Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Size: px
Start display at page:

Download "Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development"

Transcription

1 Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology Conference October 29-30, 2013 Lone Star College Conference Center The Woodlands, Texas 1 rpsea.org

2 2 Project Schedule

3 3 Project Spending vs Budget

4 Agenda o Project background o Basis of Design o Field Layout and FPSO Orientation o Hull Motions o Riser Analysis o Hull Design o Mooring System o Topside Layout o Moonpool Arr t o Offloading System 4

5 Context o FPSO o Group of challenges related to Lower Tertiary o o Field anticipated far from existing infrastructure Local storage Fig. 1: Existing Oil and Gas Pipelines in GoM and Outlined Lower Tertiary Reservoirs (Image Credit: Wood Mackenzie, taken from [19]) o Oil export to shuttle tankers o Gulf enviroment o These solutions may provide increased flexibility and reduced investment risk 5 o Innovative solutions may result in cost reduction Fig. 3: Tracks for Ivan, Denis, Katrina and Rita [16]

6 Design Basis o Field: Generic, Gulf of Mexico o Water depth: 2,500m o Storage capacity: 1,000,000 bbls o Oil production: 60,000 bopd (+50% future) o Water production: 60,000 bopd o Gas processing: 60 mmscfd o Motions: Acceptable for Steel Catenary Risers o No. of risers: 11 (not critical for Sevan design) The floating facilities shall have direct production and offloading capabilities and shall be capable of producing, processing and offloading crude oil from two separate drilling centers. 6

7 Hull Selection indicated as possible concepts are o Ship-shaped FPSO o Non ship-shaped cylindrical FPSO (represented by SEVAN 1000) o Non ship-shaped hemispherical FPSO (represented by SSP 320 Plus) o Deep draft semi-submersible FPSO (represented by Octabuoy 1 MMbbls) SEVAN 1000 selected for further study! 7

8 Scope of Work o Preliminary design and analysis of hulls, risers, moorings and topside o Evaluate whether hurricane abandonment is acceptable with hydrocarbons in storage o Regulatory evaluations o Risk analysis o Establish a complete shuttle tanker oil export concept o Provide cost and schedule for the concept, including an export solution 8

9 9 Hull and Risers

10 Sevan FPSO Motions Natural periods are obtained: Ballast Loaded Heave 23.2 s 23.6 s Roll/Pitch 32.1 s 42.1 s Hydrodynamic models of the Sevan FPSO, Left: Panel model of hull without moonpool Right: Panel model with moonpool (only used to quantify simplification effect) 10

11 Motions Heave accelerations The most probable maximum vertical acceleration amplitude at the FPSO bow (towards the waves) in the 1000-year condition is limited to 0.15g. Vertical Acceleration Process Deck Bow Wave condition Hs [m] Tp [s] Sign Amp [m/s2] Loaded draft MPM Amp [m/s2] Sign Amp [m/s2] Ballast draft MPM Amp [m/s2] 1y Operating Condition y Operating Condition y Operating Condition y Hurricane Condition y Hurricane Condition Furthermore, motion sickness evaluation is based on a Motion Sickness Dose Value (MSDV) of 15. Based on the results it can be concluded that sea sickness should not be a major issue even in the worst hurricane conditions.

12 Global Strength Analysis The analysis is based on a load case matrix considering operation, extreme, survival, and hydrotest conditions, with parameters: o OD=10.75 o WT=1.61 o 3 insulation coating o Fully straked, C d =1.4 o Dynamic analysis o Airy wave theory o Titanium TSJ at riser hang-off 12

13 Stress Utilization of Standard Pipe Joints Load Case Load Category Vessel Offset (% WD) Vessel Offset Direction Environment C f Max Stress Utilization on Standard Pipe Joints Operation Extreme Extreme Survival Installation Hydrotest Near yr Hurricane 1.0 Far 0.71 Near yr Hurricane 1.2 Far 0.79 Near yr Hurricane 1.2 Far 0.70 Near yr Hurricane 1.5 Far 0.60 Near yr Winter Storm 1.35 Far 0.48 Near yr Winter Storm 1.35 Far

14 Tension Along SCR 6000 RPSEA SCR for SEVAN Floater Tension Along SCR Arc 1000 yr Hurricane, Vessel Near Offset 5000 Tension (kn) SCR Arc Length (m) Min Tension Max Tension 14

15 Future Riser Assessment o The strength responses indicate that the designed SCR meets the strength requirements of API-RP-2RD, based on the preliminary Ballast RAOs. o Hull hydrodynamics to be validated o The way-forward is to perform a fatigue assessment on the riser s fatigue responses. 15

