1 WMC Environment, Health & Safety Management System Guideline Underground Fires Major Hazard Standard MHS-02 DocsOpen Ref: 57228, 01/03/2001 Uncontrolled copy check web for latest revision Revision Reviewed Description of Changes Date Approved 1 A Barfield Revised 01/03/2001 P Plavina 0 First Issue 19/03/1999 K Thomas WMC Resources Ltd WMC has developed this document for internal use, specific to circumstances and conditions within its operations. It is intended to provide general information and its applicability to external parties may therefore be limited. WMC makes no representations as to the applicability of the information for use by any party other than WMC and should not be relied upon as such. WMC provides no representation or warranty as to safety or business outcomes arising from application of this document and its requirements by third parties.

2 PURPOSE AND SCOPE... 2 DETAILS Responsibilities Hazards Definitions Danger Sign Caution Sign Mandatory Signs Safe Condition Location Signs Installation of Signs Barricading Signs Ground Based Signs Other Signs Signage Protocol Danger No Entry Danger No Unauthorised Entry Danger Charging in Progress Danger Charged Face Danger Firing in Progress Danger Remote Bogging in Progress Danger Jumbo Trailing Cable UGME Area - Restricted Access Only Pedestrian Area Restricted Access Only REGULATIONS... 7 Appendices... 8 A Definitions... 8 B Related Documents... 8 SAF-MHG-02 Rev.1 DOCS No Issued: 01/03/01 Page 1 of 8

3 PURPOSE AND SCOPE The purpose of this guideline is to aid in standardising signage used in mines to eliminate fatalities and serious injuries from misunderstanding the meaning of signs and barricades utilised underground. The objectives of the guideline are to: ensure all persons working and travelling underground understand the meaning and expectations of all signage and barricades erected throughout the mine; and clearly define responsibilities for the use, access and removal of signs erected underground; This guideline is for the use of all WMC employees and contractors who work at any WMC underground mine. It outlines the minimum requirements for signage required by the Major Hazard Standards for underground mines. DETAILS 1 Responsibilities The general responsibilities of relevant personnel are detailed below. Where a position is not relevant then those specific responsibilities shall be assumed by the next up relevant manager. Responsibilities for specific signs are detailed with those specific signs. The Mine Manager is responsible to ensure that their direct reports are familiar with the procedure for the use, access and removal of all signs within the standard. The Underground Manager is responsible to ensure that their direct reports are familiar with the procedure for the use, access and removal of all signs within the standard. The Production Foreman is responsible to ensure that their direct reports are familiar with the procedure for the use, access and removal of all signs within the standard. The Shift Supervisor is responsible to ensure that their direct reports are familiar with the procedure for accessing all signs within the standard. Employees are responsible to ensure that they comply with all directions and procedures relating to the erection and use of any sign. 2 Hazards Personnel installing and erecting incorrect signage or barricades Personnel misunderstanding the meaning of signs and barricades, and Personnel ignoring the requirements of signs and barricades 3 Definitions 3.1 Danger Sign This sign is red, black and white. A Danger sign should be used when access to an area needs to be restricted. This could be for the following types of hazards: Charged heading Unsupported ground Persons working above Persons working below No ventilation Remote bogging in progress Open hole (above and below). Specific instructions relating to each sign may be located on the reverse side of the sign. Alternatively other systems should be employed to ensure personnel can adequately determine the protocols required for the specific sign. 3.2 Caution Sign This is a yellow and black sign. This sign is intended to warn personnel entering an area of any hazards. This sign does not restrict access to an area. A Caution sign can be used in the following types of instances: Trip hazards are present Equipment starts automatically. SAF-MHG-02 Rev. 1 DOCS No Issued: 01/03/01 Page 2 of 8

