his is a preview only - it is not a valid BS7671 certificate. This is a nly - it is not a valid BS7671 certificate. This is a preview only - it is

Size: px
Start display at page:

Download "his is a preview only - it is not a valid BS7671 certificate. This is a nly - it is not a valid BS7671 certificate. This is a preview only - it is"

Transcription

1 certificte vlid the seril review - it vlid number hs been defced certificte. or ltered nly - it vlid ELECTRICAL certificte. INSTALLATION CERTIFICATE - it Issued in ccordnce with Brith Stndrd 7671 Requirements for Electricl Instlltions by n Approved Contrctor or ot Contrctor s vlid Reference Number certificte. - it vlid Conforming Body enrolled with NICEIC, Wrwick House, Houghton Hll Prk, Houghton Reg, Dunstble, LU5 5ZX CRN/ Ref DETAILS OF THE CLIENT ertificte. Client / - it vlid certificte. A. Smith 123 Business Centre, Min Rod, Big City A12 3AZ Address: h DETAILS OF THE INSTALLATION - it vlid certificte. The instlltion : Address: review Business it Centre, Min Rod, vlid Big City certificte. A12 3AZ New -- Extent of the New Reception Sockets & New Reception Lighting Fixed Wiring Only. An instlltion ddition covered by th An ltertion -- certificte: DESIGN Delete s Detils of permitted exceptions ppended: Yes / Rk ssessment ppended: Yes / No. of pges 0 pproprite S7671 I/We, certificte. being the person(s) responsible for the design of the electricl instlltion (s indicted by - my/our it signture(s) below), prticulrs vlid of which re described bove, hving exerced resonble skill nd cre when crrying out the design, hereby CERTIFY tht the design work for which I/we hve been responsible, to the best of my/our knowledge nd belief, in ccordnce with BS 7671, mended to (dte) except for the deprtures, if ny, detiled s follows: 17th Edition, Amendment 3:2015 h Detils of deprtures from BS 7671, s - mended it (Regultions 120.3, vlid 133.5): None certificte. The extent of libility of the signtory/signtories limited to the work described bove s the subject of th certificte. review For the DESIGN of - the it instlltion: vlid certificte. **(Where there divided responsibility for the design) Signture... Dte Nme Designer 1 Signture... Dte Nme 01/01/2016 ** A. Engineer Designer 2 CONSTRUCTION S7671 I, being certificte. the person responsible for the construction of the electricl instlltion (s indicted by my - signture it below), prticulrs of vlid which re described bove, hving exerced resonble skill nd cre when crrying out the construction, hereby CERTIFY tht the construction work for which I hve been responsible, to the best of my knowledge nd belief, in ccordnce with BS 7671, mended to (dte) except for the ertificte. - it 17th Edition, vlid Amendment 3:2015 deprtures, if ny, detiled s follows: certificte. Detils of deprtures from BS 7671, s mended (Regultions 120.3, 133.5): The extent of libility of the signtory limited to the work described bove s the subject of th certificte. review For the CONSTRUCTION - it of the instlltion: vlid Signture... Dte 01/01/2016 Nme A. Engineer Constructor INSPECTION AND TESTING ot vlid I, being the person responsible for certificte. the inspection nd testing of the electricl instlltion (s indicted by my signtures below), - it prticulrs of which re vlid described bove, hving exerced resonble skill nd cre when crrying out the inspection nd testing, hereby CERTIFY tht the work for which I hve been responsible to the best of my knowledge nd belief in ccordnce with BS 7671, mended to (dte) except for the S7671 deprtures, certificte. ny, detiled s follows: 17th - Edition, it Amendment 3:2015 vlid Detils of deprtures from BS 7671, s mended (Regultions 120.3, 133.5): None The extent of libility of the signtory/signtories limited to the work described bove s the subject of th certificte. For the INSPECTION AND TESTING of the instlltion: Reviewed by Signture... Dte 01/01/2016 Signture... Dte 01/01/2016 Nme Nme Qulified A. Engineer Inspector Qulified Supervor Supervor * box to be completed where the design, construction, DESIGN, CONSTRUCTION, INSPECTION AND TESTING * inspection nd testing hve been the responsibility of one person. ot vlid Detils of permitted exceptions ppended: certificte. Yes / Rk ssessment ppended: Yes / No. of pges - 0 Delete it s pproprite vlid I, being the person responsible for the design, construction, inspection nd testing of the electricl instlltion (s indicted by my signture below), prticulrs of which for re which described I hve bove, been hving responsible exerced to resonble the best of skill my knowledge nd cre when nd belief crrying in ccordnce out the design, with construction, BS 7671, mended inspection to nd testing, hereby CERTIFY tht the sid (dte) work except for the deprtures, if ny, detiled s follows: 17th Edition, Amendment 3:2015 Detils of deprtures from BS 7671, s mended (Regultions 120.3, 133.5): None h The extent of libility of the signtory limited to the work - it described bove s the subject of vlid th certificte. certificte. For the DESIGN, the CONSTRUCTION nd the INSPECTION AND TESTING of the instlltion. Reviewed by review Signture - it Dte vlid 01/01/2016 Signturecertificte. Dte 01/01/2016 Nme Nme Qulified nly - it A. Engineer vlid certificte. A. Engineer - it Supervor Where the inspection nd testing hve been crried out by n Approved Contrctor, the inspection nd testing results re to be reviewed by the regtered Qulified Supervor. Pge 1 of 6 ot Where vlid the design, the construction, nd the inspection certificte. nd testing hve been the responsibility of one person, the inspection nd testing results re to be - it vlid reviewed by the regtered Qulified Supervor. certificte bsed on the model forms shown in Appendix 6 of BS 7671 Publhed by Certsure LLP. Certsure LLP opertes the ELECSA & NICEIC brnds. Copyright Certsure LLP (Jnury 2015) Plese see the Notes for Recipients on the reverse of th pge. 1 Originl (To the person ordering the work) Check your certificte genuine, go to < nd put in the certificte number

2 NOTES FOR RECIPIENT THIS SAFETY CERTIFICATE IS AN IMPORTANT AND VALUABLE DOCUMENT nly - it vlid WHICH SHOULD BE RETAINED certificte. FOR FUTURE REFERENCE - it sfety certificte hs been sued to confirm tht the electricl instlltion work to which it reltes hs S7671 been certificte. designed, constructed, inspected, tested nd verified in ccordnce - with it the ntionl stndrd vlid for the sfety of electricl instlltions, Brith Stndrd 7671 (s mended) - Requirements for Electricl ertificte. Instlltions. - it vlid certificte. Where, s will often be the cse, the instlltion incorportes residul current device (RCD), there should h be ice t or ner the min - switchbord it or consumer vlid unit stting tht the device certificte. should be tested t qurterly intervls. For sfety resons, it importnt tht you crry out the test regulrly. Also for sfety resons, the complete electricl instlltion will need to be inspected nd tested t pproprite nly - it intervls by skilled vlid person or persons competent certificte. in such work. NICEIC* recommends tht you engge the - it services of n Approved Contrctor for th purpose. The mximum intervl recommended before the next ot vlid inspection stted on certificte. Pge 2 under Next Inspection. There should be ice t or - ner it the min vlid switchbord or consumer unit indicting when the inspection of the instlltion next due. Only n NICEIC Approved Contrctor or Conforming Body responsible for the construction of the electricl ertificte. instlltion uthored to sue th NICEIC Electricl Instlltion - it Certificte. vlid certificte. h The certificte consts of t lest - six it numbered pges. The vlid certificte invlid if ny of certificte. the six pges re msing. The certificte hs printed seven-digit seril number which trceble to the Approved Contrctor to which it review ws supplied - by NICEIC. it vlid certificte. For instlltions hving more thn one dtribution bord or more circuits thn cn be recorded on pges 5 nd 6, nly - it one or more dditionl vlid Schedules of Circuit Detils certificte. for the Instlltion, nd Schedules of Test Results for the - it Instlltion (pges 7 nd 8 onwrds) should form prt of the certificte. intended to be sued for new electricl instlltion or for new work ssocited with n S7671 ltertion certificte. or ddition to n exting instlltion. It should hve been sued - it for the inspection of vlid n exting electricl instlltion. An Electricl Instlltion Condition Report or, where pproprite, Domestic Electricl ertificte. Instlltion Condition Report should be sued for such - periodic it inspection. vlid certificte. h certificte should hve been - it sued for electricl vlid work in potentilly explosive certificte. tmosphere (hzrdous re) unless the Approved Contrctor holds n pproprite extension to NICEIC enrolment for such work. review You should hve - received it the certificte vlid mrked Originl nd the Approved certificte. Contrctor should hve retined the certificte mrked Duplicte. If you were the person ordering the work, but the user of the instlltion, you should pss th certificte, or ot vlid full copy of it including these certificte. es, the schedules nd dditionl pges (if ny), immeditely - to it the user. vlid The Originl should be retined in sfe plce nd shown to ny skilled person inspecting or undertking further work on the electricl instlltion in the future. If you lter vcte the property, th ertificte. certificte will demonstrte to the new user tht the electricl - it instlltion complied vlid with the requirements certificte. of the ntionl electricl sfety stndrd t the time the certificte ws sued. h Pge 1 of th certificte provides - detils it of the electricl vlid instlltion, together with the certificte. nme(s) nd signture(s) of the person(s) certifying the three elements of instlltion work: design, construction nd inspection nd testing. review Pge 2 identifies - it the orgntion(s) responsible vlid for the work certified certificte. by their representtive(s). nly - it Certifiction for inspection vlid nd testing provides certificte. n ssurnce tht the electricl instlltion work hs been fully - it inspected nd tested, nd tht the electricl work hs been crried out in ccordnce with the requirements of ot vlid BS 7671 (except for ny deprtures certificte. snctioned by the designer) nd recorded in the pproprite - it box(es) of the vlid certificte. h * NICEIC, operted by Certsure LLP, - prtnership it between the Electricl vlid Contrctors Assocition certificte. nd the chrity, Electricl Sfety First. NICEIC mintins nd publhes regters of electricl contrctors tht it hs ssessed ginst prticulr scheme review requirements (including - it the technicl stndrd vlid of electricl work). certificte. nly - it For further vlid informtion bout certificte. electricl sfety nd how NICEIC cn - it help you, vit continued on the reverse of pge 2 Publhed by Certsure LLP. Certsure LLP opertes the ELECSA & NICEIC brnds. Copyright Certsure LLP (Jnury 2015) ICN4C 1&2B

