Hazard Identification and Risk Assessment Form. Risk Assessment

Size: px
Start display at page:

Download "Hazard Identification and Risk Assessment Form. Risk Assessment"

Transcription

1 Identification and Form Tool & Machine Work General Various (including potential fatalities) All staff complete safety induction programme at the start of the module. instructed in safe operation of each tool/machine. Restricted access to the workshop. Workshop locked shut when not present. supervised by when in the workshop. issued with safety boots, overalls, eye protection and gloves. Further PPE including hearing protection, welding shield, welding aprons etc available. Use of the supplied PPE actively enforced. Emergency stops distributed around each workshop cut the power to all machines in the workshop. Power can only be reinstated once it has been reset in the s office. Guards and other safety devices on machines/tools are never defeated. Equipment is serviced and maintained as required. Faulty equipment is taken out of service until repaired satisfactorily. Equipment isolated during service or repair. Portable electric tools are 110v. Power cables are routed away from walkways. Adequate working space maintained around each machine/workstation. Long hair restrained and no loose clothing when using machines/tools. Specific precautions for some of the various machines used/activities in each workshop are detailed on the following pages. Produced by: Oak Leaf Safety Ltd. Ver: 1/2015 Page 1 of 6

2 Identification and Form Welding Oxy-acetylene, MIG, TIG, MMA Burns Arc-eye Eye from sputter Exposure to metal fume and other welding gases All staff Individual welding booths for MIG & TIG, including: o Welding curtain to the front. o Moveable extraction arm. o Rubber mat on the floor at the user position o Appropriate electrical outlet (with RCD); for plant. o Welding benches on wheels so that they can be moved. Appropriate PPE provided. Welders must wear long sleeve overalls, safety boots, welding apron, welding visor, welding gloves. Metal jewellery is prohibited Electrocution Hearing damage Fire Oxy-acetylene & oxy-propane equipment used at open benches: o Moveable extraction arms located at each bench. o Curtains on frames used to shield passers by. o Oxygen & Acetylene cylinders left on the trolley during use. o Both cylinders fitted with appropriate regulators and flashback arrestors. Larger welding gear on wheels. Extraction systems serviced and tested annually. Gas torches and hoses maintained in good condition. Hoses replaced immediately if damage noticed. Produced by: Oak Leaf Safety Ltd. Ver: 1/2015 Page 2 of 6

3 Identification and Form Pipe Threader Entanglement Moving parts enclosed. Thread cutter turns slowly Cuts & lacerations Foot pedal operation. Machine stops if pressure on the pedal released. Gloves worn to hold the pipe during use. Single pipe not excessively heavy Threader is on wheels so it can be moved to where it needs to be used. Pipe Bender Impact Manual lever operation Crush Single pipe not excessively heavy Bench Grinder Abrasions Wheels changed and dressed by competent person Cuts The side of the wheel is never used for grinding. Pinch Gloves used when holding the work piece on the moving grinding stone. Eye Flip down guards. Emergency stop. Produced by: Oak Leaf Safety Ltd. Ver: 1/2015 Page 3 of 6

4 Identification and Form Pedestal Drill Cuts & lacerations Eye Entanglement Workpiece clamped in place for drilling. Adjustable bit guard. Sharp bits used. Drive motors and belts enclosed Emergency stop. Belt Sander Abrasions Flip down guard Cuts Rest for the work piece. Pinch Gloves used when holding the work piece on the moving belt. Eye Working at height Fall from height Head Fixed stairs with handrail up to the upper level work bays. Edges protected by rail, including toe board Access to high level storage areas restricted. Flue gases Respiratory irritation Carbon monoxide poisoning All staff All trainees Flue for boilers vented to outside. Produced by: Oak Leaf Safety Ltd. Ver: 1/2015 Page 4 of 6

5 Identification and Form Housekeeping Slips, trips & falls; Fire Obstructed escape Noise Hearing damage Bins located in each workshop. Bins emptied at the end of each day. Clean as you go policy. Walkways and exits kept free of obstructions. Adequate storage including raking and cupboards. Mini skip for waste metal. Skip moved using a pallet truck. Each trainee allocated a bay for their project work. Hearing protection available Produced by: Oak Leaf Safety Ltd. Ver: 1/2015 Page 5 of 6

