Leicester City Council Health & Safety Risk Assessment Form Ref:

Size: px
Start display at page:

Download "Leicester City Council Health & Safety Risk Assessment Form Ref:"

Transcription

1 Division/Section: Bridges Team Work Activity: Structural Repairs Activity Location: 8 Minehead Street, Leicester Persons Affected: Manager: Date of Assessment: Property Occupiers and Site Operatives Abul Tafafder Severity x Likelihood Unlikely 1 Likely Very Likely Minor Injury 1 LOW 1 LOW MEDIUM Major Injury LOW MEDIUM 4 HIGH 6 Serious Injury MEDIUM HIGH 6 HIGH 9 1 Structural Instability Crushing Head Injuries Body Injuries. None Install shoring, propping, strutting and trench supports as required. Inform supervisors and cease work until building element is stabilised and erect warning signs and barriers. Dust Eyes, Breathing. None Provide suitable respiratory protection for operatives. Provide eye protection for operatives. Keep general public away from affected area. Clean up as works progress using method that do not raise dust. Where scaffold covers on entrance to the dwelling, lay continuous sheets across the boards to prevent dust falling through. Assessment Form January 011 Page 1 of 7

2 Woking at heights Falling objects from Scaffold or ladders. Falls from scaffold or ladders. Head Injuries Body Injuries None Ensure scaffold components are all complete, including toe boards and safety netting to front and rear of scaffold platform. Materials are not to be stored/stock piled above the height of the toe board and any loading of scaffold to be evenly distributed. Wear PPE. Restrict access to areas below scaffold where work is in progress. Ensure ladders are inspected before use, and are suitable for height to be reached. 4 Chemicals Inhalation breathing issues, irritation. Skin Contact burns, irritation Eye Contact burns, irritation None COSHH assessment required before use of substance/chemical commences. Comply with manufacturers COSHH assessment. Wear required PPE. Observe and comply with measures identified in COSHH assessment. 5 Noise Ears damage to ears, deafness. Operative, Pass Public None Wear required PPE Ear defenders for all operative using or in close proximity to operatives using electric, petrol or pneumatic equipment. Ensure all equipment is well maintained and fit for purpose. Assessment Form January 011 Page of 7

3 6 Manual Handling of Heavy Materials Skeletal Injuries back Muscular Injuries strains, sprains. Foot Injuries crushing None Use of mechanical lifting and handling equipment. Training in manual handling techniques and compliance with Manual handling Operations Regulations. Use PPE 7 Asbestos: Some older properties may contain various forms of asbestos. None Strict observance of regulations regarding removal and disposal of asbestos. Breathing Inhalation of fibres Eyes contamination from fibres Assessment Form January 011 Page of 7

4 8 Working in properties:- Damaged/vandalised services. Discarded/concealed hypodermic syringes. Human/animal waste. Fleas and insects Damaged/vandalised building elements/components. Discarded furniture and rubbish. Plants stings Electrocution - Contact with live electrical installations. Explosion, gas poisoning leaking gas installations. Cuts sharp objects. Biological agents Flea/insect bites and stings Trips, slips and falls. Plants stings. None Visual survey/check of services before starting works. Isolate services at point of entry. Careful visual/physical check of working area before commencing with works. Wear PPE. 9 Working in occupied Property Lifting/moving occupiers furniture. Physical & Verbal abuse from occupier. Occupiers pets Operative Manual handling injuries strains, sprains, back injuries. Physical/emotive injuries. Bites. Trips, slips and falls None Operatives to be trained in Manual Handling techniques. Arrange for occupier to clear working areas. Abuse stop work and report to supervisor. Wear ID Agree working system with occupier. Keep tools, chemicals out of reach/locked. Assessment Form January 011 Page 4 of 7