4 3.3 Mandatory Signs This is a blue and white sign. Entry past a mandatory compliance sign requires that any equipment specified on the sign are/is worn. This could include: Hearing Protection Eye Protection Foot Protection. 3.4 Safe Condition This is a green and white sign. This type of sign designates safe areas and services in the mine. These can include the following: Fresh Air Base FAB Escape Route First Aid. 3.5 Location Signs This is a blue and white sign. This type of sign provides location descriptions within the mine. Examples would include: levels and locations pump stations main magazine. 4 Installation of Signs The signs as outlined in this standard are a minimum that should be employed. Mines can have more signs, but where they do there shall be a written procedure which describes: the signs in use when they are to be used who can erect or remove them and how, and the access requirements. 4.1 Barricading Signs Barricading signs (those prohibiting or restricting access) shall be: hung on pins 1.5 m off the floor, hung on 6 mm chains (as a minimum), hung centrally in the excavation, and clean and legible. When removing the barricade the chain should remain attached to one pin and the chain swung back to that wall where it is attached to another pin. The message on the sign should face into the wall. 4.2 Ground Based Signs Signs which warn of a hazard and because of the nature of the operations in the location in which the sign is to be used it cannot be suspended from chains as required by Section 5.1 (e.g. Danger Jumbo Trailing Cable ) the sign may be ground based. These signs shall be: Supported on a purpose built stand, Placed so that they are visible to all persons and traffic which may enter the area, Placed so that they are not liable to impact from passing underground mobile equipment (UGME), and Located no closer than 6 metres from a hazard if indicating a hazard. 4.3 Other Signs Other signage may be fixed to equipment, to the walls of excavations or hung from the backs or otherwise mounted such that the signage is: Clearly visible to all personnel in the area, Will not be damaged by passing equipment, and Suitably mounted such that it will not be dislodged accidentally, or Can be removed or covered when not in use or is not applicable any more. SAF-MHG-02 Rev. 1 DOCS No Issued: 01/03/01 Page 3 of 8

5 5 Signage Protocol Danger signs are used to identify potential hazards and dangerous conditions. Specific requirements for the erection, removal and movement past these signs shall be detailed in the mine s signage procedures. These details may also be detailed on the reverse side of the sign. 5.1 Danger No Entry This sign warns that immediate danger exists beyond the barricade and that no unauthorised person is permitted past. Possible dangers may include: fall of ground scene of an incident quarantined equipment (precaution against tyre explosion) Use Only the following personnel are permitted to erect a Danger No Entry sign underground: Mine Manager Underground Manager Project Manager/Production Foreman Shift Supervisor. Persons other than those identified above should barricade access to a potentially hazardous area with a Danger No Unauthorised Entry sign and report to the Shift Supervisor immediately. Only authorised personnel are permitted to upgrade the sign to a Danger No Entry sign. Once a decision has been made to erect this sign details must be recorded in: A Sign Register Book The Daily Shift Report A prominent position (e.g. Task Assignment/Status Board). Underground crews should be made aware that a Danger No Entry sign has been erected as soon as practicable to ensure that they are aware of specific requirements that must be adhered to Access Only persons who have received written authorisation from the Underground Manager are permitted to enter the area. (this must be documented in a Sign Register Book) Removal Removal of the sign can only be undertaken with the written permission of the Underground Manager. All changes (including removal) must be recorded in the Sign Register Book Responsibilities The Underground Manager is responsible to ensure that: all instances where a Danger No sign is erected are logged in the Sign Register Book. only persons who have written authorisation from the Underground Manager are permitted to proceed past a Danger No Entry sign. whenever a Danger No Entry sign is removed it is logged in the Sign Register Book. The Production Foreman is responsible to ensure that the Underground Manager is notified as soon as practicable whenever a Danger No Entry sign is derground. a person in authority is immediately notified whenever a Danger No Entry sign is erected underground. a record of the erection of a Danger No Entry sign is documented in the Daily Shift Report and in a prominent location (e.g. on the Task Assignment/Status Board). the incoming Shift Supervisor is informed that a Danger No Entry sign has been erected. 5.2 Danger No Unauthorised Entry This sign is used for a number of reasons when access to an area needs to be restricted. Specific requirements for the use, access and removal of this sign are clearly detailed on the reverse side of the sign. This sign is erected in the following instances: Open Hole Above Open Hole Below Persons Working Above Persons Working Below Unsupported Ground No Ventilation SAF-MHG-02 Rev. 1 DOCS No Issued: 01/03/01 Page 4 of 8