6 Identification and Form Action Plan Tool & Machine Work Recommended Controls & Actions Consider implementing a formal lock out tag out procedure when undertaking service and repair work on major items of equipment. Completion Date Person Responsible Revised General Welding A monitoring programme should be undertaken to determine exposure to metal fume during welding activities. Noise The noise assessment for the Training Centre was completed several years ago, and must be repeated Manager: Date: 18 th December 2015 Produced by: Oak Leaf Safety Ltd. Ver: 1/2015 Page 6 of 6

Hazard Identification and Risk Assessment Form. Risk Assessment

Hazard Identification and Risk Assessment Form. Risk Assessment Identification and Assessment Form Assessment Tool & Machine Work General Various injuries (including potential fatalities) All staff complete safety induction programme at the start of the module. instructed

More information

Hazard Identification and Risk Assessment Form. Risk Assessment

Hazard Identification and Risk Assessment Form. Risk Assessment Current Tool & Machine Work General Various injuries (including potential fatalities) All staff complete safety induction programme at the start of the module. instructed in safe operation of each tool/machine.

More information

Hazard Identification and Risk Assessment Form. Risk Assessment

Hazard Identification and Risk Assessment Form. Risk Assessment Identification and Assessment Form Assessment Tool & Machine Work General Various injuries (including potential fatalities) All staff complete safety induction programme at the start of the module. instructed

More information

Hazard Identification and Risk Assessment Form. Risk Assessment

Hazard Identification and Risk Assessment Form. Risk Assessment Identification and Assessment Form Assessment Tool & Machine Work General Various injuries (including potential fatalities) All staff complete safety induction programme at the start of the module. instructed

More information

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title Risk assessment Introduction Please complete the form as fully and accurately as you can. Assessment details Name of organisation Assessor's name Assessors job title Any Company John Smith Manager Date

More information

UGRacing Formula Student Garage Risk Assessment

UGRacing Formula Student Garage Risk Assessment UGRacing Formula Student Garage Risk Assessment University of Glasgow School of Engineering Location: Formula Student Workshop Building: Rankine Building, Oakfield Avenue Glasgow G12 8LT Summary of activities

More information

Document: APA HSE GP Tx Version: 0.01 Date: 04/03/2013 Review by: 26/03/2014 Page 1 of 11 pages

Document: APA HSE GP Tx Version: 0.01 Date: 04/03/2013 Review by: 26/03/2014 Page 1 of 11 pages SAFE WORK METHOD STATEMENT WORKSHOP FABRICATION HSE NET NAT SWMS APAND00033 APT AM Holdings Pty. Ltd. [ABN] 95124754383 APA Group Principal Contractor (PC) Level 19, HSBC Building Subcontractor 580 George

More information

Safe Work Instructions For Oxygen Acetylene Equipment

Safe Work Instructions For Oxygen Acetylene Equipment Safe Work Instructions For Oxygen Acetylene Equipment Policy Sponsor: Assistant Vice President Facilities Management Responsible Unit: Trade Services Approval Date: September 2010 Revisions: January 2018

More information

SAFE WORK METHOD STATEMENT Part B

SAFE WORK METHOD STATEMENT Part B SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS

More information

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL SAFE -14 Page 1 of 8 U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL FUNCTION Safety TOPIC Hotwork Permit Program OBJECTIVE(S): GENERAL POLICY: To provide a work atmosphere that is conducive to

More information

University of Vermont Department of Physical Plant Personal Protective Equipment Program

University of Vermont Department of Physical Plant Personal Protective Equipment Program University of Vermont Department of Physical Plant Personal Protective Equipment Program REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING AND COMPLIANCE OFFICE

More information

Wilkins Safety Group

Wilkins Safety Group Gas Welding INTRODUCTION Welding is the union of pieces of metal by fusing the opposing surfaces that have been made molten by heat. Processes similar to welding include brazing and soldering. Allied processes

More information

BOILER MECHANIC//SR. BOILER MECHANIC

BOILER MECHANIC//SR. BOILER MECHANIC WORKING IN STEAM MANHOLES Activity Hazard Identification Required Precautions 1. Driving to and from work site. 1. Motor vehicle accident; striking pedestrians, bicyclists, or individuals using rollerblades.