5 10 Working in and around roof voids/roof level. Insulation. Low head room Fragile foor No or poor lighting Storage of occupier s property. Access through loft hatches. Confined space. Falling objects. Falls Working at heights Inhalation of fibres Head injuries Falls from ladders, scaffold or through fragile ceilings refer to working at heights above. Slips, trips and falls. Falls whilst gaining access. Confined Space. Humidity and uncomfortable temperature. None Suitable respiratory protection to be worn in accordance with COSHH assessment. Head Protection PPE Temporary boarding of fragile floors/ceilings. Provide adequate lighting. Suitable/stable access equipment to be used. Ensure adequate ventilation. 11 Electrical Power Supply Electrical shock, explosion and fire. None Only competent electricians to be used. Compliance with IEE Regulations. Compliance with Electricity at Work Regulations. Isolation of circuits before working. Permit to work on live circuits. Full maintained temporary electricity supply equipment. Fully maintained tools and equipment. Assessment Form January 011 Page 5 of 7

6 1 Working on natural gas installations Fire Explosion 1 Excavations 14 Collapse Ground water Falls None Only Gas Safe registered gas installers to be employed. Compliance with Gas safety, Installation and Use Regulations. Compliance with GSI&U ACOP No Smoking except in designated areas. Fire appliances to be readily available. None Shoring of sides Sump-pump Protection from falling into ecavations, barriers, signs. Protection of the public. Name of Assessor: Signature: Date: I accept that this is a suitable and sufficient assessment of the hazards and risks within this activity and that the remedial actions will be implemented as detailed below. Manager s Name: Signature: Date: Assessment Form January 011 Page 6 of 7

7 ACTION LIST No Action by whom? Date for completion Date completed Comments All actions have now been completed to reduce the risks listed above. I consider that any residual risk falls within acceptable/tolerable levels: Manager s Name: Signature: Date: REVIEW: NEXT REVIEW DATE REVIEWED BY SIGNATURE DATE Assessment Form January 011 Page 7 of 7

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16 All

More information

Pre-control risk estimate. Likelihood Risk

Pre-control risk estimate. Likelihood Risk Activity Consequence s mitigation measures Site Access & Egress Slips, trips & falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Ensure access to site is kept clear of plant &

More information

Potential risk of injury to staff

Potential risk of injury to staff Register Fire, Earthquake - other Emergencies Manual Handling and Repetitive Work Repetitive, Forceful Work Poor Housekeeping Not Wearing PPE (Personal Protective Equipment) Potential risk of injury to

More information

SAFE WORK METHOD STATEMENT Part B

SAFE WORK METHOD STATEMENT Part B SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

Safety Risk Assessment Roofing Works / Surveying / Inspections

Safety Risk Assessment Roofing Works / Surveying / Inspections One Direct aintenance td Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees ark Bloxidge H&S anager 0208 821 5197 One Direct Operatives accessing roof

More information

Example of an Occupational Health Risk Assessment

Example of an Occupational Health Risk Assessment SITE: ASSESSMENT DATE: EQUIPMENT/ AREA/TASK: Floor Manual ASSESSED BY: TASK/ EQUIPMENT floor manual sorting HAZARD RISK PERSONS RATING EXISITING CONTROL MEASURES AT RISK S L R FURTHER ACTION REQUIRED R

More information

Powerplay Paintball Brighouse Risk Assessment

Powerplay Paintball Brighouse Risk Assessment Chemical Gas bottles Vehicles Physical Electricity Environment Machinery Powerplay Paintball Brighouse Risk Assessment Location Powerplay Paintball Wakefield and Brighouse Venues Carried out by: Steven

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

Safe Work Procedure for installation of external cladding

Safe Work Procedure for installation of external cladding Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN). Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This

More information

Safe Work Method Statement

Safe Work Method Statement Company Name: Safe Work Method Statement Site Address: Other Details: Contractor: Activity/Trade: Electrician Date: TASKS List the tasks required to perform the activity in sequence carried out. Entry

