1 Environmental, Health, and No.: BCF Page: 1 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport REVISION HISTORY Date Revision Details of Change Number Added Periodic Inspection Requirements in Section 8.1 Added Attachment 13 Periodic Inspection Check List

2 Environmental, Health, and No.: BCF Page: 2 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 1 PURPOSE to establish minimum standard work practices and procedures for isolating Hazardous Energy Sources and otherwise disabling machines or equipment to prevent unexpected or unintentional energizing, startup, or release of stored energy that could cause personal injury or equipment damage 2 DEFINITIONS 2.1 Acceptance An acceptance signature on a Master Isolation Procedure is acknowledgement by the person signing that: The equipment specified on the isolation procedure is the equipment to be worked on. The MIP signed has the same number as the isolation tags used to isolate the equipment to be worked on. This shall be verified by auditing two or more isolation tags used for the isolation of the equipment. The owner has communicated all information needed about the isolation, lockout, and/or tag-out. The isolation procedure has a current approval signature. 2.2 Affected Employee a person whose machine or equipment is to be serviced or maintained under lockout/tag-out or a person who is working in an area which such activities are being performed 2.3 Authorized Employee A person who locks out/tags out machines or equipment or otherwise performs work on equipment subject to this procedure authorized employee and the affected employee may be the same under certain circumstances. 2.4 Contracted Employee (i.e., contractors without their company supervision on site) An individual or group of individuals for whom BASF Corporation (BC) provides direct supervision in their day-to-day activities and direction as to how an activity is to be performed. 2.5 Contractor Employee (i.e., Nestor, daily and shutdown contractors with supervision on site) An individual engaged by or through a third party to perform services principally for the third party.

3 Environmental, Health, and No.: BCF Page: 3 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 2.6 Danger Tag A tag that can be placed on equipment where the use or operation of the equipment may cause injury or equipment damage. Do not use a danger tag as an isolation tag. 2.7 De-Energized Isolated or disconnected from all energy sources and containing no residual or stored energy. 2.8 Energy Isolating Device A device that physically prevents the transmission or release of energy, including but not limited to the following: manually operated electrical circuit breakers disconnect switches radiation device lockout shutters (A radiation safety officer (RSO) for confined space entries must tag these out.) a positive shutoff actuated valve if all of the following conditions are met: It is a positive shutoff device and has no leak. Note: A process control valve cannot be used as an energy-isolating device, since it is not a positive shut-off device. The fail-safe position is the desired position. The valve is disabled. The energy source has an energy-isolating device (blocking device) and is tagged out. any similar device used to block or isolate energy(e.g., blinds, pancakes with an isolation tag attached) and air gaps (>12 ) The tube sheet/tubes of an exchanger can serve as an energy isolating device for a line break as long as verification of no leakage can be accomplished. They cannot be used for isolation for hot work or confined space without a variance granted by OM and Site Team Leader. Note: Push buttons, selector switches, and other circuit type devices are not energy isolating devices. 2.9 Four-Eyes Principle The use of (two) 2 or more individuals (equipment owner and individuals(s) performing the work) to assess tasks to ensure that all hazards are identified and eliminated/controlled through safe work practices, use of PPE, communication/ awareness, etc.

4 Environmental, Health, and No.: BCF Page: 4 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 2.10 Hazardous Energy Source Any source of electrical, mechanical, hydraulic, pneumatic, kinetic, chemical, thermal, radiation, or other energy, including stored, inertial, or residual energy that if unexpectedly or unintentionally released, could cause injury to personnel, or if introduced into a process could be hazardous Individual Release The initialing off on the Work Crew Accountability Form or MIP that the individual is no longer working behind the hazardous energy isolation Isolation The process of preparing and positioning of equipment or components of equipment in order to segregate them from Hazardous Energy Sources. Energy isolation must be performed in accordance with equipment specific hazardous energy control procedures and must achieve a Zero Energy State Locking/Lockout The placement of lockout device(s) on an energy isolating device, in accordance with an established equipment specific hazardous energy control procedure to ensure that the energy isolating device and the equipment are controlled to a Zero Energy State and cannot be operated until the lockout device is removed Lockout Device A device that holds an energy isolating device in a safe position and prevents the energizing of a machine or equipment until the lockout device is removed Master Isolation Procedure Hazardous energy source control procedure that one may use for control of multiple isolation points/devices. Since the Master Isolation Procedure relies primarily upon administrative means to control the release of potential hazardous energy, additional steps for verification of Zero Energy State are required to ensure that protection comparable to lockout is maintained during work this procedure covers. There must also be a mechanism to achieve personal acceptance of the lockout/tag-out by each authorized employee (WCAF).

5 Environmental, Health, and No.: BCF Page: 5 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 2.16 ONE-PLUS System using a mechanism of physical protection to make equipment inoperative; intended to prevent unintentional operation of an energy isolation device when lockout cannot be or is not used. All quarter-turn piping valves that do not have a locking mechanism will use one plus to secure them. Some examples include but are not limited to: removing an isolating circuit element taking off the valve handle chaining the valve handle using a lock using tie wraps to secure a valve in the proper position taping or securing non-lockable electrical breaker devices securing equipment shafts that could be rotated while being worked on stationing a stand-by person at the equipment energy isolation device 2.17 Operating /Owning Department The BASF unit or department that operates or is responsible for the daily operation of the process, area, or facility where work is taking place. Under certain documented circumstances, individuals, departments, or companies who would not normally be considered members of the operating/owning department (i.e., service and maintenance personnel) may be authorized to perform work under the permitting exemption described in this section. The following circumstances must be met to consider such individuals as operating/owning department personnel: They must be trained and qualified to perform the subject activities. They must have a level of knowledge and experience with the operation/process (equipment, hazards, and controls) that is equal to any existing operating/owning department personnel. They are specifically authorized by the OM/SM in writing (individually/department/company as appropriate) as a member of the operating/owning department for the specific tasks they are to perform Permit Issuer Personnel who have been trained, qualified, and authorized to issue or modify permits on behalf of the operating/owning department Primary Isolating Device An isolating device that is intended to withstand the rated pressure of the equipment.

6 Environmental, Health, and No.: BCF Page: 6 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 2.20 Prior Contents Includes the previous chemical contents in the equipment before clearing and any chemical agents (i.e., soda blasting, soaps, etc.) used for cleaning Qualified Electrician Person who has completed formal program of training (either classroom or on the job) and qualification and is familiar with the: hazards of electricity skills and techniques needed to distinguish exposed live parts from other parts of electrical equipment skills and techniques needed to determine the nominal voltage of exposed live parts clearance/approach distances required and the corresponding voltages to which the qualified person will be exposed applicable electric codes hazardous area classification and its application to electrical installations safety-related electrical work practices pertaining to his/her respective job assignments electrical requirements included in operating and maintenance procedures (including lock, tag, and try) use, care, and limitations of personal protective equipment (PPE) Note: The person authorizing the election to work on site will verify this. If done by contractor service, the contractor is responsible. If brought for a specific job, the person authorizing his/her use is responsible to verify his/her qualifications. No certifications are required Release A release signature on a master isolation procedure by the person who accepted the MIP who certifies that all personnel in his/her work group have stopped work, signed off WCAF, and are clear of the equipment on which they were permitted to work Tag-out The placement of an isolation tag on an energy-isolating device, in accordance with an established procedure, to indicate that the energy isolating device and the equipment being controlled may not be operated until the isolation tag is removed in accordance with established procedures.

