Greenup Lock Filling and Emptying System Study

Size: px
Start display at page:

Download "Greenup Lock Filling and Emptying System Study"

Transcription

1 Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET 2006) Breaking Frontiers and Barriers in Engineering: Education, Research and Practice June 2006, Mayagüez, Puerto Rico. Greenup Lock Filling and Emptying System Study Mario J. Sanchez Research Hydraulic Engineer, Coastal and Hydraulics Laboratory, Engineering Research and Development Center, Vicksburg, MS, USA, Abstract The United States waterway system finds itself facing increasing commercial traffic while the system s infrastructure has essentially reached its design life. Financial constraints require innovative design concepts on infrastructure improvements. The overall savings estimated from the use of these innovative construction concepts for the US Army Corps of Engineer s top 11 high-priority navigation projects are between 1.4 and 1.8 billion dollars. The Greenup Lock in the Ohio River is one of these projects. One of the innovative designs being considered for this site is extending the lock walls of the existing m auxiliary lock and converting it into a m long lock. Two alternatives have been proposed within this lock extension project. A cost effective design alternative being considered for the filling and emptying system is the use of the existing m lock system to fill the m lock. This type of system is hydraulically unbalanced and could be prone to extremely slow filling and emptying times, and higher hawser forces. Another alternative is to build a separate filling and emptying system for the extended portion of the lock. This will provide a more balanced environment within the chamber during the filling and emptying cycles. Research on these systems has determined minimum filling and emptying times, with acceptable hawser forces, minimal surface drift, and disturbance. This paper presents the modeling methods used to establish design criteria. This criterion is necessary for design engineers investigating the m extension of the Greenup Auxiliary Lock. Keywords Navigation locks, filling and emptying systems, lock extensions, intake design 1. Introduction 1.1 Background The United States waterway system finds itself facing increasing commercial traffic while the system s infrastructure has essentially reached its design life. The result is an increased demand on the nation s navigation locks.

2 Several U.S. Army Engineer Districts are considering the use of innovative design alternatives to increase their lockage capacity. Currently, many of the dams have two locks in operation, a main and an auxiliary lock. The main lock is nominally 366 m long and the auxiliary 183 m long. The Greenup Locks and Dam are one such example. The traffic of longer tows is increasing on the Ohio River and its tributaries, and one of the innovative designs being considered by several projects is extending the lock walls of existing 183 m auxiliary locks and converting them into 366 long locks. This study evaluates the performance of the Greenup auxiliary lock after the extension with two proposed alternatives. One alternative is to keep the original filling and emptying (F&E) system while the other is adding a separate F&E system for the lock extension. 1.2 Prototype The Greenup Locks and Dam project is located on the Ohio River approximately 8.04 km below Greenup, KY (Figure 1). The project consists of a non-navigable, high-lift, gated dam, top length 392 m, including 75-m fixed weir with 68-m open crest, nine tainter gates, clear span 30.5 m between 4.3- m intermediate piers and m end piers, with a damming height m above sills, and two adjacent parallel lock chambers. The chambers are located on the left side of the Ohio River (looking downstream). The main lock chamber, located on the spillway side, has clear dimensions of 33.5 m by 366 m and the auxiliary lock chamber 33.5 m by 183 m. Figure 1. Location Map for the Greenup Locks and Dam Description of lock features and nomenclature used in this paper can be found in Engineer Manual (EM) Layout and Design of Shallow-Draft Waterways, EM Planning and Design of Navigation Locks, and EM Hydraulic Design of Navigation Locks. The existing F&E system consists of a multi-ported intake, chamber laterals, and a discharge outlet connected to a single culvert. Improvements to the project to enhance navigation include a 183 m extension to the to the auxiliary lock chamber walls. The lock will be m from pintle to pintle. Due to construction issues, while we

3 refer to the extended lock to as having a nominal length of 366 m, the actual length is 408 m. The design lift is 9.14 m, which occurs with a pool elevation of and a lower pool elevation of Purpose and Scope The purpose of this study was to evaluate the hydraulic performance of the Greenup auxiliary lock after a 183 m extension and to modify the filling and emptying system, if necessary, to provide an acceptable design. Two alternatives were proposed for this study. One alternative is to keep the original F&E system while the other includes adding a separate F&E system for the lock extension. The specific objectives of the study were to determine: a) Performance of the additional F&E System b) Filling and emptying times for various valve speeds at the design lift of 9.14 m. c) Hawser forces exerted on barges moored in the lock chamber. d) Pressures in the filling and emptying system. e) Overall system performance. A laboratory model was used to evaluate the performance of the filling and emptying system. Model studies of lock filling and emptying systems designed for barge traffic have targeted maximum hawser forces of kn as a design objective. System design and operation for new projects are optimized such that a full tow at design draft produce hawser forces of kn or less during lock operations at the design pool conditions (EM ). 2. Physical Model 2.1 Description A 1:25 model was built to reproduce the upper and lower approach, complete with dummy main lock, and the extended auxiliary lock with the intake, filling and emptying culvert and valves, and the discharge system (Figure 2). The upper approach, lower approach, lock chamber floor and walls, and the miter gates were constructed of plastic-coated plywood. The filling and emptying system, including the intake, filling and emptying culvert, and the discharge outlet were constructed of acrylic plastic and the filling and emptying valves were built from brass. Initially, the model included the extended lock chamber without an addition to the F&E system. This design is referred to as the Type 1 design. The lock extension using a separate F&E system to fill and empty the downstream end of the chamber is referred as the Type 2 design.

