1 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY COMMUNICATION PIPE REPAIRS Document Title: Work Procedure Communication Pipe Repairs Document Reference: DOM-WN-PRC Date: October 2013 Approved By: Asset Management Title: General Manager

2 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC COMUNICATION PIPE REPAIRS Date: October 2013 Record of Changes and Amendments Amendment No. Document Section/ Reference Number Document / Section Title Version Number Amendment Date Archived Document / Section Text Affected 1 Section 3 Description A Oct 2013 Updated DOMS Training Guidelines Sheet i Archived Document / Section Replaced By

3 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC COMUNICATION PIPE REPAIRS Date: October 2013 FOREWORD Background DOMS stands for Distribution Operation & Maintenance Strategy and is being used by Scottish Water to: safeguard the quality of water to customers ensure that Scottish Water apply due diligence to their Scottish Water distribution network The DOMS procedures and work instructions affect all functional staff who work on the network, which includes internal employees and employees of external organisations (i.e. planners, operators, delivery teams, Framework Contractors, or any other contractors). Through the application of the DOMS principles in day-to-day network activities, Scottish Water and their approved contractors will operate and maintain their water distribution networks through operational best practice. This will allow Scottish Water to meet the following objectives: to maintain water quality; to maintain continuity of supply; to maintain water supply hygiene; to undertake water quality incident management; to maintain a cost-effective water supply. to ensure a course of action for timely network intervention (Capex and/or opex) to maintain statutory obligations and customer satisfaction. Responsibility The responsibility for adoption and implementation of all DOMS procedures and work instructions rest with Scottish Water General Managers and senior managers of external organisations. It is the responsibility of all Scottish Water employees and those of external organisations to comply with DOMS procedures and work instructions. Document Control This document is a CONTROLLED DOCUMENT when viewed on Wavelength. The document becomes UNCONTROLLED if printed or downloaded from Wavelength or any other source. Refer to the Wavelength site for the latest version of this document. Page i

4 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC COMUNICATION PIPE REPAIRS Date: October 2013 Change Request A change to this document can be requested by completing a Change Request Form - refer to document DISTRIBUTION OPERATION and MAINTENANCE STRATEGY GOVERNANCE (DOM- WN-GOV ) for change request procedure. Copyright Copyright of this document is owned by Scottish Water. The document may not be copied or reproduced in any way. Page ii

5 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC COMUNICATION PIPE REPAIRS Date: October 2013 CONTENTS FOREWORD... i CONTENTS... iii 1 PREAMBLE Procedure Objectives Related Parent Documents Related External Controlled Documents Related Internal Controlled Documents PROCEDURE SWIMLANE. 2 3 DESCRIPTION Burst Communication Pipe Repair WP.. 5 Page iii

6 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC COMUNICATION PIPE REPAIRS Date: October PREAMBLE 1.1 Procedure Objectives This work procedure details the actions to be taken, when repairing a burst communication pipe on-site. 1.2 Related Parent Documents None 1.3 Related External Controlled Documents SW Water Supply Hygiene Code Of Practice (HCOP) Health and Safety Arrangements for Safe Digging (OHSHAS/draft) 1.4 Related Internal Controlled Documents 1 Tool Box Talk Preparation and use of a Chlorine disinfectant solution 2 Tool Box Talk Potable Water Sampling and sampling details, sample registration 3 Tool Box Talk Prevention of Drips, Leaks and Spillages of Fuels, Oils and other Chemicals 4 Tool Box Talk Protection of Controlled Waters 5 Tool Box Talk DOMS IAF Guidance for the completion for access to Working on SW water Network 6 Tool Box Talk Sampling repairs and New Mains Information for those taking samples 7 Tool Box Talk Mains Flushing 8 DOMS Impact Assessment Form 2. PROCEDURE SWIMLANE One page swimlane of Functional Work Procedure refer to page 2. Page 1 of 7

7 Intelligent Control Centre Customer Service Delivery Staff Customer Service Delivery Water Response Frame work contractors Scientific Services Planned Burst repair Produce workpack PLANNED Assess and Prioritise Burst DOMS IAF to be completed if the Comm pipe cannot be isolated. EMERGENCY Emergency Burst repair Produce workpack Check workpack Utility drawings DOMS IAF, confined spaces etc. DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC All valve operations on the water network must only be completed by staff trained in DOMS both internal and external (EU Skills registered). All Boundary Valves will only be operated by designated staff who are authorised by the local Water Operation Regional Manager. Boundary Valve Authorisation Levels have now been increased (Sept 2012) for all Scottish Water NSO s/lft s and any other designated staff authorised by the local Water Operation Regional Manager up to DMA level ONLY Sample result notification Fail Complete H&S Risk assessment Notify customers Temporary supply if needed Isolate repair section Excavate Burst Is Contamination present? Yes Stop and Obtain Guidance Repair Pipe Is Contamination present? Yes Take appropriate remedial actions and sample pipe Pass No Check repair materials Update No Ops log with ITS Disinfect pipe and fittings Return pipe to service and/or Water Quality Details Test samples Page 2 of 7