More information

MAINTENANCE MECHANIC RCF

MAINTENANCE MECHANIC RCF REPAIRING AND REPLACING VALVES AND COILS MAINTENANCE MECHANIC Activity Hazard Identification Required Precautions 1. Walking to and from work site. 1a. Back ache; overexertion from carrying heavy weight.

More information

PPE and Tools PPE and Tools

PPE and Tools PPE and Tools PPE and Tools PPE and Tools PPE Definition Personal protective equipment (PPE) refers to protective clothing, helmets, goggles, or other garments or equipment designed to protect the wearer's body from

More information

WELDING & CUTTING FIRE PROTECTION SAFETY 1 NAVFAC

WELDING & CUTTING FIRE PROTECTION SAFETY 1 NAVFAC WELDING & CUTTING FIRE PROTECTION SAFETY 1 NAVFAC BASIC TYPES OF WELDING ARC WELDING 2 NAVFAC OXY/ACETYLENE OR FUEL GAS WELDING FUEL GASES USED FOR HEATING & CUTTING OPERATIONS 3 MAJOR TYPES 1. P GAS {Propane}

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD Location: Company Wide Date of Assessment: 04 April 2017 Revision No.: 0 Description of planned work or activity: HIRA Register Attendees: see attached tool-box

More information

CHAPTER 26 WELDING AND CUTTING

CHAPTER 26 WELDING AND CUTTING CHAPTER 26 WELDING AND CUTTING Revised 7/2010 1 WELDING AND CUTTING Responsibilities 1. The County Safety Officer is responsible for providing appropriate safety instructions for supervisor's use on welding

More information

TRADE AREA: ELECTRICAL INDUSTRY

TRADE AREA: ELECTRICAL INDUSTRY TRADE AREA: ELECTRICAL INDUSTRY Some possible workplace hazards and possible ways for Host employers and Apprentices/Trainees in controlling these hazards. What are possible hazards? What could be possible

More information

HOT WORK SAFETY 29 CFR WELDING & CUTTING SAFETY (HOT WORK)

HOT WORK SAFETY 29 CFR WELDING & CUTTING SAFETY (HOT WORK) Title: Hot Work/Welding Effective Date: 2/6/2013 Control Number: THG_0011 Revision Number: 1 Date: 10/10/2015 Annual Review Completed: 5/13/2015 CONTENTS HOT WORK SAFETY 29 CFR 1910.252 WELDING & CUTTING

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Hot Work Document Number OHS-PROC-128 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro PS Mica

More information

COMPANY HEALTH & SAFETY PROGRAM. Title: Welding & Cutting Section No: 45

COMPANY HEALTH & SAFETY PROGRAM. Title: Welding & Cutting Section No: 45 Page 1 of 10 1.0 PURPOSE The purpose of this section is to heighten employee awareness of potential welding and cutting hazards, and to communicate acceptable work practices. It is intended that supervisors

More information

C-Consequence, P Probability, R-Risk Rating Value Page 2 of 2

C-Consequence, P Probability, R-Risk Rating Value Page 2 of 2 General Procedure SE-GEN-04 azard nalysis & ssessment, Identification of Environmental spect and Impact ssessment P-474 / R / 01 Rev : 02 Date: 0.01.2012 CTIVITY RISK SSESSMENT WORKSEET Work ctivity: ocation:

More information

Risk Management Resources

Risk Management Resources Risk Management Resources Machine Guarding Name: Notes: Electrical Systems: Fire Prevention Are circuit breakers accessible to personnel, protected from physical damage, and located away from ignitable

More information

THE TLC COMPANIES. Self Inspection Program. Self Inspection. Program. Revised 12/13/2002 DC00026

THE TLC COMPANIES. Self Inspection Program. Self Inspection. Program. Revised 12/13/2002 DC00026 THE TLC COMPANIES Self Inspection Program Self Inspection Program Table of Contents SECTION 1 INSPECTION REQUIREMENTS 1 Informal Inspection 1 General Inspection 1 SECTION 3 CONDUCTING INSPECTIONS 5 Preparation

More information

WELDING, CUTTING AND BRAZING

WELDING, CUTTING AND BRAZING - 1 - WELDING, CUTTING AND BRAZING Are only authorized and trained personnel permitted to use welding, cutting or brazing equipment? Does each operator have a copy of the appropriate operating instructions