7 Environmental, Health, and No.: BCF Page: 7 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 2.24 Isolation Tag An Isolation tag and a means of attachment (tie-wrap), which is securely fastened to an energy isolating device in accordance with an established procedure, to indicate that the energy isolating device and the equipment being controlled may not be operated until the tag-out device is removed in accordance with established procedures Verification Means to ensure that isolation has been achieved for each type of hazardous energy source. Examples may include sampling with chemical indicating tubes, photo-ionization detectors or combustible gas indicators, measuring ph of wash water, checking voltage, checking equipment for potential rotation (ensure any other energy source such as wind on fans could cause them to rotate, etc.), attempting to operate a valve or switch, successful purge/flush, etc Work Crew Accountability Form (WCAF) A form that is attached to all safe work permits serving two purposes. This form is the administrative control to account for every individual working in the unit/block who has not signed on the accountability log (AL) and is the administrative control to account for every individual working behind hazardous energy isolation Zero Energy State The point where all potential hazardous energy sources have been verified to be deenergized. 3 SCOPE The requirements of this procedure apply to the BASF Freeport plant site. 3.1 This procedure applies to all activities where the potential exists for exposure to hazardous energy sources, unless specifically exempt below. 3.2 This procedure does not apply to the following: Work on cord and plug connected electrical equipment for which exposure to the hazards of unexpected energization or start-up of the equipment is controlled by the unplugging of the equipment from the hazardous energy source if the plug is under the exclusive control of the employee performing the service or maintenance.

8 Environmental, Health, and No.: BCF Page: 8 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport The plug is under the exclusive control of the employee if: It is physically in the possession of the employee. It is within arm s reach and in the line of site of the employee. The employee has affixed a lockout/tag-out device on the plug Activities on equipment where the energy source is not a hazardous energy source. Note: Electrical energy 50 VAC/VDC or below is not considered hazardous energy Operation and maintenance of electric power generation, control, transformation, transmission, and/or distribution lines/equipment. These tasks require specific training, work practices, and employee protection from these special hazards presented by working with energized electrical equipment not identified in this procedure Hot taps that site-developed procedures cover (Refer to BC Hot Work & BC Hot Tap Procedure.) The following procedures/processes may be exempt from a site s/unit s hazardous energy source control program if a risk assessment has been documented and approved by BASF management identifying the risks and control measures necessary to protect personnel: Activities performed by operating/owning department personnel where the work is routine, repetitive, and integral to the use of the equipment for production and under the exclusive control of the individual(s) performing the work. Exclusive control means within ten (10) feet. One example of such an activity could be changing a filter on a filter pot with integrated isolation and proper draining. (See the attached Permit vs. Procedure Flow Chart, Sec ) Note: Lab instrument servicing, maintenance and repair can qualify for this exemption by following manufacturers recommended installation, maintenance, and servicing procedures as long as the work is performed by the operating owning department. The isolation sources

9 Environmental, Health, and No.: BCF Page: 9 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 4 PROCEDURE must be under the control of the servicing personnel where applicable for control of hazardous energy Routine electrical tasks involving specific equipment that must be performed in an energized state, and are conducted by a qualified electrician Removal of a plug/blind flange from a bleed valve and the operation of a bleed valve may be exempt from site s/unit s hazardous energy source control program if they are in compliance with the following items and only performed by the operating/owning department: PPE grid identifies proper PPE for bleed removal and/or bleed operation for each potential exposure condition and they are followed during each task Personnel are instructed in and use of proper defensive positioning techniques during tasks Personnel maintain direct control of bleed during the plug removal or bleed operation Loading and unloading operations performed by PST, Logistics, or the operating/owning department may be exempt from site s/unit s hazardous energy source control program if they are using a BASF manager approved TJA that covers all steps necessary to ensure that personnel are not exposed to hazardous energy during the process of loading and/or unloading Gas bottles that supply lab instruments, cutting torches, or other equipment and the person replacing the bottle can isolate the energy. 4.1 Equipment Shutdown, Preparation, and Isolation Authorization to Prepare and Approve Hazardous Energy Isolations Each department manager must designate in writing the personnel who are approved to prepare and/or approve hazardous energy isolation procedures. The employee must be knowledgeable of the system, energy sources, and other hazards associated with the equipment being isolated.

10 Environmental, Health, and No.: BCF Page: 10 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport Control of Work Involving Hazardous Energy Sources Personnel, excluding operating/owning department personnel when proper criteria are met ( ), shall not perform activities involving the control of hazardous energy sources without prior written authorization in the form of a safe work permit issued by a permit issuer. The applicable equipment-specific hazardous energy control procedure(s) shall, at a minimum, be referenced on the permit. To meet the requirements of the four eyes concept, the permit issuer and the permit accepter cannot be the same person Zero Energy State Verification Perform all activities, to the extent possible, under a zero energy state that has been verified, at a minimum, by operating/owning department personnel. For permitted work, verification of zero energy state shall be documented on the permit. When zero energy state verification is not possible, use proper PPE and/or additional administrative/engineering controls to minimize exposure to hazards Communication Before the performance of activities subject to this procedure, the operating/owning department shall notify all affected employees of the work activities and any potential hazards/consequences associated with the work. In addition, all affected employees shall be notified before placing equipment back into service New and Replacement Equipment Whenever replacement, major repair, renovation, modification of a machine or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such equipment shall be designed to accept a lockout device. All new and replacement quarter-turn piping valves shall be designed to accept a locking mechanism Equipment Specific Hazardous Energy Control Procedures All activities subject to the requirements of this procedure shall be performed by the owning/operating department using written equipment specific hazardous energy control procedures. These procedures shall be prepared for each piece of equipment or for each group for similar equipment (i.e., equipment with similar energy source type/magnitude and similar isolation requirements).

11 Environmental, Health, and No.: BCF Page: 11 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport The format and structure of the procedures are not mandated. Examples of acceptable procedures may include operating procedures, written job instructions, total job analyses, maintenance procedures, master isolation procedures, or equipment drawings, depending upon the complexity of the equipment. A checklist or equipment drawing can be used to supplement a generic procedure if it provides the required information Exemption Equipment-specific energy control procedures are not required if all of the following eight conditions are met: The equipment has no potential for stored or residual energy or reaccumulation of stored energy after shut down that could endanger employees. Equipment has a single hazardous energy source that one can readily identify and isolate. The isolation and locking out of the hazardous energy source will completely de-energize and deactivate the equipment. The equipment is isolated from the hazardous energy source and locked out during service/maintenance. A single lockout device will achieve a locked out condition. The lockout device is under the exclusive control of the authorized employee performing the service or maintenance. The service/maintenance does not create hazards for other employees. The site/unit has had no incidents involving the unexpected activation or re-energization of the equipment during service/maintenance Specifications for Equipment-Specific Hazardous Energy Control Procedures Written equipment specific hazardous energy control procedures shall, at a minimum, include the following elements: identification of the covered equipment or group of equipment a list of the specific types and magnitudes of hazardous energy sources specific steps, with proper sequence if necessary, for safely shutting down, isolating, blocking, positioning, and/or otherwise securing the equipment identification of the safe position for energy isolation devices

12 Environmental, Health, and No.: BCF Page: 12 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport specific steps necessary for safely releasing any stored or contained hazardous energy sources specific methods (i.e., lockout devices, one- plus/tag plus, etc.) and isolation location(s) necessary for achieving zero energy state isolation specific steps and methods for verification must include when the sequence of returning equipment to service has impact on safety the sequence Owning/operating department lockout devices and tags shall be the first tags applied in the procedure and the last removed Guidelines for Equipment-Specific Hazardous Energy Control Procedures When writing equipment specific hazardous energy control procedures use the following when applicable: Electrical power sources must be shut down. Process, utility, and feed and/or discharge sources must be drained, de-pressured, purged, flushed, or cleaned as much as possible to effectively remove the potential for injury. Additional precautions could include the blinding or physical disconnection of lines and/or lockout of valves. Hydraulic pressure sources must either be completely de-pressured, or adequate blocking devices must be placed to prevent unintentional movement of the equipment. Inertial energy identification and verification steps must be taken. Proper Isolation of systems with remote start capabilities, including the ability of such systems to have multiple methods for energizing equipment (i.e., field start/stop and DCS), must be in place. Capacitors shall be fully discharged or removed. On equipment and controls that operate on circuits in excess of the 480 volt rating, lockout shall be accomplished by disconnect and/or breakers opened, racked out, and tagged. A qualified electrician shall verify. If re-accumulation of stored energy can occur, verification of isolation will continue until work is complete or until such re-accumulation hazards no longer exist. Reference BCF Confined Space Entry and BCF Line Breaking.