4 Figure 2. Model Photo Looking Downstream. The existing filling system consists of one intake located in the left guide wall (looking downstream) that contains eight ports 3.66 m high by 2.5 m wide with a intake port-to-culvert area ratio at the filling valve well of 2.7. The flow into the intake feeds a rectangular culvert that is 5.49 m high by 4.88 m wide. The culvert delivers flow to a set of laterals located in the upper part of the lock chamber floor. The laterals are centered in the original 183 m lock chamber. By extending the lock walls by 183 m nominally, the laterals remain in the upper part of the lock chamber (Type 1 design) and portrays an unbalanced filling system. The laterals also serve as the emptying system. During empty the flow exists through the laterals into a single culvert (5.49 m by 4.88 m) that carries the discharge into the lower approach. The additional filling and emptying system (Type 2) consists of an intake located behind the land side lock wall that contains four ports, which are 5.47 m high by 3.05 m with a intake port-to-culvert area ratio at the filling valve well of 4.3 (Figure 3). The flow into the intake feeds into a rectangular culvert 5.49 m high by 4.88 m wide. The supplemental culvert delivers flow to a set of laterals located in the lower part of the lock chamber floor. Figure 3. Plan view of Greenup extended lock, Type 2 design (scale 1:25). Eighteen aluminum barges, each simulating a length of m and width of m, tied together in a 3 by 6 tow arrangement, were loaded with weights to reproduce the desired 2.74-m draft.

5 2.2 Appurtenances and Instrumentation Water was supplied to the model through a circulating system. The upper and lower pools were maintained at near constant elevations during the filling and emptying operations using constant-head skimming weirs in the model head bay and tail bay. During a typical filling operation, excess flow was allowed to drain over the weirs at the beginning of the fill operation and minimal flow over the weir was maintained at the peak discharge thereby minimizing the drawdown in the upper reservoir. The opposite of this operation was performed during lock emptying. Upper and lower pool elevations were set to the desired level by adjusting the skimming weirs and reading piezometers placed in calm areas of the upper and lower pools. Water-surface elevations inside the chamber were determined from electronic pressure cells located in the middle and on each end of the lock chamber. Histories of the end-to-end watersurface differential were also recorded during filling and emptying operations. An automated data acquisition and control program was used to control valve operations and collect pressure and strain gauge data. The data were usually collected at a sampling rate of 50 Hz. Some of the hawser force and lock filling and emptying data were collected at 10 Hz. The processed data were used to reveal lock filling and emptying times, longitudinal and transverse hawser forces, and pressures downstream from the filling and emptying valves. A hawser-pull (force links) device was used to measure the longitudinal and transverse forces acting on the tow in the lock chamber during filling and emptying operations. Three such devices were used: one measured longitudinal forces and the other two measured transverse forces on the downstream and upstream ends of the tow, respectively. When the device was mounted on the tow, one end of the link was pin-connected to the tow while the other end was engaged to a fixed vertical rod. While connected to the tow, the link was free to move up and down with changes in the water-surface in the lock. 2.3 Similitude for lock models Complete similitude in a laboratory model is attained when geometric, kinematic, and dynamic similitudes are satisfied. Physical models of hydraulic structures with both internal flow (pressure flow) and external flow (free surface) typically are scaled using kinematic (Froudian) similitude at a large enough scale so that the viscous effects in the scaled model can be neglected. More than 50 model and 10 prototype studies of lock filling and emptying systems have been investigated (Pickett and Neilson 1988). The majority of these physical model studies used a scale of 1 to 25 (model to prototype). Lock model velocities scaled using kinematic similitude (model Froude number equal to prototype Froude number) in a 1:25-scale model have maximum Reynolds numbers at peak discharges on the order of 10 5 yet the corresponding prototype values are on the order of Boundary friction losses in lock culverts are empirically described using the smooth- pipe curve of the Darcy-Weisbach friction factor where the headloss is expressed as H f = f L D 2 V 2g where H f is the headloss due to boundary friction, f is the Darcy-Weisbach friction factor, L is the culvert length, and D is the culvert diameter. The Darcy-Weisbach friction factor for turbulent flow in smooth pipes is given in an implicit form (Vennard and Street 1982) 1 f = 2.0 log ( N R f )- 0.8