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

Temporary load-bearing support for structural alterations or repairs

Temporary load-bearing support for structural alterations or repairs CRITICAL NOTE This document only becomes a Safe Work Method Statement where the High Risk Construction Work section of this document is completed Company: ABN: Contact Person: Ph: Project/Site: Principal

More information

Risk Assessment. Appendix A contains

Risk Assessment. Appendix A contains Risk Assessment Department The Cockpit Risk Assessment number AM/09/01 Date. 1 st July 01 Review due date 0 th July 01 Activity Maintenance and support service working Location The Cockpit Name of Assessor/s

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS Project: Insert Client Repair/ Replacement of low level light units/ low level

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Understanding health and safety in gas utilisation

Understanding health and safety in gas utilisation Level: 3 Credit value: 11 URN: M/502/8461 Unit aim This unit aims to provide learners with the knowledge and understanding of the general health and safety requirements for working in the gas industry.

More information

Risk Assessment Form (Qualitative)

Risk Assessment Form (Qualitative) Assessment Form (Qualitative) Project / ocation:..d.a.s WATERS Contract No: RA & Issue No: 008 Prepared by:.r.smit Date: 10/10/16 Signature: ACTIVITY DESCRIPTION: Person (s) at risk: General Ground works

More information

WORK METHOD STATEMENT STRUCTURAL STEEL

WORK METHOD STATEMENT STRUCTURAL STEEL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

Job Hazard Analysis Analysis by:

Job Hazard Analysis Analysis by: Job Analysis Possible s or Task Machinery e.g. Mowers Chainsaws Grinders Floor polisher Power tools Weed trimmers Sweepers Snow blowers Hedge trimmer Tiller Auto scrubbers Burnishers Ford tractor Sand

More information

PLANT RISK ASSESSMENT

PLANT RISK ASSESSMENT PLANT RISK ASSESSMENT Forktruck: Year of Manufacture Make: Model: Serial : TCM FD30T3 Attachment: Name: Mfg: Model : Owner: Business/Organisation: Address: This header page and the following 5 pages have

More information

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible) Page 1 of 6 How to use the Assessment Charts 1. Determine the Likelihood on the Qualitative Assessment Process Chart (pick a letter applicable to the task). 2. Determine the Consequence on the Qualitative

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

Health & Safety Risk Assessment (RA) Use of Church facilities by/for: Working & Cleaning Parties

Health & Safety Risk Assessment (RA) Use of Church facilities by/for: Working & Cleaning Parties GJM/DTM Cole Street Assessment Assessment No: RA 008 Health & Safety Assessment (RA) Use of Church facilities by/for: Working & Cleaning Parties For completion by event/group organiser(s)/supervisor(s)

More information

Portland Community College Facilities Management Services ENERGIZED ELECTRICAL WORK PERMIT AND WORK PLAN

Portland Community College Facilities Management Services ENERGIZED ELECTRICAL WORK PERMIT AND WORK PLAN Portland Community College Facilities Management Services ENERGIZED ELECTRICAL WORK PERMIT AND WORK PLAN Section 1 - PROJECT INFORMATION Project Work Request No. Building Room/Location Equip. Serial No.

More information

Safety Risk Assessment Carpentry

Safety Risk Assessment Carpentry One Direct aintenance td Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees ark Bloxidge H&S anager 0208 821 5197 General carpentry activities including,

More information

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT June 2013 Lead Manager John Green, Health & Safety Service Manager Responsible Director Director of Human Resources Approved By Health and

More information

Safe Work Method Statement (SWMS)

Safe Work Method Statement (SWMS) Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project

More information

Potential hazards People at risk and how? Actions already in place Further action required Action by

Potential hazards People at risk and how? Actions already in place Further action required Action by Risk Assessment Flat Roof Repair Prepared by Oracle Managed Services For: BAM FM On: 24/02/2017 Review date: N/A Potential hazards People at risk and how? Actions already in place Further action required