13 Environmental, Health, and No.: BCF Page: 13 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport Electrical Lockout additional requirements A lock must be used as a one-plus on electrical energy isolating device by operating/owning department and any work crew that has the potential to touch an un-insulated conductor or a moving part that would be driven by an electrical motor. One lock per crew/safe work permit. An Isolation tag must be hung on the lock to indicate who hung the lock and who is authorized to remove the lock. The lock does not need to be a specific color or unique key. The lock and tag do not need to be listed on the MIP Considerations for Verifications Equipment interlocks, where applicable, must be verified that they are not preventing or interfering with the proper verification of Isolation. If work is being performed on mechanical parts only (gearbox, seal, belt, fan, etc.), verification of electrical isolation must be by a means that provides a direct indication of power that is not affected by an interlock or shutdown. A light, screen, display, or voltage reading directly off the power source that have written approval by an Authorized Qualified Electrical Person (See #10.) are acceptable examples, but attempts to verify a local field switch on equipment controlled automatically or remotely (such as by DCS systems) cannot serve as the sole means to verify isolation. If work is being performed on electrically operated devices in such a manner that failure to de-energize the circuit could put workers into contact with exposed, live circuits (unwire motor, switch gear parts, switch replacement, etc.), a qualified electrical person shall test voltage to verify that the power is de-energized. Other methods may be necessary to determine if energy sources have been isolated. 4.2 Permission to Work Work Authorization (See attached Permit vs. Procedure Flow Chart, Sec ) The safe work permit must include an isolation procedure for the equipment to be worked on. The isolation procedure can be a drawing, P&ID, or descriptive text and must: Be approved by an authorized employee

14 Environmental, Health, and No.: BCF Page: 14 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport Be included in the safe work permit or MIP Identify the equipment Identify specific types and magnitude(s) of energy potential included in isolation Specific steps with proper sequence for safely shutting down, isolating, blocking, positioning, and/or otherwise securing the equipment Show/identify each energy isolation point and indicate the method of isolation to be used at each point, i.e., valve open/closed, pancake, double block and bleed, etc. Specific steps necessary for safely releasing any stored or contained hazardous energy sources. Identify the verification method required to ensure that isolation has been achieved for each type of energy source, i.e., valve(s) open/closed, blinds/pancakes in place, MCC off, start/stop switch (es) off, LEL/O 2 checks, CO or NO 2 checks, etc. Include specific steps and sequences necessary to safely return the piece of equipment to service. Include RSO sign-off for nuclear device isolation for CSE. Include the date, approval signature, and master isolation procedure number (if applicable). Attach it to the safe work permit if not using a MIP. If a MIP or SWP is not used, the isolation procedure must be placed in a designated location Worker or Crew Leader Responsibilities Before Work When the equipment has been properly isolated per department procedures, the person performing the work, or the crew leader, will for himself and/or his crew determine that the provisions of the site/department procedures have been properly applied and: Attach an isolation tag to each energy isolation device on the equipment to be worked on, or sign Acceptance on the respective master isolation procedure(s). Obtain a safe work permit before performing any work Changes Made to MIP after Work has Begun When work is in progress, and changes need to be made to the isolation procedure, the following steps must be taken: Remove employees from any work covered by the isolation procedure. Have employees sign off (release) the existing master isolation procedure and WCAF portion of the SWP if one is in effect.

15 Environmental, Health, and No.: BCF Page: 15 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport Change the isolation and revise the isolation procedure documentation, safe work permit, and/or master isolation procedure. Communicate the changes to affected workers. Have employees sign on (acceptance of) the WCAF portion of the SWP/MIP, if one is in effect, before resuming work Test/Position of Equipment For situations in which lockout/tag-out devices must be temporarily removed from the lockout device and the machine or equipment energized to test or position the machine, equipment, or component, the following sequence of actions will be followed: Approval must be obtained from representatives the operating/owning department and authorized employees. Machines or equipment must be cleared of non-essential tools and materials and assurance made that components are operationally intact. Have employees sign off (release) the existing master isolation procedure and WCAF portion of the SWP, if one is in effect. Testing shall be performed in the sequence: Remove the work crew tags first. Then remove the operating/owning department tags. The operating/owning department will then restore all valves, switches, etc., to their normal operating positions and perform the test. Equipment/machines must be de-energized, and energy control measures previously in place must be restored before servicing activities may resume. After test, energy(s) that were re-energized must be verified again and signed off as verified on next revision. Energy(s) that were not touched may be just carried down with ditto marks under verified columns. Have employees sign on (acceptance of) the WCAF portion of the SWP/MIP, if one is in effect before resuming work Removal of Tags after Completion of Work All tags shall be removed by the person(s) who applied them or the designated representative upon completion of work. After verification that all work is completed and MIP is signed off, all operating/owning department tags shall be removed by an authorized employee from the operating/owning department. In the case in which a tag has not been removed and the MIP has not been signed off by the person who applied it or the owner cannot be identified, the operating/owning department operations team leader may remove the tag only

16 Environmental, Health, and No.: BCF Page: 16 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport upon positive verification that the employee responsible for the lockout/tagout is not available and that the removal will not create an unsafe condition. All affected employees shall be informed before equipment is placed back into service. 4.3 Lockout Devices Lockout devices must have positive identification as to ownership by department or individual and shall not be used for any other purpose. This will be met by attaching an isolation tag to each lockout device If an energy-isolating device is designed for a lockout device, the isolation tag will be attached at that point One-plus is the minimum tagging/tag-out requirement for an energy isolating device that has the potential for unexpected or unintentional operation. All quarter-turn piping valves must use one-plus for isolation if they do not have a locking mechanism An isolation tag shall be attached to the energy isolating device. Where the tag cannot be placed directly on the energy isolating device, it must be located as close as safely possible to the device in a position that would be immediately obvious to anyone attempting to operate the device. 4.4 Isolation Tags Isolation tags are to be used, as applicable, with lockout devices and one-plus restraint methods to ensure the integrity of the isolation One-plus must be used with the isolation device if the energy isolating device has the potential for unintentional operation. All quarter- turn piping valves without a locking mechanism must use one-plus Isolation tags must be the only tag used for controlling energy and shall not be used for any other purpose. Note: A printer version of this tag is available for use with automated red tag programs Isolation tags must be placed directly on lockout devices or on energy isolating devices.