6 5.2.1 Use A Danger No Unauthorised Entry sign can be installed by anyone, however the Shift Supervisor must be notified immediately once the sign has been erected Access Only persons who have been authorised by the Shift Supervisor can gain access to this area (this authorisation can be verbal) Removal This sign can only be removed at the direction of the Shift Supervisor Responsibilities a record of the erection of a Danger No Unauthorised Entry sign is documented on the Task Assignment/Status Board (this is not always possible but does assist the oncoming Shift Supervisor to manage his/her crew better if this information is available). the incoming Shift Supervisor is informed that a Danger No Unauthorised Entry sign has been erected. 5.3 Danger Charging in Progress This sign must be installed when charging is in progress it shall be erected a minimum of 10 meters from the charging equipment 5.4 Danger Charged Face This sign is installed once a charged face or heading has been left unattended it shall be erected a minimum of 10 meters from the face 5.5 Danger Firing in Progress A Danger Firing in Progress sign indicates that the detonator and firing line have been connected and that the initiation of a blast is imminent. This sign is erected across the level to be fired (if more than one access to the level exists all access must be similarly barricaded and have sentries posted). 5.6 Danger Remote Bogging in Progress The Danger Remote Bogging in Progress sign is hung in a location determined by the mine. This should be recorded on the Mining Instructions or Work Plans Use The Remote Loader Operator (RLO) is the only authorised person permitted to erect a Danger Remote Bogging in Progress sign. The location of this sign is to be determined prior to remote loading in consultation with the Planning Engineer, Shift Supervisor and RLO Access Only persons who have been authorised by the Shift Supervisor are permitted to contact the RLO. Once the RLO has been notified and granted permission are persons permitted to proceed past the sign and barricade Removal Only the RLO is permitted to remove a Danger Remote Bogging in Progress sign. If access to the area remains restricted once the loader has left the area a Danger No Unauthorised Entry sign must be hung to restrict access (refer to section for further information) Responsibilities The Planning Engineer is responsible to ensure that: the details of the location of where signage and barricades are to be erected is recorded on the appropriate instructions a copy of the instructions or plans are forwarded to the Production Foreman. SAF-MHG-02 Rev. 1 DOCS No Issued: 01/03/01 Page 5 of 8

7 The Production Foreman is responsible to ensure that a copy of the RLIS is forwarded to the Shift Supervisor the location of where the remote loading is to be conducted is detailed on the Task Assignment/Status Board a copy of the instructions or plans are forwarded to the RLO prior to commencing remote loading. 5.7 Danger Jumbo Trailing Cable This sign is used to prevent the jumbo cable from being damaged by underground vehicles or equipment. Alternative wording for this sign may be Danger Jumbo Trailing Cable Use The Drill Rig Operator or Offsider are to erect this sign prior to commencing work Access All persons walking can proceed past this sign at all times (unless otherwise directed). If vehicular access is required the Drill Rig Operator must be contacted and grant permission. The sign must be re-hung once the vehicle or equipment has past Use This sign is to be used when an area is determined to be for vehicles only and personnel (pedestrian) access is to be restricted (e.g. draw points of a stope, crusher tip area, etc.) Access Access to the area by pedestrians is restricted. Each mine shall develop a procedure for accessing these type of sites before erecting the signs Removal The sign may only be removed with approval of the Shift Supervisor after a systematic check of the area to ensure no UGME are still operating Responsibilities the signs are installed correctly and in the correct location. no signs are removed without their authorisation. the location of these signs is recorded in the Sign Register Book and in a prominent position. The UGME Operator is responsible to ensure that: they comply with all directions relating to the use, access and removal of a Danger UGME Area Restricted Access Only sign. they stop the equipment if any personnel inadvertently accesses the restricted area. 5.9 Pedestrian Area Restricted Access Only Removal The Drill Rig Operator or Offsider are to remove this sign once the drill rig leaves the area Responsibilities The Drill Rig Operator is responsible to ensure that a Danger Jumbo Cable sign is erected prior to any work commencing. 5.8 UGME Area - Restricted Access Only This sign warns that there is a collision danger from Underground Mobile Equipment. Access to the area is restricted. This sign warns that it is a Pedestrians area. Access to the area by Underground Mobile Equipment is restricted Use This sign is to be used when an area is determined to be primarily for pedestrians and UGME access is to be restricted (e.g. workshops, cribrooms, plats etc.) Access Access to the area by UGME is restricted. Each mine shall develop a procedure for accessing these type of sites before erecting the signs. Personnel may enter at any time. SAF-MHG-02 Rev. 1 DOCS No Issued: 01/03/01 Page 6 of 8

8 5.9.3 Removal The sign may only be removed with approval of the Shift Supervisor after a systematic check of the area to ensure no pedestrians are present Responsibilities their direct reports are familiar with the procedure for using, accessing and removing a Danger Pedestrian Area Restricted Access Only sign. the signs are installed correctly and in the correct location. no signs are removed without their authorisation. the location of these signs is recorded in the Sign Register Book and in a prominent position. The UGME Operator is responsible to ensure that: they comply with all directions relating to the use, access and removal of a Danger Pedestrian Area Restricted Access Only sign. they stop the equipment if any personnel inadvertently accesses the restricted area. 6 REGULATIONS Safety Signs Regulation 4.10 (4) A person must not: (a) damage, deface or obscure a safety sign at a mine: or (b) remove a safety sign at a mine unless the person is authorised to do so by the manager of the mine. SAF-MHG-02 Rev. 1 DOCS No Issued: 01/03/01 Page 7 of 8