More information

Risk Controls Proposed: (in hierarchy order from the most preferred control)

Risk Controls Proposed: (in hierarchy order from the most preferred control) are to be assessed and controlled by eliminating or minimising any risks to health and safety. Eliminate - Where the risk to health and safety is removed from the workplace. Minimise - Where the risk cannot

More information

Risk Assessment June Skirmish Paintball Games Exeter

Risk Assessment June Skirmish Paintball Games Exeter Ve hicl Physical Electricity Environment Machiner y Risk Assessment June 2012. Skirmish Paintball Games Exeter Location Skirmish Paintball Exeter Carried out by: Martin Collins Date 10 th June 2012 Authorised

More information

TASK DAY RISK ASSESSMENT FORM

TASK DAY RISK ASSESSMENT FORM TASK DAY RISK ASSESSMENT FORM Assessment date Location and Activity details: Site Address Step One - Identify the activity and hazards Consider the activity or work area and identify if any of the hazards

More information

Risk Assessment & Safe Working Practice

Risk Assessment & Safe Working Practice RA Ref Number: 32 Revision: 4 Project/Job Number Reference Insert Job Number Approval Date: 30/03/2018 RA Description: confined space Next Review Date: 01/04/2019 Notes: Please refer to Safe Working Practices

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-08001-011 : Harrison 550 CNC Lathe Large Sale Type For what use is this asset being sold? Re-Use þ Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information

P N J CLEANERS LTD. Ventilation only Risk Assessments and Method Statements

P N J CLEANERS LTD. Ventilation only Risk Assessments and Method Statements Church Farm Wychor, Alrewas, Burton on Trent, Staffordshire. DE13 8BY P N J CLEANERS LTD Telephone 01283791953 Mobile 07585127242 Email admin@pnjcleaning.co.uk Ventilation only Risk Assessments and Method

More information

SUMBSE01 - SQA Code HC85 04 Apply health and safety and environmental legislation in the building services engineering sector

SUMBSE01 - SQA Code HC85 04 Apply health and safety and environmental legislation in the building services engineering sector Overview This standard is about establishing and maintaining working practices and procedures across a specified range of installation and/or maintenance activities that give consideration to health and

More information

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE. TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Using Angle Grinders SWMS No. 8 Authorized and email Signed by the

More information

RISK ASSESSMENT FOR THE CHIMERA CLIMBING CENTRE DATE LAST UPDATED: 25 AUGUST STUART HOWARD

RISK ASSESSMENT FOR THE CHIMERA CLIMBING CENTRE DATE LAST UPDATED: 25 AUGUST STUART HOWARD ASSESSMENT FOR THE CHIMERA CLIMBING CENTRE DATE LAST UPDATED: 2 AUGUST 201 - STUART HOWARD ASSESSMENT PROCESS: Likelihood of occurrence x Severity, L X S Likelihood of occurrence 1 Highly unlikely to ever

More information

Pocklington Town Council Risk Assessment Christmas Festival Wednesday Assessor: Gordon Scaife Date

Pocklington Town Council Risk Assessment Christmas Festival Wednesday Assessor: Gordon Scaife Date Activity: Christmas Festival Wednesday Assessor: Gordon Scaife Date 16/07/2018 5 December Completed: Persons At Risk: PTC Staff, Volunteers & Public Reference: 180716 Public Events Review Date: 16/07/2019

More information

Specific Risk Assessment Partyrocksbounce

Specific Risk Assessment Partyrocksbounce Specific Risk Assessment Partyrocksbounce Activity CHILDREN S BOUNCY CASTLE RISK ASSESSMENT Location 3 rd party venues Persons involved in risk assessment: Catherine Downs Risk Assessment Reference Number:

More information

University College Dublin Machinery/Equipment Risk Assessment Template

University College Dublin Machinery/Equipment Risk Assessment Template 1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-09100-060 : Gantry hoist system Sale Type For what use is this asset being sold? Re-Use Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other use is at the

More information

LVS RISK ASSESSMENT Handling of Sulphuric acid. Alf Jarecki Cross referenced assessments: Assessment ID Reference DIA.BAC.GEN.008.