17 Environmental, Health, and No.: BCF Page: 17 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport Isolation tags must include: equipment number/identification: Note: This can be achieved by reference to MIP or listing on the tag. The reason for tagging. Name, date, and department of person attaching the tag. Person/position authorized to remove the tag All isolation tags must be attached with a fastener that is non-reusable, attachable by hand, self-locking, and non-releasable with a minimum unlocking strength of fifty (50) pounds The isolation tags must be capable of withstanding inadvertent or accidental removal and be capable of tolerating the environment and time period in which they will be used Isolation tag information must be legible and able to withstand environmental conditions In-use isolation tags must be updated if they are no longer legible but do not have renewal requirements based on time Equipment owners are responsible for assuring that all isolation tags are removed from equipment before that equipment is physically removed for maintenance, demolition, etc Isolation tags must be disposed of, after removal, in a trash/waste container or another location designated by the unit by the person(s) removing the tag(s) Any isolation tag that is found on the ground or dislodged from where it was hung must be immediately investigated to prove that it is not part of an active isolation. If the tag was part of an active isolation, it must be re-attached and a near-miss incident report created to track and address the issue. 4.5 Master Isolation Procedure (MIP) System A master isolation procedure (MIP) can be used to control the lockout and/or tag-out of multiple isolation points as long as it will afford both the authorized and affected employees protection comparable to that of individual lockout

18 Environmental, Health, and No.: BCF Page: 18 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport devices All hazardous energy sources must be isolated as per the requirements of this procedure before implementing and authorizing work under the protection of an MIP The person completing, and authorizing work under a MIP must verify that all hazardous energy sources are properly isolated and that verification methods have been performed An approved isolation procedure shall be on or attached to the respective MIP(s) The MIP number shall be written on all isolation tags used for the isolation. The unique number on the top of the MIP form must be used and another number or name not substituted for it Safe work permits must reference the number of the MIP(s) controlling the isolation for the respective job(s). The person doing the work, or crew leader, will sign acceptance on the MIP to indicate that he/she is performing work under the protection of the MIP Lockout devices or isolation tags on equipment or on energy isolating devices referring to a MIP number cannot be removed until the respective MIP has been checked, and all personnel have signed off the MIP Individual authorized employees must be given the opportunity to personally verify isolations if they choose Approval of all MIPs must be by an authorized person, department, or company by OM/SM of the area Additional sheets must be attached to the original MIP if more sign-on locations are needed. Attachment F must be used, and the header must be filled out If a MIP is not used for isolation, every worker associated with the job/task must attach his/her personal tag to every energy isolating device Verification of energy isolation (zero energy) is separated into 3 sections to aid in multiple departments performing parts of the overall energy isolation verification. (Non-electrical isolation verification, Electrical isolation verification,

19 Environmental, Health, and No.: BCF Page: 19 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport Power Distribution isolation verification) Verification of an MIP may be carried out by three separate entities or just one depending on the isolation energy sources and verification methods. 4.6 Work Crew Accountability All workers are required to be in control of the hazardous energy sources. The work crew accountability form (WCAF) serves as the administrative control to ensure the safety for every individual working behind hazardous energy sources. If the permit acceptor and signer of the MIP is the same person, he/she is not required to sign on the WCAF The WCAF will be a part of safe work permits that involve hazardous energy isolation and/or line breaking activities. Additional WCAF sheet(s) may be attached if needed The WCAF must reference all associated MIPs or energy isolations if the WCAF is on a separate sheet from the permit The permit acceptor will be responsible for ensuring that all affected workers sign on and off the WCAF The permit acceptor may not sign off (release) the MIP if all affected workers have not signed off the WCAF If an authorized worker forgets to sign off the WCAF or MIP and is not available, all reasonable efforts must be made to contact that specific worker. If that specific worker cannot be located, the owning department may initial off the worker after a thorough physical inspection of the work-site/equipment has been performed, and it has been determined that the equipment can be safely operated. If a worker has been initialed off the WCAF by the owning department, that specific worker or his/her supervision must be informed before he/she resumes work. 4.7 Job Completion Upon job completion, tags must be removed. If a MIP is in use, the "Release" section must be signed and the job status box checked complete If the job is not complete, tags can be left in place. If a MIP is in use, the "Release" section must be signed and the job status box checked Incomplete.

20 Environmental, Health, and No.: BCF Page: 20 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 5 OTHER TAGS 5.1 Danger Tags (See the Attachments section for tag design.) Danger tags are used to convey information on hazards where the use or improper operation of equipment may cause personal/environmental injury or equipment damage. They should be used for notification and securing of damaged equipment, air mover valve position, and/or transmission/security of any other condition that could pose a safety risk to anyone Danger tags must indicate the: name, date, and department of person attaching the tag reason for tagging person/position authorized to remove the tag Equipment with a danger tag attached must follow all instructions on the tag Only the authorized person or position designated on the tag is authorized to remove the tag. If he/she is not available, the operations team leader may authorize removal after it has been determined that it is safe to do so Danger tags must remain legible at all times, but there are no renewal requirements based upon time. 5.2 Process Information Tags (See the Attachments section for tag design.) Process Information tags are used to convey process information. They can show material status, equipment out of service, or any specific instructions needing to be communicated at a given position in the process. A comment section is provided for more detail info. Check boxes are provided near the edge of tag to allow for holepunching for long-term tagging. No time based renewal requirements apply to this tag. 5.3 Relief Device Removal Tags (Pink) (See the Attachments section for tag design.) The relief valve removal tag(s) are used to indicate that a piece of equipment (i.e., pressure relief device) has been properly cleared and isolated and is ready to be removed. No relief device shall be removed unless it has a relief device removal tag attached.

21 Environmental, Health, and No.: BCF Page: 21 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport The relief device removal tag(s) shall be hung after the verification of isolation has been completed for that piece of equipment. The relief device removal tag(s) shall specifically identify the piece of equipment that will be removed (i.e., relief valve number). The equipment numbers shall match at all three places: o the equipment to be removed o the relief device removal tag o the equipment number description on the safe work permit An authorized safe work permit writer shall hang the relief device removal tag and may hang it during the Four Eyes process of permitting. The relief device removal tag(s) shall be returned to the control room with the safe work permit. This tag may be removed by the permitted crew removing the piece of equipment or any authorized permit writer. 6 VIOLATIONS Violations of tagging and/or hazardous energy control procedures must result in disciplinary action up to and including termination of employment. 7 TRAINING 7.1 General Each department shall provide training to ensure that the purpose and function of this procedure is understood and that adequate knowledge and skills are developed and maintained for the safe application and removal of energy isolation techniques. 7.2 Training Content BASF and contracted employees performing work as authorized employees shall receive training on the following: content of this standard (SS#12) recognition of applicable hazardous energy sources and their hazards type and magnitude of energy sources in the workplace use of adequate methods and means to control these sources and the limitations of a tag-out system

22 Environmental, Health, and No.: BCF Page: 22 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport that tags are essentially warning devices affixed to energy isolating devices and do not provide the physical restraint that a lock provides on those devices that when a tag is attached to an energy isolating device, it is not to be removed without authorization of the person responsible for it and it is never to be bypassed, ignored, or otherwise defeated that tags must be legible and understandable by all employees that tags may evoke a false sense of security, and their meaning needs to be understood as part of the overall hazardous energy control program use of equipment specific hazardous energy control procedures the requirements for issuing a permit and the necessary means to safeguard against the hazards posed during these activities BASF and contracted affected employees shall receive training in: the purpose and use of the site energy control program and how it may affect their specific work operation. the limitations of a tag-out system (See for details.) BASF and Contracted Not Directly Involved in the Site s Hazardous Energy Control Program: Personnel not directly involved in the hazardous energy control program will receive awareness training for this and other safe work practices in accordance with the EHS curriculum assignment process. 7.3 Training Frequency for Affected Employees and Authorized Employees Training shall be delivered in accordance with the EHS curriculum assignment process. Retraining of an employee is required whenever: o There is a change in job assignment affecting the level of participation in the program (i.e., an employee changes from an affected employee to an authorized Employee). o Deviations or inadequacies in an individual s performance of an applicable procedure indicate that lack of knowledge is a cause. o An applicable equipment specific hazardous energy isolation procedure has been changed because of equipment or process changes or when a new hazard is introduced.