3 NOTES FOR RECIPIENT (continued from the reverse of pge 1) Where responsibility for the design, the construction nd the inspection nd testing of the electricl work divided between the Approved Contrctor nd one or more other bodies, the divion of responsibility should hve ertificte. been estblhed nd greed before commencement - of it the work. In such vlid cse, NICEIC considers tht certificte. the bsence of certifiction for the construction, or the inspection nd testing elements of the work would render the h certificte invlid. If the design- section it of the certificte vlid hs been completed, NICEIC certificte. recommends tht you question why those responsible for the design hve certified tht th importnt element of the work in review ccordnce with - it the ntionl electricl vlid sfety stndrd. certificte. Where the electricl work to which th certificte reltes includes the instlltion of fire lrm system nd/or nly - it vlid certificte. - it n emergency lighting system (or prt of such systems) in ccordnce with Brith Stndrds BS 5839 nd ot vlid BS 5266 respectively, th certificte. electricl sfety certificte should be ccompnied by seprte - it certificte or vlid certifictes s prescribed by those stndrds. S7671 Where certificte. the instlltion cn be supplied by more thn one source, such - s it the public supply nd vlid stndby genertor, the number of sources should hve been recorded in the box entitled Number of Sources, under the generl heding Supply Chrctertics nd Erthing Arrngements on pge 2 of the certificte, nd the Schedule h of Test Results compiled ccordingly. - it Where number vlid of sources re vilble to certificte. supply the instlltion, nd where the dt given for the primry source my differ from other sources, n dditionl pge should hve been review provided which - gives it the relevnt informtion vlid relting to ech dditionl certificte. source, nd to the ssocited erthing rrngements nd min switchger. nly - it Should the person vlid ordering the work (e.g. the client, certificte. s identified on Pge 1 of th certificte), hve reson to - it believe tht ny element of the work for which the Approved Contrctor hs ccepted responsibility (s indicted by the signtures on th certificte) does comply with the requirements of the ntionl electricl sfety S7671 stndrd certificte. (BS 7671), the client should in the first instnce re the specific concerns - it in writing with the vlid Approved Contrctor. If the concerns remin unresolved, the client my mke forml complint to NICEIC, for which ertificte. purpose stndrd complint form vilble request. - it vlid certificte. The complints procedure offered by NICEIC subject to certin terms nd conditions, full detils of which re h vilble upon ppliction. NICEIC - it does investigte vlid complints relting to the certificte. opertionl performnce of electricl instlltions (such s lighting levels), or to contrctul or commercil sues (such s time or cost). Publhed by Certsure LLP. Certsure LLP opertes the ELECSA & NICEIC brnds. Copyright Certsure LLP (Jnury 2015) ICN4C 3&4B

4 certificte vlid the seril review - it vlid number hs been defced certificte. or ltered PARTICULARS OF THE ORGANISATION(S) RESPONSIBLE FOR THE ELECTRICAL INSTALLATION ot vlid Orgntion certificte. - it vlid DESIGN (1) Technerve Ltd S7671 Address: certificte. NICEIC - Enrolment it No vlid New Mesters Business Prk (where pproprite) ertificte. - it Brnch vlid number: certificte. Postcode S3 8EN (if pplicble) DESIGN (2) Orgntion review Address: - it vlid certificte. NICEIC Enrolment No (where pproprite) nly - it vlid certificte. Brnch number: - it Postcode (if pplicble) ot vlid certificte. - it vlid CONSTRUCTION Orgntion Technerve Ltd S7671 Address: certificte. NICEIC - Enrolment it No vlid (Essentil informtion) ertificte. New Mesters Business Prk - it Brnch vlid number: certificte. Postcode S3 8EN (if pplicble) h INSPECTION - it vlid certificte. Orgntion AND TESTING Technerve Ltd review Address: - it vlid certificte. NICEIC Enrolment No (where pproprite) nly - it New Mesters Business vlid Prk certificte. - it Brnch number: Postcode S3 8EN (if pplicble) Tick boxes nd enter SUPPLY CHARACTERISTICS AND EARTHING ARRANGEMENTS Chrctertics of Primry Supply detils, s pproprite Overcurrent Protective Device(s) S7671 System certificte. Type(s) Number nd Type of Live Conductors Nture of Supply Prmeters - it vlid TN-S.c. d.c. Nominl V V BS(EN) voltge(s): ertificte. - it U (1) (1) 400 U o vlid certificte. TN-C-S 1-phse 1-phse 2-pole Nominl Notes: (2-wire) Hz Type (3-wire) frequency, f h - it vlid (1) 50 gg (1) by enquiry certificte. TN-C 2-phse Prospective fult (2) by enquiry or by 3-pole ka A (2)(3) mesurement Rted current (3-wire) current, I pf (3) where more thn review TT 3-phse - it 3-phse vlid Externl erth fult other certificte. (3-wire) one supply, record Short-circuit (2)(3) W ka (4-wire) loop impednce, Z 0.35 the higher or highest cpcity 33 e vlues Plese stte nly - ITit Other vlid certificte. Number of Confirmtion of sources 1 - it supply polrity ( ) ot vlid PARTICULARS OF INSTALLATION certificte. AT THE ORIGIN Tick boxes nd enter detils, s pproprite - it vlid Mens of Erthing Detils of Instlltion Erth Electrode (where pplicble) S7671 Dtributor s certificte. Type: - it vlid fcility: (eg rod(s), tpe etc) Loction: ertificte. Instlltion Electrode Method of- it vlid certificte. erth electrode: restnce, R A : (W) mesurement: h Min Switch/Switch-Fuse/ Circuit-Breker/RCD - it Mximum vlid kva / Amps Protective certificte. mesures Type Voltge Demnd (Lod): *Delete s pproprite ginst electric shock: BS(EN) rting 400 V Erthing nd Protective Bonding Conductors No of Erthing conductor Min protective bonding conductors 4 Rted Bonding of extrneous-conductive-prts ( ) poles current, I 200 A nly - it vlid n Conductor Conductor Wter certificte. Lightning Supply mteril copper - it RCD operting mteril copper instlltion pipes protection conductors copper ma mteril current, I n * Conductor cs mm Conductor 2 Oil Structurl Supply RCD operting 70 conductors mm ms cs 50 mm2 instlltion pipes steel time (t I n ) * cs Continuity/ Continuity/ Gs Other connection Rted time ( ) connection ( ) S7671 certificte. ms verified verified - it vlid instlltion dely* pipes * (pplicble where n RCD suitble nd used s min circuit-breker) ertificte. - it vlid certificte. COMMENTS ON EXISTING INSTALLATION Note: Enter NONE or, where pproprite, the pge number(s) None In the cse of n ltertion or dditions see Section 633 of dditionl pge(s) of comments on the exting instlltion. NEXT INSPECTION** Enter intervl in terms of yers, months or weeks, s pproprite review - it vlid certificte. 3 yers I/We, the designer(s), RECOMMEND tht th instlltion further inspected nd tested fter n intervl of more thn ** The proposed dte for the next inspection should tke into considertion the frequency nd qulity of mintennce tht the instlltion cn resonbly be expected to receive during its intended life, nd the period should be greed between the designer, instller nd other relevnt prties. Where the Approved Contrctor responsible for the construction of the electricl instlltion hs lso been responsible for the design ot vlid nd the inspection nd testing of tht instlltion, certificte. the Prticulrs of the Orgntion(s) responsible for the Electricl Instlltion my be - it Pge 2 of recorded in the section entitled CONSTRUCTION. 6vlid Where number of sources re vilble to supply the instlltion, nd where the dt given for the primry source my differ from other sources, seprte sheet must be provided which identifies the relevnt informtion relting to ech dditionl source. certificte bsed on the model forms shown in Appendix 6 of BS 7671 Publhed by Certsure LLP. Certsure LLP opertes the ELECSA & NICEIC brnds. Copyright Certsure LLP (Jnury 2015) Plese see the Notes for Recipients on the reverse of th pge. 3 Originl (To the person ordering the work)