8 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC DESCRIPTION This work procedure details the actions, which should be followed on-site by the squad / team. All employees, contractors and consultants, etc, working for or on behalf of Scottish Water will be required to complete formal training in water supply hygiene practices and also in Scottish Water's Distribution Operations Maintenance Strategy (DOMS). Scottish Water will make training modules available to support this process and employees, contractors and consultants must complete this training in the relevant category of DOMS with a training provider that has been approved to deliver this training on behalf of Scottish Water. This training will be formally recorded and registered with Energy & Utility Skills (EU Skills) as part of the Water Industry Registration Scheme (WIRS) and an authorisation card will be issued by EU Skills on behalf of Scottish Water for both water hygiene and Scottish Water DOMS procedures. Note: EUS Skills hygiene training will be equivalent to module 1 of SW DOMS. The team members must all have a valid Hygiene Authorisation and DOMS card with the relevant DOMS modules completed for this work activity on site and must comply with: SW Water Supply Hygiene Code of Practice. As the HCoP/DOMS Training period is now over, all internal and external staff working on the water network must have completed the relevant training. If the site challenges are made by SW staff (and on occasions the DWQR) for all those working on the network, the message will be sent clearly that 'IF YOU HAVEN T HAD THE TRAINING YOU CANNOT WORK ON OUR NETWORK OR ANY INFRASTRUCTURE THAT WILL BE CONNECTED TO OUR NETWORK DOMS TRAINING GUIDELINES EVIDENCE OF DOMS TRAINING In 2007, Scottish Water set the goal that all staff working on the water network receives the relevant DOMS training by the end of the year. The result - over 9,000 people have currently completed DOMS training to support their network activities since it has been introduced within SW. All staff, both internal and external, who work on the water network, MUST complete the relevant Distribution, Operation and Maintenance Strategy (DOMS) training associated with their specific network activities and as a result MUST carry two cards which confirm their training. DOMS training is available through a number of approved Training Providers and the registration of the training units taken by individuals is administered through EU Skills. The first card relates to training given around the Hygiene Code of Practice (HCoP) and the card usually coloured light blue, confirms the cardholder has completed this element, which includes a health screening questionnaire. The second card, usually coloured white, relates to training given around DOMS and the training units shown on the back of the card detail the type of DOMS related site activities that the cardholder can undertake. Page 3 of 8

9 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC Both cards detail the name of the cardholder, along with their picture, which will allow confirmation that the cardholder is the person holding the card. Scottish Water staff may and will challenge all internal and external staff working on the water network at anytime to produce both their cards to ensure that cardholder has the relevant training and understanding of DOMS Procedures and Work Instruction for the specific task that they are undertaking. The following guidelines should be followed for deciding the course of action to take when either internal of external staff were found to be working on the water network, or any infrastructure that will be connected to our network, without the requisite HCoP/DOMS cards confirming training 1) New starts - expectation that they will have their necessary HCoP/DOMS training organised by their employer within the first 4 weeks of them joining their company. They will not be allowed to work on the water network without the HCoP/DOMS training, even though they are being supervised by a person who has gone through the training. There is a minimal health risk here, which the health questionnaire, completed during the HCoP training, will confirm as acceptable or unacceptable. 2) Completed HCoP/DOMS Training but no card issued by EU Skills - staff in this situation can work on the water network as long as they can demonstrate that they have a 'cover note' issued by training providers. If a 'cover note' is produced, then the person challenging can ensure that 'cover note' refers to the actual person by checking the EU Skills web site against name or reference number. This will be done in conjunction with the relevant DOMS Working Group representative. 3) Person challenged on site and person has no HCoP/DOMS relevant training - if this scenario occurs then the person who has made the challenge will remove the person from working on the water network and contact the relevant business unit DOMS Working Group representative as the first point of contact. Together, the site contact and the DOMS Working Group representative will make the decision on whether work can or cannot continue after discussions with the employee s relevant organisation. 4) Person challenged on site and cannot produce HCoP/DOMS relevant training cards, but claims to have undergone training - if no cards can be produced, then the person challenging can not confirm that the person has had the relevant training by checking the EU Skills web site against name or reference number. This will be done in conjunction with the relevant DOMS Working Group representative. 5) Person challenged on site; DOMS CARD EXPIRED. If a DOMS card has expired and the person is waiting to attend a SW DOMS training course, a signed and dated cover note, with the course reference confirmation number and Registration Status clearly shown, must be issued by the person s line manager, in order to allow access to the network. The person must present this cover note on site. Page 4 of 8