23 Environmental, Health, and No.: BCF Page: 23 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 7.4 Documentation for BASF and Contracted Employees Training will be documented including: o each trainee's name o date(s) of attendance, o means to verify understanding o learning objectives for the course Documentation shall be maintained according to BC037, Record Retention Policy, and the applicable record retention schedule. 7.5 Contractor Employees Refer to BC , Contractor EHS Qualification and Oversight, for requirements. 8 Management System Review 8.1 Site Review of Program Site shall review the effectiveness of the site s program at least annually to ensure that the management systems are properly implemented and that the elements adequately control exposures to hazardous energy sources. As a minimum, the following management system elements shall be included in the review: a review of the site safety standard to ensure that all currently required corporate requirements are included a review of incidents on site that involve the failure to control hazardous energy sources since last annual review A representative number of equipment specific hazardous energy isolation procedures shall be reviewed annually Each unit needs to determine the number of Equipment Specific Isolation Procedures that need to be reviewed on an annual basis based on the number of equipment specific isolations preformed in a year. For example, a unit performs 100 isolations in a year, they determine 10% of these isolations would accurately represent the 100 equipment specific isolations. Therefore, the unit should have 10 Periodic Inspections performed annually Each unit will need to complete the periodic inspections for the Equipment Specific Isolation Procedures using the Control of Hazardous Energy Periodic Inspection Check List (Attachment 13).

24 Environmental, Health, and No.: BCF Page: 24 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport Completed Checklist, Control of Hazardous Energy Documentation, and Action Plan to correct Deficiencies found need to be retained for Current year plus 2 or duration of the Audit period whichever comes first An authorized employee who is not currently using the procedures under review must perform the review. The audit shall include: a comparison of the procedure(s) with existing equipment design and layout at least one each on line breaking and electrical energy sources a comparison of the procedure(s) with actual implementation practices interviews with authorized employees who use the procedure(s) that include: o a discussion of with each authorized employee regarding his/her responsibilities under the procedure(s) A discussion of any limitations of the isolation methods specified by the procedure(s) certification that the review has been performed with documentation of the following: o name of inspector and employees included in the inspection o o date of inspection equipment-specific hazardous energy control procedure inspected and the machine or equipment on which the energy control procedure was being used findings and corrective action, where applicable, of any deviations or deficiencies identified during the review The review shall be documented and reported to MAT. Note: For an example, see the Safe Work Practices Management Review Checklist located as an attachment in the related documents section of corporate standard BC Unit Review Requirements Notify site safety of all incidents involving the failure to control hazardous energy sources. Site must be notified of these incidents to meet annual review requirements. 8.3 Action Item Tracking Corrective actions resulting from the reviews shall be tracked to completion using a tracking system and must be communicated to all authorized and affected employees.

25 Environmental, Health, and No.: BCF Page: 25 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport 9 RESPONSIBILITIES 9.1 Site Manager The Site Manager has responsibility for ensuring the implementation of this procedure. 9.2 /Industrial Hygiene Team Leader The Team Leader of the Site Team has the primary responsibility for issuing, reviewing, administering, and/or interpreting this procedure. 9.3 Operations and Service Managers Implement the requirements of this procedure. Ensure that the requirements are being followed in their areas of responsibility. Ensure that training is provided as per requirements. Ensure that identified deficiencies are corrected and forwarded to site for review. Authorize, in writing, personnel, departments, and companies who can prepare and approve equipment isolation procedures in their areas. Verify that they have training on this and other applicable BASF safety standards and have procedures to comply with them. Verify that they are trained and qualified to perform the subject activities Verify that they have a level of knowledge and experience with the operation/process (equipment, hazards, and controls) that is equal to any existing operating/owning department personnel. 9.4 Permit Writer Ensure that all applicable requirements in this standard are met before issuing a SWP. When issuing a SWP to a designated owner/operator, verify that he/she has procedures to meet the requirements of this standard, just as if he/she were the normal owner/operator. (i.e., MIP, TJA, SOP, that addresses all aspects of this standard) 9.5 Employees Prepare and approve isolation procedures if authorized. Isolate and verify isolations of equipment per procedure/requirements. Assign/issue MIPs. Communicate the following to the MIP acceptor:: o positive I.D. of equipment o isolation and method(s) used

26 Environmental, Health, and No.: BCF Page: 26 of 26 Site Representative Manager, Environ, Health & VP and Gen. Mgr., Freeport o o verification (testing) methods used any known potential hazards, safety precautions, and requirements for the job 10 RELATED DOCUMENTS OSHA 29 CFR (control of hazardous energy) OSHA 29 CFR (electrical safety references) BC Lock, Tag, and Try BCF Line Breaking BCF Confined Space Entry BCF Safe Work Procedures 11 ATTACHMENTS Attachment 1 - Master Isolation Plan (MIP) Attachment 2 - MIP Additional Sign-on Sheet Attachment 3 Control of Hazardous Energy Sources Review Checklist Attachment 4 Work Crew Accountability Form (WCAF) Attachment 5 - Isolation Tag Attachment 6 - Danger Tag PVC Attachment 7 - Process Information Tag PVC Attachment 8 - Blind Installed Tag PVC Attachment 9 - Permit vs. Procedure Flow Chart Attachment 10 - Sample TJA for LOTO Exemption Attachment 11 - TJA Exemption Criteria Attachment 12 - Relief Device Removal Tag Attachment 13 Periodic Inspection Check List

Big 5 Site Training Support Information

Big 5 Site Training Support Information Big 5 Site Training Support Information Line Break July & August 2008 Safety Standard Philosophy Our Safety Standards are in place to address Occupational Safety Hazards they do not address the Process

More information

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) WAC Page 296-307-320 Control of hazardous energy (lockout-tagout). 1 296-307-32001 What does this section cover? 1 296-307-32003 When does this section

More information

THE UNIVERSITY OF NORTH CAROLINA

THE UNIVERSITY OF NORTH CAROLINA THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL CHILLED WATER DEPARTMENT ENERGY CONTROL PROCEDURE The purpose of this document is to establish minimum requirements for the manual isolation and securing

More information

LO/TO LOCKOUT/TAGOUT PROGRAM

LO/TO LOCKOUT/TAGOUT PROGRAM LO/TO LOCKOUT/TAGOUT PROGRAM April 2017 CONTENTS Section 1: Introduction...1 Section 2: Purpose... 1 Section 3: Application... 1 Section 4: Definitions... 2 Section 5: Roles and Responsibilities... 4 Section

More information

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established: OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM Environmental Health and Safety Established: Developed in accordance with OSHA Standard 29 CFR 1910.147 1 1.0 SCOPE. Oklahoma City Community

More information

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.147 BASIS: Approximately three million workers in the United States face risks from uncontrolled energy when servicing machinery

More information

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees. SAFETY DIRECTIVE Title: Control of Hazardous Energy Lock-out/Tag-out/Try-out Issuing Department: Town Manager s Safety Office Effective Date: July 1, 2014 Approved: Gilbert Davidson, Town Manager Type

More information

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0 () 30.0 The purpose of the Energy Control Policy (Lockout/Tagout) is to ensure that before any employee performs any servicing and/or maintenance on machinery or equipment, where the unexpected energizing,

More information

LOCKOUT-TAGOUT PROGRAM

LOCKOUT-TAGOUT PROGRAM LOCKOUT-TAGOUT PROGRAM Please Note: This material, or any other material used to inform employers/employees of compliance requirements of OSHA standards through simplification of the regulations should

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) 1. PURPOSE The purpose of this program is to establish policy, rules and procedures for the protection of employees against the unexpected energizing, start-up,

More information

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Introduction 2 Regulatory Requirements 2 Protective Materials

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM Page: 1 of 15 1.0 Purpose and Applicability 2.0 Scope 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the

More information

Title: Control of Hazardous Energy. No.: PA Page: 1 of 53. Supersedes: 05/17 (Rev. 17) Document Revision Change Table