6 Because f decreases with increasing N R, the model is hydraulically too rough. The scaled friction losses in the model will be larger than those experienced by the prototype structure. Consequently, the scaled velocities (and discharges) in the model will be less and the scaled pressures within the culverts will be higher than those of the prototype. Low pressures were not a major concern with the Lock Research model s design; however, the lower discharges would in turn result in longer filling and emptying times in the model than the prototype will experience. Prototype filling and emptying times for similar designs will be less than those measured in a 1:25-scale lock model. This study used a 1:25-scale Froudian model in which the viscous differences were small and could be estimated based on previously reported model-to-prototype comparisons. Setting the model and prototype Froude numbers equal results in the following relations between the dimensions and hydraulic quantities: Characteristic Dimension 1 Scale Relation Model : Prototype Length L r = L 1:25 Pressure P r = L r 1:25 Area 2 A r = L r 1:625 Velocity 1/2 V r = L r 1:5 Discharge 5/2 Q r = L r 1:3, 125 Time T r = L 1/2 r 1:5 Force 3 F r = L r 1:15,625 1 Dimensions are in terms of length. These relations were used to transfer model data to prototype equivalents and vice versa. 2.4 Experimental Procedures Evaluation of the various elements of the lock system was based on data obtained during typical filling and emptying operations. Performance was based primarily on hawser forces on tows in lockage, roughness of the water surface, pressures, and time required for filling and emptying. 3. Model Experiments and Results 3.1 Filling Operations Initial model experiments were performed to evaluate the performance of the extended lock using only the existing filling system with a lift of 9.14 m and a lateral port submergence of 4.57 m. The lateral port submergence is defined as the distance from the lower pool to the top of the lateral port. Figure 4 shows typical time histories of water-surface and hawser forces during filling with a 9.14-m lift and 9-min filling valve. The maximum downstream longitudinal hawser was -105 kn and occurred between 4 and 5 min into the filling operation. The negative sign indicates the longitudinal hawser force is in the downstream direction. This exceeds the kn target for acceptable chamber operations. The time history of the longitudinal hawser force illustrates the conditions that exist with a F&E system that only fills in the upper half of the lock chamber.

7 Figure 4. Time History of Water-Surface and Hawser Forces During Filling Operation. The longitudinal hawser forces remain in the downstream direction until 10 min into the filling cycle. The maximum upstream transverse hawser forces measured during filling with a 9.14 m lift and 9-min valve were 11.6 kn to the left side (looking downstream) of the chamber and 20.5 kn to the right side of the chamber. The negative sign represents a transverse hawser force that moves the barges to the left side of the chamber. A positive transverse hawser would move the barges to the right side of the chamber. The maximum downstream hawser forces measured during filling with a 9.14 m lift and 9-min valve were 21.4 kn to the left side of the chamber and 20.5 kn to the right side of the chamber. The transverse hawser forces did not exceed the kn limit with the 9.14 m lift and 9-min filling valve. To determine the filling time required to maintain kn hawser forces or less with a 9.14 m lift, experiments were conducted with filling valve operations of 9, 15, and 20 min. The results from these experiments and the results for the type 2 design are shown in Figure 5. The longitudinal forces are significantly lower with the Type 2 design. Figure 5. Longitudinal Forces During the Filling Cycle.

8 3.2 Emptying operations Similar experiments were conducted to evaluate the performance of the lock chamber during emptying, using 1.0-, 3.0- and 5.0-min valve schedules. Figure 6 shows the longitudinal hawser forces obtained from these tests for both design types. The hawser force magnitudes were considerably lower than those measured during the filling cycle and again the type 2 design produced lower forces on the moored tow as compared to the Type 1 design. Figure 6. Longitudinal forces during the emptying cycle. 4. Summary and Conclusions Tables 1 and 2 show filling and emptying times and valve operations required to maintain hawser forces of kn or less for the different design types. The supplemental system reduced the filling time by 13 minutes and the emptying time by 9.5 minutes, improving chamber performance by a factor of 2 in both cases. Results show that using the existing lateral system for the 183-m lock to fill the 366-m extended lock will be inherently slow since the filling is being conducted from one end of the chamber. The system is unbalanced and unable to provide even flow distribution within the chamber. As shown on Table 1, a filling time of 24.1 min was required for safe operating conditions with the 9.14-m lift. Results show that by adding a separate F&E system on the downstream end of the lock chamber considerably reduces the filling and emptying times. Table 1. Acceptable operation times with 9.14-m lift Design Type Filling Operation Valve Time Filling Time (min.) (min.)

9 Table 2. Acceptable operation times with 9.14-m lift Design Type Emptying Operation Valve Time (min.) Emptying Time (min.) Acknowledgement The laboratory experiments presented in this paper were based on studies conducted by the U.S. Army Engineer Research and Development Center. Funding for the research effort was provided through the Civil Works Program of the U.S. Army Corps of Engineers. Permission has been granted by the Corps of Engineers to publish this paper. References Pickett, E. B., and Neilson, F. M. (1988). Lock hydraulic system model and prototype study data, Miscellaneous Paper Hl-88-1, U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS U.S. Army Corps of Engineers (1995). EM , Planning and design of navigation locks. U.S. Army Corps of Engineers (1995). EM , Hydraulic design of navigation locks. U.S. Army Corps of Engineers (1995). EM , Layout and Design of Shallow-Draft Waterways, Vennard, J. K. and Street, R. L. (1982). Elementary Fluid Mechanics, 6 th edition, John Wiley and Sons, New York.