LVS RISK ASSESSMENT Handling of Sulphuric acid. Alf Jarecki Cross referenced assessments: Assessment ID Reference DIA.BAC.GEN.008. Divisional Manager: LVS RISK ASSESSMENT Handling of Sulphuric acid. Cross referenced assessments: Assessment ID Reference DIA.BAC.GEN.008.01: Owner (Doc Author): Responsible Person: *Stock Checker: First

More information

Refresher Licensed Asbestos Supervisor Training

Refresher Licensed Asbestos Supervisor Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS Refresher Licensed Asbestos Supervisor Training This unit has nineteen learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

Risk Assessment Underwritten For:

Risk Assessment Underwritten For: Competition Organising Partner: CITB /SkillBuild Competition Skills: Bricklaying SKILLBUILD Risk Assessment Venue: Regional Competitions Event Dates: 0 April 9 June 017 Written by PM: Donna Havers Risk

More information

Workplace Safety Inspection Sheet

Workplace Safety Inspection Sheet Workplace Safety Inspection Sheet Record all details of a safety inspection carried out at your workplace 1 of 2 Date and Time of Inspection:... Area or workplace inspected:... Name(s) and signature(s)

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Safety Risk Assessment Hand and Power Tools

Safety Risk Assessment Hand and Power Tools One Direct aintenance td Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees ark Bloxidge H&S anager 0208 821 5197 Use of hand and power tools B Contractors/Sub

More information

QUEENSLAND UNIVERSITY OF TECHNOLOGY

QUEENSLAND UNIVERSITY OF TECHNOLOGY QUEENSLAND UNIVERSITY OF TECHNOLOGY SITE SPECIFIC SAFETY MANAGEMENT PLAN FOR SAMFORD HOUSE SAMFORD ECOLOGICAL RESEARCH FACILITY SAMFORD VALLEY 2007 Dylan Randall SN: 06305466 dylan.randall@student.qut.edu.au

More information

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010) (Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:

More information

SAFE WORK METHOD STATEMENT CARPENTER

SAFE WORK METHOD STATEMENT CARPENTER HOST EMPLOYER DECLARATION I declare the worker/s named on this work authority have been provided with a site specific safety induction that complies with the requirements of the Workplace Health & Safety

More information

SAFE WORK METHOD STATEMENT (SWMS) GENERAL GARDENING with Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units

SAFE WORK METHOD STATEMENT (SWMS) GENERAL GARDENING with Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units Job Description/Task/: General Gardening such as using Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units Name and Phone Number of Person Completing SWMS: Name and Phone Number of the Person

More information

WORK METHOD STATEMENT RENDERING

WORK METHOD STATEMENT RENDERING ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0 EF26 Risk Assessment CAT Excavator Hazards Requiring Attention: AS AT Friday, 29 January 2016 0 Next Review Saturday, 28 January 2017 Total Hazards Recorded 39 Critical Risk Hazards 0 High Risk Hazards

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT Authorised by: Date: list individually, do not group, M or Installing Pipework in ground, M or Induction Take 5 review working area for hazards Falls, crushing, explosions, slips and trips MUST be inducted

More information

Risk Assessment for Shoring & Piling Operations

Risk Assessment for Shoring & Piling Operations Reference No. STIG 0403 CPA Safety Guidance Risk Assessment for Shoring & Piling Operations 1. Introduction This safety guidance contains a generic list of possible hazards that may be present when planning

More information

CENTRAL PLANT HEATING/CHILLED WATER OPERATOR Ref. Code: C-WO-4

CENTRAL PLANT HEATING/CHILLED WATER OPERATOR Ref. Code: C-WO-4 CENTRAL PLANT HEATING/CHILLED WATER OPERATOR Ref. Code: C-WO-4 OPERATING OF AUXILIARY EQUIPMENT Activity Hazard Identification Required Precautions 1. Inspecting boilers. 1a. Slipping on oily or wet floor.