10 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC (Failure to provide cover note will result in the individual being removed from working on the network until a cover note is issued, or the individual is retrained and re-registered with EUSR) The cover note will only be valid for 3 months after the original card expiry date. After 3 months has elapsed, if the person has not re-registered and is NOT in possession of a new card or a cover note stating the person is awaiting delivery of a new card, then access to work on the network will be refused. All internal and external staff working on the water network must have completed the relevant training. If the site challenges are made by SW staff (and on occasions the DWQR) for all those working on the network, the message will be sent clearly that 'IF YOU HAVEN T HAD THE TRAINING YOU CANNOT WORK ON OUR NETWORK OR ANY INFRASTRUCTURE THAT WILL BE CONNECTED TO OUR NETWORK. While we all want to balanced and professional in our company approach to this matter, water quality and customer satisfaction in our product is our paramount concern. Finally, can all Scottish Water staff note that for out-of-hours advice on public health issues, a representative from the Public Health Team can be contacted 24/7 through the ICC. 3.1 Burst Communication Pipe Repair WP For planned burst repairs the Operations Management Centre will provide the work pack. The work pack will include details of other utilities' apparatus, any roadway work authorisation and will include the information provided by the Customer Service Delivery person, who has assessed the burst. The local Customer Service Delivery team will have already investigated and prioritised the burst, completed a DOMS impact assessment form where applicable will have identified affected customers (including dialysis, key or other sensitive customers), listed customer notification needs and identified any Maintaining supply alternative arrangements. For emergency burst repairs the repair team must collate the above data. Work procedure: Check workpack includes all relevant information. All excavations must be carried out in accordance with: - Health and Safety Arrangements for Safe Digging, OHS/HAS/draft Complete a health and safety risk assessment. - Refer to the Health and Safety Management System Manual on the SW intranet site. Check that the DOMS Impact assessment is sufficient. Where required, produce a site specific impact assessment Any DOMS IAF completed must Now also be Risk Assessed For Maintaining Supplies to include any alternative supplies overland requirements, or tankering operations etc to mitigate any risk to both Water Quality and prevent any unnecessary Interruptions To Supply which will or may affect SW OPA Score. All Authorised DOMS IAF are now required to be sent to the Operation Log for Situational awareness with a proposed or planned start date. Confirm that the other Utility Companies' plans / clearances are included. Page 5 of 8

11 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC If the repair is located within a CONFINED SPACE, then the authority's safe entry procedures must be adhered to. - Refer to SW H&S procedure OHS/HAS/01. If the main is AC, refer to: Health and Safety AC Guidance Document (Being developed) Set up any road and pedestrian signing in compliance with Roads Authority legislation. Before shutting down any communication pipe, STOP AND THINK, the area to be cut must be inspected for signs of contamination. Should contamination be suspected the area must be cleaned and free of the contaminant before shutting and draining of the communication pipe occurs. If the escaping water is causing damage to a roadway / private property or is causing unacceptable flooding or icing, then the burst should be isolated as soon as possible. If the escaping water is not causing damage, flooding or icing, then, wherever practicable, the communication pipe should be left under pressure until the main has been excavated and a sump created below the burst. This will reduce the likelihood of foreign matter entering the depressurised pipe. Note: where a communication pipe is operating at a high pressure it may not be safe to carry out a repair without first shutting down the under pressure connection. In some instances, where the communication pipe cannot be isolated from the public main, the flow within the pipe can be isolated using freezing equipment or where the pipe is made of polyethylene, a squeeze-off tool can be used. Freezing equipment must be operated in accordance with the manufacturer's instructions. Where the burst communication pipe does not have to be shut down immediately, SW must notify any affected customers in accordance with Scottish Waters Code Of Practice for Guaranteed Standards and the workpack' instructions prior to isolating the burst and / or providing any alternative supply. Where applicable Update operations log prior to any mains shut down with the start time and number of properties affected. Where applicable Prior to any Boundary Valve Operations required, these must be authorised by the correct and relevant level of Scottish Water s Customer Service Delivery staff. All Boundary Valves will only be operated by designated staff who are authorised by the local Water Operation Regional Manager. A comprehensive list Of All Staff for both the BV Authorisation and BV Operators will be updated by the Regional Manager and retained by the BV control line for Boundary Valve Management with any un-authorised BV operations being reportable to the Local Water Operation Regional Manager for action. Update Boundary Valve Control 24 Hour Telephone Number if any boundary valves involved in the shut off. Identify and clearly mark on-site all other public utilities' apparatus. Identify and clearly mark on-site all water apparatus adjacent to the burst. Where a metal pipe is being repaired, the communication pipe may be acting as an electrical earth. Install a temporary continuity connector before cutting the pipe. Issue an electrical earthing notice to the customer(s), whose property's communication pipe is being repaired. Page 6 of 8