Title: Control of Hazardous Energy. No.: PA Page: 1 of 53. Supersedes: 05/17 (Rev. 17) Document Revision Change Table No.: PA-020-0001 Page: 1 of 53 Document Revision Change Table Revision Revision Description Number 15 Updated clearing valves to remain open in 4.6.2 per AIM incident 0126-CLD-16-0286. 16 4.6.2 Clearing

More information

Product Information Report Lockout/Tagout Hazardous Energy Control

Product Information Report Lockout/Tagout Hazardous Energy Control Overview A properly implemented (LOTO) program is designed to protect workers involved in the maintenance and servicing of equipment from the dangerous effects of hazardous energy caused by the unexpected

More information

Lock Out/Tag Out Control of Hazardous Energy

Lock Out/Tag Out Control of Hazardous Energy Lock Out/Tag Out Control of Hazardous Energy University Facilities Internal Procedure: July 1, 2013 Effective date: July 1, 2013 Last Modified: April 2013 Approved by: Bob Wells 1.0 Program Objective UF

More information

Lockout / Tag out Program

Lockout / Tag out Program Lockout / Tag out Program Presented by DOSHTI www.doshti.com You will learn Purpose of Lockout- Tag out Requirements for LOTO Types of Hazardous Energy Procedures for LOTO The OSHA Standard for the Control

More information

Lockout/Tagout Safety Policy

Lockout/Tagout Safety Policy University of North Carolina Wilmington Environmental Health & Safety Workplace Safety Lockout/Tagout Safety Policy GENERAL The UNCW Environmental Health & Safety Department (EH&S) is authorized by UNCW

More information

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Lockout/Tagout Plan Environmental Health & Safety Office July 2017 July 2017 Table of Contents Acronyms... iii Foreword... iv Document History... iv 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Scope... 1 1.3 Lockout/Tagout Program... 1 2.0 Roles and Responsibilities...

More information

Hazardous Energy Control (Lockout-Tagout)

Hazardous Energy Control (Lockout-Tagout) Hazardous Energy Control (Lockout-Tagout) The purpose of this program is to prevent inadvertent operation or energization of machines, equipment, or processes in order to protect employees and establish

More information

Health, Safety, Security and Environment

Health, Safety, Security and Environment Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no

More information

230-LOCKOUT/TAGOUT PROGRAM

230-LOCKOUT/TAGOUT PROGRAM 230.1 PURPOSE A. To confirm implementation, operation, and recordkeeping of Central New Mexico Community College(CNM) lockout/tagout program in compliance with 29 CFR 1910.147. 230.2 SCOPE A. The requirements

More information

Lockout/Tagout - Energy Control Program

Lockout/Tagout - Energy Control Program Lockout/Tagout - Energy Control Program Lockout and Tagging of ELECTRICAL Circuits This portion of the K.R. Miller Contractors, Inc. safety program has been created to maintain a written copy of procedures

More information

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Training Overview. Safety Fest 2013 Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of

More information

Control of Hazardous Energy. Environmental Health and Safety

Control of Hazardous Energy. Environmental Health and Safety Control of Hazardous Energy Environmental Health and Safety 11/01/2014 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) OSHA CFR 1910.147 Revised Date: November 2014 STATEMENT OF POLICY Ball State University

More information

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012 PAGE 1 OF 7 LOCK-OUT TAG-OUT (LOTO) THE CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM PURPOSE: 1. This standard establishes lockout/tagout (LOTO) procedures for the safety of personnel working on

More information

Management Plan for Lockout Tagout (LOTO) ISD #535

Management Plan for Lockout Tagout (LOTO) ISD #535 Management Plan for Lockout Tagout (LOTO) ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9½ Street Rochester, MN 55904 507-328-4507 Modification Date Document Modification Form All

More information

Lockout/Tagout Manual

Lockout/Tagout Manual Manual 2408 Wanda Daley Drive Ames, Iowa 50011-3602 (515) 294-5359 www.ehs.iastate.edu Copyright Environmental Health and Safety 2809 Daley Drive Ames, IA 50011-3660 Ph: (515) 294-5359 www.ehs.iastate.edu

More information

Gettysburg College. Energy Control Program

Gettysburg College. Energy Control Program Gettysburg College Energy Control Program Adopted October 2009 Reviewed and Updated February 2015 Reviewed and Updated July 2015 I. Energy Control Procedures Table of Contents A. General Lockout Procedures

More information

Lockout / Tagout Safety Program

Lockout / Tagout Safety Program Lockout / Tagout Safety Program Prepared by: The Ohio State University Environmental Health and Safety Occupational Safety & Industrial Hygiene 1314 Kinnear Road Columbus, OH 43212-1168 614-292-1284 Phone

More information

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.

More information

Lock Out - Tag Out Safety Program

Lock Out - Tag Out Safety Program Lock Out - Tag Out Safety Program Daniel Schmid 4-22-15 Pam Schmid 4-22-15 Dan Schmid Pam Schmid Safety Director Quality Director Table of Contents DOCUMENT REVISION TABLE... 3 PURPOSE... 4 RESPONSIBILITY...

More information

University of Arkansas Office of Environmental Health and Safety

University of Arkansas Office of Environmental Health and Safety University of Arkansas Office of Environmental Health and Safety Procedure Name: Lockout / Tagout Procedure Number: 600.26 Effective Date: 12-1-2015 Procedure: Developed in accordance with the OSHA Control

More information

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout) PRESCOTT SCHOOL DISTRICT NO. 402-37 207 South A Street Prescott, WA 99348 509-849-2217 The Control of Hazardous Energy (Lockout/Tagout) I. Purpose The Control of Hazardous Energy (Lockout/Tagout) This

More information

UCHC Lockout/Tagout Policy (4/09)

UCHC Lockout/Tagout Policy (4/09) UCHC Lockout/Tagout Policy (4/09) Background: This safety policy is applicable to all Health Center activities and addresses practices and procedures that are necessary to disable machinery or equipment

More information

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM Santa Clarita Community College District LOCKOUT/TAGOUT PROGRAM Revised March 2018 TABLE OF CONTENTS PURPOSE... 3 COMPLIANCE...4 DEFINITIONS...5 SECTION I - ENERGY CONTROL PROCEDURES... 7 SECTION II -

More information

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM INTRODUCTION Mariposa County ( County ) facilities have equipment and systems that must be deenergized to allow for safe cleaning, repairing, servicing, setting-up,

More information

LOCKOUT / TAGOUT PROGRAM

LOCKOUT / TAGOUT PROGRAM LOCKOUT / TAGOUT PROGRAM Developed in accordance with the OSHA Control of Hazardous Energy Standard, 29 CFR 1910.147 DECEMBER 7, 2017 SKIDMORE COLLEGE 815 NORTH BROADWAY, SARATOGA SPRINGS, NY 12866 Table

More information

LOCKOUT/TAGOUT PLAN August 2015

LOCKOUT/TAGOUT PLAN August 2015 LOCKOUT/TAGOUT PLAN August 2015 Office of Environmental Health and Safety 423-354-5224 TABLE OF CONTENTS Purpose and Intended Use... 2 A. Types of Energy Sources... 2 B. Activities Requiring Lockout/Tagout

More information

Lockout/Energy Control

Lockout/Energy Control Lockout/Energy Control Presented By: Sotaris, LLP 2000 Auburn Drive, Suite 200 Beachwood, Ohio 44122 P: 216-378-7650 F: 866-794-5756 W: www.sotaris.com E: awj@sotaris.com 1 About Me Andrew W. Johnson,

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments) CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments) PURPOSE This program establishes the general and specific requirements for the control of

More information

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR Volunteer State Community College Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR 1910.147 The information contained in this maual documents the policies and procedures

More information

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107 WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107 Draft Issued 12/97 Revised 11/00 Please direct any questions or comments about the applicability of this document to Luigi Marcone, WCSU

More information

Control of Hazardous Energy Program (LOTO)

Control of Hazardous Energy Program (LOTO) 1.0 PURPOSE The purpose of this program is to establish minimum safety requirements for the lockout and tagout of hazardous energy sources and the verification of energy isolation through the use of isolating

More information

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM 0 Appendix C OCCUPATIONAL SAFETY AND HEALTH PROGRAM LOCKOUT/TAGOUT PROGRAM Hazardous Energy Control Lockout/Tagout Program TABLE OF CONTENTS Section Page I. Purpose and Scope. 1 II. Definitions 1 III.