9 APPENDICES A Definitions None. B Related Documents SAF-MHS-01 SAF-MHS-05 SAF-MHS-08 AS Underground Ground Control Underground Mobile Equipment Safe Working at Height. Mine Safety and Inspection Act 1994 Mine Safety and Inspection Regulations 1995 The design and use of reflectorized signs for mines and tunnels SAF-MHG-02 Rev. 1 DOCS No Issued: 01/03/01 Page 8 of 8

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Indicators Rule Number: 6009 Version 1.0, 31 March 2016 Indicators Rule Number: 6009 Document Control Identification Document title Number Version Date 6009 Indicators

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

GOLDEN SAFETY RULES AFT DR

GOLDEN SAFETY RULES AFT DR GOLDEN SAFETY RULES The Golden Safety Rules exist to keep you safe Your safety and the safety of your workmates is paramount. The Golden Safety Rules exist, above all else, to keep you safe. Since we adopted

More information

Electrical Machines & Drives Group Safety Policy 2018/2019

Electrical Machines & Drives Group Safety Policy 2018/2019 Electronic & Electrical Engineering. Electrical Machines & Drives Group Safety Policy 2018/2019 1 Introduction This Safety Policy provides the safety information and procedures that must be followed to

More information

SASOL LIFE SAVING RULES (LSRs)

SASOL LIFE SAVING RULES (LSRs) SASOL LIFE SAVING RULES (LSRs) Zero harm by following Life Saving Rules Adhere to fall protection requirements at all times when WORKING AT HEIGHTS Obey all traffic rules while driving and walking for

More information

WORK METHOD STATEMENT STRUCTURAL STEEL

WORK METHOD STATEMENT STRUCTURAL STEEL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Worksite Safety Update Promoting safety in roadwork

Worksite Safety Update Promoting safety in roadwork Worksite Safety Update Promoting safety in roadwork No 129 January - March 2014 In this Edition: Managing the Hazard of Mobile Plant Operations near People Human Factors Considerations.. Page 1 Preventing

More information

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.

More information

FCX Department of Occupational Health and Safety. Flagging and Barricading Guideline

FCX Department of Occupational Health and Safety. Flagging and Barricading Guideline FCX Department of Occupational Health and Safety Flagging and Barricading Guideline Approval Date: 11/12/13 Original Date: 03/30/09 SOP # FCX-19 Revision # 1 Supersedes X High Medium Task Risk Low NA Contents

More information

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings CIRCULAR NO. O-13 Recommended Practices for Manual Protection of Highway/Railway Grade Crossings Effective: October 1, 2004 CONTENTS 1. SCOPE 2. GENERAL PRINCIPLES 3. DEFINITIONS 4. PROTECTION REQUIRED

More information

Defective Fixed Signals - Rules 1 to 6

Defective Fixed Signals - Rules 1 to 6 Defective Fixed Signals - Rules 1 to 6 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Hot Work Document Number OHS-PROC-128 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro PS Mica

More information

BARRICADES AND SIGNAGE CS-OHS-36

BARRICADES AND SIGNAGE CS-OHS-36 CS ENERGY PROCEDURE FOR BARRICADES AND SIGNAGE CS-OHS-36 Responsible Officer: HSSE Management and Systems Specialist Responsible Manager: Head of Health and Safety Responsible Executive: Executive General

More information

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers SUPPLIER HEALTH AND SAFETY Supporting a healthy and safe working environment for our people and customers Document Template Control Prepared by Georgina East May 2017 Date Approved by May 2017 Mark Beder

More information

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN). Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This

More information

APPENDIX D HYDRO-VAC

APPENDIX D HYDRO-VAC The City of Winnipeg Bid Opportunity No. 33-2018 Template Version: C420160226 - RW APPENDIX D HYDRO-VAC Corporate Safety & Health Division GUIDELINES FOR EXCAVATION OF CABLES BY WATER PRESSURE/VACUUM SYSTEMS

More information

Control of Energy - Isolation Process

Control of Energy - Isolation Process Issue Date: 24/03/17 Last Reviewed: 24/03/17 Next Review Date: 24/03/18 Authorised By: Mike Muir Safe Operating Procedure Control of Energy - Isolation Process Purpose: This SOP is based on a Generic 12-step

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

Plant Isolation Lock out/tag out Procedure

Plant Isolation Lock out/tag out Procedure Plant Isolation Lock out/tag out Procedure Related Policy Responsible Officer Approved by Work Health and Safety Policy Approved and commenced November, 2014 Review by November, 2017 Responsible Organisational