12 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC Excavation: Carefully excavate above and around the communication pipe, while continuing to pinpoint other utilities' apparatus. Please note that this must be done even if no utilities are shown. Each excavation must be assessed for danger e.g. running sand, etc. and a decision made on the requirement for shoring. The Safe Working Procedure within SW is for all excavations 1.2 metres or deeper to be battered back or shored. All excavations must be carried out in accordance with the Health and Safety Arrangements for Safe Digging, OHS/HAS/draft If the water from the burst has damaged an adjacent cable or pipe belonging to another Utility, then contact the Utility to notify them of the damage and to have their cable / pipe made safe before proceeding. Check if the excavation contains any obvious potential contaminant e.g. a damaged sewer or diesel spillage. If so, cease work and notify your Superior immediately to obtain further instructions. SW Water Supply Hygiene Code of Practice Please refer to tool box talk DOM-WN-TBT Prevention of Drips, Leaks and Spillages of Fuels, Oils & other Chemicals. Please refer to Tool box talk DOM-WN-TBT Protection of Controlled Waters, Create a sump within the excavation below the invert of the pipe and keep the excavation dry to a minimum of 150mm below the pipe invert. Utilise a pump to remove the water, which is or has been leaking from the burst pipe. Before cutting any burst pipe Confirm that the correct repair materials are available. Calliper the pipe to confirm its external diameter. Remember to check for ovality. For all metal pipes install temporary continuity connectors. When the damaged section of pipe has been removed from the communication pipe, ensure that no foreign material can enter either of the two open pipe ends. All burst repairs must be disinfected in accordance with: SW Water Supply Hygiene Code of Practice. DOMS tool box talk Preparation and use of a Chlorine Disinfectant Solution. Following completion of the repair, where the communication pipe supplies existing customer(s) advise the customer(s) by card to flush their pipework before use. Issue an electrical earthing notice to those customer(s), whose property's metal communication pipe has been replaced. Bacteriological sampling must be carried out for ALL MAINS BURST REPAIRS. Unless after recharging and flushing the main, if the Responsible Person is confident the main has remained under pressure throughout the repair and if an Impact Assessment Form has been completed and the excavation has remained free from contamination, there is no need to take samples for bacteriological examination. If there is any doubt that the main has remained under pressure during the repair bacteriological samples must be taken. Samples need not be taken from repairs on service pipes below 50 mm diameter. Refer to:sw Water Supply Hygiene Code of Practice (HCOP) All staff who take samples of potable water from any part of the Treatment or Distribution processes must receive training to take samples and this tool box talk as a reminder of procedures. The information included must also be used by any line managers of the above staff and would be useful to anyone working on drinking water systems. Samples will be monitored by Scientific Services to ensure that the sampler is on a list of trained staff. Page 7 of 8

13 DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY Ref: DOM-WN-PRC Where this is not the case the sampler s line management will be informed. All initial sampling training must be complete by 1 st July 2009 and training can be requested by contacting Scientific Services ScientificServices.businessSupport@scottishwater.co.uk Samples taken by untrained staff after this date will be analysed but may need to be resampled to validate the result. In order to assess your training status Scottish Water staff will have training records on Quest and non Scottish Water staff will require to get their EURS Skills card updated after training and will need to supply their Card Number when they submit a sample. This can be put onto the Sample Registration form. Any audit of the repair / sampling process will regard samples taken by untrained staff as a Major Non-Compliance. After Mains repairs or Mains tie ins are completed the main should be flushed clear or for up to an hour and if required the sample should then be taken. If the main is still discoloured at this time still take the sample and then follow this up with another sample up to 24 hours later. Please refer to the following tool box talks for further guidance. DOM-WN-TBT Mains Flushing DOM-WN-TBT Tool Box Talk Potable Water Sampling and sampling details, sample registration. Where there is clear evidence of possible contamination within the repair excavation e.g. a damaged sewer, then the isolated communication pipe cannot be returned to service until the laboratory confirms that the bacteriological and chemical samples have provided satisfactory results. Complete Water Mains and Fittings data capture form. Update operation log with any water quality issues and or the start / stop time of ITS event and populate ITS proforma on IMS device or Manual Proforma and submit into CDR Corporate Data Repository. Page 8 of 8

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS Document Title: Work Procedure Repair of Burst Mains Document Reference: DOM-WN-PRC-00000306 Approved By: Asset Management Title: General Manager Record of Changes and Amendments Amendment No. Document

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK Document Title: Work Instruction Isolation of a Water Network Document Reference: DOM-WN-WIN-00000302 Approved By: Asset Management Title: General Manager Record of Changes and Amendments Amendment No.

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY REPAIR OF BURST MAINS Document Title: Work Procedure Repair of Burst Mains Document Reference: DOM-WN-PRC-00000306 Date: October 2013 Approved By: Asset

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE MAINS FLUSHING

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE MAINS FLUSHING Document Title: Work Procedure Mains Flushing Document Reference: DOM-WN-PRC-00000310 Approved By: Asset Management Title: General Manager Record of Changes and Amendments Amendment No. Document Section/

More information

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX SCOTTISH WATER Waste Water Treatment Works Typical WWTW Ellipse Equipment No: 500000XXXX Ellipse Plant No: STW00XXXX Works Manual Volume 1/3 Operating Manual (OMA) Non-Routine Operations Manual Ref No:

More information

Distribution Operation Maintenance Strategy Scottish Waters DOMS IAF Impact Risk Assessment Form Completion Guide

Distribution Operation Maintenance Strategy Scottish Waters DOMS IAF Impact Risk Assessment Form Completion Guide Legal tice: This document and the intellectual property rights in it belong to Scottish Water and except where you are specifically licensed to use this document, you have no right to re-use it. Disclosure

More information

Copyright Thames Water Utilities Ltd Alternative water supplies policy.