More information

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018 University Policy Volume E2: Environment, Health, Safety and Security E2.14 Control of Hazardous Energy Responsible Office: Facilities Management Responsible Officer: Safety Officer POLICY STATEMENT All

More information

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY) DRAFT [name of unit] LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY) PURPOSE This program establishes the general and specific requirements for the control of hazardous energy during the servicing

More information

H. Control of Hazardous Energy: Lockout/Tag Out

H. Control of Hazardous Energy: Lockout/Tag Out H. Control of Hazardous Energy: Lockout/Tag Out 1. Purpose Control of Hazardous energy is the purpose of the Lockout- Tagout Program. This program establishes the requirements for isolation of both kinetic

More information

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout) Purpose: To provide the minimum requirements for the lockout or tagout of energy isolating devices whenever work is performed or servicing is done on County of DuPage machinery, equipment, vehicles and

More information

Lockout Tagout Policy

Lockout Tagout Policy Office of Environmental Health & Safety www.moreheadstate.edu/ehs 606-783-2584 Lockout Tagout Policy PURPOSE To establish procedures for the de-energization and isolation of energy sources or the lockout

More information

Control of Hazardous Energy Lockout / Tagout Program

Control of Hazardous Energy Lockout / Tagout Program Control of Hazardous Energy Lockout / Tagout Program August 2016 Table of Contents Purpose... 1 Scope and Application... 1 Responsibilities... 1 Environmental Health and Safety Personnel (EH&S)... 1 Directors

More information

Lockout/Tagout - Control of Hazardous Energy Program

Lockout/Tagout - Control of Hazardous Energy Program Lockout/Tagout - Control of Hazardous Energy Program The University Of Iowa Environmental Health & Safety 122 Grand Avenue Court Iowa City, IA 52242-1000 Phone: 319-335-8501 Date Revised/Reviewed: 6/8/2018

More information

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM Procedure Number EHS-LOTO-2013 Revision Number 00 Effective Date June 1, 2014 I. Purpose II. III. IV. Scope

More information

University of Vermont Department of Physical Plant Burlington, Vermont

University of Vermont Department of Physical Plant Burlington, Vermont University of Vermont Department of Physical Plant Burlington, Vermont CONTROL OF HAZARDOUS ENERGY SOURCES AND ELECTRICAL HAZARDS LOCKOUT AND TAGOUT PROGRAM in accordance with OSHA 29 CFR 1910.147 REVISED

More information

Lockout Tagout Program

Lockout Tagout Program Lockout Tagout Program Table of Contents INTRODUCTION... 2 FORWARD... 2 OBJECTIVE... 2 APPLICABILITY... 2 RESPONSIBILITIES... 3 PROGRAM ENFORCEMENT... 4 RECORDKEEPING... 4 LOCKOUT TAGOUT EQUIPMENT... 5

More information

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4. Lockout/Tagout Page Introduction Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4 How It Works General Lockout/Tagout Procedure. 5 General Lock/Tag Removal Procedure.

More information

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by SAINT MARY S COLLEGE OF CALIFORNIA STANDARD 1.1.4 HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT Prepared by SAINT MARY S COLLEGE OF CA MORAGA, California KAREN LAURICELLA Original Date: 1 JULY

More information

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM 1.0 REGULATORY AUTHORITY Code of Federal Regulations, 29 CFR 1910.147; California Code of Regulations, Title 8, Sections 2320.1 and 3314; CSU, Fullerton

More information

Lockout Tagout Program

Lockout Tagout Program Lockout Tagout Program RIM of the World Unified School District 27315 North Bay Road Blue Jay, CA 92352 (909) 336-4100 July 2016 Safety and Risk Management Department RIM of the World Unified School District

More information

ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE

ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE Lockout/Tagout Program Approved: October 10, 2005 Reviewed and Modified: March 7, 2016 Reviewed: March 4, 2019 TABLE OF CONTENTS Section Page 1.0 Program

More information

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM (HAZARDOUS ENERGY CONTROL) May 1, 2003 1 LOCKOUT/TAGOUT PROGRAM (HAZARDOUS ENERGY CONTROL) I. PURPOSE The purpose of this Hazardous Energy Control Program is to

More information

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM Procedure Number EHS-LOTO-2013 Revision Number 01 02 Effective Date June 1, 2014 October 15, 2017 I. Purpose

More information

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell: Energy Control Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: 905.577.0303 cell: 905.977.0210 consultant@staffaid.ca www.staffaid.com Safety, Energy Control, Power Lockout & Function Test Procedures

More information

Facilities Management

Facilities Management Facilities Management Policy Number: 700.6 Title: Lockout/Tag Out Policy Implementation Date: 2004 Last Audited: July 2 nd, 2018 Last Revised: March 25 th, 2015 Introduction This policy contains the necessary

More information

Lockout Tagout Program

Lockout Tagout Program Lockout Tagout Program 1.0 INTRODUCTION Public Safety Department Environmental, Health and Safety (EHS) Division Standard Operating Procedure (SOP) #18 Purpose To ensure that machinery or equipment is

More information

Lockout / Tagout Program OSHA 29 CFR

Lockout / Tagout Program OSHA 29 CFR Lockout / Tagout Program OSHA 29 CFR 1910.147 Baylor University utilizes outside contractors to perform set-up, maintenance, service, and repair to equipment utilized on campus. University staff perform

More information

CONTROL OF HAZARDOUS ENERGY

CONTROL OF HAZARDOUS ENERGY SECTION 12 CONTROL OF HAZARDOUS ENERGY 12.A GENERAL 12.A.01 This Section shall apply to contractor-managed Hazardous Energy Control Programs (HECP) only, as well as all requirements of 1910.147, ANSI Z244.1,

More information

Elements of a Lockout/Tagout Program OSHA

Elements of a Lockout/Tagout Program OSHA September 15, 2015 Elements of a Lockout/Tagout Program OSHA 1910.147 Dayna Noble Industrial Safety Consultant Specialist Ohio BWC 567-204-8917 Dayna.noble@bwc.state.oh.us Top 10 most frequently cited

More information

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM LOCKOUT/TAGOUT PROGRAM HOW CLIMATE ENGINEERS INC. COMPLIES WITH THELO/TO STANDARD It is the intent of Climate Engineers Inc. to comply with OSHA s Control of Hazardous Energy Standard (1910.147). The following

More information

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5 Classroom, Occupational Safety & Health Plan Date: August 5, 2017 PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5 1. Purpose This document establishes the Lockout Program for Tidewater Community

More information

MCW s Control of Hazardous Energy Program

MCW s Control of Hazardous Energy Program 2018 MCW s Control of Hazardous Energy Program - Lockout Tagout Program This document is MCW s written program for managing the lockout and tagout of hazardous energy, and identifies roles and responsibilities

More information

Lockout/Tagout Program

Lockout/Tagout Program Lockout/Tagout Program Prepared by: Occupational Health and Safety Reviewed by: Joint Health and Safety Committees Approved by: Chief Human Resources Officer November 2014 TABLE OF CONTENTS 1.0 Purpose...3