5 certificte vlid the seril review - it vlid number hs been defced certificte. or ltered SCHEDULE OF ITEMS INSPECTED See e below ot vlid 1.0 CONDITION OF ELECTRICAL certificte. INTAKE EQUIPMENT 6.0 OTHER METHODS OF PROTECTION - it vlid (the Dtributor should be ified of ny (insert loction in box provided) unstfctory equipment) S7671 certificte. The presence nd - effectiveness it of other methods of vlid protection 1.1 Service cble ginst electric shock where used, s follows: 1.2 Service hed ertificte. - it vlid LOCATION certificte. 1.3 Dtributor s erthing rrngement 6.1 Bsic nd fult protection h 1.4 Meter tils - Dtributor/Consumer - it vlid ) SELV certificte. 1.5 Metering equipment b) PELV review 1.6 Isoltor - it vlid c) Double certificte. insultion/ Reinforced insultion nly - it 2.0 PARALLEL OR SWITCHED vlid ALTERNATIVE SOURCES d) Electricl seprtion for one item certificte. - it OF SUPPLY of equipment 2.1 Presence of dequte rrngements where genertor to 6.2 Fult protection ot vlid operte s switched lterntive certificte. ) Non-conducting loction/erth-free - it vlid ) Dedicted erthing rrngement independent of tht of the locl equipotentil bonding** S7671 certificte. public supply b) Electricl seprtion - it for more vlid 2.2 Presence of dequte rrngements where genertor to thn one item of equipment** operte in prllel with public supply system ) Correct connection of genertor in prllel 7.0 DISTRIBUTION EQUIPMENT h b) Comptibility of chrctertics of mens - it of genertion vlid certificte. 7.1 Adequcy of working spce/ccessibility c) Mens to provide utomtic dconnection of genertor in 7.2 Security of fixing the event of loss of public supply system or voltge or 7.3 Insultion of live prts dmged during erection frequency devition beyond declred vlues 7.4 Adequcy / security of brriers d) Mens to prevent connection of genertor in the event of nly - it loss of public supply vlid system or voltge or frequency certificte. 7.5 Suitbility of enclosures for IP nd fire rtings - it devition beyond declred vlues 7.6 Enclosures dmged during instlltion ot vlid e) Mens to olte genertor certificte. from the public supply system 7.7 Presence nd effectiveness of obstcles - it vlid 2.3 Presence of lterntive/dditionl supply wrning ices t: 7.8 Presence of min switch(es), linked where required S7671 certificte. ) The origin 7.9 Opertion of min - switch(es) it (functionl check) vlid b) The meter position, if remote from origin 7.10 Opertion of circuit-brekers nd RCDs to prove functionlity ertificte. c) The consumer unit/dtribution bord to which the - it 7.11 RCD(s) provided for fult vlid protection, where specified certificte. lterntive/dditionl sources re connected 7.12 RCD(s) provided for protection ginst fire h d) All points of oltion of ALL sources - of supply it vlid 7.13 RCD(s) provided for dditionl certificte. protection, where specified 7.14 Confirmtion overvoltge protection (SPDs) provided where review 3.0 AUTOMATIC - DISCONNECTION it OF SUPPLY vlid certificte. specified 3.1 Presence nd dequcy of protective erthing/ bonding 7.15 Confirmtion of indiction tht SPD functionl rrngements s follows: 7.16 Presence of RCD qurterly test ice t or ner the origin ) Dtributor s erthing rrngement or instlltion erth 7.17 Presence of digrms, chrts or schedules t or ner ech electrode rrngement dtribution bord, where required b) Erthing conductor nd connections 7.18 Presence of non-stndrd (mixed) cble colour wrning ice S7671 certificte. c) Min protective bonding conductors nd connections t or ner the pproprite dtribution bord, where required - it vlid d) Erthing/bonding lbels t ll pproprite loctions 7.19 Presence of next inspection recommendtion lbel ertificte. 3.2 Accessibility of: - it 7.20 Presence of other required vlid lbelling certificte. ) Erthing conductor connections 7.21 Selection of protective device(s) nd bse(s); correct type nd h b) All protective bonding connections - it rting vlid certificte. 3.3 FELV requirements stfied 7.22 Single-pole protective devices in line conductor review 3.4 Reduced low - voltge it requirements stfied vlid 7.23 Protection ginst mechnicl dmge where cbles enter certificte. equipment 7.24 Protection ginst electromgnetic effects where cbles enter nly - it 4.0 BASIC PROTECTION vlid certificte. ferromgnetic enclosures - it 4.1 Presence nd dequcy of protective mesures to provide 7.25 Confirmtion tht ALL conductor connections, including bsic protection connections to busbrs re correctly locted in terminls nd ) Insultion of live prts re tight nd secure S7671 certificte. b) Brriers or enclosures - it vlid c) Obstcles** 8.0 CIRCUITS ertificte. d) Plcing out of rech** - it 8.1 Identifiction of conductors vlid certificte. 8.2 Cbles correctly supported throughout their length h 5.0 ADDITIONAL PROTECTION - it vlid 8.3 Exmintion of cbles for signs certificte. of mechnicl dmge during 5.1 The presence nd effectiveness of dditionl protection instlltion methods used, s follows: 8.4 Exmintion of insultion of live prts, dmged during ) RCDs exceeding 30 ma operting current erection b) Supplementry bonding nly - it vlid certificte. ** For use in controlled superved/conditions - it All boxes must be completed. indictes tht n inspection ws crried out nd tht the result ws stfctory. indictes tht n inspection ws pplicble to the prticulr instlltion. * Where the electricl work to which th certificte reltes includes the instlltion of fire lrm system nd/or n emergency lighting system (or prt of such systems), th electricl sfety certificte should be ccompnied by the prticulr certificte(s) for the system(s). certificte bsed on the model forms shown in Appendix 6 of BS 7671 Publhed by Certsure LLP. Certsure LLP opertes the ELECSA & NICEIC brnds. Copyright Certsure LLP (Jnury 2015) Pge 3 of 6 5 Originl (To the person ordering the work)

6 certificte vlid the seril review - it vlid number hs been defced certificte. or ltered SCHEDULE OF ITEMS INSPECTED See e below ot vlid 8.5 Non-shethed cbles protected certificte. by enclosure in conduit, 9.2 Switching off for mechnicl mintennce - it vlid ducting or trunking ) Presence of pproprite devices S certificte. Suitbility of continment systems (including flexible conduit) b) Acceptble loction - it (stte if locl or remote) vlid 8.7 Correct temperture rting of cble insultion c) Cpble of being secured in the OFF position ertificte. 8.8 Adequcy of cbles for current-crrying cpcity with regrd - it d) Correct opertion vlid verified (functionl check) certificte. to the type nd nture of instlltion e) The circuit or prt thereof to be dconnected clerly h 8.9 Adequcy of protective devices: type nd - rted it current for vlid identified by loction nd/or certificte. durble mrking fult protection 8.10 Presence nd dequcy of circuit protective conductors 9.3 Emergency switching/stopping review - it vlid ) Presence certificte. of pproprite devices 8.11 Coordintion between conductors nd overlod protective devices b) Redily ccessible for opertion where dnger might occur 8.12 Wiring systems nd cble instlltion methods / prctices c) Correct opertion verified (functionl check) pproprite to the type nd nture of instlltion nd externl d) The instlltion, circuit or prt thereof to be dconnected, ot vlid certificte. - it influences vlid clerly identified by loction nd/or durble mrking 8.13 Cbles instlled under floors, bove ceilings, in wlls / 9.4 Functionl switching S7671 certificte. prtitions, dequtely protected ginst dmge - it vlid ) Presence of pproprite devices instlled in prescribed zones b) Correct opertion verified (functionl check) ertificte. incorporting erthed rmour or sheth, - it vlid certificte. or instlled within erthed wiring system, or otherwe protected ginst mechnicl 10.0 CURRENT-USING EQUIPMENT (PERMANENTLY dmge by nils, screws nd the like CONNECTED) review 8.14 Provion of dditionl - it protection by RCDs hving vlid rted 10.1 Suitbility certificte. of equipment in terms of IP nd fire rtings residul operting current (I n ) exceeding 30 ma 10.2 Enclosure dmged/deteriorted during instlltion so s nly - it ) for mobile equipment vlid with current rting exceeding to impir sfety certificte. - it 32 A for use outdoors 10.3 Suitbility for the environment nd externl influences b) For ll socket-outlets of rting 20 A or less, unless exempt ot vlid certificte Security of fixing - it vlid c) For cbles instlled in wlls/prtitions t depth of 10.5 Cble entry holes in ceilings bove luminires, sized or seled less thn 50 mm S7671 certificte. so s to restrict the - spred it of fire vlid d) For cbles instlled in wlls/prtitions contining metl 10.6 Recessed luminires (downlighters) prts regrdless of depth ertificte. - it ) Correct type of lmps vlid fitted certificte Provion of fire brriers, seling rrngements so s to b) Instlled to minime build-up of het minimize the spred of fire h - it vlid 10.7 Provion of undervoltge protection, certificte. where specified 8.16 Bnd II cbles segregted/seprted from Bnd I cbles 10.8 Provion of overlod protection, where specified 8.17 Cbles segregted/seprted from non-electricl services review - it vlid 10.9 Adequcy certificte. of working spce/ccessibility to equipment 8.18 Termintion of cbles t enclosures nly - it ) Connections under vlid no undue strin certificte SPECIAL INSTALLATIONS OR LOCATIONS - it b) No bsic insultion of conductor vible outside enclosure Lt below ny Specil Instlltions or Loctions which re prt of the ot vlid certificte. instlltion to be verified, nd confirm tht the - dditionl it requirements vlid c) Connections of live conductors dequtely enclosed given in the respective section of Prt 7 re fulfilled. S7671 certificte. d) Adequtely connected t point of entry to enclosure - it vlid (glnds, bushes etc.) ertificte Suitbility of circuit ccessories for externl influences - it vlid certificte Circuit ccessories dmged during erection h 8.21 Single-pole devices for switching in line - conductor it vlid certificte Adequcy of connections, including cpcs, within ccessories nd t fixed nd sttionry equipment 9.0 ISOLATION AND SWITCHING 9.1 Isoltors 12.0 OTHER ot vlid ) Presence nd loction of pproprite certificte. devices - it vlid b) Cpble of being secured in the OFF position S7671 certificte. c) Correct opertion verified (functionl check) - it vlid d) The instlltion, circuit or prt thereof tht will be olted clerly identified by loction nd/or durble mrking e) Wrning lbel posted in situtions where live prts cn be olted by the opertion of single device SCHEDULE OF ADDITIONAL RECORDS* (See ttched schedule) Pge No(s) nly - it Note: Additionl pge(s) must be vlid identified by the Electricl Instlltion Certificte certificte. seril number nd pge number(s). - it All boxes must be completed. indictes tht n inspection ws crried out nd tht the result ws stfctory. indictes tht n inspection ws pplicble to the prticulr instlltion. * Where the electricl work to which th certificte reltes includes the instlltion of fire lrm system nd/or n emergency lighting system (or prt of such systems), th electricl sfety certificte should be ccompnied by the prticulr certificte(s) for the system(s). certificte bsed on the model forms shown in Appendix 6 of BS 7671 Publhed by Certsure LLP. Certsure LLP opertes the ELECSA & NICEIC brnds. Copyright Certsure LLP (Jnury 2015) Pge 4 of 6 7 Originl (To the person ordering the work)