16 Hull Design Main Particulars Based on the design basis and design philosophy, the resulting main dimensions are: Description Hull Diameter (m) Bilge box Diameter (m) Bilge box plate Diameter (m) Main Deck Diameter (m) Process Deck Diameter (m) Main Deck El. (Hull depth) (m) Process Deck El. (m) Draft, Ballast (m) Draft, Loaded (m) Freeboard to MD, Ballast (m) Freeboard to MD, Loaded (m)

17 Hull Design Capacity Based on the main dimension in the previous slide, the key capacities are: Item Description Topside carrying capacity (t) Cargo Oil Storage (Net. at 92% fill ratio) (m3) (bbls) Slop tanks (m3) (bbls) Water Ballast (fill ratio = 95%) (m3) Marine Diesel Oil (m3) Potable Water (m3) 300 Service Water (m3) 800 Other tanks (m3)

18 18 Hull Design Tank Arrangement

19 Mooring System - Layout As only omnidirectional environmental conditions have been given in the design basis, an omnidirectional mooring system with 15 lines in three clusters has been proposed. o Anchor o 158 mm R4S bottom chain o 270 mm lower polyester rope o Connection element o 270 mm Upper polyester rope o 158 mm R4S Top chain 19

20 20 Topside Layout

21 21 Moonpool Arrangement

22 Field Layout and FPSO Orientation The field layout and FPSO orientation will be developed as a trade-off between several parameters: Governing directions of wind and waves Routing of risers and umbilicals Location of offloading station and offloading sector Location and orientation of accommodation & life boats Location of flare Other surface units or subsea structures 22

23 Offloading - Principles 23 An elongated sector is proposed to allow for near 360 degrees operation. Shuttle tanker DP2 Normal operating distance between the shuttle tanker bow and the FPSO is m Green Sector 30m wide Yellow Sector 10m wide Minimum distances between the outer side of yellow sector and the nearest mooring line is in the range of 25 m

24 Offloading - Reel o Typical diameter: 10-11m o Length: 10m o Hose length: m o Hose diameter: 20 o Offloading rate: m 3 /h o Offloading bbls in 20 hours 24

25 Contacts FPSO Sevan 1000 for the ENI operated Goliat Contract type: Technology license field Location: Norwegian Barents Sea Water depth: 400m (Harsh and sub arctic) Yard: Hyundai Heavy Industries Hull size: Sevan1000 Oil processing: bod Water injection: bwd Gas compression: 140 Mill Scfd Oil storage: bbls Power feed from shore 60 MW 25

26 Contacts PI: Jelena Vidic-Perunovic Doris, Inc RPSEA PM: Bill Head Presenter: Lars Ødeskaug SEVAN Marine ASA 26

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2 Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico (GOM) Field Development, Phase 2 10121-4404-03 Jelena Vidic-Perunovic Doris, Inc. 1 Best of RPSEA 10 Years of Research - Ultra-Deepwater

More information

Feasibility of Steel Lazy Wave Risers in the North Sea

Feasibility of Steel Lazy Wave Risers in the North Sea NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Feasibility of Steel Lazy Wave Risers in the North Sea Rohit Shankaran 2H Offshore Engineering Ltd. Agenda Risers in deepwater North Sea Are steel catenary

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands Proceedings of the ASME 2011 30th International

More information

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific June 2011 Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific Daniel Brooker, MCS Kenny Presentation Agenda 1. Objectives 2. Top Tensioned Riser (TTR) Selection Drivers

More information

The Impact of Composites on Future Deepwater Riser Configurations

The Impact of Composites on Future Deepwater Riser Configurations The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater

More information

Deepwater Floating Production Systems An Overview

Deepwater Floating Production Systems An Overview Deepwater Floating Production Systems An Overview Introduction In addition to the mono hull, three floating structure designs Tension leg Platform (TLP), Semisubmersible (Semi), and Truss Spar have been

More information

Learn more at

Learn more at Bottom Weighted Riser A Novel Design for Re-location and Disconnection Frank Lim and John McGrail 2H Offshore Engineering Ltd. Woking, Surrey, United Kingdom ABSTRACT Flexible pipe risers have limitations

More information

Design Challenges & Solutions for Large Diameter Export Risers

Design Challenges & Solutions for Large Diameter Export Risers Design Challenges & Solutions for Large Diameter Export Risers Elizabeth Tellier, Hugh Howells & Mark Cerkovnik 2H Offshore Engineering AOG 2011 Agenda WA export riser design challenges Development options

More information

Offshore Oil and Gas Platforms for Deep Waters

Offshore Oil and Gas Platforms for Deep Waters Offshore Oil and Gas Platforms for Deep Waters Atilla Incecik Department of Naval Architecture, Ocean and Marine Engineering University of Strathclyde, Glasgow, UK (atilla.incecik@strath.ac.uk) Summary

More information

A Novel Platform for Drilling in Harsh High-Latitude Environments.