More information

New Employee Safety Indoctrination Checklist

New Employee Safety Indoctrination Checklist New Employee Safety Indoctrination Checklist Emergency Response Training Read and understand the Facility s Emergency Response Action Plan Complete Emergency Response Training Locate the Facility s Evacuation

More information

MAINTENANCE MECHANIC RCF

MAINTENANCE MECHANIC RCF WORKING ON ATC EQUIPMENT MAINTENANCE MECHANIC Activity Hazard Identification Required Precautions 1. Driving to and from work site. 1. Motor vehicle accident; striking pedestrians, bicyclists, or individuals

More information

Appendix B Safe Work Method Statements

Appendix B Safe Work Method Statements OH&S Manual Service Technicians Appendix B Safe Work Method Statements for A.G. Coombs NSW PTY LTD Version, 29-Mar-12 A.G. Coombs NSW AUTHORISATION OH&S Manual Service Technicians Safe Work Method Statements

More information

SAFETY DIRECTIVE 3.0 REFERENCES. 3.1 See Appendix B

SAFETY DIRECTIVE 3.0 REFERENCES. 3.1 See Appendix B SAFETY DIRECTIVE Title: Hot Work Issuing Department: Town Manager s Safety Office Effective Date: September 1, 2014 Approved: Gilbert Davidson, Town Manager Type of Action: New 1.0 PURPOSE To provide proper

More information

Basic Safety Orientation. University of Illinois at Urbana-Champaign

Basic Safety Orientation. University of Illinois at Urbana-Champaign Basic Safety Orientation Basic Safety Orientation This orientation is General Knowledge only. Further training is required to meet hazard specific training requirements. For more information, please contact

More information

Doc No: WELDHOT Midland Engineering Co., Inc. Initial Issue Date 12/14/15 Safety Management System

Doc No: WELDHOT Midland Engineering Co., Inc. Initial Issue Date 12/14/15 Safety Management System Revision Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 PURPOSE To provide guidelines for the safe operation of welding, cutting and hot work of equipment, and to itemize

More information

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010) (Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:

More information

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS Items needed for demonstrations: Fire extinguisher PPE (Personal Protective Equipment): o Lab coats/welding jackets o Leather gloves

More information

Cutting and shaping materials using thermal cutting equipment

Cutting and shaping materials using thermal cutting equipment Unit 824 Cutting and shaping materials using thermal cutting equipment UAN: H/600/5883 Level: Level 2 Credit value: 14 GLH: 64 Relationship to NOS: This unit has been derived from national occupational

More information

PLANT RISK ASSESSMENT

PLANT RISK ASSESSMENT PLANT RISK ASSESSMENT Forktruck: Year of Manufacture Make: Model: Serial : TCM FD30T3 Attachment: Name: Mfg: Model : Owner: Business/Organisation: Address: This header page and the following 5 pages have

More information

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT 13.0 The purpose of this program is to ensure that, where applicable, the appropriate and necessary personal protective equipment (PPE) is selected and provided to employees to protect from illness or

More information

Welding, Cutting, and Brazing

Welding, Cutting, and Brazing Welding, Cutting, and Brazing Hazards of Welding Operations Fire hazards Metal splatter Electric shock Explosion hazards Released gases Radiant energy Where would these hazards be found on oil and gas

More information

Risk Assessment Underwritten For:

Risk Assessment Underwritten For: Competition Organising Partner: CITB /SkillBuild Competition Skills: Bricklaying SKILLBUILD Risk Assessment Venue: Regional Competitions Event Dates: 0 April 9 June 017 Written by PM: Donna Havers Risk

More information

The Yorkshire Waterways Museum, Dutch River Side, Goole, POND AND NATURE TRAIL RISK ASSESSMENT SHE/RA/00

The Yorkshire Waterways Museum, Dutch River Side, Goole, POND AND NATURE TRAIL RISK ASSESSMENT SHE/RA/00 The Sobriety Project The Yorkshire Waterways Museum, Dutch River Side, Goole, DN14 5TB POND AND NATURE TRAI RISK ASSESSMENT SHE/RA/00 Title of Activity: ocation(s) of Work: Using the pond area and nature

More information

Western Sydney University Safety Inspection Checklist - Laboratory Environments

Western Sydney University Safety Inspection Checklist - Laboratory Environments Western Sydney University Safety Inspection Checklist - Laboratory Environments Useful Hint: To maximise the benefits that can be gained from a workplace inspection activity read the Western Sydney University

More information

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Windmill Hazard Inspection Checklist WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Authorised by: LOCATION OF INSPECTION...... Inspected By (1)........... (2)..... PRINT PRINT Signature (1):. (2)....