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-12-1 New Lock for Soo Locks and Dam, Model nvestigations during 26 21, Sault Ste. Marie, Michigan, St. Mary s River Hydraulic Model nvestigation John E. Hite, Jr. and Carlos Bislip-Morales

More information

PAK BENG HYDROPOWER PROJECT

PAK BENG HYDROPOWER PROJECT PAK BENG HYDROPOWER PROJECT Hydraulic Physical Model Investigation of Filling and Emptying System September 2015 CONTENTS Page 1 PREFACE... - 1-2 DESIGN FEATURES... - 1-2.1 NAVIGABLE WATER LEVEL...- 1-2.2

More information

Physical Model Study of the San Antonio River Lock System

Physical Model Study of the San Antonio River Lock System ST. ANTHONY FALLS LABORATORY Engineering, Environmental and Geophysical Fluid Dynamics PROJECT REPORT 471 Physical Model Study of the San Antonio River Lock System By Omid Mohseni, Richard Christopher,

More information

Physical Model for the Filling and Emptying System of the Third Set of Panama locks

Physical Model for the Filling and Emptying System of the Third Set of Panama locks Physical Model for the Filling and Emptying System of the Third Set of Panama locks Roumieu P. CNR - Consorcio Pos Panamax France p.roumieu@cnr.tm.fr De Regge J Technum Consorcio Pos Panamax Belgium jdr@technum.be

More information

CLAIBORNE LOCK AND DAM PERTINENT DATA

CLAIBORNE LOCK AND DAM PERTINENT DATA CLAIBORNE LOCK AND DAM PERTINENT DATA GENERAL Location Clarke, Monroe, & Wilcox Counties, Alabama; Alabama River, river mile 72.5 Drainage area Millers Ferry to Claiborne sq. mi. 836 Total drainage area

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

Effect of Fluid Density and Temperature on Discharge Coefficient of Ogee Spillways Using Physical Models

Effect of Fluid Density and Temperature on Discharge Coefficient of Ogee Spillways Using Physical Models RESEARCH ARTICLE Effect of Fluid Density and Temperature on Discharge Coefficient of Ogee Spillways Using Physical Models M. SREENIVASULU REDDY 1 DR Y. RAMALINGA REDDY 2 Assistant Professor, School of

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-15-2 Monitoring Completed Navigation Projects (MCNP) Program Hydraulic Evaluation of Marmet Lock Filling and Emptying System, Kanawha River, West Virginia Richard L. Stockstill April 2015 Coastal

More information

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN Elsa Alves *, Felix Hernando and Rafael Chacón * Laboratório Nacional de Engenharia Civil (LNEC) Av. do Brasil, 101, 1700-066 Lisboa, Portugal

More information

Experiment 8: Minor Losses

Experiment 8: Minor Losses Experiment 8: Minor Losses Purpose: To determine the loss factors for flow through a range of pipe fittings including bends, a contraction, an enlargement and a gate-valve. Introduction: Energy losses

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17421 21415 3 Hours / 100 Marks Seat No. Instructions : (1) All Questions are compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary.

More information

Irrigation &Hydraulics Department lb / ft to kg/lit.

Irrigation &Hydraulics Department lb / ft to kg/lit. CAIRO UNIVERSITY FLUID MECHANICS Faculty of Engineering nd Year CIVIL ENG. Irrigation &Hydraulics Department 010-011 1. FLUID PROPERTIES 1. Identify the dimensions and units for the following engineering

More information

BY THOMAS M. WALSKI, BRIAN LUBENOW, AND JEFFREY SPAIDE. When they install a branch from a water distribution main,

BY THOMAS M. WALSKI, BRIAN LUBENOW, AND JEFFREY SPAIDE. When they install a branch from a water distribution main, BY THOMAS M. WALSKI, BRIAN LUBENOW, AND JEFFREY SPAIDE When they install a branch from a water distribution main, water utility managers often debate the benefits of using a tap as opposed to shutting

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

Zebra Mussel Research Technical Notes

Zebra Mussel Research Technical Notes US Army Corps of Engineers Waterways Experiment Station Zebra Mussel Research Technical Notes Section 3 Control Strategies Technical Note ZMR-3-08 November 1992 Components of Navigation Locks and Dams

More information

Instruction Manual. Pipe Friction Training Panel

Instruction Manual. Pipe Friction Training Panel Instruction Manual HL 102 Pipe Friction Training Panel 100 90 80 70 60 50 40 30 20 10 HL 102 Instruction Manual This manual must be kept by the unit. Before operating the unit: - Read this manual. - All

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

UNIT 15 WATER HAMMER AND SURGE TANKS

UNIT 15 WATER HAMMER AND SURGE TANKS UNT 15 WATER HAMMER AND SURGE TANKS Structure 15.1 ntroduction Objectives 15.2 Water Hammer 15.2.1 Expression for Rise in Pressure 15.3 Rapid Acceleration of Flow 15.4 Surge Tanks 15.5 Summary 15.6 Keywords

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

Investigation of Suction Process of Scroll Compressors

Investigation of Suction Process of Scroll Compressors Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 2006 Investigation of Suction Process of Scroll Compressors Michael M. Cui Trane Jack Sauls

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-15-10 Monitoring Completed Navigation Projects (MCNP) Program Marmet Locks and Dam, Kanawha River, West Virginia Donald C. Wilson, Larry R. Tolliver, and Kevin L. Pigg July 2015 Coastal and

More information

Experiment (13): Flow channel

Experiment (13): Flow channel Experiment (13): Flow channel Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface

More information

Laboratory studies of water column separation

Laboratory studies of water column separation IOP Conference Series: Materials Science and Engineering OPEN ACCESS Laboratory studies of water column separation To cite this article: R Autrique and E Rodal 2013 IOP Conf. Ser.: Mater. Sci. Eng. 52

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia. FRST 557 Lecture 7c Bridges and Culverts: Water Velocity and Discharge Lesson Background and Overview: The previous two lessons presented methods for estimating water volume flow at a particular site and

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM Akshay Haldankar 1, Mahesh Bhadra 2, Rahul Harad 3, Darpan Kapre 4, Dipali Patil 5 1,2,3,4 Under graduate,dept. of Civil Engineering, DRIEMS Neral. 5Assistant

More information

INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA)

INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA) INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA) Abdelazim M. Ali Researcher, The Hydraulics Research Institute, National Water Research Center,

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm Return-Suction Filters E 8 E 98 Tank top mounting Connection up to G½ / - SE and SE Nominal flow rate up to 6 l/min / 8. gpm Description pplication For operation in units with hydrostatic drives, when

More information

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 4 Hydraulics Jumps Lecture - 4 Features of Hydraulic Jumps (Refer Slide

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

EFFECTS OF SIDEWALL OPENINGS ON THE WIND LOADS ON PIPE-FRAMED GREENHOUSES

EFFECTS OF SIDEWALL OPENINGS ON THE WIND LOADS ON PIPE-FRAMED GREENHOUSES The Seventh Asia-Pacific Conference on Wind Engineering, November 8-12, 29, Taipei, Taiwan EFFECTS OF SIDEWALL OPENINGS ON THE WIND LOADS ON PIPE-FRAMED GREENHOUSES Yasushi Uematsu 1, Koichi Nakahara 2,

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

NUMERICAL AND PHYSICAL MODELING

NUMERICAL AND PHYSICAL MODELING POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg,

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17421 15116 3 Hours / 100 Seat No. Instructions (1) All Questions are Compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary. (4)

More information

RESIDENTIAL WATER DISTRIBUTION

RESIDENTIAL WATER DISTRIBUTION RESIDENTIAL WATER DISTRIBUTION This case study demonstrates the steady-state simulation of the fresh water (drinking water) reticulation system in a small village. WATER RETICULATION Page1 WATER RETICULATION

More information

HYDRAULIC JUMP AND WEIR FLOW

HYDRAULIC JUMP AND WEIR FLOW HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

Free Surface Flow Simulation with ACUSIM in the Water Industry

Free Surface Flow Simulation with ACUSIM in the Water Industry Free Surface Flow Simulation with ACUSIM in the Water Industry Tuan Ta Research Scientist, Innovation, Thames Water Kempton Water Treatment Works, Innovation, Feltham Hill Road, Hanworth, TW13 6XH, UK.

More information

SUMMARY PROBLEMS CAUSED BY BACKFLOW IN PIPE SYSTEMS.

SUMMARY PROBLEMS CAUSED BY BACKFLOW IN PIPE SYSTEMS. Page 1 of 11 SUMMARY There are many problems derived from a reverse flow in a piping system. A solution presented in this paper is the WaStop inline check valve. The paper aims to explain some of the important

More information

E 328 E 498 Tank top mounting Connection up to G1½ and SAE 2 Nominal flow rate up to 600 l/min

E 328 E 498 Tank top mounting Connection up to G1½ and SAE 2 Nominal flow rate up to 600 l/min Return-Suction Filters E 8 E 98 Tank top mounting Connection up to G½ and SE Nominal flow rate up to 6 l/min Description pplication For operation in units with hydrostatic drives, when the return flow

More information

Broadly speaking, there are four different types of structures, each with its own particular function:

Broadly speaking, there are four different types of structures, each with its own particular function: 3 The selection of structures 3.1 Introduction In selecting a suitable structure to measure or regulate the flow rate in open channels, all demands that will be made upon the structure should be listed.

More information

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 4 Hydraulic Jumps Lecture - 1 Rapidly Varied Flow- Introduction Welcome

More information

Hydraulic Design of Navigation Locks

Hydraulic Design of Navigation Locks 1 May 2006 US Army Corps of Engineers ENGINEERING AND DESIGN Hydraulic Design of Navigation Locks ENGINEER MANUAL AVAILABILITY Electronic copies of this and other U.S. Army Corps of Engineers (USACE) publications

More information

Impact of anti-vortex blade position on discharge experimental study on the coefficient of morning glory spillway

Impact of anti-vortex blade position on discharge experimental study on the coefficient of morning glory spillway Journal of Scientific Research and Development (7): 91-95, 015 Available online at www.jsrad.org ISSN 1115-7569 015 JSRAD Impact of anti-vortex blade position on discharge experimental study on the coefficient

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

2. RAPIDLY-VARIED FLOW (RVF) AUTUMN 2018

2. RAPIDLY-VARIED FLOW (RVF) AUTUMN 2018 2. RAPIDLY-VARIED FLOW (RVF) AUTUMN 2018 Rapidly-varied flow is a significant change in water depth over a short distance (a few times water depth). It occurs where there is a local disturbance to the