A Novel Platform for Drilling in Harsh High-Latitude Environments. AADE-7-NTCE-73 A Novel Platform for Drilling in Harsh High-Latitude Environments. Brian Roberts, Technip; Chunqun Ji, Technip; Jim O Sullivan, Technip and Terje Eilertsen, Technip. Copyright 27, AADE This

More information

Risers for Deepwater FPSO s

Risers for Deepwater FPSO s Risers for Deepwater FPSO s John Bob-Manuel Senior Engineer 2H Offshore Engineering Ltd. March 2013 Agenda 2H overview Challenges of Deepwater Operations Freestanding Riser Overview Riser Configurations

More information

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs PAU, FRANCE 5-7 APRIL 2016 Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs Author: Fan Joe Zhang Presenter: Styrk Finne DNV GL - Software Contents Typical

More information

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR ATMA 2006 HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR? ) LES TENDANCES POUR LE FUTUR Partie 1 Pierre-Armand THOMAS TECHNIP Division Offshore - Paris (France) Diapositives

More information

OMAE WET TREE SEMI-SUBMERSIBLE WITH SCRS FOR 4,000 FT WATER DEPTH IN THE GULF OF MEXICO

OMAE WET TREE SEMI-SUBMERSIBLE WITH SCRS FOR 4,000 FT WATER DEPTH IN THE GULF OF MEXICO Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands OMAE2011-50002 WET TREE SEMI-SUBMERSIBLE WITH

More information

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences. Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)

More information

FPSO Riser Solutions for Harsh environments

FPSO Riser Solutions for Harsh environments FPSO Riser Solutions for Harsh environments Hanh Ha and Hugh Howells AOG Perth, March 2015 Overview Design challenges Flexibles Configurations and response Mild Environment Riser Harsh Environment Riser

More information

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA Mazlan Muslim and Md Salim Kamil Marine and Design Technology Section, University Kuala Lumpur MIMET, Lumut, Perak, Malaysia E-Mail

More information

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS Tze King Lim, Dhyan Deka, Elizabeth Tellier, Hugh Howells AOG 2018, Perth 15 th March 2018 Agenda Lazy wave risers an enabling technology

More information

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Re-usable Riser and Flowline System for Deep Water Application C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Table of Contents Flexible Pipe Technology Deep Water Challenges for Riser, Flowline and Umbilical

More information

Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater

Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater F.E. Jamaludin, a and J. Koto, a,b,* a) Faculty of Mechanical Engineering,Universiti Teknologi Malaysia, 81200 Skudai, Johor Bahru, Malaysia

More information

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;

More information

$ Millions. The PC Semi: A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration. Semi Hull CAPEX Differentials. Topsides.

$ Millions. The PC Semi: A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration. Semi Hull CAPEX Differentials. Topsides. The : A Low Motion Semisubmersible Capable of a Wet or Dry Tree Configuration In our ever changing and uncertain market conditions, it is extremely important to ensure capital investments are successful

More information

A New Thermoplastic Composite Riser for Deepwater Application

A New Thermoplastic Composite Riser for Deepwater Application A New Thermoplastic Composite Riser for Deepwater Application Martin van Onna, Managing Director Airborne Composite Tubulars Patrick O Brien, Group Director Strategic Business & Marketing, Wood Group Kenny

More information

Dynamic analyses of tankers moored at berth

Dynamic analyses of tankers moored at berth Dynamic analyses of tankers moored at berth Marin byggteknikkdagen 18.4.2018 Martin Thuve Hovden Department of Marine Tecnology, Multiconsult Tromsø Department of Marine Tecnology, Tromsø 27 marine & coastal

More information

Minimal Structures for Marginal Nova Scotia Developments

Minimal Structures for Marginal Nova Scotia Developments Minimal Structures for Marginal Nova Scotia Developments May 12, 2009 Cameron Dunn Martec is a member of the Lloyd s Register Group 1 2 Minimal Structures Project NSDOE working to make the Nova Scotia

More information

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction This lecture deals with the equipment developed and the experience gained during

More information

REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS

REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS REVISITING GLOBAL RESPONSE OF FPSOS IN SHALLOW WATER AND THE RISER ANALYSIS REQUIREMENTS AMIR H. IZADPARAST SENIOR RESEARCH ENGINEER, HYDRODYNAMICS AND MOORING TECHNOLOGY, SOFEC JIAXING CHEN RESEARCH ENGINEER,