More information

FIRE HYDRANT TESTING METHOD STATEMENT.

FIRE HYDRANT TESTING METHOD STATEMENT. SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....

More information

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING Personal Protective Equipment Foot Hearing High Visibility Head Eye Face Hand Protective Clothing Breathing Normal Requirements: Safety footwear, hearing

More information

Staff Contractors. Public. Staff Contractors

Staff Contractors. Public. Staff Contractors 1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

New Licensed Asbestos Operative Training

New Licensed Asbestos Operative Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Operative Training This unit has twenty-two learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

Rainham Industrial Services Ltd. Plan of Works

Rainham Industrial Services Ltd. Plan of Works Rainham Industrial Services Ltd Plan of Works Enquiry No.: 22246 10 Client : BGCBC Site: Market Hall Cinema Market Square Brynmawr NP23 4AJ Project Title: Asbestos Removal and Encapsulation Prepared by

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Safety Risk Assessment Working at Height: Mobile Tower Scaffold Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 Working at height from Mobile Tower B Contractors/Sub contractors

More information

Accident /Incident/Injury Report & Investigation Form

Accident /Incident/Injury Report & Investigation Form Accident /Incident/Injury Report & Investigation Form Incident Details: Location/s of Incident: Address of Incident: Person Involved Details: Person Involved: Witness Name (If Applicable): Time of Incident

More information

Confined Space Hazard Identification & Risk Assessment Form

Confined Space Hazard Identification & Risk Assessment Form Date of assessment: Name of person(s) doing assessment: Name(s) of Qualified Person Location of space: Description of Space Description of Space: Wet Well Dry Well Valve Outlet/Inlet Tank PRV Manhole Box

More information

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD Location: Company Wide Date of Assessment: 04 April 2017 Revision No.: 0 Description of planned work or activity: HIRA Register Attendees: see attached tool-box

More information

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height. Safety Initiative 02 Working at Height May 2011 CONTENTS 1. Objective of the initiative 2. Overview. 3. Implementation 4. Duties 5. Hierarchy of Controls 6. Workplace Inspections 7. Fragile Surfaces 8.

More information

ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd RISK ASSESSMENT SHEET

ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd RISK ASSESSMENT SHEET Description of task: ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd SHEET Manual Handling of Loads Number of operatives Exposed : 4-6 Operatives 1. Muscle strains/ sprains/torn ligaments 2. Fractures from dropped

More information

MAINTENANCE MECHANIC RCF

MAINTENANCE MECHANIC RCF REPAIRING AND REPLACING VALVES AND COILS MAINTENANCE MECHANIC Activity Hazard Identification Required Precautions 1. Walking to and from work site. 1a. Back ache; overexertion from carrying heavy weight.

More information

Safety Manual Section 6 Confined Space

Safety Manual Section 6 Confined Space 6. CONFINED SPACE ENTRY Introduction The following sections provide general guidelines and procedures for confined space entry. This section covers the following topics: Topic Page 6.1 Types of s... 6-2

More information

1" RETRACTABLE SYSTEM Risk Assessment

1 RETRACTABLE SYSTEM Risk Assessment 1" RETRACTABLE SYSTEM Risk Assessment Part Number: 613015-Rev- Review Date: 1/1/2014 Our Ref: 1" Retractable System Risk Assessment Approved: Brent Ford COSASCO Hazard Identification Plan Scope of Document

More information

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 HIGH RISK APT AM Holdings Pty. Ltd. [ABN] 95124754383 Principal Contractor (PC) APA Group Level 19, HSBC Building 580 George