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Dogging of Crane General Loading and Unloading SWMS No. 20 Authorized

More information

Isolation Standard - Tags

Isolation Standard - Tags Isolation Standard - Tags 1. Purpose To provide Nyrstar Hobart with a procedure designed to ensure anyone working on plant and equipment is kept free from injury or incidents resulting from uncontrolled

More information

Welcome to the CHALLENGER SAFETY Induction

Welcome to the CHALLENGER SAFETY Induction Welcome to the CHALLENGER SAFETY Induction Completing the Course This induction is to give employees/contractors the general information on how safety is managed and an overview of the permitting and reporting

More information

General Lockout Training Briefing

General Lockout Training Briefing Page 1 of 5 Introduction What is Lockout? Lockout protects your personnel and plant from injury or accident by ensuring that equipment and machinery is properly isolated during scheduled maintenance, shutdown,

More information

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16 All

More information

Geotechnics, Face and Stockpile Operations

Geotechnics, Face and Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries

More information

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees. SAFETY DIRECTIVE Title: Control of Hazardous Energy Lock-out/Tag-out/Try-out Issuing Department: Town Manager s Safety Office Effective Date: July 1, 2014 Approved: Gilbert Davidson, Town Manager Type

More information

Barricades and Falling Object Protection Plans

Barricades and Falling Object Protection Plans Title: Barricades and Falling Object Protection Plans Freeport Site Function: Environmental, Health & Standard No.: BCF020.042 Rev 7 Page: 1 of 7 REVISION HISTORY Date Revision Number Details of Change

More information

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASONS FOR INCLUSION 3 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX

More information

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107 WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107 Draft Issued 12/97 Revised 11/00 Please direct any questions or comments about the applicability of this document to Luigi Marcone, WCSU

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

SAFE WORK METHOD STATEMENT SWMS No Version

SAFE WORK METHOD STATEMENT SWMS No Version SAFE WORK METHOD STATEMENT SWMS No Version Company Name: Hunter Readymixed Concrete Pty Ltd 00 004 Location: Thornton Cessnock Tea Gardens Gateshead ABN: 6 076 08 695 SWMS Developed By: Duane Harrison

More information

Contractor / Exhibitor Handbook

Contractor / Exhibitor Handbook Contractor / Exhibitor Handbook Health and Safety This booklet outlines the basic rules that must be followed by contractors and other visitors working on Live Promotions Events sites. The contractors

More information

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.

More information

Standards of Practice Personal Protective Equipment

Standards of Practice Personal Protective Equipment Document Authority: I. PURPOSE Standards of Practice Personal Protective Equipment Whenever feasible, hazards must be eliminated through engineering, and/or administrative controls, prior to resorting

More information

Contractor/Visitor Safety Orientation UNBC

Contractor/Visitor Safety Orientation UNBC Contractor/Visitor Safety Orientation UNBC 3333 University Way, Prince George, BC V2N 4Z9 Revised: October 2015 For All Emergencies call Security 250-960-7058 ***DO NOT DIAL 911*** Important UNBC Telephone

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

HAZARD MANAGEMENT PROCEDURE

HAZARD MANAGEMENT PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk

More information

COMPLIANCE CHECK to the AEISG CODE

COMPLIANCE CHECK to the AEISG CODE COMPLIANCE CHECK to the AEISG CODE AEISG Code: On Bench Practices for Open Cut Mines Site/ Project: Date: Compliance Details: 1 SCOPE All On-Bench Practices fully conform to the requirements set out in

More information

Lockout/Tagout Safety Policy

Lockout/Tagout Safety Policy University of North Carolina Wilmington Environmental Health & Safety Workplace Safety Lockout/Tagout Safety Policy GENERAL The UNCW Environmental Health & Safety Department (EH&S) is authorized by UNCW

More information

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL CONTENTS 1. INTENT... 3 2. APPLICATION... 3 3. UNDERGROUND VENTILATION... 3 3.2 Underground Ventilation Officer... 3 3.3 Risk

More information

Workington Golf Club GOLF BUGGY POLICY 2017

Workington Golf Club GOLF BUGGY POLICY 2017 Workington Golf Club GOLF BUGGY POLICY 2017 Use of Ride-on Buggies on the Golf Course Introduction The following documents will encompass the minimum criteria to be applied, and the conditions that must

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 1-4 EMPLOYEE TRAINING INCLUDING DOCUMENTATION 5-6 HEC APPLICATION AND REMOVAL 7-14 COMMITTEE A HEC DEVICE 15 SPECIAL SITUATIONS 16-23