Copyright Thames Water Utilities Ltd Alternative water supplies policy. Alternative water supplies policy. Version 1.3 Publish Date: 21 February 2017 Effective from: 1 April 2017 Public Contents 1. Background... 4 2. Scope... 4 3. Definition of terms... 4 4. Principles...

More information

Emergency Situation Assessment

Emergency Situation Assessment Appendix 1 Emergency Situation Assessment Emergency Situation Assessment In-coming mains electricity failure sites with generator backup Useful Information: Severity 2 Risk Rating Low / 10 Likelihood 5

More information

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES LNX-A4JHSS Received:3 November 05 Completed:5 April 06 YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES. The position of Yorkshire Water Services Ltd (YWS) apparatus shown on the existing mains record

More information

PROCEDURES FOR STANDBY

PROCEDURES FOR STANDBY 1 SCOPE This Procedure details both the circumstances in which standby shall be provided and the responsibilities borne by the Standby Man in such circumstances. 2 ISSUE RECORD This is a maintained/controlled

More information

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES LNX-9Q7DAS Received:4 October 04 Completed:4 October 04 YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES. The position of Yorkshire Water Services Ltd (YWS) apparatus shown on the existing mains record

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

LEGIONELLA CONTROL POLICY

LEGIONELLA CONTROL POLICY LEGIONELLA CONTROL POLICY Originator: Policy and Strategy Team Approval date: August 2018 Review date: August 2019 1 Introduction 1.1 1.2 1.3 1.4 Pine Court Housing Association (PCHA) treats the health

More information

Allowances, Assessment Requests and Incentive Payments. U pdated - 3 rd October 2016

Allowances, Assessment Requests and Incentive Payments. U pdated - 3 rd October 2016 Allowances, Assessment Requests and Incentive Payments U pdated - 3 rd October 2016 Allowances, Assessment Requests and Incentive Payments Why The wholesale Allowances, Assessment Requests and Incentive

More information

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland SUP 15 Health & Safety Management Pressure Systems Unified procedures for use within NHS Scotland September 2015 Contents Page Acknowledgements... 3 1. Introduction... 4 2. Purpose of this Procedure...

More information

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents Facilities and Estates Natural Gas: Standard Operating Procedure Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims

More information

MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY

MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY Version: 4 Date issued: April 2018 Review date: April 2021 Applies to: All staff (excluding office and clerical staff) This document is

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)

More information

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS ISSN 1172-3416 NZ GCP 2 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS Issued by the Secretary of Commerce in accordance with the Gas Act 1992 THE GAS ACT

More information

Operation and Maintenance manual Issue No: 1 Issue Date: 4th September 2007

Operation and Maintenance manual Issue No: 1 Issue Date: 4th September 2007 Operation and Maintenance manual Document Title: Purewater CWST O&M Issue No: 1 Issue Date: 4th September 2007 This manual is to be used in conjunction with the following products manufactured by Purewater

More information

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION ISSN 1172-3416 NZ GCP 1 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION Issued by the Secretary of Commerce in accordance with

More information

Legionella Policy. Policy Ref: PS08. Prepared By. Georgina Kent, Operations Director. Date of Current Review August 2018

Legionella Policy. Policy Ref: PS08. Prepared By. Georgina Kent, Operations Director. Date of Current Review August 2018 Legionella Policy Policy Ref: PS08 Prepared By Georgina Kent, Operations Director Date of Current Review August 2018 Date of Next Review August 2021 Reviewed By PHA Board 1. Introduction 1.1 The aim of

More information

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers SUPPLIER HEALTH AND SAFETY Supporting a healthy and safe working environment for our people and customers Document Template Control Prepared by Georgina East May 2017 Date Approved by May 2017 Mark Beder

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Health and Safety Inspection Procedure

Health and Safety Inspection Procedure Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

Health & Safety Policy HSP 07 Legionella Management Version Status Date Title of Reviewer Purpose/Outcome

Health & Safety Policy HSP 07 Legionella Management Version Status Date Title of Reviewer Purpose/Outcome Health & Safety Policy HSP 07 Legionella Management Version Status Date Title of Reviewer Purpose/Outcome 1.0 Draft 07.03.2016 David Maine 1 st Draft for consultation/review 1.1 Approved 22.12.2016 David

More information

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019 Livewell Southwest Lifting Operations and Lifting Equipment Regulations (LOLER) Policy Version No. 2 Review: May 2019 Notice to staff using a paper copy of this guidance The policies and procedures page

More information

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision Control of Hazardous Energy Program Section: Occupational Health and Safety Date of 2007.07.24 Management System Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment

More information

Procedure: Work health and safety hazard management

Procedure: Work health and safety hazard management Procedure: Work health and safety hazard management Purpose This procedure describes how the Australian National University (ANU) manages Work Health Safety hazards for the health, safety, rehabilitation

More information

I003 Lock Out - Tag Out - Try Out. Document information

I003 Lock Out - Tag Out - Try Out. Document information 2001-0046253 I003 Lock Out - Tag Out - Try Out Field of application RWE Generation NL Valid until 20-11-2020 Document information Version Version date Authorisation V3.2 20-11-2017 Manager Health, Safety