More information

Offshore Losses Case Studies

Offshore Losses Case Studies Offshore Losses Case Studies David Brown BSc(Eng), PhD, CEng, FRINA, FSUT, SNAME, FIMechE Engineering Director BPP Technical Services OPERA Lessons from Disaster Author s Experience Experience Professional

More information

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico From the Wellhead to the Tanker Offshore Production Systems Index Offshore Installations Subsea Systems Field overview Christmas Trees Manifolds Templates Mid-Water Arches Topsides FPSOs The Oil Production

More information

TARPON A Minimal Facilities Platform

TARPON A Minimal Facilities Platform TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application

More information

Development of TEU Type Mega Container Carrier

Development of TEU Type Mega Container Carrier Development of 8 700 TEU Type Mega Container Carrier SAKAGUCHI Katsunori : P. E. Jp, Manager, Ship & Offshore Basic Design Department, IHI Marine United Inc. TOYODA Masanobu : P. E, Jp, Ship & Offshore

More information

Learn more at

Learn more at vs. for Deepwater Applications Technical Appraisal John McGrail and Frank Lim 2H Offshore Engineering Limited Woking, UK ABSTRACT This paper provides a technical appraisal of the use of Single Line Offset

More information

Development of Accidental Collapse Limit State Criteria for Offshore Structures

Development of Accidental Collapse Limit State Criteria for Offshore Structures Risk Acceptance and Risk Communication Stanford, March 26-27, 2007 Development of Accidental Collapse Limit State Criteria for Offshore Structures by Torgeir Moan Norwegian University of Science and Technology

More information

Learn more at

Learn more at STRIDE JIP Phase III SUT Talk 15th November 2 Offshore VIV monitoring (vortex induced vibration) Catenary riser interaction with deepwater seabeds 3 Full Scale Riser Monitoring To get real measurements

More information

Numerical modelling of disconnectable turret mooring systems

Numerical modelling of disconnectable turret mooring systems Numerical modelling of disconnectable turret mooring systems A. Duggal, S. Ryu & O. De Andrade Research & Development Department, SOFEC Inc., USA. Abstract Floating, Production, Storage, and Offloading

More information

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA Arun S. Duggal, FMC SOFEC Floating Systems, USA Charles O. Etheridge, FMC SOFEC Floating Systems, USA James Mattinson, FMC SOFEC Floating Systems,

More information

Abstract. 1. Introduction. 2. Design Requirements. Naval Engineer - INTERMOOR DO BRASIL 2. Petroleum Engineer INTERMOOR DO BRASIL 3

Abstract. 1. Introduction. 2. Design Requirements. Naval Engineer - INTERMOOR DO BRASIL 2. Petroleum Engineer INTERMOOR DO BRASIL 3 IBP1687_14 MOORING SYSTEM FOR A SEMI-SUBMERSIBLE RIG IN ULTRA-DEEPWATER AND UNDER SEVERE CURRENTS Debora C. B. Ralha 1, Manuela C. Corrêa 2, Jeremy Abercrombie 3 and Karina G. Pinheiro 1 Copyright 2014,

More information

Coupling and Analysis of 981 Deep Water Semi-submersible. Drilling Platform and the Mooring System

Coupling and Analysis of 981 Deep Water Semi-submersible. Drilling Platform and the Mooring System 4th International Conference on Renewable Energy and Environmental Technology (ICREET 2016) Coupling and Analysis of 981 Deep Water Semi-submersible Drilling Platform and the Mooring System XuDong Wang1,

More information

Trine Risøy, Bergen,

Trine Risøy, Bergen, part of Aker The Installation of Subsea Structures without Offshore Crane Vessel Trine Risøy, Bergen, 04.06.2008 2008 Aker Solutions AKER MARINE CONTRACTORS (AMC) 35 years experience worldwide: Subsea

More information

FIXED VERSUS DISCONNECTABLE TURRET SYSTEM FOR F(P)SO S FOR GULF OF MEXICO

FIXED VERSUS DISCONNECTABLE TURRET SYSTEM FOR F(P)SO S FOR GULF OF MEXICO FIXED VERSUS DISCONNECTABLE TURRET SYSTEM FOR F(P)SO S FOR GULF OF MEXICO London T. England Jr. FMC SOFEC Floating Systems, USA ABSTRACT With the anticipated development of a large number of deepwater

More information

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer

More information

OVERVIEW. Capabilities & Services

OVERVIEW. Capabilities & Services +1.713.467.0505 Sales@boamarine.com www.boamarine.com OVERVIEW Capabilities & Services BOA MARINE SERVICES provides engineering, construction and contracting services related to fi xed and fl oating offshore