7 certificte vlid the seril review - it vlid number hs been defced certificte. or ltered nly - it vlid SCHEDULE certificte. OF CIRCUIT DETAILS - it ot vlid certificte. FOR THE INSTALLATION - it vlid TO BE COMPLETED IN EVERY CASE TO BE COMPLETED ONLY IF THE DISTRIBUTION BOARD IS NOT CONNECTED DIRECTLY TO THE ORIGIN OF THE INSTALLATION* Loction of Supply to dtribution Noof Nominl dtribution bord: bord from: Origin of Supply [ ] phses: 3 voltge: 400 V h Fctory - it vlid certificte. Associted Overcurrent protective device for the dtribution circuit: RCD (if ny): BS(EN) Dtribution review - it Type: vlid certificte. Rting: A bord designtion: 3-phse Bord RCD No BS(EN) of poles: I n ma CIRCUIT DETAILS Circuit designtion Circuit Overcurrent protective devices RCD conductors: cs S7671 certificte. Live cpc - it BS (EN) vlid (mm 2 ) (mm 2 ) (s) (A) (ka) (ma) (W) h 1L1 Sockets Reception Desk - it A B 10 vlid certificte. C L2 Lighting Office A C C L3 SPARE Circuit number nd line See Tble 4A2 of Appendix 4 of BS 7671 Type of wiring (see code below) CODES FOR TYPE OF WIRING review A B- it C D vlid E F G certificte. H O (Other - plese stte) Thermoplstic Thermoplstic nly - it insulted/ cbles Thermoplstic shethed in metllic vlid certificte. Pge 5 of - it cbles Thermoplstic Thermoplstic in non-metllic cbles cbles Thermoplstic Thermosetting/ /SWA in metllic in non-metllic cbles cbles SWA insulted Minerl- cbles 6 cbles conduit conduit trunking trunking ot * vlid In such cses, detils of the dtribution certificte. (sub-min) circuit(s), together with the test results for the circuit(s), must lso be provided - it on continution schedules. vlid certificte bsed on the model forms shown in Appendix 6 of BS 7671 Publhed by Certsure LLP. Certsure LLP opertes the ELECSA & NICEIC brnds. Copyright Certsure LLP (Jnury 2015) Reference method Number of points served Mx. dconnection time permitted by BS 7671 Type Rting Short-circuit cpcity Operting current, I n Mximum Z s permitted by BS 7671 See next pge for Schedule of Test Results 9 Originl (To the person ordering the work)

8 certificte vlid the seril review - it vlid number hs been defced certificte. or ltered SCHEDULE OF TEST RESULTS ot vlid certificte. FOR THE INSTALLATION - it vlid S7671 TO BE certificte. COMPLETED ONLY IF THE DISTRIBUTION BOARD IS NOT CONNECTED - it vlid DIRECTLY TO THE ORIGIN OF THE INSTALLATION Test instruments (seril numbers) used: ertificte. - it vlid certificte. Chrctertics t th dtribution bord Confirmtion of supply polrity Erth h - it impednce fult loop RCD See e below vlid certificte. Z Insultion Multifunction s 0.35 W Operting times At I n ms restnce review - it vlid certificte. of ssocited I pf ka RCD (if ny) At 5I 16 n Continuity Other (if pplicble) ms Phse sequence confirmed (where pproprite) ( ) TEST RESULTS S7671 certificte. Circuit impednces Insultion restnce - it Polrity Mximum vlid RCD (W) Record lower or lowest vlue mesured operting erth Ring finl circuits All circuits Line/Line Line/Neutrl Line/Erth Neutrl/Erth ertificte. (mesured end to end) - it vlid certificte. loop fult times Test (At lest one column impednce, t I n t 5I n to be completed) Z button r h 1 r n r 2 s (if pplicble) opertion (Line) (Neutrl) (cpc) (R Rit 2 ) R 2 (MW) vlid (MW) (MW) (MW) ( ) certificte. (W) (ms) (ms) ( ) 1L L nly - it 1L3 vlid certificte. - it Note: Where the instlltion cn be supplied by more thn one source, such s primry source (e.g. public supply) nd secondry source (e.g. stndby genertor), the higher or highest Circuit number nd line vlues must be recorded. TESTED BY Signture: Position: Engineer Pge 6 of 6 Nme: A. Engineer Dte of testing: 01/01/2016 certificte bsed on the model forms shown in Appendix 6 of BS 7671 Publhed by Certsure LLP. Certsure LLP opertes the ELECSA & NICEIC brnds. Copyright Certsure LLP (Jnury 2015) See previous pge for Circuit Detils 11 Originl (To the person ordering the work)

PECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671

PECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671 IMM6 NCR (No Carb o n Requi red) Minor Electrical Installation Works Certificates Installer s Reference Number IRN/ PART 1: DETAILS OF THE MINOR WORKS Client: minor works completed: IMM6/ MINOR ELECTRICAL

More information

Landlord Report Operational limitations including the reasons (see page No. ) N/A

Landlord Report Operational limitations including the reasons (see page No. ) N/A Installer s Reference Number IRN/ A. DETAILS OF THE CLIENT Client: Rosen Rentals ltd UNKNOWN Address: Issued in accordance with British Standard 7671 Requirements for Electrical Installations by an ELECSA

More information

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION For explanatory notes relating to software endorsement, see Notes for Recipients A. DETAILS OF THE CLIENT Client: PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION Issued in accordance with British

More information

TRANSPORTABLE BUILDING PERIODIC INSPECTION REPORT

TRANSPORTABLE BUILDING PERIODIC INSPECTION REPORT TPN3/03372 TRNSPORTLE UILDING PERIODIC INSPECTION REPORT Issued in accordance withritish Standard 77-Requirements for Electrical Installations by an pproved Contractor enrolled with NICEIC, Warwick House,

More information

2014 Victorian Shooting Championship

2014 Victorian Shooting Championship 2014 Victorin Shooting Chmpionship VPCI, in conjunction with the Stte Coches nd the Stte Umpires invite ll PFA licensed petnque plyers in the Stte of Victori to tke prt in the 2014 Victorin Shooting Chmpionship.

More information

Bypass Compensator Cartridge, Size 16

Bypass Compensator Cartridge, Size 16 Bypss Compenstor Crtridge, Size 6 Q mx = 5 l/min, p mx = 42 br Direct cting, djustble compenstor spring Description These direct-cting bypss pressure-compenstor (hydrostt) crtridges, series DWDP-2B -6,

More information

THERMOFLO FLUID PUMPS& SYSTEMS THERMOFLO FOR HEATING, COOLING AND WATER SUPPLY APPLICATIONS TO BS7074 SEALED SYSTEMS EXPANSION VESSELS PRESSURIZERS

THERMOFLO FLUID PUMPS& SYSTEMS THERMOFLO FOR HEATING, COOLING AND WATER SUPPLY APPLICATIONS TO BS7074 SEALED SYSTEMS EXPANSION VESSELS PRESSURIZERS THERMOFLO S E A L E D S Y S T E M S THERMOFLO SEALED SYSTEMS FOR HEATING, COOLING AND WATER SUPPLY APPLICATIONS TO BS7074 EXPANSION VESSELS PRESSURIZERS PUMPS& SYSTEMS WALL OR BASE MOUNTING PRESSURIZERS

More information

VB-7253 Series. Application. Features. Applicable Literature

VB-7253 Series. Application. Features. Applicable Literature VB-7253 Series 1/2 to 2 Screwed NPT Stinless Steel Trim with Teflon Disc Stem Up Open, Two-Wy Vlves Generl Instructions Appliction VB-7253 series single set, stem down to close, two wy vlves control wter

More information

A Measurement Framework for National Key Performance Measures

A Measurement Framework for National Key Performance Measures MINISTERIAL COUNCIL ON EDUCATION, EMPLOYMENT, TRAINING AND YOUTH AFFAIRS Performnce Mesurement nd Reporting Tskforce Working for qulity eduction outcomes A Mesurement Frmework for Ntionl Key Performnce

More information

Valve Proving System for automatic Shutoff Valves

Valve Proving System for automatic Shutoff Valves 7 66 VVGYR Vlve Proving System for utomtic Shutoff Vlves 11... The 11 vlve proving system is designed for use with shutoff vlves in connection with gs burners nd gs pplinces. In the event of indmissible

More information

Chapter 4 Group of Volunteers

Chapter 4 Group of Volunteers CHAPTER 4 SAFETY CLEARANCE, FREEBOARD AND DRAUGHT MARKS 4-1 GENERAL 4-1.1 This chpter specifies the minimum freebord for inlnd wterwy vessels. It lso contins requirements concerning the indiction of the