More information

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018 ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018 Section 1.2 Example. The discharge in a channel with bottom width 3 m is 12 m 3 s 1. If Manning s n is 0.013 m -1/3 s and the streamwise slope is 1 in 200,

More information

Discharge Coefficient in Siphon Spillway with Different Cross Sections

Discharge Coefficient in Siphon Spillway with Different Cross Sections World Applied Sciences Journal 17 (): 163-167, 01 ISSN 1818-495 IDOSI Publications, 01 Discharge Coefficient in Siphon Spillway with Different Cross Sections 1 Amin Ghafourian and Mohd. Nordin Adlan 1

More information

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Cover Page for Lab Report Group Portion. Head Losses in Pipes Cover Page for Lab Report Group Portion Head Losses in Pipes Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 February 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section

More information

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 28th, 1:30 PM The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam E. A. Thompson Sacramento District

More information

SUBMERGED VENTURI FLUME. Tom Gill 1 Robert Einhellig 2 ABSTRACT

SUBMERGED VENTURI FLUME. Tom Gill 1 Robert Einhellig 2 ABSTRACT SUBMERGED VENTURI FLUME Tom Gill 1 Robert Einhellig 2 ABSTRACT Improvement in canal operating efficiency begins with establishing the ability to measure flow at key points in the delivery system. The lack

More information

Experiment Instructions

Experiment Instructions Experiment Instructions Syphon Spillway Experiment Instructions Please read and follow the instructions before the first installation! Publication-no.: 917.000 36 A 160 02 (A) 01/2000, (DTP_2), 05/1999

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

The Estimation Of Compressor Performance Using A Theoretical Analysis Of The Gas Flow Through the Muffler Combined With Valve Motion

The Estimation Of Compressor Performance Using A Theoretical Analysis Of The Gas Flow Through the Muffler Combined With Valve Motion Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering The Estimation Of Compressor Performance Using A Theoretical Analysis Of The Gas Flow Through

More information

WIND-INDUCED LOADS OVER DOUBLE CANTILEVER BRIDGES UNDER CONSTRUCTION

WIND-INDUCED LOADS OVER DOUBLE CANTILEVER BRIDGES UNDER CONSTRUCTION WIND-INDUCED LOADS OVER DOUBLE CANTILEVER BRIDGES UNDER CONSTRUCTION S. Pindado, J. Meseguer, J. M. Perales, A. Sanz-Andres and A. Martinez Key words: Wind loads, bridge construction, yawing moment. Abstract.

More information

APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS. SEC Project No

APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS. SEC Project No APPLYING VARIABLE SPEED PRESSURE LIMITING CONTROL DRIVER FIRE PUMPS SEC Project No. 1803007-000 November 20, 2006 TABLE OF CONTENTS I. ABSTRACT...1 II. INTRODUCTION...1 III. HISTORY...2 IV. VARIABLE SPEED

More information

Nautical Studies to Define Layout Requirements for a New Sea Lock at IJmuiden

Nautical Studies to Define Layout Requirements for a New Sea Lock at IJmuiden Nautical Studies to Define Layout Requirements for a New Sea Lock at IJmuiden Wim Kortlever, Rijkswaterstaat Freek Verkerk, MARIN photo Flanders Hydraulics Research Smart Ports Seminar April 23, Wageningen

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

6. EXPERIMENTAL METHOD. A primary result of the current research effort is the design of an experimental

6. EXPERIMENTAL METHOD. A primary result of the current research effort is the design of an experimental 6. EXPERIMENTAL METHOD 6.1 Introduction A primary result of the current research effort is the design of an experimental setup that can simulate the interaction of a windmill with a vortex wake and record

More information

Course Teacher: Prof. Dr. M. R. Kabir SPILLWAY & IRRIGATION PUMPS. Spillway:

Course Teacher: Prof. Dr. M. R. Kabir SPILLWAY & IRRIGATION PUMPS. Spillway: Spillway: CHAPTER 10 The spillways are openings provided at the body of the dam to discharge safely the excess water or flood water when the water level rises above the normal pool level. Necessity of

More information

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1

Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Minggui Zhou 1, Dano Roelvink 2,4, Henk Verheij 3,4 and Han Ligteringen 2,3 1 School of Naval Architecture, Ocean and Civil Engineering,

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-D Engineer Manual 1110-2-1610 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDRAULIC DESIGN OF LOCK CULVERT VALVES EM 1110-2-1610 10 July

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-D Engineer Manual 1110-2-1610 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDRAULIC DESIGN OF LOCK CULVERT VALVES EM 1110-2-1610 10 July

More information

External Pressure Coefficients on Saw-tooth and Mono-sloped Roofs

External Pressure Coefficients on Saw-tooth and Mono-sloped Roofs External Pressure Coefficients on Saw-tooth and Mono-sloped Roofs Authors: Bo Cui, Ph.D. Candidate, Clemson University, 109 Lowry Hall, Clemson, SC 9634-0911, boc@clemson.edu David O. Prevatt, Assistant

More information

Wave Transmission Testing of the Martin Ecosystems BioHaven Floating Breakwater

Wave Transmission Testing of the Martin Ecosystems BioHaven Floating Breakwater Wave Transmission Testing of the Martin Ecosystems BioHaven Floating Breakwater March 14, 2014 Submitted by: Bret M. Webb, Ph.D., P.E. Assistant Professor Department of Civil Engineering University of

More information

ITTC Recommended Procedures and Guidelines

ITTC Recommended Procedures and Guidelines Page 1 of 6 Table of Contents 1. PURPOSE...2 2. PARAMETERS...2 2.1 General Considerations...2 3 DESCRIPTION OF PROCEDURE...2 3.1 Model Design and Construction...2 3.2 Measurements...3 3.5 Execution of

More information

Middle East Technical University Department of Mechanical Engineering ME 305 Fluid Mechanics I Fall 2018 Section 4 (Dr.