More information

Spread Moored or Turret Moored FPSO s for Deepwater Field Developments

Spread Moored or Turret Moored FPSO s for Deepwater Field Developments Spread Moored or Turret Moored FPSO s for Deepwater Field Developments G. Boyd Howell, FMC Technologies Floating Systems, USA Arun S. Duggal, FMC Technologies Floating Systems, USA Caspar Heyl, FMC Technologies

More information

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE GUIDANCE NOTES GD03-2017 CHINA CLASSIFICATION SOCIETY GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE 2017 Effective from 1 March 2017 BEIJING Chapter 1 GENERAL 1.1 Application

More information

Learn more at

Learn more at Full scale model tests of a steel catenary riser C. Bridge 1, H. Howells 1, N. Toy 2, G. Parke 2, R. Woods 2 1 2H Offshore Engineering Ltd, Woking, Surrey, UK 2 School of Engineering, University of Surrey,

More information

EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE

EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE 1 MR. G.VIJAYA KUMAR, 2 DR. R. PANNEER SELVAM 1 M.S. Research Scholar, Department of Ocean Engineering, IIT Madras, Chennai,

More information

Learn more at

Learn more at IBP1833_06 COST EFFICIENT ARTIFICIAL BUOYANT SEABED DRILLING SOLUTION Dan Moutrey 1, Frank Lim 2 Copyright 2006, Instituto Brasileiro de Petróleo e Gás - IBP This Technical Paper was prepared for presentation

More information

TLP Minimum tendon tension design and tendon down-stroke investigation

TLP Minimum tendon tension design and tendon down-stroke investigation Published by International Association of Ocean Engineers Journal of Offshore Engineering and Technology Available online at www.iaoejoet.org TLP Minimum tendon tension design and tendon down-stroke investigation

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe API Specification 17J Third Edition, January 2008 National Adoption of ISO 13628:2006(Identical) Petroleum and natural gas industries Design and operation of subsea production systems Part 2: Unbonded

More information

OTC Global Analysis of Shallow Water FPSOs Arun S. Duggal, Y. H. Liu (Allen), and Caspar N. Heyl, FMC SOFEC Floating Systems, Inc.

OTC Global Analysis of Shallow Water FPSOs Arun S. Duggal, Y. H. Liu (Allen), and Caspar N. Heyl, FMC SOFEC Floating Systems, Inc. OTC 1672 Global Analysis of Shallow Water FPSOs Arun S. Duggal, Y. H. Liu (Allen), and Caspar N. Heyl, FMC SOFEC Floating Systems, Inc. Copyright 24, Offshore Technology Conference This paper was prepared

More information

INDEX OF REVISIONS DESCRIPTION AND/OR AFFECTED SHEETS

INDEX OF REVISIONS DESCRIPTION AND/OR AFFECTED SHEETS I-ET-300.00-59-27-PPC-00 CLIENT OR JOB OR PROJECT PRODUCTION DEVELOPMENT CC Fro m UNITS AND PRODUCTION SYSTEMS CENPES INDEX OF REVISIONS REV. DESCRIPTION AND/OR AFFECTED S 0 ORIGINAL ORIGINAL REV. A REV.

More information

Experience and Future Potential of the Oblique Icebreaker

Experience and Future Potential of the Oblique Icebreaker SHIP Design & Engineering CONSULTING & Project Development ICE MODEL & Full Scale Testing OFFSHORE Development Experience and Future Potential of the Oblique Icebreaker Mika Hovilainen Project Manager

More information

A comprehensive method for the structural design and verification of the INNWIND 10MW tri-spar floater

A comprehensive method for the structural design and verification of the INNWIND 10MW tri-spar floater NATIONAL TECHNICAL UNIVERSITY of ATHENS (NTUA) A comprehensive method for the structural design and verification of the INNWIND 10MW tri-spar floater DI Manolas, CG Karvelas, IA Kapogiannis, VA Riziotis,

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

Grouped SLOR Deep Water Riser System and Installation Assessment

Grouped SLOR Deep Water Riser System and Installation Assessment Grouped SLOR Deep Water Riser System and Installation Assessment Daniel Karunakaran, Dan Lee, Subsea 7 Stephen Hatton, Nick Dale, 2H Offshore Engineering Ltd John Mair, Subsea 7 Abstract The growing trend

More information

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs RAMS 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs Introduction to RAMS Tritech s RAMS is a 360 anchor-chain and riser integrity monitoring system for Floating Production Storage and Offloading