More information

Valve Proving System for automatic Shutoff Valves

Valve Proving System for automatic Shutoff Valves LGY lve Proving System for utomtic Shutoff lves 11... The 11... vlve proving system is designed for use with shutoff vlves in connection with gs urners nd gs pplinces. n the event of indmissile lekge,

More information

Corrective actions identified

Corrective actions identified University of Otgo Lbortory helth nd sfety udit tool Deprtment: Loction Detils: DLM: Building: Room: Dte: Nme Of Auditor(s) Signture of Auditor(s) Lbortory Designtions: HSNO Exempt Rdionuclide Lbortory

More information

Inspection and Testing Pocket Notes

Inspection and Testing Pocket Notes Inspection and Testing Pocket Notes of Initial Verification Periodic Inspection Purpose of Information required by inspector 1. All equipment is correct type and complies with relevant British Standard

More information

First Aid in School Policy

First Aid in School Policy First Aid in School Policy Approved y the Governing Body of West Monkton Church of Englnd Primry School: Reviewed y Governors nd Agreed: Septemer 2017 At West Monkton we im to e n inspirtionl community,

More information

Asbestos Management Program

Asbestos Management Program ( Asbestos Mngement Progrm < West Virgini University Morgntown, WV 26506 West Virgini University '(/' Asbestos Mngement Progrm Best Prctice Mnul 1 of 22 Tble Of Contents 1.0 INTRODUCTION 4 1.1 1.2 1.3

More information

Valve Proving System for automatic Shutoff Valves

Valve Proving System for automatic Shutoff Valves LGY lve Proving System for utomtic Shutoff lves... The... vlve proving system is designed for use with shutoff vlves in connection with gs urners nd gs pplinces. n the event of indmissile lekge, the system

More information

Minnesota Manual on Uniform Traffic Control Devices

Minnesota Manual on Uniform Traffic Control Devices Minnesot Mnul on Uniform Trffic Control Devices MN MUTCD Jnury 2014 MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MN MUTCD Jnury 2014 Minnesot Deprtment of Trnsporttion Office of Trffic, Sfety,

More information

Inspection and Testing

Inspection and Testing Chapter 16 Inspection and Testing 16.1 INTRODUCTION The Purpose of Inspection, Testing and Certification or Reporting The fundamental reason for inspecting and testing an electrical installation is to

More information

POWER COMBICON feed-through plugs mm pitch DFK-PC 16/...-ST(F)-10,16

POWER COMBICON feed-through plugs mm pitch DFK-PC 16/...-ST(F)-10,16 feed-through plugs 0.6 mm pitch DFK-PC 6/...-ST(F)-0,6 If 6 mm conductor is used, the new feed-through plug connector offers the possibility to trnsfer current of 76 A from inside the device to outside

More information

Hot-Air Blowers 12 / / Hot-Air Blowers

Hot-Air Blowers 12 / / Hot-Air Blowers Hot-Air Blowers MISTRAL HOTWIND PREMIUM / HOTWIND SYSTEM MISTRAL Accessories HOTWIND Accessories VULCAN SYSTEM VULCAN SYSTEM Accessories IGNITER BM4/BR4 IGNITER BM4/BR4 Accessories 12 / 13 14 / 15 16 17

More information

Firearm Safety. Links to Topics below XAVIER BECERRA THE SIX BASIC GUN SAFETY RULES. Attorney Genera] The. Six Basic Gun Safety Rules

Firearm Safety. Links to Topics below XAVIER BECERRA THE SIX BASIC GUN SAFETY RULES. Attorney Genera] The. Six Basic Gun Safety Rules firerm Sfety Stte of Cliforni - Deprtment of Justice - Office of the Attorney Generl Pge 1 of 14 Stte of Cliforni Deprtment of]ustice XAVIER BECERRA Attorney Gener] Serch Trnslte Website Trducir Sitio

More information

ANATOMY OF A TRIPOD: Friction Lock (column) 8 Boots / Footwear. Friction Lock (Leg)

ANATOMY OF A TRIPOD: Friction Lock (column) 8 Boots / Footwear. Friction Lock (Leg) IMPORTANT DO NOT USE YOUR TRIPOD UNTIL YOU HAVE READ THESE INSTRUCTIONS. NO WARRANTY CLAIM WILL BE ENTERED INTO FOR THE MISUSE OR INCORRECT USE OF THESE PRODUCTS. ANATOMY OF A TRIPOD: We offer the three

More information

Lesson 8: Application Technology

Lesson 8: Application Technology The type of ppliction equipment used must suit the type of ppliction. In this module, you ll lern the prts of the most common types of ppliction equipment used by ssistnt pplictors, s well s how to properly

More information

2014 WHEAT PROTEIN RESPONSE TO NITROGEN

2014 WHEAT PROTEIN RESPONSE TO NITROGEN 2014 WHEAT PROTEIN RESPONSE TO NITROGEN Aron Wlters, Coopertor Ryford Schulze, Coopertor Dniel Hthcot, Extension Progrm Specilist Dr. Clrk Neely, Extension Stte Smll Grins Specilist Ryn Collett, Extension

More information

ERRATA for Guide for the Development of Bicycle Facilities, 4th Edition (GBF-4)

ERRATA for Guide for the Development of Bicycle Facilities, 4th Edition (GBF-4) Dvid Bernhrdt, P.E., President Commissioner, Mine Deprtment of Trnsporttion Bud Wright, Executive Director 444 North Cpitol Street NW, Suite 249, Wshington, DC 20001 (202) 624-5800 Fx: (202) 624-5806 www.trnsporttion.org

More information

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2016 REVISIONS

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2016 REVISIONS , NEVD YER 2016 REVISIONS DWG NO. TITLE ND REVISIONS SUMMRY EFFECTIVE DTE 223.1 Residential Driveway without djacent Sidewalk 7/1/2016 New Drawing to allow flexibility in Roadway Design. 234.1 Typical

More information

United States Patent (19)

United States Patent (19) United Sttes Ptent (19) Mobley (11) 45) Ptent Number: Dte of Ptent: Nov. 19, 1991 (54) BICYCLE RACK FORMOUNTING ON A VAN 76 Inventor: Mrk H. Mobley, P.O. Box 636, Norris, Tenn. 37828 21 Appl. No.: 436,492

More information

Owner s Manual. For TH330MR1 Hydraulic Winches Dedicated for Personnel Lifting

Owner s Manual. For TH330MR1 Hydraulic Winches Dedicated for Personnel Lifting Red this Owner s Mnul thoroughly before operting the equipment. Keep it with the equipment t ll times. Replcements re vilble from Thern, Inc., PO Box 347, Winon, MN 55987, 507-454-2996. www.thern.com IMPORTANT:

More information

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations. C&G 2395 Exam Paper June 2013 Section A-All questions carry equal marks. Answer all three questions. Show all calculations. 1. The electrical installation in an industrial unit is scheduled for a periodic

More information

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations. C&G 2395 Exam Paper April 2013 Section A - All questions carry equal marks. Answer all three questions. Show all calculations. Q.1 The electrical installation in a small food retail outlet is scheduled

More information

The Discussion of this exercise covers the following points: The open-loop Ziegler-Nichols method. The open-loop Ziegler-Nichols method

The Discussion of this exercise covers the following points: The open-loop Ziegler-Nichols method. The open-loop Ziegler-Nichols method Exercise 6-3 Level Process Control EXERCISE OBJECTIVE In this exercise, you will perform PID control of level process. You will use the open-loop step response method to tune the controller. DISCUSSION

More information

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Test instruments and recommended testing sequence 1 Outcomes of this Session describe the different

More information

ANNEX 1 CLASSIFICATION AND LABELLING SUMMARY TABLES

ANNEX 1 CLASSIFICATION AND LABELLING SUMMARY TABLES ANNEX CLASSIFICATION AND LABELLING SUMMARY TABLES ANNEX CLASSIFICATION AND LABELLING SUMMARY TABLES NOTE: The codifiction of hzrd s is further explined in Annex 3 (Section ). The hzrd re intended to be

More information

Workfit -SR, Dual Monitor Short Surface

Workfit -SR, Dual Monitor Short Surface User's Guide Workfit -SR, Dul Monitor Short Surfce Do not throw wy! Crdord locks needed for instlltion. Visit http://www.ergotron.com/workfi t-sr-instll for instlltion instructionl video. NOTE: 10 feet

More information

August Forestry Commission Wales Public Funding of Ffynone and Cilgwyn Woodlands

August Forestry Commission Wales Public Funding of Ffynone and Cilgwyn Woodlands 357A2010 - Ffynone Woodlnds report - pv5:lyout 1 09/08/2010 14:12 Pge 1 August 2010 www.wo.gov.uk Forestry Commission Wles Pulic Funding of Ffynone nd Cilgwyn Woodlnds Forestry Commission Wles Pulic Funding

More information

* LANDING ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * LANDING ** RAMP FULL CURB HEIGHT MAY BE REDUCED TO ACCOMMODATE MAXIMUM SIDE FLARE SLOPE

* LANDING ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * LANDING ** RAMP FULL CURB HEIGHT MAY BE REDUCED TO ACCOMMODATE MAXIMUM SIDE FLARE SLOPE * MXIMUM LNDING IS 2.0% IN ECH DIRECTION OF TRVEL. LNDING MINIMUM DIMENSIONS 5' x 5'. ** MXIMUM RMP CROSS IS 2.0%, RUNNING 5% - 7% (8.3% MXIMUM). "NON-WLKING" RE * LNDING 24" CROSS FULL WIDTH PERMNENT