More information

(Health, Safety, and Welfare)

(Health, Safety, and Welfare) An Appreciation of The Construction (Health, Safety, and Welfare) Regulations 1996 Course Notes Mark Mallen Health and Safety Manager Fenlock Hansen Ltd October 2002 The Construction Regs 1996: Version

More information

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have

More information

NATURAL GAS RESPONSE SOG

NATURAL GAS RESPONSE SOG SCOPE NATURAL GAS RESPONSE SOG This guideline shall apply to all members of the Stoney Point Fire Department and shall be adhered to by all members. PURPOSE The purpose of this guideline is to explain

More information

Hazard Assessment Policy

Hazard Assessment Policy Hazard Assessment Policy Introduction Construction sites, maintenance shops and yards are not without risk of injury. Those circumstances or conditions that pose the risk of an injury or loss must be determined

More information

Original Date of Issue: 04/09

Original Date of Issue: 04/09 POLICIES AND PROCEDURES DEPARTMENT: Environmental Health and Safety SUBJECT: Electrical Safety Program Original Date of Issue: 04/09 Reviewed 12/2011 Revised 12/2011 BACKGROUND ELECTRIC SHOCK It is well

More information

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established: OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM Environmental Health and Safety Established: Developed in accordance with OSHA Standard 29 CFR 1910.147 1 1.0 SCOPE. Oklahoma City Community

More information

LADDERS FIXED AND PORTABLE

LADDERS FIXED AND PORTABLE CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Delaware State University

Delaware State University Delaware State University University Area Responsible: Risk and Safety Management Policy Number and Name: 7-06: Confined Space Policy Approval Date: 7/28/11 Revisions: _8/8/2013 Reviewed: 7/26/2013 Related

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018 University Policy Volume E2: Environment, Health, Safety and Security E2.14 Control of Hazardous Energy Responsible Office: Facilities Management Responsible Officer: Safety Officer POLICY STATEMENT All

More information

Minimum Safety Requirements for Contractors Working on Railway Property

Minimum Safety Requirements for Contractors Working on Railway Property Minimum Safety Requirements for Contractors Working on Railway Property Effective_ April 1, 2007 Introduction Canadian Pacific is committed to provide a Safe and Healthy working environment for all Railway

More information

Procedure: Confined space safety

Procedure: Confined space safety Purpose To define the requirements for the control of hazards associated with the use of confined spaces at the Australian National University to ensure compliance with the Work Health and Safety Act 2011

More information

SCOUTS AUSTRALIA NSW

SCOUTS AUSTRALIA NSW SCOUTS AUSTRALIA NSW Contractor Health and Safety Handbook 2 Scouts Australia NSW Contractor Safety Handbook v 5.0 Frebruary 2018 Contents... 2 Contractor Health and Safety Handbook... 2 Revisions... 2

More information

Lock Out - Tag Out Safety Program

Lock Out - Tag Out Safety Program Lock Out - Tag Out Safety Program Daniel Schmid 4-22-15 Pam Schmid 4-22-15 Dan Schmid Pam Schmid Safety Director Quality Director Table of Contents DOCUMENT REVISION TABLE... 3 PURPOSE... 4 RESPONSIBILITY...

More information

General Isolation Procedures

General Isolation Procedures Module General Isolation Procedures Definitions Worker: an employee; a contractor or subcontractor; an employee of a contractor or subcontractor; an employee of a labour hire company who has been assigned

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

Isolation Lockout and Tagging

Isolation Lockout and Tagging PURPOSE To define the minimum system requirements for isolation of plant and equipment from hazardous substances, mechanical, electrical or other energy sources to protect all workers from personal injury

More information

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 HIGH RISK APT AM Holdings Pty. Ltd. [ABN] 95124754383 Principal Contractor (PC) APA Group Level 19, HSBC Building 580 George

More information

MSE CONTROLLED DOCUMENT. Radiological HS&E Precautions for Dismantling Equipment

MSE CONTROLLED DOCUMENT. Radiological HS&E Precautions for Dismantling Equipment MSE CONTROLLED DOCUMENT Radiological HS&E Precautions for Dismantling Equipment Document No: Supersedes Revision no: 1 1/10/2004 Custodian: MSE/32 Revision no: 1 1/10/2006 Filename: NORMMGT. DOC Administered

More information

Kettleshulme Parish Council Risk Assessment 2015 Kettleshulme Memorial Hall

Kettleshulme Parish Council Risk Assessment 2015 Kettleshulme Memorial Hall HAZARD IDENTIFICATION AND CONTROL MEASURES: Step 1 Identify significant hazards Step 2 Identify who might be harmed and how Step 3 Identify precautionary measures already in place List of significant hazards