More information

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7 Development of a New Deep-Water Riser System Daniel Karunakaran Subsea 7 Introduction Grouped SLOR TM is an open bundle riser solution developed by Subsea 7 and 2H Offshore Array of close standing SLOR

More information

DESIGN OF A SEMI-SUBMERSIBLE PRODUCTION AND DRILLING FACILITY FOR THE GULF OF MEXICO

DESIGN OF A SEMI-SUBMERSIBLE PRODUCTION AND DRILLING FACILITY FOR THE GULF OF MEXICO DESIGN OF A SEMI-SUBMERSIBLE PRODUCTION AND DRILLING FACILITY FOR THE GULF OF MEXICO OCEN 407- Design of Ocean Engineering Facilities Ocean Engineering Program Texas A&M University Final Report May 9,

More information

Semi-Submersible Offshore Platform Simulation Using ANSA & META

Semi-Submersible Offshore Platform Simulation Using ANSA & META Semi-Submersible Offshore Platform Simulation Using ANSA & META Offshore platforms are large structures designed to withstand extreme weather conditions and have a lifespan of at least 40 years. Million

More information

Permanent buoyancy systems. matrix composites & engineering

Permanent buoyancy systems. matrix composites & engineering Permanent buoyancy systems matrix composites & engineering Contents Permanent buoyancy systems 3 Materials qualification testing 4 Distributed buoyancy clamping system 5 Buoyancy building block system

More information

Edit this text for your title

Edit this text for your title Edit this text for your title MEK 4450 Marine Operations 1-3 Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2014 Installation of flexibles and cables Typical

More information

NOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY

NOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY DENTON INTEGRITY STUDY APPENDIX C INCIDENT REPORTS Incident One FPSO Questionnaire Failure of gripper used to rotate turret Several months after installation This FPSO has an internal partially rotating

More information

HiLoad, Introducing DP to Standard Tankers

HiLoad, Introducing DP to Standard Tankers DYNAMIC POSITIONING CONFERENCE September 16-17, 2003 FPSOs and Shuttle Tankers HiLoad, Introducing DP to Standard Tankers Bjørn Egil Gustavsen Remora Technology (Houston) Table of contents 1 Abstract...2

More information

Edit this text for your title

Edit this text for your title Edit this text for your title MEK 4450 Marine Operations Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA / DNV, Fall 2013 Lesson 2/3 Lift phases Load out Transportation

More information

Tension-Leg-Buoy (TLB) Platforms for Offshore Wind Turbines

Tension-Leg-Buoy (TLB) Platforms for Offshore Wind Turbines Tension-Leg-Buoy (TLB) Platforms for Offshore Wind Turbines EERA DeepWind'2014 Deep Sea Offshore Wind R&D Conference, Trondheim, 22-24 January 2014 Tor Anders Nygaard, Institute for Energy Technology (IFE),

More information

OTC Copyright 2004, Offshore Technology Conference

OTC Copyright 2004, Offshore Technology Conference OTC 16137 Field Confirmation of CFD Design for FPSO-mounted Separator Chang-Ming Lee / NATCO Group, Eric van Dijk / SBM-IMODCO, Inc., Mark Legg / SBM-IMODCO, Inc., John Byeseda / NATCO Group Copyright

More information

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT

MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT MINIMUM DECK HEIGHT OF A SEMI-SUBMERSIBLE PLATFORM ACCORDING TO BLACK SEA ENVIRONMENT Ionuț-Cristian SCURTU Principal instructor, Navy Academy Mircea cel Batran Constanta, Romania Abstract-The fast evolution

More information

Understanding Fatigue for Deepwater Mooring Systems The Footprint of Fatigue

Understanding Fatigue for Deepwater Mooring Systems The Footprint of Fatigue Understanding Fatigue for Deepwater Mooring Systems The Footprint of Fatigue Cindy Bowline FMC SOFEC Floating Systems 14741 Yorktown Plaza Drive Houston, TX 77040 Arun Duggal FMC SOFEC Floating Systems

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 RIG TYPES Land rigs in 2012... total (approx) 3200 Jack Up,... in 2012... total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,...

More information

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Safety and Risk Engineering. HSE Case Implementation Clive Rawson Safety and Risk Engineering HSE Case Implementation Clive Rawson Purpose ALARP Risk Assessment Major Accident Events Bowties Safety Critical Systems Performance Standards Implementation Getting HSE Case

More information

Liquefied gas cargo tanks and process pressure vessels

Liquefied gas cargo tanks and process pressure vessels .1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant

More information

Deepwater Horizon, by Metin Çakanyıldırım and references cited therein.