More information

Report. Honolulu City Council. The Proposed Sale of City Housing Properties

Report. Honolulu City Council. The Proposed Sale of City Housing Properties Report t o m ~ t 4 rfl +r~ +kn L~J LI IC V 0 Honolulu City Council ~2c - C rn on The Proposed Sle of City Housing Properties Prepred By The Council Tsk Force to Review Utiliztion of All City Property (Tsk

More information

Reproduction. Not for. Mower - Roller Bar WARNING. Installation and Leveling Instructions. Attention Setup Personnel: Model: ,

Reproduction. Not for. Mower - Roller Bar WARNING. Installation and Leveling Instructions. Attention Setup Personnel: Model: , Mower - Roller Br Instlltion nd Leveling Instructions 4 Model: 9555, 9594 Attention Setup Personnel: 5 4 5 Model: 958, 9595 Model: 9559 Model: 959 The sfety wrnings provided in this guide nd in the trctor's

More information

TOURNAMENT REGULATIONS OUTDOOR COMPETITIONS

TOURNAMENT REGULATIONS OUTDOOR COMPETITIONS TOURNAMENT REGULATIONS OUTDOOR COMPETITIONS Octoer 2012 INTERNATIONAL HOCKEY FEDERATION CONTENTS 1 Rules of competition 2 Tournment Officils 3 Tem entry 4 Pre-tournment riefing meetings 5 Composition of

More information

Graphic Standards Guide

Graphic Standards Guide Grphic Stndrds Guide YOGA LOVE RUN PEACE 2 ABOUT This Grphic Stndrds Guide covers the bsic guidelines for the Lululemon Athletic s new grphic identity. The Guide provides summry of the primry fetures nd

More information

Contents TRIGONOMETRIC METHODS PROBABILITY DISTRIBUTIONS

Contents TRIGONOMETRIC METHODS PROBABILITY DISTRIBUTIONS ontents UNIT 7 TRIGONOMETRI METHODS Lesson 1 Trigonometric Functions................... 462 1 onnecting ngle Mesures nd Liner Mesures.............. 463 2 Mesuring Without Mesuring.........................

More information

RENEWABLE SOFTWARE THE EASY WAY

RENEWABLE SOFTWARE THE EASY WAY RENEWABLE SOFTWARE THE EASY WAY For more inmtion plese 0800 612 43 42 or visit www.esy-rss.co.uk ? UK s & Environmentl Stw renewble environmentl secrs. The Stw Suite Completing complint ccurte Clcultions

More information

APPNA SPRING MEETING CHICAGO, ILLINOIS RETAIL BAZAAR REGISTRATION MARRIOTT DOWNTOWN MAGNIFICENT MILE 540 NORTH MICHIGAN AVENUE

APPNA SPRING MEETING CHICAGO, ILLINOIS RETAIL BAZAAR REGISTRATION MARRIOTT DOWNTOWN MAGNIFICENT MILE 540 NORTH MICHIGAN AVENUE 1 PPN SPRING MEETING 2018 CHICGO, ILLINOIS PRIL 26 29, 2018 MRRIOTT DOWNTOWN MGNIFICENT MILE 540 NORTH MICHIGN VENUE RETIL ZR REGISTRTION 2 COMPNY NME CONTCT NME DDRESS RETIL ZR REGISTRTION PREFERRED PHONE

More information

Garden City Community Park - Bike Terrain Park Consultation Process

Garden City Community Park - Bike Terrain Park Consultation Process To: From: City of Richmond Prks, Recretion nd Culturl Services Committee Mike Redpth, Senior Mnger, Prks Report to Committee To V~-- \Wht A 20 x>r3. \ Dte: My 13, 2013 File: 06-2345-20- MNOR1NoI01 Re:

More information

Collettsville Road Race

Collettsville Road Race Merckx Time Tril April 7th 2017 4690 Collettsville School Dr. Collettsville, NC 28611 Get redy to strt your omnium weekend off with n evening TT. This course is the strt nd finish stretch of the Rod Rce

More information

EMBASSY SWIMMING POOL & FITNESS SUITE Fitness Programme June - September 2017

EMBASSY SWIMMING POOL & FITNESS SUITE Fitness Programme June - September 2017 EMBASSY POOL & FITNESS SUITE Fitness Progrmme June - September 2017 7m Sturdy dy dy sdy nesdy sdy dy 7m - using the benefits of wter resistnce for low impct crdio nd muscle toning workout tht cn suit wide

More information

Instructions. Electronic Aquarium Water Change System. Replenishing Water. Extracting Water. Includes instructions for:

Instructions. Electronic Aquarium Water Change System. Replenishing Water. Extracting Water. Includes instructions for: Instructions Electronic Aqurium Wter Chnge System Includes instructions for: Replenishing Wter Extrcting Wter INTRODUCTION WHAT S INCLUDED The Aquplenish Wter Chnger conditions, monitors nd replenishes

More information

INSTRUCTION MANUAL. CET MkII TUBULAR REACTOR. CET MkII ISSUE 16

INSTRUCTION MANUAL. CET MkII TUBULAR REACTOR. CET MkII ISSUE 16 INSTRUCTION MANUAL CET MkII TUBULAR REACTOR CET MkII ISSUE 6 JANUARY 26 IMPORTANT SAFETY INFORMATION All prcticl work res nd lbortories should be covered by locl regultions which must be followed t ll

More information

X5-55/X5-70/X5-80/X Operation Maintenance Installation Warranty Manual

X5-55/X5-70/X5-80/X Operation Maintenance Installation Warranty Manual X5-55/X5-70/X5-80/X5-105 Opertion Mintennce Instlltion Wrrnty Mnul EU Complince Sttement Attwood Corportion hereby declres tht the MotorGuide X5 trolling motor is in complince with the essentil requirements

More information

Inverted POWER COMBICON feed-through plugs mm pitch DFK-IPC 16/...-ST(F)-10,16

Inverted POWER COMBICON feed-through plugs mm pitch DFK-IPC 16/...-ST(F)-10,16 .6 mm pitch DFK-IPC 6/...-ST(F)-,6 In the inverted versions of the DFK-IPC 6 feed-through connectors, the screw connection on the device side is designed with femle insted of mle contcts.this gives touch-proof

More information

TANTALUM ELECTROLYTIC CAPACITORS

TANTALUM ELECTROLYTIC CAPACITORS TNTLUM LTROLYTI PITORS TMM Series (Miniturized Tntlum hip pcitors with xtended pcitnce Rnge) Fetures model type miniturized chip cpcitor developed on the bsis of TMS production technology idel for high

More information

10mm SHOWER PANEL SIZES 1000 & 1200 SIZES 500, 600, 700, 800 & 900 SIZES 1000 & 1200 OPTION 1 - PAGES 2-4 OPTION 2 - PAGES 2-5 OPTION 3 - PAGES 6-7

10mm SHOWER PANEL SIZES 1000 & 1200 SIZES 500, 600, 700, 800 & 900 SIZES 1000 & 1200 OPTION 1 - PAGES 2-4 OPTION 2 - PAGES 2-5 OPTION 3 - PAGES 6-7 SHOWER PANEL 785 / Issue / 5 SIZES 5, 6, 7, 8 & 9 SIZES & SIZES & OPTION - PAGES - OPTION - PAGES - 5 OPTION 3 - PAGES 6-7 Plese red these instrutions refully nd keep for future referene. Inorret fitting

More information

Owner s Manual For 5122 Series Portable Davit Cranes ORIGINAL TEXT

Owner s Manual For 5122 Series Portable Davit Cranes ORIGINAL TEXT Red this Owner s Mnul thoroughly efore operting the equipment. Keep it with the equipment t ll times. Replcements re ville from Thern, Inc., PO Box 347, Winon, MN 55987, 507-454-2996. www.thern.com IMPORTANT:

More information

Chance. PARAMOUNT LDS 1st & 3rd Ward

Chance. PARAMOUNT LDS 1st & 3rd Ward FRONTIER DISTRICT MERIT BADGE DA Y

More information

TECHNICAL BULLETINApril 2016

TECHNICAL BULLETINApril 2016 SYN-86 TECHNICAL BULLETINApril 216 Synovex One-Feedlot Implnts in Feedlot Steers: Phse IIIB Studies in Nersk nd Texs Zoetis Florhm Prk, NJ 7932 Summry Two Phse IIIB studies 1,2 were conducted in feedlot

More information

SETUP & PREPARATION KNOW YOUR PRODUCT 1. ASSEMBLY CORDLESS POLE PRUNER. Fitting Rear Handle

SETUP & PREPARATION KNOW YOUR PRODUCT 1. ASSEMBLY CORDLESS POLE PRUNER. Fitting Rear Handle STANDARD EQUIPMENT Pole Chin Guide Br CORDLESS POLE PRUNER Guide Br Cover INSTRUCTION MANUAL Rer Hndle SPECIFICATIONS Input: Br Length: Cutting Length Mx.: Chin Speed: Oil Tnk Cpcity: Length: Weight: 18V

More information

Buddhafield Festival Event Plan

Buddhafield Festival Event Plan Buddhfield Festivl 2013 Event Pln Tble of Contents A: Introduction...5 1 Conventions... 6 1.1 Hierrchicl Conventions... 6 1.2 Typogrphic Conventions... 6 2 Declrtion... 8 3 Updting Procedure... 9 4 Document

More information

GREEN DEAL CERTIFICATION THE EASY WAY

GREEN DEAL CERTIFICATION THE EASY WAY GREEN DEAL CERTIFICATION THE EASY WAY inmtion plese 0800 612 43 42 or visit www.esy-greendel.com TM Green Del? Green Del UK s No.1 Green Del Certifiction both Instllers Advisory Orgnistions. Green Del