Middle East Technical University Department of Mechanical Engineering ME 305 Fluid Mechanics I Fall 2018 Section 4 (Dr. Middle East Technical University Department of Mechanical Engineering ME 305 Fluid Mechanics I Fall 2018 Section 4 (Dr. Sert) Study Set 2 Reading Assignments You can find the answers of some of the following

More information

CEE 345, Part 2, Winter 2012, Final Exam Solutions (Open Channel Flow)

CEE 345, Part 2, Winter 2012, Final Exam Solutions (Open Channel Flow) CEE 45, Part, Winter 0, Final Exam Solutions (Open Channel Flow). (a) (8) List and briefl describe the forces that must be considered in an analsis of flow in a trapezoidal channel with a slope of 0.006.

More information

E 158 E 198 E 248. Tank top mounting Connection up to G11 / 4 Nominal flow rate up to 250 l/min e d

E 158 E 198 E 248. Tank top mounting Connection up to G11 / 4 Nominal flow rate up to 250 l/min e d R e t u r n - S u c t i o n F i l t e rs E 158 E 198 E 248 Tank top mounting Connection up to G11 / 4 Nominal flow rate up to 250 l/min 20.90-5e 0.0-2d D e s c r i p t i o n Application For operation in

More information

Folsom Dam Joint Federal Project Existing Spillway Modeling

Folsom Dam Joint Federal Project Existing Spillway Modeling Hydraulic Laboratory Report HL-2009-02 Folsom Dam Joint Federal Project Existing Spillway Modeling Discharge Capacity Studies AMERICAN RIVER DIVISION CENTRAL VALLEY PROJECT MID-PACIFIC REGION U.S. Department

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-12-8 Navigation Systems Research Program Emergency Closure of Uncontrolled Flow at Locks and Dams Stephen T. Maynord and Richard L. Stockstill June 2012 Coastal and Hydraulics Laboratory Approved

More information

Quantification of the Effects of Turbulence in Wind on the Flutter Stability of Suspension Bridges

Quantification of the Effects of Turbulence in Wind on the Flutter Stability of Suspension Bridges Quantification of the Effects of Turbulence in Wind on the Flutter Stability of Suspension Bridges T. Abbas 1 and G. Morgenthal 2 1 PhD candidate, Graduate College 1462, Department of Civil Engineering,

More information

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C Exercise 2-3 EXERCISE OBJECTIVE C C C To describe the operation of a flow control valve; To establish the relationship between flow rate and velocity; To operate meter-in, meter-out, and bypass flow control

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

E 084 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 80 l/min / 21.1 gpm

E 084 Tank top mounting Connection up to G1 / -16 SAE Nominal flow rate up to 80 l/min / 21.1 gpm Return-Suction Filters E 08 Tank top mounting Connection up to G / -6 SE Nominal flow rate up to 80 l/min /. gpm Description pplication For operation in units with hydrostatic drives, when the return flow

More information

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1) Modeling and Field Verification Study of Air Slam Conditions on kalanit Pipeline System By Yiftach Brunner & Sathish Kumar ir valves are integral part of long water transmission mains and are essential

More information

Large-scale Field Test

Large-scale Field Test Vaskinn 1 Large-scale Field Test Kjetil Arne Vaskinn kav@trh.statkraftgroner.no Statkraft Grøner AS SUMMARY The objective the controlled failure of large-scale embankment is to monitor and record the failure

More information

The Physical Model Study of the Folsom Dam Auxiliary Spillway System

The Physical Model Study of the Folsom Dam Auxiliary Spillway System ST. ANTHONY FALLS LABORATORY Engineering, Environmental and Geophysical Fluid Dynamics PROJECT REPORT 511 The Physical Model Study of the Folsom Dam Auxiliary Spillway System By Matthew L. Lueker, Omid

More information

IMPACT OF MAKING THE CREST OF WEIR MULTIFACETED ON DISCHARGE COEFFICIENT OF MORNING GLORY SPILLWAY

IMPACT OF MAKING THE CREST OF WEIR MULTIFACETED ON DISCHARGE COEFFICIENT OF MORNING GLORY SPILLWAY IMPACT OF MAKING THE CREST OF WEIR MULTIFACETED ON DISCHARGE COEFFICIENT OF MORNING GLORY SPILLWAY Ali Bagheri 1 and *Ebrahim Nohani 2 1 Department of Water Engineering, Qaemshahr Branch, Islamic Azad

More information

Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Roughness

Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Roughness Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Md. Rafiue Islam a, Shariful Islam b*, Md. Abdul Qaiyum Talukder c, S. M. Rezwan Hossain d Abstract Bed

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 3-2 Orifice Plates EXERCISE OBJECTIVE In this exercise, you will study how differential pressure flowmeters operate. You will describe the relationship between the flow rate and the pressure drop

More information

H16 Losses in Piping Systems

H16 Losses in Piping Systems H16 Losses in Piping Systems The equipment described in this manual is manufactured and distributed by TECQUIPMENT LIMITED Suppliers of technological laboratory equipment designed for teaching. BONSALL

More information

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms.