Deepwater Horizon, by Metin Çakanyıldırım and references cited therein. Deepwater Horizon Page 1 Outline Summary of the events and companies Technical problems and their association with companies Managerial problems Risk averse vs. risk seeking tendencies Suggestions to avoid

More information

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5

FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 FAST SUPPLY INTERVENTION and CREW TRANSFER VESSEL M P 6 2 5 MAIN PARTICULARS LENGTH OVER ALL 60.68 m LENGTH WATER LINE 59.35 m BREADTH MAX 20.80 m DRAUGHT MAX 3.10 m DEPTH 6.70 m MAX SPEED 37.0 knots @

More information

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements STRIDE PROJECT Steel Risers in Deepwater Environments Achievements 1999-21 Neil Willis Principal Engineer 2H Offshore Engineering 6 th Annual Deepwater Technologies and Developments Conference 21 The presentation

More information

Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Ocean Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 1 Lecture - 3 Compliant type offshore structures -1 Welcome to the

More information

New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO

New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO New Innovative Anchor Solution for Deepwater Mooring Gravity Intalled Anchors Reduce Time and Costs of Marine Operations Jon Tore Lieng CTO Wokshop on Deepwater Subsea TieBack Damai Puri Resort & Spa,

More information

Initial Design of Offshore Floating Marina System

Initial Design of Offshore Floating Marina System Initial Design of Offshore Floating Marina System H. Chung* T. W. Oh* S. Namgoong* S. B. Kim* C. H. Jo** *Ocean Space Inc., Seoul, Korea **Naval Architecture and Ocean Engineering Dept., Inha University,

More information

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR ) Les tendances pour le futur. Pierre-Armand Thomas Technip

HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR ) Les tendances pour le futur. Pierre-Armand Thomas Technip HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR ) Les tendances pour le futur Pierre-Armand Thomas Technip 13 Juin 26 2 Spar progression DEEPWATER PRODUCTS SPAR Proprietary

More information

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Offshore technology: Marine and Subsea Spring semester, 2015.

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Offshore technology: Marine and Subsea Spring semester, 2015. Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Offshore technology: Marine and Subsea Spring semester, 2015 Open Writer: Aron Amundsen (Writer s signature) Faculty supervisor:

More information

A Study on Roll Damping of Bilge Keels for New Non-Ballast Ship with Rounder Cross Section

A Study on Roll Damping of Bilge Keels for New Non-Ballast Ship with Rounder Cross Section International Ship Stability Workshop 2013 1 A Study on Roll Damping of Bilge Keels for New Non-Ballast Ship with Rounder Cross Section Tatsuya Miyake and Yoshiho Ikeda Department of Marine System Engineering,

More information

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen

Aasta Hansteen. Operational Experiences. FFU Seminar 28 th January Tom-Erik Henriksen Aasta Hansteen Operational Experiences FFU Seminar 28 th January 2016 Tom-Erik Henriksen Agenda Introduction to Aasta Hansteen Main Challenges & Risks Operational Experiences - 2015 Campaigns 2 seabed-to-surface

More information

APPENDIX D. Assessment of Ship Impact Frequencies

APPENDIX D. Assessment of Ship Impact Frequencies APPENDIX D Assessment of Ship Impact Frequencies WHITE ROSE DEVELOPMENT APPLICATION APPENDIX D ASSESSMENT OF SHIP IMPACT FREQUENCIES SUBMITTED BY: HUSKY OIL OPERATIONS LIMITED AS OPERATOR SUITE 801, SCOTIA

More information

An Ocean of Possibility

An Ocean of Possibility An Ocean of Possibility SPM Offloading Buoy CALM Buoy Orwell Offshore s Catenary Anchor Leg Mooring (CALM) Buoy offers a reliable state-of-the-art solution for loading and offloading crude oil, refined

More information

EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD

EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD EFFECT OF VORTEX INDUCED VIBRATION ON FATIGUE DAMAGE OF TOP-TENSIONED RISER SUBJECTED TO CURRENT LOAD Ke Xin Lai 1,2, Do Kyun Kim 1,2,3 and Eileen Wee Chin Wong 1,4 1 Ocean and Ship Technology Research

More information

Hydrodynamic Analysis of a Heavy Lift Vessel during Offshore Installation Operations

Hydrodynamic Analysis of a Heavy Lift Vessel during Offshore Installation Operations Presentation for Defense of Master Thesis Hydrodynamic Analysis of a Heavy Lift Vessel during Offshore Installation Operations Speaker: Bin Wang Supervisor: Prof. Robert Bronsart 23 rd Feb, 2015 Nantes

More information

IMCA Competence Assessment Portfolio June 2013

IMCA Competence Assessment Portfolio June 2013 IMCA Competence Portfolio June 2013 Name: Start Date in Current Self- Checklist Entry Level Criteria Acceptance Criteria Attained Certification 500 GRT or more: Valid certificate of competency or certificate