More information

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014 Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028 Name Date Signature Author Jarred Hearle 30/11/2014 Reviewed John Nulty 30/11/2014 Approved Geoff Selfe 01/12/2014 Key Safety Acts Complete a 5

More information

Handout Activity: HA107

Handout Activity: HA107 Engines: Motive Power Types: Handout Activity: HA107 Student/Intern information: Name Date Class Identifying hazards Summary A workshop is a hazardous environment. The objective of this procedure is to

More information

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw

PLANT HAZARD REPORT. Plant Description: Element Aspect Plant Hazards and Controls Advice. Circular Saw PLANT HAZARD REPORT Plant Description: Circular Saw PLEASE NOTE This plant information has been prepared to assist the purchaser in identifying hazards associated with the plant prior to the purchaser

More information

P. & I. Pascoe Limited

P. & I. Pascoe Limited P. & I. Pascoe Limited www.hh.net.nz Significant Hazard Register and Safe Operating Procedures (SOP s) Workshop July 2008 Significant Hazard Register & Safe Operating Procedures WORKSHOP FORK LIFT Crushing

More information

75 Years of Health and Safety Guidance

75 Years of Health and Safety Guidance H&S Guide: 60 Working Risks Personal Protective Equipment Personal Protective Equipment (also known as PPE) Employers have duties concerning the provision and use of personal protective equipment at work.

More information

ISD #535 Rochester Public Schools

ISD #535 Rochester Public Schools ISD #535 Rochester Public Schools Health & Safety Office Maintenance Service Building 10 9½ St SE Rochester, MN 55904 507-328-4507 Management Plan for Machine Guarding Modification Date Document Modification

More information

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11 Issue Date: Review Date: Page Number: 1 of 11 1. Hazard Management Details General Plant/Equipment Item: WOOD LATHE Make/Model No.: Serial No.: School: Work Location: Name of Person(s) Conducting Activity:

More information

Automotive Safety Checklist

Automotive Safety Checklist Automotive Safety Checklist Facility: Address: Date: Initials: General Is your Accident Prevention Program implemented and personalized to your facility? Is the Accident Prevention Program accessible to

More information

SEMFWE3-33 SQA Unit Code HF2X 04 Cutting and shaping materials using portable thermal cutting equipment

SEMFWE3-33 SQA Unit Code HF2X 04 Cutting and shaping materials using portable thermal cutting equipment Cutting and shaping materials using portable thermal cutting equipment Overview This standard identifies the competencies you need for cutting and shaping plate (3mm thickness and above), rolled sections,

More information

ASSEMBLY & OPERATIONS MANUAL. Straight & Clean Torch Cuts. Every Time.

ASSEMBLY & OPERATIONS MANUAL. Straight & Clean Torch Cuts. Every Time. ASSEMBLY & OPERATIONS MANUAL Straight & Clean Torch Cuts. Every Time. CAUTION ALWAYS USE FLASH BACK ARRESTORS (purchased separately) READ THIS BOOK THOROUGHLY AND FOLLOW INSTRUCTIONS! FAILURE TO USE OSHA

More information

WELDING AND CUTTING GUIDELINES

WELDING AND CUTTING GUIDELINES Page 1 of 8 University employees should observe the following general safety guidelines when performing hot work operations. Also see the Hot Work Guidelines EH&S 02-008. Hot work is defined as: brazing,

More information

Unit 7 Worksheet 7 Procedures and Precautions

Unit 7 Worksheet 7 Procedures and Precautions Unit 7 Worksheet 7 Procedures and Precautions Describing health and safety precautions In industry, increasing emphasis is placed on safety planning at all stages of the development process. This often

More information

Los Angeles Unified School District Division of Adult and Career Education LOS ANGELES UNIFIED SCHOOL DISTRICT DIVISION OF ADULT AND CAREER EDUCATION