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms. CGU HS Committee on River Ice Processes and the Environment 18 th Workshop on the Hydraulics of Ice Covered Rivers Quebec City, QC, Canada, August 18-20, 2015 Design and Installation of two Permanent Booms

More information

INTERACTION BETWEEN WIND-DRIVEN AND BUOYANCY-DRIVEN NATURAL VENTILATION Bo Wang, Foster and Partners, London, UK

INTERACTION BETWEEN WIND-DRIVEN AND BUOYANCY-DRIVEN NATURAL VENTILATION Bo Wang, Foster and Partners, London, UK INTERACTION BETWEEN WIND-DRIVEN AND BUOYANCY-DRIVEN NATURAL VENTILATION Bo Wang, Foster and Partners, London, UK ABSTRACT Ventilation stacks are becoming increasingly common in the design of naturally

More information

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010. BChydro CD FOR GEf\lE IONS B-2 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 bchydroregulatorygroup@bchydro.com January 19, 2010 Ms. Erica M. Hamilton Commission Secretary

More information

International Journal of Technical Research and Applications e-issn: , Volume 4, Issue 3 (May-June, 2016), PP.

International Journal of Technical Research and Applications e-issn: ,  Volume 4, Issue 3 (May-June, 2016), PP. DESIGN AND ANALYSIS OF FEED CHECK VALVE AS CONTROL VALVE USING CFD SOFTWARE R.Nikhil M.Tech Student Industrial & Production Engineering National Institute of Engineering Mysuru, Karnataka, India -570008

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

Part 5: Mooring forces and vessel behaviour in locks Experience in Belgium. Mooring forces and vessel behaviour in locks:

Part 5: Mooring forces and vessel behaviour in locks Experience in Belgium. Mooring forces and vessel behaviour in locks: PIANC Workshop 13-14th 14th September 211 Part 5: Mooring forces and vessel behaviour in locks Experience in Belgium By T. DE MULDER & M. VANTORRE BELGIUM Mooring forces and vessel behaviour in locks:

More information

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD ST. LOUIS SECTION PROJECT OF THE YEAR AWARD Originality and Innovation The St. Louis Harbor Project is located in the Upper Mississippi River between the entrance to the Chain of Rocks Canal at River

More information

COEFFICIENT OF DISCHARGE OF CHIMNEY WEIR UNDER FREE AND SUBMERGED FLOW CONDITIONS

COEFFICIENT OF DISCHARGE OF CHIMNEY WEIR UNDER FREE AND SUBMERGED FLOW CONDITIONS COEFFICIENT OF DISCHARGE OF CHIMNEY WEIR UNDER FREE AND SUBMERGED FLOW CONDITIONS Hanaa A.M.Hayawi Amal A.G.Yahya Ghania A.M.Hayawi College Of Engineering University Of Mosul Abstract: The main objective

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2010

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 4, 2010 Effect of geometric dimensions on the transmission coefficient of floating breakwaters Mohammad Hosein Tadayon, Khosro Bargi 2, Hesam Sharifian, S. Reza Hoseini - Ph.D student, Department of Civil Engineering,

More information

The Discussion of this exercise covers the following points: Pumps Basic operation of a liquid pump Types of liquid pumps The centrifugal pump.

The Discussion of this exercise covers the following points: Pumps Basic operation of a liquid pump Types of liquid pumps The centrifugal pump. Exercise 2-3 Centrifugal Pumps EXERCISE OBJECTIVE In this exercise, you will become familiar with the operation of a centrifugal pump and read its performance chart. You will also observe the effect that

More information

2O-2 Open Channel Flow

2O-2 Open Channel Flow Iowa Stormwater Management Manual O- O- Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The procedures for performing

More information

Evaluation of step s slope on energy dissipation in stepped spillway

Evaluation of step s slope on energy dissipation in stepped spillway International Journal of Engineering & Technology, 3 (4) (2014) 501-505 Science Publishing Corporation www.sciencepubco.com/index.php/ijet doi: 10.14419/ijet.v3i4.3561 Research Paper Evaluation of step

More information

EFFECTS ON CUTTER SUCTION DREDGE PRODUCTION WHILE DREDGING SIMULATED DEBRIS IN THE LABORATORY

EFFECTS ON CUTTER SUCTION DREDGE PRODUCTION WHILE DREDGING SIMULATED DEBRIS IN THE LABORATORY EFFECTS ON CUTTER SUCTION DREDGE PRODUCTION WHILE DREDGING SIMULATED DEBRIS IN THE LABORATORY R. Randall 1, M. Warwick 2, J. Henriksen 3, D. Young 4, and A. Manikantan 5 ABSTRACT The cutter suction dredge

More information