More information

2018 Sponsorship Opportunities

2018 Sponsorship Opportunities Thursdy Sturdy, September 27 29, 2018 Henry B. Gonzlez Convention Center Hytt Regency Sn Antonio Sn Antonio, Texs 2018 Sponsorship Opportunities Secure Your Spce Tody! Event co-sponsored the Auto Glss

More information

Working Paper: Reversal Patterns

Working Paper: Reversal Patterns Remember to welcome ll ides in trding. AND remember to reserve your opinion until you hve independently vlidted the ide! Working Pper: Reversl Ptterns Working Pper In this pper I wnt to review nd (hopefully)

More information

Connectors according to DIN / IEC

Connectors according to DIN / IEC E L E C T R O N I C C O N N E C T O R S Connetors ording to DIN 41612 / IEC 60603-2 56 ept GmH I Tel. +49 (0) 88 61 / 25 01 0 I Fx +49 (0) 88 61 / 55 07 I E-Mil sles@ept.de I www.ept.de Contents Introdution

More information

FOODSERVICE PLAN ONTARIO SD ONTARIO HS FS1.01 FOOD SERVICE EQUIPMENT LIST FOODSERVICE LAYOUT ITEM QUANTITY. Continental Refrigerator

FOODSERVICE PLAN ONTARIO SD ONTARIO HS FS1.01 FOOD SERVICE EQUIPMENT LIST FOODSERVICE LAYOUT ITEM QUANTITY. Continental Refrigerator FOOD SERVICE EQUIPMENT LIST FS3.03 0 9 9 8 8. 6 5 4 3 G D 4 5 6 9 8 6 5 4 3 FS3.0 FOODSERVICE PLN /4" = '-0" 4' - /3" FS3.0 FS3.0 Electrical Panel ITEM QUNTITY NO QTY LOT DESCRIPTION MNUFCTURER HETED CBINET,

More information

PROCEDURE FOR INITIAL AND PERIODIC INSPECTION POTENTIALLY EXPLOSIVE ATMOSPHERES (HAZARDOUS AREA) ORIGINAL EDITION

PROCEDURE FOR INITIAL AND PERIODIC INSPECTION POTENTIALLY EXPLOSIVE ATMOSPHERES (HAZARDOUS AREA) ORIGINAL EDITION PROCEDURE FOR INITIL ND PERIODIC INSPECTION IN POTENTILLY EXPLOSIVE TMOSPHERES (HZRDOUS RE) ORIGINL EDITION DEC. 1997 This Standard is the property of Iranian Ministry of Petroleum. ll rights are reserved

More information

Operation Maintenance Installation Warranty Manual

Operation Maintenance Installation Warranty Manual 2017 Mercury Mrine Xi5 Wireless Edition Opertion Mintennce Instlltion Wrrnty Mnul 8M0124200 117 eng eng ORIGINAL LANGUAGE INSTRUCTIONS FCC nd IC Complince Sttement Xi5 WIRELESS FOOT PEDAL FCC ID MVU09291

More information

Design and Calibration of Submerged Open Channel Flow Measurement Structures: Part 3 - Cutthroat Flumes

Design and Calibration of Submerged Open Channel Flow Measurement Structures: Part 3 - Cutthroat Flumes Uth Stte University DigitlCommons@USU Reports Uth Wter Reserch Lbortory Jnury 1967 Design nd Clibrtion of Submerged Open Chnnel Flow Mesurement Structures: Prt 3 - Cutthrot Flumes Gylord V. Skogerboe M.

More information

Owner s Manual For M452 and M492 Series Spur Gear Hand Winches ORIGINAL TEXT

Owner s Manual For M452 and M492 Series Spur Gear Hand Winches ORIGINAL TEXT Red this Owner s Mnul thoroughly efore operting the equipment. Keep it with the equipment t ll times. Replcements re ville from Thern, Inc., PO Box 347, Winon, MN 55987, 507-454-2996. www.thern.com IMPORTANT:

More information

IGF Research Project N Safer High Heels

IGF Research Project N Safer High Heels IGF Reserch Project 17868 N Sfer High Heels Survivl of compnies in the fshion nd sesonlly dependent sectors such s the footwer industry depends upon their ility to implement the ltest trends. Shoe ottoms

More information

Owner s Manual For TAC Series Planetary Gear Air Winches ORIGINAL TEXT

Owner s Manual For TAC Series Planetary Gear Air Winches ORIGINAL TEXT Red this Owner s Mnul thoroughly efore operting the equipment. Keep it with the equipment t ll times. Replcements re ville from Thern, Inc., PO Box 347, Winon, MN 55987, 507-454-2996. www.thern.com IMPORTANT:

More information

Dorridge & District Residents Association A Walk From Dorridge to Blythe Valley Nature Reserve

Dorridge & District Residents Association A Walk From Dorridge to Blythe Valley Nature Reserve Dorridge & District Residents Assocition A Wlk From Dorridge to Bly Vlley Nture Reserve This is circulr wlk. It is wlk of round 5 miles from centre of Dorridge, though obviously, those nerer Four Ashes

More information

Owner s Manual For 4WM2 Series Worm Gear Hand Winch ORIGINAL TEXT

Owner s Manual For 4WM2 Series Worm Gear Hand Winch ORIGINAL TEXT Red this Owner s Mnul thoroughly efore operting the equipment. Keep it with the equipment t ll times. Replcements re ville from Thern, Inc., PO Box 347, Winon, MN 55987, 507-454-2996. www.thern.com IMPORTANT:

More information

Biomechanical Analysis of Pressure Redistribution

Biomechanical Analysis of Pressure Redistribution Biomechnicl Anlysis Redistribution Dul PegAssist Conur Bllet-Style Sports (neutrl shoe) Dul Chrcteristics Dul + Generl PegAssist + Conur All mpping results re bsed upon following prmeters: Test Person

More information

INVESTIGATION 2. What s the Angle?

INVESTIGATION 2. What s the Angle? INVESTIGATION 2 Wht s the Angle? In the previous investigtion, you lerned tht when the rigidity property of tringles is comined with the ility to djust the length of side, the opportunities for useful

More information

Rules of Hockey including explanations. Effective from 1 January 2017

Rules of Hockey including explanations. Effective from 1 January 2017 From 1 Jnury 2017 Rules of Hockey including explntions Effective from 1 Jnury 2017 Copyright FIH 2016 The Interntionl Hockey Federtion Rue du Vlentin 61 CH 1004 Lusnne Switzerlnd Tel. : + 41 21 641 0606

More information

PCT MINIMUM DOCUMENTATION

PCT MINIMUM DOCUMENTATION Ref.: PCT Minimum Documenttion pge: 4.1.1 PCT MINIMUM TION INVENTORY S CCORDING TO PCT RULE 34.1 (PERIOD FROM 1920 TO 2000) Explntory Notes 1. On the following pges is given the inventory of ptent documents,

More information

Pinpoint GPS. FCC and IC Compliance Statement

Pinpoint GPS. FCC and IC Compliance Statement FCC nd IC Complince Sttement PINPOINT KEY FOB, FCC ID MVU10148 ACMA: N2523 IC: 6094A 09291, 6094A 09305 This device complies with prt 15 of the FCC Rules. Opertion is suject to the following two conditions:

More information

Skills Practice Skills Practice for Lesson 4.1

Skills Practice Skills Practice for Lesson 4.1 Skills Prctice Skills Prctice for Lesson.1 Nme Dte Interior nd Exterior Angles of Tringle Tringle Sum, Exterior Angle, nd Exterior Angle Inequlity Theorems Vocbulry Write the term tht best completes ech

More information

* SEE ANCHOR SCHEDULE SHEET 7

* SEE ANCHOR SCHEDULE SHEET 7 "-20 MLE PNELMTE W/ WINGNUT -1/2" O.C. "-20 X 1/2" MCHINE OLT & NUT -1/2" O.C 04/0/15 JH UPDTE TO 5TH EDITION (2014) FC 8/14/1 Y DTE SPCING ERROR OR MSONRY POWERS CLK-IN W/ "-20 SIDEWLK OLT -1/2" O.C.

More information

bark bark bat bat Multiple Meaning Words: Kindergarten to Grade 2 More Teaching Tools at harsh sound made by a dog

bark bark bat bat Multiple Meaning Words: Kindergarten to Grade 2 More Teaching Tools at  harsh sound made by a dog the brk the brk bt bt hrsh sound mde by dog Mx, stop brking! outside cover of the trunks, brnches, nd roots of woody plnts The brk of this tree is very rough. club of wood or metl used to hit the bll in

More information

Hazard Identification Based on Plant Functional Modelling

Hazard Identification Based on Plant Functional Modelling ^K*tS> 3t?>:b Risø-R-712^$ Hzrd Identifiction Bsed on Plnt Functionl odelling Birgitte Rsmussen, ris Whetton Risø Ntionl Lbortory, Roskilde, Denmrk October 1993 Hzid Identifiction Bsed on Plnt Functionl

More information

90-8M eng. Xi5 Wireless Edition Mercury Marine

90-8M eng. Xi5 Wireless Edition Mercury Marine 2014 Mercury Mrine Xi5 Wireless Edition eng 90-8M0097265 814 eng ORIGINAL LANGUAGE INSTRUCTIONS FCC nd IC Complince Sttement Xi5 WIRELESS FOOT PEDAL FCC ID MVU09291 Xi5 WIRELESS REMOTE FCC ID MVU09305

More information

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.