More information

RiskTopics. Lockout/Tagout October 2017

RiskTopics. Lockout/Tagout October 2017 RiskTopics Lockout/Tagout October 2017 This Risktopic is designed to outline guidelines for lockout/tagout and provide assistance in developing a management program to reduce the risk of injury from unintended

More information

Energy Control Procedures Lockout/Tagout 29 CFR

Energy Control Procedures Lockout/Tagout 29 CFR Energy Control Procedures Lockout/Tagout 29 CFR 1910.147 Paul Schlumper, PE, CSP Georgia Tech Research Institute What is covered? Servicing and maintenance Normal production operations where: Employees

More information

LOCK OUT \ TAG OUT PROGRAM

LOCK OUT \ TAG OUT PROGRAM LOCK OUT \ TAG OUT PROGRAM University of Portland 5000 N. Willamette Blvd Portland, OR 97203-5798 January 2005 Revision 2.5 Prepared By: Environmental Health and Safety i TABLE OF CONTENTS Content SECTION

More information

Control of Hazardous Energy Program (Lockout/Tagout)

Control of Hazardous Energy Program (Lockout/Tagout) Control of Hazardous Energy Program (Lockout/Tagout) 1 The Control of Hazardous Energy (Lockout/Tagout) Program 1910.147 The following lockout/tagout program is provided to assist employees in complying

More information

Lockout/Tagout Program

Lockout/Tagout Program Purpose Hazardous energy appears in the workplace in the form electrical, mechanical, pneumatic, hydraulic and thermal energy and includes chemical, water, steam and gaseous energy systems. Lockout/Tagout

More information

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS A. PURPOSE 1 B. FACILITIES STAFF RESPONSIBILITIES 2 C. TRAINING AND RETRAINING of AFFECTED and EUTHORIZED EMPLOYEES 3 NINE POINTS TO REMEMBER 5 LOCKOUT/TAGOUT

More information

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT SAMPLE WRITTEN PROGRAM The objective of this procedure is to establish a means of positive control to prevent the accidental starting

More information

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout)

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout) University of Illinois at Chicago Control of Hazardous Energy Program (Lockout/Tagout) 10/4/2018 UNIVERSITY OF ILLINOIS AT CHICAGO Control of Hazardous Energy (Lockout/Tagout) Program TABLE OF CONTENTS

More information

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office Lockout / Tagout Program The Control of Hazardous Energy Environmental Health and Safety Office Revised: 07/2014 TABLE OF CONTENTS 1.0 PURPOSE STATEMENT... 1 2.0 SCOPE:... 1 3.0 RESPONSIBILITY:... 2 4.0

More information

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices. 1 of 6 1.0 PURPOSE This program applies to the installation, service, maintenance, or removal of any type of machinery, equipment, or components, in which the unexpected start up or release of stored energy

More information

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision Control of Hazardous Energy Program Section: Occupational Health and Safety Date of 2007.07.24 Management System Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment

More information

LOCKOUT TAGOUT. Quick Reference FAQs REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS

LOCKOUT TAGOUT. Quick Reference FAQs REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS Quick Reference FAQs i LOCKOUT TAGOUT BACKGROUND OSHA COVERAGE REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS CONTENTS Background...2 OSHA Coverage...3 Requirements of the Standard. 7 Commonly Used Terms...12

More information

Health and Fire Safety Review 2/15

Health and Fire Safety Review 2/15 Health and Fire Safety Review 2/15 1 TABLE OF CONTENTS Page 3 Scope 3 Control of Hazardous Energy (Introduction) 3 Authorized Employee 3 Employer Responsibility 4 Tagout Devices 4 Lockout Devices 5 General

More information

Lock Tag Try Procedure

Lock Tag Try Procedure WHEN PRINTED, THIS IS AN UNCONTROLLED DOCUMENT 8/14/2017 PRC-SAF-02 S014 Zachary EHS&S Management System SITE SAFETY POLICIES and PROCEDURES Lock Tag Try Procedure REVISION # 1.0 Revision Date - 8/26/2013

More information

University of Tennessee Safety Program

University of Tennessee Safety Program University of Tennessee Safety Program Policy Subject: Lockout/Tagout Program Effective Date: 4/22/98 Area Affected: All areas on campus where equipment can be locked out for service. Contact Information:

More information

EM385 Construction Safety and Health Certification Course Section 12 Control of Hazardous Energy

EM385 Construction Safety and Health Certification Course Section 12 Control of Hazardous Energy EM385 Construction Safety and Health Certification Course Section 12 Control of Hazardous Energy OSHAcademy Course 501 Study Guide EM 385 SAFETY AND HEALTH CERTIFICATION COURSE - SECTION 12 Edited by:

More information

Environmental Health & Safety

Environmental Health & Safety Environmental Health & Safety Oklahoma State University LOCKOUT / TAGOUT PROGRAM MANUAL Environmental Health and Safety University Health Services Suite 002 Stillwater, OK 74078 (405) 744-7241 www.ehs.okstate.edu

More information

LOCKOUT AND TAGOUT. PART 1: INTRODUCTION

LOCKOUT AND TAGOUT. PART 1: INTRODUCTION LOCKOUT AND TAGOUT PART 1: INTRODUCTION Applicability of This Module Use the following General Applicability Checklist to determine whether a rulebook and its sections apply to your operation If you answer

More information

PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2.

PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2. ZACHARY SITE PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2.0 Date: 11/7/18 PRC-SAF-16 Zachary Site SAFETY POLICIES and PROCEDURES

More information

CONTROL OF HAZARDOUS ENERGY

CONTROL OF HAZARDOUS ENERGY Table of Contents 1.0 Applicability...2 2.0 Scope...2 3.0 Definitions...2 4.0 Core Information and Requirements...3 5.0 Roles and Responsibilities... 12 6.0 Goals, Objectives and Performance Measures...

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 1-4 EMPLOYEE TRAINING INCLUDING DOCUMENTATION 5-6 HEC APPLICATION AND REMOVAL 7-14 COMMITTEE A HEC DEVICE 15 SPECIAL SITUATIONS 16-23

More information

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout) USAG Bavaria Safety Office Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout) Nov 2016 1910.147 The Control of Hazardous Energy (Lockout/Tagout) The following lockout/tagout program

More information

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE Office of Environmental Health & Safety CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE LOCK OUT/TAG OUT OSHA 29 CFR 1910.147 rev. 3 2014 Director of Environmental Health & Safety Control of Hazardous Energy

More information

2. The purpose of this program is to achieve the following objectives:

2. The purpose of this program is to achieve the following objectives: Section 16A. Lockout and Tagout Program 1. In the course of their duties, personnel at the TFREC may need to secure controls, switches, and equipment in order to prevent injury caused by the sudden, unexpected

More information

Lockout/Tagout Program

Lockout/Tagout Program Lockout/Tagout Program Control of Hazardous Energy Subpart J - 29 CFR 1910.147 29 CFR 1926.417 OSHA Standard All industries must comply Estimated to prevent Approximately 120 fatalities per year 28,000

More information

Hazardous Energies Control and Lockout/Tagout Program

Hazardous Energies Control and Lockout/Tagout Program Hazardous Energies Control and Lockout/Tagout Program Summary: This program applies to the installation, service, maintenance, or removal of any type of machinery, equipment, or components, in which the

More information

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM Procedure Number EHS-LOTO-2013 Revision Number 01 02 Effective Date June 1, 2014 October 15, 2017 I. Purpose

More information

Hazardous Energy Control

Hazardous Energy Control Lockout Tagout This program has been prepared to provide assistance in compliance with USA OSHA standards and/or Best Management Practices. It should not be used without consideration of the unique conditions

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 3 Page 1 of 20 I. PURPOSE The purpose of this program is to prevent injuries and accidents from occurring while servicing or maintaining machinery or equipment that is capable of sudden energy