Los Angeles Unified School District Division of Adult and Career Education LOS ANGELES UNIFIED SCHOOL DISTRICT DIVISION OF ADULT AND CAREER EDUCATION LOS ANGELES UNIFIED SCHOOL DISTRICT DIVISION OF ADULT AND CAREER EDUCATION SCHOOL: AREA: SAFETY TEST FOR INDUSTRIAL EDUCATION WELDING Name of Student: Date: Address: Phone: Date Enrolled: Date of Birth:

More information

Potential hazards People at risk and how? Actions already in place Further action required Action by

Potential hazards People at risk and how? Actions already in place Further action required Action by Risk Assessment Flat Roof Repair Prepared by Oracle Managed Services For: BAM FM On: 24/02/2017 Review date: N/A Potential hazards People at risk and how? Actions already in place Further action required

More information

Compressed Gases Storage and Handling Safety Policy. Individual Unit Function: Safety Procedure No.: SOP-0103 Page: 1 of 6

Compressed Gases Storage and Handling Safety Policy. Individual Unit Function: Safety Procedure No.: SOP-0103 Page: 1 of 6 Procedure No.: SOP-0103 Page: 1 of 6 MIDGA Reviewed: 07/09/18 Effective: 1/14/98 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purpose of this procedure is to establish

More information

14. Personal Protection Chapter , WAC

14. Personal Protection Chapter , WAC 14. Personal Protection Chapter 296-800-160, WAC 1.0 Introduction PLU will provide most required personal protective equipment (PPE). The employee may be required to provide PPE that is of a personal nature

More information

HORIZONTAL BEAM AND VERTICAL PANEL SAWS

HORIZONTAL BEAM AND VERTICAL PANEL SAWS FACT SHEET HORIZONTAL BEAM AND VERTICAL PANEL SAWS HORIZONTAL BEAM PANEL SAW Horizontal beam panel saws are used to cut panels into pieces and it can cut multiple panels at the same time. Multiple panels

More information

This training does not attempt to cover all safety regulations or precautions.

This training does not attempt to cover all safety regulations or precautions. This training does not attempt to cover all safety regulations or precautions. For additional safety regulations and precautions, see the following standards: American Welding Society (AWS) American National

More information

The Sample Company Pty Ltd

The Sample Company Pty Ltd Job Safety and Environmental Analysis (JSEA) / Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process Initiators of SWMSs are responsible for consulting the Project Supervisor,

More information

HSP18 Personal Protective Equipment

HSP18 Personal Protective Equipment Procedure Index Section Title 1 Introduction 2 What is Personal Protective Equipment (PPE) 3 What the Regulations require 4 Assessing the suitability of PPE 5 Thames Water minimum standards for PPE 6 General

More information

OFFICE OF STATE HUMAN RESOURCES

OFFICE OF STATE HUMAN RESOURCES OFFICE OF STATE HUMAN RESOURCES NUMBER: PPE-1 TOTAL PAGES: 8 SUBJECT: Personal Protective Equipment Program Effective Date: Revision Date: Revision #: RELATED LEGISLATION: The purpose of this program is

More information

THICKNESSER RISK ASSESSMENT (U003ra)

THICKNESSER RISK ASSESSMENT (U003ra) Task Being Carried Out: Area: Persons at Risk: Operation of T500 Thicknesser Brindle Mill Operatives, Maintenance engineers Description of Equipment: Wadkin T500 Thicknesser Serial No.: T500 82240 (Machine

More information

Arab Fertilizers Association Knowledge Sharing Template

Arab Fertilizers Association Knowledge Sharing Template In ammonia plant for abuqir 2 plant, during rising one of the workers to the top of absorption tower to check the trays of the absorption tower by crane suspended man basket. The crane shacked causing

More information

Working Environment Safety Assessment

Working Environment Safety Assessment For your own safety and/or safety of your workforce, and to improve the efficiency of your business practices, you should be aware of, and be up to date with, the key safety issues and good practices relevant

More information

HAZARD REGISTER CONSTRUCTION R E M E M B E R, T H E N U M B E R 1 H A Z A R D I S Y O U FREEPHONE:

HAZARD REGISTER CONSTRUCTION R E M E M B E R, T H E N U M B E R 1 H A Z A R D I S Y O U FREEPHONE: HAZARD REGISTER CONSTRUCTION R E M E M B E R, T H E N U M B E R 1 H A Z A R D I S Y O U FREEPHONE: 0800 555 339 WWW.HAZARDCO.COM Monitoring 01 General Use Heavy Machinery Demolition Excavation Construction