More information

ANNUAL SPECIAL EVENTS SPONSORSHIP

ANNUAL SPECIAL EVENTS SPONSORSHIP 2018-19 ANNUAL SPECIAL EVENTS SPONSORSHIP BY THE NUMBERS $160,000 TOTAL RAISED FROM SPECIAL EVENTS 480 NORFOLK COLLEGIATE PARENTS 2,965 NORFOLK COLLEGIATE ALUMNI 4,802 FOLLOWERS ON SOCIAL MEDIA Sponsorship

More information

GRENADES INTRODUCTION: EOD CONSIDERATIONS ANTI-ARMOR/HEAT: SAFETY: FRAGMENTATION: IMPACT FRAGMENTATION: FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY

GRENADES INTRODUCTION: EOD CONSIDERATIONS ANTI-ARMOR/HEAT: SAFETY: FRAGMENTATION: IMPACT FRAGMENTATION: FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY INTRODUCTION: Hnd or rifle projected. Min chrge includes HE, riot-control gents, smokes, nd incendiry nd pyrotechnic mterils. Fuzing is vried nd my be time-dely or impct fuzed. Are esily nd frequently

More information

USA Field Hockey s Modifications to the 2017 FIH Rules of Hockey

USA Field Hockey s Modifications to the 2017 FIH Rules of Hockey USA Field Hockey hs estlished tht the Interntionl Hockey Federtion (FIH) will e the ultimte uthority for rules governing the sport of hockey in the United Sttes. This rule ook is reprinted under the uthority

More information

Rules of Hockey including explanations. Effective from 1 January 2015

Rules of Hockey including explanations. Effective from 1 January 2015 Rules of Hockey including explntions Effective from 1 Jnury 2015 Copyright FIH 2014 The Interntionl Hockey Federtion Rue du Vlentin 61 CH 1004 Lusnne Switzerlnd Tel. : + 41 21 641 0606 Fx : + 41 21 641

More information

Owner s Man ual. For 4HPF/4HWF/4HBP Series Helical/Parallel, Helical/Worm, Helical/Bevel and Planetary Gear Power Winches

Owner s Man ual. For 4HPF/4HWF/4HBP Series Helical/Parallel, Helical/Worm, Helical/Bevel and Planetary Gear Power Winches Red this Own er s Mn u l thor ough ly e fore op er t ing the equip ment. Keep it with the equip ment t ll times. Re plce ments re vil le from Thern, Inc., PO Box 347, Winon, MN 55987, 507-454-2996. www.thern.com

More information

FREEWAY SYSTEM PROBLEMS AND DEFICIENCIES: PHYSICAL DESIGN, TRAFFIC SAFETY, AND TRAFFIC CONGESTION

FREEWAY SYSTEM PROBLEMS AND DEFICIENCIES: PHYSICAL DESIGN, TRAFFIC SAFETY, AND TRAFFIC CONGESTION Finl Drft s Approved by Technicl Subcommittee SEWRPC Plnning Report No. 7 A REGIONAL FREEWAY RECONSTRUCTION SYSTEM PLAN FOR SOUTHEASTERN WISCONSIN Chpter V FREEWAY SYSTEM PROBLEMS AND DEFICIENCIES: PHYSICAL

More information

APPLICATION OF POLISH CALCIUM SORBENTS IN CARBONATE LOOPING

APPLICATION OF POLISH CALCIUM SORBENTS IN CARBONATE LOOPING Physicochem. Probl. Miner. Process. 49(), 203, 20 www.minproc.pwr.wroc.pl/journl/ Physicochemicl Problems of Minerl Processing ISSN 643-049 (print) ISSN 2084-4735 (online) Received April 3, 202; reviewed;

More information

2017 Mercury Marine. Xi3 Wireless Edition. Operation Maintenance Installation Warranty Manual

2017 Mercury Marine. Xi3 Wireless Edition. Operation Maintenance Installation Warranty Manual 2017 Mercury Mrine Xi3 Wireless Edition Opertion Mintennce Instlltion Wrrnty Mnul 8M0130831 1117 eng eng ORIGINAL LANGUAGE INSTRUCTIONS FCC nd IC Complince Sttement Xi SERIES WIRELESS FOOT PEDAL FCC ID

More information

(12) Patent Application Publication (10) Pub. No.: US 2003/ A1

(12) Patent Application Publication (10) Pub. No.: US 2003/ A1 US 2003O183916A1 (19) United Sttes (12) Ptent Appliction Publiction (10) Pub. No.: US 2003/0183916A1 Heck et l. (43) Pub. Dte: Oct. 2, 2003 (54) PACKAGING (22) Filed: Mr. 27, 2002 MICROELECTROMECHANICAL

More information

PRESSURE LOSSES DUE TO THE LEAKAGE IN THE AIR DUCTS - A SAFETY PROBLEM FOR TUNNEL USERS?

PRESSURE LOSSES DUE TO THE LEAKAGE IN THE AIR DUCTS - A SAFETY PROBLEM FOR TUNNEL USERS? - 7 - PRESSURE LOSSES DUE TO THE LEAKAGE IN THE AIR DUCTS - A SAFETY PROBLEM FOR TUNNEL USERS? Pucher Krl, Grz Uniersity of Technology, Austri E-Mil: pucherk.drtech@gmx.t Pucher Robert, Uniersity of Applied

More information

An Analysis of the Visual Demands Associated with Aviation Maintenance Inspectors. The Ohio State University College of Optometry, Columbus, OH 2

An Analysis of the Visual Demands Associated with Aviation Maintenance Inspectors. The Ohio State University College of Optometry, Columbus, OH 2 An Anlysis of the Visul Demnds Associted with Avition Mintennce Inspectors Gregory W. Good 1, Json J. Nichols 1, Mnoj V. Subbrm 1, Vn B. Nkgwr 2, Ronld W. Montgomery 2 1 The Ohio Stte University College

More information

INTERNATIONAL WOMEN S CRICKET COUNCIL PLAYING CONDITIONS. Except as varied hereunder the Laws of Cricket (2000 Code 2nd Edition ) shall apply.

INTERNATIONAL WOMEN S CRICKET COUNCIL PLAYING CONDITIONS. Except as varied hereunder the Laws of Cricket (2000 Code 2nd Edition ) shall apply. INTERNATIONAL WOMEN S CRICKET COUNCIL PLAYING CONDITIONS Except s vried hereunder the Lws of Cricket (2000 Code 2nd Edition - 2003) shll pply. 1 Lw 1 - The Plyers 1.1 Lw 1.2 Nomintion of Plyers Lw 1.2

More information

Owner s Man ual. For MTA1000 and MTA2000 Series Cycloidal Gear Air Winches

Owner s Man ual. For MTA1000 and MTA2000 Series Cycloidal Gear Air Winches Red this Own er s Mn u l thor ough ly e fore op er t ing the equip ment. Keep it with the equip ment t ll times. Re plce ments re vil le from Thern, Inc., PO Box 347, Winon, MN 55987, 507-454-2996. www.thern.com

More information

HD CONDUIT MIN. 10% FALL CHAMBER MONITORING SYSTEM HD CONDUIT REFER NOTE 13 SECTION C-C DETAILS OF BENCHING

HD CONDUIT MIN. 10% FALL CHAMBER MONITORING SYSTEM HD CONDUIT REFER NOTE 13 SECTION C-C DETAILS OF BENCHING FLOT SWITH DN50 upv PRESSURE FOR SENSOR TUING ( OVER) REFER TO 4 ND FLOT SWITH (50%) DN80 upv SUTION (600 OVER) GRVITY SEWER MINS FLL TOWRDS SUMP REFER TO NOTE 9 PLN (OVERS REMOVED) SLIDE GTE VLVE ± HMER

More information

2018 Sponsorship Opportunities

2018 Sponsorship Opportunities Thursdy-Sturdy, September 27-29, 2018 Henry B. Gonzlez Convention Center L Quint Inn nd Suites Riverwlk Sn Antonio, Texs 2018 Sponsorship Opportunities Secure Your Spce Tody! Event sponsored nd orgnized

More information

Small Game Hunter Lead Shot Communication Study. Executive Summary. A cooperative study conducted by:

Small Game Hunter Lead Shot Communication Study. Executive Summary. A cooperative study conducted by: 8 Smll Gme Hunter Led Shot Communiction Study Executive Summry A coopertive study conducted y: Minnesot Coopertive Fish nd Wildlife Reserch Unit Minnesot Deprtment of Nturl Resources 9 Smll Gme Hunter

More information

TOWNSHIP OF LOWER MERION. PUBLIC WORKS COMMITTEE Wednesday, April 3, :00 PM ( Approximately)

TOWNSHIP OF LOWER MERION. PUBLIC WORKS COMMITTEE Wednesday, April 3, :00 PM ( Approximately) TOWNSHIP OF LOWER MERION PUBLIC WORKS COMMITTEE Wednesdy, April 3, 2019 6:00 PM ( Approximtely) Chirpersons: Vice Chirperson: Michel F. McKeon Rick Churchill, Anthony C. Stevenson AGENDA 1. AUTHORIZATION

More information

DIE DESIGN AND CONSTRUCTION SPECIFICATIONS STAMPING - EUROPE MINIMUM CORE HOLE SIZE TO PULL PUNCHES WITH WINDOWS

DIE DESIGN AND CONSTRUCTION SPECIFICATIONS STAMPING - EUROPE MINIMUM CORE HOLE SIZE TO PULL PUNCHES WITH WINDOWS MINIMUM CORE HOLE SIZE TO PULL PUNCHES WITH WINDOWS THE MINIMUM DIMENSIONS FOR THE HOLE IN THE PD REQUIRED TO INSERT THE PUNCH-PULLER ND THE BLL-LIFTER RE GIVEN IN THE TBLE BELOW. C CORE HOLE ØB MIN. SECTION

More information