More information

Safety Essentials. Mandatory rules for our high risk activities

Safety Essentials. Mandatory rules for our high risk activities Mandatory rules for our high risk activities Remember... Only undertake activities for which you are trained, competent and authorised to do Before you start a job take a step back, think about all the

More information

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13 DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN 1 CONTENTS Para Page 1. Introduction 3 2. Safety Management System 3 3 Reduce Risks 4 4. Identification of the Hazards and Risks... 4 5. Conformance with the

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations Overview This standard covers tightness testing and direct purging of low or medium pressure gas, in accordance with approved procedures and practices. It covers the standards required to meet the requirements

More information

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 1 : 2014 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 1: 2014 Copyright 2014 by British Compressed

More information

Health & Safety Policy & Plan. Rightway Roofing.

Health & Safety Policy & Plan. Rightway Roofing. Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring

More information

LEGIONELLA MANAGEMENT PROCEDURE

LEGIONELLA MANAGEMENT PROCEDURE LEGIONELLA MANAGEMENT PROCEDURE This procedure sets out the aims and objectives of the school and outlines responsibilities for managing the risk of exposure to legionella. General Statement of Intent

More information

Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 7.70 April 2013 Connection Procedure Table of Contents TS 7.70.01 SCOPE... 2 TS 7.70.02 NEW WATERMAIN

More information

Procedure: Pressure equipment safety

Procedure: Pressure equipment safety Procedure: Pressure equipment safety Purpose The purpose of this procedure is to define the method for safe operation and inspection of pressure equipment and the collection and recording of associated

More information

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER CONTRACTOR WHS HAZARD STANDARD HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS

More information

Lifting Operation & Lifting Equipment Procedure

Lifting Operation & Lifting Equipment Procedure SRSS Lifting Equipment Procedure 1. DOCUMENT CONTROL Management System Element Title SRSS SMS PROCEDURE Lifting Operation & Lifting Equipment Procedure SMS_HS_PR_033_ Version # & V1 10/08/2016 Lifting

More information

HAZARD MANAGEMENT PROCEDURE

HAZARD MANAGEMENT PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk

More information

Corporate Standard Hazardous Substance Management HB#625157

Corporate Standard Hazardous Substance Management HB#625157 Contents Contents... 1 Functional Flowchart... 1 Objective... 1 Scope... 1 Definitions... 2 Responsibilities... 3 OH&S Systems Manager... 3 Station / Site Manager... 3 Workers... 3 Hazards... 3 Risk Assessment...

More information

PRESSURE SYSTEMS POLICY

PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY 1. Introduction 2. Policy Statement 3. Scope 4. Background 5. Roles & Responsibilities 6. Training 7. Contractors 8. Policy Review 1. Introduction The Kilmarnock

More information

Water Hygiene Chlorination Water Treatment Legionella Control

Water Hygiene Chlorination Water Treatment Legionella Control www.whs-ltd.com Water Hygiene Chlorination Water Treatment Legionella Control WATER STORAGE TANK DISINFECTION Cleaning and Chlorination Procedure A clean and chlorination has recently been carried out

More information

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 Copyright 2018 by British Compressed

More information

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction Locate and avoid supply apparatus for Utilities Network Construction Overview This national occupational standard defines the competence involved in locating and avoiding supply apparatus by using appropriate

More information

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition WHS

More information

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Low Voltage Electricity System Safety Rules & Associated Safety Guidance Annex J To Loughborough University Facilities Management (FM) Health and Safety Policy Low Voltage Electricity System Safety Rules & Associated Safety Guidance 1. Introduction a. These Safety Rules are

More information

Control of Legionella

Control of Legionella OHSS Control of Legionella Guidance 103.1 Control of Legionella This guidance supports the Control of Legionella Health and Safety Management Standard. Contents 1 Introduction 2 2 Responsible and Appointed

More information

Level 3 Award in Emergency Rescue and Recovery Of Casualties from Confined Spaces

Level 3 Award in Emergency Rescue and Recovery Of Casualties from Confined Spaces Level 3 Award in Emergency Rescue and Recovery Of Casualties from Confined Spaces Qualification Specification ProQual 2018 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4

More information

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014. Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on

More information

Introduction. Legal Duties. Risk Assessment

Introduction. Legal Duties. Risk Assessment All Hampstead Hill School Policies are always to be read and considered in conjunction with Equal Opportunities, Race Equality and Inclusion Policies. This Policy of Hampstead Hill School applies to all

More information

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR 1910.119 PSM - Definition Not all refining hazards are caused by the same factors or involve ve the same degree of potential damage.