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-0001-003 - Overhead Transfer System and EMS. Sale Type For what use is this asset being sold? Re-Use Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015 Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039 Name Date Signature Author Jarred Hearle 27/11/2015 Reviewed FMG Site Team 27/11/2015 ---------- Approved Geoff Selfe 27/11/2015

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information

Recognition, Evaluation, and Control of Hazards

Recognition, Evaluation, and Control of Hazards Recognition, Evaluation, and Control of Hazards Latest revised date: October 26, 2011 Page 1 of 8 1.0 Introduction Memorial University has established a system for the recognition, evaluation, and control

More information

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11 Issue Date: Review Date: Page Number: 1 of 11 1. Hazard Management Details General Plant/Equipment Item: WOOD LATHE Make/Model No.: Serial No.: School: Work Location: Name of Person(s) Conducting Activity:

More information

Personal Protective Equipment 29 CFR 1926

Personal Protective Equipment 29 CFR 1926 Personal Protective Equipment 29 CFR 1926 OSHA- PPE http://www.osha.gov/publications/osha31 51.html NIOSH s Protective Clothing Web Page http://www.cdc.gov/niosh/npptl/topics/prot clothing/ 1926.95 PPE

More information

SAFE WORK METHOD STATEMENTS

SAFE WORK METHOD STATEMENTS Recips 11/56 Norcal Road Nunawading Vic. 11 ABN: 48 04 075 70 Contact Person: Dean Spicer Contact Number: 9878 9006 SAFE WORK METHOD STATEMENTS for Format 1 Various Service Clients for Service work and

More information

Health & Safety Contractor rules

Health & Safety Contractor rules Health & Safety Contractor rules Contents 1. Introduction... 1 2. The legal bit explaining our terminology... 1 2.1 Legal requirements... 1 3. Our health and safety requirements... 1 3.1 Access to BT premises...

More information

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG 4034 ABN 45 081 359 613 Phone: 07 3265 6537 Mobile: 0411 756 719 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS

More information

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2 Handling Archaeological Asbestos Fragments Non-friable Title and volume less than 10m2 School/Business Unit Humanities Location (building/lab/ workshop if applicable) JSA Development 9 June 2017 JSA Development

More information

Contractor Hazard Identification and Control Guide

Contractor Hazard Identification and Control Guide Exposure to Asbestos Containing Materials (ACM) Accidental disturbance or removal of ACM. Asbestos Containing Materials are to be removed outside school hours. No DET employees, students or visitors are

More information

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment TUDOR PARK EDUCATION TRUST Working at Heights and Risk Assessment Person(s) responsible for updating the policy: Chief Executive Officer Date Approved: Board of Directors on 7 July 2016 Period of Review:

More information

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE 1. INTRODUCTION The University uses substances hazardous to health in many of its operations, and accepts that it has a duty of care to reduce exposure

More information

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations Workplace Address: Page 1 of PART 1: TASK DETAILS Client: JOB/TASK: Using Water blaster PART 2: RESOURCES Relevant Legislation/Codes Practice: Training Required: Equipment Used: Materials Used: Substances

More information

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014. Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on

More information

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type) RISK ASSESSMENT 2011 WALLINGTON LIFT MAINTENANCE CO LTD Installation of electrically operated service lifts (non passenger type) 1 1 L a k e s i d e, W a l l i n g t o n, S u r r e y, S M 6 7 J Y T e l

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

Safety Checklist for Events Held at Hillbrook

Safety Checklist for Events Held at Hillbrook Safety Checklist for Events Held at Hillbrook Hazards/ Issues or Tasks 1. EVENT ACCESS AND EGRESS Entry / Exit areas are kept clear and accessible. For an evening event, that you have appropriate Lighting.

More information

Mobile Training Unit (MTU)

Mobile Training Unit (MTU) Mobile Training Unit (MTU) The MTU provides a convenient way of meeting training requirements by bringing a range of short duration health & safety and operative training onsite. Through the MTU, employees

More information