More information

Potential risk of injury to staff

Potential risk of injury to staff Register Fire, Earthquake - other Emergencies Manual Handling and Repetitive Work Repetitive, Forceful Work Poor Housekeeping Not Wearing PPE (Personal Protective Equipment) Potential risk of injury to

More information

Hot Work Program. California State University, Chico. Department of Environmental Health and Safety

Hot Work Program. California State University, Chico. Department of Environmental Health and Safety California State University, Chico Department of Environmental Health and Safety May 2017 Table of Contents Section 1.0 Introduction... 1-1 2.0 Definitions... 2-1 3.0 Hot Work Precautions and Procedures...

More information

Hand and Power Tools

Hand and Power Tools Hand and Power Tools Short description This section outlines the guidance for assessing and controlling hazards associated with hand and power tools. Contact person Andrew Richardson Name HSEQ Functional

More information

OWNER S MANUAL. Page: 1 of 8

OWNER S MANUAL. Page: 1 of 8 Air Needle Scaler OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious personal

More information

Preparing and using manual gas welding equipment

Preparing and using manual gas welding equipment Unit 030 Preparing and using manual gas welding Level: 2 Credit value: 14 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover a

More information

1b. Slipping; tripping; getting knocked into by pedestrians.

1b. Slipping; tripping; getting knocked into by pedestrians. MAINTAINING AND REPAIRING HYDRAULIC AND TRACTION PASSENGER AND FREIGHT ELEVATORS AND HANDICAP EQUIPMENT Activity Hazard Identification Required Precautions 1. Walking to and from work site. 1a. Back ache;

More information

WADKIN OVER HEAD ROUTER RISK ASSESSMENT (U002ra)

WADKIN OVER HEAD ROUTER RISK ASSESSMENT (U002ra) Task Being Carried Out: Area: Persons at Risk: Operation of Over Head Router Brindle Mill Operatives, Maintenance engineers Description of Equipment: Wadkin Over Head Router Serial No.: LS 3891 Location

More information

SAFE WORK INSTRUCTION

SAFE WORK INSTRUCTION (P.P.E.) Date issued on site: Ensure all Personal Protective Equipment conforms to Australian Standards and WorkCover NSW requirements. N0:SWI001 ACTIVITY Providing P.P.E HAZARDS Identify process to be

More information

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process: Initiators of JSEAs are responsible for consulting the Project Supervisor,

More information

Print this activity then complete it and keep it as evidence in your folder, or portfolio.

Print this activity then complete it and keep it as evidence in your folder, or portfolio. Workplace hazards Workplace Learning and Assessment Activity Workplace Learning and Assessment Activity Print this activity then complete it and keep it as evidence in your folder, or portfolio. Hazard

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

Collision Repair Shop Inspection Checklist

Collision Repair Shop Inspection Checklist Collision Repair Shop Inspection Checklist Note: This is a sample inspection chesklist only, and may mot include all appropriate inspection items. The Occupational Health and Safety Regulation specifies

More information

responsible present? Y/N (When all controls are in place risk will be reduced). Extension tables are used when cutting large sheet materials

responsible present? Y/N (When all controls are in place risk will be reduced). Extension tables are used when cutting large sheet materials Technologies - No.54 Woodworking Bench Circular Saw (List additional hazards, risks and s particular to your school using the blank template no.69) azards Is the What is the Risk rating Controls Is this

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT PLAT HAZARD AD EQUIPMET RISK ASSESSMET Plant Identification : HAULOTTE OPTIMUM 8.1 Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or

More information

CUSTODIAL Safety Inspection Checklist

CUSTODIAL Safety Inspection Checklist CUSTODIAL Safety Inspection Checklist Priority 1 Any condition which is life-threatening, or may cause injury, or permanent disability Priority 2 Any condition which may cause serious, but non-disabling

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

Job Hazard/Safety Analysis For the Carpenter

Job Hazard/Safety Analysis For the Carpenter Job Hazard/Safety Analysis For the Carpenter 1 INTRODUCTION Job Hazard/Safety Analysis for the Carpenter is a partial list of known task performed by the professional carpenter. We have placed the tasks