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT Health and Safety Policy Our Health and Safety Policy Name of Church: Address: As a church we understand that we owe a duty of care to ensure the safety

More information

Reg 12 - Cons Phase Plan

Reg 12 - Cons Phase Plan CDM 2015 Reg 12 - Cons Phase Plan Principal Contractor to develop for every project (not triggered by notification) HSE Busy Builder Sheet cis80.pdf CITB Wizard App CDM Wizard.pdf Company Own - CPP Carlisle.doc

More information

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY

Marine Education Society of Australasia HAZARD MANAGEMENT POLICY Marine Education Society of Australasia HAZARD MANAGEMENT POLICY Purpose of guidelines Commitment to workplace health and safety Scope Legal Framework MESA is committed to ensuring safe and healthy working

More information

Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 7.70 April 2015 Connection Procedure Table of Contents TS 7.70.01 Scope... 2 TS 7.70.02 New Watermain System...

More information

COMPETENCIES FOR SPECIFIC TASK AREAS UNDER THE SCIENTIFIC AND ARCHAEOLOGICAL DIVING ACoP

COMPETENCIES FOR SPECIFIC TASK AREAS UNDER THE SCIENTIFIC AND ARCHAEOLOGICAL DIVING ACoP COMPETENCIES FOR SPECIFIC TASK AREAS UNDER THE SCIENTIFIC AND ARCHAEOLOGICAL DIVING ACoP September 1999 (3rd revision) Purpose of these Competencies The competencies listed in this document refer to the

More information

O&M MANUAL HIGHLIGHTS

O&M MANUAL HIGHLIGHTS O&M MANUAL HIGHLIGHTS GENERAL PROVISIONS Each pipeline must be operated according to this SUBPART 192.603(a) RECORDS 192.603(b) Keep records necessary to administer the procedures of 192.605 RECORDS Life

More information

Health and Safety Policy

Health and Safety Policy Snowflake School Policy Reviewed September 2018 To be reviewed September 2019 Roy English Health and Safety Policy 1. STATEMENT OF INTENT The Trustees of Snowflake School will take steps to meet their

More information

Edinburgh Napier University Safe Working Procedure Gas Safety, Gas Systems and Equipment

Edinburgh Napier University Safe Working Procedure Gas Safety, Gas Systems and Equipment Edinburgh Napier University Safe Working Procedure Gas Safety, Gas Systems and Equipment Gas Safety Policy Date of Issue: July 2015 Policy Reference: Date of Review: July 2016 Lead Reviewer: Maintenance

More information

List all key terms and acronyms used in the procedure, and their definitions.

List all key terms and acronyms used in the procedure, and their definitions. Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,

More information

Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 7.70 January 2015 Connection Procedure Table of Contents TS 7.70.01 Scope... 2 TS 7.70.02 New Watermain

More information

Hazard Management Making your workplace safer

Hazard Management Making your workplace safer Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,

More information

Request for permission to work on a public sewer S106 (part 2 application form) 2018/19

Request for permission to work on a public sewer S106 (part 2 application form) 2018/19 Request for permission to work on a public sewer S106 (part 2 application form) 2018/19 This form will be used to assess the competency of an appointed contractor to make a connection to the public sewer.

More information

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200 Issued by: WHS Effective Date: 1 Oct 13 Rev: A Page 1 of 7 1. Purpose Hockey NSW is committed to preventing work -elated injuries and illness from occurring, however, if an accident or injury occurs, Hockey

More information

EDITION. November 2007 WORK PERMITS HSEW. Health. Safety. Well-being. Environment HSEW A WAY OF LIVING. Standards for professionals, be aware!

EDITION. November 2007 WORK PERMITS HSEW. Health. Safety. Well-being. Environment HSEW A WAY OF LIVING. Standards for professionals, be aware! NL EDITION November 2007 HSEW A WAY OF LIVING Safety Health Well-being Environment HSEW Standards for professionals, be aware! Work safely or don't work Work Permits are used within NAM to govern how work

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

Management system template for operators who have a permit to discharge used or waste sheep dip to land

Management system template for operators who have a permit to discharge used or waste sheep dip to land Management system template for operators who have a permit to discharge used or waste sheep dip to land Document owner: National Services/Knowledge, Strategy & Planning (KSP) Version history: Version Date

More information

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title: Corporate Electricity High Voltage SOP Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title: John Biggs/Estates Officer

More information

LADDERS FIXED AND PORTABLE

LADDERS FIXED AND PORTABLE CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS

THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS MANAGEMENT PROCEDURE FOR THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS J784 ( Rev 02/06 ) OCTOBER 2005 National Grid Gas plc 2006- All Rights Reserved CONTENTS Page FOREWORD BRIEF HISTORY

More information

Project & Task Work Health and Safety Risk Management Procedure

Project & Task Work Health and Safety Risk Management Procedure Project & Task Work Health and Safety Risk Management Procedure Related Policy Work Health and Safety Policy Responsible Officer Executive Director Human Resources Approved by Executive Director Human

More information

Flammable Environments Guideline

Flammable Environments Guideline GUIDE Flammable Environments Guideline 2014-0004 The Canadian Association of Petroleum Producers (CAPP) represents companies, large and small, that explore for, develop and produce natural gas and crude

More information

Your water byelaws explained

Your water byelaws explained Your water byelaws explained welcome to your water byelaws explained Scottish Water provides clean, safe and high quality drinking water to over 150,000 business premises across Scotland. Every day we

