API Number:

FORGE Energy UL 21 Freedom 1 API Number: FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000

More information

On-Off Connector Skirt

On-Off Connector Skirt On-Off Connector Skirt Retrievable Packers & Accessories The On-Off Connector Skirt is compact, reliable, fully sealing, J-type tubing disconnect device that automatically engages and releases with a small

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

Book 3 - Well Control Calculations

Book 3 - Well Control Calculations Welltrain Distance Learning Programme - DRILLING CALCULATIONS www.welltrain.com.au Welltrain Distance Learning Programme Book 3 - Well Control Calculations 162 Colin Street, West Perth, WA 6005 Tel: +61

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Coal Bed Methane (CBM) Permeability Testing

Coal Bed Methane (CBM) Permeability Testing Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April 28-29, 2011 ExxonMobil Exploration / Well Testing Team CBM Flow Characteristics Flow mechanism Gas desorbs when pressure drops below

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

Installation and commissioning instructions 255 series and 256 series

Installation and commissioning instructions 255 series and 256 series Installation and commissioning instructions 255 series and 256 series Table of contents 1 General information... 3 1.1 About these instructions... 3 1.2 About this product... 3 1.3 Appropriate usage...

More information

DB Bridge Plug. Features. Benefits. Applications

DB Bridge Plug. Features. Benefits. Applications DB Bridge Plug The WELLFIRST Premium Cast Iron Bridge Plug designed to run on electric line. Rated between 2000-10000-psi differential, and 300 F from above and below. Features Field Proven Design Constructed

More information

DAV Series. DAV-MH Air Release & Vacuum Break Valves

DAV Series. DAV-MH Air Release & Vacuum Break Valves DAV-MH Air Release & Vacuum Break Valves ISO 9 AVFI Pty Ltd 4 Enterprise Drive Bundoora Vic 383 p: 3 8467 f: 3 8467 99 e: avfi@avfi.com.au w: www.avfi.com.au General DAV-MH Air Release and Vacuum Break

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford AADE-07-NTCE-69 A Downhole Tool for Reducing ECD R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford Copyright 2007, AADE This paper

More information

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells.

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells. AADE-11-NTCE-55 MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells. Serkan Cenberlitas, Jim Crenshaw, and Ferhat Gumus, Weatherford International;

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

Pressure reducing valve, direct operated

Pressure reducing valve, direct operated Electric Drives and Controls Table of contents Hydraulics Pressure reducing valve, direct operated Model ZDR 6 D Nominal size 6 Series 4X Maximum operating pressure 20 bar (3050 PSI) Maximum flow 50 L/min

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 347a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated

More information

VortexFlow DX (Downhole) Tool Installation Instructions

VortexFlow DX (Downhole) Tool Installation Instructions VortexFlow DX (Downhole) Tool Installation Instructions www.vortextools.com Page 1 of 10 The VortexFLOW tools are based upon Technology that is a result of U.S.A. patents 6,151,751; 6,659,118; 6,749,374;

More information

DAV - P. Product Catalogue DAV - P. Air release & Vacuum Break Valves. (Plastic Air Valves) DAV - P. Edition 2012

DAV - P. Product Catalogue DAV - P. Air release & Vacuum Break Valves. (Plastic Air Valves) DAV - P. Edition 2012 Product Catalogue DAV - P DAV - P Air release & Vacuum Break Valves Edition 1 DAV - P (Plastic Air Valves) DAV Series Overview General The presence of trapped air in a pressurized pipeline can have serious

More information

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement Rotary Steerable System for high-performance drilling and accurate wellbore placement The PowerDrive X6 RSS maintains control under the most difficult conditions, bringing the benefits of rotary steerable

More information

Sucker Rod Pumping Workshop Technology in a Mature Industry. September 2017 John C. Patterson Consultant Retired from ConocoPhillips (2015)

Sucker Rod Pumping Workshop Technology in a Mature Industry. September 2017 John C. Patterson Consultant Retired from ConocoPhillips (2015) Sucker Rod Pumping Workshop Technology in a Mature Industry September 2017 John C. Patterson Consultant Retired from ConocoPhillips (2015) It is important to honor the past while looking forward to the

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete

More information

Eliminating Fatal Risks. Dale Bradford Drilling Superintendent

Eliminating Fatal Risks. Dale Bradford Drilling Superintendent Eliminating Fatal Risks Dale Bradford Drilling Superintendent Setting the Stage: The BHPB Fatal Risks BHPB Fatal Risks identified following a review of past fatalities and significant incidents within

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 333a 1. Description Viking supervised Surefire Preaction Systems Utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated Viking G-3000P Valve comes complete

More information

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Slot Recovery Procedures: Slot Recovery Running Procedures 1. Cut And Retrieve Operation: Borais s cut and retrieve equipment: 1.

More information

Authors: Mário Rui da Cunha Pereira, Hands on Science

Authors: Mário Rui da Cunha Pereira, Hands on Science 9-11 years Science Content: Physical Science Target Concepts/Skills: Density and Bouyancy Target Age group: 9-11 years Duration of activity: 3 hours Summary: In this activity children inquire about why

More information

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations WELL SCAVENGER Versatile wellbore clean-up tool for the most demanding operations WELL SCAVENGER: A versatile wellbore cleanup tool for flowrestricted applications The inability to recover wellbore debris

More information

Inflatable Packers for Grouting 11/10/00

Inflatable Packers for Grouting 11/10/00 Introduction Inflatable Packers for Grouting 11/10/00 Inflatable packers are frequently used for grout injection in geotechnical applications for structural reinforcement and/or water-proofing of foundations,

More information

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES SHUT-IN PROCEDURES Shut-in Procedures Learning Objectives You will learn general shut-in procedures: For surface BOPs. For subsea BOPs. You will learn to interpret shut-in pressures and be able to perform

More information

The OCV Series 8000 float control valves are designed to maintain a SERIES FEATURES

The OCV Series 8000 float control valves are designed to maintain a SERIES FEATURES The OCV Series 8000 float control valves are designed to maintain a desired level in a tank or reservoir by opening for filling the tank when fluid is below the high level point and closing tightly when

More information

HORIZONTAL BLADDER TANK

HORIZONTAL BLADDER TANK Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Low Ceilings UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure

More information

Chapter 4 Key Findings. 4 Key Findings

Chapter 4 Key Findings. 4 Key Findings Chapter 4 Key Findings 211 4 Key Findings 212 Chapter 4 Key Findings This summarizes the key findings of the investigation team based on its extensive review of available information concerning the Macondo

More information

E 094 E 103 E 143 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 135 l/min / 35.7 gpm

E 094 E 103 E 143 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 135 l/min / 35.7 gpm Return Filters E 9 E E Tank top mounting Connection up to G / -6 SAE Nominal flow rate up to 5 l/min / 5.7 gpm Description Application In the return line circuits of hydraulic systems. Performance features

More information