More information

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16 All

More information

DEPARTMENT SAFETY RULES AND PROCEDURES

DEPARTMENT SAFETY RULES AND PROCEDURES DEPARTMENT SAFETY RULES AND PROCEDURES 1. Working Hours 1.1. Work is primarily performed in the student machine shop under the direct supervision of a technician or faculty advisor weekdays between 8 am-

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT Plant Identification : HAULOTTE HA16RTJ Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or struck by moving objects due to: Risk es

More information

Personal Protective Equipment. Individual Unit Function: Safety Procedure No.: SOP-0147 Page: 1 of 9

Personal Protective Equipment. Individual Unit Function: Safety Procedure No.: SOP-0147 Page: 1 of 9 Procedure No.: SOP-0147 Page: 1 of 9 1. PURPOSE This procedure describes the minimum requirements concerning personal protective equipment for personnel who are exposed to areas or tasks where hazards

More information

SAFETY POLICY AND PROCEDURE MANUAL QUESTIONNAIRE

SAFETY POLICY AND PROCEDURE MANUAL QUESTIONNAIRE The following questionnaire is designed to aid us in the creation of your policy and procedure manual. Please place a checkmark in the boxes that correspond to the sections that you would like to be included

More information

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE Air Conditioning Indoor/Outdoor Unit as applicable 1. Check Pressures 2. Clean filters and screens when necessary 3.

More information

OXYGEN & ACETYLENE: Safety & Handling for these Highly Combustible Gases

OXYGEN & ACETYLENE: Safety & Handling for these Highly Combustible Gases OXYGEN & ACETYLENE: Safety & Handling for these Highly Combustible Gases TRAINING SOURCE: Safety Division, Central Welding Supply, www.centralwelding.com Oxygen & Acetylene Safety Topics covered Oxygen:

More information

Chiyoda's High-Pressure Gas Control System and Equipment

Chiyoda's High-Pressure Gas Control System and Equipment Chiyoda's High-Pressure Gas Control System and Equipment 2012 CHIYODA HELPS YOUR GAS RELATED JOBS... Since the establishment 1946, we started as a manufacturer of Gas Welding & Cutting Equipment. Nowadays

More information

Safety and Health Policy and Procedure Manual. WELDING, CUTTING, and BRAZING PROGRAM Section 0140

Safety and Health Policy and Procedure Manual. WELDING, CUTTING, and BRAZING PROGRAM Section 0140 Safety and Health Policy and Procedure Manual WELDING, CUTTING, and BRAZING PROGRAM Section 0140 I. INTRODUCTION II. SCOPE III. STANDARD IV. GENERAL REQUIREMENTS A. Basic Precautions for Fire Prevention

More information

HAZARD ASSESSMENT. For PERSONAL PROTECTIVE EQUIPMENT (PPE)

HAZARD ASSESSMENT. For PERSONAL PROTECTIVE EQUIPMENT (PPE) HAZARD ASSESSMENT For PERSONAL PROTECTIVE EQUIPMENT (PPE) Hazard Assessment For PPE This tool can help you do a hazard assessment to see if your employees need to use personal protective equipment (PPE)

More information

WORK METHOD STATEMENT STRUCTURAL STEEL

WORK METHOD STATEMENT STRUCTURAL STEEL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147 Safety Audit / Risk Assessment Of Hino 2 Tonne Dutro Tipper Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147 Mark Zimmer Unit 3, 16 Herbert St, Equipment manager Artarmon. NSW 2064 Ph: (02)

More information

Student Shop Safety. University of Tennessee Safety Guide GS-005. Purpose. Scope and Applicability. Definitions and Abbreviations.

Student Shop Safety. University of Tennessee Safety Guide GS-005. Purpose. Scope and Applicability. Definitions and Abbreviations. Student Shop Safety University of Tennessee Safety Guide GS-005 Document Contact: EHS Date effective: August 1, 2012 Revision Date: June 7, 2017 Purpose Machine shops are present in many departments and

More information

Contractor Hazard Identification and Control Guide

Contractor Hazard Identification and Control Guide Exposure to Asbestos Containing Materials (ACM) Accidental disturbance or removal of ACM. Asbestos Containing Materials are to be removed outside school hours. No DET employees, students or visitors are

More information