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure I. MISCELLANEOUS Guideline I-01 Guideline related to: Article 4 paragraph 3 What is to be understood by "sound engineering practice"? Sound engineering practice means, without prejudice to Article 5, paragraph

More information

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO Disclaimer: This document is for general guidance and awareness purposes

More information

Work Health Safety Record Management Guidelines. October, 2014

Work Health Safety Record Management Guidelines. October, 2014 Work Health Safety Record Management Guidelines October, 2014 Contents 1 Executive Summary... 2 2 More information... 2 3 University Records Management... 2 4 WHS Legislative Requirements... 2 5 Other

More information

Newtown Neighbourhood Centre

Newtown Neighbourhood Centre Policy Name Policy Number 1.10.1.1 Relevant procedures Work Health and Safety All procedures relating to the health, safety and well being of individuals in the workplace are relevant to this policy. Author

More information

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction COUNCIL POLICY Road Reserve and Footpath Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction Approved By: Council Review Date: 31 December 2013 Responsible Officer: Version No: 02 General Manager

More information

Gas and Carbon Monoxide Safety

Gas and Carbon Monoxide Safety Gas and Carbon Monoxide Safety September 2012 Our mission is to enhance the Life Chances of residents and service users through providing great homes, first class services and working in partnership to

More information

Spill response Procedure

Spill response Procedure Spill Response Procedure 1. Introduction A number of materials with the potential to be hazardous to the environment are used and stored at the University. This procedure defines the emergency procedures

More information

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

SEMEM3-73 Maintaining medical gas pipeline systems and equipment Maintaining medical gas pipeline systems and equipment Overview This unit identifies the competences you need to carry out maintenance activities on medical gas pipeline systems and equipment, in accordance

More information

Vermin, Insects and Scavenging Birds Management Plan

Vermin, Insects and Scavenging Birds Management Plan VIRIDOR WASTE MANAGEMENT LIMITED Lostock Waste Treatment Plant Vermin, Insects and Scavenging Birds Management Plan CONTENTS 1 Introduction... 2 2 Sources, Releases and Impacts... 3 3 Vermin, Insects and

More information

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled. Health and Safety Guideline: HSG 10.1 Health and Safety Inspections and Testing 1. Purpose This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards

More information

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure Health, Safety and Environment Management System HSE-PRO-008 HSE Responsibilities Procedure 1 Table of Contents 1 Intent... 3 2 Scope... 3 3 Definitions... 3 4 Duty, Obligations and Responsibilities...

More information

Significant Change to Dairy Heat Treatment Equipment and Systems

Significant Change to Dairy Heat Treatment Equipment and Systems Significant to Dairy Heat Treatment September 2008 Page 1 Significant to Dairy Heat Treatment Equipment and Systems September 2008 1 Background Requirements for the assessment of dairy heat treatment equipment

More information

Policy No: 45. Legionella Emergency Action Plan

Policy No: 45. Legionella Emergency Action Plan Policy No: 45. Legionella Emergency Action Plan Coordinator Review Frequency Executive Operations Manager Annually Policy First Issued 2014 Last Reviewed Autumn Term 2017 Date policy considered by External

More information

A MESSAGE FROM THE MD

A MESSAGE FROM THE MD A MESSAGE FROM THE MD The Life Saving Rules set out clear and simple dos and don ts covering activities with the highest potential safety risk and apply to all employees and contractors. The best-performing

More information

Works on Local Government Controlled Roads. & Traffic Control Permit No

Works on Local Government Controlled Roads. & Traffic Control Permit No Works on Local Government Controlled Roads & Traffic Control Permit No. 171219-000220 Pursuant to Local Government Act 2009 (Section 75) This permit is valid for the following purpose(s) at the locations,

More information

Code for the Provision of Chargeable Mobile Content Services

Code for the Provision of Chargeable Mobile Content Services Code for the Provision of Chargeable Mobile Content Services 1. Preamble 1.1 To address the public concern arising from the complaints regarding billing by some content service providers (CSPs) of chargeable

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

PUBLIC SWIMMING POOLS REGULATION

PUBLIC SWIMMING POOLS REGULATION Province of Alberta PUBLIC HEALTH ACT PUBLIC SWIMMING POOLS REGULATION Alberta Regulation 204/2014 Extract Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park Plaza 10611-98 Avenue

More information

Plant Isolation Lock out/tag out Procedure

Plant Isolation Lock out/tag out Procedure Plant Isolation Lock out/tag out Procedure Related Policy Responsible Officer Approved by Work Health and Safety Policy Approved and commenced November, 2014 Review by November, 2017 Responsible Organisational

More information

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar EN - english Instructions for installation and operation Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar Dear customer, Thank you for deciding in favour of the METPOINT

More information

Safe High Pressure Water Washing (HPWW) Requirement

Safe High Pressure Water Washing (HPWW) Requirement Safe High Pressure Water Washing (HPWW) Requirement Index Page Introduction 3 Flow chart of process steps 4-5 Responsibilities 6 Risk assessment process 7-9 Job safety analyses considerations 10-11 Compliance

More information