More information

CONCEPT SELECTION AND DESIGN PRINCIPLES

CONCEPT SELECTION AND DESIGN PRINCIPLES CONCEPT SELECTION AND DESIGN PRINCIPLES Based on: Floating Structures: a guide for design and analysis, (chapter 1) ISBN 1 870553 357 Editor: N.D.P. Barltrop MT 411 Floating Offshore Structures 0 1 Concept

More information

Fully Submersible Heavy Lift Vessel

Fully Submersible Heavy Lift Vessel Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Oil and Gas Authority (OGA) (15th February 2016) CONTENT Leadon structures demobilisation Competitiveness (case studies) Decommissioning options Installation

More information

OMAE INVESTIGATION ON THE USE OF DIFFERENT APPROACHES TO MOORING ANALYSIS AND APPROPRIATE SAFETY FACTORS

OMAE INVESTIGATION ON THE USE OF DIFFERENT APPROACHES TO MOORING ANALYSIS AND APPROPRIATE SAFETY FACTORS Proceedings of the ASME 212 31 st International Conference on Ocean, Offshore and Arctic Engineering OMAE212 June 1-15, 212, Rio de Janeiro, Brazil OMAE212-84121 INVESTIGATION ON THE USE OF DIFFERENT APPROACHES

More information

The Susceptibility of FPSO Vessel to Green Water in Extreme Wave Environment

The Susceptibility of FPSO Vessel to Green Water in Extreme Wave Environment December, 4 The Susceptibility of FPSO Vessel to Green Water in Extreme Wave Environment Ezebuchi Akandu, a,* Atilla Incecik, a and Nigel Barltrop, a a) Department of Naval Architecture, Ocean and Marine

More information

Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool

Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool Operability Study for DP Vessel Operations at a Deep water Spar-A Decision Support Tool Xiaobing Shi, American Global Maritime Torbjørn Hals, Kongsberg Maritime AS Suman Muddusetti, Shell Oct. 11, 2011

More information

The wind tunnel tests of wind pressure acting on the derrick of deepwater semi-submersible drilling platform

The wind tunnel tests of wind pressure acting on the derrick of deepwater semi-submersible drilling platform Available online at www.sciencedirect.com Energy Procedia 14 (2012) 1267 1272 2011 2nd International Conference on Advances in Energy Engineering (ICAEE2011) The wind tunnel tests of wind pressure acting

More information

7th Pipeline Technology Conference 2012 THE CONCEPT OF A PIPE-LAYING VESSEL FOR THE RUSSIAN ARCTIC SHELF

7th Pipeline Technology Conference 2012 THE CONCEPT OF A PIPE-LAYING VESSEL FOR THE RUSSIAN ARCTIC SHELF 7th Pipeline Technology Conference 2012 THE CONCEPT OF A PIPE-LAYING VESSEL FOR THE RUSSIAN ARCTIC SHELF О.Ya.Timofeev, N.А.Valdman, N.L.Malyarenko, V.I.Tarovik, М.S.Trub Krylov Shipbuilding Research Institute,

More information

SOFTWARE. Sesam user course. 02 May 2016 HydroD Input. Ungraded SAFER, SMARTER, GREENER DNV GL 2016

SOFTWARE. Sesam user course. 02 May 2016 HydroD Input. Ungraded SAFER, SMARTER, GREENER DNV GL 2016 SOFTWARE Sesam user course DNV GL 1 SAFER, SMARTER, GREENER About the presenter Name: Torgeir Kirkhorn Vada Position: Product Manager for floating structures Background: PhD in Applied mathematics/hydrodynamics

More information

ShipRight Design and construction. Procedure for Ship Units July 2014

ShipRight Design and construction. Procedure for Ship Units July 2014 ShipRight Design and construction Procedure for Ship Units July 2014 Document history Document date July 2014 Notes: New document Group Limited, its affiliates and subsidiaries and their respective officers,

More information

Wind Turbine Shuttle. Ferdinand van Heerd

Wind Turbine Shuttle. Ferdinand van Heerd Wind Turbine Shuttle Ferdinand van Heerd Contents Introduction Concept Resistance Seakeeping Vessel motion compensation system Hoisting motion compensation system Landing the wind turbine Workability Efficiency

More information

PLEM CONTROL SYSTEMS

PLEM CONTROL SYSTEMS Optimised PLEM Control Offspring International offers a range of PipeLine End Manifold (PLEM) control systems as part of its integrated CALM buoy and conventional buoy mooring and offloading systems. Available

More information