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Safe Work Practices / Procedures / Instruction CONFINED SPACE CONFINED SPACE Entry into and work in a confined space poses health and safety problems which may include: Presence or possible build up of a hazardous atmosphere Unexpected movement of equipment or materials

More information

SOP. Working in Confined Spaces

SOP. Working in Confined Spaces Purpose This procedure outlines the requirements for the management of entry into confined spaces in all work areas with the intention of minimising risks to health and safety from any potential hazards

More information

Lifting Operation & Lifting Equipment Procedure

Lifting Operation & Lifting Equipment Procedure SRSS Lifting Equipment Procedure 1. DOCUMENT CONTROL Management System Element Title SRSS SMS PROCEDURE Lifting Operation & Lifting Equipment Procedure SMS_HS_PR_033_ Version # & V1 10/08/2016 Lifting

More information

The purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.

The purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites. CORPORATE SAFETY MANUAL ENVIRONMENTAL, HEALTH AND SAFETY STANDARDS TITLE: Document Number: * Issue Date: Revision Date: * 1 Purpose The purpose of this document is to establish the procedures for accident

More information

2. Ensure operator visibility. 1. Always wear personal protective equipment.

2. Ensure operator visibility. 1. Always wear personal protective equipment. A Safe Operation Safety Tips for underground mining operations W hether you are mining gold, zinc, diamonds, coal or copper, an underground mine can be dangerous. Special precautions need to be considered

More information

SILICA EXPOSURE CONTROL PLAN

SILICA EXPOSURE CONTROL PLAN SILICA EXPOSURE CONTROL PLAN June 2017 Contents Purpose... 3 Scope... 3 Responsibilities... 3 Program Requirements... 4 Initial Exposure Assessment... 4 Periodic Exposure Assessment... 5 Employee Notification...

More information

CONFINED SPACE PROGRAM

CONFINED SPACE PROGRAM CONFINED SPACE PROGRAM Last updated: November 2017 1.0 PURPOSE Entry into a confined space represents a significant risk of serious injury or death to individuals not prepared for the hazards they may

More information

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Lockout/Tagout Plan Environmental Health & Safety Office July 2017 July 2017 Table of Contents Acronyms... iii Foreword... iv Document History... iv 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Scope... 1 1.3 Lockout/Tagout Program... 1 2.0 Roles and Responsibilities...

More information

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES AIGA 016/04 Asia Industrial Gases Association 298 Tiong Bahru Road, #20-01 Central Plaza, Singapore 168730 Tel :

More information

Meuangvang Development Co.LTD Standard Working Procedure 011 Towing Equipment

Meuangvang Development Co.LTD Standard Working Procedure 011 Towing Equipment 1. Application To provide a standard work practice for, as required in accordance with Meuangvang Development Co Ltd Safety Management Program 2. Revision Schedule Rev # Old Section Ref New Section Ref

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

Equipment Operation Procedures

Equipment Operation Procedures Procedures Purpose It is the policy of this company to permit only trained and authorized personnel to operate construction equipment. These procedures are applicable to both daily operators, and those

More information

Our commitment to safety

Our commitment to safety 2 Our commitment to safety At South East Water, we have an absolute commitment to achieving and maintaining a safe and healthy workplace for our people, including our contractors and stakeholders which

More information

WORKING ALONE PROGRAM

WORKING ALONE PROGRAM WORKING ALONE PROGRAM PURPOSE The purpose of UFV s Working Alone Program is to provide for measures to protect the health and safety of, and minimize risk to, any employees and students who work alone

More information

GUIDELINES FOR THE SAFE USE, STORAGE, AND DISPOSAL OF EXPLOSIVES IN SURFACE MINES AND QUARRIES

GUIDELINES FOR THE SAFE USE, STORAGE, AND DISPOSAL OF EXPLOSIVES IN SURFACE MINES AND QUARRIES MinEx Health & Safety Council GUIDELINES FOR THE SAFE USE, STORAGE, AND DISPOSAL OF EXPLOSIVES IN SURFACE MINES AND QUARRIES Updated March 2008 NOTE: These guidelines have been superseded by the Health

More information

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0 () 30.0 The purpose of the Energy Control Policy (Lockout/Tagout) is to ensure that before any employee performs any servicing and/or maintenance on machinery or equipment, where the unexpected energizing,

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30

More information

B S Glass Ltd Safety procedures- outsourced Workplaces

B S Glass Ltd Safety procedures- outsourced Workplaces B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission

More information

Control of Hazardous Energy. Environmental Health and Safety

Control of Hazardous Energy. Environmental Health and Safety Control of Hazardous Energy Environmental Health and Safety 11/01/2014 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) OSHA CFR 1910.147 Revised Date: November 2014 STATEMENT OF POLICY Ball State University

More information

GAS PIPELINE SAFETY GUIDE.

GAS PIPELINE SAFETY GUIDE. GAS PIPELINE SAFETY GUIDE. Date of issue 27/02/2017 Date of next review 27/02/2018 Page 1 Vector Limited 2017 Gas Pipeline Safety Guide February 2017 CONTENTS CONTENTS...2 WORKING SAFELY... 3 Your Legal

More information

Identify Hazards, Before They Identify You! ~Jayson Stoddard~

Identify Hazards, Before They Identify You! ~Jayson Stoddard~ 2015 Mine Safety Welcome! Identify Hazards, Before They Identify You! ~Jayson Stoddard~ Working Together to Achieve 0 Incidents Report All Incidents This would be any and all injuries as well as near miss

More information

FALL PROTECTION PLAN INSTRUCTIONS

FALL PROTECTION PLAN INSTRUCTIONS Sonic Drilling Ltd. FALL PROTECTION PLAN INSTRUCTIONS Each employer must ensure that a fall protection system is used when work is done at a place from which a fall of 3 m (10 ft) or more may occur, or

More information

EDITION. November 2007 WORK PERMITS HSEW. Health. Safety. Well-being. Environment HSEW A WAY OF LIVING. Standards for professionals, be aware!

EDITION. November 2007 WORK PERMITS HSEW. Health. Safety. Well-being. Environment HSEW A WAY OF LIVING. Standards for professionals, be aware! NL EDITION November 2007 HSEW A WAY OF LIVING Safety Health Well-being Environment HSEW Standards for professionals, be aware! Work safely or don't work Work Permits are used within NAM to govern how work

More information

THE OSHA LOCK-OUT/TAG-OUT STANDARD

THE OSHA LOCK-OUT/TAG-OUT STANDARD PRESENTER'S GUIDE "LOCK-OUT/TAG-OUT" Training for THE OSHA LOCK-OUT/TAG-OUT STANDARD Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS OUTLINE OF MAJOR PROGRAM

More information

GUIDELINE: Roadside Worksites

GUIDELINE: Roadside Worksites Title: GUIDELINE: Roadside Worksites Version 1.0 Short description Relevant to Authority Responsible officer Responsible office A guideline on ensuring a safe method of works on or near roadways within

More information

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Low Voltage Electricity System Safety Rules & Associated Safety Guidance Annex J To Loughborough University Facilities Management (FM) Health and Safety Policy Low Voltage Electricity System Safety Rules & Associated Safety Guidance 1. Introduction a. These Safety Rules are

More information

HINCKLEY GOLF CLUB BUGGY POLICY

HINCKLEY GOLF CLUB BUGGY POLICY HINCKLEY GOLF CLUB BUGGY POLICY (Revised Feb 2016 Medical form updated on advise from NGCAA) The purpose of this document is to set out a policy for use of ride-on buggies on the Hinckley Golf Club course

More information

Fall Protection at the Top of the Quarry Face

Fall Protection at the Top of the Quarry Face Fall Protection at the Top of the Quarry Face November 2017 Regulation 9 of the Safety, Health and Welfare at Work (Quarries) Regulations 2008 requires the Operator to ensure, as regards that quarry, that

More information

Palm Beach State College. Florida s First Public Community College SILICA EXPOSURE CONTROL PLAN

Palm Beach State College. Florida s First Public Community College SILICA EXPOSURE CONTROL PLAN Palm Beach State College Florida s First Public Community College SILICA EXPOSURE CONTROL PLAN 2018 Purpose The purpose of this document is to establish and implement a written exposure control plan that

More information

Excavations and Trenches

Excavations and Trenches Purpose Excavation and trenching are among the most hazardous work activities undertaken by the TNRD. This document outlines general requirements and specific safe work procedures to ensure the health

More information

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone.

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone. Lone Working Scope 1. This standard applies to anyone working; studying or taking part in any activity managed by UCL and includes staff, graduate students, contractors and visitors.. Undergraduate students

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book GERT8000-HB12 Rule Book Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession Issue 6 September 2017 Comes into force 02 December 2017 Handbook 12 Uncontrolled when printed

More information

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY Revised: February 2004 TABLE OF CONTENTS I. Introduction.. -4- II. Definition of a Confined Space -4- III. Responsibilities -5- A. University of Notre

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information